Try our mobile app

Published: 2022-04-27 21:25:52 ET
<<<  go to ELP company page
0001041792 false 2021 FY --12-31 D5 ENERGY CO OF PARANA International Financial Reporting Standards P30Y P67Y10M6D P67Y6M14D P11Y7M6D P23Y5M20D P13Y2M19D P27Y0M7D P12Y4M17D P23Y1M27D P14Y0M26D P24Y11M23D 0001041792 2021-01-01 2021-12-31 0001041792 dei:BusinessContactMember 2021-01-01 2021-12-31 0001041792 2021-12-31 0001041792 elp:ClassAIssuedCapitalMember 2021-12-31 0001041792 elp:ClassBIssuedCapitalMember 2021-12-31 0001041792 2020-12-31 0001041792 2020-01-01 2020-12-31 0001041792 2019-01-01 2019-12-31 0001041792 ifrs-full:OrdinarySharesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OrdinarySharesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OrdinarySharesMember 2019-01-01 2019-12-31 0001041792 elp:ClassAPreferredSharesMember 2021-01-01 2021-12-31 0001041792 elp:ClassAPreferredSharesMember 2020-01-01 2020-12-31 0001041792 elp:ClassAPreferredSharesMember 2019-01-01 2019-12-31 0001041792 elp:ClassBPreferredStockMember 2021-01-01 2021-12-31 0001041792 elp:ClassBPreferredStockMember 2020-01-01 2020-12-31 0001041792 elp:ClassBPreferredStockMember 2019-01-01 2019-12-31 0001041792 ifrs-full:IssuedCapitalMember 2018-12-31 0001041792 elp:DeemedCostMember 2018-12-31 0001041792 elp:OtherComprehensiveIncomesMember 2018-12-31 0001041792 ifrs-full:OtherReservesMember 2018-12-31 0001041792 elp:ProfitRetentionReserveMember 2018-12-31 0001041792 elp:AdditionalDividendsProposedFromTheNonCapitalizedEarningReserveMember 2018-12-31 0001041792 ifrs-full:RetainedEarningsMember 2018-12-31 0001041792 elp:ShareholdersEquitySubtotalMember 2018-12-31 0001041792 elp:NoncontrollingInterest1Member 2018-12-31 0001041792 2018-12-31 0001041792 ifrs-full:IssuedCapitalMember 2019-12-31 0001041792 elp:DeemedCostMember 2019-12-31 0001041792 elp:OtherComprehensiveIncomesMember 2019-12-31 0001041792 ifrs-full:OtherReservesMember 2019-12-31 0001041792 elp:ProfitRetentionReserveMember 2019-12-31 0001041792 elp:AdditionalDividendsProposedFromTheNonCapitalizedEarningReserveMember 2019-12-31 0001041792 ifrs-full:RetainedEarningsMember 2019-12-31 0001041792 elp:ShareholdersEquitySubtotalMember 2019-12-31 0001041792 elp:NoncontrollingInterest1Member 2019-12-31 0001041792 2019-12-31 0001041792 ifrs-full:IssuedCapitalMember 2020-12-31 0001041792 elp:DeemedCostMember 2020-12-31 0001041792 elp:OtherComprehensiveIncomesMember 2020-12-31 0001041792 ifrs-full:OtherReservesMember 2020-12-31 0001041792 elp:ProfitRetentionReserveMember 2020-12-31 0001041792 elp:AdditionalDividendsProposedFromTheNonCapitalizedEarningReserveMember 2020-12-31 0001041792 ifrs-full:RetainedEarningsMember 2020-12-31 0001041792 elp:ShareholdersEquitySubtotalMember 2020-12-31 0001041792 elp:NoncontrollingInterest1Member 2020-12-31 0001041792 ifrs-full:IssuedCapitalMember 2019-01-01 2019-12-31 0001041792 elp:DeemedCostMember 2019-01-01 2019-12-31 0001041792 elp:OtherComprehensiveIncomesMember 2019-01-01 2019-12-31 0001041792 ifrs-full:OtherReservesMember 2019-01-01 2019-12-31 0001041792 elp:ProfitRetentionReserveMember 2019-01-01 2019-12-31 0001041792 elp:AdditionalDividendsProposedFromTheNonCapitalizedEarningReserveMember 2019-01-01 2019-12-31 0001041792 ifrs-full:RetainedEarningsMember 2019-01-01 2019-12-31 0001041792 elp:ShareholdersEquitySubtotalMember 2019-01-01 2019-12-31 0001041792 elp:NoncontrollingInterest1Member 2019-01-01 2019-12-31 0001041792 ifrs-full:IssuedCapitalMember 2020-01-01 2020-12-31 0001041792 elp:DeemedCostMember 2020-01-01 2020-12-31 0001041792 elp:OtherComprehensiveIncomesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OtherReservesMember 2020-01-01 2020-12-31 0001041792 elp:ProfitRetentionReserveMember 2020-01-01 2020-12-31 0001041792 elp:AdditionalDividendsProposedFromTheNonCapitalizedEarningReserveMember 2020-01-01 2020-12-31 0001041792 ifrs-full:RetainedEarningsMember 2020-01-01 2020-12-31 0001041792 elp:ShareholdersEquitySubtotalMember 2020-01-01 2020-12-31 0001041792 elp:NoncontrollingInterest1Member 2020-01-01 2020-12-31 0001041792 ifrs-full:IssuedCapitalMember 2021-01-01 2021-12-31 0001041792 elp:DeemedCostMember 2021-01-01 2021-12-31 0001041792 elp:OtherComprehensiveIncomesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherReservesMember 2021-01-01 2021-12-31 0001041792 elp:ProfitRetentionReserveMember 2021-01-01 2021-12-31 0001041792 elp:AdditionalDividendsProposedFromTheNonCapitalizedEarningReserveMember 2021-01-01 2021-12-31 0001041792 ifrs-full:RetainedEarningsMember 2021-01-01 2021-12-31 0001041792 elp:ShareholdersEquitySubtotalMember 2021-01-01 2021-12-31 0001041792 elp:NoncontrollingInterest1Member 2021-01-01 2021-12-31 0001041792 ifrs-full:IssuedCapitalMember 2021-12-31 0001041792 elp:DeemedCostMember 2021-12-31 0001041792 elp:OtherComprehensiveIncomesMember 2021-12-31 0001041792 ifrs-full:OtherReservesMember 2021-12-31 0001041792 elp:ProfitRetentionReserveMember 2021-12-31 0001041792 elp:AdditionalDividendsProposedFromTheNonCapitalizedEarningReserveMember 2021-12-31 0001041792 ifrs-full:RetainedEarningsMember 2021-12-31 0001041792 elp:ShareholdersEquitySubtotalMember 2021-12-31 0001041792 elp:NoncontrollingInterest1Member 2021-12-31 0001041792 2021-09-18 2021-09-20 0001041792 2021-09-25 2021-09-27 0001041792 elp:CopelPlantsMember elp:REH29192021Member 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:ApucaraninhaMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:CachoeiraGpsMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:CavernosoMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:ChamineMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:DerivacaodDoRioJordaoMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:GuaricanaMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:SaltocaxiasMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:SaojorgeMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29192021Member elp:SegredoMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member elp:Cavernoso2Member 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member elp:ColiderMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member elp:GovBentoMunhozMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member elp:MauaMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member elp:UhebaixoIguacuMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member elp:FundaoMember 2021-01-01 2021-12-31 0001041792 elp:CopelPlantsMember elp:REH29322021Member elp:SantaclaraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember 2021-01-01 2021-12-31 0001041792 elp:CopelDistribuicaoSAMember 2021-01-01 2021-12-31 0001041792 elp:CopelTelecomunicacoesSAMember 2021-01-01 2021-12-31 0001041792 elp:CopelServicosSACopelSERMember 2021-01-01 2021-12-31 0001041792 elp:CopelComercializacaoSAMember 2021-01-01 2021-12-31 0001041792 elp:CompanhiaParanaensedeGasCompagasMember 2021-01-01 2021-12-31 0001041792 elp:ElejorCentraisEletricasdoRioJordaoSAMember 2021-01-01 2021-12-31 0001041792 elp:UEGAraucariaLtdaMember 2021-01-01 2021-12-31 0001041792 elp:UEGAraucariaLtdaOneMember 2021-01-01 2021-12-31 0001041792 elp:SaoBentoEnergiaInvestimentoseParticipacoesSAMember 2021-01-01 2021-12-31 0001041792 elp:ParticipacoesSAMember 2021-01-01 2021-12-31 0001041792 elp:NovaAsaBrancaIEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:NovaAsaBrancaIIEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:NovaAsaBrancaIIIEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:NovaEurusIVEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:SantaMariaEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:SantaHelenaEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:VentosdeSantoUrielSAMember 2021-01-01 2021-12-31 0001041792 elp:CutiaEmpreendimentosEolicosSAMember 2021-01-01 2021-12-31 0001041792 elp:BrownfieldInvestmentHoldingLItdaOneMember 2021-01-01 2021-12-31 0001041792 elp:VentosDESerraDoMelBSAOneMember 2021-01-01 2021-12-31 0001041792 elp:VentosDESerraDoMelBSA1Member 2021-01-01 2021-12-31 0001041792 elp:CostaOesteTransmissoradeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:MarumbiTransmissoradeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:UirapuruTransmissoraDeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:BelaVistaGeracaodeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:FDAGeracaoDeEnergiaEletricaSAMember 2021-01-01 2021-12-31 0001041792 elp:JandairaIEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:JandairaIIEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:JandairaIIIEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:JandairaIVEnergiasRenovaveisSAMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB61SPESAOneMember 2021-01-01 2021-12-31 0001041792 elp:GEOlhoDaguaSAMember 2021-01-01 2021-12-31 0001041792 elp:GEBoaVistaSAMember 2021-01-01 2021-12-31 0001041792 elp:GEFarolSAMember 2021-01-01 2021-12-31 0001041792 elp:ESaoBentodoNorteSAMember 2021-01-01 2021-12-31 0001041792 elp:CentralGeradoraEolicaSaoBentodoNorteISAMember 2021-01-01 2021-12-31 0001041792 elp:CentralGeradoraEolicaSaoBentodoNorteIISAMember 2021-01-01 2021-12-31 0001041792 elp:CentralGeradoraEolicaSaoBentodoNorteIIISAMember 2021-01-01 2021-12-31 0001041792 elp:VentosDESerraDoMelBSAMember 2021-01-01 2021-12-31 0001041792 elp:CentralGeradoraEolicaSaoMiguelISAMember 2021-01-01 2021-12-31 0001041792 elp:CentralGeradoraEolicaSaoMiguelIISAMember 2021-01-01 2021-12-31 0001041792 elp:CentralGeradoraEolicaSaoMiguelIIISAMember 2021-01-01 2021-12-31 0001041792 elp:UsinadeEnergiaEolicaGuajiruSAMember 2021-01-01 2021-12-31 0001041792 elp:UsinadeEnergiaEolicaJangadaSAMember 2021-01-01 2021-12-31 0001041792 elp:UsinadeEnergiaEolicaPotiguarSAMember 2021-01-01 2021-12-31 0001041792 elp:UsinadeEnergiaEolicaCutiaSAMember 2021-01-01 2021-12-31 0001041792 elp:UsinadeEnergiaEolicaMariaHelenaSAMember 2021-01-01 2021-12-31 0001041792 elp:UsinadeEnergiaEolicaEsperancadoNordesteSAMember 2021-01-01 2021-12-31 0001041792 elp:UsinadeEnergiaEolicaParaisodosVentosdoNordesteSAMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB141SPESAMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB142SPESAMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB143SPESAMember 2021-01-01 2021-12-31 0001041792 elp:EolVentosdeVilaParaibaIVSPESAMember 2021-01-01 2021-12-31 0001041792 elp:EolVentosdeVilaParaibaIVSPESATwoMember 2021-01-01 2021-12-31 0001041792 elp:VoltaliaSaoMigueldoGostosoIParticipacoesSAMember 2021-01-01 2021-12-31 0001041792 elp:SolarParanaGDParticipcoesSAMember 2021-01-01 2021-12-31 0001041792 elp:ParanaGasExploracaoeProducaoSAMember 2021-01-01 2021-12-31 0001041792 elp:CaiuaTransmissoradeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:IntegracaoMaranhenseTransmissoradeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:MatrinchaTransmissoradeEnergiaTPNORTESAMember 2021-01-01 2021-12-31 0001041792 elp:GuaraciabaTransmissoradeEnergiaTPSULSAMember 2021-01-01 2021-12-31 0001041792 elp:ParanaibaTransmissoradeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:MatadeSantaGenebraTransmissaoSAMember 2021-01-01 2021-12-31 0001041792 elp:CantareiraTransmissoradeEnergiaSAMember 2021-01-01 2021-12-31 0001041792 elp:DonaFranciscaEnergeticaSAMember 2021-01-01 2021-12-31 0001041792 elp:FozdoChopimEnergeticaLtdaMember 2021-01-01 2021-12-31 0001041792 elp:CarbocampelSAMember 2021-01-01 2021-12-31 0001041792 elp:ConsorcioEnergeticoCruzeirodoSulMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeTMember 2021-01-01 2021-12-31 0001041792 elp:EletrosulCentraisEletricasSAMember 2021-01-01 2021-12-31 0001041792 elp:ConsorcioEmpreendedorBaixoIguacuMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeT1Member 2021-01-01 2021-12-31 0001041792 elp:GeracaoCeuAzulSAMember 2021-01-01 2021-12-31 0001041792 elp:ConsorcioCopelEnergiaaGasNaturalMember 2021-01-01 2021-12-31 0001041792 elp:CopelMember 2021-01-01 2021-12-31 0001041792 elp:ShellBrasilPetroleoLtdaMember 2021-01-01 2021-12-31 0001041792 elp:ConsorcioParanaIPMember 2021-01-01 2021-12-31 0001041792 elp:Copel1Member 2021-01-01 2021-12-31 0001041792 elp:ConsorcioBRCMember 2021-01-01 2021-12-31 0001041792 elp:BrownfieldInvestmentHoldingLItdaMember 2021-01-01 2021-12-31 0001041792 elp:BrownfieldInvestmentHoldingLItdaMember 2021-01-01 2021-12-31 0001041792 elp:VentosDESerraDoMelBSAMember 2021-01-01 2021-12-31 0001041792 elp:VentosDESerraDoMelBSA1Member 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB61SPESAMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB61SPESAMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB61SPESA1Member 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB141SPESAOneMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB141SPESAOneMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB142SPESAOneMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB142SPESAOneMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB143SPESAOneMember 2021-01-01 2021-12-31 0001041792 elp:EolPotiguarB143SPESAOneMember 2021-01-01 2021-12-31 0001041792 elp:EolVentosdeVilaParaibaIVSPESA1Member 2021-01-01 2021-12-31 0001041792 elp:EolVentosdeVilaParaibaIVSPESA1Member 2021-01-01 2021-12-31 0001041792 elp:AdjustedBookValueMember 2021-12-31 0001041792 elp:FairValueMember 2021-12-31 0001041792 ifrs-full:AtFairValueMember 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:CopelDistribuicaoSAMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:ElejorMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:Elejor1Member 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorization2Member elp:Elejor1Member 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorization1Member elp:ElejorMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:DonaFranciscaEnergeticaSAMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:UEGAraucariaMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:CompagasMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:UsinaDeEnergiaEolicaSaoJoaoSAMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:UsinaDeEnergiaEolicaCarnaubaSAMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:UsinaDeEnergiaEolicaRedutoSAMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementOrAuthorizationMember elp:UsinaDeEnergiaEolicaSantoCristoSAMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GenerationConcessionHPPGovJaymeCanetJuniorMauaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GenerationConcessionHPPColiderMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GenerationConcessionHPPColiderMember 2020-01-01 2020-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:OrdinanceSHPCavernosoIIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GenerationConcessionHPPBaixoIguacuMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPApucaraninhaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPChamineMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPDerivacaodoRioJordaoMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPCavernosoMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:TPPFigueiraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPSaoJorgeMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPGovNeyAminthasdeBarrosBragaSegredoMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPGovJoseRichaSaltoCaxiasMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GenerationConcession0012020UHEGuaricanaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:AuthorizationWPPPalmasMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HGPSaltoDoVauOnlyRegisterWithANEELMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GenerationConcession0032016HPPGovPedroViriatoParigotDeSouzaGPSMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:HPPMarumbiPowerGeneratingPlantRegistrationCGHPHPR001501602Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:AuthorizationAneel53732015HGPChopimIOnlyRegisterWithANEELMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:UEGAraucariaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:NovaAsaBrancaIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:NovaAsaBrancaIIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:NovaAsaBrancaIIIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:NovaEurusIVMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SantaMariaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SantaHelenaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:VentosDeSantoUrielMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GEBoaVistaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GEFarolMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GEOlhoDAguaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GESaoBentodoNorteMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:EsperancadoNordesteMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ParaisodosVentosdoNordesteMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:UsinadeEnergiaEolicaJangadaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:MariaHelenaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:UsinadeEnergiaEolicaPotiguarMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:UsinadeEnergiaEolicaGuajiruMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:UsinadeEnergiaEolicaCutiaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SaoBentodoNorteIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SaoBentodoNorteIIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SaoBentodoNorteIIIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SaoMiguelIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SaoMigueIlMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SaoMigueIIlMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SaoMiguelIIIMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:SHPBelaVistaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:FDAGeracaoDeEnergiaEletricaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:JandairaIEnergiasRenovaveisMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:JandairaIIEnergiasRenovaveisMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:JandairaIIIEnergiasRenovaveisMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:JandairaIVEnergiasRenovaveisMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:EolPotiguarB141SPESAMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:EolPotiguarB142SPESAMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:EolPotiguarB143SPESAMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:EolPotiguarB61SPESAMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:VentosDeVilaParaibaIVSpeSaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:Contract0602001TransmissionFacilitiesSundryTransmissionLinesAndSubstationsExtendedByThe3rdaddendumMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineBateiasJaguariaivaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineBateiasPilarzinhoMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineFozDoIguacuCascavelOesteMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineAraraquaraIiTaubateMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractSubstationCerquilhoIiiMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineFozDoChopimSaltoOsorioC2TransmissionLineKvLondrinaFigueiraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineAssisParaguacuPaulistaIiSubstationKvParaguacuPaulistaIiMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineBateiasCuritibaNorteSubstationKvCuritibaNorteMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineFozDoChopimRealezaSubstationRealezaKvPatioNovoKvMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineAssisLondrinaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ContractTransmissionLineKvCuritibaLesteBlumenauCMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:CostaOesteTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:CaiuaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:MarumbiTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:IntegracaoMaranhenseMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:MatrinchaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:GuaraciabaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:ParanaibaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:MataDeSantaGenebraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:CantareiraTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:ConcessionAgreementOrAuthorizationMember elp:UirapuruTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CashAndBankAccountsMember 2021-12-31 0001041792 elp:CashAndBankAccountsMember 2020-12-31 0001041792 elp:FinancialInvestmentsWithImmediateLiquidityMember 2021-12-31 0001041792 elp:FinancialInvestmentsWithImmediateLiquidityMember 2020-12-31 0001041792 elp:QuotasInFundsMember 2021-01-01 2021-12-31 0001041792 elp:QuotasInFundsMember 2021-12-31 0001041792 elp:QuotasInFundsMember 2020-12-31 0001041792 elp:BankDepositCertificatesMember 2021-01-01 2021-12-31 0001041792 elp:BankDepositCertificatesMember 2021-12-31 0001041792 elp:BankDepositCertificatesMember 2020-12-31 0001041792 elp:FinancialTreasuryBondsMember 2021-01-01 2021-12-31 0001041792 elp:FinancialTreasuryBondsMember 2021-12-31 0001041792 elp:FinancialTreasuryBondsMember 2020-12-31 0001041792 elp:NationalTreasuryBillsMember 2021-01-01 2021-12-31 0001041792 elp:NationalTreasuryBillsMember 2021-12-31 0001041792 elp:NationalTreasuryBillsMember 2020-12-31 0001041792 elp:CustomersMember elp:ResidentialMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:ResidentialMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:ResidentialMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2021-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2020-12-31 0001041792 elp:CustomersMember elp:IndustrialMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:IndustrialMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:IndustrialMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2021-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2020-12-31 0001041792 elp:CustomersMember elp:CommercialMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:CommercialMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:CommercialMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2021-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2020-12-31 0001041792 elp:CustomersMember elp:RuralMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:RuralMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:RuralMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:RuralMember 2021-12-31 0001041792 elp:CustomersMember elp:RuralMember 2020-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2020-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2020-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2020-12-31 0001041792 elp:CustomersMember elp:UnbilledMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:UnbilledMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:UnbilledMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2021-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2020-12-31 0001041792 elp:CustomersMember elp:EnergyInstallmentsPlanMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:EnergyInstallmentsPlanMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:EnergyInstallmentsPlanMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:EnergyInstallmentsPlanMember 2021-12-31 0001041792 elp:CustomersMember elp:EnergyInstallmentsPlanMember 2020-12-31 0001041792 elp:CustomersMember elp:LowIncomeSubsidyEletrobrasMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:LowIncomeSubsidyEletrobrasMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:LowIncomeSubsidyEletrobrasMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:LowIncomeSubsidyEletrobrasMember 2021-12-31 0001041792 elp:CustomersMember elp:LowIncomeSubsidyEletrobrasMember 2020-12-31 0001041792 elp:CustomersMember elp:FreeConsumersMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:FreeConsumersMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:FreeConsumersMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:FreeConsumersMember 2021-12-31 0001041792 elp:CustomersMember elp:FreeConsumersMember 2020-12-31 0001041792 elp:CustomersMember elp:OtherReceivablesMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:OtherReceivablesMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember elp:OtherReceivablesMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember elp:OtherReceivablesMember 2021-12-31 0001041792 elp:CustomersMember elp:OtherReceivablesMember 2020-12-31 0001041792 elp:CustomersMember elp:BonusForVoluntaryConsumptionReductionMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember elp:BonusForVoluntaryConsumptionReductionMember 2021-12-31 0001041792 elp:CustomersMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:CustomersMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:CustomersMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:CustomersMember 2021-12-31 0001041792 elp:CustomersMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:BilateralContractsMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:BilateralContractsMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:BilateralContractsMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:BilateralContractsMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:BilateralContractsMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:RegulatedContractsMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:RegulatedContractsMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:RegulatedContractsMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:RegulatedContractsMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:RegulatedContractsMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:CCEEMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:CCEEMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:CCEEMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:CCEEMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:CCEEMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:EnergySupliesMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:EnergySupliesMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:EnergySupliesMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:EnergySupliesMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:EnergySupliesMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:ChargesFromUsingTransmissionGridMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:ChargesFromUsingTransmissionGridMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:ChargesFromUsingTransmissionGridMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:ChargesFromUsingTransmissionGridMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderEnergySuppliesMember elp:ChargesFromUsingTransmissionGridMember 2020-12-31 0001041792 ifrs-full:GasDistributionMember elp:BalanceFallingDueMember 2021-12-31 0001041792 ifrs-full:GasDistributionMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:GasDistributionMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:GasDistributionMember 2021-12-31 0001041792 ifrs-full:GasDistributionMember 2020-12-31 0001041792 elp:ExpectedCreditLossesMember elp:BalanceFallingDueMember 2021-12-31 0001041792 elp:ExpectedCreditLossesMember ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 elp:ExpectedCreditLossesMember ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 elp:ExpectedCreditLossesMember 2021-12-31 0001041792 elp:ExpectedCreditLossesMember 2020-12-31 0001041792 elp:BalanceFallingDueMember 2021-12-31 0001041792 ifrs-full:NotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:NotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:TopOfRangeMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2019-01-01 0001041792 elp:CustomersMember elp:ResidentialMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2019-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2020-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:ResidentialMember 2021-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2019-01-01 0001041792 elp:CustomersMember elp:IndustrialMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2019-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2020-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:IndustrialMember 2021-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2019-01-01 0001041792 elp:CustomersMember elp:CommercialMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2019-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2020-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:CommercialMember 2021-12-31 0001041792 elp:CustomersMember elp:RuralMember 2019-01-01 0001041792 elp:CustomersMember elp:RuralMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:RuralMember 2019-12-31 0001041792 elp:CustomersMember elp:RuralMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:RuralMember 2020-12-31 0001041792 elp:CustomersMember elp:RuralMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:RuralMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2019-01-01 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2019-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2020-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:PublicEntitiesMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2019-01-01 0001041792 elp:CustomersMember elp:PublicLightingMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2019-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2020-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:PublicLightingMember 2021-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2019-01-01 0001041792 elp:CustomersMember elp:PublicServiceMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2019-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2020-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:PublicServiceMember 2021-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2019-01-01 0001041792 elp:CustomersMember elp:UnbilledMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2019-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2020-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:UnbilledMember 2021-12-31 0001041792 elp:CustomersMember elp:AdjustmentToPresentValueMember 2019-01-01 0001041792 elp:CustomersMember elp:AdjustmentToPresentValueMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember elp:AdjustmentToPresentValueMember 2019-12-31 0001041792 elp:CustomersMember elp:AdjustmentToPresentValueMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember elp:AdjustmentToPresentValueMember 2020-12-31 0001041792 elp:CustomersMember elp:AdjustmentToPresentValueMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember elp:AdjustmentToPresentValueMember 2021-12-31 0001041792 elp:CustomersMember 2019-01-01 0001041792 elp:CustomersMember 2019-01-01 2019-12-31 0001041792 elp:CustomersMember 2019-12-31 0001041792 elp:CustomersMember 2020-01-01 2020-12-31 0001041792 elp:CustomersMember 2020-12-31 0001041792 elp:CustomersMember 2021-01-01 2021-12-31 0001041792 elp:CustomersMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:CCEEMember 2019-01-01 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:CCEEMember 2019-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:CCEEMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:CCEEMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:ConcessionairesAndPermissionHolderMember 2019-01-01 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:ConcessionairesAndPermissionHolderMember 2019-01-01 2019-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:ConcessionairesAndPermissionHolderMember 2019-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:ConcessionairesAndPermissionHolderMember 2020-01-01 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:ConcessionairesAndPermissionHolderMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:ConcessionairesAndPermissionHolderMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember elp:ConcessionairesAndPermissionHolderMember 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember 2019-01-01 0001041792 elp:ConcessionairesAndPermissionHolderMember 2019-01-01 2019-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember 2019-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember 2020-01-01 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember 2020-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionairesAndPermissionHolderMember 2021-12-31 0001041792 elp:TelecommunicationsMember 2019-01-01 0001041792 elp:TelecommunicationsMember 2019-01-01 2019-12-31 0001041792 elp:TelecommunicationsMember 2019-12-31 0001041792 elp:TelecommunicationsMember 2020-01-01 2020-12-31 0001041792 elp:TelecommunicationsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:GasDistributionMember 2019-01-01 0001041792 ifrs-full:GasDistributionMember 2019-01-01 2019-12-31 0001041792 ifrs-full:GasDistributionMember 2019-12-31 0001041792 ifrs-full:GasDistributionMember 2020-01-01 2020-12-31 0001041792 elp:TelecommunicationsMember 2021-12-31 0001041792 ifrs-full:GasDistributionMember 2021-01-01 2021-12-31 0001041792 ifrs-full:GasDistributionMember 2021-12-31 0001041792 2019-01-01 0001041792 2021-08-10 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:CVAEnergMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:CVAEnergMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ESSMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ESSMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:CDEMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:CDEMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ProinfaMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:PortionAMember elp:ProinfaMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:NeutralityMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:NeutralityMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:OvercontractingMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:OtherMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member elp:OtherFinancialComponentsMember elp:OtherMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2021Member 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:CVAEnergMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:ESSMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:CDEMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022MemberElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:ProinfaMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:PortionAMember elp:ProinfaMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:OtherFinancialComponentsMember elp:NeutralityMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:OtherFinancialComponentsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:OtherFinancialComponentsMember elp:ItaipuBonusMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member elp:OtherFinancialComponentsMember elp:OtherMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2022Member 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:CVAEnergMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:CVAEnergMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:ESSMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:ESSMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:CDEMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:CDEMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:ProinfaMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:ProinfaMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:OvercontractingMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:NeutralityMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:NeutralityMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:OtherMember 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member elp:OtherFinancialComponentsMember elp:OtherMember 2020-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member 2021-12-31 0001041792 elp:ElectricityRateAdjustmentRecoverable2020Member 2020-12-31 0001041792 elp:TariffReview2021Member elp:PortionAMember elp:CVAEnergMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:PortionAMember elp:ESSMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:PortionAMember elp:CDEMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:PortionAMember elp:ProinfaMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:OtherFinancialComponentsMember elp:RefundPisAndCofinsCreditsMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:OtherFinancialComponentsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:OtherFinancialComponentsMember elp:NeutralityMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2021-12-31 0001041792 elp:TariffReview2021Member elp:OtherFinancialComponentsMember elp:OtherMember 2021-12-31 0001041792 elp:TariffReview2021Member 2021-12-31 0001041792 elp:TariffReview2023Member elp:OtherFinancialComponentsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:TariffReview2023Member elp:OtherFinancialComponentsMember elp:OtherMember 2021-12-31 0001041792 elp:TariffReview2023Member 2021-12-31 0001041792 elp:TariffReview2024Member elp:TariffRefundsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:TariffReview2024Member 2021-12-31 0001041792 elp:TariffReview2025Member elp:TariffRefundsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:TariffReview2025Member 2021-12-31 0001041792 elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2020-12-31 0001041792 elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2021-01-01 2021-12-31 0001041792 elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2021-12-31 0001041792 elp:PortionAMember elp:CVAEnergMember 2020-12-31 0001041792 elp:PortionAMember elp:CVAEnergMember 2021-01-01 2021-12-31 0001041792 elp:PortionAMember elp:CVAEnergMember 2021-12-31 0001041792 elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2020-12-31 0001041792 elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2021-01-01 2021-12-31 0001041792 elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2021-12-31 0001041792 elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2020-12-31 0001041792 elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2021-01-01 2021-12-31 0001041792 elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2021-12-31 0001041792 elp:PortionAMember elp:ESSMember 2020-12-31 0001041792 elp:PortionAMember elp:ESSMember 2021-01-01 2021-12-31 0001041792 elp:PortionAMember elp:ESSMember 2021-12-31 0001041792 elp:PortionAMember elp:CDEMember 2020-12-31 0001041792 elp:PortionAMember elp:CDEMember 2021-01-01 2021-12-31 0001041792 elp:PortionAMember elp:CDEMember 2021-12-31 0001041792 elp:PortionAMember elp:ProinfaMember 2020-12-31 0001041792 elp:PortionAMember elp:ProinfaMember 2021-01-01 2021-12-31 0001041792 elp:PortionAMember elp:ProinfaMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:RefundsOfPisAndCofinsMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:RefundsOfPisAndCofinsMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:NeutralityMember 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:NeutralityMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:NeutralityMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OvercontractingMember 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OvercontractingMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OvercontractingMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:ItaipuBonusMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:ItaipuBonusMember 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OthersMember 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OthersMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OthersMember 2021-12-31 0001041792 elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2019-12-31 0001041792 elp:PortionAMember elp:ElectricityPurchasedForResaleItaipuMember 2020-01-01 2020-12-31 0001041792 elp:PortionAMember elp:CVAEnergMember 2019-12-31 0001041792 elp:PortionAMember elp:CVAEnergMember 2020-01-01 2020-12-31 0001041792 elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2019-12-31 0001041792 elp:PortionAMember elp:ChargesForUsingTheTransmissionSystemBasicGridMember 2020-01-01 2020-12-31 0001041792 elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2019-12-31 0001041792 elp:PortionAMember elp:TransportOfEnergyPurchasedFromItaipuMember 2020-01-01 2020-12-31 0001041792 elp:PortionAMember elp:ESSMember 2019-12-31 0001041792 elp:PortionAMember elp:ESSMember 2020-01-01 2020-12-31 0001041792 elp:PortionAMember elp:CDEMember 2019-12-31 0001041792 elp:PortionAMember elp:CDEMember 2020-01-01 2020-12-31 0001041792 elp:PortionAMember elp:ProinfaMember 2019-12-31 0001041792 elp:PortionAMember elp:ProinfaMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:NeutralityMember 2019-12-31 0001041792 elp:OtherFinancialComponentsMember elp:NeutralityMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2019-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OffsetOfEnergySurplusDeficitUnderCCEARBilateralContractsMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2019-12-31 0001041792 elp:OtherFinancialComponentsMember elp:HydrologicalRiskMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2019-12-31 0001041792 elp:OtherFinancialComponentsMember elp:TariffRefundsMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OvercontractingMember 2019-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OvercontractingMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OthersMember 2019-12-31 0001041792 elp:OtherFinancialComponentsMember elp:OthersMember 2020-01-01 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2021-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:RestatedOneMember 2020-12-31 0001041792 elp:PipedGasDistributionServiceConcessionMember 2021-12-31 0001041792 elp:PipedGasDistributionServiceConcessionMember elp:RestatedOneMember 2020-12-31 0001041792 elp:BonusFromTheGrantOfConcessionAgreementsUnderTheQuotaSystemMember 2021-12-31 0001041792 elp:BonusFromTheGrantOfConcessionAgreementsUnderTheQuotaSystemMember elp:RestatedOneMember 2020-12-31 0001041792 elp:GenerationConcessionAgreementsMember 2021-12-31 0001041792 elp:GenerationConcessionAgreementsMember elp:RestatedOneMember 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2019-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2020-01-01 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2021-01-01 2021-12-31 0001041792 elp:PipedGasDistributionServiceConcessionMember 2019-12-31 0001041792 elp:PipedGasDistributionServiceConcessionMember 2020-01-01 2020-12-31 0001041792 elp:PipedGasDistributionServiceConcessionMember 2020-12-31 0001041792 elp:PipedGasDistributionServiceConcessionMember 2021-01-01 2021-12-31 0001041792 elp:BonusFromTheGrantOfConcessionAgreementsUnderTheQuotaSystemMember 2019-12-31 0001041792 elp:BonusFromTheGrantOfConcessionAgreementsUnderTheQuotaSystemMember 2020-01-01 2020-12-31 0001041792 elp:BonusFromTheGrantOfConcessionAgreementsUnderTheQuotaSystemMember 2020-12-31 0001041792 elp:BonusFromTheGrantOfConcessionAgreementsUnderTheQuotaSystemMember 2021-01-01 2021-12-31 0001041792 elp:GenerationConcessionAgreementsMember 2019-12-31 0001041792 elp:GenerationConcessionAgreementsMember 2020-01-01 2020-12-31 0001041792 elp:GenerationConcessionAgreementsMember 2020-12-31 0001041792 elp:GenerationConcessionAgreementsMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAgreementMember elp:HPPGPSMember elp:BonusFromTheGrantOfConcessionAgreementsUnderTheQuotaSystemMember 2016-01-01 2016-01-05 0001041792 elp:PowerDistributionServiceConcession1Member 2021-12-31 0001041792 elp:PowerDistributionServiceConcession1Member 2020-12-31 0001041792 elp:PipedGasDistributionServiceConcession1Member 2021-12-31 0001041792 elp:PipedGasDistributionServiceConcession1Member 2020-12-31 0001041792 elp:PowerTransmissionConcession1Member 2021-12-31 0001041792 elp:PowerTransmissionConcession1Member 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:AssetsContractAssetsMember 2019-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:SpecialLiabilitiesMember 2019-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:AssetsContractAssetsMember 2020-01-01 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:SpecialLiabilitiesMember 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:SpecialLiabilitiesMember 2020-01-01 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:AssetsContractAssetsMember 2021-01-01 2021-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:AssetsContractAssetsMember 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:SpecialLiabilitiesMember 2021-01-01 2021-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:SpecialLiabilitiesMember 2021-12-31 0001041792 elp:PowerDistributionServiceConcessionMember elp:AssetsContractAssetsMember 2021-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:ConcessionAssetsMember 2019-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:RBSEAssetsMember 2019-12-31 0001041792 elp:PowerTransmissionConcessionMember 2019-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:ConcessionAssetsMember 2020-01-01 2020-12-31 0001041792 elp:PowerTransmissionConcessionMember 2020-01-01 2020-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:RBSEAssetsMember 2020-01-01 2020-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:ConcessionAssetsMember 2021-01-01 2021-12-31 0001041792 elp:PowerTransmissionConcessionMember 2021-01-01 2021-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:ConcessionAssetsMember 2020-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:RBSEAssetsMember 2020-12-31 0001041792 elp:PowerTransmissionConcessionMember 2020-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:RBSEAssetsMember 2021-01-01 2021-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:ConcessionAssetsMember 2021-12-31 0001041792 elp:PowerTransmissionConcessionMember elp:RBSEAssetsMember 2021-12-31 0001041792 elp:PowerTransmissionConcessionMember 2021-12-31 0001041792 elp:RBSEAssetsMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionAssetsMember 2021-01-01 2021-12-31 0001041792 elp:OperatingAndMaintenanceMarginMember 2021-01-01 2021-12-31 0001041792 elp:OperatingAndMaintenanceMarginMember 2020-01-01 2020-12-31 0001041792 elp:RemunerationRateMember 2021-01-01 2021-12-31 0001041792 elp:RemunerationRateMember 2020-01-01 2020-12-31 0001041792 elp:RBSEAssetsMember 2020-01-01 2020-12-31 0001041792 elp:RBSEAssetsOneMember 2021-01-01 2021-12-31 0001041792 elp:AnnualRapMember 2021-01-01 2021-12-31 0001041792 elp:RBSEAssetsTwoMember 2021-01-01 2021-12-31 0001041792 elp:AnnualRapMember 2020-01-01 2020-12-31 0001041792 elp:FairValuePurchaseAndSaleOfPowerInTheActiveMarketMember 2021-12-31 0001041792 elp:FairValuePurchaseAndSaleOfPowerInTheActiveMarketMember 2020-12-31 0001041792 elp:ServicesInProgressMember 2021-12-31 0001041792 elp:ServicesInProgressMember 2020-12-31 0001041792 elp:BonusForVoluntaryConsumptionReductionMember 2021-12-31 0001041792 elp:BonusForVoluntaryConsumptionReductionMember 2020-12-31 0001041792 elp:CreditsOnSalesAndPurchasesOfGasMember 2021-12-31 0001041792 elp:CreditsOnSalesAndPurchasesOfGasMember 2020-12-31 0001041792 elp:CDETransferMember 2021-12-31 0001041792 elp:CDETransferMember 2020-12-31 0001041792 elp:DisposalsAndDecommissioningInProgressMember 2021-12-31 0001041792 elp:DisposalsAndDecommissioningInProgressMember 2020-12-31 0001041792 elp:ReimbursementOfCoalConsumptionValuesByCDEMember 2021-12-31 0001041792 elp:ReimbursementOfCoalConsumptionValuesByCDEMember 2020-12-31 0001041792 elp:AdvancePaymentsToEmployeesMember 2021-12-31 0001041792 elp:AdvancePaymentsToEmployeesMember 2020-12-31 0001041792 elp:AdvancePaymentsToSuppliersMember 2021-12-31 0001041792 elp:AdvancePaymentsToSuppliersMember 2020-12-31 0001041792 elp:TariffFlagMember 2021-12-31 0001041792 elp:TariffFlagMember 2020-12-31 0001041792 elp:DerivativesFairValueForwardContractMember 2021-12-31 0001041792 elp:DerivativesFairValueForwardContractMember 2020-12-31 0001041792 elp:AdvanceForRealEstateMember 2021-12-31 0001041792 elp:AdvanceForRealEstateMember 2020-12-31 0001041792 elp:OtherReceivablesMember 2021-12-31 0001041792 elp:OtherReceivablesMember 2020-12-31 0001041792 elp:CDETransferMember 2021-01-01 2021-12-31 0001041792 elp:CDETransferMember 2021-01-01 2021-06-30 0001041792 ifrs-full:LegalProceedingsProvisionMember 2019-12-31 0001041792 ifrs-full:LegalProceedingsProvisionMember 2020-01-01 2020-12-31 0001041792 ifrs-full:LegalProceedingsProvisionMember 2020-12-31 0001041792 ifrs-full:LegalProceedingsProvisionMember 2021-01-01 2021-12-31 0001041792 ifrs-full:LegalProceedingsProvisionMember 2021-12-31 0001041792 elp:PostEmploymentBenefitsMember 2019-12-31 0001041792 elp:PostEmploymentBenefitsMember 2020-01-01 2020-12-31 0001041792 elp:PostEmploymentBenefitsMember 2020-12-31 0001041792 elp:PostEmploymentBenefitsMember 2021-01-01 2021-12-31 0001041792 elp:PostEmploymentBenefitsMember 2021-12-31 0001041792 elp:ImpairmentOfAssetsMember 2019-12-31 0001041792 elp:ImpairmentOfAssetsMember 2020-01-01 2020-12-31 0001041792 elp:ImpairmentOfAssetsMember 2020-12-31 0001041792 elp:ImpairmentOfAssetsMember 2021-01-01 2021-12-31 0001041792 elp:ImpairmentOfAssetsMember 2021-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyProgramsMember 2019-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyProgramsMember 2020-01-01 2020-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyProgramsMember 2020-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyProgramsMember 2021-01-01 2021-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyProgramsMember 2021-12-31 0001041792 elp:TaxLossesAndNegativeTaxBasisMember 2019-12-31 0001041792 elp:TaxLossesAndNegativeTaxBasisMember 2020-01-01 2020-12-31 0001041792 elp:TaxLossesAndNegativeTaxBasisMember 2020-12-31 0001041792 elp:TaxLossesAndNegativeTaxBasisMember 2021-01-01 2021-12-31 0001041792 elp:TaxLossesAndNegativeTaxBasisMember 2021-12-31 0001041792 elp:ProvisionForPerformanceAndProfitSharingMember 2019-12-31 0001041792 elp:ProvisionForPerformanceAndProfitSharingMember 2020-01-01 2020-12-31 0001041792 elp:ProvisionForPerformanceAndProfitSharingMember 2020-12-31 0001041792 elp:ProvisionForPerformanceAndProfitSharingMember 2021-01-01 2021-12-31 0001041792 elp:ProvisionForPerformanceAndProfitSharingMember 2021-12-31 0001041792 elp:AllowanceForDoubtfulAccountMember 2019-12-31 0001041792 elp:AllowanceForDoubtfulAccountMember 2020-01-01 2020-12-31 0001041792 elp:AllowanceForDoubtfulAccountMember 2020-12-31 0001041792 elp:AllowanceForDoubtfulAccountMember 2021-01-01 2021-12-31 0001041792 elp:AllowanceForDoubtfulAccountMember 2021-12-31 0001041792 elp:SocialSecurityContributionsInjunctionOnJudicialDepositMember 2019-12-31 0001041792 elp:SocialSecurityContributionsInjunctionOnJudicialDepositMember 2020-01-01 2020-12-31 0001041792 elp:SocialSecurityContributionsInjunctionOnJudicialDepositMember 2020-12-31 0001041792 elp:SocialSecurityContributionsInjunctionOnJudicialDepositMember 2021-01-01 2021-12-31 0001041792 elp:SocialSecurityContributionsInjunctionOnJudicialDepositMember 2021-12-31 0001041792 elp:AmortizationConcessionMember 2019-12-31 0001041792 elp:AmortizationConcessionMember 2020-01-01 2020-12-31 0001041792 elp:AmortizationConcessionMember 2020-12-31 0001041792 elp:AmortizationConcessionMember 2021-01-01 2021-12-31 0001041792 elp:AmortizationConcessionMember 2021-12-31 0001041792 elp:VoluntaryRetirementProgramMember 2019-12-31 0001041792 elp:VoluntaryRetirementProgramMember 2020-01-01 2020-12-31 0001041792 elp:VoluntaryRetirementProgramMember 2020-12-31 0001041792 elp:VoluntaryRetirementProgramMember 2021-01-01 2021-12-31 0001041792 elp:VoluntaryRetirementProgramMember 2021-12-31 0001041792 elp:ConcessionContractsMember 2019-12-31 0001041792 elp:ConcessionContractsMember 2020-01-01 2020-12-31 0001041792 elp:ConcessionContractsMember 2020-12-31 0001041792 elp:ConcessionContractsMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionContractsMember 2021-12-31 0001041792 elp:OtherMember 2019-12-31 0001041792 elp:OtherMember 2020-01-01 2020-12-31 0001041792 elp:OtherMember 2020-12-31 0001041792 elp:OtherMember 2021-01-01 2021-12-31 0001041792 elp:OtherMember 2021-12-31 0001041792 elp:DeemedCostOfPropertyPlantAndEquipmentMember 2019-12-31 0001041792 elp:DeemedCostOfPropertyPlantAndEquipmentMember 2020-01-01 2020-12-31 0001041792 elp:DeemedCostOfPropertyPlantAndEquipmentMember 2020-12-31 0001041792 elp:DeemedCostOfPropertyPlantAndEquipmentMember 2021-01-01 2021-12-31 0001041792 elp:DeemedCostOfPropertyPlantAndEquipmentMember 2021-12-31 0001041792 elp:FinancialInstrumentsMember 2019-12-31 0001041792 elp:FinancialInstrumentsMember 2020-01-01 2020-12-31 0001041792 elp:FinancialInstrumentsMember 2020-12-31 0001041792 elp:FinancialInstrumentsMember 2021-01-01 2021-12-31 0001041792 elp:FinancialInstrumentsMember 2021-12-31 0001041792 elp:AcceleratedDepreciationMember 2019-12-31 0001041792 elp:AcceleratedDepreciationMember 2020-01-01 2020-12-31 0001041792 elp:AcceleratedDepreciationMember 2020-12-31 0001041792 elp:AcceleratedDepreciationMember 2021-01-01 2021-12-31 0001041792 elp:AcceleratedDepreciationMember 2021-12-31 0001041792 elp:EscrowDepositsMonetaryVariationMember 2019-12-31 0001041792 elp:EscrowDepositsMonetaryVariationMember 2020-01-01 2020-12-31 0001041792 elp:EscrowDepositsMonetaryVariationMember 2020-12-31 0001041792 elp:EscrowDepositsMonetaryVariationMember 2021-01-01 2021-12-31 0001041792 elp:EscrowDepositsMonetaryVariationMember 2021-12-31 0001041792 elp:TransactionCostOnBorrowingsAndDebenturesMember 2019-12-31 0001041792 elp:TransactionCostOnBorrowingsAndDebenturesMember 2020-01-01 2020-12-31 0001041792 elp:TransactionCostOnBorrowingsAndDebenturesMember 2020-12-31 0001041792 elp:TransactionCostOnBorrowingsAndDebenturesMember 2021-01-01 2021-12-31 0001041792 elp:TransactionCostOnBorrowingsAndDebenturesMember 2021-12-31 0001041792 ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember 2021-12-31 0001041792 ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember 2021-12-31 0001041792 ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 elp:LaterThanFiveYearsAndNotLaterThanSixYearsMember 2021-12-31 0001041792 elp:LaterThanSixYearsAndNotLaterThanEightYearsMember 2021-12-31 0001041792 elp:LaterThanSixYearsMember 2021-12-31 0001041792 elp:LaterThanSevenYearsAndNotLaterThanNineYearsMember 2021-12-31 0001041792 elp:LaterThanTenYearsAndNotLaterThanElevenYearsMember 2021-12-31 0001041792 elp:RecoverablePISPasepAndCofinsTaxesMember 2019-09-01 2019-09-30 0001041792 elp:RecoverablePISPasepAndCofinsTaxesMember 2021-01-01 2021-12-31 0001041792 elp:RecoverablePISPasepAndCofinsTaxesMember 2020-01-01 2020-12-31 0001041792 elp:RecoverableICMSMember 2021-12-31 0001041792 elp:RecoverableICMSMember 2020-12-31 0001041792 elp:RecoverablePISPasepAndCofinsTaxesMember 2021-12-31 0001041792 elp:RecoverablePISPasepAndCofinsTaxesMember 2020-12-31 0001041792 elp:OtherRecoverableTaxesMember 2021-12-31 0001041792 elp:OtherRecoverableTaxesMember 2020-12-31 0001041792 elp:ICMSVATPayableMember 2021-12-31 0001041792 elp:ICMSVATPayableMember 2020-12-31 0001041792 elp:PISPasepAndCofinsPayableMember 2021-12-31 0001041792 elp:PISPasepAndCofinsPayableMember 2020-12-31 0001041792 elp:IRRFOnJSCPMember 2021-12-31 0001041792 elp:IRRFOnJSCPMember 2020-12-31 0001041792 elp:SpecialTaxRegularizationProgramPertMember 2021-12-31 0001041792 elp:SpecialTaxRegularizationProgramPertMember 2020-12-31 0001041792 elp:OtherTaxesMember 2021-12-31 0001041792 elp:OtherTaxesMember 2020-12-31 0001041792 elp:SocialSecurityContributionsInjunctionOnJudicialDepositMember 2021-12-31 0001041792 elp:SocialSecurityContributionsInjunctionOnJudicialDepositMember 2020-12-31 0001041792 elp:SpecialTaxRegularizationProgramPertOneMember 2021-12-31 0001041792 elp:SpecialTaxRegularizationProgramPertOneMember 2020-12-31 0001041792 elp:OtherTaxesOneMember 2021-12-31 0001041792 elp:OtherTaxesOneMember 2020-12-31 0001041792 elp:ProgramForIncentiveToAlternativeEnergySourcesProinfaMember 2021-12-31 0001041792 elp:ProgramForIncentiveToAlternativeEnergySourcesProinfaMember 2020-12-31 0001041792 elp:InsurancePremiumsMember 2021-12-31 0001041792 elp:InsurancePremiumsMember 2020-12-31 0001041792 elp:OthersMember 2021-12-31 0001041792 elp:OthersMember 2020-12-31 0001041792 elp:MatrinchaMember 2021-12-31 0001041792 elp:MatrinchaMember 2020-12-31 0001041792 elp:GuaraciabaMember 2021-12-31 0001041792 elp:GuaraciabaMember 2020-12-31 0001041792 elp:OtherMember 2021-12-31 0001041792 elp:OtherMember 2020-12-31 0001041792 elp:TaxesClaimsMember 2021-12-31 0001041792 elp:TaxesClaimsMember 2020-12-31 0001041792 elp:LaborClaimsMember 2021-12-31 0001041792 elp:LaborClaimsMember 2020-12-31 0001041792 elp:CivilMember 2021-12-31 0001041792 elp:CivilMember 2020-12-31 0001041792 elp:EasementsMember 2021-12-31 0001041792 elp:EasementsMember 2020-12-31 0001041792 elp:CustomersMember 2021-12-31 0001041792 elp:CustomersMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoIMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoIMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoIMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoDireitoDeAutorizacaoMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoDireitoDeAutorizacaoMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoDireitoDeAutorizacaoMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:SolarParanaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:SolarParanaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:SolarParanaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaMember 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaMember 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:FozDoChopimEnergeticaMember 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:FozDoChopimEnergeticaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:FozDoChopimEnergeticaMember 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:OthersMember 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:OthersMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:OthersMember 2021-12-31 0001041792 ifrs-full:AssociatesMember 2020-12-31 0001041792 ifrs-full:AssociatesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember 2021-12-31 0001041792 ifrs-full:InvestmentPropertyMember 2020-12-31 0001041792 ifrs-full:InvestmentPropertyMember 2021-01-01 2021-12-31 0001041792 ifrs-full:InvestmentPropertyMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoIMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoIMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoDireitoDeAutorizacaoMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoDireitoDeAutorizacaoMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:SolarParanaMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:SolarParanaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember 2019-12-31 0001041792 ifrs-full:JointVenturesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaMember 2019-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:FozDoChopimEnergeticaMember 2019-12-31 0001041792 ifrs-full:AssociatesMember elp:FozDoChopimEnergeticaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DominoHoldingMember 2019-12-31 0001041792 ifrs-full:AssociatesMember elp:DominoHoldingMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DominoHoldingMember 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:OthersMember 2019-12-31 0001041792 ifrs-full:AssociatesMember elp:OthersMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember 2019-12-31 0001041792 ifrs-full:AssociatesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:InvestmentPropertyMember 2019-12-31 0001041792 ifrs-full:InvestmentPropertyMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DominoHoldingMember 2021-01-01 2021-12-31 0001041792 elp:CompagasMember 2021-12-31 0001041792 elp:CompagasMember 2020-12-31 0001041792 elp:ElejorMember 2021-12-31 0001041792 elp:ElejorMember 2020-12-31 0001041792 elp:UEGAraucariaMember 2021-12-31 0001041792 elp:UEGAraucariaMember 2020-12-31 0001041792 elp:CompagasMember 2021-01-01 2021-12-31 0001041792 elp:CompagasMember 2020-01-01 2020-12-31 0001041792 elp:CompagasMember 2019-01-01 2019-12-31 0001041792 elp:ElejorMember 2021-01-01 2021-12-31 0001041792 elp:ElejorMember 2020-01-01 2020-12-31 0001041792 elp:ElejorMember 2019-01-01 2019-12-31 0001041792 elp:UEGAraucariaMember 2021-01-01 2021-12-31 0001041792 elp:UEGAraucariaMember 2020-01-01 2020-12-31 0001041792 elp:UEGAraucariaMember 2019-01-01 2019-12-31 0001041792 elp:CompagasMember 2019-12-31 0001041792 elp:ElejorMember 2019-12-31 0001041792 elp:UEGAraucariaMember 2019-12-31 0001041792 elp:CompagasMember 2018-12-31 0001041792 elp:ElejorMember 2018-12-31 0001041792 elp:UEGAraucariaMember 2018-12-31 0001041792 elp:VoltaliaMember 2021-12-31 0001041792 elp:CaiuaMember 2021-12-31 0001041792 elp:IntegracaoMaranhenseMember 2021-12-31 0001041792 elp:ParanaibaMember 2021-12-31 0001041792 elp:MataDeSantaGenebraMember 2021-12-31 0001041792 elp:CantareiraMember 2021-12-31 0001041792 elp:CaiuaMember 2021-01-01 2021-12-31 0001041792 elp:IntegracaoMaranhenseMember 2021-01-01 2021-12-31 0001041792 elp:MatrinchaMember 2021-01-01 2021-12-31 0001041792 elp:GuaraciabaMember 2021-01-01 2021-12-31 0001041792 elp:ParanaibaMember 2021-01-01 2021-12-31 0001041792 elp:MataDeSantaGenebraMember 2021-01-01 2021-12-31 0001041792 elp:CantareiraMember 2021-01-01 2021-12-31 0001041792 elp:VoltaliaMember 2021-01-01 2021-12-31 0001041792 elp:VoltaliaMember 2020-12-31 0001041792 elp:CaiuaMember 2020-12-31 0001041792 elp:IntegracaoMaranhenseMember 2020-12-31 0001041792 elp:ParanaibaMember 2020-12-31 0001041792 elp:MataDeSantaGenebraMember 2020-12-31 0001041792 elp:CantareiraMember 2020-12-31 0001041792 elp:CaiuaMember 2020-01-01 2020-12-31 0001041792 elp:IntegracaoMaranhenseMember 2020-01-01 2020-12-31 0001041792 elp:MatrinchaMember 2020-01-01 2020-12-31 0001041792 elp:GuaraciabaMember 2020-01-01 2020-12-31 0001041792 elp:ParanaibaMember 2020-01-01 2020-12-31 0001041792 elp:MataDeSantaGenebraMember 2020-01-01 2020-12-31 0001041792 elp:CantareiraMember 2020-01-01 2020-12-31 0001041792 elp:VoltaliaMember 2020-01-01 2020-12-31 0001041792 elp:CaiuaMember 2019-01-01 2019-12-31 0001041792 elp:IntegracaoMaranhenseMember 2019-01-01 2019-12-31 0001041792 elp:MatrinchaMember 2019-01-01 2019-12-31 0001041792 elp:GuaraciabaMember 2019-01-01 2019-12-31 0001041792 elp:ParanaibaMember 2019-01-01 2019-12-31 0001041792 elp:MataDeSantaGenebraMember 2019-01-01 2019-12-31 0001041792 elp:CantareiraMember 2019-01-01 2019-12-31 0001041792 elp:VoltaliaMember 2019-01-01 2019-12-31 0001041792 elp:MataDeSantaGenebraMember 2021-12-31 0001041792 elp:MataDeSantaGenebraMember 2020-12-31 0001041792 elp:DonaFranciscaMember 2021-12-31 0001041792 elp:DonaFranciscaMember 2020-12-31 0001041792 elp:FozDoChopimMember 2021-12-31 0001041792 elp:FozDoChopimMember 2020-12-31 0001041792 elp:DonaFranciscaMember 2021-01-01 2021-12-31 0001041792 elp:DonaFranciscaMember 2020-01-01 2020-12-31 0001041792 elp:FozDoChopimMember 2021-01-01 2021-12-31 0001041792 elp:FozDoChopimMember 2020-01-01 2020-12-31 0001041792 elp:DonaFranciscaMember 2019-01-01 2019-12-31 0001041792 elp:FozDoChopimMember 2019-01-01 2019-12-31 0001041792 elp:InServiceMember elp:ReservoirsDamsAndAqueductsMember 2021-12-31 0001041792 elp:InServiceMember elp:ReservoirsDamsAndAqueductsMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:ReservoirsDamsAndAqueductsMember 2020-12-31 0001041792 elp:InServiceMember elp:ReservoirsDamsAndAqueductsMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember ifrs-full:MachineryMember 2021-12-31 0001041792 elp:InServiceMember ifrs-full:MachineryMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember ifrs-full:MachineryMember 2020-12-31 0001041792 elp:InServiceMember ifrs-full:MachineryMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember ifrs-full:BuildingsMember 2021-12-31 0001041792 elp:InServiceMember ifrs-full:BuildingsMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember ifrs-full:BuildingsMember 2020-12-31 0001041792 elp:InServiceMember ifrs-full:BuildingsMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember ifrs-full:LandMember 2021-12-31 0001041792 elp:InServiceMember ifrs-full:LandMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember ifrs-full:LandMember 2020-12-31 0001041792 elp:InServiceMember ifrs-full:LandMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember ifrs-full:VehiclesMember 2021-12-31 0001041792 elp:InServiceMember ifrs-full:VehiclesMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember ifrs-full:VehiclesMember 2020-12-31 0001041792 elp:InServiceMember ifrs-full:VehiclesMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:FurnitureAndToolsMember 2021-12-31 0001041792 elp:InServiceMember elp:FurnitureAndToolsMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:FurnitureAndToolsMember 2020-12-31 0001041792 elp:InServiceMember elp:FurnitureAndToolsMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentMember 2021-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentMember 2020-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentOneMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentOneMember 2021-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentOneMember 2020-12-31 0001041792 elp:InServiceMember elp:SpecialObligationsMember 2021-12-31 0001041792 elp:InServiceMember elp:SpecialObligationsMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:SpecialObligationsMember 2020-12-31 0001041792 elp:InServiceMember elp:SpecialObligationsMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember 2021-12-31 0001041792 elp:InServiceMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember 2020-12-31 0001041792 elp:InServiceMember 2020-01-01 2020-12-31 0001041792 elp:InProgressMember elp:CostMember 2021-12-31 0001041792 elp:InProgressMember elp:CostMember 2021-01-01 2021-12-31 0001041792 elp:InProgressMember elp:CostMember 2020-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentMember 2021-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentMember 2021-01-01 2021-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentMember 2020-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentOneMember 2021-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentOneMember 2021-01-01 2021-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentOneMember 2020-12-31 0001041792 elp:InProgressMember 2021-12-31 0001041792 elp:InProgressMember 2021-01-01 2021-12-31 0001041792 elp:InProgressMember 2020-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentTwoMember 2020-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentTwoMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentTwoMember 2021-12-31 0001041792 elp:InServiceMember elp:ReclassificationMember 2020-12-31 0001041792 elp:InServiceMember elp:ReclassificationMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:ReclassificationMember 2021-12-31 0001041792 elp:InServiceMember elp:CostMember 2020-12-31 0001041792 elp:InServiceMember elp:CostMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:CostMember 2021-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentCopelTelMember 2020-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentCopelTelMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentCopelTelMember 2021-12-31 0001041792 elp:InServiceMember elp:ReclassificationOneMember 2020-12-31 0001041792 elp:InServiceMember elp:ReclassificationOneMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:ReservoirsDamsAndAqueductsMember 2019-12-31 0001041792 elp:InServiceMember ifrs-full:MachineryMember 2019-12-31 0001041792 elp:InServiceMember ifrs-full:BuildingsMember 2019-12-31 0001041792 elp:InServiceMember ifrs-full:LandMember 2019-12-31 0001041792 elp:InServiceMember ifrs-full:VehiclesMember 2019-12-31 0001041792 elp:InServiceMember elp:FurnitureAndToolsMember 2019-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentMember 2019-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentOneMember 2019-12-31 0001041792 elp:InServiceMember elp:ProvisionForImpairmentOneMember 2020-01-01 2020-12-31 0001041792 elp:ProvisionForImpairmentOneMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:SpecialObligationsMember 2019-12-31 0001041792 elp:InServiceMember elp:Reclassification1Member 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:Reclassification1Member 2020-12-31 0001041792 elp:InServiceMember 2019-12-31 0001041792 elp:InServiceMember elp:CostMember 2019-12-31 0001041792 elp:InServiceMember elp:CostMember 2020-01-01 2020-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentMember 2020-01-01 2020-12-31 0001041792 elp:InProgressMember elp:ProvisionForImpairmentOneMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:ReclassificationMember 2020-01-01 2020-12-31 0001041792 elp:InProgressMember 2019-12-31 0001041792 elp:InProgressMember 2020-01-01 2020-12-31 0001041792 elp:HPPMauaConsorcioEnergeticoCruzeiroDoSulMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:HPPMauaConsorcioEnergeticoCruzeiroDoSulMember 2021-12-31 0001041792 elp:InServiceMember elp:HPPMauaConsorcioEnergeticoCruzeiroDoSulMember 2020-12-31 0001041792 elp:InServiceMember elp:AccumulatedDepreciationMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:AccumulatedDepreciationMember 2021-12-31 0001041792 elp:InServiceMember elp:AccumulatedDepreciationMember 2020-12-31 0001041792 elp:InProgressMember elp:HPPMauaConsorcioEnergeticoCruzeiroDoSulMember 2021-12-31 0001041792 elp:InProgressMember elp:HPPMauaConsorcioEnergeticoCruzeiroDoSulMember 2020-12-31 0001041792 elp:HPPMauaConsorcioEnergeticoCruzeiroDoSulMember 2021-12-31 0001041792 elp:HPPMauaConsorcioEnergeticoCruzeiroDoSulMember 2020-12-31 0001041792 elp:HPPBaixoIguacuMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:HPPBaixoIguacuMember 2021-12-31 0001041792 elp:InServiceMember elp:HPPBaixoIguacuMember 2020-12-31 0001041792 elp:InProgressMember elp:AccumulatedDepreciationMember 2021-01-01 2021-12-31 0001041792 elp:InProgressMember elp:AccumulatedDepreciationMember 2021-12-31 0001041792 elp:InProgressMember elp:AccumulatedDepreciationMember 2020-12-31 0001041792 elp:InProgressMember elp:HPPBaixoIguacuMember 2021-12-31 0001041792 elp:InProgressMember elp:HPPBaixoIguacuMember 2020-12-31 0001041792 elp:HPPBaixoIguacuMember 2021-12-31 0001041792 elp:HPPBaixoIguacuMember 2020-12-31 0001041792 elp:ProjectsMember elp:HPPColiderMember 2020-12-31 0001041792 elp:ProjectsMember elp:HPPColiderMember 2021-01-01 2021-12-31 0001041792 elp:ProjectsMember elp:HPPColiderMember 2021-12-31 0001041792 elp:ProjectsMember elp:ConsorcioTapajosMember 2020-12-31 0001041792 elp:ProjectsMember elp:ConsorcioTapajosMember 2021-01-01 2021-12-31 0001041792 elp:ProjectsMember elp:ConsorcioTapajosMember 2021-12-31 0001041792 elp:InProgressMember elp:PowerPlantsInParanaMember 2020-12-31 0001041792 elp:InProgressMember elp:PowerPlantsInParanaMember 2021-01-01 2021-12-31 0001041792 elp:InProgressMember elp:PowerPlantsInParanaMember 2021-12-31 0001041792 elp:ProjectsMember 2020-12-31 0001041792 elp:ProjectsMember 2021-01-01 2021-12-31 0001041792 elp:ProjectsMember 2021-12-31 0001041792 elp:InServiceMember elp:UHEColiderMember 2019-12-31 0001041792 elp:InServiceMember elp:UHEColiderMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:UHEColiderMember 2020-12-31 0001041792 elp:InServiceMember elp:UHEColiderMember 2021-01-01 2021-12-31 0001041792 elp:UHEColiderMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:WindPowerComplexCutiaMember 2019-12-31 0001041792 elp:InServiceMember elp:WindPowerComplexCutiaMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:WindPowerComplexCutiaMember 2020-12-31 0001041792 elp:InServiceMember elp:WindPowerComplexCutiaMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:WindPowerComplexCutiaMember 2021-12-31 0001041792 elp:InServiceMember elp:UEGAraucariaMember 2019-12-31 0001041792 elp:InServiceMember elp:UEGAraucariaMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:UEGAraucariaMember 2020-12-31 0001041792 elp:InServiceMember elp:UEGAraucariaMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:UEGAraucariaMember 2021-12-31 0001041792 elp:InServiceMember elp:PowerPlantsInParanaMember 2019-12-31 0001041792 elp:InServiceMember elp:PowerPlantsInParanaMember 2020-01-01 2020-12-31 0001041792 elp:InServiceMember elp:PowerPlantsInParanaMember 2020-12-31 0001041792 elp:InServiceMember elp:PowerPlantsInParanaMember 2021-01-01 2021-12-31 0001041792 elp:InServiceMember elp:PowerPlantsInParanaMember 2021-12-31 0001041792 elp:InProgressMember elp:ConsorcioTapajosMember 2019-12-31 0001041792 elp:InProgressMember elp:ConsorcioTapajosMember 2020-01-01 2020-12-31 0001041792 elp:InProgressMember elp:ConsorcioTapajosMember 2020-12-31 0001041792 elp:InProgressMember elp:ConsorcioTapajosMember 2021-01-01 2021-12-31 0001041792 elp:InProgressMember elp:ConsorcioTapajosMember 2021-12-31 0001041792 elp:InProgressMember elp:PowerPlantsInParanaMember 2019-12-31 0001041792 elp:InProgressMember elp:PowerPlantsInParanaMember 2020-01-01 2020-12-31 0001041792 elp:InProgressMember elp:PowerPlantsInParanaOneMember 2021-01-01 2021-12-31 0001041792 elp:InProgressOneMember 2019-12-31 0001041792 elp:InProgressOneMember 2020-01-01 2020-12-31 0001041792 elp:InProgressOneMember 2021-01-01 2021-12-31 0001041792 elp:InProgressOneMember 2020-12-31 0001041792 elp:UHEColiderMember 2021-12-31 0001041792 elp:UHEColiderMember 2020-12-31 0001041792 elp:CashGeneratingUnitsThatHaveSufferedNoImpairmentMember 2021-12-31 0001041792 elp:CashGeneratingUnitsThatHaveSufferedNoImpairmentMember 2020-12-31 0001041792 elp:SHPPBelaVistaMember 2021-12-31 0001041792 elp:LandairaWindComplexMember 2021-12-31 0001041792 elp:LandairaWindComplexMember 2021-01-01 2021-12-31 0001041792 elp:SHPPBelaVistaMember 2021-01-01 2021-12-31 0001041792 elp:SHPPBelaVistaMember 2020-08-30 2020-08-31 0001041792 elp:LandairaWindComplexMember 2020-10-17 2020-10-18 0001041792 elp:ComplexoEOLSaoBentoMember elp:WindPowerAssetsMember 2021-01-01 2021-12-31 0001041792 elp:ComplexoEOLBrisaIMember elp:WindPowerAssetsMember 2021-01-01 2021-12-31 0001041792 elp:ComplexoEOLBrisaIIMember elp:WindPowerAssetsMember 2021-01-01 2021-12-31 0001041792 elp:BentoMiguelComplexMember elp:WindPowerAssetsMember 2021-01-01 2021-12-31 0001041792 elp:CutiaComplexMember elp:WindPowerAssetsMember 2021-01-01 2021-12-31 0001041792 elp:JandairaComplexMember elp:WindPowerAssetsMember 2021-01-01 2021-12-31 0001041792 elp:VilasComplexMember elp:WindPowerAssetsMember 2021-01-01 2021-12-31 0001041792 elp:ThermalAssetsMember elp:UEGAraucariaMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:FozDoAreiaMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:SegredoMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:CaxiasMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:GuaricanaMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:ChamineMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:ApucaraninhaMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:ChopimIMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:MauaMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:MarumbiMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:CavernosoMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:CavernosoIIMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:BelaVistaMember 2021-01-01 2021-12-31 0001041792 elp:HydricAssetsMember elp:ElejorMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:GeneralEquipmentMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:GeneralEquipmentMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:GeneralEquipmentMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember ifrs-full:MachineryMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember ifrs-full:MachineryMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember ifrs-full:MachineryMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember elp:GeneratorsMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:GeneratorsMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:GeneratorsMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember elp:ReservoirsDamsAndAqueductsMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:ReservoirsDamsAndAqueductsMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:ReservoirsDamsAndAqueductsMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember elp:HydraulicTurbinesMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:HydraulicTurbinesMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:HydraulicTurbinesMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember elp:GasAndSteamTurbinesMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:GasAndSteamTurbinesMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember elp:WaterCoolingAndTreatmentMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:WaterCoolingAndTreatmentMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:WaterCoolingAndTreatmentMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember elp:GasConditionerMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:GasConditionerMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:GasConditionerMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember elp:WindPowerPlantUnitMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember elp:WindPowerPlantUnitMember 2020-01-01 2020-12-31 0001041792 elp:GenerationMember elp:WindPowerPlantUnitMember 2019-01-01 2019-12-31 0001041792 elp:GenerationMember ifrs-full:BuildingsMember 2021-01-01 2021-12-31 0001041792 elp:GenerationMember ifrs-full:BuildingsMember 2020-01-01 2020-12-31 0001041792 elp:CentralManagementMember ifrs-full:BuildingsMember 2021-01-01 2021-12-31 0001041792 elp:CentralManagementMember ifrs-full:BuildingsMember 2020-01-01 2020-12-31 0001041792 elp:CentralManagementMember ifrs-full:BuildingsMember 2019-01-01 2019-12-31 0001041792 elp:CentralManagementMember ifrs-full:OfficeEquipmentMember 2021-01-01 2021-12-31 0001041792 elp:CentralManagementMember ifrs-full:OfficeEquipmentMember 2020-01-01 2020-12-31 0001041792 elp:CentralManagementMember ifrs-full:OfficeEquipmentMember 2019-01-01 2019-12-31 0001041792 elp:CentralManagementMember ifrs-full:FixturesAndFittingsMember 2021-01-01 2021-12-31 0001041792 elp:CentralManagementMember ifrs-full:FixturesAndFittingsMember 2020-01-01 2020-12-31 0001041792 elp:CentralManagementMember ifrs-full:FixturesAndFittingsMember 2019-01-01 2019-12-31 0001041792 elp:CentralManagementMember elp:VehicleMember 2021-01-01 2021-12-31 0001041792 elp:CentralManagementMember elp:VehicleMember 2020-01-01 2020-12-31 0001041792 elp:CentralManagementMember elp:VehicleMember 2019-01-01 2019-12-31 0001041792 elp:DistributionConcessionAgreement1Member 2021-12-31 0001041792 elp:DistributionConcessionAgreement1Member 2020-12-31 0001041792 elp:GenerationConcessionAgreementMember 2021-12-31 0001041792 elp:GenerationConcessionAgreementMember 2020-12-31 0001041792 ifrs-full:GasDistributionMember 2021-12-31 0001041792 ifrs-full:GasDistributionMember 2020-12-31 0001041792 elp:Other1Member 2021-12-31 0001041792 elp:Other1Member 2020-12-31 0001041792 elp:DistributionConcessionAgreementInServiceMember 2019-12-31 0001041792 elp:DistributionConcessionAgreementSpecialLiabilitiesInServiceMember 2019-12-31 0001041792 elp:DistributionConcessionAgreementMember 2019-12-31 0001041792 elp:DistributionConcessionAgreementInServiceMember 2020-01-01 2020-12-31 0001041792 elp:DistributionConcessionAgreementMember 2020-01-01 2020-12-31 0001041792 elp:DistributionConcessionAgreementSpecialLiabilitiesInServiceMember 2020-01-01 2020-12-31 0001041792 elp:DistributionConcessionAgreementInServiceMember 2020-12-31 0001041792 elp:DistributionConcessionAgreementSpecialLiabilitiesInServiceMember 2020-12-31 0001041792 elp:DistributionConcessionAgreementMember 2020-12-31 0001041792 elp:DistributionConcessionAgreementInServiceMember 2021-01-01 2021-12-31 0001041792 elp:DistributionConcessionAgreementSpecialLiabilitiesInServiceMember 2021-01-01 2021-12-31 0001041792 elp:DistributionConcessionAgreementMember 2021-01-01 2021-12-31 0001041792 elp:DistributionConcessionAgreementInServiceMember 2021-12-31 0001041792 elp:DistributionConcessionAgreementSpecialLiabilitiesInServiceMember 2021-12-31 0001041792 elp:DistributionConcessionAgreementMember 2021-12-31 0001041792 elp:GenerationConcessionAgreementInServiceMember 2019-12-31 0001041792 elp:GenerationConcessionAgreementConcessionAuthoriztionRightsMember 2019-12-31 0001041792 elp:GenerationConcessionAgreementMember 2019-12-31 0001041792 elp:GenerationConcessionAgreementInProgressMember 2020-01-01 2020-12-31 0001041792 elp:GenerationConcessionAgreementMember 2020-01-01 2020-12-31 0001041792 elp:GenerationConcessionAgreementInServiceMember 2020-01-01 2020-12-31 0001041792 elp:GenerationConcessionAgreementConcessionAuthoriztionRightsMember 2020-01-01 2020-12-31 0001041792 elp:GenerationConcessionAgreementInServiceMember 2020-12-31 0001041792 elp:GenerationConcessionAgreementConcessionAuthoriztionRightsMember 2020-12-31 0001041792 elp:GenerationConcessionAgreementConcessionAuthoriztionRightsMember 2021-01-01 2021-12-31 0001041792 elp:GenerationConcessionAgreementMember 2021-01-01 2021-12-31 0001041792 elp:GenerationConcessionAgreementInServiceMember 2021-01-01 2021-12-31 0001041792 elp:GenerationConcessionAgreementInProgressMember 2021-01-01 2021-12-31 0001041792 elp:GenerationConcessionAgreementInServiceMember 2021-12-31 0001041792 elp:GenerationConcessionAgreementConcessionAuthoriztionRightsMember 2021-12-31 0001041792 ifrs-full:GasDistributionMember 2019-01-01 2019-12-31 0001041792 ifrs-full:GasDistributionMember 2020-01-01 2020-12-31 0001041792 ifrs-full:GasDistributionMember 2021-01-01 2021-12-31 0001041792 elp:OtherInServiceMember 2019-12-31 0001041792 elp:OtherInProgressMember 2019-12-31 0001041792 elp:OtherMember 2019-12-31 0001041792 elp:OtherInServiceMember 2020-01-01 2020-12-31 0001041792 elp:OtherInProgressMember 2020-01-01 2020-12-31 0001041792 elp:OtherMember 2020-01-01 2020-12-31 0001041792 elp:OtherInServiceMember 2020-12-31 0001041792 elp:OtherInProgressMember 2020-12-31 0001041792 elp:OtherMember 2020-12-31 0001041792 elp:OtherInServiceMember 2021-01-01 2021-12-31 0001041792 elp:OtherMember 2021-01-01 2021-12-31 0001041792 elp:OtherInProgressMember 2021-01-01 2021-12-31 0001041792 elp:OtherInServiceMember 2021-12-31 0001041792 elp:OtherInProgressMember 2021-12-31 0001041792 elp:OtherMember 2021-12-31 0001041792 elp:SocialSecurityLiabilitiesMember elp:TaxesAndSocialContributionMember 2021-12-31 0001041792 elp:SocialSecurityLiabilitiesMember elp:TaxesAndSocialContributionMember 2020-12-31 0001041792 elp:SocialSecurityLiabilitiesMember elp:SocialSecurityChargesOnPaidVacationAnd13thSalaryMember 2021-12-31 0001041792 elp:SocialSecurityLiabilitiesMember elp:SocialSecurityChargesOnPaidVacationAnd13thSalaryMember 2020-12-31 0001041792 elp:SocialSecurityLiabilitiesMember 2021-12-31 0001041792 elp:SocialSecurityLiabilitiesMember 2020-12-31 0001041792 elp:VacationMember elp:LaborLiabilitiesMember 2021-12-31 0001041792 elp:VacationMember elp:LaborLiabilitiesMember 2020-12-31 0001041792 elp:ProvisionsByPerformancesAndProfitSharingMember elp:LaborLiabilitiesMember 2021-12-31 0001041792 elp:ProvisionsByPerformancesAndProfitSharingMember elp:LaborLiabilitiesMember 2020-12-31 0001041792 elp:VoluntaryRetirementProgramMember elp:LaborLiabilitiesMember 2021-12-31 0001041792 elp:VoluntaryRetirementProgramMember elp:LaborLiabilitiesMember 2020-12-31 0001041792 elp:OtherLiabilititesMember elp:LaborLiabilitiesMember 2021-12-31 0001041792 elp:OtherLiabilititesMember elp:LaborLiabilitiesMember 2020-12-31 0001041792 elp:LaborLiabilitiesMember 2021-12-31 0001041792 elp:LaborLiabilitiesMember 2020-12-31 0001041792 elp:EnergySuppliesMember 2021-12-31 0001041792 elp:EnergySuppliesMember 2020-12-31 0001041792 elp:MaterialsAndSuppliesMember 2021-12-31 0001041792 elp:MaterialsAndSuppliesMember 2020-12-31 0001041792 elp:NaturalGasForResaleMember 2021-12-31 0001041792 elp:NaturalGasForResaleMember 2020-12-31 0001041792 elp:ChargesForUseOfGridSystemMember 2021-12-31 0001041792 elp:ChargesForUseOfGridSystemMember 2020-12-31 0001041792 elp:ForeignCurrencyMember elp:NationalTreasuryDepartmentMember elp:ParBondMember 2021-01-01 2021-12-31 0001041792 elp:ForeignCurrencyMember elp:NationalTreasuryDepartmentMember elp:ParBondAndDiscountBondMember 2021-01-01 2021-12-31 0001041792 elp:ForeignCurrencyMember elp:NationalTreasuryDepartmentMember elp:ParBondMember 2021-12-31 0001041792 elp:ForeignCurrencyMember elp:NationalTreasuryDepartmentMember elp:ParBondMember 2020-12-31 0001041792 elp:ForeignCurrencyMember elp:NationalTreasuryDepartmentMember elp:DiscountBondMember 2021-01-01 2021-12-31 0001041792 elp:ForeignCurrencyMember elp:NationalTreasuryDepartmentMember elp:DiscountBondMember 2021-12-31 0001041792 elp:ForeignCurrencyMember elp:NationalTreasuryDepartmentMember elp:DiscountBondMember 2020-12-31 0001041792 elp:ForeignCurrencyMember 2021-12-31 0001041792 elp:ForeignCurrencyMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilMember elp:CCBMember 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilMember elp:CCBMember 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilMember elp:CCBMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:CaixaEconomicaFederalMember elp:Contract1Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:CaixaEconomicaFederalMember elp:Contract2Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:CaixaEconomicaFederalMember elp:Contract1Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:CaixaEconomicaFederalMember elp:Contract1Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:CaixaEconomicaFederalMember elp:Contract2Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:CaixaEconomicaFederalMember elp:Contract2Member 2020-12-31 0001041792 elp:CaixaEconomicaFederalMember 2021-12-31 0001041792 elp:CaixaEconomicaFederalMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract3Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract4Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract5Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract6Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract3Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract4Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract5Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract6Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract7Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract7Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract8Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract8Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract9Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract9Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract10Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract10Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract11Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember elp:Contract11Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoNordesteDoBrasilMember 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilBNDESTransferMember elp:Contract12Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilBNDESTransferMember elp:Contract12Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilBNDESTransferMember elp:Contract12Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilBNDESTransferMember 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BancoDoBrasilBNDESTransferMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract13Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract12Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract13Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract13Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract14Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract14Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract14Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract15Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract15Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract15Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract16Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract16Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract16Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract17Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract17Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract17Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract18Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract18Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract18Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract19Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract19Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract19Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract20Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract20Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract20Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract21Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract21Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract21Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract22Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract22Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract22Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract23Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract23Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract23Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract24Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract24Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract24Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract25Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract25Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract25Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract26Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract26Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract26Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract27Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract27Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract27Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract28Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract28Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract28Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract29Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract29Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract29Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract30Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract30Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract30Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract31Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract31Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract31Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract32Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract32Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract32Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract33Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract33Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract33Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract34Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract34Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract34Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract35Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract35Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract35Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract36Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract36Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract36Member 2020-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract37Member 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract37Member 2021-12-31 0001041792 elp:LocalCurrencyMember elp:BNDESMember elp:Contract37Member 2020-12-31 0001041792 elp:LocalCurrency1Member 2021-12-31 0001041792 elp:LocalCurrency1Member 2020-12-31 0001041792 elp:ForeignCurrencyMember elp:USDMember 2021-12-31 0001041792 elp:ForeignCurrencyMember elp:USDMember 2020-12-31 0001041792 elp:ForeignCurrencyMember 2021-12-31 0001041792 elp:ForeignCurrencyMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:TJLPMember 2021-12-31 0001041792 elp:LocalCurrencyMember elp:TJLPMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:CDIMember 2021-12-31 0001041792 elp:LocalCurrencyMember elp:CDIMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:IPCAemberMember 2021-12-31 0001041792 elp:LocalCurrencyMember elp:IPCAemberMember 2020-12-31 0001041792 elp:LocalCurrencyMember elp:WithoutIndexerMember 2021-12-31 0001041792 elp:LocalCurrencyMember elp:WithoutIndexerMember 2020-12-31 0001041792 elp:LocalCurrencyMember 2021-12-31 0001041792 elp:LocalCurrencyMember 2020-12-31 0001041792 elp:LaterThanSixYearsAndNotLaterThanSevenYearsMember 2021-12-31 0001041792 elp:LaterThanSevenYearsMember 2021-12-31 0001041792 elp:ForeignCurrencyMember 2019-12-31 0001041792 elp:LocalCurrencyMember 2019-12-31 0001041792 elp:ForeignCurrencyMember 2020-01-01 2020-12-31 0001041792 elp:LocalCurrencyMember 2020-01-01 2020-12-31 0001041792 elp:LocalCurrencyMember 2020-12-31 0001041792 elp:ForeignCurrencyMember 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember 2021-01-01 2021-12-31 0001041792 elp:LocalCurrencyMember 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn8209891MauaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BancodoBrasiln21020000MauaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn14205611Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn14212711Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn14212721Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESAssignmentAgreementMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn11211531Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn11211521Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn11211551Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn11211541Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn18204611Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn13212221Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:BNDESFinemn14205851Member 2021-01-01 2021-12-31 0001041792 elp:DebenturesThirtyDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesTwentyDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesThirtyDueOnMember 2020-01-02 0001041792 elp:DebenturesTwentyDueOnMember 2021-12-31 0001041792 elp:DebenturesTwentyDueOnMember 2020-12-31 0001041792 elp:DebenturesFiveDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesOneDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesTwoDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesFourDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesFive1DueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesFive2DueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesDueOnMember 2021-12-31 0001041792 elp:DebenturesDueOnMember 2020-12-31 0001041792 elp:DebenturesOneDueOnMember 2021-12-31 0001041792 elp:DebenturesOneDueOnMember 2020-12-31 0001041792 elp:DebenturesTwoDueOnMember 2021-12-31 0001041792 elp:DebenturesTwoDueOnMember 2020-12-31 0001041792 elp:DebenturesFourDueOnMember 2021-12-31 0001041792 elp:DebenturesFourDueOnMember 2020-12-31 0001041792 elp:DebenturesFiveDueOnMember 2021-12-31 0001041792 elp:DebenturesFiveDueOnMember 2020-12-31 0001041792 elp:DebenturesFive1DueOnMember 2021-12-31 0001041792 elp:DebenturesFive2DueOnMember 2021-12-31 0001041792 elp:DebenturesSixDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesSevenDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesEightDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesNineDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesNine1DueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesNine2DueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesSixDueOnMember 2021-12-31 0001041792 elp:DebenturesSixDueOnMember 2020-12-31 0001041792 elp:DebenturesSevenDueOnMember 2021-12-31 0001041792 elp:DebenturesSevenDueOnMember 2020-12-31 0001041792 elp:DebenturesEightDueOnMember 2021-12-31 0001041792 elp:DebenturesEightDueOnMember 2020-12-31 0001041792 elp:DebenturesNineDueOnMember 2021-12-31 0001041792 elp:DebenturesNineDueOnMember 2020-12-31 0001041792 elp:Debentures9DueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesNine1DueOnMember 2021-12-31 0001041792 elp:DebenturesNine2DueOnMember 2021-12-31 0001041792 elp:DebenturesTharteenDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesFourteenDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesTharteenDueOnMember 2021-12-31 0001041792 elp:DebenturesTharteenDueOnMember 2020-12-31 0001041792 elp:DebenturesFourteenDueOnMember 2021-12-31 0001041792 elp:DebenturesFourteenDueOnMember 2020-12-31 0001041792 elp:DebenturesFifteenDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesFifteenDueOnMember 2021-12-31 0001041792 elp:DebenturesFifteenDueOnMember 2020-12-31 0001041792 elp:DebenturesSixteenDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesEighteenDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesSeventeenDueOnMember 2021-01-01 2021-12-31 0001041792 elp:DebenturesSixteenDueOnMember 2021-12-31 0001041792 elp:DebenturesEighteenDueOnMember 2021-12-31 0001041792 elp:DebenturesNineteenDueOnMember 2021-12-31 0001041792 elp:CopelMember elp:DebenturesSixMember 2021-01-01 2021-12-31 0001041792 elp:CopelMember elp:DebenturesFourMember 2021-01-01 2021-12-31 0001041792 elp:CopelMember elp:DebenturesSevenMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:DebenturesMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:Debentures5Member 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:DebenturesTwoMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:DebenturesThreeMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember elp:DebenturesFourMember 2021-01-01 2021-12-31 0001041792 elp:CopelDistribuicaoSAMember elp:DebenturesTwoMember 2021-01-01 2021-12-31 0001041792 elp:CopelDistribuicaoSAMember elp:DebenturesThreeMember 2021-01-01 2021-12-31 0001041792 elp:CopelDistribuicaoSAMember elp:DebenturesFoureOneMember 2021-01-01 2021-12-31 0001041792 elp:CopelDistribuicaoSAMember elp:DebenturesFiveOneMember 2021-01-01 2021-12-31 0001041792 elp:NovaAsaBrancaIMember elp:DebenturesOneMember 2021-01-01 2021-12-31 0001041792 elp:NovaAsaBrancaIIIMember elp:DebenturesOneMember 2021-01-01 2021-12-31 0001041792 elp:NovaAsaBrancaIIMember elp:DebenturesOneMember 2021-01-01 2021-12-31 0001041792 elp:NovaEurusIVMember elp:DebenturesOneMember 2021-01-01 2021-12-31 0001041792 elp:VentosDeSantoUrielMember elp:DebenturesOneMember 2021-01-01 2021-12-31 0001041792 elp:VentosDeSantoUrielMember elp:DebenturesTwoMember 2021-01-01 2021-12-31 0001041792 ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2021-12-31 0001041792 ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2020-12-31 0001041792 elp:HealthcarePlansMember 2021-12-31 0001041792 elp:HealthcarePlansMember 2020-12-31 0001041792 elp:EmployeesMember ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2021-01-01 2021-12-31 0001041792 elp:EmployeesMember ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2020-01-01 2020-12-31 0001041792 elp:EmployeesMember ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2019-01-01 2019-12-31 0001041792 elp:EmployeesMember elp:HealthcarePlanPostEmploymentMember 2021-01-01 2021-12-31 0001041792 elp:EmployeesMember elp:HealthcarePlanPostEmploymentMember 2020-01-01 2020-12-31 0001041792 elp:EmployeesMember elp:HealthcarePlanPostEmploymentMember 2019-01-01 2019-12-31 0001041792 elp:EmployeesMember elp:HealthcarePlanActiveEmployeesMember 2021-01-01 2021-12-31 0001041792 elp:EmployeesMember elp:HealthcarePlanActiveEmployeesMember 2020-01-01 2020-12-31 0001041792 elp:EmployeesMember elp:HealthcarePlanActiveEmployeesMember 2019-01-01 2019-12-31 0001041792 elp:EmployeesMember 2021-01-01 2021-12-31 0001041792 elp:EmployeesMember 2020-01-01 2020-12-31 0001041792 elp:EmployeesMember 2019-01-01 2019-12-31 0001041792 elp:ManagementOneMember ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2021-01-01 2021-12-31 0001041792 elp:ManagementOneMember ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2020-01-01 2020-12-31 0001041792 elp:ManagementOneMember ifrs-full:DefinedBenefitPlansOtherThanMultiemployerPlansStatePlansAndPlansThatShareRisksBetweenEntitiesUnderCommonControlMember 2019-01-01 2019-12-31 0001041792 elp:ManagementOneMember elp:HealthcarePlanMember 2021-01-01 2021-12-31 0001041792 elp:ManagementOneMember elp:HealthcarePlanMember 2020-01-01 2020-12-31 0001041792 elp:ManagementOneMember elp:HealthcarePlanMember 2019-01-01 2019-12-31 0001041792 elp:ManagementOneMember 2021-01-01 2021-12-31 0001041792 elp:ManagementOneMember 2020-01-01 2020-12-31 0001041792 elp:ManagementOneMember 2019-01-01 2019-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfInflationMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:UnifiedPlanDefinedBenefitMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:UnifiedPlanDefinedBenefitMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:UnifiedPlanBalanceMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:UnifiedPlanBalanceMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:PlanIIIMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:PlanIIIMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:AssistancePlanMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfDiscountRatesMember elp:AssistancePlanMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember elp:UnifiedPlanMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember elp:UnifiedPlanMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember elp:PlanIIIMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember elp:PlanIIIMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember elp:AssistancePlanAgingFactorMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfExpectedRatesOfSalaryIncreasesMember elp:AssistancePlanAgingFactorMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfMortalityRatesMember elp:MortalityTableMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfMortalityRatesMember elp:MortalityTableMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfMortalityRatesMember elp:MortalityTableOfIndividualsWithPermanentDislityMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfMortalityRatesMember elp:MortalityTableOfIndividualsWithPermanentDislityMember 2020-01-01 2020-12-31 0001041792 ifrs-full:ActuarialAssumptionOfMortalityRatesMember elp:TableOfNewDisabilityBenefitVestedMember 2021-01-01 2021-12-31 0001041792 ifrs-full:ActuarialAssumptionOfMortalityRatesMember elp:TableOfNewDisabilityBenefitVestedMember 2020-01-01 2020-12-31 0001041792 elp:UnifiedPlanMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember 2020-01-01 2020-12-31 0001041792 elp:PlanIIIMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember 2020-01-01 2020-12-31 0001041792 elp:AssistancePlanMember 2021-01-01 2021-12-31 0001041792 elp:AssistancePlanMember 2020-01-01 2020-12-31 0001041792 elp:HealthcarePlanMember 2021-01-01 2021-12-31 0001041792 elp:PensionPlansMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember 2020-01-01 2020-12-31 0001041792 elp:PlanIIIMember 2020-01-01 2020-12-31 0001041792 elp:UnifiedPlanMember 2021-12-31 0001041792 elp:PlanIIIMember 2021-12-31 0001041792 elp:AssistancePlanMember 2021-12-31 0001041792 elp:UnifiedPlanMember 2019-12-31 0001041792 elp:PlanIIIMember 2019-12-31 0001041792 elp:AssistancePlanMember 2019-12-31 0001041792 elp:UnifiedPlanMember 2020-12-31 0001041792 elp:PlanIIIMember 2020-12-31 0001041792 elp:AssistancePlanMember 2020-12-31 0001041792 elp:UnifiedPlanMember 2021-01-01 2021-12-31 0001041792 elp:IncreaseByOnePercentMember 2021-12-31 0001041792 elp:DecreaseInOnePercentMember 2021-12-31 0001041792 elp:UnifiedPlanMember ifrs-full:NotLaterThanOneYearMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember ifrs-full:NotLaterThanOneYearMember 2021-01-01 2021-12-31 0001041792 elp:AssistancePlanMember ifrs-full:NotLaterThanOneYearMember 2021-01-01 2021-12-31 0001041792 ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember 2021-01-01 2021-12-31 0001041792 elp:AssistancePlanMember ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:LaterThanTwoYearsAndNotLaterThanThreeYearsMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember 2021-01-01 2021-12-31 0001041792 elp:AssistancePlanMember ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:LaterThanThreeYearsAndNotLaterThanFourYearsMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember 2021-01-01 2021-12-31 0001041792 elp:AssistancePlanMember ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:LaterThanFourYearsAndNotLaterThanFiveYearsMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:LaterThanFiveYearsAndNotLaterThanSixYearsMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:LaterThanFiveYearsAndNotLaterThanSixYearsMember 2021-01-01 2021-12-31 0001041792 elp:AssistancePlanMember elp:LaterThanFiveYearsAndNotLaterThanSixYearsMember 2021-01-01 2021-12-31 0001041792 elp:LaterThanFiveYearsAndNotLaterThanSixYearsMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:LaterThanFiveYearsAndNotLaterThanFourtyNineYearsMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:LaterThanFiveYearsAndNotLaterThanFourtyNineYearsMember 2021-01-01 2021-12-31 0001041792 elp:AssistancePlanMember elp:LaterThanFiveYearsAndNotLaterThanFourtyNineYearsMember 2021-01-01 2021-12-31 0001041792 elp:LaterThanFiveYearsAndNotLaterThanFourtyNineYearsMember 2021-01-01 2021-12-31 0001041792 elp:FixedIncomeMember elp:EventsAfterReportingPeriodMember 2021-01-01 2021-12-31 0001041792 elp:FixedIncomeMember 2021-01-01 2021-12-31 0001041792 elp:VariableIncomeMember elp:EventsAfterReportingPeriodMember 2021-01-01 2021-12-31 0001041792 elp:VariableIncomeMember 2021-01-01 2021-12-31 0001041792 elp:LoansAllocationMember elp:EventsAfterReportingPeriodMember 2021-01-01 2021-12-31 0001041792 elp:LoansAllocationMember 2021-01-01 2021-12-31 0001041792 elp:RealEstateAllocationMember elp:EventsAfterReportingPeriodMember 2021-01-01 2021-12-31 0001041792 elp:RealEstateAllocationMember 2021-01-01 2021-12-31 0001041792 elp:InvestmentStructuringMember elp:EventsAfterReportingPeriodMember 2021-01-01 2021-12-31 0001041792 elp:InvestmentStructuringMember 2021-01-01 2021-12-31 0001041792 elp:InvestmentsAbroadMember elp:EventsAfterReportingPeriodMember 2021-01-01 2021-12-31 0001041792 elp:InvestmentsAbroadMember 2021-01-01 2021-12-31 0001041792 elp:EventsAfterReportingPeriodMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:FixedIncomeMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:FixedIncomeMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:VariableIncomeMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:VariableIncomeMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:LoansAllocationMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:LoansAllocationMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:RealEstateAllocationMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:RealEstateAllocationMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:InvestmentStructuringMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:InvestmentStructuringMember 2021-01-01 2021-12-31 0001041792 elp:UnifiedPlanMember elp:ForeignInvestmentsAbroadMember 2021-01-01 2021-12-31 0001041792 elp:PlanIIIMember elp:ForeignInvestmentsMember 2021-01-01 2021-12-31 0001041792 elp:EnergyDevelopmentAccountMember 2021-12-31 0001041792 elp:EnergyDevelopmentAccountMember 2020-12-31 0001041792 elp:GlobalReversalReserveMember 2021-12-31 0001041792 elp:GlobalReversalReserveMember 2020-12-31 0001041792 elp:TariffFlagsMember 2021-12-31 0001041792 elp:TariffFlagsMember 2020-12-31 0001041792 elp:ResearchAndDevelopmentMember elp:NationalFundForScientificAndTechnologicalMember 2021-12-31 0001041792 elp:ResearchAndDevelopmentMember elp:NationalFundForScientificAndTechnologicalMember 2020-12-31 0001041792 elp:ResearchAndDevelopmentMember elp:MMEMember 2021-12-31 0001041792 elp:ResearchAndDevelopmentMember elp:MMEMember 2020-12-31 0001041792 elp:ResearchAndDevelopmentMember elp:RAndDMember 2021-12-31 0001041792 elp:ResearchAndDevelopmentMember elp:RAndDMember 2020-12-31 0001041792 elp:ResearchAndDevelopmentMember 2021-12-31 0001041792 elp:ResearchAndDevelopmentMember 2020-12-31 0001041792 elp:EnergyEfficiencyProgramMember elp:NationalProgramOfElectricityConservationProcelMember 2021-12-31 0001041792 elp:EnergyEfficiencyProgramMember elp:NationalProgramOfElectricityConservationProcelMember 2020-12-31 0001041792 elp:EnergyEfficiencyProgramMember elp:EEPMember 2021-12-31 0001041792 elp:EnergyEfficiencyProgramMember elp:EEPMember 2020-12-31 0001041792 elp:EnergyEfficiencyProgramMember 2021-12-31 0001041792 elp:EnergyEfficiencyProgramMember 2020-12-31 0001041792 elp:FNDCTMember 2019-12-31 0001041792 elp:MMEMember 2019-12-31 0001041792 elp:RAndDMember 2019-12-31 0001041792 elp:ProcelMember 2019-12-31 0001041792 elp:EnergyEfficiencyProgramMember 2019-12-31 0001041792 elp:FNDCTMember 2020-01-01 2020-12-31 0001041792 elp:MMEMember 2020-01-01 2020-12-31 0001041792 elp:RAndDMember 2020-01-01 2020-12-31 0001041792 elp:ProcelMember 2020-01-01 2020-12-31 0001041792 elp:EnergyEfficiencyProgramMember 2020-01-01 2020-12-31 0001041792 elp:FNDCTMember 2020-12-31 0001041792 elp:MMEMember 2020-12-31 0001041792 elp:RAndDMember 2020-12-31 0001041792 elp:ProcelMember 2020-12-31 0001041792 elp:EnergyEfficiencyProgramMember 2020-12-31 0001041792 elp:FNDCTMember 2021-01-01 2021-12-31 0001041792 elp:MMEMember 2021-01-01 2021-12-31 0001041792 elp:RAndDMember 2021-01-01 2021-12-31 0001041792 elp:ProcelMember 2021-01-01 2021-12-31 0001041792 elp:EnergyEfficiencyProgramMember 2021-01-01 2021-12-31 0001041792 elp:FNDCTMember 2021-12-31 0001041792 elp:MMEMember 2021-12-31 0001041792 elp:RAndDMember 2021-12-31 0001041792 elp:ProcelMember 2021-12-31 0001041792 elp:EnergyEfficiencyProgramMember 2021-12-31 0001041792 elp:PublicProperty1Member 2021-01-01 2021-12-31 0001041792 elp:PublicProperty1Member 2021-12-31 0001041792 elp:PublicProperty1Member 2020-12-31 0001041792 elp:PublicProperty2Member 2021-01-01 2021-12-31 0001041792 elp:PublicProperty2Member 2021-12-31 0001041792 elp:PublicProperty2Member 2020-12-31 0001041792 elp:PublicProperty3Member 2021-01-01 2021-12-31 0001041792 elp:PublicProperty3Member 2021-12-31 0001041792 elp:PublicProperty3Member 2020-12-31 0001041792 elp:PublicProperty7Member 2021-01-01 2021-12-31 0001041792 elp:PublicProperty7Member 2021-12-31 0001041792 elp:PublicProperty7Member 2020-12-31 0001041792 elp:PublicProperty8Member 2021-01-01 2021-12-31 0001041792 elp:PublicProperty8Member 2021-12-31 0001041792 elp:PublicProperty8Member 2020-12-31 0001041792 elp:AccountsPayableMember 2019-12-31 0001041792 elp:AccountsPayableMember 2020-01-01 2020-12-31 0001041792 elp:AccountsPayableMember 2020-12-31 0001041792 elp:AccountsPayableMember 2021-01-01 2021-12-31 0001041792 elp:AccountsPayableMember 2021-12-31 0001041792 elp:NominalValueMember elp:TwentyTwentyTwoMember 2021-12-31 0001041792 elp:PresentValueMember elp:TwentyTwentyTwoMember 2021-12-31 0001041792 elp:NominalValueMember elp:TwentyTwentyThreeMember 2021-12-31 0001041792 elp:PresentValueMember elp:TwentyTwentyThreeMember 2021-12-31 0001041792 elp:NominalValueMember elp:TwentyTwentyFourMember 2021-12-31 0001041792 elp:PresentValueMember elp:TwentyTwentyFourMember 2021-12-31 0001041792 elp:NominalValueMember elp:TwentyTwentyFiveMember 2021-12-31 0001041792 elp:PresentValueMember elp:TwentyTwentyFiveMember 2021-12-31 0001041792 elp:NominalValueMember elp:AfterTwentyTwentyFiveMember 2021-12-31 0001041792 elp:PresentValueMember elp:AfterTwentyTwentyFiveMember 2021-12-31 0001041792 elp:NominalValueMember 2021-12-31 0001041792 elp:PresentValueMember 2021-12-31 0001041792 elp:RealEstatesMember 2020-12-31 0001041792 elp:RealEstatesMember 2021-01-01 2021-12-31 0001041792 elp:RealEstatesMember 2021-12-31 0001041792 ifrs-full:VehiclesMember 2020-12-31 0001041792 ifrs-full:VehiclesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:VehiclesMember 2021-12-31 0001041792 elp:EquipmentsMember 2020-12-31 0001041792 elp:EquipmentsMember 2021-01-01 2021-12-31 0001041792 elp:EquipmentsMember 2021-12-31 0001041792 elp:RealEstatesMember 2019-12-31 0001041792 elp:RealEstatesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:VehiclesMember 2019-12-31 0001041792 ifrs-full:VehiclesMember 2020-01-01 2020-12-31 0001041792 elp:EquipmentsMember 2019-12-31 0001041792 elp:EquipmentsMember 2020-01-01 2020-12-31 0001041792 ifrs-full:BottomOfRangeMember 2021-01-01 2021-12-31 0001041792 ifrs-full:CashFlowHedgesMember elp:LeaseConsiderationMember 2021-12-31 0001041792 ifrs-full:CashFlowHedgesMember elp:PotentialPisOrCofinsMember 2021-12-31 0001041792 ifrs-full:AtCostOrInAccordanceWithIFRS16WithinFairValueModelMember 2021-12-31 0001041792 elp:InflationProjectedBalanceMember 2021-12-31 0001041792 ifrs-full:AtCostOrInAccordanceWithIFRS16WithinFairValueModelMember 2021-01-01 2021-12-31 0001041792 elp:InflationProjectedBalanceMember 2021-01-01 2021-12-31 0001041792 elp:NotLaterThanOneYearOneMember 2021-12-31 0001041792 ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 elp:FairValuePurchaseAndSaleOfPowerMember 2021-12-31 0001041792 elp:FairValuePurchaseAndSaleOfPowerMember 2020-12-31 0001041792 elp:GenerationDeviationWindProjectsMember 2021-12-31 0001041792 elp:GenerationDeviationWindProjectsMember 2020-12-31 0001041792 elp:InvestmentAcquisitionMember 2021-12-31 0001041792 elp:InvestmentAcquisitionMember 2020-12-31 0001041792 elp:PaymentsReturnsToConsumersMember 2021-12-31 0001041792 elp:PaymentsReturnsToConsumersMember 2020-12-31 0001041792 elp:PledgesInGuaranteeMember 2021-12-31 0001041792 elp:PledgesInGuaranteeMember 2020-12-31 0001041792 elp:ObligationsToCustomersGasSalesOperationsMember 2021-12-31 0001041792 elp:ObligationsToCustomersGasSalesOperationsMember 2020-12-31 0001041792 elp:AneelOrderProvisionMember 2021-12-31 0001041792 elp:AneelOrderProvisionMember 2020-12-31 0001041792 elp:PublicLightingRateCollectedMember 2021-12-31 0001041792 elp:PublicLightingRateCollectedMember 2020-12-31 0001041792 elp:FinancialOffsetForTheUseOfWaterResourcesMember 2021-12-31 0001041792 elp:FinancialOffsetForTheUseOfWaterResourcesMember 2020-12-31 0001041792 elp:OtherLiabilitiesOtherAccountsPayableMember 2021-12-31 0001041792 elp:OtherLiabilitiesOtherAccountsPayableMember 2020-12-31 0001041792 elp:TaxMember elp:CofinsMember 2020-12-31 0001041792 elp:TaxMember elp:CofinsMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember elp:CofinsMember 2021-12-31 0001041792 elp:TaxMember elp:OthersMember 2020-12-31 0001041792 elp:TaxMember elp:OthersMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember elp:OthersMember 2021-12-31 0001041792 elp:TaxMember 2020-12-31 0001041792 elp:TaxMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember 2021-12-31 0001041792 elp:LaborsMember 2020-12-31 0001041792 elp:LaborsMember 2021-01-01 2021-12-31 0001041792 elp:LaborsMember 2021-12-31 0001041792 elp:EmployeeBenefitsMember 2020-12-31 0001041792 elp:EmployeeBenefitsMember 2021-01-01 2021-12-31 0001041792 elp:EmployeeBenefitsMember 2021-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeClaimsMember 2020-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeClaimsMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeClaimsMember 2021-12-31 0001041792 elp:CivilMember elp:EasementsMember 2020-12-31 0001041792 elp:CivilMember elp:EasementsMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:EasementsMember 2021-12-31 0001041792 elp:CivilMember elp:ExpropriationsAndPropertyMember 2020-12-31 0001041792 elp:CivilMember elp:ExpropriationsAndPropertyMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:ExpropriationsAndPropertyMember 2021-12-31 0001041792 elp:CivilMember elp:CustomersMember 2020-12-31 0001041792 elp:CivilMember elp:CustomersMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:CustomersMember 2021-12-31 0001041792 elp:EnvironmentalMember elp:CivilMember 2020-12-31 0001041792 elp:EnvironmentalMember elp:CivilMember 2021-01-01 2021-12-31 0001041792 elp:EnvironmentalMember elp:CivilMember 2021-12-31 0001041792 elp:CivilMember 2020-12-31 0001041792 elp:CivilMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember 2021-12-31 0001041792 elp:RegulatoryMember 2020-12-31 0001041792 elp:RegulatoryMember 2021-01-01 2021-12-31 0001041792 elp:RegulatoryMember 2021-12-31 0001041792 elp:TaxMember elp:CofinsMember 2019-12-31 0001041792 elp:TaxMember elp:CofinsMember 2020-01-01 2020-12-31 0001041792 elp:TaxMember elp:OthersMember 2019-12-31 0001041792 elp:TaxMember elp:OthersMember 2020-01-01 2020-12-31 0001041792 elp:TaxMember 2019-12-31 0001041792 elp:TaxMember 2020-01-01 2020-12-31 0001041792 elp:LaborsMember 2019-12-31 0001041792 elp:LaborsMember 2020-01-01 2020-12-31 0001041792 elp:EmployeeBenefitsMember 2019-12-31 0001041792 elp:EmployeeBenefitsMember 2020-01-01 2020-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeClaimsMember 2019-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeClaimsMember 2020-01-01 2020-12-31 0001041792 elp:CivilMember elp:EasementsMember 2019-12-31 0001041792 elp:CivilMember elp:EasementsMember 2020-01-01 2020-12-31 0001041792 elp:CivilMember elp:ExpropriationsAndPropertyMember 2019-12-31 0001041792 elp:CivilMember elp:ExpropriationsAndPropertyMember 2020-01-01 2020-12-31 0001041792 elp:CivilMember elp:CustomersMember 2019-12-31 0001041792 elp:CivilMember elp:CustomersMember 2020-01-01 2020-12-31 0001041792 elp:EnvironmentalMember elp:CivilMember 2019-12-31 0001041792 elp:EnvironmentalMember elp:CivilMember 2020-01-01 2020-12-31 0001041792 elp:CivilMember 2019-12-31 0001041792 elp:CivilMember 2020-01-01 2020-12-31 0001041792 elp:RegulatoryMember 2019-12-31 0001041792 elp:RegulatoryMember 2020-01-01 2020-12-31 0001041792 elp:TaxMember elp:INSSMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember elp:INSSMember 2021-12-31 0001041792 elp:TaxMember elp:INSSMember 2020-12-31 0001041792 elp:TaxMember elp:FederalTaxesMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember elp:FederalTaxesMember 2021-12-31 0001041792 elp:TaxMember elp:FederalTaxesMember 2020-12-31 0001041792 elp:TaxMember elp:ICMSMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember elp:ICMSMember 2021-12-31 0001041792 elp:TaxMember elp:ICMSMember 2020-12-31 0001041792 elp:TaxMember elp:IPTUMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember elp:IPTUMember 2021-12-31 0001041792 elp:TaxMember elp:IPTUMember 2020-12-31 0001041792 elp:TaxMember elp:ISSMember 2021-01-01 2021-12-31 0001041792 elp:TaxMember elp:ISSMember 2021-12-31 0001041792 elp:TaxMember elp:ISSMember 2020-12-31 0001041792 elp:LaborMember 2021-01-01 2021-12-31 0001041792 elp:LaborMember 2021-12-31 0001041792 elp:LaborMember 2020-12-31 0001041792 elp:RegulatoryMember elp:DispatchAneel2882002Member 2021-01-01 2021-12-31 0001041792 elp:RegulatoryMember elp:DispatchAneel2882002Member 2021-12-31 0001041792 elp:RegulatoryMember elp:DispatchAneel2882002Member 2020-12-31 0001041792 elp:RegulatoryMember elp:ESBRMember 2021-01-01 2021-12-31 0001041792 elp:RegulatoryMember elp:ESBRMember 2021-12-31 0001041792 elp:RegulatoryMember elp:ESBRMember 2020-12-31 0001041792 elp:RegulatoryMember elp:ColiderExclusionOfLiabilityMember 2021-01-01 2021-12-31 0001041792 elp:RegulatoryMember elp:ColiderExclusionOfLiabilityMember 2021-12-31 0001041792 elp:RegulatoryMember elp:ColiderExclusionOfLiabilityMember 2020-12-31 0001041792 elp:RegulatoryMember elp:OthersMember 2021-01-01 2021-12-31 0001041792 elp:RegulatoryMember elp:OthersMember 2021-12-31 0001041792 elp:RegulatoryMember elp:OthersMember 2020-12-31 0001041792 elp:CivilMember elp:TobaccoGrowersMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:TobaccoGrowersMember 2021-12-31 0001041792 elp:CivilMember elp:TobaccoGrowersMember 2020-12-31 0001041792 elp:CivilMember elp:DepartmentOfRoadsAndRoadworksMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:DepartmentOfRoadsAndRoadworksMember 2021-12-31 0001041792 elp:CivilMember elp:DepartmentOfRoadsAndRoadworksMember 2020-12-31 0001041792 elp:CivilMember elp:ArbitrationMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:ArbitrationMember 2021-12-31 0001041792 elp:CivilMember elp:ArbitrationMember 2020-12-31 0001041792 elp:CivilMember elp:PISCOFINSCreditOnICMSMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:PISCOFINSCreditOnICMSMember 2021-12-31 0001041792 elp:CivilMember elp:PISCOFINSCreditOnICMSMember 2020-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeLawMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeLawMember 2021-12-31 0001041792 elp:CivilMember elp:CivilAndAdministrativeLawMember 2020-12-31 0001041792 elp:CivilMember elp:IndemnificationToThirdPartiesCivilMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:IndemnificationToThirdPartiesCivilMember 2021-12-31 0001041792 elp:CivilMember elp:IndemnificationToThirdPartiesCivilMember 2020-12-31 0001041792 elp:CivilMember elp:ExpropriationAndPropertyMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:ExpropriationAndPropertyMember 2021-12-31 0001041792 elp:CivilMember elp:ExpropriationAndPropertyMember 2020-12-31 0001041792 elp:CivilMember elp:IndemnificationToThirdPartiesExpropriationsMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:IndemnificationToThirdPartiesExpropriationsMember 2021-12-31 0001041792 elp:CivilMember elp:IndemnificationToThirdPartiesExpropriationsMember 2020-12-31 0001041792 elp:CivilMember elp:ConsumersMember 2021-01-01 2021-12-31 0001041792 elp:CivilMember elp:ConsumersMember 2021-12-31 0001041792 elp:CivilMember elp:ConsumersMember 2020-12-31 0001041792 elp:ClassAPreferredStockMember 2021-01-01 2021-12-31 0001041792 elp:StateOfParanaMember elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:StateOfParanaMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:StateOfParanaMember 2021-12-31 0001041792 elp:StateOfParanaMember elp:CommonSharesOneMember 2021-12-31 0001041792 elp:BNDESMember elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:BNDESMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:BNDESMember 2021-12-31 0001041792 elp:BNDESMember elp:CommonSharesOneMember 2021-12-31 0001041792 elp:EletrobrasMember elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:EletrobrasMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:EletrobrasMember 2021-12-31 0001041792 elp:EletrobrasMember elp:CommonSharesOneMember 2021-12-31 0001041792 elp:FreeFloatB3Member elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:FreeFloatB3Member 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:FreeFloatB3Member 2021-12-31 0001041792 elp:FreeFloatB3Member elp:CommonSharesOneMember 2021-12-31 0001041792 elp:FreeFloatNYSEMember elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:FreeFloatNYSEMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:FreeFloatNYSEMember 2021-12-31 0001041792 elp:FreeFloatNYSEMember elp:CommonSharesOneMember 2021-12-31 0001041792 elp:FreeFloatLatibexMember elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:FreeFloatLatibexMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:FreeFloatLatibexMember 2021-12-31 0001041792 elp:FreeFloatLatibexMember elp:CommonSharesOneMember 2021-12-31 0001041792 elp:CityHallsMember elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:CityHallsMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:CityHallsMember 2021-12-31 0001041792 elp:CityHallsMember elp:CommonSharesOneMember 2021-12-31 0001041792 elp:OtherShareholdersMember elp:CommonSharesMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember elp:OtherShareholdersMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember elp:OtherShareholdersMember 2021-12-31 0001041792 elp:OtherShareholdersMember elp:CommonSharesOneMember 2021-12-31 0001041792 elp:CommonShareMember 2021-12-31 0001041792 elp:ClassAPreferredSharesMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember 2021-12-31 0001041792 elp:ClassBPreferredSharesMember 2021-01-01 2021-12-31 0001041792 elp:ClassBPreferredSharesMember 2020-01-01 2020-12-31 0001041792 elp:ClassBPreferredSharesMember 2019-01-01 2019-12-31 0001041792 elp:OrdinaryShares1Member 2021-01-01 2021-12-31 0001041792 elp:OrdinaryShares1Member 2020-01-01 2020-12-31 0001041792 elp:OrdinaryShares1Member 2019-01-01 2019-12-31 0001041792 elp:ContinuingOperations1Member ifrs-full:OrdinarySharesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember ifrs-full:OrdinarySharesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OrdinarySharesMember 2021-01-01 2021-12-31 0001041792 elp:ContinuingOperations1Member ifrs-full:OrdinarySharesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember ifrs-full:OrdinarySharesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OrdinarySharesMember 2020-01-01 2020-12-31 0001041792 elp:ContinuingOperations1Member ifrs-full:OrdinarySharesMember 2019-01-01 2019-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember ifrs-full:OrdinarySharesMember 2019-01-01 2019-12-31 0001041792 ifrs-full:OrdinarySharesMember 2019-01-01 2019-12-31 0001041792 elp:ContinuingOperations1Member elp:ClassAPreferredSharesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember elp:ClassAPreferredSharesMember 2021-01-01 2021-12-31 0001041792 elp:ClassAPreferredSharesMember 2021-01-01 2021-12-31 0001041792 elp:ContinuingOperations1Member elp:ClassAPreferredSharesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember elp:ClassAPreferredSharesMember 2020-01-01 2020-12-31 0001041792 elp:ClassAPreferredSharesMember 2020-01-01 2020-12-31 0001041792 elp:ContinuingOperations1Member elp:ClassAPreferredSharesMember 2019-01-01 2019-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember elp:ClassAPreferredSharesMember 2019-01-01 2019-12-31 0001041792 elp:ClassAPreferredSharesMember 2019-01-01 2019-12-31 0001041792 elp:ContinuingOperations1Member elp:ClassBPreferredSharesMember 2021-01-01 2021-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember elp:ClassBPreferredSharesMember 2021-01-01 2021-12-31 0001041792 elp:ClassBPreferredSharesMember 2021-01-01 2021-12-31 0001041792 elp:ContinuingOperations1Member elp:ClassBPreferredSharesMember 2020-01-01 2020-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember elp:ClassBPreferredSharesMember 2020-01-01 2020-12-31 0001041792 elp:ClassBPreferredSharesMember 2020-01-01 2020-12-31 0001041792 elp:ContinuingOperations1Member elp:ClassBPreferredSharesMember 2019-01-01 2019-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember elp:ClassBPreferredSharesMember 2019-01-01 2019-12-31 0001041792 elp:ClassBPreferredSharesMember 2019-01-01 2019-12-31 0001041792 elp:ContinuingOperations1Member 2021-01-01 2021-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember 2021-01-01 2021-12-31 0001041792 elp:ContinuingOperations1Member 2020-01-01 2020-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember 2020-01-01 2020-12-31 0001041792 elp:ContinuingOperations1Member 2019-01-01 2019-12-31 0001041792 ifrs-full:DiscontinuedOperationsMember 2019-01-01 2019-12-31 0001041792 elp:ElectricitySalesToFinalCustomersMember 2021-01-01 2021-12-31 0001041792 elp:ElectricitySalesToFinalCustomersMember 2020-01-01 2020-12-31 0001041792 elp:ElectricitySalesToFinalCustomersMember 2019-01-01 2019-12-31 0001041792 elp:ElectricitySalesToDistributorsMember 2021-01-01 2021-12-31 0001041792 elp:ElectricitySalesToDistributorsMember 2020-01-01 2020-12-31 0001041792 elp:ElectricitySalesToDistributorsMember 2019-01-01 2019-12-31 0001041792 elp:UseOfTheMainDistributionAndTransmissionGridMember 2021-01-01 2021-12-31 0001041792 elp:UseOfTheMainDistributionAndTransmissionGridMember 2020-01-01 2020-12-31 0001041792 elp:UseOfTheMainDistributionAndTransmissionGridMember 2019-01-01 2019-12-31 0001041792 elp:ConstructionIncomeMember 2021-01-01 2021-12-31 0001041792 elp:ConstructionIncomeMember 2020-01-01 2020-12-31 0001041792 elp:ConstructionIncomeMember 2019-01-01 2019-12-31 0001041792 elp:FairValueOfAssetsFromTheIndemnityForTheConcessionMember 2021-01-01 2021-12-31 0001041792 elp:FairValueOfAssetsFromTheIndemnityForTheConcessionMember 2020-01-01 2020-12-31 0001041792 elp:FairValueOfAssetsFromTheIndemnityForTheConcessionMember 2019-01-01 2019-12-31 0001041792 elp:DistributionOfPipedGas1Member 2021-01-01 2021-12-31 0001041792 elp:DistributionOfPipedGas1Member 2020-01-01 2020-12-31 0001041792 elp:DistributionOfPipedGas1Member 2019-01-01 2019-12-31 0001041792 elp:SectorialFinancialAssetsAndLiabilitiesResultMember 2021-01-01 2021-12-31 0001041792 elp:SectorialFinancialAssetsAndLiabilitiesResult2Member 2021-01-01 2021-12-31 0001041792 elp:SectorialFinancialAssetsAndLiabilitiesResult2Member 2020-01-01 2020-12-31 0001041792 elp:SectorialFinancialAssetsAndLiabilitiesResult2Member 2019-01-01 2019-12-31 0001041792 elp:OtherOperatingRevenueMember 2021-01-01 2021-12-31 0001041792 elp:OtherOperatingRevenueMember 2020-01-01 2020-12-31 0001041792 elp:OtherOperatingRevenueMember 2019-01-01 2019-12-31 0001041792 elp:RecoveryOfPisPasepAndCofinsOnICMSMember 2020-01-01 2020-12-31 0001041792 elp:ElectricitySalesToFinalCustomersMembeMember 2021-01-01 2021-12-31 0001041792 elp:ElectricitySalesToFinalCustomersMembeMember 2020-01-01 2020-12-31 0001041792 elp:ElectricitySalesToFinalCustomersMembeMember 2019-01-01 2019-12-31 0001041792 elp:ResidentialMember 2021-01-01 2021-12-31 0001041792 elp:ResidentialMember 2020-01-01 2020-12-31 0001041792 elp:ResidentialMember 2019-01-01 2019-12-31 0001041792 elp:IndustrialMember 2021-01-01 2021-12-31 0001041792 elp:IndustrialMember 2020-01-01 2020-12-31 0001041792 elp:IndustrialMember 2019-01-01 2019-12-31 0001041792 elp:TradeServicesAndOtherActivitiesMember 2021-01-01 2021-12-31 0001041792 elp:TradeServicesAndOtherActivitiesMember 2019-01-01 2020-12-31 0001041792 elp:TradeServicesAndOtherActivitiesMember 2019-01-01 2019-12-31 0001041792 elp:RuralMember 2021-01-01 2021-12-31 0001041792 elp:RuralMember 2020-01-01 2020-12-31 0001041792 elp:RuralMember 2019-01-01 2019-12-31 0001041792 elp:PublicEntitiesMember 2021-01-01 2021-12-31 0001041792 elp:PublicEntitiesMember 2020-01-01 2020-12-31 0001041792 elp:PublicEntitiesMember 2019-01-01 2019-12-31 0001041792 elp:PublicLightingMember 2021-01-01 2021-12-31 0001041792 elp:PublicLightingMember 2020-01-01 2020-12-31 0001041792 elp:PublicLightingMember 2019-01-01 2019-12-31 0001041792 elp:PublicServiceMember 2021-01-01 2021-12-31 0001041792 elp:PublicServiceMember 2020-01-01 2020-12-31 0001041792 elp:PublicServiceMember 2019-01-01 2019-12-31 0001041792 elp:FreeConsumersMember 2021-01-01 2021-12-31 0001041792 elp:FreeConsumersMember 2020-01-01 2020-12-31 0001041792 elp:FreeConsumersMember 2019-01-01 2019-12-31 0001041792 elp:DonationsAndGrantsMember 2021-01-01 2021-12-31 0001041792 elp:DonationsAndGrantsMember 2020-01-01 2020-12-31 0001041792 elp:DonationsAndGrantsMember 2019-01-01 2019-12-31 0001041792 elp:ElectricitySalesToDistributorsOneMember 2021-01-01 2021-12-31 0001041792 elp:ElectricitySalesToDistributorsOneMember 2020-01-01 2020-12-31 0001041792 elp:ElectricitySalesToDistributorsOneMember 2019-01-01 2019-12-31 0001041792 elp:BilateralContractsMember 2021-01-01 2021-12-31 0001041792 elp:BilateralContractsMember 2020-01-01 2020-12-31 0001041792 elp:BilateralContractsMember 2019-01-01 2019-12-31 0001041792 elp:RegulatedContractsMember 2021-01-01 2021-12-31 0001041792 elp:RegulatedContractsMember 2020-01-01 2020-12-31 0001041792 elp:RegulatedContractsMember 2019-01-01 2019-12-31 0001041792 elp:ElectricEnergyTradeChamberCCEEMember 2021-01-01 2021-12-31 0001041792 elp:ElectricEnergyTradeChamberCCEEMember 2020-01-01 2020-12-31 0001041792 elp:ElectricEnergyTradeChamberCCEEMember 2019-01-01 2019-12-31 0001041792 elp:EffectiveInterestGrantBonusMember 2021-01-01 2021-12-31 0001041792 elp:EffectiveInterestGrantBonusMember 2020-01-01 2020-12-31 0001041792 elp:EffectiveInterestGrantBonusMember 2019-01-01 2019-12-31 0001041792 elp:UseOfTheMainDistributionAndTransmissionGridOneMember 2021-01-01 2021-12-31 0001041792 elp:UseOfTheMainDistributionAndTransmissionGridOneMember 2020-01-01 2020-12-31 0001041792 elp:UseOfTheMainDistributionAndTransmissionGridOneMember 2019-01-01 2019-12-31 0001041792 elp:ResidentialOneMember 2021-01-01 2021-12-31 0001041792 elp:ResidentialOneMember 2020-01-01 2020-12-31 0001041792 elp:ResidentialOneMember 2019-01-01 2019-12-31 0001041792 elp:IndustrialOneMember 2021-01-01 2021-12-31 0001041792 elp:IndustrialOneMember 2020-01-01 2020-12-31 0001041792 elp:IndustrialOneMember 2019-01-01 2019-12-31 0001041792 elp:TradeServicesAndOtherActivitiesOneMember 2021-01-01 2021-12-31 0001041792 elp:TradeServicesAndOtherActivitiesOneMember 2020-01-01 2020-12-31 0001041792 elp:TradeServicesAndOtherActivitiesOneMember 2019-01-01 2019-12-31 0001041792 elp:RuralOneMember 2021-01-01 2021-12-31 0001041792 elp:RuralOneMember 2020-01-01 2020-12-31 0001041792 elp:RuralOneMember 2019-01-01 2019-12-31 0001041792 elp:PublicEntitiesOneMember 2021-01-01 2021-12-31 0001041792 elp:PublicEntitiesOneMember 2020-01-01 2020-12-31 0001041792 elp:PublicEntitiesOneMember 2019-01-01 2019-12-31 0001041792 elp:PublicLightingOneMember 2021-01-01 2021-12-31 0001041792 elp:PublicLightingOneMember 2020-01-01 2020-12-31 0001041792 elp:PublicLightingOneMember 2019-01-01 2019-12-31 0001041792 elp:PublicServiceOneMember 2021-01-01 2021-12-31 0001041792 elp:PublicServiceOneMember 2020-01-01 2020-12-31 0001041792 elp:PublicServiceOneMember 2019-01-01 2019-12-31 0001041792 elp:FreeConsumersOneMember 2021-01-01 2021-12-31 0001041792 elp:FreeConsumersOneMember 2020-01-01 2020-12-31 0001041792 elp:FreeConsumersOneMember 2019-01-01 2019-12-31 0001041792 elp:ConcessionairesAndGeneratorsOneMember 2021-01-01 2021-12-31 0001041792 elp:ConcessionairesAndGeneratorsOneMember 2020-01-01 2020-12-31 0001041792 elp:ConcessionairesAndGeneratorsOneMember 2019-01-01 2019-12-31 0001041792 elp:OperatingAndMaintenanceIncomeOAndMAndInterestIncomeOneMember 2021-01-01 2021-12-31 0001041792 elp:OperatingAndMaintenanceIncomeOAndMAndInterestIncomeOneMember 2020-01-01 2020-12-31 0001041792 elp:OperatingAndMaintenanceIncomeOAndMAndInterestIncomeOneMember 2019-01-01 2019-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2021-01-01 2021-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2020-01-01 2020-12-31 0001041792 elp:PowerDistributionServiceConcessionMember 2019-01-01 2019-12-31 0001041792 elp:PowerGasDistributionServiceConcessionMember 2021-01-01 2021-12-31 0001041792 elp:PowerGasDistributionServiceConcessionMember 2020-01-01 2020-12-31 0001041792 elp:PowerGasDistributionServiceConcessionMember 2019-01-01 2019-12-31 0001041792 elp:PowerTransmissionConcessionMember 2021-01-01 2021-12-31 0001041792 elp:PowerTransmissionConcessionMember 2020-01-01 2020-12-31 0001041792 elp:PowerTransmissionConcessionMember 2019-01-01 2019-12-31 0001041792 elp:FairValueOfAssetsFromTheIndemnityConcessionMember 2021-01-01 2021-12-31 0001041792 elp:FairValueOfAssetsFromTheIndemnityConcessionMember 2020-01-01 2020-12-31 0001041792 elp:FairValueOfAssetsFromTheIndemnityConcessionMember 2019-01-01 2019-12-31 0001041792 elp:DistributionOfPipedGasMember 2021-01-01 2021-12-31 0001041792 elp:DistributionOfPipedGasMember 2020-01-01 2020-12-31 0001041792 elp:DistributionOfPipedGasMember 2019-01-01 2019-12-31 0001041792 elp:SectorialFinancialAssetsAndLiabilitiesResult1Member 2021-01-01 2021-12-31 0001041792 elp:SectorialFinancialAssetsAndLiabilitiesResult1Member 2020-01-01 2020-12-31 0001041792 elp:SectorialFinancialAssetsAndLiabilitiesResult1Member 2019-01-01 2019-12-31 0001041792 elp:OtherOperatingRevenueOneMember 2021-01-01 2021-12-31 0001041792 elp:OtherOperatingRevenueOneMember 2020-01-01 2020-12-31 0001041792 elp:OtherOperatingRevenueOneMember 2019-01-01 2019-12-31 0001041792 elp:LeasingAndRentMember 2021-01-01 2021-12-31 0001041792 elp:LeasingAndRentMember 2020-01-01 2020-12-31 0001041792 elp:LeasingAndRentMember 2019-01-01 2019-12-31 0001041792 elp:FairValueInThePurchaseAndSaleOfPowerMember 2020-01-01 2020-12-31 0001041792 elp:FairValueInThePurchaseAndSaleOfPowerMember 2019-01-01 2019-12-31 0001041792 elp:IncomeFromRenderingOfServicesMember 2021-01-01 2021-12-31 0001041792 elp:IncomeFromRenderingOfServicesMember 2020-01-01 2020-12-31 0001041792 elp:IncomeFromRenderingOfServicesMember 2019-01-01 2019-12-31 0001041792 elp:OtherIncomeOneMember 2021-01-01 2021-12-31 0001041792 elp:OtherIncomeOneMember 2020-01-01 2020-12-31 0001041792 elp:OtherIncomeOneMember 2019-01-01 2019-12-31 0001041792 elp:GrossOperatingRevenueOneMember 2021-01-01 2021-12-31 0001041792 elp:GrossOperatingRevenueOneMember 2020-01-01 2020-12-31 0001041792 elp:GrossOperatingRevenueOneMember 2019-01-01 2019-12-31 0001041792 elp:PisPasepAndCofinsOneMember 2021-01-01 2021-12-31 0001041792 elp:PisPasepAndCofinsOneMember 2020-01-01 2020-12-31 0001041792 elp:PisPasepAndCofinsOneMember 2019-01-01 2019-12-31 0001041792 elp:RecoveryOfPisPasepAndCofinsOnICMSMember 2021-01-01 2021-12-31 0001041792 elp:RecoveryOfPisPasepAndCofinsOnICMSMember 2019-01-01 2019-12-31 0001041792 elp:ICMSVATMember 2021-01-01 2021-12-31 0001041792 elp:ICMSVATMember 2019-01-01 2020-12-31 0001041792 elp:ICMSVATMember 2019-01-01 2019-12-31 0001041792 elp:ServiceTaxISSQNMember 2021-01-01 2021-12-31 0001041792 elp:ServiceTaxISSQNMember 2020-01-01 2020-12-31 0001041792 elp:ServiceTaxISSQNMember 2019-01-01 2019-12-31 0001041792 elp:SectorialChargesOneMember 2021-01-01 2021-12-31 0001041792 elp:SectorialChargesOneMember 2020-01-01 2020-12-31 0001041792 elp:SectorialChargesOneMember 2019-01-01 2019-12-31 0001041792 elp:NetOperatingRevenueOneMember 2021-01-01 2021-12-31 0001041792 elp:NetOperatingRevenueOneMember 2020-01-01 2020-12-31 0001041792 elp:NetOperatingRevenueOneMember 2019-01-01 2019-12-31 0001041792 elp:EquipmentAndFrameworkMember 2021-01-01 2021-12-31 0001041792 elp:EquipmentAndFrameworkMember 2020-01-01 2020-12-31 0001041792 elp:EquipmentAndFrameworkMember 2019-01-01 2019-12-31 0001041792 elp:FacilitiesSharingMember 2021-01-01 2021-12-31 0001041792 elp:FacilitiesSharingMember 2019-01-01 2019-12-31 0001041792 elp:RealEstateLeaseMember 2021-01-01 2021-12-31 0001041792 elp:RealEstateLeaseMember 2020-01-01 2020-12-31 0001041792 elp:RealEstateLeaseMember 2019-01-01 2019-12-31 0001041792 elp:EnergyDevelopmentAccountCDEEnergiaMember 2021-01-01 2021-12-31 0001041792 elp:EnergyDevelopmentAccountCDEEnergiaMember 2020-01-01 2020-12-31 0001041792 elp:EnergyDevelopmentAccountCDEEnergiaMember 2019-01-01 2019-12-31 0001041792 elp:OtherChargesRateFlagsMember 2021-01-01 2021-12-31 0001041792 elp:OtherChargesRateFlagsMember 2020-01-01 2020-12-31 0001041792 elp:OtherChargesRateFlagsMember 2019-01-01 2019-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyMember 2021-01-01 2021-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyMember 2020-01-01 2020-12-31 0001041792 elp:ResearchAndDevelopmentAndEnergyEfficiencyMember 2019-01-01 2019-12-31 0001041792 elp:GlobalReversionReserveRGRQuotaMember 2021-01-01 2021-12-31 0001041792 elp:GlobalReversionReserveRGRQuotaMember 2020-01-01 2020-12-31 0001041792 elp:GlobalReversionReserveRGRQuotaMember 2019-01-01 2019-12-31 0001041792 elp:EnergyDevelopmentAccountCDEUsoMember 2021-01-01 2021-12-31 0001041792 elp:EnergyDevelopmentAccountCDEUsoMember 2020-01-01 2020-12-31 0001041792 elp:EnergyDevelopmentAccountCDEUsoMember 2019-01-01 2019-12-31 0001041792 elp:InspectionFeeMember 2021-01-01 2021-12-31 0001041792 elp:InspectionFeeMember 2020-01-01 2020-12-31 0001041792 elp:InspectionFeeMember 2019-01-01 2019-12-31 0001041792 elp:ResolutionNo28142020Member elp:NationalElectricEnergyAgencyMember 2021-01-01 2021-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo28142021Member 2021-01-01 2021-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo283420211Member 2021-01-01 2021-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo283412021Member 2021-01-01 2021-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo286422021Member 2021-01-01 2021-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:OrderNo9392021Member 2021-01-01 2021-12-31 0001041792 elp:OderOneMember 2021-01-01 2021-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:OrderNo93912021Member 2021-01-01 2021-12-31 0001041792 elp:OrderNo93912021Member 2021-01-01 2021-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo26642019Member 2020-01-01 2020-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:PreliminaryInjunctionsMember 2020-01-01 2020-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo25102018Member 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:PreliminaryInjunctions1Member 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyMember 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo22312017Member 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo25212019Member 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ReturnOrderNo27552019Member 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyOneMember 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:ResolutionNo251012018Member 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyMember elp:PreliminaryInjunctions2Member 2019-01-01 2019-12-31 0001041792 elp:NationalElectricEnergyAgencyTwoMember 2019-01-01 2019-12-31 0001041792 elp:ElectricityPurchasedForResaleMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:ChargeOfTheMainDistributionAndTransmissionGridMember 2021-01-01 2021-12-31 0001041792 elp:PersonnelAndManagementMember 2021-01-01 2021-12-31 0001041792 elp:PensionAndHealthcarePlansMember 2021-01-01 2021-12-31 0001041792 elp:MaterialsAndSuppliesMember 2021-01-01 2021-12-31 0001041792 elp:MaterialsAndSuppliesForPowerElectricityMember 2021-01-01 2021-12-31 0001041792 elp:NaturalGasAndSuppliesForGasBusinessMember 2021-01-01 2021-12-31 0001041792 elp:ThirdPartyServicesMember 2021-01-01 2021-12-31 0001041792 elp:DepreciationAndAmortizationMember 2021-01-01 2021-12-31 0001041792 elp:EstimatedLossesProvisionsAndReversalsMember 2021-01-01 2021-12-31 0001041792 elp:ConstructionCostMember 2021-01-01 2021-12-31 0001041792 elp:HydrologicalRiskRenegotiationMember 2021-01-01 2021-12-31 0001041792 elp:OtherOperatingCostsAndExpensesNetMember 2021-01-01 2021-12-31 0001041792 elp:ElectricityPurchasedForResaleMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ChargeOfTheMainDistributionAndTransmissionGridMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:PersonnelAndManagementMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:PensionAndHealthcarePlansMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:MaterialsAndSuppliesMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:MaterialsAndSuppliesForPowerElectricityMember 2020-01-01 2020-12-31 0001041792 elp:NaturalGasAndSuppliesForGasBusinessMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ThirdPartyServicesMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:DepreciationAndAmortizationMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:EstimatedLossesProvisionsAndReversalsMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ConstructionCostMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:OtherOperatingCostsAndExpensesNetMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ElectricityPurchasedForResaleMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:ChargeOfTheMainDistributionAndTransmissionGridMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:PersonnelAndManagementMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:PensionAndHealthcarePlansMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:MaterialsAndSuppliesMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:MaterialsAndSuppliesForPowerElectricityMember 2019-01-01 2019-12-31 0001041792 elp:NaturalGasAndSuppliesForGasBusinessMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:ThirdPartyServicesMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:DepreciationAndAmortizationMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:EstimatedLossesProvisionsAndReversalsMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:ConstructionCostMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:OtherOperatingCostsAndExpensesNetMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:OtherOperatingCostsAndExpensesNetMember elp:RestatedOneMember 2018-01-01 2019-12-31 0001041792 elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:PurchaseOfEnergyInTheRegulatedEnvironmentMember 2021-01-01 2021-12-31 0001041792 elp:PurchaseOfEnergyInTheRegulatedEnvironmentMember 2020-01-01 2020-12-31 0001041792 elp:PurchaseOfEnergyInTheRegulatedEnvironmentMember 2019-01-01 2019-12-31 0001041792 elp:ItaipuBinacionalMember 2021-01-01 2021-12-31 0001041792 elp:ItaipuBinacionalMember 2020-01-01 2020-12-31 0001041792 elp:ItaipuBinacionalMember 2019-01-01 2019-12-31 0001041792 elp:ElectricEnergyTradeChamberMember 2021-01-01 2021-12-31 0001041792 elp:ElectricEnergyTradeChamberMember 2020-01-01 2020-12-31 0001041792 elp:ElectricEnergyTradeChamberMember 2019-01-01 2019-12-31 0001041792 elp:BilateralContractsMember 2021-01-01 2021-12-31 0001041792 elp:BilateralContractsMember 2020-01-01 2020-12-31 0001041792 elp:BilateralContractsMember 2019-01-01 2019-12-31 0001041792 elp:ProgramForIncentiveToAlternativeEnergySourcesProinfaMember 2021-01-01 2021-12-31 0001041792 elp:ProgramForIncentiveToAlternativeEnergySourcesProinfaMember 2020-01-01 2020-12-31 0001041792 elp:ProgramForIncentiveToAlternativeEnergySourcesProinfaMember 2019-01-01 2019-12-31 0001041792 elp:MicroAndMiniGeneratorsAndRepurchaseOfCustomersMember 2021-01-01 2021-12-31 0001041792 elp:MicroAndMiniGeneratorsAndRepurchaseOfCustomersMember 2020-01-01 2020-12-31 0001041792 elp:MicroAndMiniGeneratorsAndRepurchaseOfCustomersMember 2019-01-01 2019-12-31 0001041792 elp:FairValueInThePurchaseAndSaleOfPowerMember 2021-01-01 2021-12-31 0001041792 elp:FairValueInThePurchaseAndSaleOfPowerMember 2020-01-01 2020-12-31 0001041792 elp:PISPasepCofinsTaxesOnElectricityPurchasedForResaleMember 2021-01-01 2021-12-31 0001041792 elp:PISPasepCofinsTaxesOnElectricityPurchasedForResaleMember 2020-01-01 2020-12-31 0001041792 elp:PISPasepCofinsTaxesOnElectricityPurchasedForResaleMember 2019-01-01 2019-12-31 0001041792 elp:PersonnelMember elp:SalariesAndManagementFeesMember 2021-01-01 2021-12-31 0001041792 elp:PersonnelMember elp:SalariesAndManagementFeesMember 2020-01-01 2020-12-31 0001041792 elp:PersonnelMember elp:SalariesAndManagementFeesMember 2019-01-01 2019-12-31 0001041792 elp:PersonnelMember elp:SocialChargesOnPayrollMember 2021-01-01 2021-12-31 0001041792 elp:PersonnelMember elp:SocialChargesOnPayrollMember 2020-01-01 2020-12-31 0001041792 elp:PersonnelMember elp:SocialChargesOnPayrollMember 2019-01-01 2019-12-31 0001041792 elp:PersonnelMember elp:MealAssistanceAndEducationAllowanceMember 2021-01-01 2021-12-31 0001041792 elp:PersonnelMember elp:MealAssistanceAndEducationAllowanceMember 2020-01-01 2020-12-31 0001041792 elp:PersonnelMember elp:MealAssistanceAndEducationAllowanceMember 2019-01-01 2019-12-31 0001041792 elp:PersonnelMember elp:CompensationVoluntaryTerminationProgramRetirementMember 2021-01-01 2021-12-31 0001041792 elp:PersonnelMember elp:CompensationVoluntaryTerminationProgramRetirementMember 2020-01-01 2020-12-31 0001041792 elp:PersonnelMember elp:CompensationVoluntaryTerminationProgramRetirementMember 2019-01-01 2019-12-31 0001041792 elp:PersonnelMember 2021-01-01 2021-12-31 0001041792 elp:PersonnelMember 2020-01-01 2020-12-31 0001041792 elp:PersonnelMember 2019-01-01 2019-12-31 0001041792 elp:ManagementCatagoriesMember elp:SalariesAndManagementFeesMember 2021-01-01 2021-12-31 0001041792 elp:ManagementCatagoriesMember elp:SalariesAndManagementFeesMember 2020-01-01 2020-12-31 0001041792 elp:ManagementCatagoriesMember elp:SalariesAndManagementFeesMember 2019-01-01 2019-12-31 0001041792 elp:ManagementCatagoriesMember elp:SocialChargesOnPayrollMember 2021-01-01 2021-12-31 0001041792 elp:ManagementCatagoriesMember elp:SocialChargesOnPayrollMember 2020-01-01 2020-12-31 0001041792 elp:ManagementCatagoriesMember elp:SocialChargesOnPayrollMember 2019-01-01 2019-12-31 0001041792 elp:ManagementCatagoriesMember elp:OtherExpensesMember 2021-01-01 2021-12-31 0001041792 elp:ManagementCatagoriesMember elp:OtherExpensesMember 2020-01-01 2020-12-31 0001041792 elp:ManagementCatagoriesMember elp:OtherExpensesMember 2019-01-01 2019-12-31 0001041792 elp:ManagementCatagoriesMember 2021-01-01 2021-12-31 0001041792 elp:ManagementCatagoriesMember 2020-01-01 2020-12-31 0001041792 elp:ManagementCatagoriesMember 2019-01-01 2019-12-31 0001041792 elp:ProvisionsForPerformanceAndProfitSharingMember 2021-01-01 2021-12-31 0001041792 elp:ProvisionsForPerformanceAndProfitSharingMember 2020-01-01 2020-12-31 0001041792 elp:ProvisionsForPerformanceAndProfitSharingMember 2019-01-01 2019-12-31 0001041792 elp:MaintenanceOfElectricalSystemMember 2021-01-01 2021-12-31 0001041792 elp:MaintenanceOfElectricalSystemMember 2020-01-01 2020-12-31 0001041792 elp:MaintenanceOfElectricalSystemMember 2019-01-01 2019-12-31 0001041792 elp:MaintenanceOfFacilitiesMember 2021-01-01 2021-12-31 0001041792 elp:MaintenanceOfFacilitiesMember 2020-01-01 2020-12-31 0001041792 elp:MaintenanceOfFacilitiesMember 2019-01-01 2019-12-31 0001041792 elp:CommunicationProcessingAndTransmissionOfDataMember 2021-01-01 2021-12-31 0001041792 elp:CommunicationProcessingAndTransmissionOfDataMember 2020-01-01 2020-12-31 0001041792 elp:CommunicationProcessingAndTransmissionOfDataMember 2019-01-01 2019-12-31 0001041792 elp:ConsumerServiceMember 2021-01-01 2021-12-31 0001041792 elp:ConsumerServiceMember 2020-01-01 2020-12-31 0001041792 elp:ConsumerServiceMember 2019-01-01 2019-12-31 0001041792 elp:MeterReadingAndBillDeliveryMember 2021-01-01 2021-12-31 0001041792 elp:MeterReadingAndBillDeliveryMember 2020-01-01 2020-12-31 0001041792 elp:MeterReadingAndBillDeliveryMember 2019-01-01 2019-12-31 0001041792 elp:ConsultingAndAuditMember 2021-01-01 2021-12-31 0001041792 elp:ConsultingAndAuditMember 2020-01-01 2020-12-31 0001041792 elp:ConsultingAndAuditMember 2019-01-01 2019-12-31 0001041792 elp:OtherServicesMember 2021-01-01 2021-12-31 0001041792 elp:OtherServicesMember 2020-01-01 2020-12-31 0001041792 elp:OtherServicesMember 2019-01-01 2019-12-31 0001041792 elp:ProvisionReversalForLitigationsMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:ProvisionReversalForLitigationsMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ProvisionReversalForLitigationsMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:PowerGenerationConcessionContractMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:PowerGenerationConcessionContractMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:PowerGenerationConcessionContractMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:QNPRGasImpairmentMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:QNPRGasImpairmentMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:QNPRGasImpairmentMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:PropertyPlantAndEquipmentExpenseMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:PropertyPlantAndEquipmentExpenseMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:PropertyPlantAndEquipmentExpenseMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:AllowanceForDoubtfulAccountsClientAndOtherCreditsMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:AllowanceForDoubtfulAccountsClientAndOtherCreditsMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:AllowanceForDoubtfulAccountsClientAndOtherCreditsMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:TaxCreditsEstimatedLossesMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:TaxCreditsEstimatedLossesMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:TaxCreditsEstimatedLossesMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:ProvisionForLossesOnEquityInterestsMember elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:ProvisionForLossesOnEquityInterestsMember elp:RestatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ProvisionForLossesOnEquityInterestsMember elp:RestatedOneMember 2019-01-01 2019-12-31 0001041792 elp:RestatedOneMember 2021-01-01 2021-12-31 0001041792 elp:MaterialsAndSuppliesMember 2020-01-01 2020-12-31 0001041792 elp:MaterialsAndSuppliesMember 2019-01-01 2019-12-31 0001041792 elp:ThirdPartyServicesMember 2020-01-01 2020-12-31 0001041792 elp:ThirdPartyServicesMember 2019-01-01 2019-12-31 0001041792 elp:PersonnelMember 2021-01-01 2021-12-31 0001041792 elp:PersonnelMember 2020-01-01 2020-12-31 0001041792 elp:PersonnelMember 2019-01-01 2019-12-31 0001041792 elp:OthersMember 2021-01-01 2021-12-31 0001041792 elp:OthersMember 2020-01-01 2020-12-31 0001041792 elp:OthersMember 2019-01-01 2019-12-31 0001041792 elp:WindfarmsOfTheBrisaComplexMember 2020-01-01 2020-12-31 0001041792 elp:FinancialOffsetForTheUseOfWaterResourcesMember 2021-01-01 2021-12-31 0001041792 elp:FinancialOffsetForTheUseOfWaterResourcesMember 2020-01-01 2020-12-31 0001041792 elp:FinancialOffsetForTheUseOfWaterResourcesMember 2019-01-01 2019-12-31 0001041792 elp:CollectionChargeMember 2021-01-01 2021-12-31 0001041792 elp:CollectionChargeMember 2020-01-01 2020-12-31 0001041792 elp:CollectionChargeMember 2019-01-01 2019-12-31 0001041792 elp:CompensationMember 2021-01-01 2021-12-31 0001041792 elp:CompensationMember 2020-01-01 2020-12-31 0001041792 elp:CompensationMember 2019-01-01 2019-12-31 0001041792 elp:TaxesMember 2021-01-01 2021-12-31 0001041792 elp:TaxesMember 2020-01-01 2020-12-31 0001041792 elp:TaxesMember 2019-01-01 2019-12-31 0001041792 elp:DonationsContributionsGrantsTaxIncentivesMember 2021-01-01 2021-12-31 0001041792 elp:DonationsContributionsGrantsTaxIncentivesMember 2020-01-01 2020-12-31 0001041792 elp:DonationsContributionsGrantsTaxIncentivesMember 2019-01-01 2019-12-31 0001041792 elp:LeasingAndRentMember 2021-01-01 2021-12-31 0001041792 elp:LeasingAndRentMember 2020-01-01 2020-12-31 0001041792 elp:LeasingAndRentMember 2019-01-01 2019-12-31 0001041792 elp:NetLossesInTheDecommissioningAndDisposalOfAssetsMember 2021-01-01 2021-12-31 0001041792 elp:NetLossesInTheDecommissioningAndDisposalOfAssetsMember 2020-01-01 2020-12-31 0001041792 elp:NetLossesInTheDecommissioningAndDisposalOfAssetsMember 2019-01-01 2019-12-31 0001041792 elp:AssociacaoDasEmissorasDeRadiodifusaoDoParanaAERPMember 2021-01-01 2021-12-31 0001041792 elp:AssociacaoDasEmissorasDeRadiodifusaoDoParanaAERPMember 2020-01-01 2020-12-31 0001041792 elp:AssociacaoDasEmissorasDeRadiodifusaoDoParanaAERPMember 2019-01-01 2019-12-31 0001041792 elp:TalentoOlimpicoParanaenseTOPMember 2021-01-01 2021-12-31 0001041792 elp:TalentoOlimpicoParanaenseTOPMember 2020-01-01 2020-12-31 0001041792 elp:TalentoOlimpicoParanaenseTOPMember 2019-01-01 2019-12-31 0001041792 elp:SponsorshipMember 2021-01-01 2021-12-31 0001041792 elp:SponsorshipMember 2020-01-01 2020-12-31 0001041792 elp:SponsorshipMember 2019-01-01 2019-12-31 0001041792 elp:PublicityMember 2021-01-01 2021-12-31 0001041792 elp:PublicityMember 2020-01-01 2020-12-31 0001041792 elp:PublicityMember 2019-01-01 2019-12-31 0001041792 elp:OtherNetIncomeCostsAndExpensesMember 2021-01-01 2021-12-31 0001041792 elp:OtherNetIncomeCostsAndExpensesMember 2020-01-01 2020-12-31 0001041792 elp:OtherNetIncomeCostsAndExpensesMember 2019-01-01 2019-12-31 0001041792 elp:ArrearsChargesOnEnergyBillsMember 2021-01-01 2021-12-31 0001041792 elp:ArrearsChargesOnEnergyBillsMember 2020-01-01 2020-12-31 0001041792 elp:ArrearsChargesOnEnergyBillsMember 2019-01-01 2019-12-31 0001041792 elp:InterestAndMonetaryVariationOfCRCTransferExpenseMember 2021-01-01 2021-12-31 0001041792 elp:InterestAndMonetaryVariationOfCRCTransferExpenseMember 2020-01-01 2020-12-31 0001041792 elp:InterestAndMonetaryVariationOfCRCTransferExpenseMember 2019-01-01 2019-12-31 0001041792 elp:ReturnOnFinancialInvestmentsMember 2021-01-01 2021-12-31 0001041792 elp:ReturnOnFinancialInvestmentsMember 2020-01-01 2020-12-31 0001041792 elp:ReturnOnFinancialInvestmentsMember 2019-01-01 2019-12-31 0001041792 elp:RemunerationOfNetSectorialAssetsAndLiabilitiesExpenseMember 2021-01-01 2021-12-31 0001041792 elp:RemunerationOfNetSectorialAssetsAndLiabilitiesExpenseMember 2020-01-01 2020-12-31 0001041792 elp:RemunerationOfNetSectorialAssetsAndLiabilitiesExpenseMember 2019-01-01 2019-12-31 0001041792 elp:MonetaryVariationOverTheItaipuPowerPurchaseMember 2021-01-01 2021-12-31 0001041792 elp:MonetaryVariationOverTheItaipuPowerPurchaseMember 2020-01-01 2020-12-31 0001041792 elp:MonetaryVariationOverTheItaipuPowerPurchaseMember 2019-01-01 2019-12-31 0001041792 elp:RecognitionOfTaxCreditMember 2021-01-01 2021-12-31 0001041792 elp:RecognitionOfTaxCreditMember 2020-01-01 2020-12-31 0001041792 elp:RecognitionOfTaxCreditMember 2019-01-01 2019-12-31 0001041792 elp:ExchangeVariationOnLoanCollateralMember 2021-01-01 2021-12-31 0001041792 elp:ExchangeVariationOnLoanCollateralMember 2020-01-01 2020-12-31 0001041792 elp:ExchangeVariationOnLoanCollateralMember 2019-01-01 2019-12-31 0001041792 elp:MonetaryVariationAndAdjustToPresentValueOfAccountsPayableRelatedToTheConcessionMember 2021-01-01 2021-12-31 0001041792 elp:MonetaryVariationAndAdjustToPresentValueOfAccountsPayableRelatedToTheConcessionMember 2020-01-01 2020-12-31 0001041792 elp:MonetaryVariationAndAdjustToPresentValueOfAccountsPayableRelatedToTheConcessionMember 2019-01-01 2019-12-31 0001041792 elp:DerivativesFairValueForwardContractMember 2021-01-01 2021-12-31 0001041792 elp:DerivativesFairValueForwardContractMember 2020-01-01 2020-12-31 0001041792 elp:DerivativesFairValueForwardContractMember 2019-01-01 2019-12-31 0001041792 elp:OtherFinancialIncomeMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialIncomeMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialIncomeMember 2019-01-01 2019-12-31 0001041792 elp:PisPasepAndCofinsTaxesOnInteresOnCapitalMember 2021-01-01 2021-12-31 0001041792 elp:PisPasepAndCofinsTaxesOnInteresOnCapitalMember 2020-01-01 2020-12-31 0001041792 elp:PisPasepAndCofinsTaxesOnInteresOnCapitalMember 2019-01-01 2019-12-31 0001041792 elp:MonetaryAndCambialVariationAndDebtChargesMember 2021-01-01 2021-12-31 0001041792 elp:MonetaryAndCambialVariationAndDebtChargesMember 2020-01-01 2020-12-31 0001041792 elp:MonetaryAndCambialVariationAndDebtChargesMember 2019-01-01 2019-12-31 0001041792 elp:MonetaryVariationAndAdjustToPresentValueOfAccountsPayableRelatedToTheConcessionExpenseMember 2021-01-01 2021-12-31 0001041792 elp:MonetaryVariationAndAdjustToPresentValueOfAccountsPayableRelatedToTheConcessionExpenseMember 2020-01-01 2020-12-31 0001041792 elp:MonetaryVariationAndAdjustToPresentValueOfAccountsPayableRelatedToTheConcessionExpenseMember 2019-01-01 2019-12-31 0001041792 elp:MonetaryVariationOverTheItaipuPowerPurchaseExpenseMember 2021-01-01 2021-12-31 0001041792 elp:MonetaryVariationOverTheItaipuPowerPurchaseExpenseMember 2020-01-01 2020-12-31 0001041792 elp:MonetaryVariationOverTheItaipuPowerPurchaseExpenseMember 2019-01-01 2019-12-31 0001041792 elp:PISPasepCofinsTaxesOnInterestOnCapitalMember 2021-01-01 2021-12-31 0001041792 elp:PISPasepCofinsTaxesOnInterestOnCapitalMember 2020-01-01 2020-12-31 0001041792 elp:PISPasepCofinsTaxesOnInterestOnCapitalMember 2019-01-01 2019-12-31 0001041792 elp:InterestOnRAndDAndEEPMember 2021-01-01 2021-12-31 0001041792 elp:InterestOnRAndDAndEEPMember 2020-01-01 2020-12-31 0001041792 elp:InterestOnRAndDAndEEPMember 2019-01-01 2019-12-31 0001041792 elp:RemunerationOfNetSectorialAssetsAndLiabilitiesMember 2021-01-01 2021-12-31 0001041792 elp:RemunerationOfNetSectorialAssetsAndLiabilitiesMember 2020-01-01 2020-12-31 0001041792 elp:RemunerationOfNetSectorialAssetsAndLiabilitiesMember 2019-01-01 2019-12-31 0001041792 elp:InterestAndMonetaryVariationOfCRCTransferMember 2021-01-01 2021-12-31 0001041792 elp:InterestAndMonetaryVariationOfCRCTransferMember 2020-01-01 2020-12-31 0001041792 elp:InterestAndMonetaryVariationOfCRCTransferMember 2019-01-01 2019-12-31 0001041792 elp:OtherFinancialExpensesMember 2021-01-01 2021-12-31 0001041792 elp:OtherFinancialExpensesMember 2020-01-01 2020-12-31 0001041792 elp:OtherFinancialExpensesMember 2019-01-01 2019-12-31 0001041792 elp:ElectricityGetMember 2021-12-31 0001041792 elp:ElectricityDisMember 2021-12-31 0001041792 elp:ComMember 2021-12-31 0001041792 elp:TelMember 2021-12-31 0001041792 elp:GasMember 2021-12-31 0001041792 elp:HolMember 2021-12-31 0001041792 elp:ReclassificationsNote40Member 2021-12-31 0001041792 ifrs-full:EliminationOfIntersegmentAmountsMember 2021-12-31 0001041792 elp:ElectricityGetMember 2020-12-31 0001041792 elp:ElectricityDisMember 2020-12-31 0001041792 elp:ComMember 2020-12-31 0001041792 elp:TelMember 2020-12-31 0001041792 elp:GasMember 2020-12-31 0001041792 elp:HolMember 2020-12-31 0001041792 elp:ReclassificationsNote40Member 2020-12-31 0001041792 ifrs-full:EliminationOfIntersegmentAmountsMember 2020-12-31 0001041792 elp:ElectricityGetGerMember 2021-01-01 2021-12-31 0001041792 elp:ElectricityGetTraMember 2021-01-01 2021-12-31 0001041792 elp:ElectricityDisMember 2021-01-01 2021-12-31 0001041792 elp:ComMember 2021-01-01 2021-12-31 0001041792 elp:TelMember 2021-01-01 2021-12-31 0001041792 elp:GasMember 2021-01-01 2021-12-31 0001041792 elp:HolMember 2021-01-01 2021-12-31 0001041792 elp:ReclassificationsNote40Member 2021-01-01 2021-12-31 0001041792 ifrs-full:EliminationOfIntersegmentAmountsMember 2021-01-01 2021-12-31 0001041792 elp:ElectricityGetGerMember 2020-01-01 2020-12-31 0001041792 elp:ElectricityGetTraMember 2020-01-01 2020-12-31 0001041792 elp:ElectricityGetDisMember 2020-01-01 2020-12-31 0001041792 elp:ComMember 2020-01-01 2020-12-31 0001041792 elp:TelMember 2020-01-01 2020-12-31 0001041792 elp:GasMember 2020-01-01 2020-12-31 0001041792 elp:HolMember 2020-01-01 2020-12-31 0001041792 elp:ReclassificationsNote41Member 2020-01-01 2020-12-31 0001041792 ifrs-full:EliminationOfIntersegmentAmountsMember 2020-01-01 2020-12-31 0001041792 elp:ElectricityGetGerMember 2019-01-01 2019-12-31 0001041792 elp:ElectricityGetTraMember 2019-01-01 2019-12-31 0001041792 elp:ElectricityGetDisMember 2019-01-01 2019-12-31 0001041792 elp:ComMember 2019-01-01 2019-12-31 0001041792 elp:TelMember 2019-01-01 2019-12-31 0001041792 elp:GasMember 2019-01-01 2019-12-31 0001041792 elp:HolMember 2019-01-01 2019-12-31 0001041792 elp:ReclassificationsNote40Member 2019-01-01 2019-12-31 0001041792 ifrs-full:EliminationOfIntersegmentAmountsMember 2019-01-01 2019-12-31 0001041792 elp:ElectricityGetMember 2021-01-01 2021-12-31 0001041792 elp:ElectricityGetMember 2020-01-01 2020-12-31 0001041792 elp:ElectricityDisMember 2020-01-01 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:CashAndCashEquivalentsFinancialAssetMember ifrs-full:Level1OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:CashAndCashEquivalentsFinancialAssetMember ifrs-full:Level1OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:BondsAndSecuritiesOneMember ifrs-full:Level1OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:BondsAndSecuritiesOneMember ifrs-full:Level1OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:BondsAndSecuritiesTwoMember ifrs-full:Level2OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:BondsAndSecuritiesTwoMember ifrs-full:Level2OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:AccountsReceivableRelatedToTheDistributionConcessionMember ifrs-full:Level3OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:AccountsReceivableRelatedToTheDistributionConcessionMember ifrs-full:Level3OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:AccountsReceivableRelatedToTheGenerationConcessionMember ifrs-full:Level3OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:AccountsReceivableRelatedToTheGenerationConcessionMember ifrs-full:Level3OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:DerivativesFairValueForwardContractsMember ifrs-full:Level3OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:DerivativesFairValueForwardContractsMember ifrs-full:Level3OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:FairValueInThePurchaseAndSaleOfPowerInTheActiveMarketMember ifrs-full:Level3OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:FairValueInThePurchaseAndSaleOfPowerInTheActiveMarketMember ifrs-full:Level3OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:OtherTemporaryInvestmentsOneMember ifrs-full:Level1OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:OtherTemporaryInvestmentsOneMember ifrs-full:Level1OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:OtherTemporaryInvestmentsTwoMember ifrs-full:Level2OfFairValueHierarchyMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember elp:OtherTemporaryInvestmentsTwoMember ifrs-full:Level2OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtFairValueThroughProfitOrLossCategoryMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:CollateralsAndEscrowAccountsMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:CollateralsAndEscrowAccountsMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:CollateralsAndEscrowAccounts1Member 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:CollateralsAndEscrowAccounts1Member 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:TradeAccountsReceivableFinancialAssetsMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:TradeAccountsReceivableFinancialAssetsMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:CRCTransferredToTheStateGovernmentOfParanaMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:CRCTransferredToTheStateGovernmentOfParanaMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:SectorialFinancialAssetsMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:SectorialFinancialAssetsMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:AccountsReceivableRelatedToTheConcessionBonusFromTheGrantMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember elp:AccountsReceivableRelatedToTheConcessionBonusFromTheGrantMember 2020-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember 2021-12-31 0001041792 ifrs-full:FinancialAssetsAtAmortisedCostCategoryMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember ifrs-full:Level3OfFairValueHierarchyMember elp:FairValueInThePurchaseAndSaleOfPowerMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember elp:FairValueInThePurchaseAndSaleOfPowerMember ifrs-full:Level3OfFairValueHierarchyMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtFairValueThroughProfitOrLossCategoryMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:SectorialFinancialLiabilitiesMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:SectorialFinancialLiabilitiesMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:SpecialTaxRegularizationProgramPertMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:SpecialTaxRegularizationProgramPertMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:PISAndCofinsToBeRefundedToConsumersMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:PISAndCofinsToBeRefundedToConsumersMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:AccountsPayableToSuppliersMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:AccountsPayableToSuppliersMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:LoansAndFinancingMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:LoansAndFinancingMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:DebenturesMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:DebenturesMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:AccountsPayableRelatedToConcessionMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember elp:AccountsPayableRelatedToConcessionMember 2020-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember 2021-12-31 0001041792 ifrs-full:FinancialLiabilitiesAtAmortisedCostMember 2020-12-31 0001041792 elp:RestatedOneMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:CashAndCashEquivalentsFinancialAssetMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:CashAndCashEquivalentsFinancialAssetMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:BondsAndSecuritiesOneMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:BondsAndSecuritiesOneMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:PledgesAndRestrictedDepositsLinkedMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:PledgesAndRestrictedDepositsLinkedMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:TradeAccountsReceivableFinancialAssetsMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:TradeAccountsReceivableFinancialAssetsMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:CRCTransferredToTheStateGovernmentOfParanaMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:CRCTransferredToTheStateGovernmentOfParanaMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:SectorialFinancialAssetsMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:SectorialFinancialAssetsMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:AccountsReceivableRelatedToTheConcessionMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:AccountsReceivableRelatedToTheConcessionMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:AccountsReceivableRelatedToTheConcessionBonusFromTheGrantMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:AccountsReceivableRelatedToTheConcessionBonusFromTheGrantMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:AccountsReceivableRelatedToTheConcessionCompensationMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:AccountsReceivableRelatedToTheConcessionCompensationMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember elp:OtherTemporaryInvestmentsOneMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember elp:OtherTemporaryInvestmentsOneMember 2020-12-31 0001041792 ifrs-full:CreditRiskMember 2021-12-31 0001041792 ifrs-full:CreditRiskMember 2020-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:NotLaterThanOneMonthMember elp:LoansAndFinancingMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:LoansAndFinancingMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:LoansAndFinancingMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:LoansAndFinancingMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:LoansAndFinancingMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:LoansAndFinancingMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:NotLaterThanOneMonthMember elp:DebenturesMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:DebenturesMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:DebenturesMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:DebenturesMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:DebenturesMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:DebenturesMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:NotLaterThanOneMonthMember elp:PayableRelatedToConcessionMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:PayableRelatedToConcessionMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:PayableRelatedToConcessionMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:PayableRelatedToConcessionMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:PayableRelatedToConcessionMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:PayableRelatedToConcessionMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:NotLaterThanOneMonthMember elp:AccountsPayableToSuppliersMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:AccountsPayableToSuppliersMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:AccountsPayableToSuppliersMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:AccountsPayableToSuppliersMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:AccountsPayableToSuppliersMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:AccountsPayableToSuppliersMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:NotLaterThanOneMonthMember elp:OrdinaryFinancingOfTaxesWithTheFederalTaxAuthoritiesMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:OrdinaryFinancingOfTaxesWithTheFederalTaxAuthoritiesMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:OrdinaryFinancingOfTaxesWithTheFederalTaxAuthoritiesMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:OrdinaryFinancingOfTaxesWithTheFederalTaxAuthoritiesMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:OrdinaryFinancingOfTaxesWithTheFederalTaxAuthoritiesMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:OrdinaryFinancingOfTaxesWithTheFederalTaxAuthoritiesMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:NotLaterThanOneMonthMember elp:SpecialTaxRegularizationProgramPertMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SpecialTaxRegularizationProgramPertMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SpecialTaxRegularizationProgramPertMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SpecialTaxRegularizationProgramPertMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SpecialTaxRegularizationProgramPertMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SpecialTaxRegularizationProgramPertMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:NotLaterThanOneMonthMember elp:SectorialFinancialLiabilitiesMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SectorialFinancialLiabilitiesMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SectorialFinancialLiabilitiesMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SectorialFinancialLiabilitiesMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SectorialFinancialLiabilitiesMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:SectorialFinancialLiabilitiesMember 2021-12-31 0001041792 ifrs-full:NotLaterThanOneMonthMember ifrs-full:LiquidityRiskMember elp:LeaseLiabilityMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember elp:LeaseLiabilityMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember elp:LeaseLiabilityMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember elp:LeaseLiabilityMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanFiveYearsMember elp:LeaseLiabilityMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember elp:LeaseLiabilityMember 2021-12-31 0001041792 ifrs-full:NotLaterThanOneMonthMember ifrs-full:LiquidityRiskMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanOneMonthAndNotLaterThanThreeMonthsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanThreeMonthsAndNotLaterThanOneYearMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanOneYearAndNotLaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember ifrs-full:LaterThanFiveYearsMember 2021-12-31 0001041792 ifrs-full:LiquidityRiskMember 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:CollateralsAndEscrowAccountsSTNMember 2021-01-01 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:CollateralsAndEscrowAccountsSTNMember 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:LoansAndFinancingMember 2021-01-01 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:LoansAndFinancingMember 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:SuppliersEletrobrasItaipuMember 2021-01-01 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:SuppliersEletrobrasItaipuMember 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:SuppliersAcquisitionOfGasMember 2021-01-01 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:SuppliersAcquisitionOfGasMember 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:ExchangeRateIncreaseMember 2021-01-01 2021-12-31 0001041792 ifrs-full:CurrencyRiskMember elp:ExchangeRateDecreaseMember 2021-01-01 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:BondsAndSecuritiesOneMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:CollateralsAndEscrowAccountsMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:SectorialFinancialAssetsMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:AccountsReceivableRelatedToTheConcessionMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:AccountsReceivableRelatedToGenerationConcessionMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:FinancialAssets1Member 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:LoansAndFinancingBancoDoBrasilMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:LoansAndFinancingBNDES1Member 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:LoansAndFinancingBNDESMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:PromissoryNotesBancoDoNordesteMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:PromissoryNotesBancoDoBrasilDistributionOfFundsFromBNDESMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:PromissoryNotesOtherMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:DebenturesMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:DebenturesOneMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:DebenturesTwoMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:SectorialFinancialLiabilitiesMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:SpecialTaxRegularizationProgramPertMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:PayableRelatedToConcessionMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember elp:PayableRelatedToConcessionOneMember 2021-12-31 0001041792 elp:InterestRateRiskAndMonetaryVariationMember ifrs-full:FinancialLiabilitiesMember 2021-12-31 0001041792 elp:UntiTwentyTwentyMember 2021-01-01 2021-12-31 0001041792 elp:UntiTwentyTwentyOneMember 2021-01-01 2021-12-31 0001041792 elp:UntiTwentyTwentyTwoMember 2021-01-01 2021-12-31 0001041792 elp:UntilTwentyTwentyTwo1Member 2021-01-01 2021-12-31 0001041792 elp:UntilTwentyTwentyTwo2Member 2021-01-01 2021-12-31 0001041792 elp:UntilTwentyTwentyTwo3Member 2021-01-01 2021-12-31 0001041792 elp:UntiTwentyTwentyThreeMember 2021-01-01 2021-12-31 0001041792 elp:UntiTwentyTwentyFourMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfNonRenewalOfConcessionsDistributionOfElectricityMember ifrs-full:LaterThanOneYearAndNotLaterThanTwoYearsMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfNonRenewalOfConcessionsDistributionOfElectricityMember elp:TwentySixteenMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfNonRenewalOfConcessionsDistributionOfElectricityMember elp:TwentySeventeenMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfNonRenewalOfConcessionsDistributionOfElectricityMember elp:TwentyEighteenMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfNonRenewalOfConcessionsDistributionOfElectricityMember elp:TwentyNinteenMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfNonRenewalOfConcessionsDistributionOfElectricityMember elp:TwentyTwentyMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfPowerPurchaseAndSaleTransactionsPriceMember 2021-12-31 0001041792 elp:RiskOfPowerPurchaseAndSaleTransactionsPriceMember elp:ELevationMember 2021-01-01 2021-12-31 0001041792 elp:RiskOfPowerPurchaseAndSaleTransactionsPriceMember elp:ReductionMember 2021-01-01 2021-12-31 0001041792 elp:CapitalManagementMember 2021-12-31 0001041792 elp:CapitalManagementMember 2020-12-31 0001041792 elp:CapitalManagementMember 2021-01-01 2021-12-31 0001041792 elp:CapitalManagementMember 2020-01-01 2020-12-31 0001041792 elp:CapitalManagementMember elp:IndebtednessMember 2021-12-31 0001041792 elp:CapitalManagementMember elp:IndebtednessMember 2020-12-31 0001041792 elp:CapitalManagementMember elp:IndebtednessMember 2021-01-01 2021-12-31 0001041792 elp:CapitalManagementMember elp:IndebtednessMember 2020-01-01 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:DividendsPayableMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:DividendsPayableMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:DividendsPayableMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:CRCTransferMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:CRCTransferMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:CRCTransferMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:CRCTransferMember 2020-01-01 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:CRCTransferMember 2019-01-01 2019-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:LuzFraternaProgramMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:LuzFraternaProgramMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:LuzFraternaProgramMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TarifaRuralNoturnaProgramMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TarifaRuralNoturnaProgramMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TarifaRuralNoturnaProgramMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:MorarBemParanaProgramMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:MorarBemParanaProgramMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:MorarBemParanaProgramMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:EmployeesTransferredMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:EmployeesTransferredMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:EmployeesTransferredMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TelecommunicationServicesMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TelecommunicationServicesMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TelecommunicationServicesMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TelecommunicationServicesMember 2020-01-01 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:TelecommunicationServicesMember 2019-01-01 2019-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:SistemaMeteorologicoDoParanaSimeparMember 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:SistemaMeteorologicoDoParanaSimeparMember 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:SistemaMeteorologicoDoParanaSimeparMember 2021-01-01 2021-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:SistemaMeteorologicoDoParanaSimeparMember 2020-01-01 2020-12-31 0001041792 elp:ControllingShareholderMember elp:StateOfParanaMember elp:SistemaMeteorologicoDoParanaSimeparMember 2019-01-01 2019-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DividendsPayableMember 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DividendsPayableMember 2020-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DividendsPayableMember 2021-01-01 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:FinancingMember 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:FinancingMember 2020-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:FinancingMember 2021-01-01 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:FinancingMember 2020-01-01 2020-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:FinancingMember 2019-01-01 2019-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesCompagasMember 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesCompagasMember 2020-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesCompagasMember 2021-01-01 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesCompagasMember 2020-01-01 2020-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesCompagasMember 2019-01-01 2019-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesWindFarmsMember 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesWindFarmsMember 2020-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesWindFarmsMember 2021-01-01 2021-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesWindFarmsMember 2020-01-01 2020-12-31 0001041792 elp:EntitiesWithSignificantInfluenceMember elp:BNDESAndBNDESPARMember elp:DebenturesWindFarmsMember 2019-01-01 2019-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:SaneparMember 2021-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:SaneparMember 2020-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:SaneparMember 2021-01-01 2021-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:SaneparMember 2020-01-01 2020-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:SaneparMember 2019-01-01 2019-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:UseWaterEithdrawnFromPlantsReservoirsMember 2021-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:UseWaterEithdrawnFromPlantsReservoirsMember 2021-01-01 2021-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:UseWaterEithdrawnFromPlantsReservoirsMember 2020-01-01 2020-12-31 0001041792 elp:StateOfParanaInvesteeMember elp:UseWaterEithdrawnFromPlantsReservoirsMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoMutualMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoMutualMember elp:DividendsMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:VoltaliaSaoMiguelDoGostosoMutualMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember elp:DividendsMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CaiuaTransmissoraDeEnergiaMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember elp:DividendsMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:IntegracaoMaranhenseTransmissoraMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember elp:DividendsMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MatrinchaTransmissoraDeEnergiaMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember elp:DividendsMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:GuaraciabaTransmissoraDeEnergiaMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaTransmissoraDeEnergiaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaTransmissoraDeEnergiaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaTransmissoraDeEnergiaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaTransmissoraDeEnergiaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaTransmissoraDeEnergiaMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaTransmissoraDeEnergiaMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:ParanaibaTransmissoraDeEnergiaMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember elp:DividendsMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:CantareiraTransmissoraDeEnergiaMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraTransmissaoMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraTransmissaoMember 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraTransmissaoMember 2021-01-01 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraTransmissaoMember 2020-01-01 2020-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraTransmissaoMember 2019-01-01 2019-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraTransmissaoMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:JointVenturesMember elp:MataDeSantaGenebraTransmissaoMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember 2019-01-01 2019-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember elp:DividendsMember 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember elp:DividendsMember 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:DonaFranciscaEnergeticaSAMember elp:DividendsMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:FozdoChopimEnergeticaLtdaMember 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:FozdoChopimEnergeticaLtdaMember 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:FozdoChopimEnergeticaLtdaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:AssociatesMember elp:FozdoChopimEnergeticaLtdaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:AssociatesMember elp:FozdoChopimEnergeticaLtdaMember 2019-01-01 2019-12-31 0001041792 elp:KeyManagementStaffMember elp:FeesAndSocialSecurityChargesMember 2021-12-31 0001041792 elp:KeyManagementStaffMember elp:FeesAndSocialSecurityChargesMember 2021-01-01 2021-12-31 0001041792 elp:KeyManagementStaffMember elp:FeesAndSocialSecurityChargesMember 2020-01-01 2020-12-31 0001041792 elp:KeyManagementStaffMember elp:FeesAndSocialSecurityChargesMember 2019-01-01 2019-12-31 0001041792 elp:KeyManagementStaffMember elp:PensionAndHealthcarePlansMember 2021-12-31 0001041792 elp:KeyManagementStaffMember elp:PensionAndHealthcarePlansMember 2021-01-01 2021-12-31 0001041792 elp:KeyManagementStaffMember elp:PensionAndHealthcarePlansMember 2020-01-01 2020-12-31 0001041792 elp:KeyManagementStaffMember elp:PensionAndHealthcarePlansMember 2019-01-01 2019-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:FundacaoCopelMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:FundacaoCopelMember 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:FundacaoCopelMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:FundacaoCopelMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:FundacaoCopelMember 2019-01-01 2019-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:AdministrativePropertyRentalMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:AdministrativePropertyRentalMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:AdministrativePropertyRentalMember 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:AdministrativePropertyRentalMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:AdministrativePropertyRentalMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:AdministrativePropertyRentalMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:AdministrativePropertyRentalMember 2019-01-01 2019-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:PensionAndHealthcarePlansMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:PensionAndHealthcarePlansMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:PensionAndHealthcarePlansMember 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:PensionAndHealthcarePlansMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:PensionAndHealthcarePlansMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:LactecMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:LactecMember 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:LactecMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:LactecMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:Lactec1Member 2020-01-01 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:LactecMember 2019-01-01 2019-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:TecpaMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:TecpaMember 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:CelepaMember 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:TecpaMember 2021-01-01 2021-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:TecpaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:CelepaMember 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:CelepaMember 2020-01-01 2020-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:CelepaMember 2019-01-01 2019-12-31 0001041792 ifrs-full:OtherRelatedPartiesMember elp:CelepaMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeTMember elp:ConnectionToTheTransmissionSystemContractsMember 2021-01-01 2021-12-31 0001041792 2018-03-31 0001041792 elp:CopelCOMMember elp:EnergySaleContractsMember 2021-01-01 2021-12-31 0001041792 elp:CopelComercializacaoSAMember ifrs-full:FinancialGuaranteeContractsMember 2021-01-01 2021-12-31 0001041792 elp:CopelComercializacaoSAMember ifrs-full:FinancialGuaranteeContractsMember 2020-01-01 2020-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember ifrs-full:FinancialGuaranteeContractsMember 2021-01-01 2021-12-31 0001041792 elp:CopelGeracaoeTransmissaoSAMember ifrs-full:FinancialGuaranteeContractsMember 2020-01-01 2020-12-31 0001041792 elp:CaiuaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:CantareiraTransmissoraDeEnergiaMember 2021-01-01 2021-12-31 0001041792 elp:CantareiraTransmissoraDeEnergia1Member 2021-01-01 2021-12-31 0001041792 elp:GuaraciabaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:GuaraciabaTransmissora1Member 2021-01-01 2021-12-31 0001041792 elp:MatrinchaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:MatrinchaTransmissora1Member 2021-01-01 2021-12-31 0001041792 elp:MatrinchaTransmissora2Member 2021-01-01 2021-12-31 0001041792 elp:IMTETransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:MataDeSantaGenebra1Member 2021-01-01 2021-12-31 0001041792 elp:ParanaibaTransmissoraMember 2021-01-01 2021-12-31 0001041792 elp:ParanaibaTransmissora1Member 2021-01-01 2021-12-31 0001041792 elp:EnergyPurchaseAndTransportationContractsMember 2021-12-31 0001041792 elp:EnergyPurchaseAndTransportationContractsMember 2020-12-31 0001041792 elp:ConstructionOfTransmissionGridAndSubstationsMember 2020-12-31 0001041792 elp:ConstructionOfJandaraWindFarmComplexMember 2021-12-31 0001041792 elp:ConstructionOfJandaraWindFarmComplexMember 2020-12-31 0001041792 elp:ConstructionOfSHPBelaVistaMember 2020-12-31 0001041792 elp:TelecommunicationsWorksMember 2020-12-31 0001041792 elp:AcquisitionOfAssetsForElectricityDistributionMember 2021-12-31 0001041792 elp:AcquisitionOfAssetsForElectricityDistributionMember 2020-12-31 0001041792 elp:GasPurchaseContractsMember 2021-12-31 0001041792 elp:GasPurchaseContractsMember 2020-12-31 0001041792 elp:OperationalRisksHPPBaixoLguacuMember 2021-01-01 2021-12-31 0001041792 elp:OperationalRisksCutiaAndBentoMiguelMember 2021-01-01 2021-12-31 0001041792 elp:NamedPerilsMember 2021-01-01 2021-12-31 0001041792 elp:OperationalRisksHPPColiderMember 2021-01-01 2021-12-31 0001041792 elp:OperationalRisksHPPGovernadorJaymeCanetJuniorMember 2021-01-01 2021-12-31 0001041792 elp:FireCompanyOwnedAndRentedFacilitiesMember 2021-01-01 2021-12-31 0001041792 elp:OperationalRisksBrisaPotiguarMember 2021-01-01 2021-12-31 0001041792 elp:OperationalRisksElejorMember 2021-01-01 2021-12-31 0001041792 elp:OperationalRisksUEGAraucanaMember 2021-01-01 2021-12-31 0001041792 elp:OperationalRisksSaoBentoMember 2021-01-01 2021-12-31 0001041792 elp:PurchasesMadeInInstallmentsAndNotSettledMember 2021-12-31 0001041792 elp:PurchasesMadeInInstallmentsAndNotSettledMember 2020-12-31 0001041792 elp:PurchasesMadeInInstallmentsAndNotSettledMember 2021-01-01 2021-12-31 0001041792 elp:PurchasesMadeInInstallmentsAndNotSettledMember 2020-01-01 2020-12-31 0001041792 elp:CopelTelecomunicacoesMember 2020-09-15 2020-09-16 0001041792 elp:CopelTelecomunicacoesMember 2020-09-11 0001041792 elp:CopelTelecomunicacoesMember 2020-09-10 2020-09-11 0001041792 elp:EventsAfterReportingPeriodMember elp:LeaseAgreementMember elp:FundacaoCopelDePrevidenciaeAssistenciaSocialMember 2021-02-21 2021-02-22 0001041792 elp:ConsolidatedOneMember 2021-01-01 2021-12-31 0001041792 elp:ConsolidatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ConsolidatedOneMember 2019-01-01 2019-12-31 0001041792 elp:ConsolidatedTwoMember 2021-01-01 2021-12-31 0001041792 elp:ConsolidatedTwoMember 2020-01-01 2020-12-31 0001041792 elp:ConsolidatedTwoMember 2019-01-01 2019-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember 2021-01-01 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember 2020-01-01 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember 2019-01-01 2019-12-31 0001041792 elp:ConsolidatedOneMember 2021-01-01 2021-12-31 0001041792 elp:ConsolidatedOneMember 2020-01-01 2020-12-31 0001041792 elp:ConsolidatedOneMember 2019-01-01 2019-12-31 0001041792 elp:ConsolidatedOneMember 2020-12-31 0001041792 elp:ConsolidatedOneMember 2019-12-31 0001041792 elp:ConsolidatedOneMember 2018-12-31 0001041792 elp:ConsolidatedOneMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelDistribuicaoMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelDistribuicaoMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:UEGAraucariaMutualMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:UEGAraucariaMutualMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelCTEMutualMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelCTEMutualMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:InvesteesAndSubsidiariesStructureSharingMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:InvesteesAndSubsidiariesStructureSharingMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:ElejorAdvanceMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:ElejorAdvanceMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelGeracaoeTransmissaoMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelGeracaoeTransmissaoMember 2020-12-31 0001041792 elp:CopelDistribuicaoMember 2021-12-31 0001041792 elp:CopelDistribuicaoMember 2020-12-31 0001041792 elp:CopelTelecomunicacoesMember 2020-12-31 0001041792 elp:CopelTELMember 2020-12-31 0001041792 elp:CopelEnergiaMember 2021-12-31 0001041792 elp:CopelEnergiaMember 2020-12-31 0001041792 elp:OtherMember 2021-12-31 0001041792 elp:OtherMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelDistribuicaoMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelDistribuicaoMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelComercializacaoMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CopelComercializacaoMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CompagasMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CompagasMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:UEGAraucariaMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:UEGAraucariaMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:VoltaliaMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:VoltaliaMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:DonaFranciscaMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:DonaFranciscaMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:OtherInvestments1Member 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:OtherInvestments1Member 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:RegulatoryMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:RegulatoryMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:LaborMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:LaborMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:EmployeeBenefitsMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:EmployeeBenefitsMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CivilMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:CivilMember 2020-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:TaxClaimMember 2021-12-31 0001041792 elp:CompanhiaParanaenseDeEnergiaCopelMember elp:TaxClaimMember 2020-12-31 0001041792 elp:CopelGeracoeTransmissaoSAMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2021-12-31 0001041792 elp:CopelGeracoeTransmissaoSAMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2020-12-31 0001041792 elp:CopelDistribuicaoSAMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2021-12-31 0001041792 elp:CopelDistribuicaoSAMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2020-12-31 0001041792 elp:UEGAraucariaLtedaMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2021-12-31 0001041792 elp:UEGAraucariaLtedaMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2020-12-31 0001041792 elp:CentraisEletricasRioJordaoElejorMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2021-12-31 0001041792 elp:CentraisEletricasRioJordaoElejorMember elp:CompanhiaParanaenseDeEnergiaCopelMember 2020-12-31 0001041792 elp:LoansAndFinancingMember elp:LessThan1MonthMember 2021-12-31 0001041792 elp:LoansAndFinancingMember elp:OneToThreeMonthMember 2021-12-31 0001041792 elp:LoansAndFinancingMember elp:ThreeMonthsToOneYearMember 2021-12-31 0001041792 elp:LoansAndFinancingMember elp:OneToFiveYearsMember 2021-12-31 0001041792 elp:LoansAndFinancingMember elp:OverFiveMonthMember 2021-12-31 0001041792 elp:DebenturesMember elp:LessThan1MonthMember 2021-12-31 0001041792 elp:DebenturesMember elp:OneToThreeMonthMember 2021-12-31 0001041792 elp:DebenturesMember elp:OneToFiveYearsMember 2021-12-31 0001041792 elp:DebenturesMember elp:OverFiveMonthMember 2021-12-31 0001041792 elp:SuppliersMember elp:LessThan1MonthMember 2021-12-31 0001041792 elp:SuppliersMember elp:OneToThreeMonthMember 2021-12-31 0001041792 elp:SuppliersMember elp:ThreeMonthsToOneYearMember 2021-12-31 0001041792 elp:SuppliersMember elp:OneToFiveYearsMember 2021-12-31 0001041792 elp:SuppliersMember elp:OverFiveMonthMember 2021-12-31 0001041792 elp:LessThan1MonthMember 2021-12-31 0001041792 elp:OneToThreeMonthMember 2021-12-31 0001041792 elp:ThreeMonthsToOneYearMember 2021-12-31 0001041792 elp:OneToFiveYearsMember 2021-12-31 0001041792 elp:OverFiveMonthMember 2021-12-31 iso4217:BRL xbrli:shares iso4217:BRL xbrli:shares xbrli:pure elp:Number

As filed with the Securities and Exchange Commission on April 27, 2022

UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, DC 20549

 

FORM 20-F

 

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d)

OF THE SECURITIES EXCHANGE ACT OF 1934

For the fiscal year ended December 31, 2021

Commission file number: 001-14668

 

COMPANHIA PARANAENSE DE ENERGIA – COPEL

(Exact Name of Registrant as Specified in its Charter)

Energy Company of Paraná

(Translation of Registrant’s Name into English)

The Federative Republic of Brazil

(Jurisdiction of Incorporation or Organization)

 

Rua José Izidoro Biazetto, 158 – bloco A81200-240 Curitiba, Paraná, Brazil

(Address of Principal Executive Offices)

 

Daniel Pimentel Slaviero

+55 41 3331 4011ri@copel.com

 

Rua José Izidoro Biazetto, 158 – bloco A – CEP 81200-240, Curitiba, Paraná, Brazil

(Name, telephone, e-mail and/or facsimile number and address of company contact person)

 

Securities registered or to be registered pursuant to Section 12(b) of the Act:

Title of Each Class

Trading Symbol(s)

Name of Each Exchange on Which Registered

Common Shares, without par value N/A New York Stock Exchange*
Preferred Class B Shares, without par value N/A New York Stock Exchange*
American Depositary Shares (as evidenced by American Depositary Receipts), each representing one Unit consisting of one Common Share and four Preferred Class B Shares of Companhia Paranaense de Energia - COPEL ELP

New York Stock Exchange

 

       

 

* Not for trading, but only in connection with the listing of American Depositary Shares on the New York Stock Exchange.

Securities registered or to be registered pursuant to Section 12(g) of the Act: None

Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act: None

Indicate the number of outstanding shares of each of the Issuer’s classes of capital or common stock as of December 31, 2021:F1

1,054,090,460 Common Shares, without par value*

3,128,000 Class A Preferred Shares, without par value*

1,679,335,290 Class B Preferred Shares, without par value*

 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act.

Yes [X] No [_]

If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934.

Yes [_] No [X]

 
 

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports) and (2) has been subject to such filing requirements for the past 90 days.

Yes [X] No [_]

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

N/A

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” and “emerging growth company” in Rule 12b-2 of the Securities Exchange Act of 1934. (Check one):

Large accelerated filer [X] Accelerated filer [_]

Non-accelerated filer [_] Emerging growth company [_]

If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. [_]

†The term “new or revised financial accounting standard” refers to any update issued by the Financial Accounting Standards Board to its Accounting Standards Codification after April 5,2012.

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (§ 15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report. [X]

Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:

U.S. GAAP [_] IFRS [X] Other [_]

If “Other” has been checked in response to the previous question, indicate by check mark which financial statement item the registrant has elected to follow.

N/A

 

If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Securities Exchange Act of 1934).

Yes [_] No [X]

 
 

Table of Contents

Presentation of Financial and Other Information 2
Forward-Looking Statements 3
Item 1.   Identity of Directors, Senior Management and Advisers 3
Item 2.   Offer Statistics and Expected Timetable 3
Item 3.   Key Information 4
Risk Factors 4
Item 4.   Information on the Company 19
The Company 19
Business 23
Concessions 45
Competition 53
Environment 54
Plant, Property and Equipment 55
The Expropriation Process 56
The Brazilian Electric Power Industry 57
Recent Developments 79
Item 4A.   Unresolved Staff Comments 80
Item 5.   Operating and Financial Review and Prospects 81
Overview 81
Analysis of Electricity Sales and Cost of Electricity Purchased 85
Results of Operations for the Years Ended December 31, 2021, 2020 and 2019 87
Liquidity and Capital Resources 94
Item 6.   Directors, Senior Management and Employees 100
Board of Directors 100
Board of Executive Officers 104
Supervisory Board 106
Audit Committee 107
Appointment and Evaluation Committee 108
Investment and Innovation Comittee 109
Compensation of Directors, Officers, Fiscal Council Members and Audit Committee Members 111
Employees 112
Share Ownership 114
Item 7.   Major Shareholders and Related Party Transactions 115
Major Shareholders 115
Related Party Transactions 118
Item 8.   Financial Information 118
Legal Proceedings 120
Dividend Payment 121
Item 9.   The Offer and Listing 125
Item 10.   Additional Information 126
Memorandum and Articles of Association 126
Material Contracts 132
Exchange Controls 133
Taxation 135
Documents on Display 141
Item 11.   Quantitative and Qualitative Disclosures about Market Risk 141
Item 12.   Description of Securities Other than Equity Securities 141
Item 12A.   Debt Securities 141
Item 12B.   Warrants and Rights 141
Item 12C.   Other Securities 141
Item 12D.   American Depositary Shares 141
Item 13.   Defaults, Dividend Arrearages and Delinquencies 142
Item 14.   Material Modifications to the Rights of Security Holders and Use of Proceeds 142
Item 15.   Control and Procedures 142
Item 16A.   Audit Committee Financial Expert 144
Item 16B.   Code of Ethics 144
Item 16C.   Principal Accountant Fees and Services 144
Item 16D.   Exemption from the Listing Standards for Audit Committees 145
 
 
Item 16E.   Purchases of Equity Securities by the Issuer and Affiliated Purchasers 145
Item 16F.   Changes in Registrant’s Certifying Accountant 145
Item 16G.   Corporate Governance 145
Item 16H.   Mine Safety Disclosure 148
Item 16I.   Disclosure Regarding Foreign Jurisdictions that Prevent Inspections 148
Item 17.   Financial Statements 148
Item 18.   Financial Statements 148
Item 19.   Exhibits 149
Technical Glossary 151
Signatures 157

 

 
 

PRESENTATION OF FINANCIAL AND OTHER INFORMATION

In this annual report, we refer to Companhia Paranaense de Energia ‒ Copel, and, unless the context otherwise requires, its consolidated subsidiaries as “Copel,” the “Company,” “we” or “us”.

References to (i) the “real,” “reais” or “R$” are to Brazilian reais (plural) and the Brazilian real (singular) and (ii) “U.S. dollars,” “dollars” or “US$” are to United States dollars. We maintain our books and records in reais. Certain figures included in this annual report have been subject to rounding adjustments.

Our audited consolidated financial statements as of December 31, 2021 and 2020, and for each of the years ended December 31, 2021, 2020 and 2019, are included in this annual report. We prepared our audited consolidated financial statements included in this annual report in accordance with International Financial Reporting Standards, or “IFRS”, as issued by the International Accounting Standards Board, or IASB.

References in this annual report to the “Common Shares,” “Class A Shares” and “Class B Shares” are to our common shares, class A preferred shares, class B preferred shares, respectively. References to “Units” are to our units each composed of 1 Common Share and 4 Class B Shares. References to “American Depositary Shares” or “ADSs” are to American Depositary Shares, each representing one Unit. Units are listed on “B3” (the São Paulo Stock Exchange or B3 S.A. – Brasil, Bolsa, Balcão) and “Latibex” (Mercado de Valores Latinoamericanos en Euros). Units ADSs are listed on “NYSE” (the New York Stock Exchange).

Certain terms are defined the first time they are used in this annual report. As used herein, all references to “GW” and “GWh” are to gigawatts and gigawatt hours, respectively, references to “kW” and “kWh” are to kilowatts and kilowatt hours, respectively, references to “MW” and “MWh” are to megawatts and megawatt hours, respectively, and references to “kV” are to kilovolts. These and other technical terms are defined in the “Technical Glossary” that begins on page 151.

2 
 

 

FORWARD-LOOKING STATEMENTS

This annual report contains forward-looking statements. We may also make written or oral forward-looking statements in our annual report to shareholders, in our offering circulars and prospectuses, in press releases and other written materials and in oral statements made by our officers, directors or employees. These statements are not historical facts and are based on management’s current view and estimates of future economic circumstances, industry conditions, company performance and financial results. The words “anticipates,” “believes,” “estimates,” “expects,” “plans” and similar expressions, as they relate to us, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting the financial condition, liquidity or results of operations are examples of forward-looking statements. Forward-looking statements speak only as of the date they are made, and we undertake no obligation to update publicly any of them in light of new information or future events.

Forward-looking statements involve only the current view of management and are subject to a number of inherent risks and uncertainties. There is no guarantee that the expected events, trends or results will actually occur. We caution you that a number of important factors could cause actual results to differ materially from those contained in any forward-looking statement. Such factors include, but are not limited to:

·Brazilian political and economic conditions;
·economic conditions in the State of Paraná;
·technical and operational conditions related to the provision of electricity services;
·lawsuits;
·our ability to obtain financing;
·developments in other emerging market countries;
·changes in, or failure to comply with, governmental regulations;
·competition;
·electricity shortages;
·unfavorable hydrological conditions;
·international economic and political developments;
·impacts of the coronavirus (COVID-19) pandemic;
·the impact of the ongoing conflict in Ukraine and the trade and monetary sanctions that have been imposed in connection with those developments; and
·other factors discussed below under “Item 3. Key Information―Risk Factors”.

All forward-looking statements are expressly qualified in their entirety by this cautionary statement, and you should not place undue reliance on any forward-looking statement contained in this annual report.

Item 1. Identity of Directors, Senior Management and Advisers

Not applicable.

Item 2. Offer Statistics and Expected Timetable

Not applicable.

 
3 
 
 

Item 3. Key Information

RISK FACTORS

Risks Relating to Our Company and our Operations

We are controlled by the State of Paraná, the policies and priorities of which directly affect our operations and may conflict with the interests of our investors.

We are controlled by the State of Paraná, which owns 69.7% of our outstanding common voting shares as of the date of this annual report, and whose interests may differ from other shareholders. As a result, the State of Paraná has the power to control all of our operations, including the power to elect the majority of the members of our Board of Directors and to determine the outcome of actions that require the approval of common shareholders, including transactions with related parties and corporate reorganizations. We recognize that the State of Paraná may use its status as our controlling shareholder to promote its public policies or social objectives and not necessarily to meet the objective of improving our business and/or operating results. In addition, lawsuits involving the State of Paraná may affect its position as a controlling shareholder and, therefore, may affect our capital structure. We can not guarantee that our corporate governance policies and structures in place for protection of minority shareholders will be sufficient to fully or effectively address any or all the related risks.

We are involved in several lawsuits that could have a material adverse effect on our business if their outcome is unfavorable to us.

We are the defendant in several legal proceedings, mainly relating to civil, administrative, labor and tax claims. The outcome of these proceedings is uncertain and, if determined against us, may result in obligations that could materially affect our results of operations. On December 31, 2021, our provisions for probable (more likely than not) and reasonably estimated losses were R$1,597.4 million. For additional information, see “Item 8. Financial Information–A. Consolidated Financial Information–Legal Proceedings”.

We are subject to limitations regarding the amount and use of public sector financing, which could prevent us from obtaining financing and implementing our investment program.

Our current budget anticipates capital expenditures for expansion, modernization, research, infrastructure and environmental projects of approximately R$2,067.1 million in 2022. As a state-controlled company, we are subject to Brazilian Central Bank Resolution no. 4,589/2017 (Resolução nº 4,589/2017 do Banco Central do Brasil), which defines the limit of exposure and the annual global limit of credit to public sector entities to be observed by financial institutions and other institutions authorized to operate by the Brazilian Central Bank. The annual global limit that can be obtained in credit transactions, with and without guarantee of the Federal Government, by the bodies and entities of the public sector with the financial institutions and other institutions authorized to operate by the Brazilian Central Bank is defined by the National Monetary Council by means of inclusion of an annex to Brazilian Central Bank Resolution no. 4,589/2017, establishing, until the end of each fiscal year, the limit for the following year. The maximum amounts defined for the 2022 fiscal year are R$6.5 billion for Federal Government guaranteed transactions and up to R$ 12.1 billion for transactions without Federal Government guarantee. Although theses limits have recently increased, as a result of these limits, we may have difficulty in obtaining financing from financial institutions and other institutions authorized to operate by the Brazilian Central Bank, which could create difficulties in the implementation of our investment program. Additionally, some of our concession contracts have provisions that limit our permitted level of indebtedness, which could also affect our ability to obtain necessary financing. Furthermore, the requirements and other criteria adopted by financial institutions when approving new financing transactions may be related to certain Brazilian macroeconomic scenarios, as well as to our financial indicators, such as our indebtedness levels and other indicators usually considered by financial institutions in their credit risk assessments. We cannot ensure you that these requirements and criteria will be met. As a result of these regulations and provisions, our capacity to incur debt from certain sources is limited, which could negatively affect the implementation of our investment program.

 
4 
 
 

Failures in our cybersecurity controls or unauthorized disclosure of information, as well as failure to comply with existing data privacy and data security laws may adversely affect our business and reputation.

We collect, store, process and use various confidential information related to our business and operations. In our ordinary course of business, we also collect and store personal data of our customers in our data centers located at our own premises. We have suffered cyber-attacks in the past leading to the temporary unavailability of part of our systems.

Despite our cybersecurity controls, information technology and infrastructure (solarwinds), we may be vulnerable to failures whether caused by technical failures, negligence, accident or cyber-attacks. Those failures may result in disclosure or theft of sensitive information, loss of data integrity, misappropriation of funds and disruptions to or interruption in our business operations.

We are subject to Brazilian laws and regulations relating to data protection and data privacy, mainly the Brazilian Federal Law No. 13,709/2018 (“Brazilian Data Protection Law,” or “LGPD”) that sets forth the legal framework for the processing of personal data. LGPD entered into effect on September 2020 and administrative penalties applicable for non-compliance with LGPD entered into effect later on, on August 2021.

Violations of this statute and related regulations, including leakage of personal data, could result in individual or collective lawsuits against us, the imposition of fines, among other civil, administrative and criminal penalties, as well as damage to our reputation, which could have an adverse effect on us and our business, reputation and results of operations.

The construction and expansion of our transmission and power generation projects involve significant risks that may have an adverse effect on us.

Our activities related to the development of transmission and generation projects depend on the consent of third parties over which we have no control. In addition, project development is subject to environmental, engineering and construction risks that can lead to cost overruns, delays and other impediments to timely complete a project within the budget. We cannot assure you that we will (i) obtain all required permits and approvals for our projects, (ii) secure private sector partners for any of our projects, or (iii) obtain adequate financing for our projects or that financing will be available on a non-recourse basis to us. If we are unable to complete a project or such project is delayed, this may decrease our expected financial return from the project, which may lead to impairment. As a consequence, our costs may increase or we may fail to achieve the revenues planned in connection with such expansion projects, which may have an adverse effect on our financial condition and results of operations.

We are largely dependent upon the economy of the State of Paraná.

The distribution market for the majority of our sales of electricity is located in the State of Paraná. Although a more competitive market involving possible sales to customers outside Paraná might develop in the future, our business depends and is expected to continue to depend to a very large extent on the economic conditions of Paraná.

Further, an increase in electricity prices, combined with poor economic performance in the State of Paraná, could affect the ability of some of our distributions customers to pay amounts owed to us. As of December 31, 2021, our overdue receivables in the distribuition concession area with Final Customers were approximately R$ 711.0 million in the aggregate and our allowance for doubtful accounts related to these receivables was R$155.3 million. See Note 7 to our audited consolidated financial statements.

In addition, in the event of an economic recession combined with high energy prices, the number of our distribution customers connecting illegally to our distribution grid may increase, which would then reduce our revenue from electricity sales to Final Customers. Energy we lose as a result of these illegal connections is considered a commercial loss (non-technical), and we may incur regulatory penalties if our commercial losses exceed certain established regulatory thresholds calculated by ANEEL. If ANEEL determines that we were not efficient in inspecting and controlling the non-technical losses in the distribution grid, the agency may limit the transfer of such losses to the Final Customers.

Disruptions in the operation of, or deterioration of the quality of, our services could have an adverse effect on our business, financial condition and results of operations.

The operation of complex electricity generation, transmission and distribution systems and grids involves various risks, such as operational setbacks and unexpected interruptions, caused by accidents, breakdown or failure of equipment or processes, performance below expected levels of availability and efficiency of assets, or disasters (such as explosions, fires, natural phenomena, landslides, sabotage, vandalism, and similar events). In addition, operational decisions by authorities responsible for the electricity grid, environment matters, operations and other issues affecting the electricity generation, transmission or distribution could have an adverse effect on the performance and profitability of the operations of our generation, transmission and distribution systems. If these issues occurred, our insurance could be insufficient to wholly account for the costs and losses that we may incur as a result of the damages caused to our assets, or due to outages.

 
5 
 
 

Further, the revenues that our subsidiaries generate from establishing, operating and maintaining their facilities are related to the availability of equipment and assets, and to the quality of the services (continuity and service in accordance with levels demanded by regulations). Under the related concession contracts, we and our subsidiaries are subject to: (i) a reduction of the distributor revenue as a result of the reduction of the so-called “Portion B” allocation in the revenue calculation formula; (ii) a reduction of the Permitted Annual Revenue - APR (Receita Anual Permitida, or RAP), for the transmission companies; (iii) the effects of the Availability Factor (Fator de Disponibilidade, or FID) and the offtake guarantee levels for the generation facilities; and (iv) the application of penalties and payment of compensation amounts, depending on the scope, severity and duration of non-availability of the services and equipment. Under Brazilian Law, we are strictly liable for direct and indirect damages resulting from the inadequate supply of electricity such as abrupt interruptions arising from the generation, transmission or distribution systems. Therefore, outages or stoppages in our generation, transmission and distribution facilities, or in substations or grids, may cause a material adverse effect on our business, financial situation and results of operations.

We are subject to risks related to social and environmental impacts of our projects.

The construction and operation of our assets may modify the ecosystem, particularly the natural state of the water resources and of the vegetation of the flooded river basin in the case of Hydroelectric Power Plants. Our projects may cause direct and indirect impacts in the local communities, such as housing displacement. Moreover, they may affect the economic outputs of the local communities, lead to the loss of cultural identity or increase the demand for government services. In these cases, we may be required to implement specific plans in order to minimize and mitigate those impacts.

Failures in dams under our responsibility may cause serious damages to the affected communities, to our results and to our reputation.

Dams are important infrastructures to our business, and are fundamental components of our Hydroelectric Power Plants for the purposes of diking and storing water, accounting for the majority of our energy generation capacity. However, in any dam, there is an intrinsic risk of ruptures caused by different internal or external factors. Therefore, we are subject to the risk of a dam failure that could have repercussions much greater than just the loss of hydroelectric power generation capacity. A dam failure may result in economic, social, regulatory and environmental damages and potential loss of human life in the communities downstream from the dams, which may have a material adverse effect on our reputation, business, operational results and financial conditions.

Our governance, compliance and internal controls may fail to prevent breaches of legal, regulatory, ethical or governance standards.

We are required to comply with a wide range of laws and regulations, including anti-corruption, anti-money laundering and related laws and regulations. Although we have internal policies and controls, we may be subject to breaches of those internal policies and controls and to instances of fraudulent behavior, corrupt practices and dishonesty by our directors, officers, employees, contractors or other agents that we may not timely identify or prevent.

Further, we have a large number of contracts with suppliers, with wide distribution and outsourcing of the production chains, and we are not able to control all possible irregularities or to ensure that our selection processes will be sufficient to avoid situations where our suppliers have problems related to compliance with applicable law, sustainability or outsourcing of the production chain under inadequate safety conditions.

These risks are increased by the fact that our portfolio includes affiliated companies, such as special purpose companies, some of which we do not hold a controlling interest in.

Although we have an integrity program with timely updates and a robust process for investigating complaints, our systems may not be effective in all circumstances. Any failure in our capacity to prevent or detect noncompliance with the applicable governance rules or regulatory obligations may cause damages to our reputation or other material adverse effects to our results of operation or financial condition.

 
6 
 
 

The rules for electricity trading and market conditions may affect the sale prices of electricity.

We perform trading activities through power purchase and sale agreements, mainly in the unregulated electricity market (Free Market), through our generation and trading companies.

Energy trading is affected by changes in the methodology used to calculate energy price in the short-term (Preço de Liquidação de Diferenças, or PLD). PLD is currently determined by the results of optimization models of operation of the interconnected systems used by the ONS and by CCEE (Câmara de Comercialização de Energia Elétrica). In such determination, there may be data entry errors or errors in the model, which may lead to an unexpected change of the PLD and possible future republications of the PLD. Thus, there is a risk for the commercial business with respect to the alteration of these models, data entry errors and republishing of the PLD, which may cause market uncertainty, reduction of liquidity, and financial losses with unexpected price variation. As of January 1, 2021, the PLD is officially calculated for each submarket on an hourly basis, as proposed by the Standing Committee for Analysis of Methodologies and Programs (Comissão Permanente para Análise de Metodologias e programas Computacionais do Setor Elétrico or CPAMP), in accordance with the implementation schedule defined by MME (Ministério de Minas e Energia) Ordinance No. 301/2019.

Any change in the energy trading rules related to the increase of restrictions for the entry of new consumers in the Free Market may affect our energy trading business. Also, excess supply of energy in the market, particularly as a result of new energy projects and incentivized renewable energy projects, may cause a decrease in the energy prices and adversely impact our energy trading business.

Our business could be adversely affected by the performance of our suppliers, contractors or other third parties we do not control.

Suppliers, contractors and other third parties may fail to perform existing contracts and obligations, which may unfavorably impact our operations and financial results.

Further, being a state-controlled company, we are legally obliged to engage a bidding process for the acquisition of equipment, materials and services, which may not result in the best quality of services, equipment and materials.

Our business is subject to risks related to our supply chain which may be substantially and adversely affected by internal or external economic, political, social and natural events, such as pandemics, terrorism acts, border disputes and armed conflicts, among others.

The operations of our supply centers and of our suppliers and service providers could be substantially and adversely affected by factors and events beyond our control, such as fires, natural disasters, spread of diseases, pandemics, strikes, system failure, terrorrist attacks, deforestation, and political or armed conflicts, including the ongoing conflict between Russia and Ukraine, trade sanctions and other similar events, and the developments therein, such as high inflation, volatility in the commodities markets and financial markets, changes in currencies, lack of liquidity in the capital markets, among others. In such a scenario, if the impacted services cannot be replaced or reinstated in the affected region, the supply of electricity to our customers could be impacted or disrupted and our results could be adversely impacted.

We are subject to climate factors and to uncertainties that may adversely impact our operation and results

Our energy generation, transmission and distribution operations are subject to climatic factors and uncertainties related to severe weather events, mainly cyclones, hurricanes, floods, droughts and fires. These events can affect minimum water storage levels in hydroelectric plant reservoirs and lead to the unavailability of our electricity supply systems, impacting penalties by regulatory bodies, consumer complaints, lawsuits, costs for the restoration of systems, in addition to negatively affecting our results.

Further our wind farms operations are subject to climate factors and to uncertainties related to the speed of wind. The authorizations that govern our power generation activities in wind farms set forth certain performance covenants, which require us to generate minimum amounts of energy on annual and four-year bases in accordance with the energy amounts sold in the correspondent auctions. Non-compliance with such covenants may adversely impact our results.

 
7 
 
 

Failure to comply with ESG guidelines can adversely affect our operations, results and reputation

Our ESG-related practices are evolving and may include commitments to meet standards or deadlines of enhanced social, governance and sustainable practices, as well as to incorporate sustainability into our business. Failure to meet corporate ESG guidelines or commitments could cause us financial and operational losses, and reputational damage.

We may acquire other companies in the electric sector or new energy concessions, as we already did in the past, which may increase our financial leverage and adversely affect our consolidated performance

We constantly prospect for businesses that are related to our corporate purpose and aligned with our strategic plan. To expand our business, we may participate in auctions for the construction and operation of new power generation and transmission ventures, as well as invest in other companies from the energy sector, as we have done in the past. These acquisitions can increase our financial leverage or reduce our profits. In addition, the integration of the new businesses may not result in the synergy we expect in terms of efficiency gains and economies of scale for our operations, which may adversely affect our operational and financial performance.

Labor disputes may disrupt our operations from time to time

Our employees are represented by unions. Disagreements regarding issues related to divestitures, changes to our business strategy, and reductions in the professional staff may lead to employee reactions. Strikes, work interruptions, or other forms of protests in any of our major suppliers or contractors or at their facilities may undermine our ability to complete relevant projects on time, negatively impacting our results of operations, and affect our ability to achieve long-term strategic goals.

The State of Paraná is party to a lawsuit under which an unfavorable decision could result in the sale of its shares in our company to third parties. A change in our capital structure may expose our business to uncertainties and additional or different risks.

The State of Paraná is party to a lawsuit (Ação Judicial No. 0021271-74.2005.8.16.0000) filed by Itaú Unibanco S.A, which is currently under review by the Brazilian Supreme Court. Itau claims that it has the right to enforce a collateral security over the shares in our company held by the State of Paraná due to the alleged default by the State of Paraná in a transaction involving the acquisition of a public bank (Banestado) that took place in the 1990s. A favorable decision to Itaú could result in the transfer of the shares in our company owned by the State of Paraná that were pledged as security to third parties or to Itaú. In that scenario, the State of Paraná may no longer hold over 50% of our voting capital, possibly resulting in a new controlling shareholder or a group of private shareholders acting jointly, that could hold the decision-making power and influence our business. That may expose our business to significant uncertainties, which may adversely impact our financial and operational results.

 
8 
 
 

Risks Relating to the Brazilian Electricity Sector and Other Sectors that We Operate

We are uncertain as to the renewal of certain of our generation and transmission concessions.

Under Federal Law No. 12,783/2013, or the 2013 Concession Renewal Law, we may only renew our concessions that were in effect as of 1995 (and, in the case of generation facilities, generation concession contracts entered into prior to 2003) for an additional 30-year period (or an additional 20-year period in the case of thermal plants), if we agree to amend the terms of the concession contract that is up for renewal to reflect certain new terms and conditions imposed by the 2013 Concession Renewal Law, which vary depending on whether the concession is for generation, transmission or distribution. If we do not agree to amend the concession contract to reflect these new conditions, the concession contract cannot be renewed and will be subject to a competitive bidding process upon its expiration, which we might not win. If we do not renew our generation and transmission concessions or if they are renewed under less favorable conditions, our financial condition and results of operations could be materially adversely affected. For more information, see “Item 4. Information on the Company—The Brazilian Electric Power Industry—Concessions”.

The extension of the concession agreement of our controlled company Compagas is under review of the granting authority.

Compagas entered into a concession agreement with the State of Paraná which, pursuant to Complementary Law 227/2020, expires on July 6, 2024. The purpose of this concession is to provide piped gas distribution services and other related activities to all segments of the consumer market, either as a raw material, or for the purpose of power generation or other uses made possible by technological advances.

The gas concession agreement provides that part of the investments made by Compagas were to be recovered through the collection of tariffs paid by the end users of the public service and the remaining part should be indemnified by the granting authority, the State of Paraná, at the end of the concession.

On July 23, 2021, the State of Paraná submitted to public consultation a proposal to extend Compagás' concession for thirty years from July 6, 2024 and, on February 22, 2022, a public hearing was held to receive comments and input. The proposed extension of the concession contract includes the execution of a new concession contract, which would change the tariff structure of the concession from a tariff based on production cost to tariff defined based on a price cap. The methodology to calculate the tariffs under the new method will be developed by the State Regulatory Agency for Public Services - AGEPAR.

However, if this extension of the concession does not occur, even if Compagas is entitled to compensation for the investments made in the last 10 years prior to the end of the concession, the financial condition and results of operations of our controlled company may be adversely affected. For more information see Note 2.1.1 to our audited consolidated financial statements.

Our operating results depend on prevailing hydrological conditions, which have been volatile recently. The impact of water shortages and resulting measures taken by the government to conserve energy may have a material adverse effect on our business, financial condition and results of operations.

We are dependent on the prevailing hydrological conditions throughout Brazil and in the geographic region in which we operate. According to data from ANEEL, approximately 62% of Brazil’s installed capacity currently comes from hydroelectric generation facilities. Hydrological conditions in our region, and Brazil in general, are frequently subject to changes because of non-cyclical deviations in average rainfall.

In previous periods of low rainfall, the Brazilian government reacted to poor hydrological conditions by seeking to reduce the consumption of electricity by Final Customers by several means, from general campaigns to reduce energy consumption to rationing programs. The effect of campaigns to reduce energy consumption is not predictable, making it difficult for our distribution business to accurately estimate the volume of energy it needs to purchase for sale to Final Customers. In case of mandatory rationing program, our distribution business would be adversely affected because its revenues are partially based on the volume of electricity it provides through our distribution grid to Final Customers.

With respect to our generation business, in order to compensate for poor hydrological conditions and to maintain adequate water levels in reservoirs, the ONS may order the reduction of generation from Hydroelectric Power Plants, which would be partially compensated by increased generation by Thermoelectric Plants. This mechanism for replacing hydroelectric production with thermoelectric production may not provide all of the energy we need to fulfill our obligations under existing energy supply contracts. To compensate for this deficit, our generation business can be required to purchase energy in the Spot Market, typically at higher prices, and we would not be able to pass on these increased costs. This mechanism impacts all generation companies in Brazil regardless of whether the geographical region in which a specific generator is located is experiencing low rainfall and could have a material adverse effect on our generation business.

 
9 
 
 

In addition, in an extreme scenario, given the increased presence of thermal generation in the national electric matrix, if a shortage of natural gas were to occur, this would increase the general demand for hydroelectric energy in the market and therefore increase the risk that a rationing program would be instated.

Regarding our energy trading business, the effect of volatility in hydrological conditions is the increase of the variation of energy price, which in turn increases the Spot Market volatility, thus affecting our operating results. Spot price (PLD) is determined by the results of optimization models of operation of the interconnected systems used by the ONS and by CCEE. The energy average prices in the short term ("spot") are calculated by CCEE every hour and are set for each region.

When there is great availability of hydrological resources, the spot price tends to remain at lower levels, which may not be enough to (i) cover the generation costs of this very same energy (when related to our generation business) and (ii) cover the cost of the power purchase and sale agreement in our energy trading business.

Conversely, if hydrological availability is affected, spot prices tend to increase significantly, in addition to occasionally impacting the GSF, which may adversely impact our costs of energy purchases, as the price set forth in power purchase and sale agreements may not be sufficient.

ANEEL could penalize us for failing to comply with the terms of our concessions or with applicable laws and regulations, and we may not recover the full value of our investment in the event that any of our concessions are terminated.

Our concessions are for terms of 20 to 35 years and may be extended if certain conditions are met. In the event that we fail to comply with any term of our concessions or applicable law or regulation, ANEEL may impose penalties on us, which may include warnings, the imposition of potentially substantial fines and restrictions on our operations, among others. ANEEL may also terminate our concessions prior to the expiration of their terms if we fail to comply with their provisions or if they determine that terminating our concessions would be in the public interest, through a forfeiture or expropriation proceeding. In particular, our renewed distribution concession agreement contains both quality and financial metrics that become more restrictive over time, and that we must meet to ensure that our distribution concession agreement is not terminated. If ANEEL terminates any of our concessions before its expiration, we would not be able to operate the segment(s) of our business that had been authorized by the concession. Furthermore, any compensation that we may receive from the Brazilian government for the unamortized portion of our investment may not be sufficient for us to recover the full value of our investment. The early termination or non-renewal of any of our concessions or the imposition of severe fines or penalties by ANEEL could have a material adverse effect on our financial condition and results of operations. See “Item 4. Information on the Company—The Brazilian Electric Power Industry—Concessions”.

We are subject to comprehensive regulation of our business, which fundamentally affects our financial performance.

Our business is subject to extensive regulation by various Brazilian legal and regulatory authorities, particularly the MME and ANEEL, which regulate and oversee various aspects of our business and approve our tariffs. Changes to the laws and regulations governing our operations, which have occurred in the past, could adversely affect our financial condition and results of operations.

For example, the tariffs that we charge for sale of electricity to Captive Customers are determined pursuant to a concession agreement with the Brazilian government through ANEEL. The tariff rates we charge our customers are determined pursuant to a concession agreement and in accordance with ANEEL’s regulation. In addition, ANEEL’s decisions relating to our tariffs may be contested by public authorities or by our customers. Administrative and judicial decisions resulting from these challenges may modify ANEEL’s decisions in a manner that is unfavorable to us, which may adversely affect our financial condition and results of operations.

If any further regulations or new laws are passed by the Brazilian government to lower electricity prices, these new laws and regulations could have a material adverse effect on our results of operations.

 
10 
 
 

Certain customers in our distribution concession area may cease to purchase energy from our distribution business.

Our distribution business generates a large portion of its revenues by selling energy that it purchases from generation companies. Large electricity customers within the geographic area of our concession that meet certain regulatory requirements may qualify as free customers (“Free Customers”). A Free Customer in our distribution concession area is entitled to purchase energy directly from generation and energy trading companies rather than through our distribution business, in which case that Free Customer would cease to pay our distribution business for that energy that we previously supplied.

In addition, ANEEL has issued regulations related to micro and mini distributed generation, which has been facilitating the purchase or lease of power generation equipment by customers, especially solar photovoltaic modules, to produce energy for their own consumption. Such regulation is expected to be revised following the adoption of a new legal framework for distributed generation in Brazil (Federal Law No. 14,300/2022) and we cannot anticipate how eventual changes in regulation will affect us. If the number of customers with micro and mini distributed generation within the geographic area of our concession increases, our revenues and results of operations could also be adversely affected.

We generate a portion of our operating revenues from Free Customers who may seek other energy suppliers upon the expiration of their contracts with us.

As of December 31, 2021, we had 1,380 Free Customers, representing approximately 8.0% of our consolidated operating revenues and approximately 14.6% of the total volume of electricity sold by us. As of December 31, 2021, our energy trading company had 1,363 Free Customers, representing approximately 7.1% of our consolidated operating revenues and approximately 12.6% of the total volume of electricity we sold in 2021. Copel GeT had 17 Free Costumers on December 31, 2021. Approximately 99.99% of the megawatts-hours sold under contracts to such customers by Copel GeT expired in 2021. These customers represented approximately 2.0% of the total volume of electricity we sold in 2021, and approximately 0.9% of our consolidated operating revenues. Such Free Customers may seek other energy suppliers upon the expiration of their contracts with us. Additionally, it is possible that our large industrial clients could be authorized by ANEEL to generate electric energy for their own consumption or sale to other parties, in which case they may obtain an authorization or concession for the generation of electric power in a given area, which could adversely affect our results of operations.

We may be forced to purchase or sell energy in the Spot Market at higher or lower prices and we may not be entitled to pass on any increased costs or incurred losses to our Final Customers in a timely manner, or at all.

Under the New Industry Model Law, electric energy distributors, including us, must contract, through public bids conducted by ANEEL, 100% of the forecasted electric energy demand for their respective distribution concession areas. The auctions in which the distributors are allowed to purchase energy are held up to seven years prior to the actual delivery of electric energy. We cannot guarantee that our forecasts for energy demand in our distribution concession area will be accurate. If our forecasts fall short of actual electricity demand, or if we are unable to purchase energy through the regulated market due to lack of energy supply in the market, or if a generation company fails to deliver energy that was previously contracted, we may be forced to make up for the shortfall by entering into short-term agreements to purchase electricity in the Spot Market where we may pay significantly more for energy without being able to pass on these increased costs to our Final Customers. In addition, if we underestimate our distribution energy needs, we may be subject to penalties imposed by the CCEE. Moreover, if our forecasts surpass actual demand by more than the allowed margin (105% of actual demand), including where demand is depressed due to government campaigns in response to poor hydrological conditions or due to reduced economic activity, we will not be able to pass on to our Final Customers the cost of the excess energy that we acquire.

We are subject to a counterparty’s credit risk in agreements entered into with Copel Comercialização (Copel Mercado Livre) and in case of default, we may have to sell or purchase energy at a different base price.

Copel Comercialização is subject to a counterparty’s credit risk. When Copel Comercialização sells energy, the counterparties to power purchase agreements may default on their contractual obligations, which may cause Copel Comercialização to sell energy at a different base price. In cases where Copel purchases energy, whether from energy generation projects, in operation or under construction, or even from energy trading, the selling counterparties may also default on the relevant contracts, and, consequently, Copel Comercialização may have to buy energy at a different base price and be subject to regulatory penalties imposed by CCEE due to insufficient contractual guarantees. Even though we perform credit analyses in accordance with market standards and require our counterparties to provide guarantees in connection with the power purchase and sale agreements, we cannot guarantee that our counterparties will not fail to comply with their payment obligation or with their obligation to deliver energy, as the case may be, which may adversely affect our results.

 
11 
 
 

We are subject to the risk of exchange rate variation if we start to perform energy import business, as well as if we perform business involving natural gas.

 Our subsidiary Copel Comercialização (Copel Mercado Livre) obtained authorization from the Ministry of Mines and Energy to import energy from neighboring countries, Argentina and Uruguay, and if we start doing business in this regard, we will be subject to the risk of exchange rate fluctuation. This subsidiary was also authorized by the National Agency of Petroleum, Natural Gas and Biofuels to operate in the sale of natural gas within Brazil. Although the natural gas business still has an incipient market in Brazil, if we do business in this area, we will be subject to the risk of exchange rate variation, considering that part of these transactions may be carried out in foreign currencies.

We are subject to unrealized losses or net gains arising out from the mark-to-market of the purchase and sale of energy contracts, which may expose us to the risk of future energy prices.

Our subsidiary Copel Comercialização (Copel Mercado Livre) negotiates energy purchase and sale transactions, and part of its agreements are classified as derivative financial instruments measured at fair value through its results. Unrealized net losses or gains resulting from the mark-to-market of these contracts (difference between contracted prices and market prices) are recognized in the results of the fiscal year. This activity may expose us to the risk of future energy prices.

Our equipment, facilities and operations are subject to numerous environmental and health regulations, which may become more stringent in the future and may result in increased liabilities and increased capital expenditures.

Our distribution, transmission and generation activities are subject to comprehensive federal, state and local legislation, as well as supervision by Brazilian governmental agencies that are responsible for the implementation of environmental and health laws and policies. These agencies could take enforcement action against us for our failure to comply with their regulations and with requirements established for the maintenance of our environmental licenses. These actions could result in, among other things, the imposition of fines, embargoes and revocation of licenses, which could have a material adverse effect on our financial condition and results of operations. It is also possible that enhanced environmental and health regulations will force us to allocate capital towards compliance, and consequently, divert funds away from planned investments. Such a diversion could have a material adverse effect on our financial condition and results of operations.

We are strictly liable for any damages resulting from inadequate provision of electricity services and our insurance policies may not fully cover such damages.

We are strictly liable under Brazilian law for damages resulting from the inadequate provision of electricity distribution services. In addition, our distribution, transmission and generation utilities may be held liable for damages caused to others as a result of interruptions or disturbances arising from the Brazilian generation, transmission or distribution systems, whenever these interruptions or disturbances are not attributed to an identifiable member of ONS. We cannot assure you that our insurance policies will fully cover damages resulting from inadequate rendering of electricity services, which may have an adverse effect on us.

We are the controlling shareholder of a company that operates a gas distribution business (Compagas) and we are consequently exposed to risks inherent to this sector.

We control a business in the gas distribution sector, which is operated by Companhia Paranaense de Gas – Compagas. This company is entitled to exclusive rights to distribute piped gas in the State of Paraná. The users are Thermoelectric Plants, cogeneration plants, gas stations, among other companies and residences.

Businesses in the gas distribution sector are subject to a broad set of risks inherent to its operation, including among the main ones:

 
12 
 
 
·Regulatory instability,
·Shortage of natural gas,
·Depending on a single supplier in Brazil,
·Operational failures and accidents in distribution,
·Performance of outsourced service providers, and
·Alternative energy sources.

As a result of these uncertainties, there is no guarantee that the purposes of our gas distribution business will be achieved, which may have an adverse effect on our results of operations and our business.

We cannot assure the speed of our innovation capacity and our responses in view of the changes the energy sector has been going through as a result of technology advances.

The electric energy sector has been going through changes driven by (i) the decentralization of the power generation systems; (ii) advances in energy storage technologies; (iii) dissemination of digital technologies that improve the efficiency of energy generation, transmission and consumption; (iv) increase of renewable energy sources, such as wind and solar energy; and (v) a tendency of reducing carbon footprints in the energy system, as part of the global efforts to mitigate the effects of climate change. These changes present many challenges and we may not be able to keep up with the effects of the increasing adoption of digital technologies in the electric energy sector and the significant potential of new technology solutions (both with respect to the improvement of processes and services provided to consumers and with respect to the development of new products that may lead to higher productivity gains, more affordable prices, higher competition and the creation of new markets). Investments in research and development may contribute to mitigate the risks related to the transformations of the energy sector and create new opportunities.

Risks Relating to Brazil

The Brazilian Government has significant influence over the Brazilian economy. Brazilian economic and political conditions— and investor perception of these conditions— have a direct impact on our operation.

Historically, the country’s political situation has influenced the performance of the Brazilian economy, and political crises have affected the confidence of investors and the general public, which resulted in economic deceleration, the downgrading of credit ratings of the Brazilian government and Brazilian issuers, and heightened volatility in the securities issued abroad by Brazilian companies.

Additionally, the Brazilian government has exercised, and continues to exercise, significant influence over the Brazilian economy and often changes monetary, credit, exchange and other policies to influence Brazil’s economy. Our business, financial condition, results of operations and prospects may be adversely affected by changes in government policies, as well as other factors including, without limitation:

·exchange rate movements and volatility;
·inflation and changes in interest rates;
·exchange control policies;
·fiscal policy and changes in tax laws;
·other political, diplomatic, social and economic developments that may affect Brazil or the international markets;
·controls on capital flows; and/or
 
13 
 
 
·limits on foreign trade.

In the last few years, Brazil faced adverse fiscal developments and political instability. Brazilian GDP grew by 4.6% in 2021, decreased by 4.1% in 2020 and grew by 1.1% in 2019. Unemployment rate was 11.1% in 2021, 13.5% in 2020 and 11.9% in 2019. Inflation, as reported by the consumer price index (IPCA), was 10.06% in 2021, 4.52% in 2020 and 4.31% in 2019. The Brazilian Central Bank’s base interest rate (SELIC) was 9.25% on December 31, 2021, 2.0% on December 31, 2020 and 4.5% on December 31, 2019. Considering the accumulated amount for the first three months of 2022, the SELIC rate was 2.42%. Future economic, social and political developments in Brazil may impair our business, financial condition or results of operations, or cause the market value of our securities to decline.

Changes in, or uncertainties regarding the implementation of, the policies above, might generate or contribute to uncertainties in the Brazilian economy. This would increase the volatility of the domestic capital market and the value of Brazilian securities traded abroad, and adversely affect our business, results of operations and financial condition.

Moreover, taking into account the Brazilian presidential system of government, and the considerable influence of the executive power, it is not possible to predict whether the present government or any successive governments will have an adverse effect on the Brazilian economy, and consequently on our business.

The effects of the COVID-19 pandemic of the coronavirus may have a material adverse impact on our operations and results.

As COVID-19 continues to impact the global and local economies and financial markets, Copel has followed the load projections issued by official bodies in the electricity sector strongly impacted by the drop in consumption in the commercial and industrial segments. This fall has caused notifications by energy buyers, alleging unforeseeable circumstances and force majeure due to the COVID-19 outbreak pandemic, and requiring a reduction in the amounts of energy contracts and/or installments of defaulted bills.

Adverse impacts of the COVID-19 outbreak pandemic can also be felt on the implementation of generation and transmission projects, or on the availability of existing assets resulting from local actions, preventing access to facilities or problems with suppliers in the sector, also affected by the COVID-19 outbreak pandemic.

We have established a Contingency Committee in light of the COVID-19 outbreak pandemic with the objective of monitoring and mitigating current and futures impacts and consequences in our activities. The Contingency Committee has four main focus objectives: (i) people’s safety, (ii) continuation of our essential activities, (iii) monitoring guidelines and requirements of regulatory bodies, and (iv) preservation of adequate financial conditions to support the crisis. We have also continuously been (A) monitoring the impacts of the COVID-19 pandemic on (i) our contracts, (ii) suppliers and (ii) the liquidity of the energy market and our short-term pricing, as well as (B) involved and negotiating with the relevant authorities for the implementation of guidelines that guarantee the maintenance of the economic and financial sustainability of Brazil’s electricity power generation, transmission, commercialization and distribution chain.

Fluctuations in currency exchange rates and the devaluation of the real may adversely affect our net income and cash flow.

The Brazilian currency has been devalued periodically in the past in relation to the U.S. dollar and other foreign currencies. As of December 31, 2020, the exchange rate between the Real and the U.S. Dollar was of R$5.19 per US$1.00, depreciating 28.8% against the U.S. Dollar compared to 2019. As of December 31, 2021, the Real vs. U.S. dollar exchange rate was R$5.58 to US$1.00, depreciating 7.51% against the U.S. Dollar, compared to December 31, 2020. As of April 18, 2022, the Real vs. U.S. dollar exchange rate was R$4.67 to US$1.00, which represents a 16.31% decrease as compared to the selling rate of R$5.58 to US$1.00 on December 31, 2021. Depreciation of the Real increases the cost of servicing our foreign currency-denominated debt and the cost of purchasing electricity from the Itaipu – a hydroelectric facility, one of our major suppliers, which adjusts its electricity prices based in part on its U.S. dollar costs. Indeed, depreciation generally curtails access to international capital markets and may prompt government intervention. It also reduces the U.S. dollar value of our dividends and the U.S. dollar equivalent of the market price of our ADSs.

 
14 
 
 

Inflation and governmental measures to curb inflation may contribute to economic uncertainty in Brazil, and could reduce our margins and the market price of the ADSs.

Brazil has in the past experienced extremely high rates of inflation. Brazil’s annual rates of inflation, measured in accordance with the variation of the Índice Geral de Preços - Disponibilidade Interna (“IGP-DI”) index, were 6.0% for the three-month period ended March 31, 2022, 17.7% in the year 2021, 23.1% in the year 2020 and 7.7% in the year 2019. The Brazilian government has in the past taken measures to combat inflation, such as raising the basic Selic interest rate to elevated levels, and public speculation about possible future government actions has had significant negative effects on the Brazilian economy. Although our concession contracts provide for annual adjustments based on inflation indexes, if Brazil experiences substantial inflation in the future, and the Brazilian government adopts inflation control policies similar to those adopted in the past, our costs may increase faster than our revenues, our operating and net margins may decrease and, if investor confidence lags, the price of the ADSs may fall. Inflationary pressures may also curtail our ability to access foreign financial markets and could lead to further government intervention in the economy, including the introduction of government policies that may adversely affect the overall performance of the Brazilian economy.

Changes in Brazilian tax policies may have an adverse effect on us and our shareholders.

The Brazilian government has in the past changed its tax policies in ways that affected the electricity sector, and it may do so again in the future. These changes include increases in the tax rates affecting energy companies and, occasionally, the collection of temporary taxes related to specific governmental purposes. If we are unable to adjust our tariffs accordingly, we may be adversely affected.

The Brazilian Government is discussing a bill (Bill No. 3887/2020) that changes the rules of Income Tax and Social Contribution, by replacing Contributions to PIS / PASEP and Cofins by Contribution on Goods and Services (Contribuição sobre Bens e Serviços – CBS). We formalized a work group to assess the impacts and risks that this change may have on our financial results. The group concluded that the impacts for us will likely be low, considering that the market in which we operate has regulated tariffs and bilateral contracts, which are expected to rebalance prices in the event of new taxes. However, we estimate CBS could lead to a tariff increase for the Final Customers of our distribution concession, due to the increase in the tax rate. Our shareholders could also be affected, in case of higher taxation of dividends.

Negative developments in other national economies, especially those in developing countries, may negatively impact foreign investment in Brazil and the country’s economic growth.

International investors generally consider Brazil to be an emerging market. Historically, adverse developments in the economies of emerging markets have resulted in investors’ perception of greater risk from investments in such markets. Such perceptions regarding emerging market countries have significantly affected the market value of securities of Brazilian issuers. Furthermore, although economic conditions are different in each country, investors’ reactions to developments in one country can impact the prices of securities in other countries, including those in Brazil, and this may diminish investors’ interest in securities of Brazilian issuers, including ours.

Risks Relating to the Units ADSs

ADSs holders may not have all the rights of our shareholders, and may be unable to exercise voting rights or preemptive rights relating to the shares underlying their Units.

Our bylaws provide for the issuance of Units, each consisting of four Preferred Class B Shares and one Common Share. A holder of Units has the right to request, at any time, the cancellation of the Units and the consequent delivery of the respective deposited shares to the depositary financial institution, in compliance with the terms, rules and procedures established by our Board of Directors.

Holders of Preferred Shares do not have the same voting rights attributed to holders of Common Shares by Brazilian law or our bylaws, and thus only the 1 Common Share in each Unit that underlie ADSs has full voting rights. Moreover, the rights of ADS holders may be subject to certain limitations provided in the deposit agreement or by the securities intermediaries through which ADS holders hold their securities.

 
15 
 
 
Although ADS holders are permitted to vote at shareholders’ meetings, there are procedural steps involved in the process that create practical limitations on the ability of ADS holders to vote. In accordance with the Deposit Agreement, we will provide the notice to the Depositary, which will in turn, as soon as practicable thereafter, mail to holders of ADSs the notice of such meeting and a statement as to the manner in which instructions may be given by holders. To exercise their voting rights, ADS holders must then instruct the Depositary how to vote their shares. Because of this extra procedural step involving the Depositary, the process for exercising voting rights will take longer for ADS holders than for direct holders of Class B Shares or Common Shares. ADSs for which the Depositary does not receive timely voting instructions will not be voted.
The holders of the Common Shares, Class B Shares or Units may have fewer and less well-defined rights to protect your interests in connection with actions taken by our Board of Directors or the controlling shareholder than under the laws of the United States and certain other jurisdictions outside Brazil. Although Brazilian law imposes restrictions on insider trading and price manipulation, the Brazilian securities markets are not as highly supervised as the United States securities markets or markets in certain other jurisdictions outside Brazil.
The ability of ADS holders to exercise preemptive rights is not assured, particularly if the applicable law in the holder’s jurisdiction (for example, the Securities Act in the United States) requires that either a registration statement be effective or an exemption from registration be available with respect to those rights, as is in the case in the United States. We are not obligated to extend the offer of preemptive rights to holders of ADSs, to file a registration statement in the United States, and we cannot assure you that we will file any such registration statement. Accordingly, you may receive only the net proceeds from the sale of your preemptive rights by the Depositary or, if the preemptive rights cannot be sold, they will be allowed to lapse. If you are unable to participate in rights offerings, your holdings may also be diluted.
ADS holders may not receive dividend payments if we incur net losses or our net profit does not reach certain levels. Under Brazilian Corporate Law and our by-laws, we must pay our shareholders a mandatory distribution equal to at least 25% of our adjusted net profit for the preceding fiscal year, with holders of preferred shares having priority of payment. According to our bylaws, Class A Shares and Class B Shares are entitled to receive annual, non-cumulative minimum dividends, which dividend per share shall be at least 10% higher than the dividends per share paid to the holders of the Common Shares. Class A Shares have a dividend priority over the Class B Shares to receive a minimum dividend equal to 10% of the total share capital represented by the Class A Shares outstanding at the end of the fiscal year in respect of which the dividends have been declared, and Class B Shares have a dividend priority over the Common Shares. Units are entitled to dividends equal to their underlying shares. In the event that we are unable to declare dividends, our management may nevertheless decide to defer payment of dividends or, in limited circumstances, not to declare dividends at all. We cannot make dividend payments from our legal reserve and capital reserve accounts.

Sales of a substantial number of shares, Units or ADSs, or the perception that such sales might take place, could adversely affect the prevailing market price of our shares or Units and ADSs.

As a consequence of the issuance of new shares, Units or ADSs, sales of shares, Units or ADSs by existing investors, or the perception that such a sale might occur, the market price of our shares, Units and ADSs may decrease significantly.

Future equity issuances may dilute the holdings of current holders of our shares, Units or ADSs and could materially affect the market price for those securities.

We may in the future decide to offer additional equity to raise capital or for other purposes. Any such future equity offering could reduce the proportionate ownership and interests of holders of our shares, Units and ADSs, as well as our earnings and net equity value per share, Unit or ADS. Any offering of shares, Unit and ADSs by us or our main shareholders, or a perception that any such offering is imminent, could have an adverse effect on the market price of these securities.

 
16 
 
 

Holders of our ADSs may be unable to enforce judgments against our directors or officers.

All of our directors and officers named in this annual report reside in Brazil. Substantially all of our assets, as well as the assets of these persons, are located in Brazil. As a result, it may not be possible for holders of our ADSs to effect service of process upon us or our directors and officers within the United States or other jurisdictions outside Brazil, attach their assets or enforce against us or our directors and officers judgments obtained in the United States or other jurisdictions outside of Brazil. Because judgments of U.S. courts for civil liabilities based upon the U.S. federal securities laws may only be enforced in Brazil if certain requirements are met, holders of ADSs may face greater difficulties in protecting their interest in actions against us or our directors and officers than would shareholders of a corporation incorporated in a state or other jurisdiction of the United States.

Judgments of Brazilian courts with respect to our shares or Units will be payable only in reais.

If proceedings are brought in the courts of Brazil seeking to enforce our obligations in respect of our shares or Units, we will not be required to discharge any such obligations in a currency other than reais (R$). Under Brazilian exchange control limitations, an obligation in Brazil to pay amounts denominated in a currency other than reais (R$) may only be satisfied in Brazilian currency at the exchange rate, as determined by the Brazilian Central Bank, in effect on the date the judgment is obtained, and any such amounts are then adjusted to reflect exchange rate variations through the effective payment date. The then prevailing exchange rate may not afford non Brazilian investors with full compensation for any claim arising out of, or related to, our obligations under our shares or Units.

If you exchange your ADSs for Units, you risk increased taxes and the inability to remit foreign currency abroad.

Brazilian law requires that parties obtain a registration before the Brazilian Central Bank in order to be allowed to remit foreign currencies, including U.S. dollars, abroad. For the ADSs, the Brazilian custodian for the Units has obtained the necessary certificate from the Brazilian Central Bank for the payment of dividends or other cash distributions relating to the preferred shares and Units or upon the disposition of the preferred shares or Units. If you exchange your ADSs for the underlying Units, however, you must obtain your own certificate of registration or register in accordance with Brazilian Central Bank and CVM rules in order to obtain and remit U.S. dollars abroad upon the disposition of the Units or distributions relating to their underlying shares. If you do not obtain a certificate of registration, you may not be able to remit U.S. dollars or other currencies abroad and may be subject to less favorable tax treatment on gains with respect to the Units. Pursuant to Brazilian Central Bank rules, obtaining this registration requires exchange transactions, which are subject to taxes in Brazil. For more information, see “Item 10. Additional Information—Taxation—Brazilian Tax Considerations—Other Brazilian Taxes”. If you attempt to obtain your own registration, you may incur expenses or suffer delays in the application process, which could delay your ability to receive dividends or distributions relating to the shares underlying the Units or the return of your capital in a timely manner. The custodian’s registration before the Brazilian Central Bank and any certificate of foreign capital registration you obtain may be affected by future legislative changes. Additional restrictions may be imposed in the future on the disposition of the underlying Units or the repatriation of the proceeds from disposition.

The Brazilian government may impose exchange controls and restrictions on remittances abroad which may adversely affect your ability to convert funds in reais into other currencies and to remit other currencies abroad.

In the past, the Brazilian government has imposed restrictions on the remittance to foreign investors of the proceeds of their investments in Brazil and the conversion of Brazilian currency into foreign currencies. The Brazilian government could again choose to impose this type of restriction if, among other things, there is deterioration in Brazilian foreign currency reserves or a shift in Brazil’s exchange rate policy. Reintroduction of these restrictions would hinder or prevent your ability to convert dividends, distributions or the proceeds from any sale of Units, as the case may be, from reais into U.S. dollars or other currencies and to remit those funds abroad. We cannot assure you that the Brazilian government will not take similar measures in the future.

The relative volatility and illiquidity of the Brazilian securities markets may impair your ability to sell the Units underlying the ADSs.

The Brazilian securities markets are substantially smaller, less liquid, more concentrated and more volatile than major securities markets in the United States and certain other jurisdictions outside Brazil, and are not as highly regulated or supervised as some of these other markets. The illiquidity and relatively small market capitalization of the Brazilian equity markets may cause the market price of securities of Brazilian companies, including our ADSs, Units, Common Shares and Class B Shares, to fluctuate in both the domestic and international markets, and may substantially limit your ability to sell the Units underlying your ADSs at a price and time at which you wish to do so.

 
17 
 
 

Changes in Brazilian tax laws may have an adverse impact on the taxes applicable to a disposition of our shares, Units or ADS.

Law No. 10,833 of December 29, 2003, provides that the disposition of assets located in Brazil by a non-resident to either a Brazilian resident or a non-resident is subject to taxation in Brazil, regardless of whether the disposition occurs outside or within Brazil. This provision results in the imposition of income tax on the gains arising from a disposition of our common or preferred shares by a nonresident of Brazil to another non-resident of Brazil. There is no judicial guidance as to the application of Law No. 10,833 and, accordingly, we are unable to predict whether Brazilian courts may decide that it applies to dispositions of our ADS between nonresidents of Brazil. However, in the event that the disposition of assets is interpreted to include a disposition of our ADS, this tax law would accordingly result in the imposition of withholding taxes on the disposition of our ADS by a non-resident of Brazil to another non-resident of Brazil.

 
18 
 
 

 

Item 4. Information on the Company

 

The Company

We engage in the generation, transmission, distribution and sale of electricity mainly in the Brazilian State of Paraná, pursuant to concessions granted by ANEEL, the Brazilian regulatory agency for the electricity sector. While our activities are more concentrated in the Brazilian State of Paraná, we also operate in 10 different Brazilian states through our generation and transmission businesses.

As of December 31, 2021, we generated electricity from twenty (20) hydroelectric plants, thirty (30) wind plants and one (1) Thermoelectric Plant, for a total installed capacity of 5,957 MW, of which approximately 99.7% was derived from renewable sources. Including the installed capacity of generation companies in which we have an equity interest, our total installed capacity is 6,615 MW. Our electric power business is subject to comprehensive regulation by ANEEL.

We hold concessions to distribute electricity in 394 of the 399 municipalities in the State of Paraná and in the municipality of Porto União in the State of Santa Catarina. As of December 31, 2021, we owned and operated 3,638 km of transmission lines and 204,957 km of distribution lines, constituting one of the largest distribution grids in Brazil. Of the electricity volume we supplied in 2021 to our Final Customers:

·38.8% was to industrial customers;
·26.1% was to residential customers;
·19.1% was to commercial customers; and
·16.0% was to rural and other customers.

Key elements of our business strategy include the following:

·maximize company value through sustainable growth, profitability, adequate indebtedness levels and shareholder remuneration;
·seek to be a reference in customer satisfaction;
·seek profitable opportunities related to new businesses and services in the energy sector;
·promote and ensure adherence to best ESG, risk management and compliance practices;
·manage an integrated and strategic energy portfolio, including strategic partnerships and maximizing synergies and profitability;
·divest from non-strategic assets;
·pursue excellence in business processes;
·promote people-focused management, strengthening team engagement and reinforcing the culture of meritocracy;
·seek greater protagonism in our interaction with regulators and institutions;
·consolidate a culture focused on safety, health and quality of life;
·adopt new technologies to optimize our business and continually raise cybersecurity levels;
 
19 
 
 
·encourage innovation as a lever for growth, increased customer satisfaction and loyalty, and process improvement.

Our revenues for each of the last three (3) fiscal years by activity are described in “Item 5. Operating and Financial Review and Prospects —Results of operations for the years ended December 31, 2021, 2020 and 2019”.

Historical Background

We were formed in 1954 by the State of Paraná to engage in the generation, transmission and distribution of electricity, as part of a plan to bring the electric energy sector under state control. We acquired the principal private power companies located in the State of Paraná in the early 1970s. From 1970 to 1977, we significantly expanded our transmission and distribution grid and worked to increase the connectivity of our grid to grids in other Brazilian states. In 1979, a change in state law permitted us to extend our generating activities to include production from sources other than hydroelectric and thermal power plants.

Currently, we are the largest energy company in the State of Paraná. We are a corporation incorporated and existing under the laws of Brazil, with the legal name Companhia Paranaense de Energia – Copel. Our head offices are located at Rua José Izidoro Biazetto, 158 – Bloco A =CEP 81200-240, Curitiba, Paraná, Brazil. Our telephone number at the head office is +55 (41) 3331-4011. Our website is www.copel.com and any filings we make electronically with the SEC will be available to the public over the Internet at the SEC’s website. The commercial name of each of our businesses is provided as follows.

Relationship with the State of Paraná

As of December 31, 2021, the State of Paraná owns 69.7% of our Common Shares and, consequently, has the ability to control the election of the majority of the members of our Board of Directors, members of our Supervisory Board, the appointment of senior management and our direction, future operations and business strategy.

Corporate Structure

Prior to 2001, we operated as a single corporation engaged in the generation, transmission and distribution of electricity and in certain related activities. In compliance with the new regulatory regime, we transferred our operations to four wholly-owned subsidiaries (one each for generation, transmission, distribution and telecommunications) and our investments in other companies to a fifth wholly-owned subsidiary. This corporate restructuring was completed in July 2001.

In 2007, we divided the assets of our transmission business (“Copel Transmissão S.A.”) between our distribution business (“Copel Distribuição S.A.”) and our generation business (“Copel Geração S.A.,” renamed to “Copel Geração e Transmissão S.A.”).

In 2013, the Company was restructured in order to enhance the efficiency of our corporate structure and reduce our operating costs.

On January 28, 2016, we changed the corporate name of Copel Participações S.A. to Copel Comercialização S.A. and its corporate purpose to the sale of energy and rendering of related services in order to strength Copel’s positioning in the energy trading market and to allow greater efficiency in the sale of energy.

In September 2017, in order to optimize the management of operating activities, the Company carried out an organizational restructuring of its wholly-owned subsidiary Copel Renováveis S.A., whose activities were absorbed by Copel Geração e Transmissão S.A.

In August, 2018, Copel GeT signed a Share Exchange Agreement with Eletrosul with respect to the joint ventures Costa Oeste Transmissora de Energia S.A. (51% - Copel GeT and 49% - Eletrosul), Marumbi Transmissora de Energia S.A. (80% - Copel GeT and 20%- Eletrosul) and Transmissora Sul Brasileira de Energia S.A. (20% - Copel GeT and 80% - Eletrosul). As a result, Copel GeT acquired 100% in the joint ventures Costa Oeste and Marumbi, and Eletrosul acquired 100% in Transmissora Sul Brasileira.

 
20 
 
 

In June 2019, Copel GeT took over 100% of SPE Uirapuru Transmissora de Energia S.A. acquired from Centrais Elétricas Brasileiras S.A. and Fundação Eletrosul de Previdência e Assistencial Social - Elos.

In October, 2019, Copel GeT, through a consortium with its subsidiary Cutia Empreendimentos Eólicos, participated in the A-6 new energy generation auction, having sold 14.4 average MW of the Jandaíra Wind Complex. The Jandaíra Wind Complex, which has 90.1 MW of installed capacity and 46.9 average MW of assured energy, will be built in the northeastern state of Rio Grande do Norte, a region where Copel has other wind generation assets. The project is scheduled to come into operation, in a staggered manner, from April 2022.

In March, 2020, Copel GeT, with the objective of renewing for another 30 (thirty) years the concession of HPP Bento Munhoz (or HPP Foz do Areia), whose term, considering the GSF renegotiation, expires on December 21, 2024, filed with the Ministry of Mines and Energy its request for the classification of its special purpose company SPC FDA Geração de Energia Elétrica SA, holder of the concession, under the terms of Federal Decree no. 9,271/2018 (amended by Federal Decree No. 10,135/2019), which allows this renewal associated with the privatization of the concession holder, within 12 months of the end of the term. On March 8, 2022, ANEEL approved the draft of the new concession agreement. Copel awaits the final regulatory definition of the process for the sale of control of SPC FDA.

On November 9, 2020, an auction for the divestiment of Copel Telecomunicações S.A. (Copel Telecom), responsible for our telecommunication activities, was held at B3. The winning bid was R$2.4 billion (equity value). On January 14, 2021, a Share Purchase Agreement for the transfer of 100% of the shares of Copel Telecom was entered into with Bordeaux Multi-Strategic Investment Fund – Bordeaux Fundo de Investimentos em Participações Multiestratégia, the winning bidder of the auction. On July 9, 2021, the sale was approved by the Brazilian antitrust authority, and on August 3, 2021 Copel completed the divestment of Copel Telecom. The final restated transaction amount was R$2.5 billion, based on the SELIC rate as of August 3, 2021, and has already been transferred in full to Copel.

On November 30, 2021, we completed the acquisition of the Vilas Wind Power Complex (or “Vilas Complex”) with an enterprise value of R$1,1 billion. As the project is partially financed by Banco do Nordeste (“BNB”), under a long-term loan agreement with final maturity in 2040, the total amount paid by Copel in the acquisition was R$ 597.7 million.

Copel currently has four wholly-owned subsidiaries: Copel Geração e Transmissão S.A., Copel Distribuição S.A., Copel Comercialização S.A. (Copel Mercado Livre) and Copel Serviços S.A.

Copel also holds 100% shareholding stake in several Special Purpose Companies (SPC).

The current organization of the group is as described as follows. All of our subsidiaries are incorporated in the Federative Republic of Brazil and subject to the Brazilian law.

 
21 
 
 


 
22 
 
 

BUSINESS

In the past, our generation and distribution businesses were integrated, and we sold most of the electricity we generated to the customers of our distribution business. This changed as a result of the implementation of the New Industry Model Law, enacted in 2004. Today, open auctions on the regulated market are one of the primary channels by which our distribution business purchases energy to resell to Captive Customers and one of the channels by which our generation business generates revenues. Our generation business sells energy to our distribution business only through auctions in the regulated market. Moreover, our distribution business, like other certain Brazilian distribution companies, is also required to purchase energy from the hydroelectric facility of Itaipu, in an amount determined by the Brazilian government based on our proportionate share in the Brazilian electricity market. For more information, see “Item 4. Information on the Company—The Brazilian Electric Power Industry”.

The following table shows the total electricity (i) we generated through entities in which we hold a 100.0% shareholding stake and the 51.0% and 30.0% of energy generated by Mauá and Baixo Iguaçu Hydroelectric Plants respectively (corresponding to the interest we hold in each of these assets), (ii) we purchased in the last three years, broken down by the total amount of electricity generated and purchased by Copel Geração e Transmissão and our wind farm generation facilities described below (“Wind Farms”) and (iii) the total amount of electricity purchased by Copel Distribuição and Copel Comercialização (Copel Mercado Livre).

 

Year ended December 31,

 
 

2021

2020

2019

(GWh)
Copel Geração e Transmissão(1)      
Electricity generated(2)  14,587 10,115 17,199
Electricity purchased from Copel Comercialização  3,423 487 155
Electricity purchased from others  183 147 141
Electricity received from the Interconnected System  1,200 5,878 445
Total electricity generated and purchased by Copel Geração e Transmissão  19,393 16,627 17,940
Wind Farms(1) (3)      
Electricity generated(2) 2459 2,116 1,909
Electricity purchased from others 110 29 61
Total electricity generated and purchased by Wind Farms 2569 2,145 1,970
Copel Distribuição      
Electricity purchased from Itaipu(4) 5,435 5,498 5,533
Electricity purchased from Auction – CCEAR – affiliates 153 154 153
Electricity purchased from Auction – CCEAR – other 12,216 11,579 12,361
Electricity purchased from Mechanism for Compensation of Surpluses and Deficits of New Energy (MCSD-EN)) 178 785 -
Electricity purchased from Spot Market – CCEE - 536 23
Electricity purchased from others 7,355 7,571 8,092
Total electricity purchased by Copel Distribuição 25,337 26,123 26,162
Copel Comercialização      
Electricity purchased from Copel Geração e Transmissão 13,119 7,275 5,125
Electricity purchased from others 10,062 5,077 3,330
Electricity purchased from Spot Market – CCEE 12 97 34
Total electricity purchased by Copel Comercialização 23,192 12,449 8,489
Total electricity generated and purchased by Copel Geração e Transmissão, Copel Distribuição, Wind Farms and Copel Comercialização 53,774 49,399 54,561
         

 

(1) In 2018, Copel adopted the criteria set forth by the CCEE to determine the energy flows in sale and purchase transactions. The energy amounts reflected in this table, including those with respect to past years, were calculated in accordance with the criteria adopted by the CCEE.

(2)Includes the electrical losses of wiring and interconnecting station and technical losses by delivering energy to the Interconnected System.

(3) Electricity generated and purchased by our wind farm generation facilities which were under the supervision of Copel Renováveis until 2015. In December 2015, Copel Geração e Transmissão became responsible for the operation of these facilities.

(4) Distribution companies operating under concessions in the Midwest, South and Southeast regions of Brazil purchase electricity generated by Itaipu.

 
23 
 
 

 

The following table shows the total electricity we sold to Free Customers, Captive Customers, distributors, energy traders and other utilities service providers in the south of Brazil through the Interconnected Transmission System in the last three years.

 

Year ended December 31,

 

2021

2020

2019

(GWh)
Copel Geração e Transmissão(1)      
Electricity delivered to Free Customers  1,298 3,369 4,146
Electricity delivered to Bilateral Agreements (Copel Comercialização)  12,978 7,238 5,124
Electricity delivered to Bilateral Agreements 715 2,946 3,723
Electricity delivered under auction – CCEAR affiliates(2)  122 123 122
Electricity delivered under auction – CCEAR – other(2  2,215 2,221 2,215
Electricity delivered to Spot Market – CCEE(2)       483
Total electricity delivered by Copel Geração e Transmissão 17,328 15,897 15,814
Wind Farms(1) (3)      
Electricity delivered under auction – CCEAR – affiliates  31 31 32
Electricity delivered to Bilateral Agreements  90 37

-

 

Electricity delivered under auction – CCEAR – other 1,289 1,292 1,285
Electricity delivered under auction – CER – other 915 918 914
Electricity delivered to Spot Market – CCEE(2) 29 9 0
Total electricity delivered by Wind Farms 2,354 2,887 2,231
Copel Distribuição      
Electricity delivered to Captive Customers 19,312 19,180 19,784
Electricity delivered to distributors in the State of Paraná 86 76 164
CCEE(4) 3,157 3,787 3,153
Total electricity delivered by Copel Distribuição 22,555 23,043 23,11
Copel Comercialização      
Electricity delivered to Free Customers 8,239 4,620 2,715
Electricity delivered to Bilateral Agreements (Copel GeT) 3,535 516 216
Electricity delivered to Bilateral Agreements 11,337 6,984 5,506
Electricity delivered to Spot Market – CCEE 81 330 52
Total electricity delivered by Copel Comercialização 23,192 12,450 8,489
Total 65,428 53,668 49,635


(1) In 2018, Copel adopted the criteria set forth by the CCEE to determine the energy flows in sale and purchase transactions. The energy amounts reflected in this table, including the amounts with respect to past years, were calculated in accordance with the criteria adopted by the CCEE.

(2) Amounts from the Spot Market indicated as less than zero (negative numbers) are not considered as electricity sold nor as electricity delivered in the MRE.

(3) Electricity generated and purchased by our wind farm generation facilities which were under the supervision of Copel Renováveis until 2015. In December 2015, Copel Geração e Transmissão became responsible for the operation of these facilities.

(4) Includes the Spot Market, MCSD EN and MVE.

 
24 
 
 

 

Generation

As of December 31, 2021, the total installed capacity of all of the generation assets in which we hold equity or the rights under concessions was 6,615 MW.

During the same period, considering only the entities which we operate (solely or under consortium), including 100% of the energy produced by those in which we hold a 100.0% shareholding stake and 51.0% and 30.0% of the energy generated by Mauá and Baixo Iguaçu Hydroelectric Plants, respectively (corresponding to the interest we hold in each of these assets), we operated and sold energy through twenty (20) hydroelectric plants, thirty (30) wind plants and one (1) Thermoelectric Plant, with a total installed capacity of 5,957 MW. Our assured energy totaled 2,671 average MW in 2021. Our generation varies yearly as a result of hydrological conditions and other factors. We generated, no discount for internal losses and basic grid, 17,606 GWh in 2021, 12,665 GWh in 2020, 19,812 GWh in 2019, 19,935 GWh in 2018 and 21,469 GWh in 2017.

The generation of electrical energy at our power plants is supervised, coordinated and operated by our Generation and Transmission Operation Center in the city of Curitiba. This operation center is responsible for coordinating the operations related to major part of our total installed capacity, including some of the plants in which we hold only partial ownership interests.

In 2021 ANEEL granted us the extension of concession of the following power plants to compensate for the assumption of non-hydrological risks (provided in the Energy Reallocation Mechanism or MRE adopted by the government under Law nº 14.052/2020):

Power Plant Concession extension (days)
Apucaraninha 472
Capivari Cachoeira 2.555
Cavernoso 898
Cavernoso 2 1.742
Chamine 717
Colíder 13
Derivação Do Rio Jordão 949
Foz do Areia 461
Guaricana 705
Mauá 1.789
Salto Caxias 1.051
Sao Jorge 598
Segredo 1.045
Uhe Baixo Iguaçu 34
Fundão 1.110
Santa Clara 1.078
Dona Francisca* 1.485
Arturo Andreoli* 844
* Associates  

 

Hydroelectric Generation Facilities

The following table sets forth certain information related to our main hydroelectric plants in operation during 2021:

 
25 
 
 

 

Plant

Installed capacity

Assured energy (1)

Placed in service

Concession expires

  (MW) (Average MW)    
Foz do Areia 1,676.0 603.3 1980 December, 2024
Segredo 1,260.0 578.5 1992 September, 2032
Salto Caxias 1,240.0 605.6 1999 March, 2033
Capivari Cachoeira(2) 260.0 109.0 1970 January, 2053
Mauá 185.2(3) 100.8 2012 May, 2047
Baixo Iguaçu 105.06(4) 51.2 2019 December, 2049
Colíder 300.0 178.1 2019 January, 2046
Others 132.5 77.1 N/A N/A

 

(1) Values used to determine volumes committed for sale.

(2) On January 5, 2016, Copel Geração e Transmissão executed a concession agreement with ANEEL so that it will continue to operate this plant under an operation and maintenance regime until 2053.

(3) Corresponds to 51.0% of the installed capacity of the plant (363.1 MW), corresponding to the interest we hold in this plant, as we operate this plant through a consortium.

(4) Corresponds to 30.0% of the installed capacity of the plant (350.2 MW), corresponding to the interest we hold in this plant, as we operate this plant through a consortium.

 

Governador Bento Munhoz da Rocha Netto (“Foz do Areia” Plant). The Foz do Areia Hydroelectric Power Plant is located on the Iguaçu River, approximately 350 kilometers southwest of the city of Curitiba.

 

The concession of this plant, originally granted to Copel GeT under the terms of Concession Agreement No. 045/1999, would expire in May 2023. The concession term was later altered to December 21, 2024, as a result of the GSF reconciliations referring to the regulated market and to the Free Market. After that, Copel Get could request the renewal of the concession for another 30 years, either (i) through the amendment of certain concession terms and inclusion under the quota regime (Law No. 12,783/2013) or (ii) by means of the privatization of the concessionaire, through a bidding process for the sale of the concessionaire's shareholding control, within 12 months from the end of the concession term (Federal Decree No. 9,271/2018, amended by Federal Decree No. 10,893/2021.

Through an internal assessment, we concluded that the sale of the concessionaire’s shareholding control was more advantageous to us than the renewal upon inclusion in the quota regime. It was also more beneficial than the alternative of not expressing interest in the renewal at all, case in which the government would carry out a bidding process for a new concession and we would face the risk of loss of the concession at no additional consideration. 

In this context, in 2020, Copel GeT transferred the concession and plant’s assets to a special purpose company, SPC F.D.A. Geração de Energia Elétrica S.A. (as approved by ANEEL Resolution No. 8,578/2020), and formally manifested the intention of selling the shares of SPC F.D.A. filed with the Ministry of Mines and Energy its manifestation of intention to obtain a new Concession grant, for 30 (thirty) years from its execution, associated with the sale of FDA control, pursuant to Decree No. 9,271/2018 (amended by Decree No. 10,893/2021). This statement contains the reservation that the execution of the privatization auction of SPC FDA will only occur after the Company has knowledge and assessment of the conditions involved in obtaining the grant, especially those related to the amounts and payment conditions of the concession grant bonus.

On February 4, 2021, the Ministry of Mines and Energy published Ordinance No. 516/2021, which establishes the assured energy of HPP Foz do Areia at 596.0 average MW to be in force for the new concession agreement to be granted. On March 8, 2022, the ANEEL approved the draft of the new concession agreement. Copel awaits the final regulatory definitions of the process for the sale of control of SPC FDA.

Governador Ney Aminthas de Barros Braga (“Segredo” Plant). The Segredo Hydroelectric Power Plant is located on the Iguaçu River, approximately 370 kilometers southwest of the city of Curitiba.

Governador José Richa (“Salto Caxias” Plant). The Salto Caxias Hydroelectric Power Plant is located on the Iguaçu River, approximately 600 kilometers southwest of the city of Curitiba.

 
26 
 
 

Governador Pedro Viriato Parigot de Souza (“Capivari Cachoeira” Plant). The Capivari Cachoeira Hydroelectric Power Plant is the largest underground hydroelectric plant in Southern Brazil. The reservoir is located on the Capivari River, approximately 50 kilometers north of the city of Curitiba, and the power station is located on the Cachoeira River, approximately 15 kilometers from the reservoir.

Our former concession agreement for the Capivari Cachoeira Plant expired on July 7, 2015. As a result of new auction in which we were the winning bidder, on January 5, 2016, Copel GeT executed a new concession agreement with ANEEL to continue to operate this plant under an operation and maintenance regime until January 5, 2046. We paid R$574.8 million as signing bonus for this concession and we received an annual generation revenue (AGR) of R$144.1 million from January 5, 2016 to December 31, 2016. This AGR is subject to an annual tariff adjustment. In July 2017, the AGR was adjusted to R$114.1 million for the period from July 2017 to June 2018, and in 2018 the AGR was adjusted to R$119.2 million for the period from July 2018 to June 2019. In 2019 the AGR was adjusted to R$123,7 million for the period from July 2019 to June 2020. In 2020 the AGR was adjusted to R$127.9 million for the period from July 2020 to June 2021. In 2021, the AGR was adjusted to R$139.7 million for the period from July 2021 to July 2022 under the terms of ANEEL Resolution No. 2,902/2021.

The Capivari Cachoeira Plant has 260.0MW of installed capacity and assured energy of 957.5 GWh/year. Since January 1, 2017, 70.0% of the energy generated by this plant has been allocated in quotas to the regulated market. Copel GeT will no longer bear the hydrological risk for the energy allocated in quotas under the MRE associated with the Capivari Cachoeira Plant until January 5th, 2046. From this date until January 3rd, 2053, the power plant will operate entirely in the Free Market.

Mauá. The Jayme Canet Júnior Hydroelectric Power Plant (Mauá Plant) is located on the Tibagi River, in the State of Paraná. It was constructed between 2008 and 2012 by Consórcio Energético Cruzeiro do Sul, in which we hold a 51.0% interest and CGT Eletrosul holds the remaining 49.0%. The facility is located approximately 250 kilometers from Curitiba, in the Municipality of Telêmaco Borba.

Colíder Hydroelectric Power Plant has an installed capacity of 300.0 MW and it is located on the Teles Pires River, in the State of Mato Grosso, between the municipalities of Nova Canaã do Norte and Itaúba, with the municipalities of Colíder and Cláudia are also affected by the reservoir. The construction of the plant began in 2011 and the work was totally concluded in 2019. The first Generating Unit entered commercial operation on March 9, 2019 and the last unit started operating on December 21, 2019.

Baixo Iguaçu Hydroelectric Power Plant has an installed capacity of 350.2 MW and it is located on the Iguaçu River, in the municipalities of Capanema, Capitão Leonidas Marques, Planalto, Realeza and Nova Prata do Iguaçu, State of Paraná. Baixo Iguaçu HPP is the last large energy project planned for the main Iguaçu and it is located around 30 km downstream from Governador José Richa HPP - the Salto Caxias Hydroelectric Power Plant, which is 100.0% owned by Copel. It was constructed by a consortium in which Copel GeT holds a 30% interest and Geração Céu Azul S.A. holds the remaining 70.0%. This power plant became fully operational on April 10, 2019. In addition to our generation facilities, we have ownership interests in several other hydroelectric generation companies as detailed below.

Bela Vista. The SHP Bela Vista has 29.8 MW of installed capacity and 16.6 average MW of assured energy and is under construction in the Chopim river, in the São João and Verê municipalities, located in the southwest of the State of Paraná. The energy sales agreement will be effective as of January 1, 2024, for a 30-year term and will be subject to an annual adjustment by the IPCA. The construction of this unit started in the first half of 2019 and the third power generation unit began operations on August 12, 2021, totalling 29.3 MW in commercial operation (corresponding to 98.3% of the plant’s total capacity). The remaining unit with complementary capacity of 0.5 MW is expected to be fully implemented in 2022. Copel anticipated the commercial operation of the project by almost two and a half years in relation to the beginning of the contracted supply term, thus allowing all the energy produced by SHP Bela Vista until December 2023 to be sold in the Free Market (“ACL”).

Between 2004 and 2010, we were required by law to retain a majority of the voting shares of any company in which we obtained an ownership interest. Starting in 2010, it became possible for us to hold non-controlling interests in companies.

The following table sets forth information regarding the hydroelectric generation plants in which we had a partial equity interest as of December 31, 2021:

 
27 
 
 

 

Plant

Installed

capacity

Assured

energy

Placed in service

Our ownership

Concession

Expires

  (MW) (Average MW)   (%)  
Elejor Facility
(Santa Clara, Santa Clara I, Fundão and Fundão I)
246.41 137.9 July, 2005
June, 2006
70.0 May and June 2040
December, 2032
Dona Francisca 125.0 75.9 February, 2001 23.0 September, 2037
SHP Arturo Andreoli
(Foz do Chopim)
29.1 20.4 October, 2001 35.8 August, 2032
UHE Baixo Iguaçu 350.2 172.4 April, 2019 30.0 November, 2049

 

Elejor Facility. The Elejor Facility consists of the Santa Clara and Fundão Hydroelectric Power Plants, both of which are located on the Jordão River in the State of Paraná. The aggregate total installed capacity of the units is 246.41 MW, which includes two smaller hydroelectric generation units installed in the same location. Elejor signed a concession agreement with a term of 35 years for the Santa Clara and Fundão plants in October 2001. As of December 31, 2021, we own 70.0% of the common shares of Elejor, and Paineira Participações owns the remaining 30.0 %.

Elejor is required to make monthly payments to the Brazilian government for the use of hydroelectric resources, which in 2001 totaled R$19.0 million. This amount is adjusted on an annual basis by the IGP-M Index.

We had a power purchase agreement with Elejor, which provides that we will purchase all of the energy produced by the Santa Clara and Fundão facilities at a set rate until April 2019, to be adjusted annually in accordance with the IGP-M Index. This agreement was terminated, there was no renewal and Elejor is selling the energy in the Free Market. In 2021, Elejor’s net revenues and loss were R$171.3 million and R$54.4 million, respectively, while in 2020 its net revenues and losses were R$194.8 million and R$29.4 million, respectively.

Dona Francisca. We own 23.03 % of the common shares of Dona Francisca Energética S.A. (“DFESA”). The other shareholders are Gerdau S.A. with a 51.82% interest, Celesc S.A. with a 23.03% interest and Statkraft S.A. with a 2.12% interest. DFESA Hydroelectric Power Plant is located on the Jacuí River in the State of Rio Grande do Sul. The plant began full operations in 2001. In April 2015, we signed a new ten year power purchase agreement with DFESA, valued at R$17.0 million annually, under which Copel purchases 23.03% of DFESA’s assured energy (proportional to Copel’s stake).

In 2021, DFESA’s net revenues and net profits were R$66.8 million and R$37.2 million, respectively, while in 2020 its net revenues and net profits were R$70.3 million and R$42.0 million, respectively.

SHP Arturo Andreoli (“Foz do Chopim” Hydroelectric Plant). The Foz do Chopim Hydroelectric Plant is located on the Chopim River in the State of Paraná. We own 35.8% of the common shares of Foz do Chopim Energética Ltda., the entity that owns the Foz do Chopim Hydroelectric Plant. Silea Participações Ltda. owns the remaining 64.2%. The operation and maintenance of Foz do Chopim Hydroelectric Plant is performed by Copel Geração e Transmissão S.A. Energy supply agreements were executed at an Average Tariff of R$220.07/MWh. Foz do Chopim Energética Ltda. also had the authorization to operate Bela Vista SHP, a hydroelectric power plant that is located on the same river and has similar capacity, which was transferred to Bela Vista Geração de Energia S.A. (“Bela Vista Geração”), through the ANEEL’s Authorizing Resolution no. 7.802/2019. In 2021, Foz do Chopim’s net revenues and net profits were R$60.9 million and R$46.4 million, respectively, while in 2020 its net revenues and net profits were R$55.7 million and R$26.9 million, respectively.

Wind Farm Generation Facilities

Since 2013 we have been expanding our energy generation capacity and diversifying our energy matrix through the development of renewable energy sources, like the construction and acquisition of wind farms in the State of Rio Grande do Norte. The following table sets forth certain information relating to our wind farm plants in operation as of December 31, 2021:

 
28 
 
 

 

Plant

Installed capacity

Assured Energy

Placed in Service

Concession Expires

  (MW) (Average MW)    
São Bento Energia(1) 94.0 38.1    
Boa Vista 14.0 5.2 February, 2015 April, 2046
Olho d'Água 30.0 12.8 February, 2015 May, 2046
São Bento do Norte 30.0 11.3 February, 2015 May, 2046
Farol 20.0 8.8 February, 2015 April, 2046
Palmas 2.5 0.4 November, 1999  September, 2029
Copel Brisa Potiguar Wind Complex (2) 183.6 89.4    
Asa Branca I 27.0 12.1 August, 2015 April, 2046
Asa Branca II 27.0 11.9 September, 2015 May, 2046
Asa Branca III 27.0 12.3 September, 2015 May, 2046
Eurus IV 27.0 12.4 August, 2015 April, 2046
Santa Maria 29.7 15.7 April, 2015 May, 2047
Santa Helena 29.7 16.0 May, 2015 April, 2047
Ventos de Santo Uriel 16.2 9.0 May, 2015 April, 2047
Voltália São Miguel do Gostoso I(3) 108.0 57.1    
Carnaúbas 27.0 13.1 June, 2017 April, 2047
Reduto 27.0 14.4 June, 2017 April, 2047
Santo Cristo 27.0 15.3 June, 2017 April, 2047
São João 27.0 14.3 June, 2017 March, 2047
Cutia Empreendimentos Eólicos(4) 312.9 130.1    
Dreen Cutia 23.1 9.6 December, 2018 January, 2042
Dreen Guajiru 21.0 8.3 December, 2018 January, 2042
Esperança do Nordeste 27.3 9.1 December, 2018 May, 2050
GE Jangada 27.3 10.3 December, 2018 January, 2042
GE Maria Helena 27.3 12.0 December, 2018 January, 2042
GE Paraíso dos Ventos do Nordeste 27.3 10.6 January, 2019 May, 2050
Potiguar 27.3 11.5 December, 2018 May, 2050
Bento Miguel        
São Bento do Norte I 23.1 10.1 January, 2019 August, 2050
São Bento do Norte II 23.1 10.8 January, 2019 August, 2050
São Bento do Norte III 23.1 10.2 April, 2019 August, 2050
São Miguel I 21.0 9.3 February, 2019 August, 2050
São Miguel II 21.0 9.1 February, 2019 August, 2050
São Miguel III 21.0 9.2 February, 2019 August, 2050
Vilas Complex(4) 186.7 98.6    
Vila Maranhão I 31.95 17.8 February, 2021 January, 2054
Vila Maranhão II 31.95 17.8 March, 2021 January, 2054
Vila Maranhão III 31.95 16.6 September, 2020 January, 2054
Vila Ceará I 31.95 17.8 December, 2020 January, 2054
Ventos de Vila Mato Grosso I 58.9 28.6 June, 2021 December, 2054
         

 

(1) Pursuant to Directive (Portaria) No. 360 of September 30, 2020, the projects that are part of the São Bento Energia wind complex had their assured energy altered as of January 1, 2021, as follows: Boa Vista (from 6.3 MW to 5.2MW), Olho d'Água (from 15.3 MW to 12.8MW), São Bento do Norte (from 14.6MW to 11.3MW) and Farol (from 10.1MW to 8.8MW).

(2) Pursuant to Directive (Portaria) No. 360 of September 30, 2020, certain the projects that are part of the Copel Brisa Potiguar wind complex had their assured energy altered as of January 1, 2021, as follows: Asa Branca I (from 14.2MW to 12.1MW), Asa Branca II (from 14.3 MW to 11.9MW), Asa Branca III (from 14.5MW to 12.3MW) and Eurus IV (from 14.7MW to 12.4MW).

(3) Copel has a 49.0% interest in Voltália São Miguel do Gostoso.

(4) In November 2021, Copel acquired the Operations of the Vilas Complex.

 
29 
 
 

São Bento Energia. On February 25, 2015, the four wind farms (Boa Vista, Olho d’Água, São Bento do Norte and Farol) which are part of the São Bento Wind Farm Complex, located in the State of Rio Grande do Norte, began operations. With an installed capacity of 94 MW and assured energy of 38.1 average MW. In August 2010, 43.7 average MW was sold to fifteen distribution concessionaires in ANEEL public auctions at a weighted average price of R$134.40/MWh (annually adjusted by IPCA index). The energy generated by these wind farms is sold through 20-year term contracts.

Copel Brisa Potiguar Wind Complex. On September 15, 2015, Copel concluded the installation of the Brisa Potiguar Wind Complex with an installed capacity 183.6 MW and assured energy of 89.4 average MW. An assured energy of 57.7 average MW (from Asa Branca I, Asa Branca II, Asa Branca III and Eurus IV wind farms) was committed under contract to electric power distributors in the alternative energy auction in August 2010 at a weighted average price of R$135.40/MWh (adjusted annually by IPCA inflation index) and an assured energy of 40.7 average MW (from WPPs Santa Helena, Santa Maria and Ventos de Santo Uriel) was committed under contract in the 6th Reserve Energy Auction held in August 2011 at a weighted average price of R$101.98/MWh (annually adjusted by the IPCA inflation index). The energy to be generated was sold through 20-year term contracts with payments beginning in April 2015.

Voltália São Miguel do Gostoso I. In June 2014, we negotiated with Voltalia Energia do Brasil Ltda. (Voltalia) the acquisition of a 49.0% interest in the São Miguel do Gostoso I Wind Farm Complex, in the State of Rio Grande do Norte. The São Miguel do Gostoso wind farm complex has 108.0 MW of installed capacity and assured energy of 57.1 average MW, and its energy was sold in the 4th Reserve Energy Auction at an average price of R$98.92/MWh through 20-year term contracts. In April 2015, we concluded the construction of this wind farm complex and ANEEL, in July and August 2015, classified it as ready for commercial operation. This wind farm complex began production in June 2017 after completion of the necessary transmission lines.

Cutia. Cutia Empreendimentos Eólicos, which is Copel’s largest wind farm business, is divided into two large complexes totaling 312.9 MW of installed capacity: (a) Cutia Complex, composed of seven wind farms (Guajiru, Jangada, Potiguar, Cutia, Maria Helena, Esperança do Nordeste and Paraíso dos Ventos do Nordeste), with a total installed capacity of 180.6 MW, 71.4 average MW of assured energy and located in the State of Rio Grande do Norte; and (b) Bento Miguel Complex, composed of six wind farms (São Bento do Norte I, São Bento do Norte II, São Bento do Norte III, São Miguel I, São Miguel II and São Miguel III) with 132.3 MW of total installed capacity, 58.7 average MW of assured energy and located in the State of Rio Grande do Norte, in the same region of other wind farm complexes that belong to us. On October 31, 2014, at the 6th Reserve Energy Auction, we sold 71.2 average MW from the Cutia Complex for R$144.00/MWh (maximum auction price). In addition, at the 20th New Energy Auction (A-5), held on November 28, 2014, we sold 54.8 average MW from the six Bento Miguel wind farms for R$136.97/MWh, through Availability Agreements with a 20-year term.

Vilas Complex. In November 2021, Copel acquired 100% of the Vilas Complex, located in the state of Rio Grande do Norte, from Voltalia Energia do Brasil Ltda (“Voltalia”). The Vilas Complex has 186.7 MW of installed capacity and 98.6 average MWm of assured energy. The Vilas Complex sold 32.7 average MW at the 28th New Energy Auction at the price of R$93.00/MWh, with supply beginning in 2024, and 3.3 average MW at the 29th New Energy Auction at the price of R$79.92/MWh, with supply beginning in 2023. The energy contracts are valid for 20 years. The Vilas Complex is fully operational.

Thermoelectric Generation Facilities

The following table sets forth certain information about our Thermoelectric Plants in operation as of December 31, 2021:

Plant

Installed

capacity

Assured

energy

Placed in service

Our ownership

Concession/ authorization
expires

  (MW) (Average MW)   (%)  
TPP Araucária 484.2 267.0(1) September, 2002 81.2 (2) December, 2029
TPP Figueira 20.0 10.3 April, 1963 100.0 March, 2019(3)

 

(1) The annual assured energy of thermal plants such as Araucária varies depending on the price of natural gas, according to criteria established by the MME.

(2) Held 20.3% by Copel and 60.9% by Copel GeT.

(3) We are currently waiting for the granting authority to amend our concession agreement with respect to TPP Figueira, extending the concession of the Thermoelectric Plant for another 20 years, pursuant to the applicable law.

 
30 
 
 

Araucária. We have an 81.2% interest in UEG Araucária Ltda., which owns the Araucária Thermoeletric Plant, a combined cycle natural gas thermoelectric plant, one of the most efficient in Brazil, with 484.2 MW of installed capacity, located in the state of Paraná.

UEG Araucária has a gas supply contract with Petróleo Brasileiro S.A - Petrobras, valid until December 31, 2022, which provides for the delivery of up to 2,150,000 cubic meters of natural gas per day, without take-or-pay clauses. As a result, TPP Araucária will remain available to the National Interconnected System - SIN and, therefore, may be dispatched at the discretion of ONS. Since UEG Araucária does not have any Energy Sale Contracts in force, the energy produced by the plant, when dispatched by the ONS, is paid out on the CCEE Spot Market.

Since March 8, 2020, as part of the exceptional measures adopted by the Electric Sector Monitoring Committee (“CMSE”) for the recovery of hydroelectric reservoirs in the southern region of the country, TPP Araucária may be dispatched by the ONS with energy priced based on the Unit Variable Cost - CVU, approved by ANEEL. During 2020 and 2021, MME Ordinances authorized, on an exceptional and temporary basis, the inclusion of fixed costs in the plant's CVU. Thus, TPP Araucária ended those years with its annual fixed costs duly remunerated.

UEG Araucária also signed an amendment to the Tranfer of Energy Credits agreement with Petrobras, with the same duration as the gas supply contract, which allows the plant to be activated at the request of the gas supplier, on a weekly basis. In this context, the energy produced is not priced by the CVU, but by the amount agreed between the parties, taking into account, among other factors, market opportunities and margins considered adequate for the operation of the plant to recover part of its fixed costs.

Figueira. The Figueira plant is located in the city of Figueira, in the northeast of the state of Paraná (where the main coal basin of Paraná is located). This plant is currently in a modernization process, which consists of replacing the old equipment for new equipment. This process aims to make this plant more efficient, reduce emissions of gases and particles resulting from the burning of coal and comply with applicable environmental legislation.

After the modernization, the plant will have the installed capacity of 20.0 MW with only one Generating Unit and the assured energy of 17.7 average MW, so that it is in compliance with Normative Resolution No. 801/2017, which defines a minimum efficiency of 25% for installations with installed capacity up to 50.0 MW.

Expansion and Maintenance of Generating Capacity

We expect to spend R$237.3 million in 2022 to expand and maintain our generation capacity, including participation in new businesses, of which R$156.4 million will be invested in Jandaíra wind farm, R$27.9 million will be invested in hydroelectric plants and R$22.6 million will be invested in our wind farms. The remaining amount will be spent on small hydroelectric power plants and other projects.

Wind Farm Projects

The following table sets forth information regarding our wind farm projects, all of which currently refer to the Jandaíra wind farm (Complexo Eólico Jandaíra). In October 2019, Copel GeT and its subsidiary Cutia wind farm (Cutia Empreendimentos Eólicos) joined the Auction ANEEL A-6 for new energy generation and sold 14.4 average MW from the Jandaíra wind farm for R$98.00 MW/h. We expect to invest R$411.6 million in this new wind farm, which has an installed capacity equivalent to 90.1 MW and an assured energy of 46.9 average MW. The Jandaíra wind farm will be built in the state of Rio Grande do Norte, and as other wind farm assets of Copel are located in the same region, we believe that this project may benefit from operational synergies related to our projects that are already operating.

The amount of energy sold in October 2019 corresponds to 30% of the project’s assured energy. Pursuant to the power purchase agreement executed in connection with the above, such amount of energy shall be supplied as from January 1, 2025, this agreement will be in force for 20 years and prices will be adjusted pursuant to the IPCA index. Any additional energy generated by the Jandaíra wind farm will be negotiated in the Free Market.

 
31 
 
 

Wind Farm

Installed capacity

Assured Energy

Budgeted completion cost

Beginning of commercial operation(1)

Our ownership

Concession

expires

  (MW) (Average MW) (R$million)   (%)  
Jandaíra 90.1 46.9 411.6 May, 2022 100.0 April 2055
Jandaíra I 10.4 5.6 - - 100 April 2055
Jandaíra II 24.3 12.3 - - 100 April 2055
Jandaíra III 27.7 14.8 - - 100 April 2055
Jandaíra IV 27.7 14.2 - - 100 April 2055

 

(1)Commercial operation of each wind farm will begin as of April 2022, in a staggered manner. We expect supply of the regulated environment contracts to begin on January 1, 2025.

 

On November 30, 2021, the acquisition of the Vilas Complex was completed. Vilas Complex has 186.7 MW of installed capacity and is located in the municipality of Serra do Mel, Rio Grande do Norte:  

  

Wind Farm  Installed capacity  Assured Energy   Budgeted completion cost  Beginning of commercial operation   Our ownership 

Concession 

expires 

  (MW)  (Average MW)  (R$million)    (%)   
Vilas Complex   186.7  98.6  1049    100.0   
Vila Maranhão I  31.95   17.8  Feb, 2021  100  Jan 2054 
Vila Maranhão II  31.95  17.8 Mar, 2021  100  Jan 2054 
Vila Maranhão III  31.95  16.8  Sep 2020  100  Jan 2054 
Vila Ceará I  31.95  17.8  Dec, 2020  100  Jan 2054 
Ventos de Vila Mato Grosso I 58.9  28.4  Jun, 2021  100  Dec 2054 

 

Development Projects

We are involved in various initiatives to study the technical, economic and environmental feasibility of certain hydroelectric, wind, solar photovoltaic and thermoelectric generation projects.

In 2021, we improved out governance in relation to the development of projects by introducing an Investment and Innovation Committee, as an advisory body to the Board of Directors, and approving our Investment Policy, which establishes the criteria for the selection, prioritization, evaluation, approval and monitoring of investments.

The following table sets forth information regarding our proposed generation projects that are considered feasible under a technical, economic, social, environmental and land-related perspective pursuant to the above-mentioned studies.


Proposed Projects(1)

Estimated Installed Capacity

Estimated Assured Energy

Our Ownership
  (MW) (Average MW)

(%)

HPP São Jerônimo 330.0 178.1 41.2
WPP Complexo Alto Oriente 62.4 29.9 100.0
HPP Salto Grande 49.0 25.3 100.0
SHP Salto Alemã 29.8 18.4 19.0
TOTAL 471.2 251.7 -
(1)Does not include other proposed projects of Copel whose technical, economic, social, environmental and land-related feasibility is still under analysis.
 
32 
 
 

Copel is also a member of Consortium Geração Luz Paranaense – CGLP, which was granted with exploration rights related to the following projects: (i) SHP Foz do Curucaca, (ii) SHP Salto Alemã, (iii) SHP Alto Chopim and (iv) SHP Rancho Grande. After obtaining the applicable authorization from ANEEL and evaluating the hydraulic potential of each project, the consortium decided to carry out the studies only with respect to SHP Salto Alemã and SHP Foz do Curucaca and to return the exploration rights for SHP Alto Chopim and SHP Rancho Grande projects to ANEEL. The basic designs of SHP Salto Alemã and of SHP Foz do Curucaca had already been approved by ANEEL and the environmental studies related to this project were registered in the competent entity (IAT – Instituto Água e Terra do Paraná or “IAT”) for analysis.

Since 2018, COPEL has held the rights of the HPP Salto Grande, located in the Chopim River in the state of Paraná. The environmental studies related to this project were registered with IAT for analysis in February 2020 and the basic design was approved by ANEEL in November 2020.

As for the energy auctions planned for 2022 in Brazil, we intend to bid for concessions to construct and operate new hydroelectric and solar photovoltaic plants or wind farms in power auctions in the regulated market for new generation projects. We are studying the feasibility of our participation in the hydroelectric, wind farms and solar photovoltaic projects planned to be listed in the auctions of 2022 or sell the energy in the unregulated electricity market (Free Market). We will also conduct studies of new hydroelectric power plants. For instance, we have partnered with BE - Empresa de Estudos Energéticos S.A., Minas PCH S.A. and SILEA Participações Ltda. to develop studies in the lower region of the Chopim River, which may lead to the development of another four (4) hydroelectric projects. We are also conducting studies related to future government auctions for wind farms, solar photovoltaic and hydropower plants, small hydroelectric plants and thermoelectric power plants (gas) in which we may eventually participate.

Other renewable energy projects under study or development include the use of municipal solid waste in power generation and biometanoand thermosolar energy. For instance, since 2017, Copel has conducted solarimetric measurements in two solarimetric stations located in areas leased by Copel Brisa Potiguar. The development of this solar project is ready to advance to the next phase (implementation), subject to the opening of availability for connection with our transmission system.

We are also developing studies for the implementation / acquisition of projects related to Generation Distribution, Energy Efficiency Biomass, Biogas and Natural Gas. In addition to energy generation projects, investment opportunities in new energy transmission assets whose concession will be auctioned by the Brazilian government or existing assets that have synergy with our current portfolio are also being studied.

With regards to innovation, in 2021, we launched our Open Innovation program ("Copel Volt"). Copel Voltt adds a business component to our strategic vision with the goal to bring us closer to the startup ecosystem, upon the improval of internal processes and the development of new businesses and services. We are currently developing five prototype initiatives.

Transmission and Distribution

General

Electricity is transferred from power plants to customers through transmission and distribution systems. Transmission is the bulk transfer of electricity from generating facilities to the distribution system by means of the Interconnected Transmission System, in tension greater than or equal to 230 kV. Distribution is the transfer of electricity to Final Customers, in tension lesser or equal to 138 kV.

The following table sets forth certain information concerning our transmission and distribution grids on the dates presented.

 
33 
 
 
 

2021

2020

2019

Transmission lines (km):      
230 kV and 500 kV 3,630.8 3,443.0 3,127.6
138 kV 7.2 7.2 7.2
Distribution lines (km):      
230 kV(1) - - -
138 kV 6,513.5 6,457 6,506.7
69 kV 755.4 755 755.6
34.5 kV 87,744.0 86,489 85,734.5
13.8 kV 109,943.8 108,384 106,955.7
Transformer capacity (MVA):      
Transmission and distribution substations (69 kV – 500 kV)(2) 25,032.1 24,518.0 23,860.2
Generation (step up) substations 6,691.0 6,691.0 6,691.0
Distribution substations (34.5 kV) 1,624.5 1,594.2 1,545.8
Distribution transformers 14,621.8 14,180.8 13,800.9
Total energy losses(3) (4) 7.7% 7.8% 7.0%

 

(1) Due to improvements to registration and control systems used by Copel Distribuição to classify and register its transmission lines, lines were classified pursuant to its insulation voltage, and not according to its structure and isolate components. Consequently, all lines previously registered by Copel Distribuição were reclassified and there are no lines classified as 230 kV anymore.

(2) This figure includes transformers with primary tensions of 69 kV and 138 kV which belong to Copel Distribuição but are implemented in 230 kV and 525 kV substations, which belong to Copel Geração e Transmissão.

(3) Percentage of losses on the energy injected in the distributor (technical and non-technical losses on injected energy). Does not consider losses in the basic grid.

(4) We note that percentages measured until 2016 and reported in previous reports of the Company reflected the amounts of physical losses (Technical), commercial losses (Non-Technical) and losses on the basic grid (allocation of agreements on the gravity center of the submarket) of Copel Distribuição, as well as the losses related to the allocation of agreements of Copel GeT. Those percentages were calculated taking into account the total of power purchased and sale agreements entered into by both Copel Distribuição and Copel GeT. For a better representation and comparison of the percentage of losses, we considered the percentage obtained by dividing the total amount of technical and non-technical losses by the energy injected into the Copel Distribuição´s grid. This percentage may be compared to other companies and has a more accurate physical meaning as it utilizes the database of measured data and not information taken from agreements of the period being analyzed.

 

Transmission

Our transmission system consists of all our assets of 230 kV and greater and a small portion of our 138 kV assets, which are used to transmit the electricity we generate and the energy we receive from other sources. In addition to using our transmission lines to provide energy to customers in the State of Paraná, we also transmit energy through the Interconnected Transmission System. Two companies owned by the Brazilian government, Companhia de Geração e Transmissão de Energia Elétrica do Sul do Brasil – CGT Eletrosul and Furnas, also maintain significant transmission systems in the State of Paraná. Furnas is responsible for the transmission of electricity from Itaipu, while CGT Eletrosul’s transmission system links the states in the south of Brazil. Copel, like all other companies that own transmission facilities, is required to allow third party access to its transmission facilities in exchange for compensation at a level set by ANEEL.

Currently, we carry out the operation and maintenance of 3,638 km of transmission lines, forty three (43) substations in the State of Paraná and two (2) substations in the State of São Paulo. In addition, we have partnerships with other companies to operate 5,978 km of transmission lines and eight (8) substations through special purpose companies (SPCs).

 
34 
 
 

The table below sets forth information regarding our transmission assets in operation:

Subsidiary / SPC

Transmission Lines

TL Extension

(km)4

Number of Substations

Concession Expiration Date

Our Ownership

APR ¹
(R$million)

COPEL GeT Main Transmission Concession(1) 2,063 35 January, 2043 100.0% 459.4
COPEL GeT TL Bateias - Jaguariaiva 138 - August, 2031 100.0% 15.9
COPEL GeT TL Bateias - Pilarzinho 32 - March, 2038 100.0% 1.2
COPEL GeT TL Foz - Cascavel Oeste 117 - November, 2039 100.0% 13.8
COPEL GeT Cerquilho III Substation - 1 October, 2040 100.0% 6.0
COPEL GeT

TL Londrina – Figueira C2

Foz do Chopim – Salto Osório

102 - August, 2042 100.0% 6.7
COPEL GeT

TL Assis – Paraguaçu Paulista C1 and C2

Paraguaçu Paulista II Substation

83 1 February, 2043 100.0% 10.5
COPEL GeT

Curitiba Norte Substation

TL Bateias – Curitiba Norte

31 1 January, 2044 100.0% 11.1
COPEL GeT

Realeza Sul Substation

TL Foz do Chopim- Realeza Sul

52 1 September, 2044 100.0% 11.2
COPEL GeT TL Assis – Londrina 122 - September, 2044 100.0% 23.3
COPEL GeT TL Araraquara II – Taubaté 334 - October, 2040 100.0% 37.5
COPEL GeT

TL Baixo Iguaçu – Realeza

TL Baixo Iguaçu – Cascavel Oeste

TL Curitiba Centro – Uberaba

TL Curitiba Leste – Blumenau

Medianeira Norte Substation

Curitiba Centro Substation

Andirá Leste Substation

Baixo Iguaçu Substation

254 4 April, 2046 100% 133.3
Uirapuru (Copel GeT – 100%)(2) TL Ivaiporã - Londrina 122 - March, 2035 100% 26.0
Costa Oeste (Copel GeT – 100%)

LT Cascavel Oeste - Cascavel Norte
TL Cascavel Norte - Umuarama Sul

Umuarama Sul Substation

159 1 January, 2042 100% 14.8
Marumbi   (Copel GeT – 100%)

TL Curitiba – Curitiba Leste

Curitiba Leste Substation

29 1 May, 2042 100% 21.5
Subtotal Copel GeT 3,638 45     792.2
Caiuá Transmissora TL Guaíra - Umuarama Sul
TL Cascavel Norte - Cascavel Oeste
Santa Quitéria Substation / Cascavel Norte Substation
142 2 May, 2042 49.0%(3) 12.8
Integração Maranhense TL Açailandia-Miranda II 365 - May, 2042 49.0%(3) 19.3
Matrinchã TL Paranaíta - Ribeirãozinho 2,033 4 May, 2042 49.0%(3) 115.4
Guaraciaba TL Ribeirãozinho - Marimbondo 930 1 May, 2042 49.0%(3) 52.3
Paranaíba TL Barreiras II - Pirapora II 967 - May, 2043 24.5%(3) 38.3
Cantareira TL Estreito – Fernão Dias 656 - September, 2044 49.0%(3) 58.6
Mata de Santa Genebra

TL Araraquara II - - Itatiba
TL Araraquara 2 - Fernão Dias–

TL Bateias - Itatiba

885 1 May, 2044 50.1%(3) 131.3
Subtotal SPCs   5,978 8     427.9
Total   9,616 53     1,220.1

 

(1) Our main transmission concessions encompasses several transmission lines.

(2) In March 2019, Copel GeT signed a purchase and sale agreement with Centrais Elétricas Brasileiras SA and Fundação Eletrosul de Previdência e Assistencial Social - Elos to transfer 100% of shares issued by SPE Uirapuru Transmissora de Energia S.A. In June, 2019 Copel GeT took over the stake control of the company.

(3) Refers to the equity interest held by Copel Geração e Transmissão.

(4) Considers double circuits.

 
35 
 
 

Expansion and Maintenance of Transmission Facilities

The construction of new transmission facilities of 230 kV and higher must be awarded in a bidding process or otherwise authorized by ANEEL. We are permitted by ANEEL to make minor improvements to some of the existing 230 kV and 500 kV facilities.

In November 2013, SPC Mata de Santa Genebra Transmissora, a strategic partnership between Copel (50.1%) and Furnas (49.9%), won the right to build and operate 847 km of transmission lines and three substations in the States of Paraná and São Paulo. The construction schedule of the Mata de Santa Genebra project was affected by successive vandalism events, which resulted in the collapse of towers and theft of aluminum cables in transmission lines already installed and commissioned, in different sections of the project. On November 11, 2020, the LT 440 kV Fernão Dias / Taubaté, the last asset of the SPC Mata de Santa Genebra project, began its commercial operation. With the completion of these steps, the SPC Mata de Santa Genebra became fully operational. The project an APR of R$262.0 million, of which R$131.2 million are related to COPEL's stake.

In November 2015, Copel GeT won ANEEL’s public auction No. 005/2015 for the construction and operation of 188 km of transmission lines in the States of Paraná and Santa Catarina, and three (3) substations in the State of Paraná, with a total capacity of 900 MVA. With an APR of R$133.3 million, the corresponding concession agreement was signed in April 2016, and the remaining facility which was still under construction, the transmission line Curitiba Leste - Blumenau, become operational in April 1, 2021. This facility has an APR of R$42.6 million, approved for 2021-2022 tariff adjustment cycle.

Distribution

Our distribution system consists of a widespread grid of overhead lines and substations with voltages up to 138 kV assets. Higher Voltage electricity is supplied to bigger industrial and commercial customers and lower voltage electricity is supplied to residential, small industrial, and commercial customers in addition to other customers. As of December 31, 2021, we provided electricity in a geographic area encompassing approximately 97% of the State of Paraná and served 4.9 million customers.

Our distribution grid includes 204,957 km of distribution lines, 54,124 distribution transformers and 235 distribution substations of 34.5 kV, 36 substations of 69 kV and 113 substations of 138 kV. During 2021, 90,756 new captive customers were connected to our grid, including customers connected through the rural and urban electrification programs. We are continuing to implement compact grid design distribution lines in urban areas with large concentration of trees in the vicinity of the distribution grid.

We have four (4) captive customers that are directly supplied with energy at a high voltage (69 kV and above) through connections to our distribution lines. The volume of energy commercialized for these customers was 35,139MWh in 2021.

We are also responsible for expanding the 138 kV and 69 kV distribution grid within our concession area to meet any future demand growth.

On October 16, 2019 Copel Distribuição launched a program to modernize its distribution grid called “Transformation Program” (Programa Transformação). The Transformation Program is comprised of three projects: “Total Reliability” (Confiabilidade Total), “Three-phase Paraná” (Paraná Trifásico) and “Smart Grid Copel”. The goal is to improve infrastructure, particularly in rural areas, in order to enhance quality of energy supply and reduce supply restoration period in case of power outages. With investments of up to R$3.9 billion until 2025, which shall compose the Regulatory Remuneration Base, the Transformation Program involves the construction of approximately twenty-five 25,000 kilometers of power grids, 15,000 new automated power connections and the setting up of smart grid technology in the State of Paraná. The Smart Grid Project deals with the implementation of a communication network for distribution automation equipment and for smart meters. In addition, computer systems for efficient management of this communication network are included in this project.

 
36 
 
 

Performance of the Distribution System

Total losses are commonly divided into a technical and non-technical component. Technical losses are inherent to the transportation of electricity and consist mainly of power dissipation in the line grid. Non-technical (or commercial) losses are caused by actions external to the power system (for instance, electricity theft). Since total losses are comprised of both technical and non-technical parcels, the latter is easily calculated as the difference between total losses and the estimated technical losses inherent to the system.

Total losses in our distribution system are segmented between (i) losses in the basic grid (tension equal to or greater than 230kV), which are external to our distribution grid and have a technical cause, and (ii) losses in the distribution grid (internal to our distribution grid), which are usually caused by both technical and non-technical reasons.

Losses in the basic grid are calculated monthly by the CCEE as the difference between the total generation and the energy effectively delivered to the distribution grids. The total losses from our distribution grid are calculated as the difference between the energy allocated to the system and the energy supplied to the customers.

Our total energy distribution losses (including transmission system, technical and commercial losses) totaled 9.2% of the total energy amount available in 2021, being (i) 1.5% related to losses in the basic grid, (ii) 5.8% of technical losses and (iii) 1.9% of non-technical losses.

ANEEL grants the transfer of all energy losses to the Final Customers when the real losses are less than regulatory losses. The calculation is made within the regulatory period, that is different from a civil year, and thereby we will know the result just in the next tariff adjustment, in June 2022. But our simulation indicates that in the civil year, from January through December 2022, we will have all losses transferred to the Final Customers.

Furthermore, ANEEL requires distributors to observe certain standards for “energy supply continuity,” namely (i) duration of outages per customer per year or DEC – Duração Equivalente de Interrupção por Unidade Consumidora and (ii) frequency of outages per customer per year or FEC – Frequência Equivalente de Interrupção por Unidade Consumidora. Information regarding the duration and frequency of outages for our customers is set forth in the following chart for the years indicated.

   

Quality of supply indicator

2021

2020

2019

2018

2017

DEC – Duration of outages per customer per year

(in hours)

7h13min 7h50min 09h07min 10h19min 10h28min
FEC – Frequency of outages per customer per year (number of outages) 4.83 5.61 6.02 6.22 6.83

 

We comply with the quality indicators defined by ANEEL for 2021, which penalizes power outages in excess of an average number of hours per customer, in each case calculated on an annual basis. These limits vary depending on the geographic region, and the average limit established by ANEEL for our distribution company was 9 hours and 17 minutes of outages per customer per year, and a total of 6.84 outages per customer per year. Failure to comply with these predetermined standards with a Final Customer results in a reduction of the amount we can charge such Final Customer in future periods.

In addition, quality target indicators are taken into consideration by ANEEL during distribution concession renewal proceedings, and also influence ANEEL’s calculation of our tariff adjustments. For more information, see “–Concessions–Distribution Concessions” and “–The Brazilian Electric Power Industry–Distribution Tariffs”.

Purchases for the captive market

The following table contains information concerning volume, cost and Average Tariff for the main sources of the electricity we purchased for the captive market in the last three years.

 
37 
 
 

 

Source

2021

2020

2019

Itaipu      
Volume (GWh) 5,435 5,498 5,533
Cost (R$millions) 1,787.7 1,766.1 1,317.0
Average Tariff (R$/MWh) 328.81 321.23 238.00
Angra      
Volume (GWh) 976 968 979
Cost (R$millions) 224.7 269.0 248.0
Average Tariff (R$/MWh) 230.23 277.89 253.00
CCGF      
Volume (GWh) 5,916 6,136 6,274
Cost (R$millions) 686.3 673.0 642.0
Average Tariff (R$/MWh) 116.01 109.68 102.32
Auctions in the regulated market      
Volume (GWh)(1) 12,369 11,733 12,515
Cost (R$millions)(2) 3,194.0 2,207.0 2,257.0
Average Tariff (R$/MWh) 258.24 188.08 180.34

 

(1) These numbers do not include assignments related to MCSD-EN and MVE.

(2) These numbers do not include short-term energy purchased through the CCEE.

 

Itaipu

We purchased 5,435 GWh of electricity from Itaipu in 2021, which constituted 10.1% of our total available electricity in 2021 and 21.4% of Copel Distribuição’s total available electricity in 2021. Our purchases represented approximately 8.2% of Itaipu’s total production. Distribution companies operating under concessions in the midwest, south and southeast regions of Brazil are required by law to purchase Brazil’s portion of the energy generated by Itaipu in a proportion that correlates with the volume of electricity that they provide to customers. The rates at which these companies are required to purchase Itaipu’s energy are fixed to cover Itaipu’s operating expenses and payments of principal and interest on Itaipu’s U.S. dollar-denominated borrowings, as well as the cost of transmitting the power to their concession areas. These rates are denominated in U.S. dollars and have been set for 2022 at US$24.73 per kW.

In 2021, we paid an Average Tariff of R$328.81/MWh for energy from Itaipu, compared to R$321.23/MWh in 2020. These figures do not include the transmission tariff that distribution companies must pay for the transmission of energy from Itaipu.

ANGRA

Because Eletronuclear renewed the generation concession of Angra under the 2013 Concession Renewal Law, the energy generated by Angra is no longer sold in auctions in the regulated market. Rather, under the 2013 Concession Renewal Law, this energy is sold to distributors in accordance with the quota system established by said law. For more information, see “Item 4. Information on the Company—The Brazilian Electric Power Industry”. As a result, Copel Distribuição was legally required to purchase 976 GWh from Angra in 2021, 968 GWh in 2020 and 979 GWh in 2019.

 
38 
 
 

Assured Energy Quota Contract – CCGF

Under the 2013 Concession Renewal Law, certain generation concessionaires renewed their concession contracts, and therefore these concessionaires no longer sell the energy produced by these generation facilities at auctions in the regulated market. Rather, this energy is sold to distribution companies in accordance with the quota system established by the 2013 Concession Renewal Law. For more information, see “Item 4. Information on the Company—The Brazilian Electric Power Industry”. Copel Distribuição is obligated to purchase energy from these generation concessionaires that have renewed generation concessions under this quota system. Copel Distribução was legally required to purchase 5,916 GWh in CCGF contracts in 2021, 6,136 GWh in 2020 and 6,274 GWh in 2019.

Auctions in the Regulated Market

In 2021, we purchased 12,369 GWh of thermoelectric and hydroelectric energy through auctions in the regulated market. This energy represents 48.8% of the total electricity purchased by the Copel Distribuição. For more information on the regulated market and the Free Market, see “Item 4. Information on the Company—The Brazilian Electric Power Industry”.

Sales to Captive Customers

During 2021, we supplied approximately 95.8% of the energy distributed directly to Captive Customers in the State of Paraná. Our concession area includes nearly 4.9 million customers located in the State of Paraná and in one municipality in the State of Santa Catarina, located in the south of the State of Paraná. During 2021, the total power consumption of our Captive Customers was 19,312 GWh, a 0.7% increase as compared to 19,180 GWh during 2020.

   

Categories of purchaser

2021

2020

2019

(GWh)  
Industrial customers 2,275 2,314 2,648
Residential 8,068 7,910 7,499
Commercial 4,149 4,172 4,730
Rural 2,461 2,451 2,361
Other(1) 2,359 2,333 2,546
Total(2) 19,312 19,180 19,784

 

(1) Includes public services such as street lighting, electricity supply for municipalities and other governmental agencies, as well as our own consumption.

(2) Total GWh does not include our energy losses.

 

 
39 
 
 

Sales to Free Customers

 

We operate in the ACL through our wholly owned subsidiaries Copel Geração e Transmissão and Copel Comercialização (Copel Mercado Livre). As of December 31, 2021, we had 1,380 Free Customers (of which 1,363 were customers of our energy trading company and 17 of Copel GeT), representing approximately 8.0% of our consolidated operating revenue and approximately 14.6% of the total quantity of electricity sold by us. During 2021, the total power consumption of our Free Customers was 9,537 GWh, a 19.4% increase as compared to 7,989 GWh during 2020.

 

   

Categories of purchaser

2021

2020

2019

(GWh)  
Industrial customers 8,176 7,308 6,352
Commercial 1,360 680 508
Total 9,537 7,989 6,860

 

The following table sets forth the number of our Final Customers, considering both Captive and Free Customers, in each category as of December 31, 2021.

Category

Number of Final Customers

Industrial 71,651
Residential 4,038,454
Commercial 423,812
Rural 342,465
Other(1) 52,544
Total 4,928,926

 

(1) Includes street lighting, as well as electricity for municipalities and other governmental agencies, public services and own

consumption.

 

Industrial and commercial customers accounted for approximately 10.0%and 17.9%, respectively, of our total revenues from energy sales to Final Customers of Captive Market during 2021. In 2021, 33.3% of our total revenues from energy sales were from to residential customers.

Tariffs

Retail Tariffs. We classify our customers in two groups (“Group A Customers” and “Group B Customers”), based on the voltage level at which electricity is supplied to them and on whether they are considered as industrial, commercial, residential or rural customers. Each customer falls within a certain tariff level defined by law and based on the customer’s classification, although some flexibility is available according to the nature of each customer’s demand. Under Brazilian regulation, low voltage customers such as residential customers (other than Low-income Residential Customers, as defined as follows) pay the highest tariff rates, followed by 13.8 kV and 34.5 kV voltage customers (usually commercial customers), and 69 kV and 138 kV voltage customers (usually industrial customers).

Group A Customers receive electricity at 2.3 kV or higher and the tariffs applied to them are based on the actual voltage level at which energy is supplied and the time of day the energy is supplied. Tariffs are comprised of two components: a “capacity charge” and an “energy charge”. The capacity charge, expressed in reais per kW, is based on the higher of (i) contracted firm capacity and (ii) power capacity actually used. The energy charge, expressed in reais per MWh, is based on the amount of electricity actually consumed as evidenced by our metering.

Group B Customers receive electricity at less than 2.3 kV, and the tariffs applied to them are comprised solely of an energy charge and are based on the classification of the customer.

ANEEL restates our tariffs annually, usually in June. For more information about the distribution tariff adjustments that have been made by ANEEL in recent years, see “Item 5. Operating and Financial Review and Prospects—Overview—Rates and Prices”.

The following table sets forth the Average Tariffs for each category of Final Customer.

Tariffs

2021

2020

2019

  (R$/MWh)
Industrial 540.97 487.41 488.78
Residential 530.98 498.82 504.36
Commercial 629.62 574.57 574.41
Rural 589.41 489.57 466.9
Other customers 401.34 356.03 364.49
All Final Customers 592.17 537.81 534.32
 
40 
 
 

Low-income Residential Customers. Under Brazilian law, we are required to provide low level rates to certain low-income residential customers (“Low-income Residential Customers”). In December 2021, we served approximately 388,874 low-income residential customers. For servicing these customers, in 2021 we received an approximately R$95.5 million compensation from the Brazilian government, which was approved by ANEEL.

The following table sets forth the current minimum discount rates approved by ANEEL for each category of Low-income Residential Customer.

Consumption

Discount from base tariff

Up to 30 kWh per month 65%
From 31 to 100 kWh per month 40%
From 101 to 220 kWh per month 10%

 

Special Customers. A customer of our distribution business that consumes at least 500 kW (a “Special Customer”) may choose its energy supplier if that supplier derives its energy from alternative sources, such as small hydroelectric plants, wind plants or biomass plants. A Special Customer that chooses to purchase energy from a supplier other than Copel Geração e Transmissão continues to use our distribution grid and to pay our distribution tariff. However, as an incentive for Special Customers to purchase from alternative sources, we are required to reduce the tariff paid by Special Customers by 50%. This discount is subsidized by the Brazilian government, and therefore does not impact the revenues of our distribution business.

Transmission Tariffs. A transmission concessionaire is entitled to annual revenues based on the transmission grid it owns and operates. These revenues are annually readjusted according to criteria stipulated in the concession contract. We are directly a party to twelve (12) transmission concession contracts in operation. Not all of the transmission concession contracts employ the same revenue model, 2.2% of our transmission revenues are updated on an annual basis by the IGP-M and the other 97.8% are subject to the tariff review process.

The first periodic revision related to our Main Transmission Concession scheduled for 2005 was only carried out in 2007, at which point ANEEL reduced the tariffs by 15.08%. This adjustment was applied retroactively to July 2005, and was passed on to our Final Customers until June 2009. In addition, in July 2010 pursuant to a second periodic revision of our principal concession, ANEEL granted provisional approval of a reduction in our transmission tariff by 22.88%, applied to the revenues of new installations in the Interconnected Transmission System, and applied retroactively from July 1, 2009 onward. In June 2011, ANEEL reviewed the figures of the second periodic revision and reduced the annual revenues by 19.94%. The remainder of our annual revenues was subject to adjustment by IGP-M or IPCA, as applicable.

By late 2012, Copel decided to anticipate the extension of its main transmission concession agreement (corresponding to 78% of our transmission lines then in operation) that would expire in 2015, pursuant to the new rules of the 2013 Concession Renewal Law. In December 2012, Copel executed the Third Addendum to the Concession Agreement 060/2001, extending this transmission concession agreement until December 31, 2042. In order to adjust these assets’ annual permitted revenue to the new rules of 2013 Concession Renewal Law, ANEEL reduced the transmission tariffs we charged by 61.9%.

Of all our transmission concessions in operational stage, our main transmission concession (which involves our main transmission facilities) accounted for about 71% of our gross transmission revenues in 2019. In addition, we have ten (10) concession agreements for transmission lines and substations in operation and one (1) partially in operation, which correspond to an aggregate of 29% of our transmission revenues. The amount of revenues we are entitled to receive pursuant to one (1) of these contracts is updated on an annual basis by the IGP-M and is not subject to the tariff review process, but, pursuant to the terms set forth in this agreement, our revenues were reduced by 50% starting in June 2018. Other ten (10) agreements revenues are subject to the tariff review process and adjustments by the IPCA.

 
41 
 
 

In relation to our main concession agreement, on April 22, 2016, Ordinance No. 120/2016 of the Ministry of Mines and Energy determined that the amounts ratified by ANEEL related to the non-depreciated transmission assets existing on May 31, 2000 (Basic Grid Existing System “RBSE”) should be incorporated to the Regulatory Remuneration Base, and that their cost of capital should be added to APR. The Ordinance also determined that the cost of capital would be composed of compensation and depreciation installments, plus related taxes, and recognized as of the 2017 tariff revision process, with adjustments and revisions in accordance with contractual conditions.

Also pursuant to the above mentioned Ordinance, the cost of capital not incorporated between the concessions’ extensions and the 2017 tariff revision process should be restated at the real cost of own capital of the transmission segment defined by ANEEL (10.4%) and, after the tariff revision process, it should be remunerated at the Weighted Average Cost of Capital (WACC) of 6.6%, also defined by that agency.

On May 9, 2017, ANEEL approved the result of the inspection of the appraisal report of the transmission assets existing on May 31, 2000 (RBSE and Other Transmission Facilities - RPC) related to our main transmission concession agreement. The Agency recognized the amount of R$667.6 million as the net value of the assets for the purposes of indemnification as of December 31, 2012. As of December 31, 2017, the net value of those assets for the purposes of indemnification amounted to R$1,418.4 million.

On June 27, 2017, ANEEL approved the Annual Permitted Revenue (Receita Anual Permitida, or APR) of the transmission assets of Copel GeT for the 2017/2018 cycle, including the commencement of receipt of the RBSE indemnification of our main transmission concession agreement.

In 2017(i) our main transmission concession agreement was adjusted by the IPCA and by the portion related the commencement of receipt of the RBSE indemnification (average increase of 151.3%) (ii) one of our transmission concession agreements was adjusted by the IPCA and improvements to the system were approved by ANEEL (average increase of 3.7%), (iii) six transmission concession agreements were adjusted by the IPCA (3.6%), (iv) one transmission concession agreement was adjusted by the IGP-M (1.6%), and (v) one transmission agreement became operational in August 2017, adding R$18.9 million of annual permitted revenues. As a result, the annual permitted revenues for the 2017/2018 cycle for our transmission assets reflected an increase of 121.2% over our annual permitted revenues for the 2016/2017 cycle.

In June 2018, ANEEL approved the APR for the 2018/2019 cycle, considering (i) an adjustment of relevant amounts by the IGP-M and IPCA indexes, and (ii) the expansion of our transmission system with upgrades and revenues from other works classified as improvement measures.

Compared to our total APR for the 2017/2018 cycle, the APR of our main concession for the 2018/2019 cycle was reduced by 8.1%, as a result of the correction of a prior calculation made by ANEEL, which take into account certain financial and economic portions of unamortized and unrepaired assets related to the RBSE when determining the assets of the Regulatory Remuneration Base in the prior cycle.

The APR of concession No. 075/2001 was reduced by approximately 30.5%, as a result of a 50% reduction of the APR starting at the 16th anniversary of commercial operation, which occurred during the 2018/2019 cycle. Two of our concession agreements (022/2012 and 002/2013) were subject to a periodic review, which resulted in a lower APR in connection with increasing revenues related to upgrade works.

In June 2019, ANEEL approved the APR for the 2019/2020 cycle, considering (i) an adjustment of relevant amounts by the IGP-M and IPCA indexes, and (ii) the expansion of our transmission system with upgrade works and revenues from other works classified as improvement measures.

In 2020, in the scope of the tariff review process for the contracts extended under Law No. 12,783/2013, holders of assets belonging to RBSE had their review ratified in June 2020 despite originally being scheduled for 2018, due to a two-year delay and the retroactive effects of REN 880/2020 on the 2018 tariff year. For Copel, this process was ratified through Homologation Resolution No. 2,715/2020 for concession agreement No. 060/2001, granted to Copel GeT. During review process, ANEEL decided that starting on the 2020/2021 cycle, the renumeration portion of the RBSE would be calculated by the cost of equity (“KE”) as provided for in Ordinance MME No. 120/2016. The value not received during the three previous cycles (2017-2020) will be incorporated into the next three cycles (2020-2023) by the means of an Adjustment Installment (Parcela de Ajuste).

 
42 
 
 

In view of the strong tariff impact of the increased risk of default in the electricity sector caused by the COVID-19 pandemic, on April 22, 2021, ANEEL changed the timeline for the payment of the financial component of the RBSE/RPC for 8 years and gradually for all the transmission concession agreements renewed under the terms of Law No. 12,783/2013. The new rule was approved by Resolution No. 2,847, of 04.22.2021, which changed the result of the periodic review of the APR, ratified in 2020, associated with Concession Agreement No. 060/2001.

Additionally, by means of Homologation Resolution No. 2,725/2020, ANEEL established the adjustment of APRs for electric energy transmission assets for the 2020-2021 cycle, effective from July 1, 2020 until June 30, 2021. According to the aforementioned resolution, Copel GeT’s transmission asset APRs for the 2020-2021 cycle were R$811.8 million. Considering the homologated APRs for the Special Purpose Companies (Sociedades de Propósito Específicos) in which Copel GeT has equity ownership, the total consolidated value for Copel GeT is R$1,199.8 million.

On July 13, 2021, ANEEL readjusted the APRs for electric energy transmission assets for the cycle from July 1, 2021 to June 30, 2022 through Resolutions 2,895/2021 and 2,959/2021. Copel GeT’s transmission assets APR was set at R$792.2 of assets in operation. Considering the APRs approved for the Specific Purpose Vehicles 100% owened by Copel Geração e Transmissão, the total consolidated amount reached R$1,220.1 million.

The table below shows our APR (R$million) for the last three cycles of transmission lines over which we hold a 100% ownership:

Contract

Transmission Line /

Substation

Jul. 2021 Jun.2022

Jul. 2020

Jun. 2021

Jul. 2019

Jun. 2020

    APR (R$million)  
060/2001 Main Transmission Concession(1) 459.4 505.4 469.5
075/2001 Bateias – Jaguariaiva 15.9 11.6 10.9
006/2008 Bateias – Pilarzinho 1.2 1.1 1.1
027/2009 Foz do Iguaçu - Cascavel Oeste 13.8 12.7 12.5
015/2010 Cerquilho III 6.0 5.2 5.1
022/2012

Foz do Chopim – Salto Osório

Londrina – Figueira C2

6.7 6.2 6.1
002/2013

Assis — Paraguaçu Paulista II C1 and C2

SE Paraguaçu Paulista II

10.5 9.7 8.2
005/2014

Bateias - Curitiba Norte

SE Curitiba Norte

11.1 10.2 9.9
021/2014 Foz do Chopim - Realeza(2) 11.2 8.0 7.8
022/2014 Assis – Londrina(3) 23.3 20.8 20.4
010/2010 Araraquara 2 – Taubaté(4) 37.5 32.0 31.4
006/2016

TL Baixo Iguaçu - Realeza;

TL Baixo Iguaçu - Cascavel Oeste; TL Uberaba - Curitiba Centro;

TL Curitiba Leste - Blumenau; SE Medianeira; SE Curitiba Centro; SE Andirá leste; SE Baixo Iguaçu; Demais Seccionamentos

133.3 119.1 79.0
002/2005 Uirapuru(5) 26.0 37.1 34.8
001/2012 Costa Oeste(6) 14.8 12.8 12.5
008/2012 Marumbi(6) 21.5 19.9 19.5
Total   792.2 811.8 728.7

 

(1) Our main transmission concessions encompass several transmission lines.

(2) This transmission line became operational in January 2017.

(3) This transmission line became operational in August 2017.

(4) This transmission line became operational in July 2018.

(5) In June 2019, Copel Geração e Transmissão S.A. became the owner of 100% of the project.

(6) In August 2018, Copel Geração e Transmissão S.A. became the owner of 100% of the project.

 
43 
 
 

Other Businesses

Gas

Gas Distribution

Compagas entered into a concession agreement with the State of Paraná which expires on July 6, 2024. The scope of this concession is to provide piped gas distribution services and other related activities to all segments of the consumer market, either as a raw material, or for the purposes of power generation or other uses made possible by technological advances.

The gas concession agreement provides that part of the investments made by Compagas were to be recovered through the collection of tariffs paid by the end users of the public service and the remaining part should be indemnified by the granting authority, the State of Paraná, at the end of the concession.

On July 23, 2021, the State of Paraná submitted to public consultation a proposal to extend Compagás' concession for thirty years as of July 7, 2024. The proposed extension includes the execution of a new concession contract, which would change the tariff structure of the concession from a tariff based on production cost to a tariff defined based on a price cap. The methodology to calculate the tariffs under the new contract will be determined by the State Regulatory Agency for Public Services AGEPAR.

On February 22, 2022, a public hearing was held in order to make the State Plan and concession extension proposal public and collect input from the private sector (as provided under Complementary Law No. 205/2017). The collected comments and input are now under analysis of the State Secretary for Planning and Projects (Secretaria do Planejamento e Projetos Estruturantes do Estado do Paraná).

If the extension of the concession does not occur, even if Compagas is entitled to compensation for the investments made in the last 10 years prior to the end of the concession, the financial condition and results of operations of our controlled company may be adversely affected. For more information see Note 2.1.1 to our audited consolidated financial statements.

Additionally, a federal law of April 8, 2021 (Law No. 14,134/2021, later regulated by Federal Decree No. 10,712/2021) established a new milestone for the gas producing sector in Brazil. The purpose is to increase competition in the Natural Gas and Biofuels market, attracting new investors, consequently reducing production costs and the final price of gas for the consumer.

Compagas covered 852 kilometers in 2021, an increase of 1.2% compared to 842 kilometers covered in 2020. Compagas’s net revenues were R$738.05 million, an increase of 40.7%, compared to 2020 (R$524.23 million), and its net income was R$125.65 million, an increase of 110.7% compared to 2020. Compagas’ customers include industries, gas stations, other businesses, residences and Araucária Thermoelectric plan. Compagas is focusing its business strategy on increasing the volume of gas it distributes to customers by marketing the benefits of substituting oil and other fuels by gas as a mean of achieving greater energy efficiency. Compagas’ customer base increased 3.4%, to 51,000 customers in 2021 from 49,335 in 2020. Compagas registered an increase of 1.3% in the average daily volume of natural gas distributed to Final Customers, to 893,203 cubic meters per day in 2021 compared to 881,745 cubic meters per day in 2020 (not including the volume of gas supplied to Araucária Thermoelectric Plant). In addition, Compagas makes its distribution grid available to transport natural gas to Araucária TPP. The volume of natural gas supplied from Petrobras and distributed by Compagas to Araucária TPP, was 1,212,597 cubic meters per day in 2021, compared to 676,113 cubic meters per day in 2020.

 
44 
 
 

As of December 31, 2021, we held a controlling stake (51%) of the capital stock of Compagas and consolidated this equity interest in our financial statements. The minority shareholders of Compagas are Petrobras, through its subsidiary Gaspetro, and Mitsui Gás, each of which owns 24.5% of the capital stock of Compagas.

Gas Exploration

In the 12th bidding round of National Petroleum Agency (Agência Nacional do Petróleo “ANP”), held at the end of 2013, the consortium formed by us (30%), Bayar Participações (30%), Tucumann Engenharia (10%) and Petra Energia (30%), the latter acting as operating company, won the right to explore, research, develop and produce natural gas in four blocks located in the central southern region of the State of Paraná, in a 11,327 km² area. The minimum investment in the first phase of the research is approximately R$78.1 million for a 4-year term. We and our partners have signed the concession contracts for 2 blocks in May 2014. However, because of a public civil action the first phase of exploration for these two blocks was halted and the signing of the other two concession contracts was prohibited. On June 7th, 2017, a court decision held that all the bidding round and the agreements related thereto should be deemed null and void. Moreover, the Government of the State of Paraná enacted Law No. 19,878 (July 3, 2019), forbidding the exploration of shale gas through the drilling/fracking method.

As a result of the above-mentioned events, our consortium requested ANP to release it from its contractual obligations, with no liabilities and with reimbursement of the signing bonuses, reimbursement of all costs incurred in connection with guarantees and release of such guarantees for the four blocks. Even though this request was submitted to ANP on September 6th, 2017, it is still under analysis. All the activities for the four blocks were interrupted due to the suspension of the effects of the12th bidding round of ANP because of an injunction granted in connection with the above mentioned public civil action, which awaits a decision from the Federal Court of Appeals of the 4th Region. For this reason, in October 2018, the consortium approved the establishment of an institutional arbitration procedure with the ANP for the two blocks whose concession contracts were signed, asking for the refund of the contributions made. Arbitral proceedings are ongoing. In relation to the other two blocks, there is an administrative process in which the consortium requests the reimbursement of bonuses and other costs.

Gas Natural Power Plants

On January 14, 2020, Copel and Shell Brasil Petróleo formed the "Copel Energia a Gás Natural" Consortium with the objective of developing feasibility studies for natural gas power plants in the state of Paraná. The consortium hired consultantsto provide specialized technical services to carry out studies to identify the best location for the implementation of natural gas thermoelectric projects in the State. The studies have been completed and the consortium is planning the next project’s activities.

CONCESSIONS

 

We operate under concessions granted by the Brazilian government for our generation, transmission and distribution businesses. Under Brazilian law, concessions are subject to competitive bidding processes at the end of their respective terms.

2013 Concession Renewal Law

Until 2013, the Brazilian rules governing generation concessions gave concessionaires the right to renew for additional 20 year concession contracts that were entered into prior to December 11, 2003. For transmission and distribution concessions granted after 1995, concessionaires had the right to renew these contracts for an additional 30-year period.

On September 11, 2012, the Brazilian government enacted the Provisional Measure No. 579, subsequently converted into the 2013 Concession Renewal Law, which significantly changed the conditions under which concessionaires are able to renew concession contracts. Under the 2013 Concession Renewal Law, generation, transmission and distribution concessionaires may renew the concessions that were in effect as of 1995 (and, in the case of generation facilities, generation concession contracts entered into prior to 2003) for an additional period of 30 years (or an additional 20-year period in the case thermal plants), provided that the concessionaire agrees to amend the concession contract to reflect a series of new conditions that aim to ensure that services are provided in a continuous and efficient fashion and subject to low tariffs. Under the 2013 Concession Renewal Law, concessionaires must decide 60 months before the end of each concession term (or 24 months with respect to thermal plant concessions that it is 24 months) whether to amend and renew a concession contract or to terminate each concession contract at the end of its respective term.

 
45 
 
 

For concessionaires of generation facilities existing at that time, the 2013 Concession Renewal Law changed the scope of the concession contracts at the moment they were renewed. Previously, a generation concessionaire had the right to sell the energy generated by the facilities subject to its concession for profit. In contrast, generation concessions renewed pursuant to the 2013 Concession Renewal Law do not grant concessionaires the right to sell the energy generated by these facilities. Instead, these concessions only cover the operation and maintenance of the generation facilities, subject to quality standards determined by Brazilian authorities. The energy generated by these facilities are allocated by the Brazilian government in quotas to the regulated market, for purchase by distribution concessionaires. For new generation facilities (i.e., generation facilities operated after the 2013 Concession Renewal Law), on the other hand, the concessionaire still has the right to sell the energy produced by the generation facility.

In addition to changing the scope of generation concessions, the 2013 Concession Renewal Law establishes a new tariff regime that significantly affects the treatment of amounts to be invested by concessionaires to improve and maintain generation plants. To this effect, several regulations were issued by MME and ANEEL to regulate the compensation due to concessionaires as a result of their investments to improve and maintain generation plants.

The 2013 Concession Renewal Law affects transmission and distribution concessions differently. The principal change is that amounts invested in modernization projects, structural reforms, equipment and contingencies are subject to prior ANEEL approval. However, the 2013 Concession Renewal Law does not affect the manner in which distribution and transmission concessionaires may recover amounts invested in transmission infrastructure.

With respect to the transmission agreements, the conditions for renewal set forth in the 2013 Concession Renewal Law are the acceptance of a fixed income as determined by ANEEL and compliance with quality standards set forth in applicable regulation. With respect to distribution agreements, the conditions are set forth in the amendment to the concession agreement and are related to compliance with quality standards, economic-financial sustainability indicators and corporate governance as set forth in the amendment to the concession agreement according to the parameters provided in the 2013 Concession Renewal Law.

The 2013 Concession Renewal Law applies to all generation, transmission and distribution contracts that were in effect as of 1995 (and, in the case of generation concessions, entered into prior to 2003), regardless of whether a contract grants to the concessionaire the right to renew a concession on its original terms. For example, several of our concession contracts contain provisions allowing us to renew these concessions for a period of 20 years. Under the 2013 Concession Renewal Law, in order to renew these contracts, we nonetheless would be required to accept the application of the conditions imposed by the 2013 Concession Renewal Law to the contract, and the concession contract would then be renewed for 30 years, rather than 20 years. If we choose to renew a concession contract that contains a renewal provision, we would be indemnified by the Brazilian government using funds from the RGR Fund (see Energy Sector Regulatory Charges) in an amount equal to the portion of our investments related to the concession that have not yet been amortized or depreciated, as calculated by ANEEL.

If a concessionaire decides not to accept the new tariff regime with respect to a concession contract and therefore decides not to renew the contract, the concession will terminate at the end of its original term, and the Brazilian government will conduct a new competitive bidding process for the concession. The original concessionaire may participate in the new competitive bidding process.

In the case of hydroelectric generation concessions with an installed capacity of more than 5,000 kW, upon the expiration of their original term and provided that the concessionaire does not request the extension of such term, the granting authority may submit the concession to a new bidding process. In the case of concessions for hydroelectric generation units with an installed capacity of 5,000 kW or less, upon the expiration of their original term, the concessions may be granted to the current concessionaire in the form of registration, for an indefinite term.

 
46 
 
 

Generation Concessions

Of the nineteen (19) hydroelectric plants we operated in 2021, fourteen (14) were operated under the generation concession contracts that were in force prior to the 2013 Concession Renewal Law, and five (5) were operated in accordance with the 2013 Concession Renewal Law (Capivari Cachoeira HPP, Chopim I HPP, Marumbi HPP, Baixo Iguaçu HPP and Colíder HPP). In 2013, 12 of the 13 hydro and thermoelectric generation concessions operated by the Company in 2013 (exception made only to Rio dos Patos HPP) were extended pursuant to the old regime and could be renewed again under the 2013 Concession Renewal Law.

However, at the time the 2013 Concession Renewal Law was enacted, the Company elected not to renew the following generation concessions: Rio dos Patos (2014), Mourão I (2015), Chopim I (2015) and Capivari Cachoeira (2015), all of which had remaining terms of 60 months or less. Please see below for further information on each of these concessions.

Foz do Areia HPP. Copel Geração e Transmissão did not elect to renew the original concession pursuant the 2013 Concession Renewal Law for the Foz do Areia HPP (Governador Bento Munhoz da Rocha Netto). However, in order to obtain a new concession for the Foz do Areia HPP for another 30 years, Copel GeT transferred the ownership of this HPP to its subsidiary, the SPC F.D.A. Geração de Energia Elétrica S.A (F.D.A) on March 3, 2020, and, on the same date, requested a new concession from the Ministry of Mines and Energy pursuant to Federal Decree no. 9,271/2018 (as amended by Federal Decree No. 10,135/2019 and Federal Decree No. 10,893/2021), which conditions that, to obtain a new concession, the sale of the concession's corporate control (F.D.A) must occur. On the same date, F.D.A. signed with ANEEL the Concession Contract that transfers the concession of the HPP Foz do Areia from Copel GeT to the F.D.A., for the exploration of the plant until the end of the current concession, on December 21, 2024.

Rio dos Patos HPP. The concession of Rio dos Patos HPP was terminated and not submitted to a further bidding process due to the lack operational conditions.

Mourão I and Capivari Cachoeira HPP. The granting authority submitted the concessions for HPP Capivari Cachoeira and Mourão I to new bidding processes, pursuant to which new agreements should be in force for a 30-year period. Copel GeT was the winner in the bidding process related to HPP Capivari Cachoeira. With respect to Capivari Cachoeira, although Copel GeT did not elect to renew the original concession for the Capivari Cachoeira HPP, it participated in the new competitive bidding process and won. On January 5, 2016, Copel GeT executed a concession agreement with ANEEL so that it will continue to operate this plant under an operation and maintenance regime until 2046. We paid a total amount of R$574.8 million as signing bonus for this concession agreement. 100.0% of the energy generated by this plant in 2016 was allocated in quotas to the regulated market, and reduced to 70.0% on January 1, 2017. Copel GeT can sell remaining amount of energy generated by this plant on the Free Market or Spot Market.

Chopin I HPP. As the installed capacity of Chopin I HPP also does not exceed 5,000 kW, the concession regime of this plant has been changed to a registration in favor of the Company, valid for an indefinite term. In addition, pursuant to the same statute, we may notify the granting authority of its intention to extend: (i) in 2024, the concession of Apucaraninha HPP; and (ii) in 2025, the concessions of Guaricana and Chaminé HPPs. In the event we do not request the extension of these concessions, they will be subject to new bidding processes conducted by the granting authority.

Figueira TPP. Our concession for the Figueira TPP expired on March 26, 2019. We had filed an extension request with respect to this plant on May 24, 2017, but we are still waiting for the granting authority to amnd our concession agreement, extending its term for an additional 20-year period in accordance with the 2013 Concession Renewal Law. This plant has an installed capacity equivalent to 20 MW and subject to a modernization process.

With respect to the concessions granted between 2011 and 2017 with no renewal right attached, we acquired the right to renew only one of the hydroelectric plants (HPP Cavernoso II) for a 30-year period, as a result of an amendment to the 2013 Concession Renewal Law by Law No. 13,360, of November 17, 2016.

In accordance with the 2013 Concession Renewal Law, Copel could have flagged to the granting authority by 2019 its intention to renew the concession of HPP São Jorge. However, Copel elected not to renew such concession and, consequently, it will be able to operate such HPP until July 2026 and request the conversion of this operating regime into a registration regime, as the installed capacity does not exceed 5,000 kW.

 
47 
 
 

Concessions for generation projects granted after December 11, 2003 were not affected by the 2013 Concession Renewal Law and are non-renewable, meaning that upon expiration of their 35-year term, the concession will be granted subject to a new competitive bidding process. In 2019, we had three (3) hydroelectric plants operating in this condition (HPP Mauá, HPP Colíder and HPP Baixo Iguaçu).

In September 2020, the GSF Law was passed, which established new conditions for the renegotiation of hydrological risk of electricity generation, amending Article 2 of Law No. 13,203/2015, among other measures. This procedure was regulated through Normative Resolution No. 895/2020, in which ANEEL established the methodology for calculating compensation to the owners of hydroelectric plants participating in the MRE. It also regulated the repatriation of hydrological risk to equate the issue of GSF and open debts in CCEE to allow for the return of normalcy and greater liquidity in the short-term electricity market, in exchange for the extension of the terms of grants given to hydroelectric plants to up to seven years.

 

In 2021, the government issued new legislation that changed the calculation method applied by CCEE for the financial compensation to plants participating in the MRE. For our plants 16 plants that adhered to the method, the compensation amount was R$1,570.5 million. ANEEL extended the terms of our grantings that adhered to new method to a total of 15,217 days (Resolutions No. 2919 and No. 2932).

The following tables sets forth information relating to the actual terms as well as the renewals of our main generation hydroelectric, thermoelectric and wind farm plants and all of which we hold a direct ownership interest in:

Hydroelectric Plants

Initial concession date

First expiration date

Extension Date

Final expiration date(5)

Foz do Areia (1) May, 1973 May, 2003 January, 2001 December, 2024
Apucaraninha October, 1975 October, 2005 April, 2003 January, 2027
Guaricana August, 1976 August, 2006 August, 2005 July, 2028
Chaminé August, 1976 August, 2006 August, 2005 August, 2028
Segredo November, 1979 November, 2009 September, 2009 September, 2032
Derivação do Rio Jordão November, 1979 November, 2009 September, 2009 June, 2032
Salto Caxias May, 1980 May, 2010 September, 2009 March, 2033
Mauá (2) June, 2007 July, 2042 Not extendable May, 2047
Colíder January, 2011 January, 2046 Not extendable January, 2046
Cavernoso II February, 2011 February, 2046 Not extendable December, 2050
Baixo Iguaçu(3) August, 2012 August, 2047 Not extendable December, 2049
SHP Bela Vista (4) May, 2007 January, 2041 Extendable January, 2041

 

(1) In March 3, 2020, the concession of Foz do Areia was transferred from Copel GeT to FDA pursuant to ANEEL Authorizing Resolution no. 8.578/2020. Copel GeT owns 100% of FDA Geração de Energia S.A.

(2) Mauá was constructed by Consórcio Energético Cruzeiro do Sul, of which Copel owns 51.0% and Eletrosul owns the remaining 49.0%.

(3) Baixo Iguaçu was constructed by Consórcio Empreendedor Baixo Iguaçu, of which Copel owns 30% and Geração Céu Azul the remaining 70%. The commercial operations of generation units 1, 2 and 3 of Baixo Iguaçu’s began in February 2019, Feburary 2019 and April 2019, respectively.

(4) The consortium CBVG, formed by Copel GeT and Foz do Chopim Energética Ltda., won ANEEL Auction No. 003/2018 for SHP Bela Vista. In April 2019, the authorization to operate SHP Bela Vista was transferred from Foz do Chopim Energética Ltda. to Bela Vista Geração de Energia S.A through the ANEEL’s Authorizing Resolution no. 7.802/2019. In December 2019, Copel GeT became the owner of 100% of Bela Vista Geração de Energia. This power plant is still under construction.

(5) Tems in this collum consider the extended term of the grantings.

 
48 
 
 

Thermoelectric Plants

Initial concession date

First expiration date

Extension date

Final expiration date

Figueira March 1969 March 1999 June 1999 March 2019

 

Wind Plants

Initial concession date

First expiration date

Asa Branca I April, 2011 April, 2046
Asa Branca II May, 2011 May, 2046
Asa Branca III May, 2011 May, 2046
Nova Eurus IV April, 2011 April, 2046
Santa Maria May, 2012 May, 2047
Santa Helena April, 2012 April, 2047
Ventos de Santo Uriel April, 2012 April, 2047
Boa Vista April, 2011 April, 2046
Farol April, 2011 April, 2046
Olho D'Água June, 2011 June, 2046
São Bento do Norte May, 2011 May, 2046
Cutia(1) January, 2012 January, 2042
Guariju(1) January, 2012 January, 2042
Jangada(1) January, 2012 January, 2042
Maria Helena(1) January, 2012 January, 2042
Palmas September, 1999 September, 2029
Potiguar(1) May, 2015 May, 2050
Esperança do Nordeste(1) May, 2015 May, 2050
Paraíso dos Ventos do Nordeste(1) May, 2015 May, 2050
São Bento do Norte I(1) August, 2015 August, 2050
São Bento do Norte II(1) August, 2015 August, 2050
São Bento do Norte III(1) August, 2015 August, 2050
São Miguel I(1) August, 2015 August, 2050
São Miguel II(1) August, 2015 August, 2050
São Miguel III(1) August, 2015 August, 2050
Jandaíra I(2) April, 2020 April, 2055
Jandaíra II(2) April, 2020 April, 2055
Jandaíra III(2) April, 2020 April, 2055
Jandaíra IV(2) April, 2020 April, 2055
Vila Maranhão I(3) January, 2019 January, 2054
Vila Maranhão II(3) January, 2019 January, 2054
Vila Maranhão III(3) January, 2019 January, 2054
Vila Ceará I(3) January, 2019 January, 2054
Ventos de Vila Mato Grosso I(3) December, 2019 December, 2054

(1) Wind plants located at Copel’s Cutia wind farm complex.

(2) The consortium formed by Copel GeT and Cutia Empreendimentos Eólicos S.A., won ANEEL Auction no. 004/2019 for Jandaíra Wind Complex (I, II, III and IV).

(3) Vilas Complex, located in the State of Rio Grande do Norte, which we acquired in November 2021.

 

The following table sets forth information relating to the terms of our generation hydroelectric plant, whose concession agreement has been executed under the terms and conditions of the 2013 Concession Renewal Law:

Hydroelectric Plants

Initial concession date

First expiration date

Extension Date

Final expiration date

Capivari Cachoeira (Gov Parigot de Souza) January, 2016 January, 2046 Not subject to extension January, 2053

 

The following table sets forth information relating to the terms of our generation hydroelectric plants which, once respective original concession period expires, will no longer be subject to a concession regime but rather to a registration proceeding with the ANEEL:

 
49 
 
 

 

Hydroelectric Plants(1)

Initial concession date

Concession expiration date

Final expiration date

Chopim I March, 1964 July, 2015 Indefinitely
São Jorge December, 1974 July, 2026 -
Cavernoso January, 1981 June, 2033 -
Melissa May, 2002 Indefinitely -
Pitangui May, 2002 Indefinitely -
Salto do Vau May, 2002 Indefinitely -
Marumbi March, 1956 May, 2018 Indefinitely

 

(1) Upon the expiration of concessions or authorizations for hydroelectric energy generation with installed capacity equal to or less than 5,000 KW, the relevant projects are subject to a registration regime in accordance with Brazilian Federal Law No. 9,074/1995, as amended by Brazilian Federal Law No. 13,360/2016. The operation of hydroelectric and thermoelectric plans with installed capacity of up to 5,000 KW are not subject to any concession, permission or authorization and require solely the registration with the granting authority.

 

We also have ownership interests in eleven (11) other generation projects. The following table sets forth information relating to the terms of the concessions of the generation facilities in which we had such partial ownership interest as of December 31, 2021.

Generation Facility

Company

Initial concession date

Expiration date

Extension

HPP Dona Francisca Dona Francisca Energética SA ‒ DFESA July, 1979 September, 2037 Possible
HPP Santa Clara Centrais Elétricas do Rio Jordão S.A. - ELEJOR October, 2001 April, 2041 Possible
HPP Fundão Centrais Elétricas do Rio Jordão S.A. - ELEJOR October, 2001 June, 2040 Possible
SHP Santa Clara I Centrais Elétricas do Rio Jordão S.A. - ELEJOR December, 2002 December, 2032 Possible
SHP Fundão I Centrais Elétricas do Rio Jordão S.A. - ELEJOR December, 2002 December, 2032 Possible
TPP Araucária UEG Araucária Ltda. December, 1999 December, 2029 Possible
HPP Arturo Andreoli Foz do Chopim Energética April, 2000 August,2032 Possible
WPP Carnaúbas São Miguel do Gostoso I April, 2012 April, 2047 Not possible
WPP Reduto São Miguel do Gostoso I April, 2012 April, 2047 Not possible
WPP Santo Cristo São Miguel do Gostoso I April, 2012 April, 2047 Not possible
WPP São João São Miguel do Gostoso I March, 2012 March, 2047 Not possible

 

Transmission Concessions

Pursuant to the 2013 Concession Renewal Law and the terms of our transmission concessions, we have the right to request 30-year extensions of the concessions from ANEEL, provided that such request is delivered within 60 months prior to the expiration of the contract. Our principal transmission concession, from which 62.2% of our transmission revenues in 2021 derived, has been renewed pursuant to the 2013 Concession Renewal Law, and will therefore now expire in January 2043.

In addition, in 2021, an aggregate of 37.8% of our transmission revenues derived from eleven (11) other concession contracts for transmission lines and substations that are currently in operation and whose terms and extensions are set forth in the next table. In accordance with the 2013 Concession Renewal Law, each of these contracts can be extended for an additional 30-year period.

We intend to continue requesting extensions for all of our transmission concessions.

 
50 
 
 

The following table sets forth certain information relating to the terms and extension terms of our main transmission concessions (all of which we hold a direct ownership interest), including the concession contracts for transmission lines and substations both in operation or under construction:

Transmission

Facility

Initial concession

Date

First expiration

Date

Possibility of extension

Expected (or final) expiration date

Main transmission concession July, 2001 July, 2015 Extended January, 2043
Bateias – Jaguariaíva August, 2001 August, 2031 Possible August, 2061
Bateias – Pilarzinho March, 2008 March, 2038 Possible March, 2068
Foz do Iguaçu – Cascavel Oeste November, 2009 November, 2039 Possible November, 2069
Substation Cerquilho III October, 2010 October, 2040 Possible October, 2070
Araraquara 2 – Taubaté October, 2010 October, 2040 Possible October, 2070
Foz do Chopim - Salto Osorio August, 2012 August, 2042 Possible August, 2072
Assis – Paraguaçu Paulista II February, 2013 February, 2043 Possible February, 2073
Bateias – Curitiba Norte January, 2014 January, 2044 Possible January, 2074
Realeza Sul – Foz do Chopim September, 2014 September, 2044 Possible September, 2074
Assis - Londrina September, 2014 September, 2044 Possible September, 2074
Curitiba Leste – Blumenau April, 2016 April, 2046 Possible April, 2076

 

We have ownership interests in ten (10) other transmission projects, through special purpose companies. The following table sets forth information relating to the terms of the concessions of the transmission facilities in which we had such partial ownership interest as of December 31, 2021:

Transmission Facility

Special Purpose Company (SPC)

Initial concession date

First Expiration date

Possibility of Extension

Expected (or final) expiration date

Cascavel Oeste – Umuarama Costa Oeste Transmissora de Energia S.A January, 2012 January, 2042 Possible January, 2072
Umuarama - Guaira Caiuá Transmissora de Energia S.A May, 2012 May, 2042 Possible May, 2072
Açailândia
Miranda II
Integração Maranhense Transmissora de Energia S.A. May, 2012 May, 2042 Possible May, 2072

Curitiba -

Curitiba Leste

Marumbi Transmissora de Energia S.A. May, 2012 May, 2042 Possible May, 2072

Paranaíta –

Ribeirãozinho

Matrinchã Transmissora de Energia S.A. May, 2012 May, 2042 Possible May, 2072
Ribeirãozinho – Marimbondo II Guaraciaba Transmissora de Energia S.A May, 2012 May, 2042 Possible May, 2072
Barreiras II – Pirapora II Paranaíba Transmissora de Energia S.A May, 2013 May, 2043 Possible May, 2073
Itatiba – Bateias Mata de Santa Genebra Transmissora S.A May, 2014 May, 2044 Possible May, 2074
Estreito – Fernão Dias Cantareira Transmissora de Energia S.A. September, 2014 September, 2044 Possible September, 2074
Ivaiporã – Londrina Uirapuru Transmissora de Energia S.A. March, 2005 March, 2035 Possible March 2065

 

Distribution Concessions

We originally operated our distribution business pursuant to a concession contract that was signed on June 24, 1999 (retroactive to July 7, 1995) and was set to expire on July 7, 2015. Under the 2013 Concession Renewal Law, we had the right to renew this concession for an additional 30-year period by accepting an amendment to the concession contract. In 2013, after a careful evaluation of the conditions imposed by the Brazilian government for the extension of our distribution concession, we decided to request the renewal of this contract and our renewal request was approved by the MME on November 11, 2015. On December 9, 2015, we executed the fifth amendment to the public Electricity Distribution Service Concession Agreement No. 46/1999 of Copel Distribuição S.A.

 
51 
 
 

This amendment imposes efficiency conditions to Copel Distribuição that are measured through two different metrics: quality of the service and economic-financial sustainability of the company. Failure to comply with either of these metrics (i) for two consecutive years within the first four years of this renewed concession or (ii) in the fifth year of this concession, may, in each case, result in the termination of our distribution concession.

On November 17, 2020, ANEEL detailed the performance and efficiency indicators applicable to the electricity distribution services starting in 2021 with respect to no-interruption in supply and economic-financial management (pursuant to Resolutions 896/2020 and 948/2021). ANEEL also changed the parameters for the calculation of some variables of the Economic-Financial Management indicator.

The economic-financial management indicator is breached when the cash flow generation, after deduction of the Regulatory Reintegration Quota (cota de reintegração regulatória) is below 111% of SELIC, which it is considered insufficient to comply with debt interest, or when the EBITDA is lower than the Regulatory Reintegration Quota or Regulatory Depreciation Expense (“QRR’). Non-compliance for one year obliges the concessionaire to limit the payment of dividends and interest on equity capital and prohibits new legal action and business deals between the concessionaire and its related parties. Non-compliance for two consecutive years allows ANEEL to terminate the concession.

The breach of indicators of no-interruption in supply for one year imposes the obligation to create a plan to improve results. Non-compliance for two consecutive years or three years within a five-year period, may lead to limitation on the distribution of dividends, and for a consecutive period of three years, may result in the termination of the concession.

Performance evaluation occurs at the end of each calendar year, when the results are disclosed in Regulatory Accounting Statements (Demonstrações Contábeis Regulatórias – DCR).

The table below presents the economic and financial and quality indicators established for the last six (6) years.

 

Economic and Financial Indicators

Quality Indicators (1)

 

Quality Performed

Year

Indicator

DECi(2)

FECi(2)

DECi(2)

FECi(2)

2016 N/A

13.61

 

9.24

 

10.80 7.14
2017 EBITDA(3) ≥ 0 12.54 8.74 10.41 6.79
2018 [EBITDA (-) QRR (4)] ≥ 0 11.23 8.24 10.29 6.20
2019 {Net Debt(5)/[EBITDA(3) (-) QRR(4)]} ≤ 1/(0.8*SELIC(6)) 10.12 7.74 9.10 6.00
2020 {Net Debt(5)/[EBITDA(3) (-) QRR(4)]} ≤ 1/(1.11*SELIC(6) 1/(1.11*SELIC(6)) 9.83 7.24 7.81 5.55
2021 {Net Debt(5)/[EBITDA(3) (-) QRR(4) ≥ 0]} ≤ 1/(1.11*SELIC(7) 9.29 6.84 7.20 4.76
2022 {Net Debt(5)/[EBITDA(3) (-) QRR(4) ≥ 0]} ≤ 1/(1.11*SELIC(7) 9.19 6.80 - -
           

 

(1) According to ANEEL’s Technical Note No. 0335/2015.

(2) DECi – Duration of outages per customer per year (in hours); and FECi – Frequency of outages per customer per year (number of outages).

(3) Earnings before interest, tax depreciation and amortization, as calculated according to ANEEL regulations.

(4) QRR: Regulatory Reintegration Quota or Regulatory Depreciation Expense. Untill 2020, this value corresponds to the most recent Periodic Tariff Review (RTP), plus the General Market Price inflation index (IGP-M) between the month preceding the Periodic Tariff Review and the month preceding the twelve-month period of the economic and financial sustainability measurement. As of 2021, it reflects the defined value in the last periodic tariff review and updated by the Regulatory B Parcel, is calculated pro rata.

(5) As calculated according to ANEEL regulations.

(6) Selic base rate: limited to 12.87% per year.

(7) Limited to 9,009 % per year if it exceeds this percentage, and to 6,006 % if it fall under said percentage.

 

 
52 
 
 

COMPETITION

 

We have concessions to distribute electricity in substantially all of the State of Paraná, and we do not face competition from the four utilities that have been granted concessions for the remainder of the state. As a result of legislation passed in 2004, however, other suppliers are able to offer electricity to our existing Free Customers at prices lower than those we currently charge. However, when a Captive Customer becomes a Free Customer, it is still required to pay to use our distribution grid. The reduction in net revenue of our distribution business is therefore compensated with a reduction in our costs for energy that we would otherwise acquire to sell to these customers.

Furthermore, under certain circumstances, Free Customers may be entitled to connect directly to the Interconnected Transmission System rather than our distribution grid. Unlike a Free Customer’s choice of another energy supplier, in which case that customer must still use our distribution grid and thus pay us the appropriate tariff, our distribution business ceases to collect tariffs from a customer that connects directly to the Interconnected Transmission System. The migration of customers from the distribution grid to the transmission grid therefore results in the loss of revenues for our distribution business.

Distribution and transmission companies are required to permit the use of their lines and ancillary facilities for the distribution and transmission of electricity by other parties upon payment of a tariff.

Free Customers are limited to, as from January 1, 2022, with demand of at least 1.0 MW at any voltage; and, after January 1, 2023, with demand of at least 500 kW at any voltage.

Special customers are costumers with demand of at least 500 kW that opt to be supplied energy by means of alternative sources, such as wind power projects, small hydroelectric power plants, biomass projects, solar plants and others.

As of December 31, 2021, we had 1,380 Free Customers (of which of 1,363 were customers of our energy trading company and 17 of Copel GeT), representing approximately 8.0% of our consolidated operating revenue and approximately 14.6% of the total quantity of electricity sold by us.

Copel GeT has 17 Free Costumers as of December 31, 2021. Approximately 99.99% of the megawatts-hours sold under contracts to such customers by Copel GeT expired in 2021. These customers represented approximately 2.0% of the total volume of electricity we sold in 2021, and approximately 0.9% of our consolidated operating revenues.

In the generation business, any producer may be granted a concession to build or manage thermoelectric and small hydroelectric generating facilities in the State of Paraná. Brazilian law provides for competitive bidding for generation concessions for hydroelectric facilities and, since 2017, this requirement applies only to facilities with capacity higher than 50 MW.

In the transmission business, Brazilian law provides for competitive bidding for transmission concessions for facilities with a voltage of 230 kV or greater that will form part of the Interconnected Transmission System.

Brazilian law requires that all of our generation, transmission and distribution concessions be subject to a competitive bidding process upon their expiration. We may face significant competition from third parties in bidding for renewal of such concessions or for any new concessions. The loss of certain concessions could adversely affect our results of operations.

On June 2021, a study was published by the Empresa de Pesquisa Energética - EPE) projecting a 30 GW growth on Generation Distribution in the next 10 years. Generation Distribution refers to the generation of eletricity close to or within the consumer site, and can involve any power, technology or energy source. In early 2022, the government adopted a new legal framework for distributed generation in Brazil (Federal Law No. 14,300/2022), which esblished diferent categories of energy distribution, the creation of the Electric Energy Compensation System (Sistema de Compensação de Energia Elétrica - SCEE) and the Social Renewable Energy Program (Programa de Energia Renovável Social - PERS). The expansion ofGeneration Distribution services can adversely affect the demand of electricity and therefore impact the eletricity sector and the distribution concessionaires as a whole in the long-term.
 

 
53 
 
 

ENVIRONMENT

Our construction and operation activities for the generation, transmission and distribution of electric energy and distribution of natural gas are subject to federal, state and municipal environmental regulations.

All of our activities follow Copel’s Sustainability and Environmental Policies, which integrates corporate planning and sustainability management in order to optimize our financial, social and environmental performance. Also, our activities follow our Climate Change Policy, which establishes guidelines for the mitigation of greenhouse gas emission and changes in our business, evaluating risks and opportunities related to climate change. Following the implementation of our Climate Change Policy, we annually disclose our greenhouse gas inventory.

We request and renew our environmental licenses in accordance with the environmental regulation issued by applicable federal, state and municipal level authorities. We are in compliance with all material environmental regulations and our more recent (post-1986) generation, transmission and distribution projects are in compliance with federal, state and municipal regulations.

Being a signatory to the Global Compact since 2000, we are committed to sustainability. As a founding member of the Brazilian Global Compact Network Committee, created in 2003, we support the movement to disseminate the principles of the Global Compact in promoting effective and consistent articulations between governments, companies and social organizations in favor of social, environmental and economic challenges for sustainability, as well as raising awareness among other Brazilian companies to engage and adopt corporate citizenship as a standard for managing their businesses.

We have been working to improve our environmental and governance practices, and to integrate sustainability into our business through a comprehensive approach based on systemic planning and execution, prioritizing the management of risks and impacts and establishing a positive social, economic and environmental legacy in the locations where we operate. We are also working to add value to our businesses by engaging with sustainable companies, which we believe to be better prepared to manage economic, social and environmental risks.

In 2020, we launched our Human Rights Policy, to establish a clear guide for employees and other stakeholders on how we should act. We also promote the social inclusion of immigrants by translating information into refugee languages, such as Spanish and Haitian Creole. In the environmental sphere, in 2021 we approved the Environmental Policy and replaced risk areas with green and productive areas by enabling community gardens under the company's transmission lines in the Cultivar Energia Program. For the 16th time we were mentioned in the Corporate Sustainability Index - ISE B3, and we once again were pre-selected by the Dow Jones Sustainability Index.

We work hard so that our operations are aligned with a low carbon economy. Our shares became part of B3's Carbon Efficient Index (ICO2) portfolio, demonstrating our commitment to the transparency of our emissions. We made progress in Climate Change Management, where we hold Concept B of the CDP (Carbon Disclosure Program), one of the main initiatives in the financial sector that aims to reduce companies' greenhouse gas emissions. Our Board of Directors also approved the Carbon Neutrality Plan, comprising initiatives aiming at neutralizing our emissions by 2030.

In 2021, we approved new bylaws, under which we created the Sustainable Development Committee, with the objective of keeping Copel among the companies with the best governance practices and actions on ESG and guiding the company's sustainability strategy. We also implemented initiatives under the scope of the Carbon Neutrality Plan.

We adopt best market practices to guide and evaluate our performance and compare practices with global and local references: B3 Corporate Sustainability Index - ISE, Ethos Indicators for Sustainable and Responsible Business Models, and other evaluations and classifications related to ESG (Environmental, Social and Governance) matters.

Through an annual report, we reinforce our commitment to sustainable development and are accountable for our performance related to economic, social, environmental and governance aspects (Integrated Report Copel). This report follows the international guidelines of the Standards model of the Global Reporting Initiative (GRI), and the International Integrated Reporting Initiative (IIRC), and is submitted to independent assurance, to ensure the reliability of the information disclosed.

 
54 
 
 

 

PLANT, PROPERTY AND EQUIPMENT

Our principal properties consist of the generation facilities described in “Business”. Of the net book value of our total property, plant and equipment as of December 31, 2021 (including construction in progress), generation facilities represented 58.3%, wind farms represented 36.1%, Elejor represented 3.5%, and Araucária Thermoelectric Plant represented 2.1%. We believe that our facilities generally are adequate for our present needs and suitable for their intended purposes.

In addition, the infrastructure used by the transmission and distribution business is classified as accounts receivable related to the concession, contract assets and intangible assets as described in Notes 4.4, 4.5 and 4.9 to our audited consolidated financial statements.

 
55 
 
 

 

THE EXPROPRIATION PROCESS

Although we receive concessions from the Brazilian government to construct hydroelectric facilities, we do not receive title to the land on which the facilities are to be located. In order for us to construct, the land must be expropriated. The land required for the implementation of a hydroelectric facility may only be expropriated pursuant to specific legislation, after proving its public interest. We generally negotiate with communities and individual owners occupying the land so as to resettle such communities in other areas and to compensate individual owners. Our policy of resettlement and compensation generally has resulted in the settlement of expropriation disputes, with friendly settlements for most of them. As of December 31, 2021, we estimated our liability related to the settlement of such disputes to be approximately R$125.0 million. This amount is in addition to amounts for land expropriation included in each of our hydroelectric facility budgets.

 

 
56 
 
 

 

The Brazilian eLECTRIC Power Industry

General

In April 2021, according to Ordinance No. 40/2022, MME approved the Decennial Energy Plan - PDE 2031, which projects that the installed capacity of electricity generation in Brazil will be 945 TWh in 2031. It is projected in the 2022 PDE that 83% of this total will be renewable (53% is projected to be hydroelectric, 15% self-production and distributed generation, 14% wind and solar generation, 8% will be thermoelectric and 10% other generation sources).

As of 2021, approximately 28% of the installed power generating capacity of Brazil is currently owned by Eletrobras (including its wholly-owned subsidiary Eletronuclear and its 50% participation interest in Itaipu). Through its subsidiaries, Eletrobras is also responsible for approximately 45% of the installed transmission capacity equal or above 230 kV within Brazil. In addition, some Brazilian states control entities involved in the generation, transmission and distribution of electricity. They include Companhia Energética de Minas Gerais – CEMIG and us, among others.

Principal Regulatory Authorities

Ministry of Mines and Energy – MME

The MME is the primary regulatory institution of the power industry and acts as the Brazilian governmental authority empowered with policymaking, regulatory and supervisory powers.

National Energy Policy Council – CNPE

The National Energy Policy Council (Conselho Nacional de Política Energética - “CNPE”), created in August 1997, provides advice to the President of the Republic of Brazil regarding the development and creation of a national energy policy. The CNPE is chaired by the MME and is composed of ten ministers of the Brazilian government and five members designated by the President of CNPE. The CNPE was created in order to optimize the use of energy resources in Brazil and ensure the national supply of electricity.

National Electric Energy Agency – ANEEL

The Brazilian power industry is regulated by ANEEL, an independent federal regulatory agency. ANEEL’s primary responsibility is to regulate and supervise the power industry in accordance with the policies set forth by the MME and to respond to matters which are delegated to it by the Brazilian government and the MME. ANEEL’s current responsibilities include, among others, (i) administering concessions for electric energy generation, transmission and distribution, including the approval of electricity tariffs, (ii) enacting regulations for the electric energy industry, (iii) implementing and regulating the utilization of energy sources, including the use of hydroelectric power, (iv) promoting, monitoring and managing the public bidding process for new concessions, (v) settling administrative disputes among electricity sector entities and electricity purchasers, and (vi) defining the criteria and methodology for the determination of transmission and distribution tariffs.

National Electric System Operator – ONS

The ONS is a non-profit private entity comprised of electric utilities engaged in the generation, transmission and distribution of electric energy, in addition to other private participants such as importers, exporters and Free Customers. The primary role of the ONS is to coordinate and regulate the generation and transmission operations in the Interconnected Transmission System, subject to the ANEEL’s regulation and supervision. The objectives and principal responsibilities of the ONS include, among others, operational planning for the generation industry, organizing the use of the domestic Interconnected Transmission System and international interconnections, ensuring that industry participants have access to the transmission grid in a non-discriminatory manner, assisting in the expansion of the electric energy system, proposing plans to the MME for extensions of the Interconnected Transmission System, and formulating regulations regarding the operation of the transmission system for ANEEL’s approval.

 
57 
 
 

Electric Energy Trading Chamber – CCEE

The CCEE (Câmara de Comercialização de Energia Elétrica) is a non-profit private entity subject to authorization, inspection and regulation by ANEEL. The CCEE is responsible for, among other things, (i) registering all energy purchase agreements in the regulated market, Contratos de Comercialização de Energia no Ambiente Regulado (“CCEAR”) and in the Free Market, (ii) accounting for and clearing short-term transactions and (iii) managing funds generated by some of the regulatory charges. The CCEE is composed of holders of concessions, permissions and authorizations in the electricity industry and Free Customers, and its board of directors is composed of five members, out of which four are appointed by these agents and one by the MME, who is the chairman of the board of directors.

Energy Sector Monitoring Committee – CMSE

The CMSE (Comitê de Monitoramento do Setor Elétrico) was created by the New Industry Model Law to monitor service conditions and to recommend preventative measures to ensure energy supply adequacy, including demand-side action and contracting of energy reserves.

Energy Research Company – EPE

In August 2004, the Brazilian government created the Energy Research Company (Empresa de Pesquisa Energética - “EPE”), a federal public company responsible for conducting strategic studies and research in the energy sector, including the industries of electric power, petroleum, natural gas, coal and renewable energy sources. The studies and research conducted by the EPE subsidize the formulation of energy policy by the MME.

Eletrobras

Eletrobras serves as a holding company for the following federally-owned energy companies: Companhia Hidro Elétrica do São Francisco – CHESF, Furnas Centrais Elétricas S.A., CGT Eletrosul, Centrais Elétricas do Norte do Brasil S.A. – Eletronorte, Companhia de Geração Térmica de Energia Elétrica – CGTEE and Eletrobras Termonuclear S.A. Eletronuclear, Centro de Pesquisas de Energia Elétrica – Cepel and Itaipu Binacional. Eletrobras manages the commercialization of energy from Itaipu and from alternative energy sources, under the Program for incentive to alternative energy sources (Programa de Incentivo às Fontes Alternativas de Energia – “Proinfa”).

Historical Background of Industry Legislation

The Brazilian constitution provides that the development, use and sale of electric energy may be undertaken directly by the Brazilian government or indirectly through the granting of concessions, permissions or authorizations. Historically, the Brazilian electric energy industry has been dominated by generation, transmission and distribution concessionaires controlled by the federal or state governments. Since 1995, the Brazilian government has taken a number of measures to reform the Brazilian electric energy industry. in general, these measures were aimed at increasing the role of private investment and eliminating foreign investment restrictions in order to increase overall competition and productivity in the industry.

The following is a summary of the principal developments in the regulatory and legal framework of the Brazilian electricity sector:

·In 1995, (i) the Brazilian constitution was amended to authorize foreign investment in power generation; (ii) the Concessions Law was enacted, requiring that all concessions for energy-related services be granted through public bidding processes, providing for the creation of independent producers and Free Customers and granting electricity suppliers and Free Customers open access to all distribution and transmission systems; and (iii) a portion of the controlling interests held by Eletrobras and various Brazilian states in generation and distribution companies were sold to private investors.
·In 1998, the Power Industry Law was enacted, providing for, among other things, the creation of the ONS and the appointment of National Bank for Economic and Social Development, or Banco Nacional de Desenvolvimento Econômico e Social (“BNDES”), a development bank wholly owned by the Brazilian government, as the financing agent of the power industry, especially to support new generation projects.
 
58 
 
 
·In 2001, Brazil faced a serious energy crisis that lasted through February 2002. During this period, the Brazilian government implemented an energy-rationing program in the most adversely affected regions, namely the southeast, central-west and northeast regions of Brazil. In April 2002, the Brazilian government for the first time implemented the extraordinary tariff adjustment to compensate the electricity suppliers for financial losses incurred as a result of the rationing period.
·In 2004, the Brazilian government enacted the New Industry Model Law (Law No. 10,848), in an effort to further restructure the power industry with the ultimate goal of providing customers with a stable supply of electricity at reasonable prices. The New Industry Model Law introduced material changes to the regulation of the electric energy industry, in order to (i) provide incentives to private and public entities to build and maintain generation capacity, and (ii) ensure the supply of electricity in Brazil at low tariffs through a competitive electricity public bidding process. The key elements of the New Industry Model Law include:
oEnsuring the existence of two markets: (i) the regulated market, a more stable market in terms of supply of electricity, and (ii) a market specifically addressed to certain participants (i.e., Free Customers and energy-trading companies), called the Free Market, that permits a certain degree of competition vis-à-vis the regulated market.
oRestrictions on certain distribution activities, including requiring distributors to focus on their core business of distribution activities in order to promote more efficient and reliable services to Captive Customers.
oElimination of self-dealing by providing an incentive for distributors to purchase electricity at the lowest available prices rather than buying electricity from related parties.
oUpholding contracts executed prior to the New Industry Model Law, in order to provide regulatory stability for transactions carried out before its enactment.
·In 2004, Decree No. 5,163 was enacted to governor the purchase and sale of electricity in the regulated market and the Free Market, as well as the granting of authorizations and concessions for electricity generation projects. This decree includes, among other items, rules relating to auction procedures, the form of power purchase agreements and the mechanism for passing costs through to Final Customers. Among other matters, this decree:
oprovides for the guidelines under which electricity-purchasing agents must contract their electricity demand. Electricity-selling agents must show that the energy to be sold comes from existing or planned power generation facilities. Agents that do not comply with such requirements are subject to penalties imposed by ANEEL.
orequires electricity distribution companies to contract for 100% of their energy needs primarily through public auctions. In addition to these auctions, distribution companies can purchase limited amounts (up to 10% of their demand) from: (i) generation companies that are connected directly to a distribution company (except for hydroelectric power plants with capacity higher than 30 MW and certain thermoelectric power plants) (ii) electricity generation projects participating in the initial phase of the Proinfa Program, (iii) the Itaipu Power Plant and (iv) quotas from those generation concession contracts extended or subject to a new competitive bidding process in accordance with the 2013 Concession Renewal Law.
oprovides that the MME shall establish the total amount of energy that will be contracted in the regulated market, including the number and the type of generation projects that will be auctioned each year.
orequires all electricity generation, distribution and trading companies, independent producers and Free Customers to notify MME, by August 1st of each year, of their estimated electricity demand or estimated electricity generation, as the case may be, for each of the subsequent five years. In advance of each electricity auction, each distribution company is also required to inform MME of the amount of electricity that it intends to contract in the auction. In addition, distribution companies are required to specify the portion of the contracted amount they intend to use to supply potentially Free Customers.
 
59 
 
 

·In 2012, the Brazilian government enacted two Provisional Measures that brought important changes to the Brazilian electricity regulatory framework: (i) Provisional Measure No. 577, dated as of August 29, 2012 (converted into Law No. 12,767 dated as of December 27, 2012); and (ii) Provisional Measure No. 579, dated September 11, 2012 (converted into the 2013 Concession Renewal Law). Provisional Measure No. 577 established the obligation of the granting authority to render electricity services in the event of termination of an electricity concession, as well as new rules related to the intervention by the granting authority in electricity concessions to ensure adequate performance of Utility services. The 2013 Concession Renewal Law established new rules that changed concessionaires’ ability to renew concession contracts. Under this Law, generation and distribution concessionaires may renew their concession contracts that were in effect as of 1995 and transmission concessionaires may renew their concession contracts that were in effect prior to and as of 1995 for an additional period of 30 years, provided that the concessionaires agree to amend the concession contracts to reflect a new tariff regime to be established by ANEEL. See “—Concessions”.
·In 2013, the 2013 Concession Renewal Law was enacted. This statute changed the nature of the concession agreements for generation facilities existing at the time. Prior to 2013, a generation concessionaire had the right to sell the energy generated by the facilities subject to its concession for profit. In contrast, generation concessions for existing generation facilities (including those renewed pursuant to the 2013 Concession Renewal Law) could no longer grant concessionaires the right to sell the energy generated by these facilities. Instead, these concessions started to cover the operation and maintenance of the generation facilities. The energy generated by these facilities was then allocated by the Brazilian government in quotas to the regulated market, for purchase by distribution concessionaires. In case of generation facilities created after the 2013 Concession Renewal Law, the concessionaire has the right to sell the energy produced by the facility. For further information, see “—Concessions—2013 Concession Renewal Law.”
·In 2015, the Brazilian government enacted Provisional Measure No. 688, dated as of August 18, 2015, converted into Federal Law No. 13,203, dated as of December 8, 2015, to revise the allocation of the hydrological risks borne by hydroelectric power plants that share hydrological risks under Energy Reallocation Mechanism. In 2014 and 2015, given poor hydrological conditions, the MRE participants generated less electricity than their assured energies, which was confirmed by a significant decrease of the Generating Scaling Factor (“GSF”), a measurement of the proportion between the electricity generated by the MRE participants and their respective assured energy. These generation deficits resulted in losses for the MRE participants given their exposure to hydrological risks. As a consequence, Federal Law No. 13,203 established an optional mechanism that allows each generation plant to transfer these risks to Final Customers upon payment of a risk premium to the Brazilian government, as well as certain temporary extensions of generation concessions to compensate for losses in 2015. We decided to opt-in with respect to all of Copel GeT´s and Elejor´s eligible Energy Agreements under this new hydrological risk allocation mechanism, which represented approximately 16% of Copel GeT´s total assured energy.
·In 2016, the Brazilian government enacted Provisional Measure No. 735, dated as of June 22, 2016, converted into Federal Law No. 13,360, dated as of November 17, 2016, which changed several federal laws mainly to: (i) revise certain rules related to regulatory charges (CDE, CCC and RGE) and appoint CCEE as the new manager of such charges in lieu of Eletrobras; (ii) facilitate the privatization of generation, transmission and distribution companies, (iii) change certain requirements of the generation concession and authorization regimes; (iv) change rules related to the MRE; (v) allow distribution companies to sell energy excess in the Free Market; (vi) extension of terms for commencement of the supply under energy auctions in the regulated market; and (vii) transfer back from MME to ANEEL the authority to decide about generation and transmission companies’ requests for extension of their facilities construction schedules.
·In July 2017, the MME released the Public Consultation No. 033/2017, named “Proposal for improvement of the legal framework of the electricity sector”. This public consultation marks an important step to guide the MME in preparation of specific legislative proposals capable of providing measures of economic rationalization and modernization of the electricity sector.
 
60 
 
 
·In August 2017, Decree No. 9,143/2017 changed the frequency of the auctions for new energy and authorized the distribution companies to negotiate contracts for the sale of energy in the Free Market to Free Consumers and other agents (generators, marketers, and self-producers), provided that these contracts are linked to excess in energy contracted in auctions.
·In January 2018, Decree No 9,271/2018 regulated the granting of a new energy concession in the event of privatization of an energy generation concession holder that provides public services, in accordance with Law No 9.074, dated July 7, 1995. Pursuant to this decree, the Brazilian government may grant a new concession contract for a period of up to 30 years to the entity that results from a bidding process for the privatization of a concessionaire previously controlled directly or indirectly by a federal, state or municipal governmental entity. This decree determined that the concessionaire shall request a new concession contract during the remaining period of its concession (up to 60 months counted from the end of the concession) This decree was amended in November 2019 pursuant to Decree No 10,135 in order to reduce the deadline for the concessionaire to request the granting of a new agreement, from 60 months to 42 months counted from the end of the concession and required the privatization process to be concluded no later than 18 months prior to the termination of the prior concession.
·During 2018, the Brazilian government concluded the privatization of Eletrobras’ distribution companies Companhia Energética do Piauí - Cepisa, Companhia Energética de Rondônia S.A. - Ceron, Companhia de Eletricidade do Acre - Eletroacre, Boa Vista Energia S.A. - Boa Vista Energia, Companhia Energética de Alagoas - Ceal and Amazonas Distribuidora de Energia S.A. - Amazonas Distribuidora.
·In June 2019, the National Energy Policy Council (Conselho Nacional de Política Energética – CNPE) launched a program pursuant to its Resolution No. 16 to boost the natural gas market and foster competition by promoting free competition and using Thermoelectric Plants as a vehicle for creating demand for the better use of natural gas from the Pre-Salt layer.
·In December 2019, MME published the Ordinance No. 465/2019, determining that MME will gradually decrease, over the next years, the power limits to contract electric power by consumers served at any voltage, allowing them to purchase energy from conventional sources, considering the following schedule: (i) from January 1, 2021: consumers with demand equal to or greater than 1,500 kW; (ii) from January 1, 2022: consumers with demand equal to or greater than 1,000 kW; and (iii) January 1, 2023: consumers with demand of 500 kW or more. Furthermore, by January 31, 2022, ANEEL and CCEE shall present studies on the regulatory measures necessary to allow the opening of the Free Market for consumers with electric load below 500 kW.
·In January 2020, the ONS implemented the Short Term Hydrothermal Dispatch Model (Modelo de Despacho Hidrotérmico de Curtíssimo Prazo - DESSEM), in order to optimize the operations of National Interconnected System (Sistema Interligado Nacional – SIN), and to reduce the difference between the planned dispatch and the one that is actually carried out by taking into account factors related to the electric grid, the operation of hydroelectric power plants, Thermoelectric Plants and other sector components. The execution of DESSEM meets the schedule set forth in Ordinance MME nº 301, dated July 31, 2019.
·In September 2020, Law No. 14,052 (the “GSF Law”) was passed, which established new conditions for the renegotiation of hydrological risk of electricity generation, amending Article 2 of Law No. 13,203/2015, among other measures. This procedure was regulated through Normative Resolution No. 895/2020, in which ANEEL established the methodology for calculating compensation to the owners of hydroelectric plants participating in the MRE. It also regulated the repatriation of hydrological risk to equate the issue of GSF and open debts in CCEE to allow for the return of normalcy and greater liquidity in the short-term electricity market, in exchange for the extension of the terms of grants given to hydroelectric plants to up to seven years. The resolution was amended by Normative Resolution No. 945/2021, changing the compensation methodology for plants that renegotiated the hydrological risk under Normative Resolution No. 684/2015. ANEEL later approved the deadlines for the extension of the grant of the plants participating in the MRE through Homologatory Resolutions No. 2,919/2021 and No. 2,932/2021. Those interested in adhering to new mechanism must withdraw from lawsuits related to the mitigation of hydrological risks of the MRE and execute a term of acceptance of such conditions.
 
61 
 
 
·In December 2020, through Normative Resolution No. 905/2020, ANEEL consolidated the rules for Electric Energy Transmission Services in the National Electric System, effective January 1, 2021.
·In January 2021, the CCEE adopted an hourly pricing model for the accounting and settlement of the short-term market. Thus, since January 1, 2021, the PLD is officially calculated for each submarket on an hourly basis, per the implementation schedule defined by MME Directive 301/2019.
·Additionally, 2020 and 2021 were atypical years due to the COVID-19 pandemic, which required the introduction of various legal and regulatory measures, as highlighted below:
oIn March 2020, Decree No. 6 officially declared a state of emergency in Brazil, effective until December 31, 2020. On the same date, Decree no. 10,282 was released (complemented by Decree No. 10,288/2020), which regulated Law No. 13,979/2020 and dealt with the new COVID-19 measures, including directives regarding the operation of public services and essential activities, specifically the electricity sector and electricity generation, transmission and distribution. By means of Decree No. 117/2020, the MME also established a Crisis Committee within the Ministry’s scope to articulate, coordinate, monitor, guide and supervise the measures and actions taken against COVID-19 for the duration of the public health crisis. In line with the guidelines established by this decree, ANEEL issued Decree No. 6,335/2020, the Office of Monitoring the Electrical Situation (Gabinete de Monitoramento da Situação Elétrica), with the objective of identifying the effects of the COVID-19 pandemic on the electrical energy market and monitoring the economic-financial situation in relation to supply and demand, as well as coordinating studies of proposals to preserve equilibrium between different entities within the sector.
oIn March 2020, to ensure the continuity of electricity distribution services, ANEEL issued Normative Resolution No. 878/2020, solidifying the Agency's first measures in order to guarantee the supply of electricity to certain consumer units that have lost the ability to remain compliant as a result of the COVID-19 pandemic. This especially concerns consumer units related to the supply of energy to services and activities considered essential, as defined by Federal Decrees No. 10,282/2020 and No. 10,288/2020.
oOn April 8, 2020, the Brazilian government issued Provisional Measure No. 950, which specified temporary emergency measures for the electricity sector to cope with the state of emergency by establishing an exemption in energy tariffs funded by the CDE for low-income consumers for up to 220 kWh/month, for the period of April 1 to June 30, 2020. For this purpose, resources were provisioned by means of a credit operation aimed at providing financial relief to electricity distributors. On the same date, ANEEL published Order No. 986, authorizing the CCEE to transfer the surplus financial resources available in the reserve fund for future relief to the sector's agents, based on consumption, with the aim of reinforcing the sector's liquidity in the midst of the COVID-19 pandemic.
oOn May 18, 2020, Decree No. 10,350 was issued by the Brazilian government, which regulated Provisional Measure No. 950/2020 and provided for the creation of the COVID-19 Fund. This fund was to receive resources to cover potential deficits or anticipate distributors' revenues and regulate the use of tariffs by the CDE for the purpose of payments and receipts of amounts to cover or defer costs arising from the COVID-19 pandemic. Through Resolution No. 885/2020, ANEEL established criteria and procedures for the management of the COVID-19 Fund. The value of the resources of the COVID-19 Fund given to concessionaires were made operational by the CCEE throughout 2020, considering, for this purpose, the existence of a positive balance in the fund.
oIn May 2020, by means of Order No. 1,511/2020, ANEEL, suspended the systematic application of the system for activating the Tariff Flags (Bandeiras Tarifárias), under exceptional and temporary circumstances, as provided for in Submodule 6.8 of the Procedures for Tariff Regulation. This added a “green flag” through December 31, 2020 to cover the electric sector’s costs with resources from the COVID-19 Fund. This was in effect until November 30, 2020, when it was revoked by ANEEL with the same-day issuance of Order No. 3,364/2020.
 
62 
 
 

oIn September 2020, Provisional Measure No. 998/2020 was issued, due to important changes in the electricity sector rules to mitigate the effects on the consumer due to aid granted to companies as a result of the COVID-19 pandemic. After being approved by the House of Representatives on December 17, 2020 and by the Federal Senate on February 4, 2021, being sanctioned in March 2021 by the President of the Republic, through Law 14.120, of March 1, 2021. With the same purpose, Law No. 14,120 allowed the reallocation of certain P&D and energetic efficiency (EE) resources to the CDE account between 2021 and 2025 for certain projects. New enterprises for renewable energy among others are excluded from this benefit. New projects for hydrological energy with more than 30 MW capacity will be entitled to a discount in tariffs of 50% for 5 years counted a March 2, 2021 and 25% for the subsequent 5 years.
oLaw 14,120/2021 also set a deadline for the definition of guidelines for the government for the granting of certain environmental benefits, aligned with certain efficiency, safety and competitiveness parameters, in connection with the efforts to modernize the electricity sector.
oIn January 2021, the CCEE adopted an hourly pricing model for the accounting and settlement of the short-term market. Thus, since January 1, 2021, the PLD is officially calculated for each submarket on an hourly basis, and implemented pursuant to a schedule defined by MME Directive 301/2019.
oIn April 2021, CNPE Resolution 24/2021 approved the Guidelines on Cybersecurity for the Electricity Sector, as established in CNPE Resolution 1 of February 10, 2021, which created a working group with consideration for prevention, treatment, response and systemic resilience.
oIn April 2021, Law No. 14,134/2021 was approved, establishing the new regulatory framework for the natural gas market in Brazil. This law sets rules for the economic activities of transportation of natural gas through pipelines, and changed the regime for economic exploration of such activity from concession to authorization to be granted by ANP. It also regulated the import, export, treatment, processing, storage and commercialization of natural gas, among other related activities.
oIn May 2021, Decree No. 10,707 was passed to regulate the legal provisions for the suspension of electricity supply to consumers in the Free Market and reserve capacity contracts, with the goal of assuring the continuous supply of electricity.
oIn June 2021, several measures were adopted by the Federal Government to address the scarcity of hydroelectric power. Provisional Measure 1,055/2021 created the Chamber of Exceptional Rules for Hydroelectric Management (“CREG”) to establish emergency measures for the optimization of the use of hydroelectric resources and to combat water shortage, in order to preserve the continuity and security of the electro energetic supply in Brazil. The CREG was entitled to approve urgent measures proposed by the Comitê de Monitoramento do Setor Elétrico (CMSE) and if approved, compliance was mandatory by other regulatory agencies and entities in the sector. Among the measures adopted by CREG, the following stand out: (i) creation of an incentive program for the voluntary reduction of consumption by consumers of Groups A and B in the regulated market; (ii) the regulation of Tariffs Flags, (associating the tarrifs to level of scarcity of water and hydrological shortages); and (iii) the adoption of a simplified procedure to demand reserved capacity from 2022 to 2025.
oIn July 2021, Law No. 14,182 approved the privatization model of Eletrobrás and also set new rules for the purchase of reserve capacity from natural gas thermoelectric plants in several regions of Brazil and the allocation of at least 50% of the demand declared by distributors to hydroelectric plants up to 50 MW in the A-5 and A-6 auctions.
 
63 
 
 

oIn December 2021, the Brazilian government published Provisional Measure No. 1,078/2021, which allows the structuring of credit operations using the Energy Development Account (“CDE”) for amortization, the same structure used for Conta-Covid. This measure mitigates the mismatch between revenues collected from the tariff and the costs of generating energy through loans to distributors to equalize these costs. Decree 10,939/2022 further regulated the matter. Additionally, the measure also provides for the institution of extraordinary tariff flags when necessary.
oIn December 2021, ANEEL published Normative Resolution No. 964/2021, that regulates provides guidelines for cybersecurity policies and activities for the sector.
oIn December 2021, Decree No. 10,893/2021 was published, easing the requirements for the issuance of authorizations to implementation and operation of power plants. It lifted the requirements relating to proof of feasibility to connect to the transmission and/or distribution system for generation projects based on solar, wind, biomass or qualified cogeneration until March 2, 2022.
oIn December 2021, ANEEL published REN No. 1,000/2021, which defines in a simpler and more objective manner the responsibilities of the agents and the procedures to be followed by consumers so that universal access to the electric power service is available in an efficient and valuable manner.

Potential New Regulatory Framework

The following potential changes to the Brazilian regulatory framework may have a direct impact in our operations, as our business is subject to comprehensive regulation by various Brazilian legal and regulatory bodies, especially the MME (which proposes sector policies) and ANEEL (which regulates, supervises and inspects various aspects of our business, including our tariff rates).

·In February 2018, the MME published on its website a report of the public hearing, reflecting the final proposal for improvements to the energy regulatory framework, which were especially motivated by technological, social and environmental matters, as well as difficulties arising from the current business models. Among the discussed topics, the following stand out:
oTermination of the quota system applicable to hydropower plants (HPP) concessions that have been extended or granted through competitive biddings, in accordance with Federal Law No. 12,783/2013, and allocation of part of the economic benefit of grants to the CDE in order to reduce what is charged to the population;
oLowering the minimum thresholds for accessing the Free Market;
oApproach between the short-term price formation and the operating cost of the system;
oWhether energy and ballast (currently combined for commercialization purposes) should be segregated;
oEffects of the migration of consumers to the Free Market;
oMarket for environmental attributes;
oAttraction of foreign capital for investments in the Brazilian energy sector;
oMore efficient tariff discounts;
 
64 
 
 
oAllocation of resources from the global reversion reserve to the transmission segment;
oGuidelines for the use of research and development resources;
oModernization of the regulated market; and
oReduction of judicial disputes regarding the hydrological risk.
·In May 2018, most of the improvements proposed by the MME with respect to the regulatory framework applicable to the energy sector were included in Bill No. 1,917/2015 of the House of Representatives, known as the bill for the energy bill portability (Projeto de Lei da Portabilidade da Conta de Luz). This bill is still subject to analysis in the House of Representatives and, if approved, will depend on further approval by the Senate and the President of Brazil.
·Also, there are initiatives in order to promote the modernization of the energy sector. Ordinance MME No. 187/2019 established a working group in order to develop proposals for the modernization of the energy sector, which released a report in October, 2019 with measures that should be adopted or studied, including topics such as (i) opening of the consumer market; (ii) pricing mechanism for the short-market; (iii) expansion of the Free Market accommodating new technologies and new business models; (iv) Energy Reallocation Mechanism; (v) cost and risk allocation; (vi) introduction of new technologies; and (vii) sustainable distribution services. This working group has been appointed for a 2-year term, which may be extended for 1 additional year.
·In November 2019, the Brazilian government submitted to Brazilian Congress Bill No. 5,877, which, among other matters, address the privatization of Centrais Elétricas Brasileiras S.A. - Eletrobras. Such bill determines the privatization of Eletrobras pursuant to a capital increase and public offering of new common shares (that entitle their holders to voting rights), resulting in the dilution of the stake held by the Brazilian government in Eletrobras (the “Eletrobras Privatization”). In February 2021, Provisional Measure No. 1,031/2021 on the Eletrobras Privatization was issued.
·In November 2019, ANEEL submitted a proposed amendment to Resolution No. 482/2012 to a public hearing. This resolution refers to the distribution of micro and mini energy generation. The update of such rules was required in 2015 by Resolution 687/2015 and suggests improvements to the credit compensation system in view of changes to distributed generation in recent years.
·In December 2019, CNPE approved its Resolution No. 29, pursuant to which (i) it reviewed the general criteria adopted with respect to supply guarantee in studies on offer expansion, planning of the SIN operations, and calculations of assured energy and power of a generation project. However, MME shall determine the specific thresholds for such criteria, which is used in the calculation of assured energy and plans for expansion.
·In 2020, due to the COVID-19 pandemic, discussions beginning in 2017 between the MME and the electric sector with regards to proposals for the industry’s improvement of the legal and regulatory framework were interrupted. This meant limited progress on measures such as PL No. 1,917/2015 and PLS No. 232/2016, which address issues such as the commercial model of the electric sector, the portability of electricity bills and concessions for electric energy generation. The COVID-19 pandemic also allowed for compromise within Special Commission of the House of Representatives, established in August 2019, regarding the Brazilian Electric Energy Code, which aims to consolidate electricity legislation that is currently scattered between ordinances issued by various government agencies. In 2021, the Congress reinitiated the discussions towards PL Nos. 1,917/2015 and PLS No. 232/2016 (now PL No. 414), the later now being labeled a priority bill under consideration of the Congress.
·Nonetheless, there were important legislative developments in 2021 and 2022 in relation to distributed generation, including the approval of legal framework for micro and mini distributed generation, and the creation of the Electric Energy Compensation System (Sistema de Compensação de Energia Elétrica - SCEE) and the Social Renewable Energy Program (Programa de Energia Renovável Social - PERS).
 
65 
 
 
·Additionally, CCEE published two relevant Technical Notes. The first suggests mechanisms to improve the monitoring of the electricity energy market, as well as the regulation of the commercialization of electricity, by the adoption of new procedures to identify market risks and anomalous conduct, supported by the practices and principles adopted in the financial market. The second one proposes improvements to the models of financial safeguards and mechanisms to mitigate losses arising from defaults in the Spot Market. ANEEL will deliberate on whether to submit the proposals to public hearing.

These potential changes to the regulatory framework applicable to the Brazilian Energy Sector may impact our operations in the coming years.

Concessions

The companies or consortia that wish to build or operate facilities for generation, transmission or distribution of electricity in Brazil must participate in a competitive bidding process or must apply to the MME or to ANEEL for a concession, permission or authorization, as the case may be. Concessions grant rights to generate, transmit or distribute electricity in a specific concession area for a specified period. This period is 35 years for generation concessions granted after 2003, and 30 years for new transmission or distribution concessions. In accordance with the 2013 Concession Renewal Law, generation and distribution concessionaires may renew their concession contracts that were in effect as of 1995 and transmission concessionaires may renew their concession contracts that were in effect prior to and as of 1995 for an additional period of 30 years, provided that the concessionaires agree to amend the concession contracts to reflect certain new terms and conditions established by the law. The 2013 Concession Renewal Law does not impact generation concessions granted after 2003, as they are non-renewable.

The Concessions Law establishes, among others, the conditions that the concessionaire must comply with when providing electricity services, customers’ rights and the respective rights and obligations of the concessionaire and the granting authority. In addition to the Concessions Law, the concessionaire must also comply with the general regulations governing the electricity sector. The main provisions of the Concessions Law and related ANEEL regulations are summarized as follows:

Adequate service. The concessionaire must render adequate service to all customers in its concession and must maintain certain standards with respect to regularity, continuity, efficiency, safety and accessibility.

Use of land. The concessionaire may use public land or request that the granting authority expropriate necessary private land for the benefit of the concessionaire. In the latter case, the concessionaire must compensate the affected private landowners.

Strict liability. The concessionaire is strictly liable for all damages arising from the provision of its services.

Changes in controlling interest. The granting authority must approve any direct or indirect change in the concessionaire’s controlling interest.

Intervention by the granting authority. The granting authority may intervene in the concession, through ANEEL, to ensure the adequate performance of services, as well as the full compliance with applicable contractual and regulatory provisions. Once ANEEL determines the intervention, limited to one year, but extendable for additional two years, it must designate a third party to manage the concession. Within 30 days of the determination of the intervention, the granting authority’s representative must commence an administrative proceeding in which the concessionaire is entitled to contest the intervention. The administrative proceeding must be completed within 1 year. The shareholders of the concessionaire under intervention must submit to ANEEL, within 60 days of the determination of the intervention, a recovery and correction plan. If ANEEL approves such plan, the intervention is terminated. In the event ANEEL does not approve the plan, the granting authority may: (i) declare forfeiture of the concession; (ii) determine the spin-off, incorporation, merger or transformation of the concessionaire, incorporation of a subsidiary or assignment of quotas/shares to a third party; (iii) determine the change of control of the concessionaire; (iv) determine a capital increase of the concessionaire; or (v) determine the incorporation of a special purpose company.

Termination of the concession. The termination of the concession agreement may occur by means of expropriation and/or forfeiture. Expropriation is the early termination of a concession for reasons related to the public interest. An expropriation must be specifically approved by law or decree. Forfeiture must be declared by the granting authority after ANEEL or the MME has made a final administrative ruling that the concessionaire, among other things, (i) has failed to render adequate service or comply with an applicable law or regulation, (ii) no longer has the technical, financial or economic capacity to provide adequate service, or (iii) has not complied with penalties assessed by the granting authority. The concessionaire may contest any expropriation or forfeiture in the courts.

 
66 
 
 

A concession agreement may also be terminated (i) through the mutual agreement of the parties, (ii) upon the bankruptcy or dissolution of the concessionaire, or (iii) following a final, non-appealable judicial decision rendered in a proceeding filed by the concessionaire.

When a concession agreement is terminated, all assets, rights and privileges that are materially related to the rendering of electricity services revert to the Brazilian government. Following termination, the concessionaire is entitled to indemnification for its investments in assets that have not been fully amortized or depreciated, after deduction of any amounts due by the concessionaire related to fines and damages.

Expiration. When the concession expires, all assets, rights and privileges that are materially related to the rendering of the electricity services revert to the Brazilian government. Following the expiration, the concessionaire is entitled to indemnification for its investments in assets that have not been fully amortized or depreciated as of the expiration.

Penalties. ANEEL regulations govern the imposition of sanctions against electricity sector participants and determine the appropriate penalties based on the nature and importance of the breach (including warnings, fines, temporary suspension from the right to participate in bidding procedures for new concessions, licenses or authorizations and forfeiture). For each infraction, the fines can be up to 2% of the revenue (net of value-added tax and services tax) of the concessionaire in the 12-month period preceding any penalty notice. Some infractions that may result in fines relate to the failure to request ANEEL’s approval to, among other things: (i) execute certain contracts between related parties; (ii) sell or assign the assets related to services rendered as well as impose any encumbrance (including any security, bond, guaranty, pledge and mortgage) on these or any other assets related to the concession or the revenues from electricity services; (iii) effect a change in the controlling interest of the holder of the authorization or concession; and (iv) make certain changes to the bylaws. In the case of contracts executed between related parties that are submitted for ANEEL’s approval, ANEEL may seek to impose restrictions on the terms and conditions of these contracts and, in extreme circumstances, require that the contract be rescinded.

Parallel Environment for the Trading of Electric Energy

Under the New Industry Model Law, the purchase and sale of electricity is carried out in two different segments: (i) the regulated market, which contemplates that distribution companies will purchase by public auction all the electricity they need to supply their customers; and (ii) the Free Market, which provides for the purchase of electricity by non-regulated entities (such as the Free Customers and energy traders).

However, the electricity arising from the following is subject to specific rules different from the rules applicable to the regulated market and to the Free Market: (i) low capacity generation projects located near consumption points (such as certain co-generation plants and small hydroelectric power plants), (ii) plants qualified under the Proinfa Program, an initiative established by the Brazilian government to create incentives for the development of alternative energy sources, such as wind power projects, small hydroelectric power plants and biomass projects, (iii) Itaipu, (iv) Angra 1 and 2 as from 2013 and (v) those generation concession contracts extended or subject to a new bidding process in accordance with the 2013 Concession Renewal Law.

The electricity generated by Itaipu will continue to be sold by Eletrobras to the distribution concessionaires operating in the South, Southeast and Midwest portions of the Interconnected Transmission System. The rates at which Itaipu-generated electricity is traded are denominated in U.S. dollars and established pursuant to a treaty between Brazil and Paraguay. As a consequence, Itaipu rates rise or fall in accordance with the variation of the real/U.S. dollar exchange rate. Changes in the price of Itaipu-generated electricity are, however, subject to the Parcel A cost recovery mechanism discussed as follows under “–Distribution Tariffs”.

Beginning January 2013, the energy generated by nuclear plants Angra 1 and 2 started to be sold by Eletronuclear to the distribution concessionaires at a rate calculated by ANEEL.

 
67 
 
 

The New Industry Model Law does not affect Bilateral Agreements entered into before 2004.

The Regulated Market

In the regulated market, distribution companies must purchase their expected electricity requirements for their Captive Customers in the regulated market through a public auction process. The auction process is administered by ANEEL, either directly or through the CCEE, under certain guidelines provided by the MME.

Electricity purchases are generally made through three types of Bilateral Agreements: (i) Energy Agreements (Contratos de Quantidade de Energia), (ii) Availability Agreements (Contratos de Disponibilidade de Energia) and (iii) allocation of energy quotas, as defined by the ANEEL. Under an Energy Agreement, a generator commits to supply a certain amount of electricity and assumes the risk that its electricity supply could be adversely affected by hydrological conditions and low reservoir levels, among other conditions, which could interrupt the supply of electricity. In such case, the generator would be required to purchase electricity elsewhere in order to comply with its supply commitments. Under an Availability Agreement, a generator commits to making a certain amount of capacity available to the regulated market. In such case, the generator’s revenue is guaranteed and the distributors must bear the risk of a supply shortage. With respect to the third method (introduced by the 2013 Concession Renewal Law), the plants that have had their concession renewed under the 2013 Concession Renewal Law lost the right to sell their energy, and from now on will only receive compensation under the energy quota system as a result of the operation and maintenance of such facilities. As a result, energy generated by these generation concessionaires are passed on to distributors at a lower cost through quotas that match the size of the markets served.

With respect to the generation plants with expired concessions, which are subject to a new competitive bidding process, the winner of the competitive bidding process may be required to allocate up to 100% of the energy generated by this plant in quotas to the regulated Market depending on the criteria adopted in the relevant auction process.

The estimate of demand from distributors is the principal factor in determining how much electricity the system as a whole will contract. A distributor is obligated to contract all of its projected electricity needs. A deviation in actual demand from projected demand could result in penalties to distributors. In the event of under-contracting, the distributor is penalized directly in an amount that increases as the difference between the amounts of energy contracted for and actual demand increases. An under-contracting distributor must also pay to meet its demand by purchasing energy in the Spot Market.

In the event of over-contracting, where the contracted volume falls between 100% and 105% of actual demand, the distributor is not penalized and the additional costs are compensated customers’ tariffs. Where the contracted volume is over 105% of actual demand, the distributor must sell energy in the Spot Market. If the contract price proves lower than the current Spot Market price, the distributor sells its excess energy for a profit. On the other hand, if the contract price is higher than the Spot Market price, the distributor sells its excess energy at a loss. The Federal Law No. 13,360, dated November 17, 2016, also permitted the sale of excess energy by distribution companies in the Free Market. Resolutions No. 833, dated December 4, 2018 and 904, dated December 8, 2020, have recently provided additional rules on the methodology to be adopted by distribution companies with respect to the Mechanism of Surplus Sales (Mecanismo de Venda de Excedentes, or MVE).

With respect to the granting of new concessions, regulations provide that bids for new hydroelectric generation facilities may include, among other things, the minimum percentage of electricity to be supplied in auctions in the regulated market. Concessions for new generation projects, such as Mauá and Colíder in our case, are non-renewable, meaning that upon expiration, the concessionaire must again complete a competitive bidding process.

The Free Market

The Free Market covers transactions between generation concessionaires, Independent Power Producers – IPPs, self-generators, energy traders, exporters and importers of electric energy and Free Customers. The Free Market also covers bilateral agreements between generators and distributors signed under the old model, until they expire. Upon expiration, such contracts must be executed under the New Industry Model Law guidelines.

A consumer that is eligible to choose its supplier may only do so upon the expiration of its contract with the local distributor and with advance notice or, in the case of a contract with no expiration date, upon 15 days’ notice in advance of the date on which the distributor must provide MME with its estimated electricity demand for the year. In the latter case, the contract will only be terminated in the following year. Once a consumer has chosen the Free Market, it may only return to the regulated system with five years prior notice to its regional distributor, provided that the distributor may reduce such term at its discretion. This extended period of notice seeks to assure that, if necessary, the distributor can buy additional energy in auctions on the regulated market without imposing extra costs on the captive market.

 
68 
 
 

Private generators may sell electricity directly to Free Customers. State-owned generators may sell electricity directly to Free Customers but are obligated to do so only through private auctions carried out by the state-owned generators exclusively to Free Customers or by the Free Customers.

As mentioned above, recently, Federal Law No. 13,360, dated November 17, 2016, also permitted the sale of excess energy by distribution companies in the Free Market, but the effectiveness of the rule is still subject to further regulation by ANEEL.

Focusing on the future of the electricity sector, the Ministry of Mines and Energy launched Public Consultation No. 33/2017 with the purpose of obtaining the view of different participants around improvements in the business model of the sector. Issues such as the expansion of the Free Market and removal of barriers to the entry of its participants, hourly energy price, adequate allocation of risks, security of supply and socio-environmental sustainability were discussed. Further regulation is expected for the years to come with bills being discussed in the Brazilian Congress in order to implement reforms in the power sector. For more information see “–Potential New Regulatory Framework”.

Regulation under the New Industry Model Law and further rules enacted

A July 2004 decree governs the purchase and sale of electricity in the regulated market and the Free Market, as well as the granting of authorizations and concessions for electricity generation projects. This decree includes, among other items, regulations relating to auction procedures, the form of power purchase agreements and the mechanism for passing costs through to Final Customers.

These regulations establish the guidelines under which electricity-purchasing agents must contract their electricity demand. Electricity-selling agents must show that the energy to be sold comes from existing or planned power generation facilities. Agents that do not comply with such requirements are subject to penalties imposed by ANEEL.

These regulations also require electricity distribution companies to contract for 100% of their energy needs primarily through public auctions. In addition to these auctions, distribution companies can purchase limited amounts (up to 10% of their demand) from: (i) generation companies that are connected directly to the distribution company (except for hydroelectric power plants with capacity higher than 30 MW and certain thermoelectric power plants) (ii) electricity generation projects participating in the initial phase of the Proinfa Program, (iii) the Itaipu Power Plant and (iv) quotas from those generation concession contracts extended or subject to a new competitive bidding process in accordance with the 2013 Concession Renewal Law.

The MME establishes the total amount of energy that will be contracted in the regulated market, the number and the type of generation projects that will be auctioned each year.

All electricity generation, distribution and trading companies, independent producers and Free Customers are required to notify MME, by August 1st of each year of their estimated electricity demand or estimated electricity generation, as the case may be, for each of the subsequent five years. In advance of each electricity auction, each distribution company is also required to inform MME of the amount of electricity that it intends to contract in the auction. In addition, distribution companies are required to specify the portion of the contracted amount they intend to use to supply potentially Free Customers.

Auctions in the Regulated Market

Electricity auctions for new generation projects are held from the third to the seventh year before the initial delivery date of electricity. Electricity auctions for existing generation projects are held (i) from the first to the fifth year before the initial delivery date, and (ii) up to four months before the initial delivery date (“Adjustment Auctions”).

 
69 
 
 

New and existing power generators may participate in the Reserve Energy Auctions as long as these generators increase the power system capacity or if they did not achieve commercial operation by January 2008. Invitations to bid in the auctions are prepared by ANEEL in accordance with guidelines established by the MME, including the requirement that the lowest bid wins the auction. Each generation company that participates in the auction executes a contract for the purchase and sale of electricity with each distribution company, in proportion to the distribution companies’ respective estimated demand for electricity, except for the market adjustment and Reserve Energy Auctions.

The contracts for new generation projects have a term between 15 and 35 years, and the contracts for existing generation projects have a term between 1 and 15 years. Contracts arising from market Adjustment Auctions are limited to a two-year term. The reserve energy contracts are limited to a 35-year term.

The quantity of energy contracted from existing generation facilities may be reduced for three reasons: (i) to compensate for Captive Customers that become Free Customers; (ii) to compensate for market deviations from the estimated market projections (up to 4% per year of the annual contracted amount, beginning two years after the initial electricity demand is estimated); and (iii) to adjust the quantity of contracted energy in bilateral agreements entered into prior to the enactment of the New Industry Model Law.

With regard to (i) above, the reduction in net revenue caused when a Captive Customer becomes a Free Customer is partially compensated by the increased amounts that Free Customers are required to pay to use our distribution system. However, a Free Customer may disconnect from our distribution grid (and therefore cease to pay us a distribution tariff) if it chooses to connect directly to the Interconnected Transmission System or if it generates energy for self-consumption and transports this energy without using our distribution grid. Because a Free Customer that connects directly to the Interconnected Transmission System no longer pays us a distribution tariff, we might not be able to fully recover this loss in revenues.

Since 2004, CCEE has conducted thirty three (33) auctions for new generation projects, twenty five (25) auctions for energy from existing power generation facilities, ten (10) auctions for reserve energy in order to increase energy supply security, three (3) auctions from alternative energy sources, seventeen (17) auctions for market adjustments, one (1) simplified competitive procedures and one (1) capacity reserve auction. No later than August 1 of each year, the generators and distributors provide their estimated electricity generation or estimated electricity demand for the five subsequent years. Based on this information, MME establishes the total amount of electricity to be traded in the auction and determines which generation companies will participate in the auction. The auction is carried out electronically in two phases.

After the completion of the auction (except in the case of Reserve Energy Auction), generators and distributors execute the CCEAR, in which the parties establish the price and amount of the energy contracted in the auction. The price is adjusted annually based on price variations published by the IPCA. The distributors grant financial guarantees to the generators (mainly receivables from the distribution service) to secure their payment obligations under the CCEAR.

Also, after completion of the Reserve Energy Auction, the generation concessionaire and the CCEE execute the Contrato de Energia de Reserva, in which the parties establish the price and amount of the energy contracted for in the auction. The distributors, Free Customers and self-producing customers then execute the Contrato de Uso da Energia de Reserva (“CONUER”) with CCEE, in order to provide for the terms of the use of the reserve energy. The reserve energy customers grant financial guarantees to CCEE to secure their payment obligations under CONUER.

The 2013 Concession Renewal Law established that generation concessions entered into prior to 2003 that were not renewed would be subject to a new competitive bidding process and that the energy generated by these facilities will be allocated by the Brazilian government in quotas to the regulated market, for purchase by distribution concessionaires. On November 25, 2015, ANEEL carried out a competitive bidding process for the grant of new 30-year concessions of 29 hydroelectric plants in accordance with the 2013 Concession Renewal Law. Until December 31, 2016, 100% of the electricity generated by such 29 hydroelectric plants must be destined to the regulated market and, as of January 1, 2017, the percentage was reduced to 70%. On September 27, 2017, the ANEEL carried another competitive bidding process for the grant of new 30-year concessions of 4 hydroelectric plants in accordance with the 2013 Concession Renewal Law. In this auction, the percentage destined to the regulate market was 70% since the beginning of the concession.

 
70 
 
 

The Annual Reference Value

Brazilian regulation establishes a mechanism (“Annual Reference Value”) that limits the costs that can be passed through to Final Customers.

The regulation establishes certain limitations on the ability of distribution companies to pass-through costs to customers, such as no pass-through of costs for electricity purchases that exceed 105% of actual demand.

The MME establishes the maximum acquisition price for electricity generated by existing projects. If distributors do not comply with the obligation to fully contract their demand, the pass-through of costs from energy acquired in the short-term market is the lower of the Spot Market price and the Annual Reference Value.

Electric Energy Trading Convention

The Electric Energy Trading Convention (Convenção de Comercialização de Energia Elétrica) regulates the organization and functioning of the CCEE and defines, among other things, (i) the rights and obligations of CCEE participants, (ii) the penalties to be imposed on defaulting agents, (iii) the means of dispute resolution, (iv) trading rules in the regulated and Free Markets, and (v) the accounting and clearing process for short-term transactions.

Restricted Activities of Distributors

Distributors in the Interconnected Transmission System are not permitted to (i) engage in activities related to the generation or transmission of electric energy, (ii) hold, directly or indirectly, any interest in any other company, corporation or strategic agreement, or (iii) engage in activities that are unrelated to their respective concessions, except for those permitted by law or the relevant concession agreement. According to Law No. 13,360/2016, distributors are allowed to sell energy to Free Customers. This possibility is regulated by ANEEL through REH No. 904/2020, with the application of the MVE.

Elimination of Self-Dealing

Since the purchase of electricity for Captive Customers is now performed through auctions in the regulated market, “self-dealing” (under which distributors were permitted to meet up to 30% of their energy needs using energy that was either self-produced or acquired from affiliated companies) is no longer permitted.

Challenges to the Constitutionality of the New Industry Model Law

The New Industry Model Law is currently being challenged on constitutional grounds before the Brazilian Supreme Court. The Brazilian government moved to dismiss the actions, arguing that the constitutional challenges were moot because they related to a provisional measure that had already been converted into law. To date, the Supreme Court has not reached a final decision and we do not know when such a decision may be reached. While the Supreme Court is reviewing the law, its provisions have remained in effect. Regardless of the Supreme Court’s final decision, certain portions of the New Industry Model Law relating to restrictions on distributors performing activities unrelated to the distribution of electricity, including sales of energy by distributors to Free Customers and the elimination of self-dealing, are expected to remain in full force and effect.

Tariffs for the Use of the Distribution and Transmission Systems

ANEEL regulates access to the distribution and transmission systems and establishes tariffs for the use of these systems. The tariffs are (i) distribution system usage charges, which are charges for the use of the proprietary local grid of distribution companies (“TUSD”) and (ii) for the use of the transmission system, which is the Interconnected Transmission System and its ancillary facilities (“TUST”).

TUSD

Users of a distribution grid pay the distribution concessionaire a tariff known as the TUSD (Tarifa de Uso dos Sistemas Elétricos de Distribuição). The TUSD is divided into two parts: one related to the contracted power in R$/kW and another related to the regulatory charges in R$/kWh. The amount paid by the users of a distribution grid is calculated by multiplying the maximum contracted power for each of the customer’s points of connection to the concessionaire’s distribution grid, by the tariff in R$/kW, plus the product of the power consumption by the tariff in R$/kWh, per month.

 
71 
 
 

In relation to the Captive Customers, the TUSD is part of the supply tariff that is calculated based on the voltage used by each customer.

TUST

The TUST (Tarifa de Uso do Sistema de Transmissão) is paid by distribution companies, generators and Free Customers to transmission companies for the use of the Interconnected Transmission System (electrical transmission system with a voltage equal or higher than 230 kV). This tariff is revised annually according to (i) the location of the user of the Interconnected Transmission System and (ii) the annual revenues that a transmission company is permitted to collect for the use of its assets in the Interconnected Transmission System. The ONS, an entity that represents all transmission companies that own assets in the Interconnected Transmission System, coordinates the payment of transmission tariffs to these transmission companies. Users of the Interconnected Transmission System sign contracts with the ONS, which allows them to use the transmission grid in return for paying TUST.

Distribution Tariffs

Distribution tariff rates to Final Customers are subject to review by ANEEL, which has the authority to adjust and review these tariffs in response to changes in energy purchase costs and market conditions. When adjusting distribution tariffs, ANEEL divides the costs of distribution companies into (i) costs that are beyond the control of the distributor, (“Parcel A costs”), and (ii) costs that are under control of distributors (“Parcel B costs”). ANEEL’s tariff adjustment formula treats these two categories differently.

Parcel A costs include, among others, the following:

·costs of electricity purchased by the concessionaire to attend Captive Customers, in accordance to the regulatory model in force;
·charges for the connection to and use of the transmission and distribution grids; and
·energy sector regulatory charges.

Parcel B costs include, among others, the following:

·a component designed to pay the distributor for the investments made by the distributor on the concession assets;
·depreciation costs; and
·a component designed to compensate the distributor for its operating and maintenance costs.

Each distribution company’s concession agreement provides annual adjustments. In general, Parcel A costs are fully passed through to customers. Parcel B costs, however, are adjusted for inflation in accordance with the IPCA Index, minus the X factor.

Electricity distribution concessionaires are also entitled to periodic tariff revisions (revisão periódica) every four or five years. In these processes, Parcel B is recalculated, taking into account incentives for efficiency, quality improvement and reasonable tariff. These revisions are aimed at (i) assuring necessary revenues to cover efficient Parcel B operational costs and adequate compensation for investments deemed essential for services provided within the scope of each such company’s concession and (ii) determining the “X factor”. The fifth amendment to our concession agreement, which establishes the renewal of our concession agreement, determines the Periodic Tariff Review every five years.

The X factor for each distribution company is calculated based on the following components:

·P, based on the concessionaire’s productivity, which is calculated through the productivity of the distribution segment (PTF), determined by the relation between the variation of the billed market and the operating and capital costs, plus the average growth of the billed market and the consumer units of the concessionaire itself;
 
72 
 
 

·T, based on the trajectory of the concessionaire’s operating costs, measured as the difference between the cost benchmarks established by ANEEL and the concessionaire’s actual operating costs; and
·Q, based on quality target indicators that measure the interruption of energy supply to Final Customers, and other quality indicators.

In addition, a distribution concessionaire may request an Extraordinary Tariff Review of its tariffs in case of evident economic-financial imbalance, according to the admissibility criteria established through the Tariff Regulation Procedures (PRORET), sub-module 2.9. Extraordinary tariff adjustments were granted (i) in June 1999 to compensate for increased costs of electricity purchased from Itaipu as a result of the devaluation of the real against the dollar; (ii) in 2000 to compensate for the increase in Social Security Financing Contribution (Contribuição para o Financiamento da Seguridade Social - COFINS) from 2% to 3%; (iii) in December 2001 to compensate for losses caused by the Rationing Program; (iv) in January 2013, due to the enactment of 2013 Concession Renewal Law; (v) in March 2015, to compensate the costs related to the quotas of the CDE and increased costs with the purchase of energy, and (vi) in March 2017, to compensate the amount unduly included in the tariffs for captive consumers in 2016, referring to the Angra III plant.

Since October 2004, on the date of a subsequent tariff adjustment or tariff revision, whichever occurs earlier, distribution companies have been required to execute separate contracts for the connection and use of the distribution grid and for the sale of electricity to their potentially Free Customers.

Tariff Flags (Bandeiras Tarifárias)

Effective as of January 1, 2015, a new system has been introduced by the ANEEL to permit distribution concessionaires to pass on to their Final Customer certain variable cost increases attributable to changes in hydrological conditions in Brazil, prior to the formal tariffs periodic revisions made by ANEEL.

In accordance with this model, a green, yellow or red flag, as determined by ANEEL, is included in invoices sent to Final Customers, reflecting nationwide hydrological conditions (except for the State of Roraima). If a green flag is added to Final Customers’ invoices due to satisfactory hydrological conditions, no additional charges are added. On the other hand, if these invoices contain yellow or red flags, this indicates that distribution concessionaires are facing higher variable costs from the acquisition of electricity and will pass these costs on to Final Customers.

Incentives

In 2000, a Federal decree created the Thermoelectric Priority Program, (Programa Prioritário de Termoeletricidade, or “PPT”), for the purposes of diversifying the Brazilian energy matrix and decreasing Brazil’s strong dependence on hydroelectric plants. The incentives granted to the Thermoelectric Plants included in the PPT were: (i) guarantee of gas supply for 20 years, as per a MME regulation, (ii) assurance that the costs related to the acquisition of the electric energy produced by Thermoelectric Plants will be passed on to customers through tariffs up to the normative value established by ANEEL, and (iii) guarantee of access to a special BNDES financing program for the electric energy industry.

In 2002, the Brazilian government established the Proinfa Program to encourage the generation of alternative energy sources. Under the Proinfa Program, Eletrobras would purchase the energy generated by alternative sources for a period of 20 years. In its initial phase, the Proinfa Program was limited to a total contracted capacity of 3,300 MW. In its second phase, which should start after the 3,300 MW cap has been reached, the Proinfa Program intends to purchase up to 10% of Brazil’s annual electric energy consumption from alternative sources. The first phase of the Proinfa program commenced in 2004 and it so far has supported the construction of 131 alternative energy plants which is expected to reach the production of 11.2 million MWh. According to a decision of ANEEL, the total investment to the Proinfa Program in 2022 will be R$ 6.38billion.

 
73 
 
 

Energy Sector Regulatory Charges

EER

The Encargo de Energia de Reserva (“EER”) is a regulatory charge designed to raise funds for energy reserves that have been contracted through CCEE and which are deposited in the Reserve Energy Account (Conta de Energia de Reserva – CONER). These energy reserves, which are mandatory, were created in order to attempt to ensure a sufficient supply of energy in the Interconnected Transmission System. The EER shall be collected from Final Customers of the Interconnected Transmission System. Beginning in 2010, this charge has been collected on a monthly basis.

RGR Fund

In certain circumstances, electric energy companies are compensated for certain assets used in connection with a concession if the concession is revoked or is not renewed. In 1971, the Brazilian Congress created a reserve fund designed to provide these compensatory payments (“RGR Fund”). In February 1999, ANEEL established a fee requiring public-industry electric companies to make monthly contributions to the RGR Fund at an annual rate equal to 2.5% of the company’s fixed assets in service, not to exceed 3% of total operating revenues in any year. Since the enactment of the 2013 Concession Renewal Law, the RGR Fund has been used to fund the compensations arising from the termination of non-renewed concessions. The 2013 Concession Renewal Law also allowed the funds from the RGR Fund to be transferred to the CDE.

According to 2013 Concession Renewal Law, as from January 1, 2013, the concession contracts from concessionaires of (i) distribution; (ii) transmission which competitive bidding process occurred after September 12, 2012; and (iii) transmission and generation which had their concession contract renewed or had their underlying facilities subject to a new competitive bidding process are no longer obliged to pay the annual RGR fee.

UBP

Some hydroelectric generation enterprises (except small hydroelectric power plants) are required to make contributions for using a public asset, Uso de Bem Público (“UBP”) according to the rules of the corresponding public bidding process for the granting of concessions. Eletrobras receives the UBP payments in a specific account. See Note 26 to our audited consolidated financial statements.

ESS

The costs related to maintaining system reliability and stability when Thermoelectric Plants generate energy to meet demand in the National Connection System (SIN) are called System Service Charges, or Encargos de Serviços de Sistema (ESS). These amounts are paid by each entity that purchases energy in the Spot Market (CCEE), proportional to each such entity’s consumption.

ESS is expressed in R$/MWh and paid only to Thermoelectric Plants that generate energy in response to requests by the ONS.

CDE

In 2002, the Brazilian government instituted the Electric Energy Development Account, Conta de Desenvolvimento Energético (“CDE”). The CDE is funded by (i) annual payments made by concessionaires for the use of public assets, (ii) penalties imposed by ANEEL, (iii) the annual fees paid by agents offering electric energy to Final Customers, by means of an additional charge added to the tariffs for the use of the transmission and distribution grids and (iv) transfer of resources from the Federal General Budget. The CDE was originally created, amongst others, to promote the availability of electric energy services to all of Brazil and the competitiveness of the energy produced by alternative sources.

Currently, CDE aims to fund several public policies in the Brazilian electricity sector, such as: universalization of the electricity service throughout the national territory; granting of tariff discounts to various users of the service (low income; rural; Irrigating; public water, sewage and sanitation services; incentive energy generation and consumption, etc.); low tariff on isolated electricity systems (Fuel Consumption Account - CCC); competitiveness of electricity generation from the national coal source; among others. The CDE is managed by CCEE since May, 2017, pursuant to Federal Law No. 13,360/2016. This charge had been substantially reduced by the 2013 Concession Renewal Law (approximately 75% compared to its December 31, 2011 amount) in an attempt to reduce the cost of electricity paid by Final Customers. The 2013 Concession Renewal Law also allowed the funds from the RGR Fund to be transferred to the CDE, provided that the Federal Treasury would also contribute with the CDE and permit the funds deposited in the CDE to be used in support of the electricity generation program in non-integrated electric grids (sistemas elétricos isolados) as well as to partially offset the increased costs borne by distribution concessionaires for the purchase of energy in the Spot Market as a result of the non-renewal of generation concessions due to the 2013 Concession Renewal Law.

 
74 
 
 

On March 7, 2014, the Brazilian government also permitted the transfer to distribution concessionaires of funds deposited in the CDE to cover their respective costs arising from involuntary exposure to the Spot Market in January 2014 as a result of poor hydrological conditions in 2013 and 2014, which mandated the acquisition of thermoelectric energy at higher prices in the Spot Market, costs which distribution concessionaires were not able to pass on to Final Customers through regular Retail Tariffs prior to annual adjustments or formal tariffs periodic revisions made by ANEEL.

Distribution concessionaires will be able to pass on to its Final Customer a CDE charge, to the extent necessary to repay their respective financing obligations contracted by the CCEE through the ACR Account. See “—Regulated Market Account–ACR Account.”

On February 27, 2015, ANEEL approved a significant increase of the CDE fee charged to cover all of these additional costs supported by the CDE. ABRACE, an association of Free Customers filed lawsuits to contest the increase of the CDE fee. Since July 2015, the Free Customers associated with ABRACE benefit from an injunction suspending the increase of the CDE fee. Associations of distributors of energy (ABRADEE, with whom Copel Distribuição is associated) also obtained injunctions suspending its obligation to withhold such CDE fees while ABRACE´s and other consumers’ injunction remains in force.

Federal Law No. 13,360/2016 established that the Brazilian government must prepare a plan for a structural reduction of the CDE charge until December 31, 2017, and it also provided that the revenues, expenses and beneficiaries of the CDE must be published monthly by CCEE, among other changes. As a result, Decree nº 9,642/2018 was published, which determined the gradual reduction, in 5 years, of discounts granted to consumer units classified as Rural and Public Service of Water, Sewage and Sanitation, in Groups A (high voltage) and B (low voltage).

Regulated Market Account – ACR Account.

On April 2014, the Brazilian government created the Regulated Market Account, Conta no Ambiente de Contratação Regulada – Conta-ACR (“ACR Account”), to assist distribution concessionaires to cover their respective costs for the acquisition of thermoelectric energy for the period from February 2014 to December 2014, incurred as a result of poor hydrological conditions. Distributors incurred higher costs as a result of adverse hydrological conditions because they were required to buy thermoelectric energy at higher prices in the Spot Market, and were unable to pass all these costs on to Final Customers prior to a formal tariff periodic revision made by ANEEL. To fund the ACR Account, the Brazilian government authorized the CCEE to enter into credit agreements with certain Brazilian financial institutions. An aggregate of R$21.7 billion, composed of nine tranches, was deposited in the ACR Account. Distribution concessionaires have been repaying this loan since 2015 by charging its Final Customers with additional CDE amounts on a monthly basis. At first, the amount deposited in the ACR Account should be repaid by 2020. However, in March 2019, ANEEL authorized CCEE to negotiate with the creditor financial institutions and seek early termination of the corresponding loans, which occurred in September 2019.

Itaipu Transmission Fee

The Itaipu Hydroelectric Plant has an exclusive transmission grid and is not part of the Interconnected Transmission System. Companies that are entitled to receive electricity from Itaipu pay a transmission fee in an amount equal to their proportional share of the Itaipu generated electricity.

Use of Water Resources Tax

Holders of concessions and authorizations that allow for the exploitation of water resources must pay a total tax of 7.00% of the value of the energy they generate, which for the purposes of this calculation is based on a rate set by ANEEL. Beginning on January 1, 2021, ANEEL set this rate at R$76.00/MWh. The proceeds of this tax are shared among the states and municipalities where the plant or the plant’s reservoir is located, as well as with certain federal agencies.

 
75 
 
 

ANEEL Inspection Fee (TFSEE)

The ANEEL Inspection Fee is an annual fee due by the holders of concessions, permissions or authorizations equal to an ANEEL determined percentage of their revenues. The ANEEL Inspection Fee requires these holders to pay up to 0.4% of their annual revenue to ANEEL in 12 monthly installments.

Default on the Payment of Regulatory Charges

The failure to pay required contributions to the RGR Fund, Proinfa Program or CDE or to make certain payments, such as those due from the purchase of electric energy in the regulated market or from Itaipu, will prevent the defaulting party from receiving adjustments or reviews of their tariffs (except for an extraordinary review) and will also prevent the defaulting party from receiving funds from the RGR Fund or CDE. We comply with payment obligations related to Regulatory Charges.

Energy Reallocation Mechanism

The Energy Reallocation Mechanism (Mecanismo de Realocação de Energia, or MRE) attempts to mitigate the risks borne by hydroelectric generators due to variations in river flows (hydrological risk).

Under Brazilian law, each hydroelectric plant is assigned a determined amount of “assured energy,” according to an energy supply risk criterion defined by MME, based on historical river flow records. The assured energy also represents the maximum energy that can be sold by the generator, which is set forth in each concession agreement, irrespective of the volume of electricity actually generated by the facility.

The MRE tries to guarantee that all participating plants receive the revenue corresponding to their assured energy, irrespective of the volume of electricity generated by them. In other words, the MRE effectively reallocates the electricity, transferring the surplus from those who have produced in excess of their assured energy to those that have produced less than their assured energy. The relocation, which occurs in the Interconnected Transmission System, is determined by the ONS, considering the nationwide electricity demand and hydrological conditions, regardless of the power purchase agreement of each individual generator. The volume of electricity actually generated by the plant, whether more or less than their assigned assured energy quotient, is priced pursuant to a tariff known as the “Energy Optimization Tariff,” designed to cover only the variable operation and maintenance costs of the plant, so that generators are largely unaffected by the actual dispatch of their plants.

Each hydroelectric plant which has its concession contract renewed in accordance to 2013 Concession Renewal Law will no longer participate in the MRE, and the hydrological risk from those plants will be borne by the distribution concessionaires under the National Interconnected Power Grid. For the generation plants with expired concessions, which were subject to a new competitive bidding process under the 2013 Concession Renewal Law, 30% of the generated energy available for the generation concessionaire to sell in the market is also subject to the MRE hydrological risk allocation mechanism. This risk does not impact our distribution business, since we are allowed to increase the tariffs of our distribution customers to compensate any costs arising from this hydrological risk.

Research and Development

The companies holding concessions and permissions for distribution of electricity must invest a minimum of 0.50% of their annual net operational revenues in research and development and 0.50% in energy efficiency programs. Beginning on January 1, 2023, these percentages will become 0.75% and 0.25%, respectively.

A company holding concessions and authorizations for generation and transmission of electricity must invest a minimum of 1% of its annual net operational revenues in research and development. A company that generates electricity exclusively from small hydroelectric power plants, cogeneration or alternative energy projects is not subject to this requirement.

The amount to be invested in research and development must be distributed as follows:

·40% to the company research and development projects, under the supervision of ANEEL;
·40% to the Ministry of Sciences and Technology, to be invested in national research and development projects; and
 
76 
 
 
·20% to the MME, to defray EPE.

In March 2021, Law 14,120/2021 and ANEEL Resolution 929/2021 changed the allocation of research and development resources.

The amount not yet committed to the research and development program until September 2020 will be transferred to CDE as a way to promote tariff moderateness. In the same way, until December 2025, a minimum of 70% of the percentages defined by law must continue to be invested in research and development programs while the difference will be transferred to CDE.

·These measures do not impact the amounts to be invested by the concessionaires, but rather their destination.

Environmental Regulations

The Brazilian Federal Constitution includes environmental matters among the ones that are subject to concurrent legislative competence. This means that the Brazilian Federal Government announces general rules that can be then complemented by rules approved by states and municipalities. The system aims to integrate environmental policies, which are always guided by a national directive, while still granting some power to the states and municipalities to regulate and act locally.

In 1981, the National Environmental Policy was enacted in Brazil (Federal Law 6,938/1981), with an aim to preserve, improve, and recover the environment in Brazil by the establishing several principles to be met by different parties. This culminated in an extensive regulatory framework towards mindful use, conservation, and effective protection of natural resources.

For example, in 1988, Article 225 of the Federal Constitution alluded to environmental issues, advocating for the right of all citizens to an ecologically balanced environment and the duty of the collective to defend and preserve the environment for future generations. In 1998, the Federal Environmental Crimes Law (Law 9,605/1998) was published, providing for criminal and administrative penalties for conduct and activity deemed harmful to the environment.

The entities that make up the National Environmental System and the publications of the National Environmental Council (Conselho Nacional de Meio Ambiente), which regulate numerous issues, especially those related to the process of environmental licensing of enterprises, are also relevant to Brazil’s efforts towards environmental protection.

Additional federal laws and statutes established the National System of Water Resources Administration and the National Council of Water Resources in order to deal with main environmental issues associated with the hydroelectric sector and water usage. In 2000, the Federal Government created an independent agency, the National Water Resources Agency, to regulate and supervise the usage of water resources. In 2008, Federal Decree 6,514/2008 was enacted to further define administrative responsibility for environmental violations.

Also noteworthy is the Brazilian Forest Code (Federal Law 12,651/2012) and related regulations that established norms in relation to vegetation that may suffer from the impacts resulting from the implementation of enterprises associated with hydroelectric reservoirs.

In addition to the applicable legislation mentioned above, it is also necessary to consider the actions of the so-called Intervening Bodies, which are entities related to the environmental licensing process. However, the Intervening Bodies also act on more specific issues, the most frequent being related to the National Indian Foundation (Funai), the Institute of National Historical and Artistic Heritage (Iphan), the Palmares Foundation, the Chico Mendes Institute for Biodiversity Conservation (ICMBio), among others.

All these regulations can increase the costs associated with the implementation of energy generation and transmission projects, since concessionaires need to fully adhere to all environmental laws and regulations.

Thus, according to Brazilian environmental legislation, any action that represents environmental risk can result in up to three types of liability: civil, administrative and criminal. Thus, those who violate an environmental law may be subject to administrative and criminal sanctions, and in cases of environmental damage, will have the obligation to repair or compensate the affected party. Administrative sanctions may apply to the company and to individual company representatives simultaneously and may include significant fines and suspension of activities. Criminal sanctions may include fines, and for individuals, including directors and employees of companies that have committed environmental crimes, possible imprisonment.

 
77 
 
 

All of the Company's power generation, distribution and transmission facilities are subject to environmental licensing procedures and environmental licenses obtained by such facilities may establish several criteria. The maintenance of these licenses will still be subject to compliance with certain requirements, hence why the Company consistently acts in full compliance of applicable environmental legislation.

 
78 
 
 

 

recent developments

Divestment of Copel Telecomunicações S.A.

On November 9, 2020, an auction for the divestiment of Copel Telecomunicações S.A. (Copel Telecom), responsible for our telecommunication activities, was held at B3. The winning bid was R$2.4 billion (equity value). On January 14, 2021, a Share Purchase Agreement for the transfer of 100% of the shares of Copel Telecom was entered into with Bordeaux Multi-Strategic Investment Fund – Bordeaux Fundo de Investimentos em Participações Multiestratégia, the winning bidder of the auction. On July 9, 2021, the sale was approved by the Brazilian antitrust authority, and on August 3, 2021 Copel completed the divestment of Copel Telecom. The final restated transaction amount was R$2.5 billion, based on the SELIC rate as of August 3, 2021, and has already been transferred in full to Copel.

Therefore, from August 3, 2021, Copel no longer controls Copel Telecomunicações S.A., nor does it hold or control any of its assets, liabilities or business.

Migration to Level 2 of Corporate Governance of B3 (Brasil, Bolsa, Balcão - bolsa de valores de São Paulo)

Our bylaws were amended at the shareholders meeting of November 26, 2021 to provide for certain changes in our corporate governance necessary to permit our shares and Units to be listed on B3 listing segment known as Level 2. These amendments had previously been approved by the sharholders meeting of March 11, 2021, subject to certain conditions that were later fulfilled. As a result, we migrated to Level 2 of Corporate Governance of B3. Level 2 includes enhanced levels of corporate governance, including providing for (1) 100% tag along for Common Shares and Preferred Shares, granting equal treatment to our shareholders; (2) voting rights for the holders of Preferred Shares (Class A Shares and Class B Shares) on matters involving the transformation, merger or spin-off of Copel; (3) a mandatory tender offer to all shareholders upon specified events, including a change of control, removal from the Level 2 with the exception of a removal for the purpose of Copel’s being listed in Novo Mercado, a special listing segment of B3 listing segment, or termination of registration as a public company under Brazilian law; (4) additional protections for minority shareholders. 

Unitization

In March 2021, we sought to improve the liquidity of the trading market for our securities by establishing Units (the steps to establish the Units, taken as a whole, are referred to as the “Unitization”). The Unitization and related amendments to our bylaws to facilitate necessary changes in our corporate governance to permit the Unitization were approved by our shareholders on March 11, 2021.

The Unitization included, among other steps, the Conversion Offers (as defined in the 2020 Form 20-F), which were conditioned on the aggregate number of Units issuable as a result of the Conversion Offers (taken together) attaining 229, 172, 878 Units (the “Minimum Participation Condition”). We announced on April 23, 2021 that the requirements of the Minimum Participation Condition had been met, and all Preferred Class B Shares, the holders of which elected to convert their Preferred Class B Shares (and had not withdrawn such election), including Preferred Class B Shares then represented by Preferred ADSs, were accepted for conversion.

On April 26, 2021, Our Board of Directors approved the conversion of 478,550,731 Common Shares into Preferred Class B Shares, the conversion of 139,520 Preferred Class A Shares into Preferred Class B Shares, the conversion of 82,330,391 Preferred Class B Shares into Common Shares and the formation of 277,126,554 Units. The Units began trading on B3 under the symbol “CPLE11” and on the NYSE under the symbol “ELP” on April 26, 2021 and April 28, 2021, respectively.

Vilas Wind Power Complex Acquisition

On May 17, 2021, Copel Geração e Transmissão (“Copel GeT”) entered into a contract for the acquisition of 100% of Vilas Complex, comprising of 5 fully operational wind farms and a total installed capacity of 186.7 MW located in the Municipality of Serra do Mel - RN. On November 30, 2021, Copel GeT completed the acquisition of 100% of Vilas Complex with an enterprise value of R$1.1 billion as part of the company's strategy of sustainable growth in renewable energy, expanding the diversification of the aligned generation matrix to the Investment Policy. The project is partially financed by Banco do Nordeste (“BNB”), under a long-term loan agreement with final maturity in 2040. The total amount paid by Copel in the acquisition was R$ 597.7 million.

 
79 
 
 

Item 4A. Unresolved Staff Comments

None.

 
80 
 
 

 

Item 5. Operating and Financial Review and Prospects

The information presented in this section should be read together with our audited consolidated financial statements for the years ended December 31, 2021, 2020 and 2019 that have been prepared in accordance with IFRS as issued by the IASB. For more information see “Presentation of Financial and Other Information” and Note 3 to our audited consolidated financial statements for the year ended December 31, 2021.

The information presented in this section focuses on material events and uncertainties known to our management that could result in reported financial information not being indicative of future operating results or future financial condition, including a quantitative and qualitative description of the reasons underlying material changes. The following discussion contains forward-looking statements that involve risks and uncertainties. Our actual results may differ significantly from those discussed in the forward-looking statements for several reasons, including, without limitation, the risks described in “Forward-Looking Statements” and “Item 3. Key Information―Risk Factors.

OVERVIEW

Brazilian Economic Conditions

All of our operations are in Brazil, and we are affected by general Brazilian economic conditions. In particular, the general performance of the Brazilian economy affects demand for electricity, and inflation affects our costs and our margins. The Brazilian economic environment faced periods of instability in recent years, impacting the performance of the Brazilian GDP growth rates, with an increase of 2.3% in 2013 and 0.1% in 2014 and a decrease of 3.8% in 2015. The growth rate was equally negative in 2016, with a decrease of 3.3%. The economic environment showed signs of recovery in 2017, with an increase of 1.0% in growth rate. In 2018 and 2019, the economic environment continued to recover, with an increase of 1.3% and 1.1%, respectively, in growth rate. In 2020, the growth rate decreased by 4.1%. In 2021, the growth rate increased by 4.6%.

The following table shows selected economic data for the periods indicated:

 

Year ended December 31,

 

2021

2020

2019

Inflation (IPCA) 10.06% 4.52% 4.31%
Inflation (IGP-DI) 17.74% 23.7% 7.70%
Appreciation (depreciation) of the real vs. U.S. dollar 7.5% (28.8)% (4.0%)
Period-end exchange rate – US$1.00(1) 5.5799 5.1967 4.0307
Average exchange rate – US$1.00 5.3949 5.1558 3.9461
Change in real GDP 4.6% (4.1)% 1.1%
Average interbank interest rates(2) 5.94% 2.77% 4.40%

 

(1) The real/U.S. dollar exchange rate at December 31, 2021 was R$5.5799 per US$1.00.

(2) Calculated in accordance with Central Clearing and Custody House, or Central de Custódia e Liquidação Financeira de Títulos (“CETIP”), methodology (based on nominal rates).

Sources: FGV ‒ Fundação Getúlio Vargas, the Brazilian Central Bank, the Brazilian Geography and Statistics Institute IBGE and CETIP.

Rates and Prices

Our operational results are significantly affected by changes in the prices at which our generation business sells energy, and by the prices at which our distribution and trading business buys and resells energy.

Our generation business sells energy at unregulated prices in the regulated market, in the Free Market and in the Spot Market. Our generation business allocates the amount of energy that it sells in each of these markets seeking to maximize returns and subject to applicable restrictions, based on factors such as: (i) the requirements of its concession contracts, many of which set a minimum percentage of energy generated in a particular concession that must be sold in the regulated market; (ii) the volume of energy that we plan to sell to Free Customers for a given year; and (iii) the outlook of the short-term, medium-term and long-term for energy prices generally. Although sales in the Free Market and the Spot Market are not directly regulated, they are influenced by energy regulatory policy. The prices at which our generation business sells energy are not regulated.

 
81 
 
 

Our distribution business purchases enough energy to meet 100% of the demand we forecast for our Final Customers in auctions at unregulated prices in the regulated market. Our distribution business resells that energy to Final Customers at regulated tariffs that take into consideration the price at which the energy was purchased. If our forecasts fall short of the actual electricity demand of our Final Customers, we may be required to enter into short-term agreements to purchase electricity in the Spot Market. If our forecasts exceed the actual demand of our Final Customers, our distribution business sells the excess energy in the Spot Market. The margins in our distribution business tend to be relatively stable due to the regulated nature of the distribution business, while the margins in our generation business are typically larger but less stable, since they are not substantially market regulated.

Sales to Final Customers (which include sales by our distribution business to Captive Customers, sales by our generation business and sales by our trading business to Free Customers) represented approximately 44.1% of the volume of electricity we made available in 2021, and accounted for 63.6% of our energy sales revenues. Almost all of such sales were to Captive Customers. For more information, see “Item 4. Information on the Company—The Brazilian Electric Power Industry—Distribution Tariffs”. In general, if our costs for energy increase, the tariff process permits us to recover these costs from our customers through higher rates in future periods. However, if we do not receive tariff increases to cover our costs, if the recovery of these costs is delayed, or if our Board of Directors elects to reduce the tariff increase awarded by ANEEL, our profits and cash flows may be adversely affected.

ANEEL modifies our Retail Tariffs annually, generally in June. Since January 2013, the adjustments have been as follows.

·In January 2013, due to the enactment of 2013 Concession Renewal Law, we were subject to an extraordinary revision approved by ANEEL. The average impact of this extraordinary review in the tariffs we charge our customers was a decrease of 19.28%.
·In June 2013, ANEEL approved the annual revision of our Retail Tariffs, increasing them by an average of 13.08%, of which 11.40% related to the tariff increase and 1.68% referred to an increase in recovery of deferred regulatory accounts (CVA). After giving effect to the recovery of Parcel A costs, the average effect of this tariff adjustment on our Captive Customers was an increase of 14.61%. However, Copel Distribuição requested a partial deferral of this adjustment, which was authorized by ANEEL and approved on July 9, 2013. The amount of R$255.9 million was therefore deferred and included as a financial component in the 2014 annual revision. This deferral reduced the average effect of the tariff adjustment to 9.55%.
·In June 2014, ANEEL approved the annual adjustment of our Retail Tariffs, increasing them by an average of 35.38%, of which 25.05% related to the tariff increase and 10.34% related to an increase in recovery of deferred regulatory accounts (CVA). After giving effect to the recovery of Parcel A costs, the average effect of this tariff adjustment on our Captive Customers was an increase of 39.71%. However, Copel Distribuição requested a partial deferral of this adjustment, which was authorized by ANEEL and approved on July 22, 2014. The amount of R$898.3 million was therefore deferred and included as a financial component in the 2015 annual adjustment. This deferral reduced the average effect of the tariff revision to 24.86%.
·In March 2015, ANEEL approved an extraordinary revision due to a series of events that significantly impacted the distribution concessionaires’ costs, which were not originally foreseen in the 2014 Retail Tariff increase, such as the increase of Itaipu tariffs (46.14%) and higher prices to purchase energy in recent energy auctions. Copel Distribuição’s Average Tariff revision approved by ANEEL was 36.79% starting from March 2, 2015. Of this total, 22.14% related to CDE charges that have been passed to customers and 14.65% relates to (i) Itaipu’s tariff increase and (ii) the higher prices paid by us to purchase energy in recent energy auctions that have been passed to customers.
·In June 2015, ANEEL authorized the annual revision of Copel Distribuição’s tariff to Final Customers, increasing them by an average of 15.32%, of which (i) 20.58% related to the inclusion of the financial components, which will be recovered in the 12 months subsequent to the adjustment (including the amount of R$935.3 million corresponding to the deferrals in 2013 and 2014), (ii) 0.34% related to the restatement of Portion B, (iii) (3.25)% related to the adjustment of Portion A, and (iv) (2.35)% reflected the removal of the financial components from the previous process. The adjustment was fully applied to Copel Distribuição’s tariffs as of June 24, 2015.
 
82 
 
 

·In June 2016, ANEEL approved the fourth periodic review of our Retail Tariffs, decreasing them by 12.87%, of which: (1.73)% related to the inclusion of financial components; 4.48% due to the update of Portion B; (2.57)% related to the update of Portion A; and (13.05)% reflecting the removal of the financial components of the previous tariff process.
·In March 2017, ANEEL approved an extraordinary tariff revision to correct the amount unduly included in the tariffs for captive consumers in 2016. The return corresponded to the energy that was to be generated by the Angra III power plant; however, the plant was not yet in commercial operation. The refund of the amount charged the most was made in a single installment during the month of April 2017, and, as of May 2017, the tariffs were adjusted to disregard the amount that was being charged. The decision, of extraordinary character, affected 90 distributors of electric power of the country. Copel's retail tariff (residential B1) was reduced by an average of 11.8% during April 2017 due to the adjustment resulting from the removal of the Reserve Energy Charge (EER) tariff coverage of the Angra III plant, retroactive to the last Periodic Tariff Review, held in June/2016. As of May 2017, the tariff was reset, disregarding the effect arising from the retroactive adjustment, but maintaining the exclusion of the EER (Reserve Energy Charge) component of Angra III for the coming months, until June 2017, the month of the adjustment annual tariff.
·In June 2017, ANEEL approved the annual revision of our Retail Tariffs, increasing them by an average of 3.13%, of which 3.86% related to the tariff increase and (0.73)% related to the inclusion of financial components. After the removal of the financial components of the previous tariff process, the average effect of this tariff adjustment on our Customers was an increase of 5.85%.
·In June 2018, ANEEL approved the annual revision of our Retail Tariffs, increasing them by an average of 14.32%, of which 7.80% related to the tariff increase and 6.52% related to the inclusion of financial components. After the removal of the financial components of the previous tariff process, the average effect of this tariff adjustment on our Customers was an increase of 15.99%.
·In June 2019, ANEEL approved the annual adjustment of our Tariffs, increasing them on average by 8.57%, with 1.96% related to the variation in economic revenue and 10.54% related to the inclusion of financial components. After removing the financial components from the previous tariff process, the average effect of the tariff adjustment on our consumers was an increase by 3.41%.
·In June 2020, ANEEL approved the annual adjustment of our supply tariffs, which represented a tariff repositioning index of 15.84%, comprised of a variation of 8.68% in the economic components and 7.16% in the financial components. After removing the effect of the financial variables from the previous tariff process, the average effect perceived by the customers would be 5.39%. However, in an aim to reduce the impact on electric bills due to the financial consequences of the COVID-19 pandemic, ANEEL created the COVID-19 Fund, a loan operation between various banks contracted by the CCEE in order to dilute tariff increases in the next five years. Thus, Copel Distribution asked that the effects the COVID-19 Fund be applied to our annual tariff adjustment in the amount of R$536 million, equivalent to the accumulated total of the Compensation Account for the Variation of Items of Parcel A (CVA), considered a negative financial component, ultimately reducing the effect on the consumer. With the removal of the previous year’s financial components, the final average effect perceived by the consumer was 0.41%.
·In June 2021, ANEEL approved the fifth periodic review of our Retail Tariffs, increasing them by 9.89% in average, of which: 1.19% related to the inclusion of financial components; 1.05% due to the update of Portion B; 8.62% related to the update of Portion A; and (0.98)% reflecting the removal of the financial components of the previous tariff process.
 
83 
 
 

Purchase and Resale of Energy

Our distribution business purchases energy from generation companies and resells this energy to Final Customers at regulated rates. For more information, see “Item 4. Information on the Company— Business—Generation” and “Item 4. Information on the Company—Business—Purchases for the captive market”. Our major long-term contracts or purchase obligations are described as follows.

·We purchase energy from Itaipu at prices that are determined based on the Itaipu project’s costs, including servicing its U.S. dollar-denominated debt. In 2021, our electricity purchases from Itaipu amounted to R$1,787 million;
·Our distribution business is required to purchase a large portion of its energy needs from the regulated market. For more information, see “Item 4. Information on the Company—The Brazilian Electric Power—Industry—Concessions—Auctions in the Regulated Market”.

Under current legislation, the amount that our distribution business charges Final Customers is composed of two fees: a fee for the actual energy consumed and a fee for the use of our distribution grid. Since the regulated rates at which our distribution business sells energy to Final Customers are substantially the same as the rates at which it purchases energy (after accounting for deductions and the cost of energy purchased for resale), our distribution business does not generate operating profit from the sale of electricity to Final Customers. Rather, our distribution business generates operating profit principally by collecting tariffs for the use of our distribution grid.

Impact of the CRC Account

One of our most significant assets consisted of the obligations of the State of Paraná derived from amounts we were entitled to recover under a prior regulatory regime, and as a result they are referred to as the recoverable rate deficit account or “CRC Account” (Conta de Resultados a Compensar). On August 10, 2021, the State of Paraná offset the updated outstanding amount under CRC Account in the total of R$1,431.2 million and fulfilled all outstanding obligations under the CRC Agreement.

For additional information, see Note 8 to our audited consolidated financial statements.

Special Obligations

The contributions received from the Brazilian government and our customers exclusively for investment in our generation assets, transmission and distribution grid are named as special obligations. We record the amount of these contributions on our statement of financial position as a reduction of assets, under the caption “special obligations,” and, upon the conclusion or termination of the operating concession granted to us, the amount of these contributions is offset against the assets. The highest amount we recorded as special obligations as of December 31, 2021, from the distribution segment, was R$2,734.1 million as a reduction of intangible assets and R$53.7 million as a reduction of contract assets.


 
84 
 
 

ANALYSIS OF ELECTRICITY SALES AND COST OF ELECTRICITY PURCHASED

The following table sets forth the volume and Average Rate components of electricity sales and purchases for the years ended December 31, 2021, 2020 and 2019:

 

Year ended December 31,

 

2021

2020

2019

Electricity Sales      
Electricity sales to Final Customers      
Average price (R$/MWh):(1)      
Industrial customers 541.07 419.46 481.91
Residential customers 507.95 391.78 444.92
Commercial customers 530.84 407.78 460.78
Rural customers 354.96 250.27 267.48
Other customers(3) 715.58 604.80 639.02
Free Customers(2) 231.00 216.50 208.64
All customers 426.23 350.58 393.40
Volume (GWh):      
Industrial customers 2,275 2,314 2,648
Residential customers 8,068 7,910 7,499
Commercial customers 4,149 4,172 4,730
Rural customers 2,461 2,451 2,361
Other customers(3) 2,359 2,333 2,546
Free Customers(2) 9,538 7,989 6,860
All customers 28,849 27,169 26,644
Total revenues from sales to Final Customers (millions of R$) 12,296 9,525 10,482
Electricity sales to distributors(4)      
Average price (R$/MWh)(1) 320.83 224,55 168.31
Volume (GWh) 21,925 19,287 19,615
Total revenues (millions of R$) 7,034 4,331   3,301
Electricity Purchases      
Purchases from Itaipu      
Average cost (R$/MWh)(5) 328,92 321.23 237.4
Volume (GWh) 5,435 5,498 5,533
Percentage of total Itaipu production purchased 8.2 9.2 8.7
Total cost (millions of R$)(6) 1,787.7 1,766.1 1,316.5
Purchases from Angra      
Average cost (R$/MWh) 230,23 277,69 253,58
Volume (GWh) 0,976 0,968 0,978
Total cost (millions of R$)(6) 224.7 268.8 248.0
Purchases from CCGF      
Average cost (R$/MWh) 116.1 109.18 102.28
Volume (GWh) 5,916 6,136 6,274
Total cost (millions of R$)(6) 686.3 669.9 641.7
Purchases from others(4)      
Average cost (R$/MWh) 196.00 213.77 185.27
Volume (GWh) 34,719 19,295 21,045
Total cost (millions of R$)(6) 6,805 4,125 3,899

 

(1) Average prices or costs do not consider “use of main distribution and transmission grid” revenue and were calculated by dividing (i) the corresponding revenues or expenses by (ii) MWh of electricity sold or purchased.

(2) Includes Free Customers of Copel GeT and Copel Mercado Livre.

(3) Includes public services such as street lighting, as well as the supply of electricity to government agencies, and Donations and grants.

(4) Energy traded between Copel’s subsidiaries not included.

(5) Our purchases of electricity generated by Itaipu are stated in reais and paid for on the basis of a capacity charge expressed in U.S. dollars per kW plus a “wheeling” (or transportation) charge expressed in reais per kWh.

(6) See “Item 4. Information on the Company—Business—Generation” and “Item 4. Information on the Company—Business— Purchases for the captive market” for an explanation of our expenses relating to electricity purchases.

 
85 
 
 

 

RESULTS OF OPERATIONS FOR THE YEARS ENDED DECEMBER 31, 2021, 2020 AND 2019

The following table summarizes our results of operations for the years ended December 31, 2021, 2020 and 2019.

As a result of the approval of the divestment of Copel Telecom divestment during the year 2020, we have classified the results of this subsidiary as discontinued operations for the years 2021, 2020 and 2019. Additional information on the divestment process and about the amounts considered as a discontinued operation can be found in Note 41 to our consolidated financial statements.

In 2021, our result was positively impacted by, among other factors, the sale of 2,195 GWh energy produced by TPP Araucária, the 5.6% increase in the grid market of Copel Copel Distribuição and the 5th tariff review cycle, by the increase on transmission assets remuneration and by the increase in energy volume sold by Copel Mercado Livre in comparison to the prior year. The revenue increase was partially offset by a 29.7% increase in our expenses mainly due to the 39.2% increase in electricity purchased for resale due to the need to purchase of energy to comply with existing contracts in view of the hydrological deficit in the period. There was a slight increase in demand of energy in the captive market of 0.7% in relation to 2020. Our net income increased 29% in 2021 in relation to 2020.

Economic effects of the pandemic on the assumptions of the Company's relevant non-financial assets were individually assessed and management concluded it was necessary to adjust the impairment value for some assets. The most significant adjustment occurred at UEG Araucária, as its cash flow estimates were affected by the decrease in energy demand in the country, whereas on the other projects there were impairment reversals.

Despite of the impacts of energy consumption and credit losses, the results of our operation were not materially affected. Further information in Notes 1(a) of our consolidated financial statements,

 

 

Year ended December 31,

 

2021

2020

2019

  (R$ million)
Net Operating Revenues:      
Electricity sales to Final Customers: 12,296.5 9,524.9 10,481.7
Residential 4,098.2 3,098.9 3,336.4
Industrial 1,230.9 970.6 1,276.1
Commercial, services and other activities 2,202.5 1,701.2 2,179.5
Rural 873.6 613.4 631.5
Other classes 3,891.3 3,140.7 3,058.2
Electricity sales to distributors 7,034.2 4,331.0 3,301.3
Use of main distribution and transmission grid 10,088.2 8,780.6 8,271.0
Residential 3,011.5 2,788.7 2,585.9
Industrial 1,456.4 1,273.3 1,280.2
Commercial, services and other activities 1,771.5 1,628.1 1,713.6
Rural 623.3 548.7 467.0
Other classes 633.2 582.3 597.9
Free consumers 1,440.9 1,164.0 1,052.5
Concessionaires and generators 79.5 61.7 62.4
 Operating and maintenance income - O&M and interest income 1,072.0 733.7 511.4
Construction revenues 1,951.6 1,414.1 1,132.9
Revenues from telecommunications - - -
Distribution of piped gas 950.9 679.3 1,003.8
Sectorial financial assets and liabilities result 2,502.3 746.1 25.1
           
 
86 
 
 

 

Other operating revenues          359.0 406.5 438.9
Fair value of assets from the indemnity for the concession 142.6 57.3 36.6
(-) Revenue deductions (11,340.9) (7,306.5) (8,822.1)
  23,984.3 18,633.2 15,869.2
Cost of sales and services provided:      
Electricity purchased for resale (9,503.7) (6,829.5) (6,105.3)
Charge of main distribution and transmission grid (2,501.6) (1,525.6) (1,249.3)
Personnel and management (1,550.9) (1,601.9) (1,325.4)
Pension and healthcare plans (248.8) (228.6) (238.3)
Material and supplies (69.8) (72.7) (80.2)
Materials and supplies for power electricity (1,854.9) (404.5) (49.4)
Natural gas and supplies for gas business (506.1) (354.7) (585.2)
Third-party services (706.6) (558.0) (526.0)
Depreciation and amortization (1,082.5) (1,009.9) (950.7)
Accruals and provisions (240.8) (237.3) (260.1)
Construction cost (1,899.8) (1,417.5) (1,091.4)
Hydrological risk renegotiation - GSF 1,570.5 - -
Other costs and expenses (309.5) (333.3) (212.5)
  (18,904.6) (14,573.5) (12,673.7)
Equity in earnings of associates and joint ventures 366.3 193.5 106.8
Financial results (327.4) 866.3 (455.4)
Profit before income tax and social contribution 5,118.7 5,119.5 2,846.9
Income tax and social contribution on profit (1,259.6) (1,285.4) (675.6)
Net income from continuing operations 3,859.0 3,834.2 2,171.3
Net income (loss) from discontinued operations 1,189.6 75.6 (108.4)
Net income for the year 5,048.6 3,909.7 2,062.9
Net income attributable to controlling shareholders 4,952.6 3,904.2 1,989.9
Net income attributable to non-controlling interest 96.0 5.5 72.9
Other comprehensive income 152.7 (179.2) (123.2)
Comprehensive income 5,201.3 3,730.6 1,939.7
Comprehensive income attributable to controlling shareholders 5,105.2 3,725.2 1,862.5
Comprehensive income attributable to non-controlling interest 96.2 5.3 77.2

 

Results of Operations for 2021 Compared with 2020

Operating Revenues

Our consolidated net operating revenues increased by 28.7%, or R$5,351.1 million, in 2021 compared to 2020. This result reflected, an increase of R$9,385.4 million in gross operating revenue offset by an increase of R$4,034.4 million in revenue deductions (Pis/Pasep and Cofins, ICMS, ISSQN and sectorial charges). Below are the main reasons for variations in revenue accounts:

Electricity Sales to Final Customers. Our revenues from electricity sales to Final Customers increased by 29.1%, or R$2,771.6 million, mainly due to the increase in the average price and volume sold, as follows:

·The revenue from electricity sold to residential customers increased R$999.3 million in 2021 compared to 2020, also considering a growth of 29.7% on the average price (R$/MWh) of the electricity sold during the same period, and the increase in volume sold compared to 2020.
·The revenue from electricity sold to industrial customers increased by 26.8%, or R$260.3 million, in 2021 compared to 2020, considering a increase of 29.0% on the average price (R$/MWh).
 
87 
 
 
·The revenue from electricity sold to commercial customers increased by 29.5%, or R$501.3 million, in 2021 compared to 2020, considering a increase of 30.2% on the average price (R$/MWh).
·The revenue from electricity sold to rural customers increased by 42.4%, or R$260.2 million, in 2021 compared to 2020. This increase is mainly due to the reduction of subsidies applied to the rural class, under the terms of Federal Decree n. 9,642/2018.
·The revenue from electricity sold to free customers increased by 27.4%, or R$ 473.7 million, in 2021 compared to 2020. This increase is mainly due to increase of 70.0% in the volume of energy sold to Copel Mercado Livre's free consumers.

Electricity Sales to Distributors. Our revenues from electricity sales to distributors increased by 62.4%, or R$ 2,703.2 million, mainly due to the sale of 2,195 GWh of energy produced by TPP Araucária in 2021 and the increase in volume of energy sold under bilateral contracts by Copel Mercado Livre.

Use of main distribution and transmission grid. Our revenues from the use of main distribution and transmission grid increased by 14.9%, or R$1,307.6 million, mainly due to the increase in remuneration on transmission assets, due to the growth of the IPCA and IGPM indexers, the5.6% growth in the grid market and the tariff adjustment of Copel Distribuição which corresponded to the Average Tariff effect being 9.57% for consumers connected in high voltage and 10.04% for consumers connected in low voltage.

Construction revenues. Our revenues from construction increased by 38.0%, or R$537.5 million, mainly to higher investments in the energy distribution segment.

Distribution of Piped Gas. Revenues from the distribution of piped gas increased by 40.0%, or R$271.6 million, due to the higher volume of sales from Compagas to TPP Araucária and the tariff adjustment, with an average effect of 18.2%, applied to consumers as of August 1, 2021.

Sectorial Financial Assets and Liabilities. Our financial assets and liabilities result increased by 235.4%, or R$1,756.2 million due to the higher value of net assets constituted in 2021, mainly due to higher electricity costs and system service charges (ESS) than those considered in the calculation of the electricity tariff of Copel DIS, a reflection of the hydrological deficit in the period with greater dispatch of thermoelectric plants.

Other Operating Revenues. Other operating revenues decreased by 11.7%, or R$47.5 million, mainly as a result of the decrease in the fair value of the energy purchase and sale agreements of Copel Comercialização, offset by the increase in rental revenue.

Cost of sales and services provided

Our consolidated costs of sales and services provided increased by 29.7% or R$4,331.0 million. The main factors leading to such increase in our cost of sales and services provided are as follows:

·Electricity Purchased for Resale. Our purchased energy costs for resale increased by 39.2%, or R$2,674.2 million, mainly due to the impact of the water crisis on energy prices and to cope with the higher volume of energy sold in the period.
·Charge of Main Distribution and Transmission Grid. Expenses we incurred for our use of the main distribution and transmission grid increased 64.0%, or R$976.0 million due to the higher value of System Services Charges - ESS due to the higher thermal dispatch outside the order of merit to face the water crisis and the tariff adjustment of the contracts of the basic grid.
·Personnel and administrative expenses decreased by 3.2%, or R$51.0 million, mainly reflecting the reduction of R$114.3 million in the provision for performance and profit sharing, the reduction in the number of employees and the cost reduction policy, offset by the salary adjustment of 10.78% in October 2021 resulting from the higher inflation rate in the period (3.89% in October 2020), according to the collective bargaining agreement and the R$73.2 million increase in the provision for the voluntary termination program in the period.
 
88 
 
 

·Material and Supplies for Power Electricity increased 358.6% or R$1,450.4 million as a result of TPP Araucaria dispatch in 2021.
·Natural Gas and Supplies for Gas Business. Expenses related to natural gas purchases increased 42.7%, or R$151.4 million, resulting from the higher volume of acquisition for resale.
·Third-Party Services. Expenses related to third party services increased by 26.6%, or R$148.6 million, resulting from the increase in maintenance costs of the electrical system, due to actions to reduce interruptions to consumers (DEC/FEC) and the increase in O&M services with full entry of wind farms.
·Depreciation and Amortization. Depreciation and amortization increased by 7.2%, or R$72.6 million, as a result of a revision of estimated useful life of certain assets in the generation segment, mainly due to the effects of the hydrological risk renegotiation – GSF.
·Accruals and Provisions. Accrual and provisions increased by 1.5%, or R$3.5 million, as a result of an increase of R$52.6 million in the estimate of expected credit losses and of R$39.8 million in provisions for litigation, partially offset by the the reversal of impairment of R$110.3 million, mainly in the generation segment due to higher operation of TPP Araucária.
·Construction Cost. Costs related to construction increased by 34.0%, or R$482.3 million, reflecting investments made in the transmission and distribution infrastructure of energy and piped gas.
·Hydrological risk renegotiation – GSF. On September 28, 2021, the Board of Directors of Copel Geração e Transmissão (“Copel GeT”) approved the adhesion to the renegotiation of the hydrological risk of the assured energy portion not committed to the Regulated Contracting Environment (“ACR”), through the extension of the concession of its hydroelectric plants participating in the energy reallocation mechanism (“MRE”). More information in Note 1-b to our Financial Statements.
·Other Costs and Expenses.Other costs and expenses decreased 7.1%, or R$23.8 million, mainly due to gains from disposals of assets and rights, greater recovery of costs and expenses, including recovery of invoices and taxes, and gains from updating the values of indemnifiable assets in the generation segment, offset by the increase in financial compensation for the use of water resources and by the valuation adjustment of the coal stock.

Equity earnings of associates and joint ventures

Equity earnings of associates and joint ventures was R$366.3 million in 2021, an increase of 89.3%, compared to R$193.5 million in 2020. This variation is a result of the positive result of equity in the electricity transmission jointly controlled companies, mainly as a result of the higher monetary restatement on contract assets, the conclusion of works and the lower provision for arbitration disputes with the EPC holder.

Financial Results

We recognized a decrease of financial gains of 137.8%, or R$1,193.7 million mainly due to: (i) recognition of Pis/Cofins tax credit in 2020; (ii) the lower income from financial updating of the CRC contract due to its settlement in August 2021 and; (iii) increase in interest expenses in the amount of R$ 248.2 million, due to higher interest on loans and financing (CDI accumulated in 2021 of 4.42% against 2.76% in 2020 and IPCA of 10.06% against 4.52%), partially offset by the better return on financial investments (in the amount of R$ 83.2 million).

 
89 
 
 

Income Tax and Social Contribution Expenses

In 2021, our income tax and social contribution expenses was R$1,259.6 million, reflecting an effective tax rate of 24.6% in our pretax income, compared to R$1,285.4 million and an effective tax rate of 25.1% in our pretax profit in 2020.

Net income (loss) from discontinued operations

Due to the divestment process, as described in Note 41 to our Consolidated Financial Statements, the results of Copel Telecom operations were classified as discontinued operations. The gross gain from the sale of Copel Telecom, completed on August 3, 2021, was R$ 1,723.9 million, deducting taxes, the net gain was R$1,116.4 million. Considering the consolidated result for 2021, net income from discontinued operations was R$ 1,189.6 million.

Results of Operations for 2020 Compared with 2019

Operating Revenues

Our consolidated net operating revenues increased by 17.4% or R$2,764.0 million in 2020 compared to 2019. This result reflected, mainly, an increase of R$1,029.7 million in electricity sales to distributors and of R$721.0 million in sectorial financial assets and liabilities, partially offset by a decrease of R$956.8 million in electricity sales to Final Customers. In addition, there was an increase in the amount of recovery of Pis/Pasep and Cofins on ICMS, recorded within the revenue deductions. Below are the main reasons for variations in revenue accounts:

Electricity Sales to Final Customers. Our revenues from electricity sales to Final Customers decreased by 9.1%, or R$956.9 million, mainly due to a decrease of the average price per kilowatt hour sold to the Final Customers by Copel Distribuição and the effects of the economic downturn caused by the coronavirus pandemic, as follows:

·The revenue from electricity sold to residential customers decreased R$237.5 million in 2020 compared to 2019, also considering a reduction of 11.9% on the average price (R$/MWh) of the electricity sold during the same period, despite the increased volume compared to 2019.
·The revenue from electricity sold to industrial customers decreased by 23.9%, or R$305.5 million, in 2020 compared to 2019, considering a reduction of 13.0% on the average price (R$/MWh)) and a decrease in volume (GWh) of electricity sold during the same period.
·The revenue from electricity sold to commercial customers decreased by 21.9%, or R$478.3 million, in 2020 compared to 2019, considering a reduction of 11.5% on the average price (R$/MWh) and a decrease in volume (GWh) of electricity sold during the same period.
·The revenue from electricity sold to rural customers decreased by 2.9%, or R$18.1 million, in 2020 compared to 2019. This decrease is mainly due to the reduction of consumers compared to 2019 and agribusiness performance in the State of Paraná during the COVID-19 pandemic.

Electricity Sales to Distributors. Our revenues from electricity sales to distributors increased by 31.2%, or R$1,029.7 million. This increase was mainly due to the increase in our revenues from energy sold through bilateral contracts by Copel Mercado Livre and contracts in the regulated environment, reflection of the TPP Araucária dispatch, which had not operated in 2019.

Use of main distribution and transmission grid. Our revenues from the use of main distribution and transmission grid increased by 6.2%, or R$509.6 million, mainly due the positive result of the periodic tariff review of the transmission contract 060/2001, the increase in remuneration on transmission assets, due to the growth of the IGPM / IPCA indexers, the growth in the grid market and the tariff readjustment of Copel Distribuição which corresponded to the Average Tariff effect being 1.13% for consumers connected in high voltage and 0.05% for consumers connected in low voltage. Besides that, there was an increase of 2.6% on the number of consumers compared to 2019.

Construction revenues. Our revenues from construction increased by 24.8%, or R$281.2 million, mainly due an intensification of construction efforts and improvement of the infrastructure of the distribution businesses.

 
90 
 
 

Fair value of assets from the indemnity for the concession. The fair value of the assets from the indemnity for the concession increased by 56.6%, or R$20.7 million, mainly due to higher variation in the distribution concession agreement’s assets fair value.

Distribution of Piped Gas. Revenues from the distribution of piped gas decreased by 32.3%, or R$324.5 million, considering the impacts by the reduction in gas volume due to the Covid-19 pandemic, mainly in the industrial, commercial and vehicular segments.

Sectorial Financial Assets and Liabilities. Increased by 2,877.4%, or R$721.0 million due to the higher value of net assets constituted in 2020, mainly due to the purchasing energy and charges for use of the network costs being higher than those considered in the calculation of the electricity tariff approved by Aneel for the annual tariff cycle ending in June 2021.

Other Operating Revenues. Other operating revenues decreased by 7.4%, or R$32.4 million, mainly reflecting the recognition of the fair value of the portfolio of energy purchase and sale contracts of Copel Mercado Livre referring to the variation of the contracted price in relation to the market price in an amount lower than that recorded in 2019.

Cost of sales and services provided

Our consolidated costs of sales and services provided increased by 15.0% or R$1,899.8 million. The main factors leading to such increase in our cost of sales and services provided are as follows:

·Electricity Purchased for Resale. Our purchased energy costs for resale increased by 11.8%, or R$724.2 million, mainly due to an increase in the purchase of Energy in the Regulated Environment – CCEAR of energy from Itaipu Binacional by Copel Distribuição and from bilateral contracts to face the higher volume of energy sold on the Free Market in the period by Copel Mercado Livre.
·Charge of Main Distribution and Transmission Grid. Expenses we incurred for our use of the main distribution and transmission grid increased 22.1%, or R$276.3 million mainly as a result of the increase in tariffs and charges for transmission infrastructure made available from 2020, in addition to the effect of the variation in costs related to dispatching thermal plants, with an impact on system service fees – ESS and increase in charges for the use of the system and in the reserve energy charge - EER, partially offset by the reduction in Itaipu's transportation charges.
·Personnel and administrative expenses increased by 20.8%, or R$276.5 million, reflecting the increase in provision for performance and profit sharing and the salary readjustment in October 2020, higher than in 2019, partially offset by the reduction in the number of employees and cost reduction policy.
·Material and Supplies for Power Electricity increased 719.6% or R$355.1 million as a result of Araucaria TPP dispatch in 2020.
·Natural Gas and Supplies for Gas Business. Expenses related to natural gas purchases decreased 39.4%, or R$230.5 million, mainly due to lower acquisition volume for resale.
·Third-Party Services. Expenses related to third party services increased by 6.1%, or R$32.0 million, mainly due to increase in maintenance of the electrical system in Copel Distribuição, consulting and auditing and customer service.
·Depreciation and Amortization. Depreciation and amortization increased by 6.2%, or R$59.2 million, as a result of the start of commercial operations during 2019 of the Colíder, Cutia and Baixo Iguaçu plants. In 2020, all plants depreciated a full year of use compared to prior period.
·Accruals and Provisions. Accrual and provisions decreased by 8.8%, or R$22.8 million, mainly due a decrease of R$ 93.6 million in provisions for litigations, partially offset by an increase of R$ 72.6 million referred to generation segment impairment.
 
91 
 
 
·Construction Cost. Costs related to construction increased by 29.9%, or R$326.1 million, reflecting the investments made in the transmission, energy distribution and piped gas infrastructure.
·Other Costs and Expenses.Other costs and expenses increased 56.8%, or R$120.8 million, mainly due to the repeal of the state law and, consequently, the registration of the water rate reversal in 2019, which is not recurring in 2020.

Equity earnings of associates and joint ventures

Equity earnings of associates and joint ventures was R$193.5 million in 2020, an increase of 81.2%, compared to R$106.8 million in 2019. This variation is a result of an increase by 111.7% in equity earnings of joint ventures, mainly Mata de Santa Genebra, offset by a decrease of 21.4% in equity earnings of associates, mainly Foz do Chopim. 

Financial Results

We recognized an increase of financial gains of 290.2%, or R$1,321.7 million mainly due to: (i) increase of R$906.1 million of recognition of tax credit; (ii) increase of R$149.2 million of interest and monetary variation of CRC transfer; (iii) increase of R$ 56.4 million of arrears charges on bills; and (iv) decrease of R$246.3 of monetary and exchange variation and debt charges.

Income Tax and Social Contribution Expenses

In 2020, our income tax and social contribution expenses was R$1,285.4 million, reflecting an effective tax rate of 25.1% in our pretax income, compared to R$675.6 million and an effective tax rate of 23.7% in our pretax profit in 2019.

Net income (loss) from discontinued operations

Due to the ongoing divestment process, as described in Note 40 to our Consolidated Financial Statements, the results of Copel Telecom operations were classified as discontinued operations. The R$183.9 increase in the results of discontinued operations is due to the fact that, in 2019, there was a process of revision of Copel Telecom's property, plant and equipament assets that resulted in significant amounts of impairment and write-offs recorded that year, not recurring in 2020.

 

 
92 
 
 

 

LIQUIDITY AND CAPITAL RESOURCES

Our principal liquidity and capital requirements are to finance the expansion and improvement of our distribution and transmission infrastructure and to finance the expansion of our generation facilities.

We believe our working capital is sufficient for our present requirements and the next 12 months. We expect to finance our liquidity and capital requirements primarily with our own resources, arising from retained earnings and cash generation from our operations and third party resources (BNDES, Other Financial Institutions and Capital Markets). However, the expectation of the economic impacts resulting from the shutdown caused by the outbreak of the coronavirus (COVID-19), with subsequent effects on Copel's operations, may affect Company's financial results. In December 2021, our Current Liquidity, an index ratio that measures our current assets over our current liabilities reached 1.4x (1.2x in 2020) with a cash balance, equivalent to cash and marketable securities of R$3,853.9 million (R$3,545.7 million in 2020 and R$3,251.5 million in 2019).

With respect to long term capital needs, we use a model of five years to monitor our needs in a series of scenarios and variables, including Net Debt/ EBITDA and minimum cash balance with the intention to preserve the liquidity and improve the capital structure. In this context, we work to anticipate exercises of liability management to improve liquidity or if conditions are favorable.5

All of our future liquidity conditions rely on a series of scenarios and may be adversely affected depending on market and other conditions. Actual liquidity may differ significantly for several reasons, including, without limitation, the risks described in “Forward-Looking Statements” and “Item 3. Key Information―Risk Factors”.F

We have not engaged in any off-balance sheet arrangements that have, or are reasonably likely to have a current or future effect on the registrant’s financial condition, changes in financial condition, revenues or expenses, results of operations, liquidity, capital expenditures or capital resources that is material to investors.

We monitor our financial liquidity continuously and, for that purpose, we consider (i) on the external side, the possibility of raising funds and the prospect of preserving cash through the assistance of structural measures by the Brazilian government and other Sectoral Institutions, and (b) on the internal side, taking the necessary actions in our operations by reducing expenses or postponing investments in order to guarantee the timely fulfillment of financial obligations. Accordingly, we expect to preserve the working capital required for our operations throughout the period.

In addition to working capital, our other principal uses of cash are capital expenditures, dividend payments and debt servicing. Capital expenditures were R$2,255.2 million in 2021 and R$1,904.7 million in 2020. The following table sets forth a breakdown of our capital expenditures for the periods indicated. Our capital expenditures are focused on projects located in Brazil.

 

Year ended December 31,

 

2021

2020

2019

  (R$million)
Generation and transmission¹ 494.8 431.9 691.9
Distribution 1,623.0 1,279.6 919.9
Telecom 54.4 103.4 146.3
Investment of associates and joint ventures 31.0 72.4 267.5
Araucária Thermoelectric Plant 0.0 0.4 0.4
Compagas 14.3 15.2 17.6
Elejor 31.1 0.2 0.2
Others 6.6 1.6 11.8
Total 2,255.2 1,904.7 2,055.6

 

¹ Considers investment in projects held 100% by Copel GeT.

 
93 
 
 

As in previous years, our capital requirement will be financed by cash from our operations and/or by external financing, which may serve to offset commitments arising from the maturity of previous external financing.

Our total budgeted capital expenditures for our wholly-owned subsidiaries for 2022 is R$2,067.1 million, of which:

·R$228.1 million are for generation and transmission;
·R$1,634.5 million are for our distribution business;
·R$179.2 million for the construction of the Cutia Wind Farm Complex, Jandaíra Wind Farm Complex and Vilas Complex;
·R$25.3 million are for other investments.

Our following subsidiaries also budgeted their own capital expenditures for 2022, as described as follows:

·Compagas: R$23.7 million;
·Araucária: R$3.9 million; and
·Elejor: R$23.9 million.

Historically, we have financed our liquidity and capital requirements primarily with cash provided by our operations and through external financing. Our principal source of funds in 2021 was our operating activities. Net cash used by financing activities was R$2,884.4 million in 2021, compared with R$1,715.1 million in 2020. Net cash provided by operating activities was R$3,386.8 million in 2021, compared with R$3,940.8 million in 2020 and R$2,945.0 million in 2019. The decrease is mainly explained by the growth in expenses with “Electricity Purchased for Resale,” due to the hydrological deficit and the need to purchase energy to compy with existing contracts. In 2021, the main events were the receipt of R$ 2.4 billion (equity value) for the sale of Copel Telecomunicações, the recognition by the governement a credit of R$1,570.5 million in our favor referring to the renegotiation of hydrological risk (GSF) and the full settlement by the State of Paraná of the debt balance of R$ 1,431.2 million relating to an existing contract (CRC Contract). In 2022, we expect to finance our liquidity and capital requirements primarily with own Resources, arising from retained earnings and cash generation from our operations and Third Party Resources (BNDES, Other Financial Institutions and Capital Markets).

Long-term debt have generally been used to finance our major capital expenditure projects, or capital expenditures acquisition financing programs offered by Federal Development Bank, as BNDES. The scheduled maturities of these long-term loans have been structured to match the expected cash flow from the conclusion of the related capital expenditure projects and, as a result, reduce the risk of any significant deterioration of our liquidity position.

The following table shows the maturity of loans, financing and debentures:

 
 

(R$million)

 

Short Term

Long Term

 

2022

2023

2024

2025

2026

2027

>2027

Total

Domestic Currency 2,722.95 1,728.661 741,57 1,843.51 1,553.655 483.81 2,601.336 11,675.49
Foreign Currency  1.30  -  149.27  -  -  -  -    150.57
Total 2,724.25 1,728.661 890.84 1,843.51 1,553.655 483.81 2,601.336 11,826.06

 

As in prior years, we plan to make significant investments in future periods to expand and upgrade our generation, transmission and distribution businesses. In addition, we may seek to invest in other existing electric utilities, in communications services or in other areas, each of which may require additional domestic and international financing. Our ability to generate cash sufficient to meet our planned expenditures is dependent upon a variety of factors, including our ability to maintain adequate tariff levels, to obtain the required regulatory and environmental authorizations, to access domestic and international capital markets, and a variety of operating and other contingencies. We anticipate that our cash provided by operations may be insufficient to meet these planned capital expenditures, and that we may require additional financing from sources such as BNDES and the Brazilian and international capital markets.

 
94 
 
 

ANEEL’s regulations require prior approval from ANEEL for any transfer of funds from our subsidiaries to us in the form of loans or advances. ANEEL approval is not required for cash dividends, as long as cash dividends do not exceed a dividend threshold (“Dividend Threshold”) equal to the greater of adjusted net income or income reserves available for distribution. The Dividend Threshold is established by Brazilian Corporate Law.

The cash dividends we have received from our subsidiaries have been historically sufficient to meet our cash flow requirements without exceeding the Dividend Threshold. As a result, we have not sought approval from ANEEL to receive either loans or advances from our subsidiaries or cash dividends from our subsidiaries in excess of the Dividend Threshold. We do not expect these restrictions on loans and advances and on cash dividends exceeding the Dividend Threshold to impact our ability to meet our cash obligations, since we expect cash dividends below the Dividend Threshold to be sufficient in the future.

Like other state-owned companies, we are subject to certain CMN restrictions on our ability to obtain financing from domestic and international financial institutions. CMN restrictions could limit our ability to obtain bank financing but do not affect our ability to access the Brazilian and international capital markets, and do not restrict our access to banking financing for the purpose of repaying or refinancing debt.

Our outstanding loans and financing (including debentures) as of December 31, 2021 totaled R$11,826.1 million. Approximately R$150.6 million of the total debt outstanding as of December 31, 2021 was denominated in U.S. dollars. For more information on the terms of these loans and financings including reference to their specific maturity dates and interest rate structure, see Note 22 to our audited consolidated financial statements. We are not subject to seasonality with respect to our borrowing requirements. Our major loans and financing arrangements are:

Banco do Brasil:

·We have R$641.2 million of outstanding debt with Banco do Brasil (not including the debentures listed below), consisting of financings we contracted to increase our working capital.

Debentures:

·In March 2016, Nova Asa Branca I, Nova Asa Branca II, Nova Asa Branca III, Nova Eurus IV and Ventos de Santo Uriel Wind Farms issued R$300.8 million in non-convertible debentures, with sixteen-year maturity and payment of interest on monthly basis. The interest rate of TJLP index + 2.02% per year is applicable to R$147.6 million and IPCA index + 9.87% per year is applicable to R$153.2 million. As of December 31, 2021, we had an aggregate balance of R$231.9 million of outstanding debt under these debentures;
·In October 2017, Copel Distribuição issued R$500.0 million in simple, non-convertible debentures, with an interest rate of 126% of the CDI index per year, with a five years maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$254.8 million under these debentures;
·In October 2017, Copel GeT issued R$1.0 billion in simple non-convertible debentures, with an interest rate of 126% of the CDI index per year, with a five years maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$ 339.8 million under these debentures;
·In July 2018, Copel GeT issued R$1.0 billion in simple, non-convertible debentures, with an interest rate of 126% of the CDI index per year, with a five-year maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$690.3 million under these debentures;
 
95 
 
 
·In September 2018, Copel GeT issued R$290.0 million in simple, non-convertible debentures. These debentures have an interest rate equal to IPCA index + 7.6475% per year, with a seven-year maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$284.5 million under these debentures;
·In September 2018, Copel Distribuição issued R$1.0 billion in simple, non-convertible debentures with an interest rate of CDI index + 2.70% per year, with a five-year maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$684.2 million under these debentures;
·In March 2019, Cutia Empreendimentos issued R$360.0 million in simple, non-convertible debentures. These debentures have an interest rate equal to IPCA index + 5.8813% per year, with a thirteen-year maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$370.9 million under these debentures;
·In June 2019, Copel Holding issued R$500 million in simple, non-convertible debentures, with an interest rate of 106% of the CDI index per year, with a three-year maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$502.4 million under these debentures;
·In July 2019, Copel GeT issued R$1 billion in simple, non-convertible debentures, in two series, with an interest rate of 109% of the CDI index per year and IPCA index + 3.90% with a five-years and six-years maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$1,063.0 million under these debentures;
·In November 2019, Copel Distribuição issued R$850 million in simple, non-convertible debentures, in two series, with an interest rate of IPCA index + 4.20% per year and CDI index + 1,45% per year with an eight-years and three-years maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$761.7 million under these debentures; and
·In June 2021, Copel Distribuição issued R$1.5 billion in simple, non-convertible debentures, in two series, with an interest rate of IPCA index + 4.7742% per year and CDI index + 1.95% per year with an ten-year and five-year maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$1,534.5 million under these debentures; and
·In October 2021, Copel GeT issued R$1.5 billion in simple, non-convertible debentures, in two series, with an interest rate of CDI index + 1,38% per year and IPCA index + 5.7138% per year with a five-year and ten-year maturity and payment of interest on a semester basis. As of December 31, 2021, we had an aggregate outstanding balance of R$1,522.9 million under these debentures.

BNDES

·In December 2013, we received approval for the BNDES financing of HPP Colíder in an aggregate amount of R$1,041.2 million, maturing in October 2031. As of December 31, 2013, we had received R$840.1 million of this amount, with the remaining disbursements to be made in accordance with the construction schedule of HPP Colíder. Additionally, BNDES approved the finance of the Cerquilho III transmission substation in the amount of R$17.6 million, which was disbursed in a single installment. As of December 31, 2021, the aggregate outstanding balance of these two contracts totaled R$689.2 million;
·BNDES has provided a loan to Copel of R$339.0 million to finance the construction of the Mauá Hydroelectric Plant. Mauá is owned by Consórcio Energético Cruzeiro do Sul, in which Copel has a 51.0% interest and Eletrosul has a 49.0% interest. BNDES is providing 50.0% of the loan amount, and Banco do Brasil S.A. is providing the remaining 50.0%. All the receivables arising from this plant were pledged in favor of BNDES and Banco do Brasil until full repayment of the loan. As of December 31, 2021, we had an aggregate of R$144.2 million in outstanding debt with BNDES and Banco do Brasil under this facility;
 
96 
 
 
·In December 2011, we entered into a financing contract with BNDES in the total value of R$44.7 million for the construction of Transmission Line Foz do Iguacu - Cascavel Oeste, with maturity in 14 years. As of December 31, 2021, we had an aggregate of R$14.4 million in outstanding debt under this financing contract;
·In March 2012, we entered into a financing contract with BNDES in the total value of R$282.1 million for the construction of GE Farol, Ge Boa Vista, GE São Bento do Norte and GE Olho D’Água Wind Farms with maturity in 16 years. As of December 31, 2021, we had an aggregate of R$174.8 million in outstanding debt under this financing contract;
·In September 2012, we entered into a financing contract with BNDES in the total value of R$73.1 million for the construction of SHP Cavernoso II, with maturity in 16 years. As of December 31, 2021, we had an aggregate balance of R$36.6 million of outstanding debt under this financing contract;
·In December 2014, we entered into a financing contract with BNDES to finance the improvement of the distribution system of the greater Curitiba area, with maturity in 9.4 years. We have obtained a R$139.1 million funding on December 2014 and as of December 31, 2021, we had an aggregate outstanding balance of R$19.6 million under this financing contract;
·In June 2015, we entered into a financing contract with BNDES in the total value of R$ 154.6 million for the construction Santa Helena and Santa Maria Wind Farm, with maturity in 16 years. As of December 31, 2021, we had an aggregate balance of R$78.8 million of outstanding debt under this financing contract;
·In December 2015, we entered into a financing contract with BNDES in the total value of R$55.8 million for the construction of Transmission Line Assis - Paraguaçu Paulista II and Londrina - Figueira e Salto Osório - Foz do Chopim C2, with maturity in 15 years. As of December 31, 2021, we had an aggregate balance of R$29.0 million of outstanding debt under this financing contract;
·In October 2018, we entered into a financing contract with BNDES in the total value of R$194.0 million for the implementing Baixo Iguaçu Hydroelectric Power Plant as well as its associated transmission system, with maturity in 17 years. As of December 31, 2021, we had an aggregate balance of R$171.4 million of outstanding debt under this financing contract;
·In October 2018, we entered into a financing contract with BNDES in the total value of R$619.4 million for the construction and implementing Cutia Empreendimentos Eólicos Wind Farms, with maturity in 17 years. As of December 31, 2021, we had an aggregate balance of R$563.6 million of outstanding debt under this financing contract.
·In August 2018, Copel GeT signed a share exchange agreement with Eletrosul in the controlled ventures Costa Oeste Transmissora de Energia S.A. (51% Copel GeT and 49% Eletrosul), Marumbi Transmissora de Energia S.A. (80% Copel GeT and 20% Eletrosul) and Transmissora Sul Brasileira de Energia S.A. (20% Copel GeT and 80% Eletrosul). With this contract, Copel GeT starts to hold 100% interest in the Costa Oeste and Marumbi undertakings and Eletrosul now holds 100% stake in Transmissora Sul Brasileira.
·Marumbi has an agreement signed with BNDES in 2014, in the amount of R$55 million, for the Implementation of the 525 kV Transmission Line between SE Curitiba and SE Curitiba Leste and the implementation of SE Curitiba, with maturity in 14 years. It has a balance on December 31, 2021 of R$24.7 million.
·Costa Oeste has an agreement signed with BNDES in 2013, in the amount of R$36.7 million, for the implementation of the 230 kV Transmission Line between SE Cascavel Oeste and SE Umuarama Sul and the implementation of the SE, with maturity in 14 years. It has a balance on December 31, 2021 of R$16.3 million.
·In June 2020, we entered into a financing contract with BNDES in the total value of R$432.1 million for the implementing of the Transmission Line SE Medianeira, SE Curitiba Centro, SE Curitiba Uberaba, SE Andirá Leste, Curitiba Leste-Blumenau and Baixo Iguaçu Realeza as well as its associated transmission system, with maturity in 23 years. As of December 31, 2021, we had an aggregate balance of R$348.3 million of outstanding debt under this financing contract.
 
97 
 
 

·On December 8, 2020, BNDES announced the selection of investment bank Banco BTG Pactual SA to coordinate a secondary offering of its holdings in our share capital. There is no contractual or regulatory condition linking the BNDES Secondary Offering to the Conversion Offers described in “Item 4. Information on the Company – Recent Developments”.

CAIXA ECONÔMICA FEDERAL (CEF)

·We have R$9.6 million in outstanding debt related to government programs to finance distribution projects.

BANCO DO NORDESTE

·In May 2021, we entered into a financing contract with BNB for a total value of R$208.7 million for the construction of Jandaíra I, Jandaíra II, Jandaíra III and Jandaíra IV Wind Farms, with a maturity of 17 years. We had received R$69.1 million of this amount, with the remaining disbursements to be made in accordance with the construction schedule. As of December 31, 2021, we had an aggregate balance of R$69.4 million of outstanding debt under this financing contract.
·In November 2021, we completed the acquisition of Vilas Complex, which has financing until 2039/2040. As of December 31, 2021, we had an aggregate balance of R$556.6 million of outstanding debt under this financing contract.

In addition, Copel Distribuição applied to receive a loan in the amount of R$ 145,843,744.31, pursuant to the Term of Acceptance to the Water Scarcity Account created by Decree 10,939/2022 (as proposed in ANEEL Technical Note 08/2022). The loan aims to mitigate the decrease in our operating cash flow as a result of the payments of the Bonus of the Incentive Program for Voluntary Reduction of Consumption of Electricity, energy imports referring to the competences of July and August 2021 and the costs related to the fixed revenue referring to the competences from May to December 2022 of the Simplified Competitive Procedure - PCS of 2021 with monthly transfers as determined and settled by the CCEE. Our application still needs to be approved by the regulatory body.

We are party to several legal proceedings that could have a material adverse impact on our liquidity if the rulings are unfavorable to us. These contingencies are described in “Item 8. Financial Information—Legal Proceedings”.

In addition, we have commitments not yet incurred related to long-term contracts, and therefore not recognized in the financial statements, as presented in Note 38 to our consolidated financial statements. The main amount refers to energy purchase and transportation contracts commitments, totaling R$132,307.4 million on December 31, 2021. These commitments are expected to be settled as follows: R$ 8,403.2 million in less than a year, R$27,275.1 million from one to 5 years and R$96,629.1 million after 5 years.

In Note 36.2.2 to our consolidated financial statements we present the expected values for settlement of contractual obligations undiscounted in each time range. Our projections are based on financial indicators linked to the related financial instruments and forecast according to average market expectations as disclosed in the Brazilian Central Bank's Focus Report.

 
98 
 
 

 

Item 6. Directors, Senior Management and Employees

We are managed by:

·a Board of Directors, which may be composed of up to nine (9) members and is currently composed of nine (9) members; and
·a Board of Executive Officers, which is currently composed of seven (7) members.

BOARD OF DIRECTORS

The Board of Directors ordinarily meets monthly. A majority of the members of the Board of Directors is required for the meeting to be held, and decisions are taken by a majority vote of those present at the meeting. For additional information, see “Item 10. Additional Information—Memorandum and Articles of Association”. The members of the Board of Directors are elected to serve for two-year terms and may be reelected up to another three consecutive terms. Among the current nine members of the Board of Directors:

·five were elected by the controlling shareholders;
·two was elected by minority shareholders (holding voting shares);
·one was elected by minority shareholders (holding outstanding non-voting shares); and
·one was elected by our employees.

According to Brazilian Corporate Law, minority shareholders are entitled to appoint and remove at least one member of the Board of Directors, in a separate election, without the participation of the controlling shareholder, if such minority shareholders hold (i) at least 15% of our voting shares or (ii) at least 10% of the company’s outstanding non-voting shares. Minority shareholders holding at least 10% of our voting shares are entitled to request that a multiple voting procedure be adopted, a proceeding that grants each voting share as many votes as there are members of the Board of Directors and the right for all the voting shareholders to vote for only one candidate or to distribute his votes among several candidates, also in accordance with the Brazilian Corporate Law.

Our bylaws entitle minority shareholders that hold voting shares the right to appoint and remove two members of the Board of Directors, in a separate election, regardless of the voting shares which are held by them as a class, if they haven’t appointed a higher number through a Multiple Vote proceeding in the general shareholders’ meeting. Moreover, our employees are also entitled to appoint and remove one member of the Board of Directors. However, if a multiple vote proceeding is adopted and, also, the minority shareholders appoint members of the Board of Directors through a separate election, the controlling shareholder is entitled to appoint and remove the same number of members appointed and elected by the minority shareholders and employees, plus one.

Also according to Brazilian Corporate law, members of our Board of Directors who are elected by the non-controlling shareholders have the right to veto (provided it is duly justified) the appointment of the independent accountant made by the majority of the members of our Board of Directors.

The terms of the current members of the Board of Directors expire in April, 2023. The current members of our Board of Directors are:

Name

Position

Since

Marcel Martins Malczewski Chairman 2019
Leila Abraham Loria Director 2017
Andriei José Beber Director 2021
 Carlos Biedermann Director 2019
Fausto Augusto de Souza Director 2021
Marco Antônio Barbosa Cândido Director 2018
Gustavo Bonini Guedes Director 2019
Marco Antonio Bologna Director 2021
Daniel Pimentel Slaviero Director 2019
 
99 
 
 

The following are brief biographies of the current members of our Board of Directors:

Marcel Martins Malczewski. Mr. Malczewski was born on December 8, 1964. He holds a Master's degree in Industrial Sciences and Computing from Universidade Tecnológica Federal do Paraná (1989); and a Bachelor's degree in Electrical Engineering from Universidade Federal do Paraná (1987). Mr. Malczewski also attended the Owner/President Management Program at Harvard Business School (2004). He serves as Chairman in our Board of Directors. He is also member of the Board of Directors of AMcom, InfoPrice and Velsis. Additionally, Mr. Malczewski is a partner at M3 Investimentos Ltda. and at Trivella M3 Investimentos S.A. Previously, he was member of the Board of Directors of Ubook (2017-2021); member of the Board of Directors of Veltec (2012-2018); co-founder (1990), CEO (2001-2009), Chairman (2010-2011) and member of the Board of Directors (2012-2015) at Bematech S.A. He was also a Professor (1989-1994) and coordinator (1991-1994) of the Computer Engineering undergraduate course at Pontifícia Universidade Católica do Paraná.

Leila Abraham Loria. Ms. Loria was born on January 26, 1954. Ms. Loria took a course in Sustainable Capitalism & ESG online from Berkeley Executive Education (2021); an advanced Governance, Risk and Compliance training course at Risk University - KPMG (2018) and a Corporate Governance and Innovation course at Nova School of Business and Economics, in Lisbon, Portugal (2016). She holds a Post-MBA in Corporate Governance and Capital Markets for executives from B.I. International (2015) and an International Executive MBA from APG-Amana (1994). Ms. Loria also has a Postgraduate Degree in Business Administration from COPPEAD-UFRJ Business School (1978) and a Bachelor’s Degree in Business Administration from Fundação Getúlio Vargas (1976). Ms. Loria is currently a member of our Board of Directors and Chairman of our Minority Shareholders Committee. Additionally, she is the Chairman of the Board of the Brazilian Institute of Corporate Governance - IBGC, Independent Member of the Board of Directors of JBS, alternate member of the Advisory Board of Anaconda, member of the Advisory Council of Casas Pernambucanas and Co-chair of the Women Corporate Directors - WCD. Previously, she was a member of the Statutory Audit Committee of Companhia Paranaense de Energia - Copel (2017-2021); Member of the Board of Directors of Madeira Energia - MESA and Santo Antônio Energia -SAE (2017-2021); Member of the Advisory Board of INPLAC Indústria de Plástico (2016-2021); Member of the Advisory Council of Costão do Santinho Resort (2016-2021); Member of the Advisory Board of the COPPEAD-UFRJ Business School (2005-2018);Executive Officer at Telefonica Brasil and Member of the Board of Directors of Telefonica Vivo (2010-2015); Chairman and General Officer at TVA (Abril Group) and Member of the Board of Directors at Tevecap (1997-2006) and Canbras, a joint venture between Abril and Bell Canada (1998-2002); General Officer and Member of the Board of Directors at Direct TV (1997-1999); Chief Business Officer at Walmart (1994-1997); and Chief Officer for Marketing, Sales, Business, Acquisitions and Human Resources at Mesbla (1978-1994).

Marco Antônio Barbosa Cândido. Mr. Cândido was born on March 6, 1969. Mr. Cândido holds a Ph.D. degree in Production Engineering from Universidade Federal de Santa Catarina - UFSC (1997), a Master’s degree in Production Engineering from Universidade Federal de Santa Catarina - UFSC (1994) and a degree in Aeronautical Mechanics Engineering from Instituto Tecnológico de Aeronáutica - ITA (1991). Mr. Cândido is currently a member of our Board of Directors, Chairman of our Statutory Audit Committee and Chairman of our Investment and Innovation Committee. He is also Chief Executive Officer and Founding Partner at MBC Consultoria, and member of the Board of Directors of the hotel group Rafain, in the city of Foz do Iguaçu–PR, ofAthena Saúde S.A., of Expresso Princesa dos Campos and of Aebel. Previously, he was a member of the Board of Directors of Hospital Santa Rita and Santa Rita Saúde health care provider in the city of Maringá - PR (2015-2019), at Grupo Positivo (2014-2016) and at Sistema de Saúde Mãe de Deus, in the state of Rio Grande do Sul - RS (2014-2015); Chief Executive Officer at Grupo Marista (2012-2013), at Grupo Paysage (2013-2015) and at Associação Paranaense de Cultura - APC, a parent company of Pontifícia Universidade Católica do Paraná - PUCPR (2005-2012); and a professor and researcher at Pontifícia Universidade Católica do Paraná - PUCPR (1995-2013).

Carlos Biedermann. Mr. Biedermann was born on August 18, 1953. Mr. Biedermann attended the Executive Program of the Singularity University (2019) and the International Business Programme at INSEAD in France (1995). He holds a post-graduate degree in Financial Markets from Fundação Getúlio Vargas - FGV (1979) and Bachelors’ degrees in Accounting, from Unisinos (1977), and in Business Management and Public Management, from Universidade Federal do Rio Grande do Sul (1975). He is currently a member of our Board of Directors and Financial expert member of our Statutory Audit Committee. Mr. Biedermann has considerable experience as a board member in several sectors, including organizations such as Amcham/RS and the Association of Marketing and Sales Directors of Brazil - ADVB/RS. At present, he is Chairman of the Board of Directors of Brivia Dez and also has seats in the Board of Directors of Lojas Lebes, Madero and CFL Participações. He is a member of the Audit Committee of Suzano Papel e Celulose, Grupo Algar, Grupo Solar and Grupo Cornélio Brennand, Moinho Paulista, Banrisul and of Grupo Edson Queiroz. Mr. Biedermann also acts as Chairman of the Deliberative Council of Grêmio Foot-Ball Porto Alegrense. Additionally, he is an instructor at the Brazilian Institute of Corporate Governance - IBGC and a partner at Biedermann Consulting. Previously, he was Chairman of the Board of Directors of Trensurb (2019 -2021); Guest lecturer in the Post-MBA Corporate Governance Program at Unisinos (2017 - 2019); Member of the Advisory Board of Farmácias São João (2016 - 2019); Chairman of the Audit Committee of Instituto Brasileiro de Governança Corporativa - IBGC (2009 - 2014); Chairman (2013 - 2014) and member of the Board of the Young Presidents Organization - YPO (2009 - 2012 and 2015 - 2017); and Senior Partner at PricewaterhouseCoopers Auditing and Consulting (2002 - 2015).

 
100 
 
 

Gustavo Bonini Guedes. Mr. Guedes was born on April 10, 1982. He holds a post-graduate degree in Election Law from Centro Universitário Curitiba (2009) and a Bachelor's degree in Law from Centro Universitário Autônomo do Brasil (2004). Mr. Guedes is currently a member of our Board of Directors. Additionally, he is a member of the Brazilian Academy of Election and Political Law - Abradep, founding partner at Bonini Guedes Advocacia and a Lawyer specialized in Public Law, with more than 15 years of experience in Electoral, Administrative and Public Management Law. Previously, he was President of the Election Law Institute of Paraná (2015-2016); a Professor at Escola Superior de Advocacia - ESA/PR (2008-2014); advisory member of the Election Law Commission of the Federal Council of the Brazilian Bar Association - OAB (2013-2015); and coordinator of the Election Law Department of Vernalha Guimarães e Pereira Advogados (2008-2015).

Daniel Pimentel Slaviero. Mr. Slaviero was born on November 22, 1980. Mr. Slaviero attended the Owner/President Management - OPM program (2015) and the YPO Harvard President Seminar (2010), both from Harvard Business School. Mr. Slaviero also completed the Executive Business Program (STC) from Kellog School of Management/Fundação Dom Cabral (2009); and holds a degree in Business Administration from Universidade Positivo - UP (2001). Mr. Slaviero is currently our Chief Executive Officer, Member of the Investment and Innovation Committee, Member of the Sustainable Development Committee and Executive Secretary of the Company’s Board of Directors. Additionally, Mr. Slaviero serves as Chairman of the Board of Directors of our wholly-owned subsidiaries Copel Geração e Transmissão S.A., Copel Distribuição S.A., Copel Comercialização S.A., and Copel Renováveis S.A. (currently Copel Serviços S.A.). He is also Chairman of the Board of Directors of F.D.A. Geração de Energia Elétrica S.A. and Full member in the consumption category of the Board of Directors of ONS. Previously he acted as Chairman of the Board of Directors of Copel Telecomunicações S.A. (2019-2021); Chief Executive Officer at Sistema Brasileiro de Televisão - SBT (2017-2018); Chief Business Officer at Sistema Brasileiro de Televisão - SBT (2017-2018); Chief Institutional Officer at Grupo Silvio Santos (2010-2017); General Director at Sistema Brasileiro de Televisão - SBT Brasília (2010-2017); Chairman at the Brazilian Association of Radio and Television Broadcasters - ABERT (2006-2016); Executive Officer at Grupo Paulo Pimentel (2001-2010); and Programming and Production Manager at Grupo Paulo Pimentel (2000-2001).

Andriei José Beber. Mr. Beber was born on November 18, 1973. He holds an MBA in Business Management from Fundação Getúlio Vargas (2006); a PhD in Engineering, Concentration Area: Structures, from Universidade Federal do Rio Grande do Sul (2003); a Masters Degree in Engineering, Concentration Area: Structures, from Universidade Federal do Rio Grande do Sul (1999); and a Bachelor of Science in Civil Engineering from Universidade Regional de Blumenau (1997). He took several professional development courses at Instituto Brasileiro de Governança Corporativa - IBGC (Corporate Risk Management Course (2019), Advanced Course for Board Members (2018), Performance Monitoring Course (2018), Audit Committee Course (2017), and Certified Board Member Course (2016). He is a member of our Board of Directors, Chairman of our Sustainable Development Committee, and Member of our Minority Shareholders Committee. He is also Member of the Board of Directors and Coordinator of the Audit Committee of Tecnisa; Member of the Coordinating Committee - SC Chapter of IBGC; Member of the Supervisory Board of Usiminas; and Professor of the FGV Management Graduate Program of Fundação Getúlio Vargas. Previously, he was an Independent Board Member at AES Eletropaulo (2017-2018); Coordinator of the Graduate Course in Building Maintenance at Universidade do Vale do Itajaí (2004-2019); Board Member at Centrais Elétricas de Santa Catarina - CELESC S.A. (2010-2015); and Associate Researcher at Universidade Federal do Rio Grande do Sul (1999-2003).

 
101 
 
 

Marco Antonio Bologna. Mr. Bologna was born on April 22, 1955. He holds a Bachelor degree in Production Engineering from Escola Politécnica da Universidade de São Paulo (1978) and took an Extension course in Financial Services from Lloyds Bank PLC - Manchester Business School da University of Manchester (UK) (1988). At Companhia Paranaense de Energia - Copel, he is a member of our Board of Directors, our the Investment and Innovation Committee and of our Minority Shareholders Committee. Additionally, he is a member of the Board of Directors of Grupo Edson Queiroz, member of the Advisory Board of Grupo Cornélio Brennand and of Grupo Silvio Santos and Board Member at the non-governmental organization Amigos do Bem. He also acts as Strategy, Finance and Governance Consultant of Grupo F. A. Oliva/Astra and Partner of Grupo Galapagos. Previously, he was President of Grupo Banco Fator - Banco de Investimento, Corretora de Valores, Administração de Recursos e Seguradora (Investment Bank, Brokerage House, Asset Management and Insurance Company) (2015-2018); Member of the Board of Directors and Coordinator of the Audit Committee of Suzano Papel e Celulose S.A. (2006-2018); Chairman of the Board at TAM S.A. (2014-2016); Member of the Board at Multiplus Empresa de Fidelização S.A. (2013-2016); President of TAM S.A. - Holding Company (2010-2015); President of TAM S.A. and TAM Linhas Aéreas S.A. (2004-2007 and 2012-2013); Member of the Board at TAM S.A. (2009-2012); Member of the Board at TAM Aviação Executiva S.A. (2008-2012); CEO of Wtorre S.A. (2008) and Member of the Board of Wtorre Commercial Properties (2009-2011); Member of the Board of Directors of IATF - IATA Tranning Fund (Geneva) (2010-2011); CEO of TAM Aviação Executiva (2009-2010); Advisor of TAM Empreendimentos e Participações - Holding Company (Amaro family) (2003-2009); Member of the Board of Directors of Banco Daycoval S.A. (2007-2008); Member of the Board of Directors of Interprint S.A (2006-2007); CEO of Banco VR and Chief Financial Officer of Grupo VR (Szajman family) (2003); and CFO of TAM S.A. and TAM Linhas Aéreas S.A. (2001-2003).

Fausto Augusto de Souza. Mr. Souza was born on November 04, 1980. He holds an Executive MBA in Management - Electricity Sector from Fundação Getúlio Vargas (2019), a Master's degree in Electrical Engineering from Universidade Federal do Paraná (2015), a Bachelor's degree in Electrotechnical Engineering fom Universidade Tuiuti do Paraná (2011) and a Specialization in Automation and Industrial Process Control from Universidade Tecnológica Federal do Paraná (2005). He formerly took courses in Technologist in Electrotechnics: Automation and Industrial Drives (2003) and Technician in Electrotechnics at Universidade Tecnológica Federal do Paraná (1999). He is currently a member of our Board of Directors and Sustainable Development Committee. He also serves as Electro-technical Technician at Copel Distribuição S.A. Previously he was a member of the Permanent Commission of the Ecoefficiency Program at Companhia Paranaense de Energia - Copel (2017-2018); Substitute Professor of the Electrical Engineering, Control and Automation Engineering and Industrial Automation Technology courses at Universidade Tecnológica Federal do Paraná - UTFPR (2013-2015); Professor and researcher of the Electrical Engineering and Control and Automation Engineering courses at Unisociesc - Curitiba campus (2016-2017); and Professor of the Electrical Engineering and Systems Analysis course at Universidade Unicesumar - Curitiba (2018-2020).


 
102 
 
 

BOARD OF EXECUTIVE OFFICERS

Our Board of Executive Officers meets fortnightly and is responsible for the daily management of the Company. Each Executive Officer also has individual responsibilities established by the Board’s rules of procedure.

According to our bylaws, our Board of Executive Officers consists of seven (7) members. The Executive Officers are elected by the Board of Directors for two-year terms but may be removed by the Board of Directors at any time. The terms of the current members of the Board of Executive Officers expire in December 2023. The current members are as follows:

Name

Position

Since

Daniel Pimentel Slaviero Chief Executive Officer 2019
Ana Letícia Feller Chief Business Management Officer 2018
Adriano Rudek de Moura Chief Financial and Investor Relations Officer 2017
Cassio Santana da Silva Chief Business Development Officer 2019
Eduardo Vieira de Souza Barbosa Chief Legal and Institutional Relations Officer 2019
Vicente Loiácono Neto Chief Governance, Risk and Compliance Officer 2018
David Campos Chief Assistant Communications Officer. 2019

 

The following are brief biographies of the current members of our Board of Executive Officers:

Daniel Pimentel Slaviero. Mr. Slaviero has been our Chief Executive Officer since January 8, 2019. For biographical information regarding Mr. Slaviero, see “—Board of Directors”.

Ana Letícia Feller. Ms. Feller was born on October 15, 1977. She received an MBA degree in Leadership with emphasis in Management, from Estação Business School (2015); a Post-graduate degree in Management with emphasis in Strategic People Management, from FAE Centro Universitário (2009); and a Post-graduate degree in Labor Law, from Unibrasil (2005). She holds a Bachelor’s degree in Law from Pontifícia Universidade Católica do Paraná (2000). She is currently our Chief Business Management Officer; as well as Member of the Board of Directors of Copel Distribuição S.A., Copel Comercialização S.A., and Copel Renováveis S.A. (currently Copel Serviços S.A.). Ms. Feller has worked for us since 2002, first as a lawyer and also as Member of the Board of Directors of Copel Telecomunicações (2019-2021); Assistant to the Chief Business Management Officer (2017-2018); Chair of the Permanent Compensation Committee (2017-2018); Chair of the Management Committee (2017-2018); Human Resources Chief Official (2007-2010 and 2013-2017); and member of the Ethical Guidance Council (2006-2008 and 2010-2012). Additionally, she was an alternate member of the Deliberative Council of Fundação Copel de Previdência e Assistência Social (2014-2018).

Adriano Rudek de Moura. Mr. Moura was born on September 25, 1962. Mr. Moura took a professional development course at Instituto Brasileiro de Governança Corporativa - IBGC (2020 and 2018), at Fundação Dom Cabral (2019), at Duke’s Fuqua School of Business (2010) and at Harvard Business School (2007). He received a post-graduate degree in Finance and Controllership from Fundação Instituto de Pesquisas Contábeis, Atuariais e Financeiras - FIPECAFI/USP (1997). Mr. Moura holds a degree in Accounting from Centro Universitário Ítalo Brasileiro – Unítalo (1985). Mr. Moura is currently Copel’s Chief Financial and Investor Relations Officer. He is also Chief Financial and Investor Relations Officer of Copel Geração e Transmissão S.A.; Chief Financial Officer of Copel Distribuição S.A.; Chief Financial Officer of Copel Comercialização S.A.; and Chief Financial Officer of Copel Renováveis S.A. (currently Copel Serviços S.A.). Previously, he was Vice-president and Chief Management, Financial and Investor Relations Officer at Elecrolux for Latin America (2003-2017); Chief Management, Financial and Investor Relations Officer at Electrolux do Brasil (1999-2003); Controller at Electrolux do Brasil (1997-1999); Vice-president at Associação Nacional de Fabricantes de Produtos Eletroeletrônicos (National Association of Home Appliance Manufacturers)(2013-2015); member of the Board of Directors at CTI (2011-2017) and at Eletros (2013-2015); member of the Supervisory Board at Gafisa (2009-2014); Tenda (2009-2014); and Alphaville (2012-2013); graduate school Professor at Fundação Armando Alvares Penteado - FAAP (1999); Professor at Faculdade de Administração de Empresas e Economia do Paraná – FAE (1995); and auditor and consultant at Arthur Andersen (1982-1997).

Cassio Santana da Silva. Mr. da Silva was born on August 14, 1978. He holds a Bachelor’s degree in Business Administration from Universidade Federal do Paraná - UFPR (2002); and an Executive MBA from Fundação Getúlio Vargas - Rio de Janeiro (2003). He is currently Copel’s Chief Business Development Officer and a member of the Board of Directors of Copel Geração e Transmissão S.A. Previously, he held leading positions in many multinational companies, such as Business Unit Manager at Telefônica Brasil S.A. (2014-2019); Senior Brand and Trade Manager at Kimberly Clark (2011-2013); Marketing and Trade Marketing Manager at Danone Northeastern Business Unit (2009-2011); National Trade Marketing Manager at Danone (2008-2009); Trade Marketing Manager at Philip Morris (2007-2008); Regional Sales Manager at Ambev in the Dominican Republic (2006-2007); and Trade Marketing Manager (2005-2006) at AmBev.

 
103 
 
 

Eduardo Vieira de Souza Barbosa. Mr. Barbosa was born on October 3, 1982. Mr. Barbosa holds a post-graduate degree in Constitutional Law from Academia Brasileira de Direito Constitucional - ABDConstand a Bachelor’s degree in Law from Universidade Tuiuti do Paraná - UTP. He is currently Copel’s Chief Legal and Regulatory Officer, as well as the Chief Legal and Institutional Relations Officer of Copel Geração e Transmissão S.A., Copel Distribuição S.A., Copel Comercialização S.A. and Copel Renováveis S.A. (currently Copel Serviços S.A.). Previously he acted as Chief Executive Officer at Copel Renováveis S.A. (2019-2021); Member of the Board of Directors of Copel Renováveis S.A., as Executive Secretary (2019-2021); Visiting Professor of Corporative Law for the first graduate studies module at Pontifícia Universidade Católica do Paraná - PUC/PR (2018); Vice President of the Câmara de Arbitragem, Mediação e Conciliação Societária do Brasil - Cambra (1st Brazilian Corporate Chamber of Arbitration, Mediation and Conciliation) (2017-2018); Member of the Board of Directors, elected member of the Executive Board and member of the Auction Committee of the Commercial Registry of the State of Paraná (2015-2018); Strategic Consultant of Companhia Paranaense de Saneamento do Paraná - Sanepar, Assistant to the Chief Legal Officer for CS Bioenergia S.A. (2015-2018); Professor at the Centro de Estudos da Administração Pública - Ceap (Public Administration Studies Center) (2014) and visiting professor of Public Administration; Member of the Political Council (2013-2016) and Chief Legal Officer of the Conselho de Jovens Empresários - CJE (Young Entrepreneurs Committee) (2011-2016) at the State of Paraná Trade Association; Chief Prosecutor of the Commercial Registry of the State of Paraná (2011-2015); Member of the Board of Directors of the Instituto Paranaense de Direito Eleitoral - Iprade (Electoral Law Institute of Paraná) (2010); Member of the Electoral Law Committee of the Brazilian Bar Association - State of Paraná - OAB/PR (2010); Founding partner at Vieira Barbosa & Carneiro law office (2009); and Legal adviser and referee to legal and individual entities directly and indirectly connected to the Public Administration.

Vicente Loiácono Neto. Mr. Loiácono was born on June 4, 1983. He holds a Master’s Degree in Business Law and Citizenship from Centro Universitário Curitiba - Unicuritiba (2021); a post-graduate degree in Civil Procedure Law - Great Transformations from Universidade do Sul de Santa Catarina (2010), and a Bachelor’s degree in Law from Faculdades Integradas Curitiba (2007). Mr. Loiácono is currently Copel’s Chief Governance, Risk and Compliance Officer. Mr. Loiácono has been a lawyer at the company since 2011, where he also served as Advisor to the Chief Executive Office (2017-2018) and to the Chief Legal Office (2013); and as Member of the Ethical Guidance Council (2014). He also was Coordinator of the Risk and Compliance Committee of Instituto Brasileiro de Executivos de Finanças no Paraná - IBEF-PR (2020-2021); member of the Comission on Corporate Compliance and Anti-corruption of the Brazilian Bar Association - OAB-PR (2019-2021); member of the Comission of Employee Lawyers of the Brazilian Bar Association - OAB-PR (20219-2021); member of the Supervisory Board of Fundação Copel de Previdência e Assistência Social (2015); and deputy coordinator of the Conselho de Jovens Empresários - CJE (Young Entrepreneurs Committee) at the State of Paraná Trade Association (2014-2016).

David Campos. Mr. Campos was born on November 05, 1969. Mr. Campos received a Bachelor’s degree in Social Communication - Journalism from Universidade Estadual de Ponta Grossa - UEPG (1990). He is currently Chief Assistant Communications Officer at Companhia Paranaense de Energia - Copel. Previously he acted as Chief Communication Official at Itaipu Binacional (2017); Municipal Secretary of Social Communication at Curitiba Municipality (2011-2012); Head of the Mayor’s Office in Curitiba (2010); Chief Journalist at the State of Paraná Legislative Assembly (2001-2009); Secretary of Social Communication for the State of Paraná (1999-2000); and Municipal Secretary of Social Communication at Curitiba Municipality (1997-1998).

 

 
104 
 
 

SUPERVISORY BOARD

 

We have a permanent Supervisory Board (Conselho Fiscal), which meets monthly. The Supervisory Board consists of five (5) members and five (5) alternates elected for two-year terms by the shareholders at the annual meeting, and may be re-elected up to two (2) consecutive times. The Supervisory Board, which is independent of our management and of our external auditors, has the responsibilities provided in Federal Law No. 6,404/1976 and Federal Law No. 13,303/2016, which include, among others:

·reviewing our financial statements and reporting on them to our shareholders;
·issuing reports on proposed changes in capitalization, corporate budgets and proposed dividend distributions and any corporate reorganization to be submitted to the shareholders; and
·in general, supervising the activities of management and reporting on them to our shareholders.

The following table lists the curent and alternate members of the Supervisory Board, who were appointed at the 66th annual shareholders' meeting, held on April 29, 2021. The term of all members of the Supervisory Board indicated below will expire in April, 2023.

Name

Since

Demetrius Nichele Macei 2019
Harry Françóia Júnior 2019
José Paulo da Silva Filho 2019
Eduardo Badyr Donni  2021 
Raphael Manhães Martins  2021 
Alternates  
João Luiz Giona Junior(1) 2018
Otamir Cesar Martins 2018
Verônica Peixoto Coelho 2021
Estevão de Almeida Accioly 2019
Cristiane do Amaral Mendonça  2021 

(1) João Luiz Giona Junior resigned on December 21, 2021.

 
105 
 
 

 

AUDIT COMMITTEE

Pursuant to Rule 10A-3 under the Securities Exchange Act and our bylaws, our Audit Committee consists of three (3) members, each of whom serves a term of two years, and may be re-elected up to two consecutive times. Pursuant to the rules of procedure of the Audit Committee, the members of this committee are appointed by, and may be replaced by, a resolution taken by our Board of Directors. The members of the Audit Committee are Mr. Marco Antônio Barbosa Cândido (chairman), Mr. Luiz Claudio Maia Vieira and Mr. Carlos Biedermann. The Audit Committee is responsible for auditing and supervising the processes related to the preparation of our financial statements, ensuring that we are in compliance with all legal requirements related to our reporting obligations, monitoring the work of the independent auditors and our staff who are responsible for internal auditing of the Company and reviewing the effectiveness of our internal control and risk management procedures and staff.

 
106 
 
 

APPOINTMENT AND EVALUATION COMMITTEE (“CIA”)

 

The CIA is a permanent statutory body of Copel which provides support to Copel’s shareholders. The CIA’s purpose is to verify the compliance of the process of appointment and evaluation of statutory body members of Copel (i.e. Board of Directors, Fiscal Council, Executive Board and relevant statutory committees), in each case in accordance with (i) the Appointment Policy; (ii) the Internal Rules of Appointment of Statutory Bodies Members; (iii) other internal rules; and (iv) applicable law. The CIA works closely with Copel (Holding) and its wholly-owned subsidiaries and its scope may be extended to controlled companies, affiliates and other companies in which Copel and its wholly-owned subsidiaries hold equity interests.

Member

Position

Date of Appointment

Marcos Leandro Pereira Chairman 04.29.2021
Robson Augusto Pascoalini Member 04.29.2021
Durval Jose Soledade Santos Member 10.01.2021

 

 
107 
 
 

INVESTMENT AND INNOVATION COMMITTEE (“CII”)

 

In 2021, Copel created the Investments and Innovation Committee (“The CII”), an advisory body to the Board of Directors, and approved the Investment Policy to improve capital allocation, an essential tool for the execution of our Strategic Guidelines of sustainable growth, value generation for shareholders and the longevity of our energy business. The policy establishes criteria for the selection, prioritization, evaluation, approval and monitoring of investments. As such, the development of projects takes this Policy and our Strategic Guidelines into account. Our Investment Policy is available in our website ri.copel.com/en/.

The CII is a permanent statutory body of Copel which provides support to Copel’s Board of Directors. The CII’s purpose is to analyze and issue recommendations regarding Copel’s investment plans, in order to facilitate robust oversight of our investments by the Board of Directs. The CII works closely with Copel (Holding) and its wholly-owned subsidiaries and its scope may be extended to controlled companies, affiliates and other companies in which Copel and its wholly-owned subsidiaries hold equity interests.

Member

Position

Date of Appointment

Daniel Pimentel Slaviero Member 05.06.2021
Marco Antônio Barbosa Cândido Chairman 05.06.2021
Marco Antonio Bologna Member 05.06.2021

 

 
108 
 
 

 

SUSTAINABLE DEVELOPMENT COMMITTEE (“CDS”)

The Sustainable Development Committee (“CDS”) is an independent and permanent body that advises the Board of Directors in relation to Copel and its wholly-owned subsidiaries. CDS may interact with companies directly or indirectly controlled by us when determined by the Board of Directors. CDS role, operation and composition are determined by internal policies approved by the Board of Directors. Among its activities, we highlight the assistance to the set of guidelines, policies and principles for the management of personnel and the sustainable development of the Company and its sudisidiaries, focusing on social, environmental and governance (ESG) matters, based on best market practices.

Member

Position

Date of Appointment

Andriei José Beber Chairman 05.06.2021
Daniel Pimentel Slaviero Member 05.06.2021
Fausto Augusto de Souza Member 05.06.2021
Marcos Leandro Pereira Member 05.06.2021

 

MINORITY SHAREHOLDERS COMMITTEE (“CDM”)

The Minority Shareholders' Committee (“CDM”) is an independent and permanent body that advises the Board of Directors. CDM role, operation and composition are detailed in internal policies approved by the Board of Directors.

Member

Position

Date of Appointment

Leila Abraham Loria Chairman 06.16.2021
Andriei José Beber Member 06.16.2021
Marco Antonio Bologna Member 06.16.2021

 

 

 
109 
 
 

 

 

COMPENSATION OF DIRECTORS, OFFICERS, SUPERVISORY BOARD MEMBERS AND AUDIT COMMITTEE MEMBERS

Under Brazilian Corporate law, the total compensation of the Board of Directors, Executive Board and Supervisory Board is established annually by our general shareholders meeting. Under paragraph 3 of section 162 of the Brazilian Corporate Law, the compensation of the members of our Supervisory Board must be equal to, or greater than, 10% of the average compensation paid to the members of our Executive Board (excluding benefits, representation funds and profit-sharing plans, if applicable). The members of our Supervisory Board received in 2020 15% of the monthly compensation of the Chief Executive Officer. Finally, the members of our Audit Committee (who are also members of our Board of Directors) received the monthly compensation paid to the members of the Supervisory Board plus R$5,000.00.

For the year ended December 31, 2021, the aggregate amount of compensation paid by us to the members of our Board of Directors, Board of Executive Officers and Supervisory Board was R$12.94 million, of which 75.92% was for our Board of Executive Officers, 17.87% was for our Board of Directors, and 6.21% was for our Supervisory Board, as approved by our 66th annual shareholders’ meeting held on April 29, 2021.

The following table shows additional details about the compensation paid to the members of our Board of Directors, Executive Board and Supervisory Board for the periods indicated.

 

Compensation (R$’000) in the years ended December 31,

 

Board of Directors

Executive Officers

Supervisory Board

Area

2021

2020

2019

2021

2020

2019

2021

2020

2019

Number of members(1) 9.17 9.00 8.33 7.00 7.00 7.00 5.17 5.00 5.00
Total Salary 756.83 641,1 514.7 4,993.50 4,995,0 4,976.8 659.43 659,4 659.2
Largest Salary 227.83 227,80 230.3 879.23 879,2 1,731.4 131.89 131,9 171.4
Smallest Salary 43.23 131,9 158.3 388.42 389,9 805,6 43.23 131,9 158.3
Average Salary 157.39 181,4 224.6 713.36 713,6 1,409.7 106.73 131,9 161.8
Compensation for attending committees(2) 1,099.68 1183,6 1,005.2 -    - - -    - -
Others(3) 456.46 451,9 340.0 4,834.56 2,106.0 2,059.5 144.31 145,8 147.5
Total(4) 2,312.98 2,276.6 1,871.9 9,828.06 9,360.0 9,868.0 803.74 805,2 809.1
                     

 

(1) This figure corresponds to the average number of members per year.

(2) Refers to Statutory Committees.

(3) Refers to Private Pension Contribution, Assistance Plan for all members and Representation Grant for Executive Officers.

(4) Comprises Total Salary, Compensation for attending committees and Others.

 

We have no service contracts with our directors providing for benefits upon termination of employment. We do not have a stock option plan for our directors, officers or employees.

 
110 
 
 

EMPLOYEES

On December 31, 2021, we had 6,383 employees, compared to 6,667 employees on December 31, 2020 and 7,095 employees on December 31, 2019. Including employees at Compagas, Elejor and UEG Araucária Ltda. (companies in which we have a majority stake) we had 6,538 employees as of December 31, 2021.

The following table sets forth the number of our employees and a breakdown of employees by area of activity as of the dates indicated in each area of our operations.

 

As of December 31,

Area

2021

2020

2019

Generation and transmission 1,523  1,533 1,620
Distribution 4,430  4,641 4,964
Telecommunications 355 412
Services 217     
Corporation staff and research and development 169  96 61
Other employees 44  42 38
Total employees of Copel and wholly-owned subsidiaries 6,383  6,667 7,095
Compagas 133  142 148
Elejor 7 7
Araucária 15  17 16
Total 6,538  6,833 7,266

All of our employees are covered by collective bargaining agreements that we renegotiate annually with the unions that represent the various employee groups. In 2020, we negotiated and signed labor agreements with the unions representing our employees. These new bargaining agreements became effective in October and will be in place for a period of two years. We agreed to salary increases of 3.89% in 2020 compared to 2019 salaries, and of 10.78% in 2021, in comparison to 2020.

We provide a number of benefits to our employees. The most significant is our sponsorship of Fundação Copel de Previdência e Assistência Social (“Fundação Copel”), which supplements the Brazilian government retirement and health benefits available to our employees. As of December 31, 2021, approximately 99% of our employees had elected to participate in a defined contribution plan.

In accordance with federal law and our compensation policy, our employees participate in a profit-sharing plan. The Board of Directors and the shareholders must approve the amount of such compensation, which is determined in accordance with an agreement between an employee committee and us. An employee’s receipt of compensation is conditioned on the company meeting certain benchmarks described in the above-mentioned agreement, as confirmed in our published year-end financial statements. The amount of profit-sharing distributions reserved and approved for the 2021 fiscal year was R$290.1 million. The amount of profit-sharing distributions accrued and approved for the 2020 fiscal year was R$420.0 million.

In November 2020, the auction for the sale of Copel Telecom was held. The sale was part of the Company's policy to divest non-strategic assets and focus on businesses and services in the energy sector. A Voluntary Dismissal Initiative (Programa de Demissão Voluntária – “PDI”) was created for the remaining employees of Copel Telecom, reducing the number of employees that were relocated within other entities affiliated to COPEL. The program included three phases:

Phase 1: targeted active employees that joined Copel Telecom as of May 31, 2021. The opt-in period began on August 18 to 31, 2021 and the employment contracts of those that adhered to this phase was terminated on February 15, 2022.

Phase 2: target active employees that joined Copel Telecom between January 1, 2019 and May 30, 2021. The opt-in period for this phase was from September 21, 2021 to October 5, 2021 and contract termination for employees that opted in occurred on February 15, 2022.

 
111 
 
 

Phase 3: target the remaining employees of Copel, and adopted categorization based on age and time in the company in descending order as of September 30, 2021. The opt-in period for this phase was from October 11 to October 22, 2021. The termination of employment for those who opted in took place on February 15, 2022.

In total, 461 employees opted into the PDI, resulting in a cost of R$139.2 million in severance pay and a potential reduction of R$153.9 million in annual costs in comparison to the realocation of such employees within our economic group.

On February 12, 2020 the Board of Directors approved the implementation, within Copel and its wholly-owned subsidiaries, of a short-term incentive program called Performance Incentive Program, or Prêmio Por Desempenho (“PPD”) directed at aligning efforts throughout different organizational levels to the company's strategic objectives. The first cycle of the program began on January 1, 2020 and ended on December 31, 20. Payment occurred in April 2021. The results obtained at the end of this first cycle show that 61% of Copel's areas met or exceeded the our set goals and the Goal Achievement Index average (Indice de Cumprimento de Metas or “ICM”) was 100.58%.

 
112 
 
 

SHARE OWNERSHIP

As of March 31, 2022, board members and executive officers held, collectively, directly or indirectly, less than 1.0% of any class of our shares.

The following table indicates the board members, executive officers and members of the Supervisory Board who held shares as of March 31, 2022 and their respective share ownership as of such date, considering shares traded on the B3. No other board member, executive officer, members or alternate members of the Supervisory Board held shares issued by the Company on March 31, 2022.

    Number of shares(1)
Common Class A Class B Units
  Board of Directors
Marcel Martins Malczewski        
Daniel Pimentel Slaviero -   - -
Marco Antônio Barbosa Cândido -   - -
Carlos Biedermann -   - -
Gustavo Bonini Guedes -   - -
Marco Antonio Bologna -   - -
Leila Abraham Loria -   - -
Andriei José Beber -   - -
Fausto Augusto de Souza        
  Executive Officers
Daniel Pimentel Slaviero -   - -
Ana Letícia Feller -   - -
Adriano Rudek de Moura -   13.200 17.100
Cassio Santana da Silva -   - -
Eduardo Vieira de Souza Barbosa -   - -
Vicente Loiácono Neto -   - -
David Campos -   - -
  Supervisory Board – Members
Demetrius Nichele Macei -     -
Harry Françóia Júnior -   - -
José Paulo da Silva Filho -   - -
Eduardo Badyr Donni -   - -
Raphael Manhãs Martins -   9.900 -
  Supervisory Board – Alternates
Otamir Cesar Marins        
Estevão de Almeida Accioly -   - -
Veronica Peixoto Coelho -   - -
Cristiane do Amaral Mendonça -   - -
-        
             

(1) Considers the share split and the shares held directly or indirectly.

 

We have no share-based incentive plan for employees.

 
113 
 
 

 

Item 7. Major Shareholders and Related Party Transactions.

MAJOR SHAREHOLDERS

Since 1954, the State of Paraná has owned the majority of our Common Shares and has exercised control over us. On December 31, 2021, the State of Paraná directly owned 69.66% of the Common Shares. The State of Paraná does not have any different voting rights, but as long as it holds a majority of our Common Shares, it will have the right to elect a majority of our directors.

On December 31, 2021, BNDESPAR owned directly 12.44% of our Common Shares.

The following table, sets forth certain information regarding the ownership of our Common Shares on December 31, 2021:

Shareholder

Common shares(1)

 
  (thousands) (% of total)
State of Paraná  734,305   69.7 
BNDESPAR  131,162   12.4 
Eletrobras  15.308   1.5 
Traded as ADSs  43,115   4.1 
Traded in the B3 (Brasil, Bolsa, Balcão)  126,654   12.0 
Traded in the B3 (Brasil, Bolsa, Balcão) – All directors and officers as a group(2)  17   -
Other  3,539   0.3 
Total  1.054.090   100.0 
       

 

(1) Considers shares held through Units or ADS.

(2) On December 31, 2021, our directors and officers held an aggregate of 17,100 Common Shares.

The following table, sets forth certain information regarding the ownership of our Class B Shares on December 31, 2021:

Shareholder

Class B Shares(1)

 
  (thousand) (% of total)
State of Paraná 115,970   6.9 
BNDESPAR  524,646  31.2 
Eletrobras  -  
Traded as ADSs  172,460  10.3
Traded in the B3 (Brasil, Bolsa, Balcão) 863,945 51.5 
Traded in the B3 (Brasil, Bolsa, Balcão) All directors and officers as a group (2)  92  – 
Other 2,223  0.1
Total 1,679,336 100.0 
       

(1) Considers shares held through Units or ADS.

(2) On December 31, 2021, our directors and officers held an aggregate of 91,500 Class B Shares.

 

As of March 31, 2022, 1.82% of Common Shares, 19.62% of Class B Shares and 1.29% Units were held by United States residents registered at B3 and Unit ADSs listed on the NYSE represented 15.67% of all outstanding Units.

Our total share capital remained unchaged over the past fiscal year. Upon our migration to Level 2 of Governance Standards of B3, in December 2021, the holder of Preferred Shares holder were granted restricted voting rights in relation to certain matters. As of today, each Unit gives its holder equal rights to the underlying 1 Common Shares and 4 Class B Shares, as follows: (i) each Common Shares has one voting right in any shareholder meeting (1 Unit = 1 vote); and (ii) each Class B Share has restricted voting right,s in regards to certain fundamental matters when discussed in a shareholders’ meeting, as further detailed in “Item 10. Additional Information. Memorandum and Articles of Association. Voting Rights”.

 
114 
 
 

Unitization

On April 23, 2021, the Board of Directors approved, the conversion of shares and the formation of share deposit certificates (“Units”) under the 1st Share Conversion and Share Deposit Certificate Formation Program (“1st Units Program” or “Program”). During the request period, the non-controlling shareholders requested (i) the conversion of 362,580,947 common shares into class “B” preferred shares, the conversion of 139,520 class “A” preferred shares into class “B” preferred shares, the total conversion of 82,330,391 class “B” preferred shares into common shares; and (ii) the creation of 248,134,108 Units. In addition, the State of Paraná, as the controlling shareholder, after the request period, required (i) the conversion of 115,969,784 common shares into Class B preferred shares; and (ii) the creation of 28,992,446 Units, in the book-entry environment. After the conversion, the State of Paraná maintains its participation of 31.1% in the total capital of the Company, bout of which 5.3% sre Units. The Board of Directors approved (i) the ratification of the capital stock, fully subscribed and paid up, in the amount of R$10,800,000,000.00, which, after the conversion of shares, represented by 2,736,553,750 shares, without par value, being 1,054,090,460 common shares, 3,128,000 class “A” preferred shares, and 1,679,335,290 class “B” preferred shares; and (ii) the total formation of 277,126,554 Units.

Each Unit comprises four Class B shares plus one Common share. In the United States, each Unit is represented by an ADS issued by the Depositary pursuant to a Deposit Agreement by and among Copel, the Depositary and the registered holders and beneficial owners from time to time of the ADSs. The ADSs trade on the NYSE under the symbol “ELP”. In addition to NYSE and B3, in 2021, Latibex also started trading the Units, under the symbol “XCOPU”.

The following table, sets forth certain information regarding the ownership of our Units ADSs on December 31, 2021: 

 

Shareholder

UNITs

 
  (thousands)
State of Paraná  28,992 
BNDESPAR  131,162  
Eletrobras  - 
Traded – as ADSs  43,344  
 Traded in the B3 (Brasil, Bolsa, Balcão)  32,587  
Other  -  
Traded in the B3 (Brasil, Bolsa, Balcão)All directors and officers as a group(1)

17    

Total  235,874  

 

(1) On December 31, 2021, our directors and officers held an aggregate of 17,100 Units.

 

Since the Conversion Offers were consummated on April 23, 2021 only Units ADS are being traded on the NYSE, while all Class B ADSs are no longer traded.

Share Split

On March 11, 2021, acting at an Extraordinary Shareholders’ Meeting, the shareholders of Copel approved the splitting of our shares, pursuant the Brazilian Corporate Law, in the proportion of one share to ten shares, so that for each one share issued by the Company, nine new shares of the same class and type would be credited (the "Share Split"). The shares were traded ex-Share Split as of March 12, 2021 (inclusive), and the shares resulting from the Share Split were credited to the shareholders on March 16, 2021. Considering that the Share Split was carried out in such a way that each share we issued was split into ten shares of the same type and class, there was no surplus resulting from fractions of shares.

 
115 
 
 

The Share Split did not affect our capital stock, which remained at R$10,800,000,000.00 as of March 12, 2021 or impacted any rights of holders of Copel shares. After the Share Split, our capital stock was represented by 2,736,553,750 shares with no par value, of which 1,450,310,800 Common Shares and 1,286,242,950 Preferred Shares and, of these, 3,267,520 Class A Shares and 1,282,975,430 are Class B Shares. Our management took the necessary measures to implement the Share Split of the ADRs.

 
116 
 
 

Related Party Transactions

We engage in transactions, including the sale of electric energy and charges for use of the transmission system, with our principal shareholders and with our joint ventures and affiliates. The tariffs we charge on electric energy sold to our related parties are approved by ANEEL, and the amounts are not material. We also provide guarantees in the context of financing transactions and power purchase agreements entered into by our subsidiaries in the ordinary course of business. For more information, see Note 37 to our audited consolidated financial statements.

Transactions with Shareholders

The following summarizes the most significant transactions with our principal shareholders:

Government of the State of Paraná

On August 10, 2021, the State of Paraná fully settled the debit balance, updated pro-rata die, of the CRC Account relating to the CRC Agreement in the amount of R$1,431.2 million.

For additional information, see Note 8 to our audited consolidated financial statements.

BNDES and BNDESPAR

BNDESPAR, a wholly-owned subsidiary of BNDES, owns 12.4% of our Common Shares. BNDES has granted us loans to finance the construction of generation and transmission facilities and both BNDES and BNDESPAR have purchased debentures issued by Compagas, Cutia and all debentures issued by Nova Asa Branca I, Nova Asa Branca II, Nova Asa Branca III, Nova Eurus IV and Ventos de Santo Uriel Wind Farms, which are our subsidiaries.

As of December 31, 2021, we had an aggregate of R$2,447.6 million in outstanding net debt with BNDES and BNDESPAR under these financing transactions. For additional information, please see Notes 22, 23 and 37 to our audited consolidated financial statements, as well as Item 5. Operating and Financial Review and Prospects—Liquidity and Capital Resources.

Transactions with Joint Ventures and Affiliates

We have operation and maintenance services agreements, transmission system connection agreements and contracts for the use of transmission system with our Joint Ventures and, also, operation and maintenance services agreements, connection to the transmission system contracts and power purchase and sale agreements signed with our Affiliates, as described on Note 37 to our audited consolidated financial statements. We also have dividend amounts receivable from these investees, as presented in the same note.

Transactions with Other related parties

Fundação Copel

Fundação Copel is a closed pension fund sponsored by Copel, Compagas and other entities that runs and operates benefit plans, welfare and social assistance. In 2021, Copel made payments to Fundação Copel consisting of rental and for expenditure on pension and welfare plans. For more information, see Notes 24 and 37 to our audited consolidated financial statements.

Transactions with Key management staff

The fees and social security charges and the pension and healthcare plans expenses with the Management are presents at Notes 33.2 and 24.3 to our audited consolidated financial statements.

 

Item 8. Financial Information

 

See pages F-1 through F-134.

 
117 
 
 

A. Consolidated Financial Information

See “Item 5. Operating and Financial Review and Prospects—Overview” and “Item 18. Financial Statements.”

 
118 
 
 

 

Legal Proceedings

We are currently subject to numerous proceedings relating to civil, administrative, labor and tax claims. Our audited consolidated financial statements only include provisions when the Company has a present obligation (legal or constructive) resulting from a past event; it is probable (i.e. more likely than not) that an outflow of resources embodying economic benefits will be required to settle the obligation; and a reliable estimate can be made of the amount necessary to settle the obligation. As of December 31, 2021, our provisions for such risks were R$1,597.4 million. However, it is possible that some amounts actually paid are different from the estimates made in recognizing these provisions because of determinations of final judgments and/or liquidations of the award.

As of December 31, 2021, we estimate that the total amount of claims against us, excluding disputes involving non-monetary claims or claims whose potential losses cannot be reasonably estimated due to the current early stages of proceedings, for which no provisions have been made, was approximately R$5,477.5 million, of which R$275.2 million correspond to labor claims; R$3.5 million to employee benefits; R$1,400.5 million to regulatory claims; R$3,237.3 million to civil claims; and R$561.0 million to tax claims. For more information, see Note 30 to our audited consolidated financial statements.

Tax and Social Contribution Claims

During the second half of 2010, two lawsuits were decided before the Federal Regional Court (Tribunal Regional Federal) in favor of the Brazilian government, reversing the prior judgment that recognized our immunity regarding the payment of COFINS tax. As a result, the Federal Internal Revenue Service (Receita Federal) issued an infraction notice demanding the payment of COFINS tax from the period between August 1995 and December 1996. As of December 31, 2021, we had provisioned R$110.1 million to cover expected losses related to these lawsuits.

Additionally, we are party to administrative and judicial proceedings pursuant to which we are challenging claims of the Brazilian Social Security authorities to pay additional security contributions for the period between 2000 and 2006. In these proceedings, we estimate the amount of our expected loss to be R$29.8 million.

Labor-related Claims

We are the defendant in several lawsuits filed by either current or past employees of ours, related to overtime claims, dangerous work conditions, relocation, and other matters. As of December 31, 2021, we have provisions totaling R$569.8 million reflecting the expected losses related to these lawsuits.

Regulatory

We are disputing certain regulatory and legal proceedings in connection with ANEEL’s allegations that we violated regulatory standards. As of December 31, 2021, we have provisions totaling R$103.1 million reflecting the expected losses related to these proceedings.

Additional Claims

We are party to several lawsuits related to accidents involving equipment used in our electricity transmission and distribution grids and vehicle accidents (see Note 30.1 to our audited consolidated financial statements). As of December 31, 2021, we have provisions totaling R$433.4 million reflecting the expected losses related to these lawsuits.

We are also party to several lawsuits brought by landowners whose land has been affected by our transmission and distributions lines. As of December 31, 2021, we have provisions totaling R$263.1 million reflecting the expected losses related to these lawsuits.

 
119 
 
 

Dividend Payment

 

In accordance with our bylaws and Brazilian Corporate Law, we regularly pay annual dividends for each fiscal year within sixty days of the declaration of the dividends at the annual shareholders’ meeting or by the Board of Directors. To the extent amounts are available for distribution, we are required to distribute as a mandatory dividend an aggregate amount equal to at least 25.0% of our adjusted net profit. Dividends are allocated pursuant to the formula described in “Dividend Priority of Class A Shares and Class B Shares” below. Under Brazilian Corporate Law, we are not permitted to suspend the mandatory dividend payable with respect to the Common Shares, Class A Shares and Class B Shares for any year. Brazilian Corporate Law permits, however, a company to suspend the payment of all dividends if the Board of Directors, with the approval of the Supervisory Board, reports at the shareholders’ meeting that the distribution would be detrimental to the Company given its financial circumstances. In such a case, companies with publicly traded securities must submit a report to the CVM providing the reasons for the suspension of dividend payments. Notwithstanding the above, Brazilian Corporate Law and our bylaws provide that Class A Shares and Class B Shares shall acquire voting rights if we suspend the mandatory dividend payments for more than three consecutive fiscal years, and such voting rights will continue until all dividend payments, including back payments, have been made. We are not subject to any contractual limitations on our ability to pay dividends.

In accordance with our dividends policy, we may distribute yearly regular dividends higher than the mandatory minimum of 25% following certain guidelines related to our Financial Leverage Ratio, defined as the ratio between net debt and interest, taxes, depreciation, and amortization:

·If our Financial Leverage Ratio is below 1.5x, we shall distribute 65% of our adjusted net profits.
·If our Financial Leverage Ratio is in between 1.5x and 2.7x, we shall distribute 50% of our adjusted net profits.
·If our Financial Leverage Ratio is higher than 2.7x, we shall distribute the mandatory minimum of 25% of our adjusted net profits.

Any distribution of dividends higher than the minimum amount of 25% of our adjusted net profits is constrained to the Available Cash Flow of the same year, defined as the operating cash flow minus net cash flow used for investment.

Calculation of Adjusted Net Profit

Annual dividends are payable from our adjusted net profit for such period. Brazilian Corporate Law defines “net profit” for any fiscal year as the profits of a fiscal year after the deduction of income and social contribution taxes for that fiscal year and after the deduction of any amounts allocated to employees’ and management’s participation in our results in such fiscal year. The “net profit” for a relevant fiscal year is subject to adjustment by the addition or subtraction of amounts allocated to legal and other reserves, the result of which is known as our adjusted net profit.

In accordance with Brazilian Corporate Law, we must maintain a legal reserve, to which we must allocate a minimum of 5% of our net profits for each fiscal year until such reserve reaches an amount equal to 20.0% of our capital stock (calculated in accordance with Brazilian Corporate Law). However, we are not required to make any allocations to our legal reserve in a fiscal year in which the legal reserve, when added to our other established capital reserves, exceeds 30.0% of our total capital stock. The amounts to be allocated to such reserve must be approved by our shareholders in a shareholders’ meeting and may be used only for the increase of our capital stock or compensation of losses.

On December 31, 2021, our legal reserve was R$1,457.1 million, or approximately 13.5% of our capital stock at that date.

In addition to deducting amounts for the legal reserve, under Brazilian Corporate Law net profit may also be adjusted by deducting amounts allocated to:

·the contingency reserve: under Brazilian Corporate Law, our shareholders’ meeting, upon a justified proposal of our Board of Directors or Board of Executive Officers, may decide to allocate a percentage of our net profits to a contingency reserve for anticipated losses that are deemed probable in future years, which amount may be estimated;
 
120 
 
 
·the tax incentives reserve: under Brazilian Corporate Law, our shareholders’ meeting, upon a justified proposal of our Board of Directors or Board of Executive Officers, may decide to allocate a percentage of our net profits resulting from government donations or subsidies for investment purposes.

On the other hand, net profits may also be increased by:

·the reversal of any amounts previously allocated to a contingency reserve in the fiscal year in which the loss that had been anticipated does not occur as projected or in which the anticipated loss occurs but is lower than the contingency allocated to it; and
·any amounts included in the unrealized profits reserve that have been realized in the relevant fiscal year and have not been used to offset losses, as approved by our shareholders’ meeting, upon the proposal of our Board of Directors or Board of Executive Officers.

Moreover, our net profits are also adjusted by adding the realization of amounts registered under “Equity Value Adjustments”. The account “Equity Value Adjustments” was created as a result of the first-time adoption of IFRS by Copel in 2010, which caused a fair value revaluation of certain fixed assets and the adoption of the fair value as its “deemed cost” at that date. The increase of the deemed cost of fixed assets led to an increase in depreciation costs. Thus, our management has decided to add to the adjusted net profits the realization of the “Equity Value Adjustments” in order to compensate for effects of the increased depreciation costs. In 2021, our adjusted net profits used to calculate our dividends was increased by R$46.6 million as a result of said realization.

The amounts available for distribution are determined on the basis of the Statutory Financial Statements prepared using the method required by Brazilian Corporate Law, which differ from our audited consolidated financial statements included herein.

Dividend Priority of Class A Shares and Class B Shares

According to our bylaws, Class A Shares and Class B Shares are entitled to receive annual, non-cumulative minimum dividends, which dividend per share shall be at least 10% higher than the dividends per share paid to the holders of the Common Shares. Class A Shares have a dividend priority over the Class B Shares, and Class B Shares have a dividend priority over the Common Shares. To the extent that dividends are paid, they are to be paid in the following order:

·first, the holders of Class A Shares have the right to receive a minimum dividend equal to 10% of the total share capital represented by the Class A Shares outstanding at the end of the fiscal year in respect of which the dividends have been declared;
·second, to the extent there are additional amounts to be distributed after all amounts allocated to the Class A Shares have been paid in accordance with the first bullet point above, the holders of Class B Shares have the right to receive a minimum dividend per share equal to (i) the mandatory dividend divided by (ii) the total number of Class B Shares outstanding at the end of the fiscal year in respect of which the dividends have been declared; and
·third, to the extent that there are additional amounts to be distributed after all amounts allocated to the Class A Shares and the Class B Shares have been paid, the holders of Common Shares have the right to receive an amount per share equal to (i) the mandatory dividend divided by (ii) the total number of Common Shares outstanding at the end of the fiscal year in respect of which dividends have been declared, provided that the Class A Shares and Class B Shares receive dividends per share at least 10% higher than the dividends per share paid to the Common Shares.

To the extent that there are additional amounts to be distributed after all amounts described in the preceding items have been paid and in the form therein described, any such additional amount will be divided equally among all our shareholders. Holders of Units are paid dividends equal to those of their underlying shares.

 
121 
 
 

Payment of Dividends

We are required to hold an annual shareholders’ meeting by April 30th of each year at which, among other things, an annual dividend may be declared by decision of the shareholders on the recommendation of the management, as approved by the Board of Directors. The payment of annual dividends is based on the financial statements prepared for the fiscal year ending December 31. Under Brazilian Corporate Law, we must pay dividends to shareholders of record within 60 days of the date of the shareholders meeting that declared the dividends. A shareholders’ resolution may set forth another date of payment, which must occur prior to the end of the fiscal year in which such dividend was declared. We are not required to adjust the amount of paid-in capital for inflation for the period from the end of the last fiscal year to the date of declaration or to adjust the amount of the dividend for inflation for the period from the end of the relevant fiscal year to the payment date. Consequently, the amount of dividends paid to holders of Units may be substantially reduced due to inflation.

Pursuant to our bylaws, our management may declare interim dividends to be paid from profits in our semi-annual financial statements, in accordance with the Company's dividend policy. Any payment of interim dividends counts towards the mandatory dividend for the year in which the interim dividends were paid. In accordance with our dividends policy, Board of Directors should approve at least once a year interim dividends.

Pursuant to Brazilian Corporate Law, we may pay interest on equity in lieu of dividends as an alternative form of making distributions to shareholders. We may treat a payment of interest on equity as a deductible expense for tax purposes, provided that it does not exceed the lesser of:

·the total amount resulting from (i) Long-Term Interest Rate (Taxa de Juros a Longo Prazo, or “TJLP”) multiplied by (ii) the total shareholders’ equity (determined in accordance with Brazilian tax legislation), less certain deductions prescribed by Brazilian tax legislation; and
·the greater of (i) 50.0% of current net income (after the deduction of social contribution on profits (CSLL ‒ Contribuição Social sobre o Lucro Líquido) and before taking such distributions and any deductions for corporate income tax) for the year in respect of which the payment is made or (ii) 50.0% of retained earnings and profit reserves for the year prior to the year in respect of which the payment is made.

In order to be eligible to receive amounts remitted in foreign currency outside of Brazil, shareholders who are not residents of Brazil must register with the Brazilian Central Bank in order to receive dividends, sales proceeds or other amounts with respect to their shares. The Units underlying the ADSs are held in Brazil by the Custodian, as agent for the Depositary, which is the registered owner of our shares.

Payments of cash dividends and distributions, if any, will be made in Brazilian currency to the Custodian on behalf of the Depositary, which will then convert such proceeds into U.S. dollars and will cause such U.S. dollars to be delivered to the Depositary for distribution to holders of ADSs. In the event that the Custodian is unable to immediately convert the Brazilian currency received as dividends into U.S. dollars, the amount of U.S. dollars payable to holders of ADSs may be adversely affected by devaluations of the Brazilian currency that occur before such dividends are converted and remitted. In the event the holder of an ADS fails to collect its dividends from the Custodian within three (3) years, counted as of the date when such dividend was made available, Brazilian Corporate Law states that such dividends may be returned to us. In this case, the ADS holder shall lose its right to receive the dividends.

 
122 
 
 

The table below, sets forth the cash distributions we paid/will pay as dividends and as interest on equity for the periods indicated.

 

Year

Payment date

Distribution (R$thousands)

Payment per share (R$)

      Common Preferred A Preferred B UNIT
2014 Jun 2015                       622,523       0.21723600       0.25250700       0.23900000 -
2015 Jun 2016                       326,795       0.11371600       0.25250700       0.12547300 -
2016 Jun 2017                       282,947       0.09853900       0.28905000       0.10841000 -
2016 Dec 2017                       223,266       0.07792700                      -          0.08593200 -
2017 Aug 2018                       266,000       0.09262400       0.28905000       0.10188700 -
2017 Aug 2018                         23,401       0.00817700                      -          0.00899600 -
2018 Jun 2019                       280,000       0.09751500       0.28905000       0.10727000 -
2018 Jun 2019                         98,542       0.03443500                      -          0.03788100 -
2019 Jun 2020                       321,500       0.11211739       0.19732848       0.12334596 -
2019 Sep 2020                       321,500       0.11211739       0.19732848       0.12334596 -
2020 Sep 2020                              781                      -          0.23912059                      -    -
2020 Aug 2021                       807,500       0.28183240       0.31001564       0.31001564 -
2020 Aug 2021                       210,276       0.07231977       0.14384143       0.07955175 0.39052677
profit reserves (*) Apr 2021                    1,250,000       0.43627306       0.47990038       0.47990038 -
profit reserves (*) Aug 2021                       123,257       0.04301883       0.04732072       0.04732072 -
profit reserves (*) Aug 2021                       134,192       0.04683557       0.05151910       0.05151910 -
2021 (**) Nov 2021                    1,197,002       0.08249641       0.09074606       0.09074606 0.44548065
2021 (**) Nov 2021                       239,636       0.41207756       0.45328533       0.45328533 2.22521888
profit reserves (***) until 7/31/2022                       283,173       0.09748467       0.10723314       0.10723314 0.52641723
2021 (***) until 7/31/2022                    1,368,675       0.47117031       0.51829476       0.51829476 2.54435609

The table below sets forth the cash distributions we paid/will pay as dividends and as interest on equity, translated into US$ based on the exchange rate at year-end, for the periods indicated.

 

Year

Payment date

Distribution (US$ thousands)

Payment per shares (US$)

     

Common

Preferred A

Preferred B

UNIT

2014 Jun 2015 234,366       0.08178450       0.09506325       0.08997816                      -   
2015 Jun 2016 83,691       0.02912211       0.06466580       0.03213302                      -   
2016 Jun 2017 86,818       0.03023503       0.08869013       0.03326378                      -   
2016 Dec 2017 68,505       0.02391059                      -          0.02636679                      -   
2017 Aug 2018 81,618       0.02800000       0.08737908       0.03080018                      -   
2017 Aug 2018 7,074       0.00247189                      -          0.00271947                      -   
2018 Jun 2019 72,262       0.02516646       0.07459740       0.02768401                      -   
2018 Jun 2019 25,431       0.00888691                      -          0.00977625                      -   
2019 Jun 2020 79,763       0.02781586       0.04895638       0.03060162                      -   
2019 Sep 2020 79,763       0.02781586       0.04895638       0.03060162                      -   
2020 Sep 2020 150                      -          0.04601393                      -                         -   
2020 Aug 2021 155,387       0.05423296       0.05965625       0.05965625                      -   
2020 Aug 2021 40,463       0.01391648       0.02767938       0.01530813       0.07514899
profit reserves (*) Apr 2021 219,402       0.07657541       0.08423295       0.08423295                      -   
profit reserves (*) Aug 2021 21,634       0.00755074       0.00830582       0.00830582                      -   
profit reserves (*) Aug 2021 23,554       0.00822066       0.00904272       0.00904272                      -   
2021 (**) Nov 2021 220,061       0.01516645       0.01668310       0.01668310       0.08189886
2021 (**) Nov 2021 44,056       0.07575791       0.08333370       0.08333370       0.40909271
profit reserves(***) until 7/31/2022 50,743       0.01746881       0.01921569       0.01921569       0.09433155
2021(***) until 7/31/2022 245,260       0.08443156       0.09287604       0.09287604       0.45593694

 

(*) US$ based on the exchange rate of 3/31/2021 (**) US$ based on the exchange rate of 9/30/2021 (***) US$ based on the exchange rate of 12/31/2021

 

 
123 
 
 
Item 9.The Offer and Listing

 

The principal trading market for our shares (including our Class B Shares, Common Shares and Units) is the B3 (Brasil, Bolsa, and Balcão) market. Our Common Shares trade on B3 under the symbol “CPLE3” our Class B Shares trade under the symbol “CPLE6” and our Units shares, each representing four Class B shares plus one Common share, trade under the symbol “CPLE11”. On March 31, 2022, approximately 188,638 shareholders owned our CPLE6 shares, 65,854 owned CPLE3 shares and 11,436 owned Units in B3.

In the United States, our Units are in the form of ADSs, issued by the Depositary pursuant to the Deposit Agreement by and between Copel, the Depositary and the registered holders and beneficial owners from time to time of the ADSs. The ADSs trade on the NYSE under the symbol “ELP”.

On June 19, 2002, our shares were listed on Latibex, an Euro-based market for Latin American securities. In 2021, Latibex also started trading the Units, under the symbol “XCOPU”. The shares trade under the symbols “XCOP,” XCOPO and XCOPU.

 
124 
 
 

Item 10. Additional Information

 

Memorandum and Articles of Association

 

Organization

We are a publicly traded company duly registered with the CVM under No. 1431-1. According to Article Four of our bylaws, we are authorized to pursue, directly or through consortia or in partnership with private companies, the following objectives and purposes:

·researching and studying, technically and economically, all energy sources, providing solutions for a sustainable development;
·researching, studying, planning, constructing and developing the production, transformation, transportation, storage, distribution and trade of energy in any of its forms, chiefly electric power, as well as fuels and energy raw materials;
·studying, planning, designing, constructing and operating dams and their reservoirs, as well as other undertakings for multiple uses of water resources;
·providing services in energy trading, energy infrastructure, information and technical assistance concerning the rational use of energy to business undertakings with the aim of implementing and developing economic activities deemed relevant for the development of the State of Paraná, upon approval by the Board of Directors; and
·developing activities in the areas of energy generation, electronic data transmission, electronic communications and control, cellular telephone systems, and other endeavors that may be deemed relevant to the Company and the State of Paraná, being authorized, for such aims, upon approval by the Board of Directors, and for the aims set forth in the second and third sub-items above, to join, preferably holding major stakes or controlling interest, consortia or concerns with private companies, pension funds or other private entities, to participate in bidding processes of new concessions and/or already established special purpose companies to exploit already existing concessions, having taken into consideration, besides the projects' general features, their respective social and environmental impacts.

Except as described in this section, our bylaws do not contain provisions addressing the duties, authority, or liabilities of directors and management, which are instead established by Brazilian Corporate Law.

Qualification of Board of Directors

The appointed directors must comply with the legal requirements set forth in Federal Law No. 13,303/2016, particularly the ones mentioned in its article 17, and Federal Law No. 6,404/1976. Moreover, pursuant to Federal Law No. 13,303/2016 and to our bylaws, our Board of Directors will mandatorily comprise, at least, (i) three independent members or no less than 25% of the members of our Board of Directors, (ii) three to five members that meet the requirements for members of the Statutory Audit Committee, (iii) two members appointed by minority shareholders which held voting shares, if they do not elect a higher number through multiple vote, (iv) one member appointed by shareholders holding preferred shares, representing, at least, 10% of Copel’s total capital stock, and (v) one member appointed by the employees. Among the members described in item (ii) above, at least one shall compulsorily have recognized professional experience in matters of corporate accounting in order to sit on the Statutory Audit Committee.

Limitations on Directors’ Powers

Under Brazilian Corporate Law, if a director or an executive officer has a conflict of interest with the company in connection with any proposed transaction, the director or executive officer may not vote in any decision of the board of directors or of the board of executive officers related to that transaction, and must disclose the nature and extent of the conflict of interest for transcription in the minutes of the meeting. A director or an executive officer may not transact any business with a company, including accepting any loans, except on reasonable and fair terms for the Company and conditions that are identical to the terms and conditions prevailing in the market or offered by third parties. According to our bylaws, shareholders set the aggregate compensation payable to directors, executive officers, and members of the Supervisory Board. For more information, see “Item 6. Directors, Senior Management and Employees”. Our bylaws do not establish any mandatory retirement age limits.

 
125 
 
 

Board of Directors and Board of Executive Officers

According to our bylaws, we are managed by a Board of Directors, composed of nine members and a Board of Executive Officers, composed of six to seven members.

Our Board of Directors ordinarily meets monthly and is responsible, among other things, for: (i) establishing our corporate strategy; (ii) defining the general orientation of our business; (iii) defining the responsibilities of members of our Board of Executive Officers; and (iv) electing the members of our Board of Executive Officers.

Our Board of Executive Officers meets every two weeks and is responsible for the daily management of the Company. Each Executive Officer also has individual responsibilities established by our bylaws.

The members of our Board of Directors, of our Board of Executive Officers, our Supervisory Board and of our statutory committees shall be liable for any loss or damages resulting from the performance of their duties, in compliance with the applicable law. Notwithstanding, we shall ensure, provided no conflict with our own interests arises, legal assistance for members or former members of statutory bodies in judicial and administrative proceedings brought by third parties, during or after their term of office, for the performance of the duties of their office, in accordance to the terms and provisions of our bylaws.

For further information, see Items 6 – “Directors, Senior Management and Employees - Board of Directors” and “Directors, Senior Management and Employees - Board of Executive Officers”.

Shareholders’ Meetings

The convening of our shareholders’ meeting is made through publication of a notice to shareholders in a newspaper. As provided by Brazilian Corporate Law, publications have to be made in a newspaper with wide circulation in the same city as our corporate headquarters. The notice must be published no fewer than three times, beginning at least 21 calendar days prior to the scheduled meeting date. We make local notices in the Folha de Londrina.

In order for a shareholders’ meeting to be held on first call, shareholders representing at least one-quarter of the voting capital have to be present, except as otherwise provided for under Brazilian law. If no such quorum is verified, a second meeting may be called by notice given at least 8 calendar days prior to such meeting and in accordance with the same rules of publication previously described. The quorum requirements will not apply to a second meeting, subject to the minimum quorum and voting requirements for certain matters, as discussed as follows. A shareholder without a right to vote may attend a general shareholders’ meeting and take part in the discussion of matters submitted for consideration.

A shareholder may be represented at a general shareholders' meeting by a proxy appointed in accordance with applicable Brazilian law not more than one year before the meeting, who must be a shareholder, a company officer, a lawyer or a financial institution.

 
126 
 
 

Right of Withdrawal

Our common shares and preferred shares are not redeemable, with the exception that a dissenting shareholder has, under certain circumstances provided for in Brazilian Corporate Law, the right to withdraw its equity interest from a company and to receive a payment for the portion of shareholder’s equity attributable to his or her equity interest.

This right of withdrawal arises if any of the following matters are decided upon at a shareholders' meeting:

·creation of a new class of preferred shares or a disproportionate increase in an existing class of preferred shares relative to other classes of shares, unless such action is provided for in or authorized by our bylaws, which, as of the this date, is not the case;
·modification to the preference, privilege or conditions for redemption or amortization granted to one or more classes of preferred shares, or the creation of a new class of preferred shares with greater privileges than the existing classes of preferred shares;
·reduction of the mandatory dividend;
·consolidation or merger into another company;
·participation in a group of companies (grupo de sociedades), as defined by Brazilian Corporate Law;
·the transfer of all shares to another company or receipt of shares by another company, in such a way as to make the company whose shares were transferred a wholly-owned subsidiary of the other;
·changes to our corporate purpose; or
·a spin-off that results in (a) a change to our corporate purpose (unless the spin-off company's assets and liabilities are transferred to a company that has substantially the same corporate purpose); (b) a reduction in any mandatory dividend (although in our case, our preferred shares do not carry mandatory dividends); or (c) any participation in a group of companies.

The right of withdrawal also arises if a spin-off or merger occurs but the new company fails to register as a public stock corporation (and, if applicable, fails to list its shares on the stock exchange) within 120 days of the date of the shareholders' meeting that approved the spin-off or merger.

Preferred Shares Rights

Pursuant to Brazilian Corporate Law, each preferred share of a class that is admitted to trading on a Brazilian stock exchange must have the certain rights under the Company’s bylaws.

Our bylaws comply with the directives provided by Brazilian Corporate Law as follows: (i) our Class A Shares shall have priority in the distribution of minimum dividends of 10% per year, pro rata, calculated as a percentage of the paid-in capital stock represented by such shares on December 31 of the previous fiscal year; (ii) our Class B Shares shall have priority in the distribution of minimum dividends, pro rata, in the amount equivalent to 25.0% of our net profits, as adjusted in accordance with Article202 of Law No. 6,404/76, calculated as a proportion of the paid-in capital stock represented by such shares on December 31st of the previous fiscal year; (iii) the dividends paid on Class B Shares pursuant to item (ii) above shall be paid only from any remaining profits after the payment of priority dividends to Class A Shares; and (iv) the dividends to be paid per preferred share, regardless of the class, shall be at least 10% higher than the dividends to be paid per Common Share; (v) the preferred shares will acquire voting rights if, during three consecutive fiscal years, we fail to pay a fixed or minimum dividend to which the preferred shares are entitled; and (vi) each Unit receives dividends for its underlying 1 Common Share and 4 Class B Shares. For more information on our dividend policy, see “Item 8. Financial Information – Dividend Payment.”

 
127 
 
 

Voting Rights

As a general rule, only our Common Shares are entitled to vote and each Common Share corresponds to one vote. Holders of preferred shares acquire voting rights if, during three consecutive fiscal years, we fail to pay a fixed or minimum dividend to which the preferred shares are entitled. If a holder of preferred shares acquires voting rights in this manner, such rights will be identical to the voting rights of a holder of Common Shares and will continue until the dividend is paid.

Furthermore, in accordance with our bylaws holders of preferred shares are entitled to voting rights in regards of specific matter discussed in a shareholders’ meeting:

·Change in Copel’s corporate type into another, as well as incorporation, merger or spin-off.
·Agreements between Copel and its controlling shareholder, directly or through a third party, or an entity influenced by the controlling shareholder, when such agreements shall be discussed in a shareholders’ meeting by force of statute or our bylaws.
·Appraisal of assets for paying in Copel’s capital increase.
·Choice of an entity to be hired for the assessment of the economic value of Copel.
·Change or revocation of articles in our bylaws that alter or modify any of the requirements set forth in item 4.1. of the regulation of the Level 2 of B3, while the Level 2 participation contract is still in effect.
·Appointment and removal of a member of the Board of Directors in a separate election, when requested by shareholders which have preferred shares equal to at least 10% of the Copel’s total shares.

Exclusion or change in our bylaws aimed to suppress the right set forth in article 28, XXIX of our bylaws, which provides for the adoption of the full tariff set by a granting authority, requires the approval of most of the preferred shares. Holders of Units may exercise their voting rights in accordance with its underlying shares.

Preemptive Rights

Our shareholders have a general preemptive right to subscribe for shares in any capital increase, in proportion to his or her ownership, as provided for in the Brazilian Corporate Law. A minimum period of 30 days following the publication of notice of a capital increase is assured for the exercise of the right, and the right is transferable. We may issue shares up to the limit of the authorized capital, excluding right of first refusal to the shareholders, as provided for in the Brazilian Corporate Law and in our bylaws.

Liquidation

In the event of liquidation of the Company, after all creditors have been paid, all shareholders will participate equally and ratably in any remaining residual assets.

Liability of the Shareholders for Further Capital Calls

Neither Brazilian Corporate Law nor our bylaws provide for capital calls after shares are paid in. The shareholders’ liability is limited to the payment of the issue price of the shares subscribed or acquired.

Conversion Rights

Our bylaws provide, as a general rule, that the only permitted conversion of shares is Class A Shares are convertible into Class B Shares. As an exception, Class B Shares can be converted into Common Shares, and vice-versa, strictly for the formation of Units made of four Class B Shares and one Common Share under Copel’s unitization programs set by the Board of Directors. Our shares are not otherwise convertible.

 
128 
 
 

Form and Transfer

Our shares are maintained in book-entry form with a transfer agent (“Transfer Agent”). To make a transfer of shares, the Transfer Agent makes an entry in the register, debits the share account of the transferor and credits the share account of the transferee.

Transfers of shares by foreign investors are made in the manner described above and are executed by the investor’s local agent on the investor’s behalf. However, if the original investment was registered with the Brazilian Central Bank pursuant to a foreign investment mechanism regulated by Resolution No. 4,373 of September 29, 2014 of the CMN (“Resolution No. 4,373”) as described under “Exchange Controls” as follows, the foreign investor must declare the transfer in its electronic registration.

A shareholder may choose, in its individual discretion, to hold its shares through B3. Shares and Units are added to the B3 system through Brazilian institutions that have clearing accounts with the B3. Our shareholder registry indicates which shares and Units are listed on the B3 system. Each participating shareholder is in turn registered in a register of beneficial shareholders maintained by the B3 and is treated in the same manner as the other registered shareholders.

Changes in Rights of Shareholders

A General Meeting of Shareholders must be held whenever the Company intends to change the rights of holders of our common shares or preferred shares. Under Brazilian Corporate Law the proposed changes must be approved by a majority of the class of shareholders that would be affected. Certain changes related to the rights of preferred shares, such as changes in preferences, advantages or conditions of redemption or amortization, may result in the exercise of rights to withdraw by the holders of the shares affected.

Regulation of and Restrictions on Foreign Investors

Foreign investors face no legal restrictions barring them from holding Common Shares, Class A Shares, Class B Shares, Units or ADSs.

The ability to convert into foreign currency dividend payments and proceeds from the sale of Common Shares, Preferred Shares or Units or from the exercise of preemptive rights, and to remit such amounts outside Brazil is subject to restrictions under foreign investment legislation which generally requires, among other things, the registration of the relevant investment with the Brazilian Central Bank. Any foreign investor who registers with the CVM in accordance with CMN Resolution No. 4,373 may buy and sell securities on Brazilian stock exchanges without obtaining a separate certificate of registration for each transaction.

Annex II to CMN Resolution No. 4,373 (“Annex II Regulations”) allows Brazilian companies to issue depositary receipts in foreign exchange markets. Our ADS program is duly registered with the Brazilian Central Bank and the CVM.

Our bylaws do not impose any limitation on the rights of Brazilian residents or non-residents to hold our shares and exercise the rights in connection therewith.

Disclosure of Shareholder Ownership

Under Brazilian regulations any person or group of persons representing the same interest that carries out a relevant trading involving shares or securities issued by a publicly traded company must disclose its share ownership to the investor relations officer of such company, which, in turn, must disclose such information to the CVM and to any relevant stock exchange. A relevant trading is defined as a transaction by which the direct or indirect equity stake of the persons referred above reaches an equity interest corresponding to 5% or its multiples (10%, 15%, and so on), of a type or class of shares representing the company’s capital stock. Any subsequent increase or decrease of 5% or its multiples in ownership of any class of shares must be similarly disclosed. The same reporting obligation applies to the acquisition of any rights over the shares and other securities mentioned in applicable regulation and to the execution of any derivative financial instruments referenced in shares. If such increase results in change of corporate control or administrative structure, or if the increase imposes a public offering, in addition to informing the investor relations officer, a statement containing certain required information must be published in newspapers that are widely circulated in Brazil.

 
129 
 
 

Change of Controlling Shareholder

Under the Brazilian constitution and our bylaws, a change of the controlling shareholder, the State of Paraná, is only permitted with legislative authorization. If such approval is granted to the State of Paraná, and the change in the control over us would happen by a private sale of shares held by the current controlling shareholder or sale of preemptive rights from such controlling shareholder, such transaction shall be subject to the buyer launch a tender offer for the shares held by the minority shareholders.

Arbitration

As provided for in our bylaws, we, our shareholders, directors, officers and members of the supervisory board shall resolve through arbitration any dispute or conflict that may arise between them, regarding, among others, the application, validity, effectiveness, interpretation, violation and corresponding effects of the provisions of our bylaws, of the current applicable law, of the rules applicable to the capital markets in general, as well as those of the regulation of the level 2 of corporate governance of B3 S.A. (Brasil, Bolsa, Balcão) (“Level 2”), of the Level 2 participation contract, and of the Sanctions and the Arbitration Regulations of the B3 Market Arbitration Chamber.

 
130 
 
 

Material Contracts

For information concerning our material contracts, see “Item 4. Information on the Company” and “Item 5. Operating and Financial Review and Prospects”.

 
131 
 
 

 

Exchange Controls

The ownership of Class A Shares, Class B Shares, Common Shares or Units of the Company by individuals or legal entities domiciled outside Brazil is subject to certain conditions established under Brazilian law, as described below.

The right to convert dividend payments and proceeds from the sale of shares into foreign currency and to remit such amounts outside Brazil is subject to restrictions under Brazilian foreign investment legislation, which generally requires, among other things, that the relevant investments have been registered with the Brazilian Central Bank. Such restrictions on the remittance of foreign capital abroad may hinder or prevent Itaú Unibanco S.A., as custodian for the Units represented by ADSs (“Custodian”), or holders who have exchanged ADSs for Units from converting dividends, distributions or the proceeds from any sale of such Units, as the case may be, into U.S. dollars and remitting such U.S. dollars abroad. Holders of ADSs could be adversely affected by delays in, or refusal to grant any, required government approval for conversions of Brazilian currency payments and remittances abroad of the Units underlying the ADSs.

Under Resolution No. 4,373/2014, foreign investors may invest in almost all financial assets and engage in almost all transactions available in the Brazilian financial and capital markets, provided that certain requirements are fulfilled. The definition of foreign investor includes individuals, legal entities, mutual funds and other collective investment entities, domiciled or headquartered abroad.

To be eligible to invest in the Brazilian financial and capital markets, foreign investors must:

1.point at least one representative in Brazil with powers to perform actions relating to foreign investments;
2.register as a foreign investor with the CVM, pursuant to CVM Rule No. 13/2020;
3.register the foreign investment with the Brazilian Central Bank; and
4.constitute at least one custodian institution authorized by CVM, provided that this provision is not applicable to foreign investors who are individuals.

Securities and other financial assets held by foreign investors must be registered or maintained in deposit accounts or under the custody of an entity duly licensed by the Brazilian Central Bank or the CVM. In addition, securities trading is restricted to transactions carried out in the stock exchanges or organized over-the-counter markets licensed by the CVM.

The Annex II Regulations provide for the issuance of depositary receipts in foreign markets in respect of shares of Brazilian issuers. Prior to the issuance of the ADSs, the ADS program was approved by the Brazilian Central Bank and the CVM under the Annex V to CMN Resolution No. 2,689, which allowed Brazilian companies to issue depositary receipts in foreign exchange markets and was in force by the time the ADSs were issued. Depositary receipts are currently governed by Resolution No. 4,373. The proceeds from the sale of ADSs by ADS holders outside Brazil are free of Brazilian foreign investment controls and should not be subject to taxation in Brazil. The withdrawal and the disposal of Units upon cancellation of ADS will be subject to taxation in Brazil. For more information, see “Item 10. Additional Information—Taxation—Brazilian Tax Considerations—Taxation of Gains Outside Brazil”.

An electronic registration has been issued in the name of the Depositary with respect to the ADSs and is maintained by the Custodian on behalf of the Depositary. Pursuant to this electronic registration, the Custodian and the Depositary are able to convert dividends and other distributions with respect to the Units represented by ADSs into foreign currency and remit the proceeds outside Brazil. In the event that a holder of ADSs exchanges such ADSs for Units, such holder must seek to obtain its own electronic registration with the Brazilian Central Bank.

Pursuant to Brazilian Central Bank Resolution No. 4,373/2014, the withdrawal of Units upon cancellation of ADSs may require simultaneous exchange transactions in the event the investor decides not to dispose of those Units. The simultaneous exchange transactions may be required in order to obtain a certificate of registration of Units with the Brazilian Central Bank. This transaction will be subject to tax in Brazil. For more information, see “Item 10. Additional Information—Taxation—Brazilian Tax Considerations—Other Brazilian Taxes”.

 
132 
 
 

Thereafter, any holder of Units may not be able to convert into foreign currency and remit outside Brazil the proceeds from the disposition of, or distributions with respect to, such Units, unless such holder obtains his own electronic registration. A holder that obtains an electronic registration may be subject to less favorable Brazilian tax treatment than a holder of ADSs. For more information, see “Item 10. Additional Information—Taxation—Brazilian Tax Considerations”.

 
133 
 
 

 

Taxation

The following summary contains a description of the principal Brazilian and U.S. federal income tax consequences of the acquisition, ownership and disposition of Common Shares, Preferred Shares, Units or ADSs, but it does not purport to be a comprehensive description of all of the tax considerations that may be relevant to a decision to purchase Common Shares, Preferred Shares, Units or ADSs. The summary is based upon the tax laws of Brazil and regulations thereunder and on the tax laws of the United States and regulations thereunder as in effect on the date hereof, which are subject to change. Prospective purchasers of Common Shares, Preferred Shares, Units or ADSs should consult their own tax advisors as to the tax consequences of the acquisition, ownership and disposition of Common Shares, Preferred Shares, Units or ADSs.

Although there is at present no income tax treaty between Brazil and the United States, the tax authorities of the two countries have had discussions that may culminate in such a treaty. No assurance can be given, however, as to whether or when a treaty will enter into force or how it will affect the U.S. holders of Common Shares, Preferred Shares, Units or ADSs. Prospective holders of Common Shares, Preferred Shares, Units or ADSs should consult their own tax advisors as to the tax consequences of the acquisition, ownership and disposition of Common Shares, Preferred Shares, Units or ADSs in their particular circumstances.

Brazilian Tax Considerations

The following discussion summarizes the principal Brazilian tax consequences of the acquisition, ownership and disposition of Common Shares, Preferred Shares, Units or ADSs by an individual, entity, trust or organization resident or domiciled outside Brazil for purposes of Brazilian taxation (“Non-Brazilian Holder”). It is based on Brazilian law currently in effect, which is subject to differing interpretations and changes that may apply retroactively. This discussion does not address all the Brazilian tax considerations that may be applicable to any particular Non-Brazilian Holder, and each Non-Brazilian Holder should consult its own tax advisor about the Brazilian tax consequences of investing in Common Shares, Preferred Shares, Units or ADSs.

Taxation of Dividends

Dividends paid by the Company in cash or in kind from profits of periods beginning on or after January 1, 1996 (i) to the Depositary in respect of Units underlying ADSs or (ii) to a Non-Brazilian Holder in respect of Common Shares, Preferred Shares or Units generally will not be subject to Brazilian withholding income tax. Dividends paid from profits generated before January 1, 1996 may be subject to Brazilian withholding income tax at varying rates depending upon the year in which the profits have been obtained.

Distributions of Interest on Equity

In accordance with Law No. 9,249, dated December 26, 1995, as amended, Brazilian corporations may make payments to shareholders characterized as distributions of interest on the equity of the company as an alternative form of making dividend distributions. The rate of interest may not be higher than TJLP, as determined by the Brazilian Central Bank from time to time. The total amount distributed as interest on equity may not exceed, for tax purposes, the greater of (i) 50.0% of net income (after the deduction of the social contribution on net profits and before taking into account the provision for corporate income tax and the amounts attributable to shareholders as net interest on equity) related to the period in respect of which the payment is made and (ii) 50.0% of the sum of retained profits and profit reserves as of the date of the beginning of the period in respect of which the payment is made.

Distributions of interest on equity paid to Brazilian and Non-Brazilian Holders of Units, including payments to the Depositary in respect of Units underlying ADSs, are deductible by the Company for Brazilian corporate income tax and social contribution on net profits purposes as far as the limits above described are observed. Such payments to shareholders are subject to Brazilian withholding income tax at the rate of 15.0%, except for payments to shareholders situated in tax haven jurisdictions (that is, a country or location that does not impose income tax or where the maximum income tax rate is lower than 20% or where the local legislation imposes restrictions on disclosing the shareholding composition or the ownership of the investment or the beneficial owner of the income derived from transactions carried out and attributable to a Non-Brazilian Holder – “Tax Haven Holder”), which payments are subject to withholding income tax at a 25.0% rate. A regulation issued by the Brazilian tax authorities on November 28, 2014 (Ordinance 488, of 2014) decreased, from 20% to 17%, the minimum threshold for certain specific cases. The reduced 17% threshold applies only to countries and regimes aligned with international standards of fiscal transparency in accordance with rules to be established by the Brazilian tax authorities in Normative Ruling 1,530 dated December 19, 2014. The list of tax haven jurisdictions is currently provided in Normative Ruling No. 1,037. These payments may be included, at their net value, as part of any mandatory dividend. To the extent that payment of interest on net equity is so included, the corporation is required to distribute to shareholders an additional amount to ensure that the net amount received by them, after payment of the applicable withholding income tax, plus the amount of declared dividends, is at least equal to the mandatory dividend.

 
134 
 
 

Taxation of Gains Outside Brazil

According to Law No. 10,833 of December 29, 2003 (“Law No. 10,833/03”), capital gains realized on the disposition of assets located in Brazil by a Non-Brazilian Holder, whether to another non-Brazilian resident or to Brazilian residents, are subject to taxation in Brazil. In this sense, if the Common Shares, Preferred Shares or Units are disposed of by a Non-Brazilian Holder, as they are defined as assets located in Brazil, such holder will be subject to income tax on the gains assessed, following the rules described below, whether the disposition is conducted in Brazil or abroad and with a Brazilian resident or not.

A disposition of Units can occur abroad if an investor decides to cancel its investment in ADSs and register the underlying Units as a direct foreign investment under Law No. 4,131. Any capital gain arising from sales or other dispositions of Units outside Brazil would be subject to Brazilian income tax at the rates that range from 15% to 22.5% depending on the amount of the gain, as follows: (i) 15% on gains not exceeding R$5,000,000.00; (ii) 17.5% on gains that exceed R$5,000,000.00 and do not exceed R$10,000,000.00; (iii) 20% on gains that exceed R$10,000,000.00 and do not exceed R$30,000,000.00; and (iv) 22.5% on gains exceeding R$30,000,000.00 or, if the investor is a Tax Haven Holder, 25.0%, which should be withheld by the purchaser of the Units outside Brazil or its attorney-in-fact in Brazil.

Regarding ADSs, although the matter is not free from doubt, the gains realized by a Non-Brazilian Holder on the disposition of ADSs to another Non-Brazilian Holder should not be taxed in Brazil, based on the theory that ADSs do not constitute assets located in Brazil for purposes of Law No. 10,833/03. However, we cannot assure you that Brazilian courts would adopt this theory. Thus, the gain on a disposition of ADSs by a Non-Brazilian Holder to a resident in Brazil (or possibly even to a Non-Brazilian Holder in the event that courts determine that ADSs would constitute assets located in Brazil) may be subject to income tax in Brazil.

Taxation of Gains in Brazil

For purposes of Brazilian taxation, the income tax rules on gains related to disposition of Common Shares, Preferred Shares or Units vary depending on the domicile of the Non-Brazilian Holder, the form by which such Non-Brazilian Holder has registered its investment before the Brazilian Central Bank and/or how the disposition is carried out, as described below.

Generally, gains are defined as the positive difference between the amount realized on the sale or exchange of a security and its acquisition cost. Gains assessed on the disposition of the Common Shares, Preferred Shares or Units carried out on the Brazilian stock exchange (which includes the transactions carried out on the organized over-the-counter market) are:

1.exempt from income tax when assessed by a Non-Brazilian Holder registered under Resolution No. 4,373 of the CMN (“4,373 Holder”) that is not a Tax Haven Holder;
2.subject to income tax at a rate of 15.0% in the case of gains assessed by a Non-Brazilian Holder that (i) is not a 4,373 Holder and is not a Tax Haven Holder, or (ii) is a 4,373 Holder and is a Tax Haven Holder; or
3.subject to income tax at a rate of 25.0% in the case of gains assessed by a Non-Brazilian Holder that is not a 4,373 Holder and is a Tax Haven Holder.

There can be no assurance that the current preferential treatment for 4,373 Holders will continue in the future.

 
135 
 
 

Any other gains assessed on a disposition of the Common Shares, Preferred Shares or Units that is not carried out on the Brazilian stock exchange is subject to income tax at the progressive rates ranging from 15% to 22.5%, except for gains assessed by Tax Haven Holders who are subject to an income tax rate of 25.0%.

If these gains are related to transactions conducted on the Brazilian non-organized, over-the-counter market, through an intermediary, the withholding income tax of 0.005% on the sale value shall also be applicable and can be offset with the eventual income tax due on the capital gain.

The deposit of Units in exchange for the ADSs may be subject to Brazilian income tax. In this case, the difference between the acquisition cost and the market price of the Units would be subject to income tax at the progressive rates ranging from 15% to 22.5% or 25.0% in the case of investors that are Tax Haven Holders. There may be arguments to claim that this taxation is not applicable in the case of a Non-Brazilian Holder that is registered under Resolution 4,373 (other than Tax Haven Holders), which should not be subject to income tax in such a transaction.

The withdrawal of Units upon cancellation of ADSs should not be subject to Brazilian income tax, as long as the regulatory rules are appropriately observed with respect to the registration of the investment before the Brazilian Central Bank.

In the case of redemption of the Common Shares, Preferred Shares or Units or ADSs or capital reduction by a Brazilian corporation, with subsequent withdrawal of the ADSs, such as our company, the positive difference between the amount effectively received by the Non-Brazilian Holder and the acquisition cost of the securities redeemed is treated as capital gain derived from the sale or exchange of shares not carried out on a Brazilian stock exchange market and is therefore subject to income tax at the progressive rates ranging from 15.0% to 22.5% or 25.0%, as the case may be.

Any exercise of preemptive rights relating to the Common Shares, Preferred Shares, Units or ADSs will not be subject to Brazilian taxation. Gains on the sale or assignment of preemptive rights will be subject to the same tax treatment applicable to disposition of Common Shares, Preferred Shares or Units.

Other Brazilian Taxes

There are no Brazilian inheritance, gift or succession taxes applicable to the ownership, transfer or disposition of Common Shares, Preferred Shares, Units or ADSs by a Non-Brazilian Holder except for gift and inheritance taxes levied by some states in Brazil on gifts made or inheritances bestowed by individuals or entities not resident or domiciled in Brazil or in the relevant State to individuals or entities that are resident or domiciled within such State in Brazil. There are no Brazilian stamp, issue, registration, or similar taxes or duties payable by holders of Common Shares, Preferred Shares, Units or ADSs.

Pursuant to Decree No. 6,306 of December 14, 2007 (“Decree No. 6,306/07”), a tax on foreign exchange transactions (“IOF/Exchange”) may be imposed on the conversion of Brazilian currency into foreign currency (e.g., for purposes of paying dividends and interest) or vice-versa. Currently, for most exchange transactions, the rate of IOF/Exchange is 0.38%, except for: (i) foreign exchange transactions for the inflow of funds related to investments in variable income effectuated by a Non-Brazilian Holder in the Brazilian financial and capital market, in which case the rate is 0%, and (ii) payment of dividends, and interest on shareholders’ equity related to the investment mentioned under item (i) above, in which case the rate is zero. Nonetheless, the Brazilian government may increase the rate to a maximum of 25.0%. Any such increase will be applicable only prospectively.

Pursuant to Decree No 6,306/07, the Tax on Bonds and Securities Transactions (“IOF/Bonds”) may be imposed on any transactions involving bonds and securities, including those carried out on Brazilian stock, futures and commodities exchanges. The rate of IOF/Bonds Tax applicable to transactions involving common shares is currently zero if the redemption, transfer or renegotiation occurs after 30 days of their acquisition. As from December 24, 2013, the IOF/Bonds levies at a rate of zero percent on the transfer (cessão) of shares traded in a Brazilian stock exchange environment with the specific purpose of enabling the issuance of depositary receipts to be traded outside Brazil. The Brazilian government is permitted to increase such rate at any time up to 1.5% per day, but only in respect of future transactions.

 
136 
 
 

U.S. Federal Income Tax Considerations

The statements regarding U.S. tax law set forth below are based on U.S. law as in force on the date of this annual report, and changes to such law subsequent to the date of this annual report may affect the tax consequences described herein (possibly with retroactive effect). This summary describes the principal U.S. federal income tax consequences of the ownership and disposition of Common Shares, Preferred Shares, Units or ADSs, but it does not purport to be a comprehensive description of all of the U.S. tax consequences that may be relevant to a decision to hold or dispose of Common Shares, Preferred Shares, Units or ADSs. This summary applies only to purchasers of Common Shares, Preferred Shares, Units or ADSs who will hold the Common Shares, Preferred Shares, Units or ADSs as capital assets and does not apply to special classes of holders such as brokers or dealers in securities or currencies, holders whose functional currency is not the U.S. dollar, holders of 10% or more of our shares by vote or value (taking into account shares held directly or through depositary arrangements), tax-exempt organizations, financial institutions, holders liable for the alternative minimum tax, securities traders who elect to account for their investment in Common Shares, Preferred Shares, Units or ADSs on a mark-to-market basis, regulated investment companies, partnerships or other pass-through entities (or partners or members therein), insurance companies, U.S. expatriates, and persons holding Common Shares, Preferred Shares, Units or ADSs in a hedging transaction or as part of a straddle, conversion or other integrated transaction for U.S. federal income tax purposes. Moreover, this summary does not address the Medicare tax on net investment income or the tax consequences to U.S. holders of acquiring, owning or disposing of Common Shares, Preferred Shares, Units or ADSs under any U.S. federal estate or gift, state, local or foreign taxes.

Each holder is encouraged to consult such holder’s tax advisor concerning the overall tax consequences to it, including the consequences under laws other than U.S. federal income tax laws, of an investment in Common Shares, Preferred Shares, Units or ADSs.

In this discussion, references to a “U.S. holder” are to a beneficial holder of a Common Shares, Preferred Shares, Units or an ADS that is (i) an individual citizen or resident of the United States of America, (ii) a corporation, or any other entity taxable as a corporation, organized under the laws of the United States of America, any state thereof, or the District of Columbia, or (iii) otherwise subject to U.S. federal income taxation on a net basis with respect to the Common Shares, Preferred Shares, Units or ADS.

For purposes of the U.S. Internal Revenue Code of 1986, as amended, which we call the “Code,” holders of ADSs will generally be treated as owners of the Units represented by such ADSs

Taxation of Distributions

A U.S. holder will recognize dividend income for U.S. federal income tax purposes in an amount equal to the amount of any cash and the value of any property distributed by us as a dividend to the extent that such distribution is paid out of our current or accumulated earnings and profits, as determined for U.S. federal income tax purposes, when such distribution is received by the custodian (or by the U.S. holder in the case of a holder of Common Shares, Preferred Shares or Units).

We do not expect to maintain calculations of our earnings and profits in accordance with U.S. federal income tax principles. U.S. holders therefore should expect that distributions generally will be treated as dividends for U.S. federal income tax purpose.

If you are a U.S. holder, the amount of any distribution will include the amount of Brazilian tax withheld on the amount distributed, and the amount of a distribution paid in reais will be measured by reference to the exchange rate for converting reais into U.S. dollars in effect on the date the distribution is received by the custodian (or by a U.S. holder in the case of a holder of Common Shares, Preferred Shares or Units). If the custodian (or U.S. holder in the case of a holder of Common Shares, Preferred Shares or Units) does not convert such reais into U.S. dollars on the date it receives them, it is possible that the U.S. holder will recognize foreign currency loss or gain, which would be ordinary loss or gain, when the reais are converted into U.S. dollars. Dividends paid by us will not be eligible for the dividends received deduction allowed to corporations under the Code.

Subject to certain exceptions for short-term and hedged positions, the U.S. dollar amount of dividends received by an individual, with respect to the ADSs, will be subject to taxation at preferential rates if the dividends are “qualified dividends”. Dividends paid on the ADSs will be treated as qualified dividends if (i) the ADSs are readily tradable on an established securities market in the United States and (ii) we were not, in the year prior to the year in which the dividend was paid, and are not, in the year in which the dividend is paid, a passive foreign investment company (“PFIC”). The ADSs are listed on the New York Stock Exchange, and will qualify as readily tradable on an established securities market in the United States so long as they are so listed. Based on our audited consolidated financial statements and relevant market and shareholder data, we believe that we were not treated as a PFIC for U.S. federal income tax purposes with respect to our 2020 and 2021 taxable years. In addition, based on our audited consolidated financial statements and our current expectations regarding the value and nature of our assets, the sources and nature of our income, and relevant market and shareholder data, we do not anticipate becoming a PFIC for the 2022 taxable year. Based on existing guidance, it is not clear whether dividends received with respect to the Units will be treated as qualified dividends, because the Units themselves are not listed on a U.S. exchange. Holders of ADSs and Units should consult their own tax advisers regarding the availability of the reduced dividend tax rate in light of the considerations discussed above and their own particular circumstances.

 
137 
 
 

Subject to generally applicable limitations and conditions, Brazilian withholding tax on dividends with respect to Common Shares, Preferred Shares, Units or ADSs that is paid at the appropriate rate applicable to the U.S. holder may be eligible for credit against such U.S. holder’s U.S. federal income tax liability. For taxable years beginning after December 28, 2021, these generally applicable limitations and conditions include new requirements recently adopted by the IRS and any Brazilian tax will need to satisfy these requirements in order to be eligible to be a creditable tax for a U.S. holder. The application of these requirements to the Brazilian tax on dividends is uncertain and we have not determined whether these requirements have been met. If the Brazilian tax is not a creditable tax for a U.S. holder or the U.S. holder does not elect to claim a foreign tax credit for any foreign income taxes, the U.S. holder may be able to deduct the Brazilian tax in computing such U.S. holder’s taxable income for U.S. federal income tax purposes. For U.S. holders that do elect to claim foreign tax credits, dividend distributions will constitute income from sources without the United States and generally will constitute “passive category income” for foreign tax credit purposes. The availability and calculation of foreign tax credits and deductions for foreign taxes involve the application of complex rules and also vary depending upon on a U.S. holder’s particular circumstances. U.S. holders should consult their own tax advisors regarding the application of these rules to their particular situations.

Distributions of additional shares to holders with respect to their Common Shares, Preferred Shares, Units or ADSs that are made as part of a pro rata distribution to all our shareholders generally will not be subject to U.S. federal income tax.

Holders of Common Shares, Preferred Shares, Units or ADSs that are foreign corporations or nonresident alien individuals, which we call “non-U.S. Holders,” generally will not be subject to U.S. federal income tax or withholding tax on distributions with respect to Common Shares, Preferred Shares, Units or ADSs that are treated as dividend income for U.S. federal income tax purposes unless such dividends are effectively connected with the conduct by the holder of a trade or business in the United States.

Taxation of Capital Gains

Upon the sale or other taxable disposition of a Common Shares, Preferred Shares, Units or ADS, a U.S. holder will recognize gain or loss for U.S. federal income tax purposes. The amount of the gain or loss will be equal to the difference between the amount realized in consideration for the disposition of the Common Shares, Preferred Shares, Units or ADS (including the gross amount of the proceeds before the deduction of any Brazilian tax) and the U.S. holder’s tax basis in the Common Shares, Preferred Shares, Units or ADS. Such gain or loss generally will be subject to U.S. federal income tax as capital gain or loss and will be long-term capital gain or loss if the Common Shares, Preferred Shares, Units or ADS has been held for more than one year on the date of the disposition. The net amount of long-term capital gain recognized by an individual holder generally is subject to taxation at preferential rates. Capital losses may be deducted from taxable income, subject to certain limitations. Gain realized by a U.S. holder on a sale or disposition of Common Shares, Preferred Shares, Units or ADSs generally will be treated as U.S. source income for U.S. foreign tax credit purposes. Consequently, if Brazilian tax is imposed on such gain, the U.S. holder will not be able to use the corresponding foreign tax credit, unless the holder has other foreign source income of the appropriate type in respect of which the credit may be used. In addition, under the new foreign tax credit requirements recently adopted by the IRS, for taxable years beginning after December 28, 2021, any Brazilian tax imposed on the sale or other disposition of the Common Shares, Preferred Shares, Units or ADSs is unlikely to be treated as a creditable tax for U.S. foreign tax credit purposes. If the Brazilian tax is not a creditable tax for a U.S. holder or the U.S. holder does not elect to claim a foreign tax credit for any foreign income taxes, the U.S. holder may be able to deduct the Brazilian tax in computing such U.S. holder’s taxable income for U.S. federal income tax purposes. U.S. holders should consult their own tax advisors regarding the application of the foreign tax credit rules to a sale or other disposition of the Common Shares, Preferred Shares, Units or ADSs and any Brazilian tax imposed on such sale or disposition.

A non-U.S. Holder will not be subject to U.S. federal income tax or withholding tax on gain realized on the sale or other disposition of a Common Shares, Preferred Shares, Units or ADS unless (i) such gain is effectively connected with the conduct by the holder of a trade or business in the United States, or (ii) such holder is an individual who is present in the United States of America for 183 days or more in the taxable year of the sale and certain other conditions are met.

 
138 
 
 

Foreign Financial Asset Reporting

Certain U.S. Holders that own “specified foreign financial assets” with an aggregate value in excess of US$50,000 on the last day of the taxable year or US$75,000 at any time during the taxable year are generally required to file an information statement along with their tax returns, currently on IRS Form 8938, with respect to such assets. “Specified foreign financial assets” include any financial accounts held at a non-U.S. financial institution, as well as securities issued by a non-U.S. issuer that are not held in accounts maintained by financial institutions. The understatement of income attributable to “specified foreign financial assets” in excess of US$5,000 extends the statute of limitations with respect to the tax return to six years after the return was filed. U.S. Holders who fail to report the required information could be subject to substantial penalties. Prospective investors are encouraged to consult with their own tax advisors regarding the possible application of these rules, including the application of the rules to their particular circumstances.

Backup Withholding and Information Reporting

Dividends paid on, and proceeds from the sale or other disposition of, the ADSs or Common Shares, Preferred Shares or Units to a U.S. holder generally may be subject to the information reporting requirements of the Code and may be subject to backup withholding unless the U.S. holder (i) is a corporation or other exempt recipient or (ii) provides an accurate taxpayer identification number and certifies that no loss of exemption from backup withholding has occurred. The amount of any backup withholding collected from a payment to a U.S. holder will be allowed as a credit against the U.S. holder’s U.S. federal income tax liability and may entitle the U.S. holder to a refund, provided that certain required information is furnished to the Internal Revenue Service.

A non-U.S. Holder generally will be exempt from these information reporting requirements and backup withholding tax, but may be required to comply with certain certification and identification procedures in order to establish its eligibility for such exemption in connection with payments received within the United States or through certain U.S.-related intermediaries.

 
139 
 
 

 

 

Documents on Display

We file reports, including annual reports on Form 20-F and other information with the SEC pursuant to the rules and regulations of the SEC that apply to foreign private issuers. We are required to make filings with the SEC by electronic means. Any filings we make electronically will be available to the public over the Internet at the SEC’s website.

For more information about our securities, see Exhibit 2.4 to this annual report.

Item 11. Quantitative and Qualitative Disclosures about Market Risk

See Note 36.2.3 to our audited consolidated financial statements for disclosure about market risk.

Item 12. Description of Securities Other than Equity Securities

Not applicable.

Item 12A. Debt Securities

Not applicable.

Item 12B. Warrants and Rights

Not applicable.

Item 12C. Other Securities

Not applicable.

Item 12D. American Depositary Shares

In the United States, the Units trade in the form of ADSs, each representing one Unit, issued by The Bank of New York Mellon (or the Depositary) pursuant to the Deposit Agreement. The ADSs trade under the symbol “ELP”. ADS holders are required to pay various fees to the Depositary, and the Depositary may refuse to provide any service for which a fee is assessed until the applicable fee has been paid. The Depositary is located at 240 Greenwich Street, New York, NY 10286.

ADS holders are required to pay the Depositary: (i) an annual fee of up to US$0.02 per ADS (or portion thereof) for administering the ADS program, and (ii) amounts in respect of expenses incurred by the Depositary or its agents on behalf of ADS holders, including expenses arising from compliance with applicable law, taxes or other governmental charges, cable, telex and facsimile transmission, or conversion of foreign currency into U.S. dollars. In both cases, the Depositary may decide in its sole discretion to seek payment by either billing holders or by deducting the fee from one or more cash dividends or other cash distributions.

 
140 
 
 

ADS holders are also required to pay additional fees for certain services provided by the Depositary, as set forth in the table below.

Depositary service

Fee payable by ADS holders

Issuance of ADSs, including issuances resulting from a distribution of shares or rights or other property US$5.00 or less per 100 ADSs (or portion thereof)
Cancellation of ADSs for the purpose of withdrawal, including if the deposit agreement terminates US$5.00 or less per 100 ADSs (or portion thereof)
Distribution of cash dividends US$0.02 or less per ADS
Distribution of securities distributed to holders of deposited securities which are distributed by the depositary to ADS registered holders A fee equivalent to the fee that would be payable if securities distributed to the holder had been shares and the shares had been deposited for issuance of ADSs
Depositary services US$0.02 (or less) per ADSs per calendar year
Transfer and registration of shares on the Depositary’s share register to or from the name of the depositary or its agent when the holder deposits or withdraws shares Registration or transfer fees
Cable, telex and facsimile transmissions (when expressly provided in the deposit agreement) Expenses of the Depositary
Converting foreign currency to U.S. dollars Expenses of the Depositary
Taxes and other governmental charges the Depositary or the custodian are required to pay on any ADS or share underlying an ADS (e.g., stock transfer taxes, stamp duty or withholding taxes) As necessary
Any charges incurred by the Depositary or its agents for servicing the deposited securities As necessary

Payments by the Depositary

The Depositary pays us an agreed amount, which includes reimbursements for certain expenses we incur in connection with the ADS program. These reimbursable expenses currently include legal and accounting fees, listing fees, investor relations expenses and fees payable to service providers for the distribution of material to ADR holders. For the year ended December 31, 2021, this amount was US$639,862.98.

Item 13. Defaults, Dividend Arrearages and Delinquencies

Not applicable.

Item 14. Material Modifications to the Rights of Security Holders and Use of Proceeds

None.

Item 15. Control and Procedures

2021 Fiscal Year

Disclosure Controls and Procedures, and Report on Internal Control over Financial Reporting

(a) Disclosure Control and Procedures

We evaluated the effectiveness of our disclosure controls and procedures as of December 31, 2021 with the participation of our Chief Executive Officer and Chief Financial Officer. Based on our assessment, we concluded that, as of December 31, 2021, our disclosure controls and procedures were effective in providing reasonable assurance that information that we are required to disclose in the reports we present or submit under the Exchange Act is recorded, processed, summarized and reported, within the deadlines specified in the applicable rules and forms, and are accumulated and reported to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate to allow for timely decisions regarding any required disclosure.

(b) Management Annual Report on Internal Control over Financial Reporting

Our management is responsible for establishing and maintaining adequate internal control over financial reporting and for evaluating the effectiveness of internal control over financial reporting. The process of internal controls over financial reporting is designed by our Chief Executive Officer and our Chief Financial Officer, under the supervision of our Board of Directors, and is carried out by our management and other employees as a means to provide reasonable assurance regarding the reliability of financial reporting and the preparation of consolidated financial statements for external purposes in accordance with IFRS, issued by the IASB.

 
141 
 
 

Rules 13a-15(f) and 15d-15(f) under the Exchange Act define internal control over financial reporting as a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles, and includes policies and procedures that (1) refer to record keeping that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the Company’s assets; (2) provide reasonable assurance that transactions are recorded as necessary to enable the preparation of financial statements in accordance with generally accepted accounting principles, and that Company’s receipts and expenses are being made only with authorization from Company's management and directors; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of Company's assets that could have a material effect on the audited consolidated financial statements.

Due to its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. In addition, projections of any assessment of effectiveness for future periods are subject to numerous risks, including that controls may become inadequate due to changes in conditions.

Our management has assessed the effectiveness of our internal controls over financial reporting as of December 31, 2021, was based on the criteria established in the Internal Control – Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO).

In accordance with the directive issued by the Securities and Exchange Commission that the evaluation of a recently acquired business can be omitted from the management report on internal control in the period of disclosure of the year in which the acquisition occurred, management excluded the assessment of the effectiveness of internal control disclosure period for the Vilas Wind Complex (Complexo Parque Vilas), whose acquisition was completed on November 30, 2021, and which represented 1.85% of our total assets and 0.05% of our net operating revenues and 0.10% of our net income for the period subsequent to its consolidation in our consolidated financial statements for the year ended on December 31, 2021.

Based on this evaluation, subject to the exclusions mentioned above, management has concluded that as of December 31, 2021, the Company's internal control over financial reporting is effective.

Our independent registered public accounting firm has examined the effectiveness of our internal control over financial reporting, as indicated in the report included in this document.

(c) Attestation Report of the Registered Public Accounting Firm

 

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Shareholders and the Board of Directors of
Companhia Paranaense de Energia - Copel

Opinion on internal control over financial reporting

We have audited the internal control over financial reporting of Companhia Paranaense de Energia - Copel and subsidiaries (the “Company”) as of December 31, 2021, based on criteria established in Internal Control - Integrated Framework (2013), issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 2021, based on criteria established in “Internal Control - Integrated Framework (2013)”, issued by COSO.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the consolidated financial statements as of and for the year ended December 31, 2021 of the Company and our report, dated April 27, 2022, expressed an unqualified opinion on those financial statements.

As described in the Management Annual Report on Internal Control over Financial Reporting, management excluded from its assessment the internal control over financial reporting at Vilas Wind Complex, which was acquired on November 30, 2021, and whose financial statements constitute 1.85% of total assets, 0.05% of net operating revenue and 0.10% of net income of the consolidated financial statement amounts as of and for the year ended December 31, 2021. Accordingly, our audit did not include the internal control over financial reporting at Vilas Wind Complex.

Basis for opinion

The Company’s Management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audit in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

 
142 
 
 

Definition and limitations of internal control over financial reporting

A company’s internal control over financial reporting is a process designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that: (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the Company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the Company are being made only in accordance with authorizations of Management and directors of the Company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the Company’s assets that could have a material effect on the financial statements.

Because of its inherent limitations, internal control over financial reporting may not prevent or detect misstatements. Also, projections of any evaluation of effectiveness to future periods are subject to the risk that controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

/s/ DELOITTE TOUCHE TOHMATSU

Auditores Independentes Ltda.

Curitiba, Brazil

April 27, 2022

 

(d) Changes in Internal Control on Financial Reporting

Our management implemented changes to its internal control over financial reporting during the year ended December 31, 2021 related to cyber security, as highlighted below:

·Improvements in procedures for monitoring and detection of cyber attacks, by means of the implementation of the EDR techonology (Endpoint Detection and Response) and rollout of the environment, with the aim of improving our timely response to cyber threat incidents;
·Conducting mandatory training for employees and third parties on cyber security;
·Conducting awareness campaigns for employees regarding cybersecurity, home office, LGPD, and access control;
·Improvement in the procedures and controls relating to monitoring and update of security patches for all Company assets;
·Implementation of a second authentication factor to all external access channels.

Our management has not identified any other changes in its internal control over financial disclosure reporting during the year ended December 31, 2021 that has significantly affected, or is reasonably likely to materially affect, its internal control over financial reporting.

 

 
143 
 
 

Item 16A. Audit Committee Financial Expert

On April 30, 2021, our Board of Directors reviewed the qualifications and backgrounds of the members of the Audit Committee and determined that Mr. Carlos Biedermann an “audit committee financial expert” within the meaning of Item 16A of Form 20-F and satisfied the requirements of independence of Rule 10A-3 under the Securities Exchange Act. For more information regarding our Audit Committee, see “Item 6. Directors, Senior Management and Employees—Audit Committee”.

Item 16B. Code of Ethics

Our code of ethics, called the "Code of Conduct", was first adopted in 2003. Over the years there have been reviews to the document to adequate it to the Company's reality. We highlight the review carried out in 2015, when a public consultation to stakeholders took place, and the 2017 review that started to reflect the new Brazilian regulations on conflict of interests and periodic training. The current version of the Code of Conduct was approved on March 13, 2018 by the Board of Directors. In 2019, we began a new process of reviewing our Code through public consultation, which is expected to be completed in 2022.

The Code of Conduct applies to all of our employees, interns, suppliers, service providers, contractors, directors and officers (including our Chief Executive Officer, our Chief Financial Officer and the officer in charge of our accounting department), as well as of our wholly-owned subsidiaries. Since the adoption of our Code of Conduct, we have not granted any express or implied waiver of any section of our code to the persons to whom it applies.

Our Code is available on our website (ir.copel.com) and copies may also be delivered by mail upon written request to the address provided on the cover page.

Item 16C. Principal Accountant Fees and Services

Audit and Non-Audit Fees

Deloitte Touche Tohmatsu Auditores Independentes Ltda, PCAOB ID No. 1045, acted as our independent registered public accounting firm for the fiscal years ended December 31, 2021 and 2020.

The table next sets forth the total amount billed to Deloitte Touche Tohmatsu Auditores Independentes Ltda. for services performed 2021 and 2020, and breaksdown these amounts by category of service.

 

 

Year ended December 31,

Billed

2021

2020

  (R$ million)
Audit fees 4.7 4.3
Audit-related fees - -
Tax fees 0.1 0.2
All other fees - 0.1
Total 4.8 4.6

Audit Fees

Audit fees are fees billed for the audit of our annual financial statements and for the reviews of our quarterly financial information in connection with statutory and regulatory filings or engagements.

Tax Fees

Tax fees are fees billed for the review of fiscal and tax procedures, including the examination of the procedures in force for the calculation, retention, registration, control, collection, recovery and accounting of taxes, including ancillary obligations.

 
144 
 
 

All Other Fees

The services comprising the fees disclosed under “All Other Fees” refer to (i) fact finding consultive services in connection with the discussion with the Colíder Consortium, with respect to the “Agreement for the Supply of Goods and Services” for the Implementation of the Colíder HPP, and (ii) fact finding consultive services in connection with the discussion to reestablishing the economic and financial balance of said Agreement.

Audit Committee Pre-Approval Policies and Procedures

When hiring other services from its external auditors, the Company's practice provides for prior analysis by the Audit Committee of the Board of Directors, which must consider in this assessment whether a relationship or service provided by an independent auditor: (i) creates conflicting interests with your audit client; (ii) puts them in a position to audit their own work; (iii) results in acting as a manager or as an employee of the audit client; or (iv) puts them in a position of attorney for the audit client.

The Audit Committee also considers, in this type of assessment, whether any service provided by the independent auditing company may impair, in fact or apparently, the firm's independence. Whenever necessary, the Audit Committee can count on the technical support of the Internal Audit, or of an independent consultancy, for technical evaluation that may be required in each specific case, with discussions on the contracting of other services being recorded in the minutes of this collegiate meeting independent auditor.

For more information regarding our Board of Directors and Audit Committee, see “Item 6. Directors, Senior Management and Employees”.

Item 16D. Exemption from the Listing Standards for Audit Committees

Under the rules of the NYSE and the SEC, absent an exemption, we must comply with Securities Exchange Act Rule 10A-3, which requires that we establish an audit committee composed of independent members of the board of directors that meets specified independence requirements. We rely on our Audit Committee to meet the exemption requirements under paragraph (c)(3) of Rule 10A-3. Under our bylaws and the Audit Committee’s charter, (i) our Audit Committee shall have three to five members, (ii) each member must comply with the independence requirements of our bylaws and of Federal Law 13,303/2016, (iii) at least one member must be a member of our Board of Directors, (iv) at least one member must not be a member of our Board of Directors and (v) at least one member must be must satisfy accounting / financial expertise requirements of Federal Law 13,303/2016.

Currently, our Audit Committee is composed of three members. Mr. Carlos Biedermann, Marco Antônio Barbosa Cândido and Mr Luiz Claudio Maia Vieira. Mr Luiz Claudio Maia Vieira is characterized as an external member. For more information regarding our Audit Committee, see “Item 6. Directors, Senior Management and Employees—Audit Committee”.

Item 16E. Purchases of Equity Securities by the Issuer and Affiliated Purchasers

None.

Item 16F. Changes in Registrant’s Certifying Accountant

Not applicable.

 
145 
 
 

Item 16G. Corporate Governance

 

Section

New York Stock Exchange Corporate Governance Rules for U.S. Domestic Issuers

Copel’s Approach

Director Independence

303A.01 A company listed on the New York Stock Exchange (a “listed company”) must have a majority of independent directors on its Board of Directors. “Controlled companies” are not required to comply with this requirement. Since the majority of its voting shares are held by the State of Paraná. As such, Copel would not be required to comply with the majority of independent directors requirement. At least three directors of Copel must be independent, to equal or exceed 25% of the total number of members. Such directors must be recognized as independent in the minutes of the General Meeting that elects them, in accordance with Copel's Bylaws, Federal Laws 6,404/1976 and 13,303/2016, B3's Level 2 Corporate Governance Regulation and Rule 10A-3 of the Securities Exchange Act
303A.03 The non-management directors of a listed company must meet at regularly scheduled executive sessions without management.

Copel's non-managing directors regularly hold executive sessions without management, which are usually scheduled to occur at the end of board meetings Our Chief Executive Officer is also a member of our board of directors.

Pursuant to the internal regulations of our board of directors, in the event a conflict of interest or particular interest of any board member is identified in relation to a matter to be decided to be decided by the board, such board member must recuse himself from the meeting, which will continue without his presence.

Nominating/Corporate Governance Committee

303A.04 A listed company must have a Nominating/ Corporate Governance Committee composed entirely of independent directors, with a written charter that covers certain minimum specified duties. “Controlled companies” are not required to comply with this requirement. As a controlled company, Copel would not be required to comply with the nominating/ corporate governance committee requirements. However,  Article 10 of Brazilian Law 13,303 / 2016 requires Copel to keep a permanent statutory committee, advisory to the shareholders, and responsible for monitoring the nomination and evaluation processes applicable to our management, members of our board of directors, Supervisory Board and board committees. This committee is composed of members nominated by the shareholders.
 
146 
 
 

Compensation Committee

303A.05 A listed company must have a compensation committee composed entirely of independent directors, with a written charter that covers certain minimum specified duties. “Controlled companies” are not required to comply with this requirement. Copel fits the definition of “controlled company,” as the majority of its voting shares are held by the State of Paraná. As a controlled company, Copel would not be required to comply with the compensation committee requirements if it were a U.S. domestic issuer.

Audit Committee

303A.06

303A.07

A listed company must have an audit committee with a minimum of three (3) independent directors who satisfy the independence requirements of Rule 10A-3 under the Securities Exchange Act, with a written charter that covers certain minimum specified duties.

Copel has a Statutory Audit Committee, an independent advisory body to the Board of Directors, as per Article 51 of Copel's Bylaws (Holding Company), whose responsibilities, duties, competencies and attributions are established in specific internal regulations, in compliance with the laws of Brazil and the United States, including the provisions of the Sarbanes-Oxley Act (SOX); SEC and NYSE rule sand best practices.

This Committee has three to five members elected by the Board of Directors, which can also remove members, all with a unified term of office of two years and a maximum of three consecutive reappointments. The Audit Committee must have at least one member of the Board of Directors, one member who is not part of the Board of Directors, chosen from a pool of individuals with significant experience and technical capacity, and one member with recognized professional experience in matters of corporate accounting, auditing, and finance, which characterizes them as a "financial expert" under applicable legislation. Currently the Audit Committee is composed of three independent members.

The Audit Committee is an advisory committee responsible for assisting our Board of Directors and giving its opinion on matters related to our financial and accounting management, risks, internal controls and audit, including, but not limited to, the quality, transparency and integrity of our financial statements, effectiveness of our internal controls with respect to the preparation of financial reports, as well as the activities, independence and quality of the work of our external and internal auditors. In addition, the Audit Committee is responsible for monitoring the collection, subsequent investigations, findings and any follow-up of complaints made through the Reporting Channel. The Audit Committee is also responsible for issuing its annual report, published together with the Company's accounting and financial statements.

Equity Compensation Plans

303A.08 Shareholders must be given the opportunity to vote on all equity compensation plans and material revisions thereto, with limited exemptions set forth in the NYSE rules.

Under Brazilian Corporate Law, shareholder pre-approval is required for the adoption of any equity compensation plans and material revisions thereto.

 

Corporate Governance Guidelines

303A.09 A listed company must adopt and disclose corporate governance guidelines that cover certain minimum specified subjects. Although the corporate governance practices adopted by Copel do not comply with all the terms specified in the rules of the NYSE, they fulfill the requirements established for companies listed on level 2 of corporate governance of B3 (Brasil, Bolsa, Balcão). The Company also adopts the Code of Better Corporate Governance Practices of the Brazilian Institute for Corporate Governance (”IBGC”).
Code of Ethics for Directors, Officers and Employees
303A.10 A listed company must adopt and disclose a code of business conduct and ethics for its directors, officers and employees, and must promptly disclose any waivers of the code for directors or executive officers.

Copel has adopted a code of ethics, a set of rules that guide the actions of all persons who perform activities on behalf of Copel and its wholly-owned and controlled subsidiaries, including employees (regardless of their function or hierarchical position), administrators (members of the Board of Directors and Executive Board), members of the Audit Committee, interns, suppliers, service providers and outsourced personnel. All such individuals are responsible for abiding by the code’s provisions and applying its content within their respective roles, in addition to promoting disclosure, understanding and integration of Copel’s code of ethics.

 

Certification Requirements

303A.12 A CEO of a listed company must promptly notify the NYSE in writing after any executive officer of the listed company becomes aware of any material non-compliance with any applicable provisions of Section 303A and certify he or she is not aware of any violation by the listed company of NYSE corporate governance listing standards, qualifying the certification to the extent necessary. Each listed company must submit an executed Written Affirmation annually to the NYSE. In addition, each listed company must submit an interim Written Affirmation as and when required by the interim Written Affirmation form specified by the NYSE.

Copel’s CEO will promptly notify the NYSE in writing after any executive officer of Copel becomes aware of any material non-compliance with any applicable provisions of the NYSE corporate governance rules and will also certify if he is not aware of any violation by the listed company of NYSE corporate governance listing standards.

Copel submits every year an Annual Written Affirmation to the NYSE and will submit an interim Written Affirmation when required.

 
147 
 
 

Item 16H. Mine Safety Disclosure

Not applicable.

Item 16I. Disclosure Regarding Foreign Jurisdictions that Prevent Inspections

Not applicable. 

Item 17. Financial Statements

Not applicable.

Item 18. Financial Statements

Reference is made to pages F-1 through F-134.

 
148 
 
 

 

Item 19. Exhibits9F9F

1.1 Corporate Bylaws approved and consolidated by the 203rd Extraordinary Shareholders’ meeting, of November 26, 2021.
2.1 Deposit Agreement (preferred shares) dated as of March 21, 1996, as amended and restated as of April 27, 2021 in the form of Exhibit 2.1 hereto.
2.4 Description of Securities registered under Section 12 of the Exchange Act.
4.1 The Adjustment Agreement of August 4, 1994 between the State of Paraná and Companhia Paranaense de Energia ‒ Copel (“Adjustment Agreement”) (incorporated by reference to our Form F-1 333-7148, filed with the SEC on June 30, 1997), the Deed of Amendment to the Adjustment Agreement (Quarto Termo Aditivo ao Termo de Ajuste celebrado em 21 de janeiro de 2005) (English translation) (incorporated by reference to our annual report on Form 20-F for the year ended December 31, 2005, filed with the SEC on June 30, 2006) (File No. 001-14668), and the Deed of Amendment to the Adjustment Agreement (Quinto Termo Aditivo ao Termo de Ajuste celebrado em 31 de outubro de 2017) (English translation).
8.1 List of subsidiaries controlled by Copel
12.1 Certification of the Chief Executive Officer of Copel, pursuant to Rules 13a-14 and 15d-14 under the Securities Exchange Act of 1934.
12.2 Certification of the Chief Financial Officer of Copel, pursuant to Rules 13a-14 and 15d-14 under the Securities Exchange Act of 1934.
13.1 Certification of Chief Executive Officer of Copel, pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
13.2 Certification of the Chief Financial Officer of Copel, pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.
101.INS Inline XBRL Instance Document.
101.SCH Inline XBRL Taxonomy Extension Schema Document.
101. CAL Inline XBRL Taxonomy Extension Calculation Linkbase Document.
101. DEF Inline XBRL Taxonomy Extension Definition Linkbase Document.
101.LAB Inline XBRL Taxonomy Extension Label Linkbase Document.
101.PRE Inline XBRL Taxonomy Extension Presentation Linkbase Document.
 
149 
 
 

We omitted from the exhibits filed with or incorporated by reference into this annual report certain promissory notes and other instruments and agreements with respect to our long-term debt, none of which authorizes securities in a total amount that exceeds 10% of our total assets. We hereby agree to furnish to the Securities and Exchange Commission copies of any such omitted promissory notes or other instruments or agreements as the Commission requests.

 
150 
 
 

technical GLOSSARY

2013 Concession Renewal Law: Brazilian Law No. 12,783 enacted on January 11, 2013, under which most generation, transmission and distribution concessionaires may be renewed at the request of the concessionaire for an additional period of 30 years, but only if the concessionaire agrees to amend the terms of the concession contract to reflect a new tariff regime to be established by ANEEL.

ADSs: American Depositary Shares, each representing one Unit.

ANATEL: The Brazilian National Telecommunication Agency, or the Agência Nacional de Telecomunicações.

ANEEL: The Brazilian Electricity Regulatory Agency, or the Agência Nacional de Energia Elétrica.

Assured Energy: Determined amount assigned to each hydroelectric plant according to the energy supply risk criteria defined by MME. The assured energy also represents the maximum energy that can be sold by the generator, which is set forth in each concession agreement, irrespective of the volume of electricity actually generated by the facility.

Availability Agreement: Agreement under which a generator commits to making a certain amount of electrical capacity available to the Regulated Market. In such case, the generator’s revenue is guaranteed and the distributors must bear the risk of a supply shortage.

Average Tariff or Rate: Total sales revenue divided by total megawatt hours (MWh) sold for each relevant period, including in the case of the Company, unbilled electricity, or electricity which has been delivered to a customer, but for which the utility has yet to deliver a bill. Total sales revenue, for the purpose of computing average tariff or rate, includes both gross billings before deducting value-added tax and unbilled electricity sales upon which such taxes have not yet accrued.

Bilateral Agreement: Legal instrument that formalizes the purchase and sale of electric energy between Agents of the Chamber of Commercialization of Electric Energy - CCEE, with the purpose of establishing prices, terms and amounts of supply at determined time intervals.

BNDES: the National Bank for Economic and Social Development, or Banco Nacional de Desenvolvimento Econômico e Social.

Brazilian Central Bank: The Brazilian Central Bank, or Banco Central do Brasil. Brazilian Forestry Code: Federal Law No. 12,651/2012.

B3 (Brasil, Bolsa, Balcão): B3 S.A. - Brasil, Bolsa, Balcão, the securities, commodities and futures exchange, headquartered in São Paulo, Brazil, incoporated as a result of the merger of BM&FBOVESPA S.A. – Bolsa de Valores, Mercadorias e Futuros and CETIP S.A. – Mercados Organizados.

Captive Customers: customers whose energy is supplied by the distributor in which the consumer unit is connected, such as that the amount paid already includes the energy cost and service cost for use of transmission and distribution - wire service. The consumer is not free to negotiate the conditions and the flexibility of energy supplied to meet the needs of its business, instead having to follow the determinations set forth by the distributor. The consumer is subject to the unpredictability of the annual variation of the value of the distributors’ tariffs.

CCEE (Câmara de Comercialização de Energia Elétrica): Chamber of Commercialization of Electric Energy.

CDE: the Electric Energy Development Account, or Conta de Desenvolvimento Energético.

CER: Reserve Energy Contract (Contrato de Energia Reserva).

Class A Shares: The Company’s class A preferred shares.

 
151 
 
 

Class B Shares: The Company’s class B preferred shares.

CMN: The National Monetary Council of Brazil, or Conselho Monetário Nacional.

Code: The U.S. Internal Revenue Code of 1986, as amended.

Common Shares: The Company’s common shares.

Compagas: Companhia Paranaense de Gás – Compagas

Copel Distribuição: Copel Distribuição S.A., the Company’s entity engaged in the distribution business.

Copel Geração e Transmissão S.A. or Copel GeT: The Company’s entity engaged in the generation and transmission business.

CRC Account: The recoverable rate deficit account, or Conta de Resultados a Compensar.

Custodian: Itaú Unibanco S.A., as custodian for the Units represented by ADSs.

CVM (Comissão de Valores Mobiliários): Securities and Exchange Commission

Decree No. 6,306/07: Brazilian tax Decree No. 6,306 dated December 14, 2007, which regulates tax on credit, exchange and insurance, or relating to securities – IOF.

Deloitte: Deloitte Touche Tohmatsu Auditores Independentes Ltda.

Deposit Agreement: A Deposit Agreement between Copel, the Depositary and the registered holders and beneficial owners from time to time of the ADSs.

Depositary: The Bank of New York Mellon, as depositary.

Distribution: The transfer of electricity from the transmission lines at grid supply points and its delivery to customers through distribution lines at voltages between 13.8 kV and 44 kV.

Distributor: An entity supplying electrical energy to a group of customers by means of a distribution grid.

Elejor: Centrais Elétricas do Rio Jordão S.A.

Eletrosul: Eletrosul Centrais Elétricas S.A.

Energy Agreement: Agreement under which a generator commits to supply a certain amount of electricity and assumes the risk that its electricity supply could be adversely affected by hydrological conditions and low reservoir levels, which could interrupt the supply of electricity. In such case, the generator would be required to purchase electricity elsewhere in order to comply with its supply commitments.

Final Customer: A party that uses electricity for its own needs.

Free Customers: Electricity customers that are able to choose their own power suppliers since they meet the following requirements: (i) demand of at least 3 MW at any voltage for new customers (those connected to the distribution grid after July 1995); (ii) demand of at least 3 MW and supplied at voltage levels equal to or greater than 69 kV for existing customers (those connected to the distribution grid before July 1995); and (iii) demand of at least 500 kW and that opt to be supplied energy by means of alternative sources, such as wind power projects, small hydroelectric power plants or biomass projects (also known as Special Customers).

Free Market: Market segment that permits a certain degree of competition. The Free Market specifically contemplates purchase of electricity by non-regulated entities such as Free Customers and energy traders.

 
152 
 
 

Furnas: Furnas Centrais Elétricas S.A

Generating Unit: An electric generator together with the turbine or other device that drives it.

Gigawatt (GW): One billion watts.

Gigawatt hour (GWh): One gigawatt of power supplied or demanded for one hour, or one billionwatt hours.

GPON: Gigabit-Capable Passive Optical Networks - A passive optical network (PON) is a system that brings optical fiber cabling and signals all or most of the way to the end user. Depending on where the PON terminates, the system can be described as fiber-to-the-curb (FTTC), fiber-to-the-building (FTTB), or fiber-to-the-home (FTTH). Passive Optical Network: A point-to-multipoint, passive fiber network architecture in which a single fiber utilizes optical splitters to serve multiple premises. Gigabit PON: Based on the previous PON types, GPON supports higher data rates and increased security, and has been deployed around the world by major telecom operators.

Group A Customers: A group of customers that uses electricity at 2.3 kV or higher. Tariffs applied to this group are based on the actual voltage level at which energy is supplied and the time of day and year the energy is supplied.

Group B Customers: A group of customers that uses electricity at less than 2.3 kV. Tariffs applied to this group are comprised solely of an energy charge and are based on the classification of the customer.

GSF: Generation Scaling Factor.

High Voltage: A class of nominal system voltages equal to or greater than 69,000 volts and less than 230,000 volts.

HPP or Hydroelectric Power Plant: A generating unit that uses water power to drive the electric generator.

IASB: International Accounting Standards Board.

IFRS: International Financial Reporting Standards.

IGP-DI: The Índice Geral de Preços—Disponibilidade Interna inflation index.

IGP-M Index: The Brazilian General Market Price inflation index, or the Índice Geral de Preços do Mercado.

Installed Capacity: The level of electricity that can be delivered from a particular generating unit on a full-load continuous basis under specified conditions as designated by the manufacturer.

Interconnected Transmission System: Systems or grids for the transmission of energy, connected together by means of one or more lines and transformers.

IPCA: Índice Nacional de Preços ao Consumidor Amplo - IPCA inflation index.

IPP: Independent Power Producer, a legal entity or consortium holding a concession or authorization for power generation for sale for its own account to public Utility concessionaires or Free Customers.

Itaipu: Itaipu Binacional, a hydroelectric facility equally owned by Brazil and Paraguay, with an installed capacity of 14,000 MW.

Kilovolt (kV): One thousand volts.

Kilowatt (kW): One thousand watts.

Kilowatt hour (kWh): One kilowatt of power supplied or demanded for one hour, or one thousand watt hours.

Latibex: A Euro-based market for Latin American securities, which is part of the Madrid Stock Exchange.

 
153 
 
 

LGPD: Brazilian Federal Law No. 13,709/2018, or Lei Geral de Proteção de Dados Pessoais.

Low-income Residential Customers: A group of customers that consumes less than 220 kWh per month and has filed an application to receive benefits under any of the Brazilian government’s social programs. Low-income residential customers are considered a subgroup of residential customers and are not subject to payment of emergency capacity and emergency acquisition charges or any extraordinary tariff approved by ANEEL.

Main Transmission Concession: transmission concession contract No. 060/2001 comprised of different transmission assets that were in operation in the year of 2001 (date of execution of the concession agreement).

MCSD: The Mechanism for Compensation of Surpluses and Deficits (Mecanismo de Compensação de Sobras e Déficits), which corresponds to the process of reallocation of energy surpluses and deficits undertaken in accordance with the Regulated Contracting Environment – ACR among the distribution agents that participate in CCEE.

MCSD-EN: The Mechanism for Compensation of Surpluses and Deficits of New Energy (Mecanismo de Compensação de Sobras e Déficits de Energia Nova), which allows distribution agents to offset amounts of electric energy and power acquired in auctions of new generation projects, and allows the reduction of amounts contracted with generating agents bound to new generation ventures.

Megawatt (MW): One million watts.

Megawatt hour (MWh): One megawatt of power supplied or demanded for one hour, or one million watt hours.

MME: The Brazilian Ministry of Mines and Energy, or the Ministério de Minas e Energia.

MRE: The Energy Reallocation Mechanism is a mechanism which attempts to mitigate the risks borne by hydroelectric generators due to variations in river flows (hydrological risk).

MVE: The Mechanism of Surplus Sales, or the Mecanismo de Venda de Excedentes, which allows distribution companies to sell energy surpluses and, in the case of sales related to amounts within the regulatory limits or involuntary over contracting, allows distribution companies to revert the acquired benefit to consumers through tariff adjustments.

Non-Brazilian Holder: An individual, entity, trust or organization resident or domiciled outside Brazil for purposes of Brazilian taxation that acquires, owns and disposes of Common Shares, Preferred Shares, Units or ADSs.

PLD: Difference Settlement Price or, Preço de Liquidação de Diferenças.

PPD: Performance Incentive Program, or Prêmio Por Desempenho.

Preferred Shares: the preferred shares of the company, divided between Classe A Shares and Class B Shares.

ONS: The National Electric System Operator, or the Operador Nacional do Sistema Elétrico.

RAP or APR: Annual Permitted Revenues, or Receita Anual Permitida, the annual revenue established by ANEEL to be charged by a transmission concessionaire for the use of its transmission lines by third parties, which include Free Customers, generators and distributors.

Rationing Program: A program instituted by the Brazilian government to reduce electricity consumption, in effect from June 1, 2001 to February 28, 2002, given it was a period of low rainfall in Brazil.

Real, Reais or R$: Brazilian reais (plural) and the Brazilian real (singular).

Regulated Market: Market segment in which distribution companies purchase all the electricity needed to supply customers through public auctions. The auction process is administered by ANEEL, either directly or through CCEE, under certain guidelines provided by the MME. The regulated market is generally considered to be more stable in terms of supply of electricity.

 
154 
 
 

Regulatory Remuneration Base: The aggregate amount of investments made by the distribution companies in connection with the services compensated by tariffs charged to consumers (Base de Remuneração Regulatória).

Reserve Energy Auction: mechanism for the contracting of reserve energy created to increase the security in the supplied of energy by the National Interconnected System (SIN). The reserve auction acts as an insurance contracted by distributors to be used when there is a mismatch between forecasted demand and supply. This modality of contracting is formalized through the conclusion of the CER between the selling agents in the auctions and the CCEE.

Retail Tariff: Revenue charged by distribution companies to its customers. Each customer falls within a certain tariff level defined by law and based on the customer’s classification, although some flexibility is available according to the nature of each customer’s demand. Retails tariffs are subject to annual revision by ANEEL.

RGR Fund: A reserve fund designed to provide compensatory payments to energy companies for certain assets used in connection with a concession if the concession is revoked or is not renewed.

Sanepar: Companhia de Saneamento do Paraná Sanepar.

Securities Act: The United States Securities Act of 1933, as amended.

Securities Exchange Act: The United States Securities Exchange Act of 1934, as amended.

Sercomtel: Sercomtel Telecomunicações S.A.

SHP ‒ Small Hydroelectric Plant: Hydroelectric plants with generating capacity between 1,000 kW and 30,000 kW with a reservoir covering an area equal to or less than 3.0 km2.

SPC: Special Purpose Company, or Sociedade de Propósito Específico.

Special Customers: A group of customers that uses at least 500 kV. A Special Customer may choose its energy supplier if that supplier derives its energy from alternative sources, such as small hydroelectric plants, wind plants or biomass plants.

Spot Market: Deregulated market segment in which electricity is bought or sold for immediate delivery. In general, prices of spot market energy purchases tend to be substantially higher than the price of energy under long-term energy purchase agreements.

Substation: An assemblage of equipment, which switches and/or changes or regulates the voltage of electricity in a transmission and distribution system.

Tax Haven Holder: A shareholder situated in tax haven jurisdictions (that is, a country or location that does not impose income tax or where the maximum income tax rate is lower than 20% (or 17%, as the case may be) or where the local legislation imposes restrictions on disclosing the shareholding composition or the ownership of the investment or the beneficial owner of the income derived from transactions carried out and attributable to a Non-Brazilian Holder). The list of tax haven jurisdictions is currently provided in Normative Ruling No. 1,037.

Thermoelectric Plant or TPP: A generating unit which uses combustible fuel, such as coal, oil, diesel natural gas or other hydrocarbon as the source of energy to drive the electric generator.

TJLP: The Long-Term Interest Rate, or the Taxa de Juros a Longo Prazo, the Brazilian government’s long-term interest rate.

Transmission: The bulk transfer of electricity from generating facilities to the distribution grid at load center station by means of the transmission grid (in lines with capacity between 69 kV and 525 kV).

Transmission Tariff: Revenue charged by a transmission concessionaire based on the transmission grid it owns and operates. Transmission tariffs are subject to periodic revisions by ANEEL.

 
155 
 
 

TUST: The tariff established by ANEEL for the use of the transmission system, which is the Interconnected Transmission System and its ancillary facilities.

UHE GBM: Governador Bento Munhoz da Rocha Netto Hydroelectric Power Plant.

Unit(s): depositary receipt traded in B3 and Latibex, and depending on the context, the depositary receipt represented by ADS traded in NYSE, in each case composed by one Common Share and four Class B Shares.

U.S. Dollars, dollars, or US$: United States dollars.

U.S. Holder: A beneficial holder of a Common Share, a Preferred Share, an Unit or an ADS that is (i) an individual citizen or resident of the United States of America, (ii) a corporation, or any other entity taxable as a corporation, organized under the laws of the United States of America, any state thereof, or the District of Columbia, or (iii) otherwise subject to U.S. federal income taxation on a net basis with respect to the Common Share, Preferred Share, Unit or ADS.

Utility: An entity that is the holder of a concession or authorization to engage in the generation, transmission or distribution of electric energy in Brazil.

Volt: The basic unit of electric force analogous to water pressure in pounds per square inch.

Watt: The basic unit of electrical power.

 
156 
 
 

Signatures

The registrant hereby certifies that it meets all of the requirements for filing on Form 20-F and that it has duly caused and authorized the undersigned to sign this annual report on its behalf.

 

Companhia Paranaense De Energia – Copel

By: /s/ Daniel Pimentel Slaviero

Name: Daniel Pimentel Slaviero

Title: Chief Executive Officer

 

 

By: /s/ Adriano Rudek de Moura

Name: Adriano Rudek de Moura

Title: Chief Financial and Investor Relations Officer

 

Date: April 27, 2022

 
157 
 
 

 

 

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM

To the Shareholders and the Board of Directors of

Companhia Paranaense de Energia - Copel

Opinion on the financial statements

We have audited the accompanying consolidated statements of financial position of Companhia Paranaense de Energia - Copel and subsidiaries (the “Company”) as of December 31, 2021 and 2020, the related consolidated statements of income, of comprehensive income, of changes in equity and of cash flows for each of the three years in the period ended December 31, 2021, and the related notes (collectively referred to as the “financial statements”). In our opinion, the financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2021 and 2020, and the results of its operations and of its cash flows for each of the three years in the period ended December 31, 2021, in conformity with International Financial Reporting Standards - IFRS as issued by the International Accounting Standards Board - IASB.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States) (PCAOB), the Company’s internal controls over financial reporting as of December 31, 2021, based on the criteria established in “Internal Control - Integrated Framework (2013)” issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated April 27, 2022, expressed an unqualified opinion on the Company’s internal controls over financial reporting.

Basis for opinion

These financial statements are the responsibility of the Company’s Management. Our responsibility is to express an opinion on the Company’s financial statements based on our audits. We are a public accounting firm registered with the PCAOB and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission - SEC and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by Management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.

 
158 
 
 

 

Emphasis of matter

COVID-19-related matters

We draw attention to note 1 to the financial statements, where the Company describes the impacts of the coronavirus disease (COVID-19) on the operations of the business and the uncertainties of related future impacts on the business, as well as the measures, both taken and planned, to deal with these events and circumstances.

Critical audit matters

The critical audit matters communicated below are matters arising from the current-period audit of the financial statements that were communicated or required to be communicated to the audit committee and that (1) relate to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective, or complex judgments. The communication of critical audit matters does not alter in any way our opinion on the financial statements, taken as a whole, and we are not, by communicating the critical audit matters below, providing separate opinions on the critical audit matters or on the accounts or disclosures to which they relate.

Recognition of revenue from electricity sales to final customers and use of the main distribution and transmission grid - Refer to notes 4.12 and 32 to the financial statements

Critical audit matter description

The Company recognize unbilled revenue calculated between the date of the last measurement and the end of the month, on estimated basis, based on the average of the last billing. The Company bills its consumers on a monthly basis based on the energy measured. Unbilled revenues from the billing date to month-end are estimated based on the prior month’s billing and recognized as revenue at the end of the month in which the service was provided. At the end of each month, the volume of energy delivered to customers since the date of the last measurement is estimated and the corresponding unbilled revenue is determined considering the estimated daily consumption and the applicable rates by customer class, reflecting historical trends and significant experience. The differences between estimated unbilled and actual revenues are recognized in the next month.

We identified recognition of revenue from electricity sales to final customers and use of the main distribution and transmission grid as a critical audit matter because of the judgments necessary to audit the revenue recognition, including the methods and assumptions used to estimate unbilled revenue, as well as the use of automated systems to process and recognize revenue. Performing procedures to audit revenue required a high degree of auditor judgment and extensive audit effort, including involvement of our Information Technology (IT) specialists.

How the critical audit matter was addressed in the audit

Our audit procedures on revenue recognition included the following, among others:

·We tested the effectiveness of controls over revenue recognition, including Management’s controls over the measurement of energy volumes and pricing, as well as controls over estimates of unbilled revenue.
·With the assistance of our IT specialists, we:
-Identified the significant systems used to process revenue transactions and tested the general IT controls over each of these systems, including testing of user access controls, change management controls, and IT operations controls.
Performed testing of system interface controls and automated controls within the relevant revenue streams, as well as the controls designed to ensure the accuracy and completeness of revenue.

 

 

 
159 
 
 
·With respect to unbilled revenue, we:
-Evaluated the appropriateness and consistency of the methods and assumptions used by Management to develop the estimates of unbilled revenue.
-Tested the mathematical accuracy of Management’s estimates of unbilled revenue.
-We evaluated Management’s ability to estimate unbilled revenue accurately by comparing actual subsequent revenue with Management’s historical estimates for the related revenue streams.
·We performed a test that comprised developing an independent expectation of the revenue amounts and its comparison with revenue effectively recognized.
·For a sample of revenue transactions, we performed detail transaction testing by agreeing the amounts recognized to source documents, testing the mathematical accuracy of the revenue recognized, and verifying subsequent cash receipts.
·We assessed whether the disclosures made by Management in the financial statements are appropriate.

Provisions for legal claims and contingent liabilities - Refer to notes 4.11 and 30 to the financial statements

Critical audit matter description

The Company is part in several legal and administrative proceedings before different courts. Based on assessments made by the Company’s legal counsel, Management recognized a provision for those lawsuits which likelihood of loss is probable. The Company’s Management believes that it is not practicable to provide information regarding the expected timing of any cash outflows related to the lawsuits in which the Company and its subsidiaries are involved, due to the slow pace and unpredictability of Brazilian legal, tax and regulatory systems, and since final resolution of the proceedings for which a provision has been registered depends on the conclusions of the lawsuits.

We identified provisions for legal claims and contingent liabilities as a critical audit matter because of the large number of cases and the subjectivity necessary to estimate the likelihood and to measure the provision for litigation of potential losses. Performing audit procedures to evaluate whether the provision for legal claims was appropriately recognized and disclosed required a high degree of auditor judgment and an increased extent of effort.

How the critical audit matter was addressed in the audit

Our audit procedures related to provision for legal claims and contingent liabilities included the following, among others:

·We tested the effectiveness of controls related to provision for legal claims and evaluation of contingent liabilities, including those over the completeness and review of new and outstanding legal matters, as well as controls over the measurement of potential losses.
·With the assistance of our IT specialists, we tested the effectiveness of controls related to the information systems used by Management to monitor and evaluate outstanding legal matters.
·We tested the completeness and accuracy of the database used by Management to manage outstanding legal matters and to determine the likelihood of loss and measuring potential losses.
 
160 
 
 

 

·We inquired internal and external legal counsel to understand developments in legal matters and progression in potential settlement discussions.
·We requested and received a written response from internal and external legal counsel as it relates to lawsuits and the related classification of the likelihood of loss for the Company and the amounts involved.
·We read Board of Directors and Executive meeting minutes for evidence of undisclosed contingencies or unrecognized provisions.
·We evaluated the assumptions and judgments used by Management to estimate the provision for legal claims, including corroborating the assumptions with internal legal counsel, with the assistance of our tax and environmental specialists.
·We evaluated the Company’s disclosures for consistency with our knowledge of the Company’s legal matters.

Renegotiation of the hydrological risk (Generation Scaling Factor-GSF) - Refer to note 1(b) and 4.9.2 to the financial statements

Management exercised judgment in the development and application of the accounting policy and measurement of the fair value of the intangible asset upon recognition of the effects relating to the renegotiation of the hydrological risk prescribed by Law 14.052, which amended Law 13.203/2015, and which methodology for calculation of the compensation and the procedures for the renegotiation were established by Aneel Regulatory Resolution 895.

We identified the renegotiation of the hydrological risk as a critical audit matter because of the judgments exercised in the application of the accounting pronouncements to define the existence of the intangible asset and its recognition at fair value and the corresponding impact on the Company’s results of operations. Performing procedures to audit the renegotiation of the hydrological risk required a high degree of auditor judgment due to the significant judgment exercised by Management in determining the related accounting policy and estimates for fair value measurement.

How the critical audit matter was addressed in the audit

Our audit procedures related to renegotiation of the hydrological risk included the following, among others:

·We tested the effectiveness of controls related to the Management’s process to measure the fair value of the intangible asset recognized.
·With the assistance of our specialists in technical accounting and audit standards, we:
-Assessed the accounting policy and corresponding methodology defined by Management for fair value measurement (discounted cash flow).
-Assessed the recognition period.
·With respect of the intangible asset recognized deriving from the renegotiation:
-We evaluated the key business assumptions used in the discounted cash flow model, more specifically related to the projected revenue and estimated costs.
-We evaluated the accounting for as intangible asset and the amount recognized in other operational income.
 
161 
 
 

 

·We have evaluated the Company’s disclosures for consistency.

/s/ DELOITTE TOUCHE TOHMATSU

Auditores Independentes Ltda.

Curitiba, Brazil

April 27, 2022

 

We have served as the Company’s auditor since 2016.

162 
 

Companhia Paranaense de Energia – Copel and Subsidiaries

Consolidated Financial Statements as of December 31, 2021 and 2020

and for the years ended December 31, 2021, 2020 and 2019 and Report of

Independent Registered Public Accounting Firm

 

 

 

 
 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Consolidated Statements of Financial Position

As of December 31, 2021 and 2020

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

       
ASSETS Note 12.31.2021 12.31.2020
       
CURRENT ASSETS      
 Cash and cash equivalents  5 3,472,845  3,222,768
 Bonds and securities  6   16,121   1,465
 Collaterals and escrow accounts    182  197
 Trade accounts receivable  7 4,433,193  3,768,242
 Dividends receivable      68,162 67,066
 CRC transferred to the Paraná State Government  8   -  287,789
 Sectorial financial assets  9 383,740  173,465
 Accounts receivable - concessions  10  5,121   4,515
 Contract assets  11 148,488  285,682
 Other current receivables  12 749,816  514,185
 Inventories    197,779  162,791
 Income tax and social contribution receivable    151,912 86,410
 Other current recoverable taxes  13.2 1,508,864  1,565,323
 Prepaid expenses  14   53,649 36,987
      11,189,872 10,176,885
 Assets held for sale  41   -  1,230,546
TOTAL CURRENT ASSETS   11,189,872 11,407,431
     
NONCURRENT ASSETS      
Long Term Assets      
 Bonds and securities  6 344,937  299,065
 Other temporary investments      19,985 22,385
 Collaterals and escrow accounts  22.1 142,764  133,521
 Trade accounts receivable  7   82,233 51,438
 CRC transferred to the Paraná State Government  8   -  1,104,835
 Judicial deposits   16 591,131  486,746
 Sectorial financial assets  9 383,740  173,465
 Accounts receivable - concessions  10 2,261,684  1,897,825
 Contract assets  11 6,739,560  5,207,115
 Other noncurrent receivables  12 916,606  845,460
 Income tax and social contribution receivable    153,850  137,778
 Deferred income tax and social contribution  13.1 963,259  1,191,104
 Other noncurrent recoverable taxes  13.2 3,143,546  4,539,498
 Prepaid expenses  14   27 44
Total long term asset    15,743,322 16,090,279
       
Investments 17 3,042,134  2,729,517
Property, plant and equipment 18   10,142,591  9,495,460
Intangible assets 19 9,215,560  6,929,456
Right-of-use asset 28 204,056  132,521
       
Total non current assets    38,347,663 35,377,233
       
 TOTAL ASSETS      49,537,535 46,784,664
Notes are an integral part of these financial statements
   
 F-1 
 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Consolidated Statements of Financial Position

As of December 31, 2021 and 2020

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

LIABILITIES Note 12.31.2021 12.31.2020
       
CURRENT LIABILITIES      
 Payroll, social charges and accruals  20 604,810  684,046
 Accounts payable to suppliers   21 2,585,735  2,291,307
 Income tax and social contribution payable      63,946  681,831
 Other taxes due  13.2 440,933  490,608
 Loans and financing  22 579,770  717,677
 Debentures   23 2,144,485  1,881,411
 Dividend payable    330,947  991,887
 Post-employment benefits 24   68,836 69,231
 Sectorial charges payable  25 198,386 33,712
 Research and development and Energy efficiency  26 292,495  380,186
 Accounts payable related to concession   27 104,963 88,951
 Sectorial financial liabilities  9 139,770  188,709
 Lease liability  28   47,240 41,193
 Other accounts payable  29 370,383  235,400
 PIS and Cofins to be refunded to consumers  13.2.1  7,294  121,838
 Before liabilities associated with assets held for sale   7,979,993  8,897,987
 Liabilities associated with assets held for sale  41   -  756,405
TOTAL CURRENT LIABILITIES     7,979,993  9,654,392
       
NONCURRENT LIABILITIES      
 Accounts payable to suppliers   21 125,249  145,145
 Deferred income tax and social contribution  13.1 1,364,828  484,338
 Other taxes due  13.2 594,810  622,483
 Loans and financing  22 3,098,674  2,470,854
 Debentures   23 6,003,132  4,876,070
 Post-employment benefits 24 1,226,338  1,424,383
 Research and development and Energy efficiency  26 334,602  284,825
 Accounts payable related to concession   27 798,996  642,913
 Sectorial financial liabilities  9 153,409 -
 Lease liability  28 165,494 97,168
 Other accounts payable  29 599,909  469,886
 PIS and Cofins to be refunded to consumers  13.2.1 3,319,501  3,805,985
 Provisions for legal claims  30 1,597,365  1,555,704
TOTAL NONCURRENT LIABILITIES    19,382,307 16,879,754
       
EQUITY      
Attributable to controlling shareholders      
 Capital  31.1   10,800,000 10,800,000
 Equity valuation adjustments  31.2 426,170  353,349
 Legal reserve    1,457,087  1,209,458
 Profit retention reserve    7,785,092  6,088,855
 Additional dividends proposed from the non-capitalized earning reserve  31.4 1,368,675  1,507,449
 TOTAL EQUITY     21,837,024 19,959,111
       
Attributable to non-controlling interests 17.2.2 338,211  291,407
       
TOTAL EQUITY AFTER NON-CONTROLLING INTERESTS    22,175,235 20,250,518
       
 TOTAL LIABILITIES & EQUITY      49,537,535 46,784,664
Notes are an integral part of these financial statements
   
 F-2 
 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Consolidated Statements of Income

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

  Note 12.31.2021 12.31.2020 12.31.2019
CONTINUING OPERATIONS        
         
NET OPERATING REVENUE 32 23,984,287 18,633,249 15,869,245
         
Operating costs 33   (19,119,637)   (13,347,822)   (11,464,148)
         
GROSS OPERATING PROFIT     4,864,650   5,285,427   4,405,097
         
Other operational expenses / income        
 Selling expenses  33  (194,998)  (159,825)  (175,772)
 General and administrative expenses  33  (924,561)  (809,408)  (711,289)
 Hydrological Risk Renegotiation - GSF  33   1,570,543 - -
 Other operational income (expenses), net  33  (235,910)  (256,475)  (322,506)
 Equity in earnings of investees  17   366,314   193,547   106,757
 Total operational expenses / income     581,388  (1,032,161)  (1,102,810)
         
PROFIT BEFORE FINANCIAL RESULTS AND TAXES     5,446,038   4,253,266   3,302,287
         
Financial results 34      
 Financial income      932,049   1,839,668   729,506
 Financial expenses     (1,259,410)  (973,397)  (1,184,870)
Total financial results      (327,361)  866,271  (455,364)
         
OPERATING PROFIT      5,118,677   5,119,537   2,846,923
         
INCOME TAX AND SOCIAL CONTRIBUTION 13.3      
 Current     (469,226)  (1,260,469)  (416,687)
 Deferred     (790,406) (24,896)  (258,974)
 TOTAL INCOME TAX AND SOCIAL CONTRIBUTION    (1,259,632)  (1,285,365)  (675,661)
         
 NET INCOME FROM CONTINUING OPERATIONS     3,859,045   3,834,172   2,171,262
         
DISCONTINUED OPERATIONS        
Net income from discontinued operations 41   1,189,557  75,578  (108,393)
         
NET INCOME     5,048,602   3,909,750   2,062,869
 Attributed to shareholders of the parent company arising from continuing operations      3,767,197   3,823,981   2,078,267
 Attributed to shareholders of the parent company due to discontinued operations      1,185,376  80,221 (88,321)
 Attributed to non-controlling shareholders resulting from continuing operations  17.2.2  96,029   5,548  72,923
         
BASIC AND DILUTED EARNING PER SHARE ATTRIBUTED TO CONTROLLING         
SHAREHOLDERS - CONTINUING OPERATIONS - Expressed in Brazilian Reais 31.3      
 Common shares      1.20448   1.33430   0.72523
 Class "A" Preferred shares      1.41173   1.76982   0.89086
 Class "B" Preferred shares      1.50668   1.46773   0.79778
BASIC AND DILUTED EARNING PER SHARE         
 ATTRIBUTED TO CONTROLLING SHAREHOLDERS - Expressed in Brazilian Reais 31.3      
 Common shares      1.61429   1.36229   0.69440
 Class "A" Preferred shares      1.86252   1.80062   0.85790
 Class "B" Preferred shares      1.95747   1.49582   0.76388
Notes are an integral part of these financial statements

 

   
 F-3 
 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Consolidated Statements of Comprehensive Income

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

  Note 12.31.2021 12.31.2020 12.31.2019
         
NET INCOME     5,048,602   3,909,750   2,062,869
 Items that will never be reclassified to profit or loss  31.2      
 Gain (losses) on actuarial liabilities         
Post employment benefits      246,626  (271,345)  (186,628)
 Taxes on other comprehensive income    (93,881)  92,190  63,444
 Total other comprehensive income, net of taxes      152,745  (179,155)  (123,184)
         
TOTAL COMPREHENSIVE INCOME      5,201,347   3,730,595   1,939,685
 Attributable to controlling shareholders - continuing operations      3,919,798   3,645,033   1,950,810
 Attributable to controlling shareholders - discontinued operations      1,185,376  80,221 (88,321)
 Attributed to non-controlling shareholders - continuing operations     96,173   5,341  37,095
         
Notes are an integral part of these financial statements

 

   
 F-4 
 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Consolidated Statements of Changes in Equity

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

                       
    Attributable to controlling shareholders      
      Equity valuation adjustments Profit reserves        
          Additional dividends proposed     Attributable  
            Profit     to non -  
      Deemed Other comprehensive Legal retention Accumulated Shareholders’ controlling  Equity
  Note Capital  cost income reserve reserve profit  equity interests Consolidated
Balance as of January 1, 2019     7,910,000   806,220 (20,610)   914,751   6,422,564 - - 16,032,925   303,289 16,336,214
Net Income   - -  - - - -   1,989,946   1,989,946  72,923   2,062,869
Other comprehensive income                      
 Actuarial gain (losses), net of taxes  31.2 - -  (122,583) - - - -  (122,583)  (601)  (123,184)
 Gain (losses) on Subsidiary with interest variation  31.2 - -   (4,874) - - - -  (4,874)   4,874 -
Total comprehensive income    - -  (127,457) - - -   1,989,946   1,862,489  77,196   1,939,685
Realization - deemed cost, net of taxes 31.2 - (66,226)  - - - -  66,226 - - -
Deliberation of additional dividends proposed 17.2.2   2,890,000 -  - -  (2,890,000) - - -  (3,335)  (3,335)
Dividends   - -  - - - - - -  (7,838)  (7,838)
Allocation proposed to AGM:                      
 Legal reserve    - -  -  99,497 - - (99,497) - - -
 Interest on own capital  31.4 - -  - - - -  (643,000)  (643,000) -  (643,000)
 Dividends  31.4 - -  - - - - - - (23,514) (23,514)
 Profit retention reserve    - -  - -   1,313,675 -  (1,313,675) - - -
Balance as of December 31, 2019   10,800,000   739,994  (148,067)   1,014,248   4,846,239 - - 17,252,414   345,798 17,598,212
Net income   - -  - - - -   3,904,202   3,904,202   5,548   3,909,750
Other comprehensive income                      
 Actuarial losses, net of taxes  31.2 - -  (178,948) - - - -  (178,948)  (207)  (179,155)
Total comprehensive income    - -  (178,948) - - -   3,904,202   3,725,254   5,341   3,730,595
Realization - deemed cost, net of taxes 31.2 - (59,630)  - - - -  59,630 - - -
Deliberation of additional dividends proposed 17.2.2 - -  - - - - - - (51,799) (51,799)
Allocation proposed to AGM:                      
 Legal reserve    - -  -   195,210 - -  (195,210) - - -
 Interest on own capital  31.4 - -  - - - -  (807,500)  (807,500) -  (807,500)
 Additional dividends proposed from the non-capitalized earning reserve  31.4 - -  - -  (1,507,449)   1,507,449 - - - -
 Dividends  31.4 - -  - - - -  (211,057)  (211,057)  (7,933)  (218,990)
 Profit retention reserve    - -  - -   2,750,065 -  (2,750,065) - - -
Balance as of December 31, 2020   10,800,000   680,364  (327,015)   1,209,458   6,088,855   1,507,449 - 19,959,111   291,407 20,250,518
Net income   - -  - - - -   4,952,573   4,952,573  96,029   5,048,602
Other comprehensive income                      
 Actuarial losses, net of taxes  31.2 - -   152,601 - - - -   152,601   144   152,745
Total comprehensive income    - -   152,601 - - -   4,952,573   5,105,174  96,173   5,201,347
Realization - deemed cost, net of taxes 31.2 - (46,575)  - - - -  46,575 - - -
Realization of actuarial liabilities - divestment of Copel Telecom 31.2 - - (33,205) -  33,205 - - - - -
Deliberation of additional dividends proposed 17.2.2 and 31.4 - -  - - -  (1,507,449) -  (1,507,449) (32,638)  (1,540,087)
Allocation proposed to AGM:                      
 Legal reserve    - -  -   247,629 - -  (247,629) - - -
 Interest on own capital  31.4 - -  - -  (283,173) -  (239,636)  (522,809) -  (522,809)
 Additional dividends proposed from the non-capitalized earning reserve  31.4 - -  - - - - - - - -
 Dividends  31.4 - -  - - -   1,368,675  (2,565,678)  (1,197,003) (16,731)  (1,213,734)
 Profit retention reserve    - -  - -   1,946,205 -  (1,946,205) - - -
Balance as of December 31, 2021   10,800,000   633,789  (207,619)   1,457,087   7,785,092   1,368,675 - 21,837,024   338,211 22,175,235
Notes are an integral part of these financial statements

 

   
 F-5 
 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Consolidated Statements of Cash Flows

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

  Note 12.31.2021 12.31.2020 12.31.2019
 CASH FLOWS FROM OPERATIONAL ACTIVITIES         
         
 Net income from continuing operations    3,859,045  3,834,172  2,171,262
 Net income (loss) from discontinued operations    1,189,557 75,578 (108,393)
 Net income    5,048,602  3,909,750  2,062,869
         
 Adjustments to reconcile net income for the period with cash         
 Unrealized monetary and exchange variation and debt charges - net    622,680  456,456  760,727
 Interest - bonus from the grant of concession agreements under the quota system  10.3   (134,482)   (94,307)   (91,404)
 Remuneration of transmission concession contracts  11.3   (1,084,986) (777,670) (501,566)
 Recovery of PIS / Pasep and Cofins on ICMS  13.2.1  (21,640) (1,755,112) (105,184)
 Income tax and social contribution  13.3 469,226  1,260,469  416,687
 Deferred income tax and social contribution  13.3 790,406 24,896  258,972
 Equity in earnings of investees      (303,137) (193,547) (106,757)
 Appropriation of post-employment benefits obligations  24.4 246,812  224,478  238,552
 Creation for research and development and energy efficiency programs  26.2 194,016  148,019  130,678
 Recognition of fair value  of assets related to concession compensation  32   (142,642)   (57,341)   (36,646)
 Sectorial financial assets and liabilities result  32   (2,502,324) (746,052)   (25,057)
 Depreciation and amortization  33 1,082,539  1,009,912  950,726
 Net operating estimated losses, provisions and reversals  33.4 240,787  237,294  260,051
 Net hydrological risk renegotiation - GSF  33   (1,570,543) - -
 Result of business combination carried out with asset swap - gain      - -   1,414
 Realization of added value in business combinations      (722) (722)   1,536
 Fair value in energy purchase and sale operations  32.1 and 33.1   35,818 (137,463) (204,876)
 Derivatives fair value  34   20,401   (24,511) -
 Loss on disposal of accounts receivable related to concession 10.1 and 10.2   20  144  146
 Loss on disposal of contract assets  11.1 and 11.3  7,155 35,590   7,949
 Loss on disposal of property, plant and equipment      40,305   5,195 15,287
 Loss on disposal of intangible assets  19.1 to 19.4   30,623 52,811 26,368
 Result of write-offs of use rights of assets and liabilities of leases - net  28.1 and 28.2   (177) (314)   (31)
         
 Net income for the period from discontinued operations  41   (1,189,557) - -
         
 Total   1,879,180  3,577,975  4,060,441
         
 Decrease (increase) in assets        
 Trade accounts receivable      (210,965) (175,049)  243,617
 Dividends and interest on own capital received       82,937 53,952 36,732
 CRC transferred to the Government of the State of Paraná  8.1 1,646,614  300,025  278,586
 Judicial deposits     (87,866) 16,729 45,482
 Sectorial financial assets  9.2 1,509,802  979,642  277,265
 Other receivables       (129,814)   (13,898)   (59,793)
 Inventories     (30,699)   (40,035)   (13,662)
 Income tax and social contribution      (267,179)  123,582   (37,226)
 Other current taxes recoverable     (64,130) 74,125   (20,350)
 Prepaid expenses     (16,621)  (3,473) 10,450
 Related parties      - - (602)
 Total   2,432,079  1,315,600  760,499
         
 Increase (decrease) in liabilities         
 Payroll, social charges and accruals      17,224  347,002 52,792
 Suppliers     (53,298)  292,108  263,346
 Other taxes    834,358   (79,053) (132,423)
 Post-employment benefits  24.4   (198,626) (197,143) (199,007)
 Sectorial charges due    164,674   5,204   (51,442)
 Research and development and energy efficiency   26.2   (246,744) (153,729)   (91,306)
 Payable related to the concession  27.1  (88,430)   (74,931)   (70,569)
 Other accounts payable      21,828  117,610   (51,095)
 Provisions for legal claims     (207,877) (167,316) (366,066)
 Total   243,109 89,752 (645,770)
         
 CASH GENERATED BY OPERATING ACTIVITIES   4,554,368  4,983,327  4,175,170
         
 Income tax and social contribution paid      (659,318) (636,420) (560,692)
 Loans and financing - interest due and paid  22.4   (193,421) (183,391) (325,677)
 Debentures - interest due and paid  23.2   (343,903) (386,281) (664,247)
 Charges for lease liabilities paid    (6,514)  (6,679)  (8,356)
         
 NET CASH GENERATED BY OPERATING ACTIVITIES FROM          
 CONTINUING OPERATIONS    3,351,212  3,770,556  2,616,198
         
 NET CASH (USED) GENERATED BY OPERATING ACTIVITIES FROM          
 DISCONTINUED OPERATIONS  41   35,620  170,288  328,808
         
 NET CASH GENERATED FROM OPERATING ACTIVITIES   3,386,832  3,940,844  2,945,006
 (continued)         

   
 F-6 
 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Consolidated Statements of Cash Flows, continuation

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

         
  Note 12.31.2021 12.31.2020 12.31.2019
         
 CASH FLOWS FROM INVESTMENT ACTIVITIES         
 Financial investments     (54,120)   (48,238) 45,170
 Additions to contract assets      (1,482,785) (1,236,999) (938,026)
 Acquisitions of subsidiaries - effect on cash  1.2  (501,886) - (123,794)
 Additions in investments 17.1 (30,970)   (72,439) (133,874)
 Capital reduction of investees  17.1  -  228 35,035
 Additions to property, plant and equipment      (338,137) (226,325) (367,883)
 Additions to intangible assets      (4,546)   (10,225)  (4,711)
         
 NET CASH USED BY INVESTMENT ACTIVITIES         
  FROM CONTINUING OPERATIONS      (2,412,444) (1,593,998) (1,488,083)
         
 NET CASH GENERATED (USED) BY INVESTMENT ACTIVITIES         
  FROM DISCONTINUED OPERATIONS  41 2,444,352   (73,573) (175,568)
         
 NET CASH GENERATED (USED) FROM INVESTING ACTIVITIES    31,908 (1,667,571) (1,663,651)
         
 CASH FLOWS FROM FINANCING ACTIVITIES         
 Loans and financing obtained from third parties 22.4   134,313  263,000  796,296
 Custos de transação na captação de empréstimos e financiamentos  22.4   (1,647) - -
 Issue of Debentures  23.2 3,000,000 -  2,755,028
 Custos de transação na emissão de debêntures  23.2 (35,030) - -
 Payments of principal - loans and financing 22.4  (202,577) (248,863) (1,655,065)
 Payments of principal - debentures  23.2   (1,852,048) (1,036,490) (1,977,125)
 Amortization of principal of lease liabilities    (51,270)   (46,365)   (27,490)
 Dividends and interest on own capital paid      (3,874,318) (626,357) (380,421)
         
          
 NET CASH USED BY FINANCING ACTIVITIES FROM CONTINUING OPERATIONS      (2,882,577) (1,695,075) (488,777)
         
         
 NET CASH USED BY FINANCING ACTIVITIES FROM DISCONTINUED OPERATIONS  41   (1,850)   (20,038)  200,740
         
 NET CASH USED FROM FINANCING ACTIVITIES      (2,884,427) (1,715,113) (288,037)
         
 TOTAL EFFECTS ON CASH AND CASH EQUIVALENTS      534,313  558,160  993,318
         
 Cash and cash equivalents at the beginning of the period  5 3,222,768  2,941,727  1,948,409
 Cash and cash equivalents at the end of the period  5 3,472,845  3,222,768  2,515,179
 Cash and cash equivalents variations from discontinued operations  41   284,236  277,119  426,548
         
 CHANGE IN CASH AND CASH EQUIVALENTS       534,313  558,160  993,318
Notes are an integral part of these financial statements  

 

 

 

   
 F-7 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

1.Operations

Companhia Paranaense de Energia (Copel, Company), with its head office located at Rua José Izidoro Biazetto, 158, bloco A, Curitiba - State of Paraná, is a publicly-held mixed capital company controlled by the State of Paraná and its shares are traded at Corporate Governance Level 1 of the Special Listing Segments of B3 S.A. - Brasil, Bolsa Balcão Stock Exchange and also on the New York Stock Exchange (NYSE) and on the Madrid Stock Exchange, in the Latin American segment (Latibex).

The core activities of Copel and its subsidiaries, which are regulated by the Brazilian Electricity Regulatory Agency (ANEEL), linked to the Brazilian Ministry of Mines and Energy (MME), are to carry out research, study, planning, and asset building activities related to the generation, transformation, distribution and trading of energy in any of its forms, primarily electricity. Furthermore, Copel has participations in consortiums and in private sector and mixed-capital companies for the purpose of engaging in activities, primarily in the fields of energy and natural gas. On August 03, 2021 the divestment is telecommunications participation was concluded (Note 41).

a)Coronavirus pandemic (Covid-19) and its impacts

Coronavirus is a family of viruses discovered in 2019 after cases registered in China and causes the disease called Covid-19, which has clinical symptoms ranging from asymptomatic infections to severe respiratory conditions. On February 26, 2020 the first case of infection was identified in Brazil, in the city of São Paulo and on March 11, 2020, World Health Organization - WHO attributed the status of pandemic to coronavirus, in view of the spread of contamination throughout the world. In Brazil, federal state and municipal governments have implemented several measures of action with the public health emergency. In the state of Paraná, measures included social isolation and restrictions on the operation of non-essential activities as a way to slow the spread of the disease, as well as expanding vaccination for the general population. After an aggravation cycle of the pandemic that lasted until mid-June 2021, there was a reduction in social isolation and increase in economic activity from this period, mainly due to the advance of vaccination, which reflected in the decrease in severe cases of the disease, even with the increase in infections by the Ômicron variant in late 2021 and early 2022.

As of March 2020, Copel’s Management issued rules that aim to ensure compliance with the measures to contain the spread of the disease in the Company and minimize its impacts and potential impacts on the administrative, operations and economic-financial areas.

Accordingly, Copel established a Contingency Commission, whose objective is to monitor and mitigate the impacts and consequences in the main activities of the Company. The 4 pillars defined are: (i) safety of personnel, (ii) continuity of essential activities, (iii) monitoring of the guidelines and requirements of regulatory bodies, and (iv) preservation of adequate financial conditions to withstand the crisis

   
 F-8 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Among the main initiatives implemented by the Company, there are actions to prevent and mitigate the effects of contagion in the workplace, such as: adoption of home office in areas where it is possible to adopt this format, travel restrictions, meetings by video conference, daily monitoring of the health and well-being of employees and contingency protocols in order to fully maintain the operations of the electric power and piped gas infrastructure, preserving the health of its professionals, their safe access to locations, an environment that preserves distance between individuals, hygiene and access to personal protective equipment.

Likewise, Copel has adopted several activities in favor of its customers, maintaining the reliability and availability of its plants, the transmission and distribution systems of electric power and gas, so that they can remain connected and take advantage of Company services in this moment of pandemic.

Effects from coronavirus (Covid-19) on the financial statements

Copel has been continuously monitoring energy load projections and from the second quarter of 2021 there was a resumption of most sectors of the economy, the load in the National Interconnected System - SIN in 2021 increased by 4.1% compared to 2020, the result of which is mainly attributed to the progressive reduction of restrictive measures to combat Covid-19.

With regard to the implementation schedule of energy distribution, generation and transmission projects, or even on the availability of existing assets resulting from local actions that prevent access to facilities or problems with suppliers in the sector, also affected by the downturn, Management, diligently, continues to monitor the deadlines for construction works in progress and has maintained continuous communication with the concession regulator regarding any delays that may occur until the normalization of commercial activities in the overall market. The Company’s construction in progress to date have not had any significant delays.

With the objective of mitigating the impacts and consequences on its main activities, Copel has been continuously monitoring its contracts, liquidity in the energy market and the short-term energy price, as well as communicating with the Regulatory Body of the Brazilian energy sector for the implementation of guidelines ensuring maintenance of economic and financial sustainability of the entire chain of energy generation, transmission, sale and distribution.

In this scenario, for the purposes of preparing and disclosing these financial statements, the Company’s management evaluated its estimates in order to identify the possible impacts of Covid-19 on the Company’s business, as follows:

   
 F-9 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

a.1) Expected credit losses

A potentially relevant risk in the emergence of Covid-19 is related to customer default. In this scenario, the Company maintains regular contact with its main customers, adding flexibility to the collection policy during the pandemic period and increasing the level of digitalization in the relationship with Copel.

In relation to the captive energy distribution market, Copel, after the end of the restrictions imposed by Aneel, resumed the collection actions with defaulting consumers and created special conditions for debt payment in installments, providing conditions to consumers in remaining compliant with the Company.

On March 26, 2021, Aneel Resolution No. 928 was issued, which prevents the suspension of energy supply to low-income consumers and some other consumer groups, with no relevant impact for Copel, given that these consumers are already covered by the State Law No. 20.187/2020 which also deals with the prohibition of power supply cuts.

In the area of ​​energy contracts entered into on the free market, to reduce the impact on collection and avoid future legal disputes, Copel renegotiated with customers with difficulties in complying with contracts, proposing installment payments and postponing the maturity of invoices.

Both the Company’s accounts receivable position as well as the estimates of expected credit losses recorded on December 31, 2021 reflect, in a timely manner, the best analysis by Management at this time on the quality and recoverability of this financial asset.

Although the loss indicator has not significantly deteriorated, the Company may face pressure on this indicator if the pandemic lasts longer and if implemented stricter restrictions on social distancing.

a.2) Impairment of non-financial assets - impairment

On December 31, 2021 the assumptions of the Company’s relevant non-financial assets were assessed individually and Management did not identify that any asset may have suffered additional impairment as a result of the economic consequences of the pandemic, in addition to the entries shown in Note 18.4.

The most significant entry recorded occurred at the UEG Araucária thermoelectric plant, with the reversal in June 30, 2021 of the entire impairment recognized in previous periods, considering that the estimates of its cash flows are affected by the increase in dispatch from thermal plants, due to unfavorable hydrological conditions associated with operational policies of the National Operator of the Electric System – ONS to guarantee energy supply, including the restoration of the reservoirs of the hydroelectric plants, which makes the plant’s future dispatch assumptions have longer periods than previous projections.

   
 F-10 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

In relation to the projections for hydroelectric and wind projects, the main assumptions applied in the preparation of cash flow models did not have a significant impact in the short term, given that most of the energy is already contracted and the amount of energy exposed to Settlement Price of the Differences (PLD) is not significant. In the medium and long term, there was an improvement in the prices practiced in the free market on the portion of non-contracted energy. Finally, in the long term, the expected GSF assumption used to calculate the impairment did not change significantly, accordingly evidencing the recoverability of assets.

a.3) Recovery of deferred tax assets

The Company has a balance of R$963,259 related to deferred tax assets on income tax and social contribution losses and temporary differences recorded at December 31, 2021. The Company assessed its estimates of expected future taxable income and did not identify the need for a provision for loss.

a.4) Fair value of future energy purchase and sale operations

The variation in the mark-to-market of electric power purchase and sale agreements occurred mainly due to the increase in the discount rate, which uses as a reference the rate of return of NTN-B disclosed by Anbima. In the medium and long-term, future electric power prices did not change significantly. Therefore, currently, the effects of the pandemic did not have a significant impact on the fair value of the Company’s future energy purchase and sale operations.

a.5) Fair value of other assets and liabilities

At the present time, the effects of the pandemic did not have a significant impact on the fair value of the Company’s assets and liabilities, mainly on assets originating from concession agreements that are made in the long-term and are contractually guaranteed to receive residual balance at the end of the concession and/ or right to receive cash during the concession. Accordingly, considering that there were no changes in long-term estimates and assumptions, and that the Company’s assets are essential and indicate continuity of operations and cash flows in the medium and long term, up to the present date, its effects did not have a significant impact on the fair value of the Company’s assets and liabilities.

a.6) Post-employment benefits

The Company’s management has constantly monitored the fair value of the actuarial asset of the post-employment benefit plans due to the instability of the interest rate, which is determined based on market data. Despite the economic instability in this pandemic period, the pension plan surplus remained in 2021 due to the increase in discount rates that reduced the present value of actuarial liabilities and offset the fall in the fair value of financial assets. As shown in Note 24, the benefit plans did not generate additional obligations.

a.7) Liquidity

The Company has met its expected liquidity ratios and Management believes the financial situation and working capital are within its sufficient requirements.

   
 F-11 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

At December 31, 2021, the Company’s net working capital totals R$3,209,879 (R$1,753,039, at December 31, 2020) with a balance of cash and cash equivalents of R$3,472,845, compared to the balance of R$3,222,768 at December 31, 2020.

The Company has been monitoring its financial liquidity, considering raising funds and implementing cost reduction actions, with the objective of guaranteeing compliance with financial obligations in due time.

a.8) Other assets

The Company has not identified any changes in circumstances that indicate impairment of other assets. It should be noted that the Company records changes in sectorial financial assets and liabilities, updated up to the date of the tariff adjustment/review when, the Granting Authority ratifies the transfer on the tariff base and the Company transfers it to the consumer during the next annual cycle, which at Copel occurs as of June 24 of each year.

In view of the above, it should be noted that there was no significant or material impact on the Company’s business that could change the measurement of its assets and liabilities presented in the financial statements at December 31, 2021, and until the date of this publication. However, considering that, like all companies, Copel is exposed to risks arising from any legal and market restrictions that may be imposed, it is not possible to ensure that there will be no impact on operations or that the result will not be affected by the future consequences of the pandemic.

b)Renegotiation of the Hydrological Risk (Generation Scaling Factor-GSF)

On September 9, 2020, Law No. 14,052 was published, which amended Law No. 13,203/2015, establishing new conditions for renegotiating the hydrological risk related to the portion of the costs incurred with the GSF, assumed by the holders of the hydroelectric plants participating in the Energy Reallocation Mechanism (MRE) since 2012, with the worsening of the water crisis.

The purpose of the legal amendment was to compensate the owners of the hydroelectric power plants participating in the MRE for non-hydrological risks caused: (i) for generation projects called structuring, related to the anticipation of the physical guarantee, (ii) for the restrictions on the start-up of transmission facilities necessary for the flow of the generation of structuring and (iii) for generation outside the order of merit and import. Such compensation will occur upon the extension of the grant, limited to seven years, and calculated based on the values of the standards applied by Aneel.

On December 1, 2020, Aneel Normative Resolution No. 895 was issued, which establishes the methodology for calculating the compensation and the procedures for renegotiating the hydrological risk. To be eligible for the compensation provided for in Law No. 14,052, holders of hydroelectric power plants participating in the MRE must: (i) withdraw any lawsuits whose purpose is the exemption or mitigation of hydrological risks related to the MRE, (ii) waive any allegation and/or new actions in relation to the exemption or mitigation of the hydrological risks related to the MRE, (iii) not having renegotiated the hydrological risk on terms of the Law No. 13.203/2015.

   
 F-12 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

In the renegotiation of the hydrological risk, Management exercised its judgment in the development and application of the accounting policy, as provided for in IAS 8 - Accounting Policies, Changes in Accounting Estimates and Errors, using the precepts of IAS 38 by analogy, in order to deal with it is essentially an intangible asset related to the concession right resulting from compensation for costs incurred in previous years. Additionally, considering also by analogy of the referred IAS 38, the constituted asset, in case of renegotiation of the non-hydrological risk, was recognized at fair value, considering the best estimate of the Company.

Copel’s plants with the right to extend the concession, pursuant to Aneel Ratification Resolution No, 2.919 of August 03, 2021 and No. 2.932, of September 17, 2021, are listed below:

             
Aneel Homologation Company Plant Lease End Date (Current) Extension (days) Concession end date (After adhesion) Interest %
REH 2.919/2021 Copel GeT APUCARANINHA 10.12.2025 472 01.27.2027 100
Copel GeT CAPIVARI/CACHOEIRA(GPS) 01.05.2046 2,555 01.03.2053 100
Copel GeT CAVERNOSO 01.07.2031 898 06.23.2033 100
Copel GeT CHAMINE 08.16.2026 717 08.02.2028 100
Copel GeT DERIVAÇÃO DO RIO JORDÃO 11.15.2029 949 06.21.2032 100
Copel GeT GUARICANA 08.16.2026 705 07.21.2028 100
Copel GeT SALTO CAXIAS (GJR) 05.04.2030 1,051 03.20.2033 100
Copel GeT SAO JORGE 12.03.2024 598 07.24.2026 100
Copel GeT SEGREDO (GNB) 11.15.2029 1,045 09.25.2032 100
REH 2.932/2021 Copel GeT CAVERNOSO 2 02.28.2046 1,742 12.06.2050 100
Copel GeT COLÍDER 01.17.2046 13 01.30.2046 100
FDA (a) GOV. BENTO MUNHOZ 09.17.2023 461 12.21.2024 100
Copel GeT MAUA 07.03.2042 1,789 05.27.2047 51
Copel GeT UHE BAIXO IGUAÇU 10.30.2049 34 12.03.2049 30
ELEJOR FUNDÃO 05.28.2037 1,110 06.11.2040 70
ELEJOR SANTA CLARA 05.28.2037 1078 05.10.2040 70
(a) Copel GeT subsidiaries          

 

On September 20, 2021 and September 28, 2021, the Board of Directors of Elejor and Copel GeT, respectively, approved the adhesion to the renegotiation of the hydrological risk of the portion of physical guarantee not renegotiated in the Regulated Contracting Environment - ACR, through the extension of grant of its hydroelectric plants participating in the energy reallocation mechanism - MRE. With the approval of the Board of Directors of adherence to the terms of the Law, which includes the waiver of future questions or lawsuits in relation to the hydrological risks in question, the Company recognized an intangible asset referring to the right to the extension of the grant, in return to the item “Operating costs” as a cost recovery, in the amount of R$1,570,543 with a positive impact on its operating result and R$1,036,558 in net income.

 

   
 F-13 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
1.1Copel’s equity interests

Copel has direct and indirect interests in subsidiaries (1.1.1), joint ventures (1.1.2), associates (1.1.3) and joint operations (1.1.4).

 

1.1.1Subsidiaries

         
         
  Headquarters Main activity Interest
Subsidiaries  % Investor
Copel Geração e Transmissão S.A. (Copel GeT) Curitiba/PR Production and transmission of electricity   100.0  Copel 
Copel Distribuição S.A. (Copel DIS) Curitiba/PR Distribution and marketing of electricity   100.0  Copel 
Copel Telecomunicações S.A. (Copel TEL) - Note 41 Curitiba/PR Telecommunication and communication    100.0  Copel 
Copel Serviços S.A. (Copel SER) Curitiba/PR Production of electricity    100.0  Copel 
Copel Comercialização S.A. (Copel COM) Curitiba/PR Commercialization of electricity   100.0  Copel 
Companhia Paranaense de Gás - Compagás Curitiba/PR Distribution of pipeline gas  51.0  Copel 
Elejor - Centrais Elétricas do Rio Jordão S.A. Curitiba/PR Production of electricity  70.0  Copel 
UEG Araucária S.A. (UEGA) Curitiba/PR Production of electricity from natural gas  20.3  Copel 
       60.9  Copel GeT 
São Bento Energia, Investimentos e        
 Participações S.A. (São Bento) Curitiba/PR Control and management of interests   100.0  Copel GeT 
Nova Asa Branca I Energias Renováveis S.A. S. Miguel do Gostoso/RN Production of electricity from wind sources   100.0  Copel GeT 
Nova Asa Branca II Energias Renováveis S.A. Parazinho/RN Production of electricity from wind sources   100.0  Copel GeT 
Nova Asa Branca III Energias Renováveis S.A. Parazinho/RN Production of electricity from wind sources   100.0  Copel GeT 
Nova Eurus IV Energias Renováveis S.A. Touros/RN Production of electricity from wind sources   100.0  Copel GeT 
Santa Maria Energias Renováveis S.A. Maracanaú/CE Production of electricity from wind sources   100.0  Copel GeT 
Santa Helena Energias Renováveis S.A. Maracanaú/CE Production of electricity from wind sources   100.0  Copel GeT 
Ventos de Santo Uriel S.A. João Câmara/RN Production of electricity from wind sources   100.0  Copel GeT 
Cutia Empreendimentos Eólicos S.A. (Cutia) Curitiba/PR Control and management of interests   100.0  Copel GeT 
Brownfield Investment Holding Lltda. (Brownfield) - Note 1.2 Curitiba/PR Control and management of interests   100.0  Copel GeT 
Ventos de Serra do Mel B S.A.  - Note 1.2 Serra do Mel/RN Control and management of interests   68.84  Copel GeT 
        31.16  Brownfield 
Costa Oeste Transmissora de Energia S.A.  Curitiba/PR Transmission of electricity   100.0 Copel GeT
Marumbi Transmissora de Energia S.A.  Curitiba/PR Transmission of electricity   100.0 Copel GeT
Uirapuru Transmissora de Energia S.A   Curitiba/PR Transmission of electricity   100.0 Copel GeT
Bela Vista Geração de Energia S.A. Curitiba/PR Production of electricity   100.0 Copel GeT
F.D.A. Geração de Energia Elétrica S.A. (FDA) Curitiba/PR Production of electricity   100.0 Copel GeT
Jandaíra I Energias Renováveis S.A. (a) (b) Curitiba/PR Production of electricity from wind sources   100.0 Copel GeT
Jandaíra II Energias Renováveis S.A. (a) (b) Curitiba/PR Production of electricity from wind sources   100.0 Copel GeT
Jandaíra III Energias Renováveis S.A. (a) (b) Curitiba/PR Production of electricity from wind sources   100.0 Copel GeT
Jandaíra IV Energias Renováveis S.A. (a) (b) Curitiba/PR Production of electricity from wind sources   100.0 Copel GeT
Eol Potiguar B61 SPE S.A. (c) - Note 1.2 Serra do Mel/RN Production of electricity from wind sources   100.0 Copel GeT
GE Olho D’Água S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  São Bento 
GE Boa Vista S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  São Bento 
GE Farol S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  São Bento 
GE São Bento do Norte S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  São Bento 
Central Geradora Eólica São Bento do Norte I S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Central Geradora Eólica São Bento do Norte II S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Central Geradora Eólica São Bento do Norte III S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Central Geradora Eólica São Miguel I S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Central Geradora Eólica São Miguel II S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Central Geradora Eólica São Miguel III S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Usina de Energia Eólica Guajiru S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Usina de Energia Eólica Jangada S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Usina de Energia Eólica Potiguar S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Usina de Energia Eólica Cutia S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Usina de Energia Eólica Maria Helena S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Usina de Energia Eólica Esperança do Nordeste S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Usina de Energia Eólica Paraíso dos Ventos do Nordeste S.A. São Bento do Norte/RN Production of electricity from wind sources   100.0  Cutia 
Eol Potiguar B141 SPE S.A. - Note 1.2 Serra do Mel/RN Production of electricity from wind sources   100.0  Serra do Mel 
Eol Potiguar B142 SPE S.A. - Note 1.2 Serra do Mel/RN Production of electricity from wind sources   100.0  Serra do Mel 
Eol Potiguar B143 SPE S.A. - Note 1.2 Serra do Mel/RN Production of electricity from wind sources   100.0  Serra do Mel 
Eol Ventos de Vila Paraíba IV SPE S.A. - Note 1.2 Serra do Mel/RN Production of electricity from wind sources   100.0  Serra do Mel 
(a) Pre-operating stage.
(b) SPEs established with 0.1% interest in Cutia. The transfer of all shares to Copel GeT was concluded in 2021.

(c) Wind farm with 99.99992% interest in Copel Get and 0.00008% in Brownfield.

 

 

   
 F-14 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

1.1.2Joint Ventures

         
Joint ventures Headquarters Main activity Interest
 % Investor
Voltalia São Miguel do Gostoso I Participações S.A.  São Paulo/SP Interests in companies 49.0  Copel
Solar Paraná GD Participações S.A. (a) Curitiba/PR Interests in companies 49.0  Copel
Paraná Gás Exploração e Produção S.A. (b) Curitiba/PR Exploration of oil and natural gas 30.0  Copel
Caiuá Transmissora de Energia S.A. Rio de Janeiro/RJ Transmission of electricity 49.0  Copel GeT 
Integração Maranhense Transmissora de Energia S.A. Rio de Janeiro/RJ Transmission of electricity 49.0  Copel GeT 
Matrinchã Transmissora de Energia (TP NORTE) S.A. Rio de Janeiro/RJ Transmission of electricity 49.0  Copel GeT 
Guaraciaba Transmissora de Energia (TP SUL) S.A. Rio de Janeiro/RJ Transmission of electricity 49.0  Copel GeT 
Paranaíba Transmissora de Energia S.A. Rio de Janeiro/RJ Transmission of electricity 24.5  Copel GeT 
Mata de Santa Genebra Transmissão S.A. Jundiaí/SP Transmission of electricity 50.1  Copel GeT 
Cantareira Transmissora de Energia S.A. Rio de Janeiro/RJ Transmission of electricity 49.0  Copel GeT 
         
(a) Holding of 6 Special Purpose Entities (SPEs) operating in the distributed generation sector (photovoltaic plants): Pharma Solar II, Pharma Solar III, Pharma Solar IV, in commercial operation, and Bandeirantes Solar I, Bandeirantes Solar II and Bandeirantes Solar III, in pre-operating stage.

(b) Company closed in July 26, 2021.

 

 

1.1.3Associates

         
Associated companies Headquarters Main activity Interest
 % Investor
Dona Francisca Energética S.A. Agudo/RS Production of electricity  23.03  Copel
Foz do Chopim Energética Ltda. Curitiba/PR Production of electricity  35.77  Copel GeT 
Carbocampel S.A. Figueira/PR Coal exploration 49.0  Copel

 

 

1.1.4Joint operations (consortiums)

     
     
Joint operations - Consortiums Consortium members Interest (%)
Consórcio Energético Cruzeiro do Sul (Note 18.3) Copel GeT 51.0
Eletrosul Centrais Elétricas S.A.   49.0
Consórcio Empreendedor Baixo Iguaçu (Note 18.3) Copel GeT  30.0
Geração Céu Azul S.A (subsidiary of Neoenergia S.A.) 70.0
Consórcio Copel Energia a Gás Natural (a) Copel  49.0
Shell Brasil Petróleo Ltda.  51.0
Consórcio Paraná IP (b) Copel  49.0
Consórcio BRC  51.0
a)Consórcio Copel Energia a Gás Natural

In July 2020, Consórcio Copel Energia a Gás Natural was created with the purpose of developing technical, economic-financial and socio-environmental feasibility studies of natural gas thermoelectric generation projects. The object planned for the consortium is under development.

b)Consórcio Paraná IP 

In September 2020, the Consórcio Paraná IP was created, with the objective of participating in studies and tenders for modernization of public lighting systems and development of smart cities solutions. However, the Company deepened the prospecting of business opportunities and the analysis of attractiveness to operate in the segment, considering the recent concessions made by municipalities to establish Public-Private Partnerships and the discount levels presented by potential competitors and decided to not prioritize its performance in this service currently. The consortium’s termination process was completed on May 25th, 2021 with registration with the Paraná Commercial Registry.

 

   
 F-15 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
1.2Business combination – Vilas Wind Complex

According to Material Fact 19/21, on November 30, 2021 Copel GeT completed the acquisition of 100% of the Vilas Wind Complex as part of the Company’s strategy of sustainable growth in renewable energy, expanding the diversification of the generation matrix aligned with the Investment Policy.

The project comprises 5 wind farms with 186.7 MW of installed capacity located in the Municipality of Serra do Mel - RN, fully in operation.

The table below shows the equity interests acquired. Copel GeT took control over these companies that, until then, were directly or indirectly controlled by Voltalia S.A.:

     
  Interest
Subsidiaries  % Investor
Brownfield Investment Holding Lltda. (Brownfield)  100.0  Copel GeT 
Ventos de Serra do Mel B S.A.   68.84  Copel GeT 
   31.16 Brownfield
Eol Potiguar B61 SPE S.A.   99.99992 Copel GeT
   0.00008 Brownfield
Eol Potiguar B141 SPE S.A.  100.0  Ventos de Serra do Mel 
Eol Potiguar B142 SPE S.A.  100.0  Ventos de Serra do Mel 
Eol Potiguar B143 SPE S.A.  100.0  Ventos de Serra do Mel 
Eol Ventos de Vila Paraíba IV SPE S.A.  100.0  Ventos de Serra do Mel 

 

Copel GeT preliminarily measured the fair value of the identified assets acquired and liabilities assumed at the acquisition date. The table below shows the consolidated amounts of all companies acquired:

       
  Adjusted  Fair value Fair value at the
  book value (a) adjustment acquisition date
Assets acquired 901,059  277,120 1,178,179
Cash and cash equivalents   76,350  -   76,350
Bonds and securities   13,236  -   13,236
Trade accounts receivable   23,585  -   23,585
Other receivables  341  -  341
Income tax and social contribution   476  -  476
Other recoverable taxes 64  - 64
Prepaid expenses 24  - 24
Property, plant and equipment 754,557  - 754,557
Intangible assets   10,275  277,120 287,395
Right-of-use asset   22,151  -   22,151
Liabilities assumed 580,495 94,221 674,716
Suppliers   11,229  -   11,229
Income tax and social contribution   117  -  117
Other taxes due  2,905  -  2,905
Deferred income tax and social contribution   3,191 94,221   97,412
Loans and financing 514,273  - 514,273
Lease liability   22,379  -   22,379
Other accounts payable   26,401  -   26,401
Net assets acquired 320,564  182,899 503,463
(a) Book value of investees adjusted to the Company’s practices before the allocation of fair value in the business combination.

 

   
 F-16 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The authorization right and the deferred tax liability generated in the business combination were recorded in Copel GeT’s investment. In the consolidated balance sheet, these amounts will comprise the balances of intangible assets and deferred income tax and social contribution.

The table below shows the consideration transferred for the assets acquired and the goodwill determined as a result of the recognition of the deferred tax liability in the business combination:

   
Consideration amount   597,684
(-) Fair value of net assets acquired   503,463
Goodwill  94,221

 

The amount paid is supported by the projections of discounted cash flows from the operations of the projects acquired. Of the total consideration, Copel GeT disbursed R$578,236 in November 2021 and the remainder will be paid during the first half of 2022 when prices will also be adjusted in accordance with the contractual provisions. Considering the cash acquired from the subsidiary in the amount of R$76,350, the net effect on the Company’s cash was R$501,886, as shown in the Statements of Cash Flows.

Had this business combination been carried out on January 1, 2021, the net operating revenue would have increased by R$78,071, totaling R$24,062,358, and the net income for the year would have increased by R$45,792, totaling R$5,094,394.

 

 

2.Concessions and Authorizations

 

2.1Concession contracts or authorizations obtained by Copel

Concession agreement / authorization of the equity   Interest % Maturity 
Copel DIS Contract 046/1999, extended by 5th addendum to the contract 100  07.07.2045 
Elejor  Contract 125/2001 - HPP Fundão 70  06.11.2040 
  Contract 125/2001 - HPP Santa Clara  70  05.10.2040 
  Authorization - SHP Fundão I and SHP Santa Clara I - 753/2002 and 757/2002  70  12.19.2032 
Dona Francisca Energética  Contract 188/1998 - HPP Dona Francisca 23  09.21.2037 
UEG Araucária  Authorization 351/1999  - TPP Araucária (60.9% Copel GET) 20.3  12.23.2029 
Compagás (2.1.1) Concession gas distribution contract  51  07.06.2024 
Usina de Energia Eólica São João S.A. (a) MME Ordinance 173 /2012 - WPP São João 49  03.26.2047 
Usina de Energia Eólica Carnaúba S.A. (a) MME Ordinance 204 /2012 - WPP Carnaúbas 49  04.09.2047 
Usina de Energia Eólica Reduto S.A. (a) MME Ordinance 230 /2012 - WPP Reduto 49  04.16.2047 
Usina de Energia Eólica Santo Cristo S.A. (a) MME Ordinance 233/2012 - WPP Santo Cristo 49  04.18.2047 
   
(a) Subsidiaries of Voltalia São Miguel do Gostoso I Participações S.A.
Hydroelectric Power Plant - HPP
Small Hydroelectric Plant - SHP
Thermal Power Plant - TPP
Wind Power Plant - WPP

2.1.1Compagas

Compagas is a party to a concession agreement entered into with the Concession Grantor, the State of Paraná, which determines the validity of 30 years as of July 6, 1994.

   
 F-17 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

On December 7, 2017, the State of Paraná published Complementary Law 205, introducing a new interpretation to the end of the concession that occurred on January 20, 2019. There was an understanding among the shareholders that the law could be challenged and Compagas filed a lawsuit, due to the unconstitutionality of the Law. Provisional protection was granted to Compagas recognizing the validity of the maturity clause provided for in the contract.

On December 1, 2020, Supplementary Law No. 227 was issued, revoking article 15 of Supplementary Law No. 205/17, maintaining the expiration of the concession on July 6, 2024.

On July 23, 2021, the Secretary of Planning and Structuring Projects of the State of Paraná submitted for public consultation the State Plan for the Piped Gas Distribution Sector, covering the proposal to extend the concession of Compagas for 30 years, counted from July 6, 2024. The proposal includes the execution of a new concession agreement, with a change in the tariff structure of the price concession by cost to a ceiling tariff. On February 22, 2022, a Public Hearing was held via videoconference to obtain suggestions and contributions to the State Gas and Concession Extension Plan. The Final Report of the hearing had not been disclosed until the authorization for issuance of these financial statements.

   
 F-18 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

2.2Concession contracts or authorizations obtained by Copel Get and its investees
       
       
Copel GeT   Interest % Maturity 
ONEROUS CONCESSION BY THE USE OF PUBLIC PROPERTY  - UBP    
Generation Concession Contract 001/2007 - HPP Gov. Jayme Canet Júnior (Mauá) 51  05.27.2047 
Generation Concession Contract 001/2011 - HPP Colíder 100  01.30.2046 
Authorization - Ordinance 133/2011 - SHP Cavernoso II  100  12.06.2050 
Generation Concession Contract 002/2012 - HPP Baixo Iguaçu 30  12.03.2049 
Generation Concession Contract 007/2013    
HPP Apucaraninha    100  01.27.2027 
HPP Chaminé   100  08.02.2028 
HPP Derivação do Rio Jordão   100  06.21.2032 
HPP Cavernoso   100  06.23.2033 
       
PUBLIC SERVICE CONCESSIONS      
Generation Concession Contract 045/1999    
TPP Figueira (Note 36.2.6)   100  03.27.2019 
HPP São Jorge (Note 36.2.6)   100  07.24.2026 
HPP Gov. Ney Aminthas de Barros Braga (Segredo) 100  09.25.2032 
HPP Gov. José Richa (Salto Caxias)   100  03.20.2033 
Generation Concession Contract 001/2020    
UHE Guaricana   100  07.21.2028 
Authorization - Resolution 278/1999 - WPP Palmas  100  09.29.2029 
Dispatch 182/2002 - Hydroeletric Generating Plant - HGP Melissa, HGP Pitangui and    
 HGP Salto do Vau  (only register with ANEEL) 100 -
Generation Concession Contract 003/2016 - HPP Gov. Pedro Viriato Parigot de Souza (GPS) 100  01.03.2053 
HPP Marumbi - Power generating plant registration: CGH. PH. PR. 001501-6.02 100 -
Authorization Aneel 5,373/2015 - HGP Chopim I  (only register with ANEEL) 100 -
Concession agreement / authorization of the equity    
UEG Araucária Authorization 351/1999  - TPP Araucária (20,3% - Copel) 60.9  12.23.2029 
Nova Asa Branca I MME Ordinance 267/2011 - WPP Asa Branca I  100  04.25.2046 
Nova Asa Branca II MME Ordinance 333/2011 - WPP Asa Branca II  100  05.31.2046 
Nova Asa Branca III MME Ordinance 334/2011 - WPP Asa Branca III  100  05.31.2046 
Nova Eurus IV MME Ordinance 273/2011 -WPP Eurus IV  100  04.27.2046 
Santa Maria MME Ordinance 274/2012 - WPP SM  100  05.08.2047 
Santa Helena MME Ordinance 207/2012 - WPP Santa Helena  100  04.09.2047 
Ventos de Santo Uriel MME Ordinance 201/2012 - WPP Santo Uriel  100  04.09.2047 
GE Boa Vista MME Ordinance 276 /2011 - WPP Dreen Boa Vista  100  04.28.2046 
GE Farol MME Ordinance 263 /2011 - WPP Farol  100  04.20.2046 
GE Olho D’Água MME Ordinance 343 /2011 - WPP Dreen Olho D’Água  100  06.01.2046 
GE São Bento do Norte MME Ordinance 310 /2011 - WPP Dreen São Bento do Norte  100  05.19.2046 
Esperança do Nordeste MME Ordinance 183/2015 - WPP Esperança do Nordeste 100  05.11.2050 
Paraíso dos Ventos do Nordeste MME Ordinance 182/2015 - WPP Paraíso dos Ventos do Nordeste 100  05.11.2050 
Usina de Energia Eólica Jangada Resolution 3,257/2011 - WPP GE Jangada 100  01.05.2042 
Maria Helena Resolution 3,259/2011 - WPP GE Maria Helena 100  01.05.2042 
Usina de Energia Eólica Potiguar MME Ordinance 179/2015 - WPP Potiguar 100  05.11.2050 
Usina de Energia Eólica Guajiru Resolution 3,256/2011 - WPP Dreen Guajiru 100  01.05.2042 
Usina de Energia Eólica Cutia Resolution 3,258/2011 - WPP Dreen Cutia 100  01.05.2042 
São Bento do Norte I Ordinance 349/2015 - WPP São Bento do Norte I 100  08.04.2050 
São Bento do Norte II  Ordinance 348/2015 - WPP São Bento do Norte II 100  08.04.2050 
São Bento do Norte III Ordinance 347/2015 - WPP São Bento do Norte III  100  08.04.2050 
São Miguel I Ordinance 352/2015 - WPP São Miguel I 100  08.04.2050 
São MigueI lI Ordinance 351/2015 - WPP São Miguel II 100  08.04.2050 
São Miguel III Ordinance 350/2015 - WPP São Miguel III 100  08.04.2050 
Foz do Chopim Authorization 114/2000 - SHP Arturo Andreoli  35.77  08.15.2032 
SHP Bela Vista Resolution 913/2017 - transfer of title under     
  Resolution 7,802/2019  100  01.02.2041 
F.D.A. Electricity Generation (Note 36.2.6) Generation Concession Contract contract 002/2020 100  12.21.2024 
Jandaíra I Energias Renováveis (a) Ordinance 140/2020 - WPP Jandaíra I 100  04.02.2055 
Jandaíra II Energias Renováveis (a) Ordinance 141/2020 - WPP Jandaíra II 100  04.02.2055 
Jandaíra III Energias Renováveis (a) Ordinance 142/2020 - WPP Jandaíra III 100  04.02.2055 
Jandaíra IV Energias Renováveis (a) Ordinance 139/2020 - WPP Jandaíra IV 100  04.02.2055 
EOL Potiguar B 141 SPE S.A. Ordinance 02/2019 - WPP Vila Maranhão I 100  01.11.2054 
EOL Potiguar B 142 SPE S.A. Ordinance 12/2019 - WPP Vila Maranhão II 100  01.14.2054 
EOL Potiguar B 143 SPE S.A. Ordinance 13/2019 - WPP Vila Maranhão III 100  01.14.2054 
EOL Potiguar B  61 SPE S.A. Ordinance 453/2019 - WPP Ventos de Vila Mato Grosso I 100  12.06.2054 
Ventos de Vila Paraíba IV SPE S.A  Ordinance 10/2019 - WPP Vila Ceará I 100  01.14.2054 
(a) Building under construction. Building under construction.
   
 F-19 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

         
Copel GeT   Interest % Maturity  Next tariff
review
Transmission lines and substations concession agreements      
Contract 060/2001 - Transmission facilities (sundry Transmission lines and Substations) 100  01.01.2043  2023
Contract 075/2001 - Transmission line 230 kV Bateias - Jaguariaíva 100  08.17.2031  (b)
Contract 006/2008 - Transmission line 230 kV Bateias - Pilarzinho 100  03.17.2038  2023
Contract 027/2009 - Transmission line 525 kV Foz do Iguaçu - Cascavel Oeste 100  11.19.2039  2025
Contract 010/2010 - Transmission line 500 kV Araraquara II - Taubaté  100  10.06.2040  2026
Contract 015/2010 - Substation Cerquilho III 230/138 kV 100  10.06.2040  2026
Contract 022/2012 - Transmission line 230 kV Londrina - Figueira and Transmission line 230 kV Foz do Chopim - Salto Osório 100  08.27.2042  2023
Contract 002/2013 - Transmission line 230 kV Assis - Paraguaçu Paulista II e Substation Paraguaçu Paulista II 230 kV   100  02.25.2043  2023
Contract 005/2014 - Transmission line 230 kV Bateias - Curitiba Norte e Substation Curitiba Norte 230/138 kV 100  01.29.2044  2024
Contract 021/2014 - Transmission line 230 kV Foz do Chopim - Realeza e Substation Realeza 230/138 kV  100  09.05.2044  2025
Contract 022/2014 - Transmission line 500 kV Assis - Londrina 100  09.05.2044  2025
Contract 006/2016 - Transmission line 525 kV Curitiba Leste - Blumenau  (a) 100  04.07.2046  2026
Contract 006/2016 - Transmission line 230 kV Baixo Iguaçu - Realeza      
Contract 006/2016 - Transmission line 230 kV Curitiba Centro - Uberaba      
Contract 006/2016 - Substation Medianeira 230/138 kV      
Contract 006/2016 - Substation Curitiba Centro 230/138 kV       
Contract 006/2016 - Substation Andirá Leste 230/138 kV       
         
Concession agreement / authorization of the equity        
Costa Oeste Transmissora Contract 001/2012: 100  01.12.2042  2022
  Transmission line 230 kV Cascavel Oeste - Umuarama      
  Substation Umuarama 230/138 kV      
Caiuá Transmissora  Contract 007/2012: 49  05.10.2042  2022
  Transmission line 230 kV Umuarama - Guaíra      
  Transmission line 230 kV Cascavel Oeste - Cascavel Norte      
  Substation Santa Quitéria 230/138/13,8 kV      
  Substation Cascavel Norte 230/138/13,8 kV      
Marumbi Transmissora Contract 008/2012: 100  05.10.2042  2022
  Transmission line 525 kV Curitiba - Curitiba Leste      
  Substation Curitiba Leste 525/230 kV      
Integração Maranhense Contract 011/2012: Transmission line 500 Kv Açailândia - Miranda II 49  05.10.2042  2022
Matrinchã Transmissora Contract 012/2012: 49  05.10.2042  2022
  Transmission line 500 kV Paranaíta - Cláudia        
  Transmission line 500 kV Cláudia - Paranatinga      
  Transmission line 500 kV Paranatinga - Ribeirãozinho      
  Substation Paranaíta 500 kV      
  Substation Cláudia 500 kV      
  Substation Paranatinga 500 kV      
Guaraciaba Transmissora Contract 013/2012: 49  05.10.2042  2022
  Transmission line 500 kV Ribeirãozinho - Rio Verde Norte      
  Transmission line 500 kV Rio Verde Norte - Marimbondo II       
  Substation Marimbondo II 500 kV      
Paranaíba Transmissora Contract 007/2013: 24.5  05.02.2043  2023
  Transmission line 500 kV Barreiras II - Rio das Éguas      
  Transmission line 500 kV Rio das Éguas - Luziânia      
  Transmission line 500 kV Luziânia - Pirapora 2      
Mata de Santa Genebra Contract 001/2014: 50.1  05.14.2044  2024
  Transmission line 500 kV Itatiba - Bateias      
  Transmission line 500 kV Araraquara 2 - Itatiba      
  Transmission line 500 kV Araraquara 2 - Fernão Dias      
  Substation Santa Bárbara D ́Oeste 440 kV      
  Substation Itatiba 500 kV      
  Substation Fernão Dias 500/440 kV      
Cantareira Transmissora Contract 019/2014: Transmission line Estreito - Fernão Dias  49  09.05.2044  2025
Uirapuru Transmissora Contract 002/2005: Transmission line 525 kV Ivaiporã - Londrina 100  03.04.2035  (b)
(a) Beginning of commercial operation on April 1, 2021.
(b) Do not undergo tariff review and RAP reduces to 50% in the 16th year.

 

 

3.Basis of Preparation
3.1Basis of elaboration

The consolidated financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS) issued by the International Accounting Standards Board, IASB.

The Company’s Management believes that all the relevant information used in its management is evidenced in the consolidated financial statements, and that it corresponds to that used by Management in administering the Company.

   
 F-20 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The issuance of these consolidated financial statements was approved by Board of Directors on April 27, 2022.

3.2Functional and presentation currency

The consolidated financial statements are presented in Brazilian Reais, which is the functional and presentation currency of the Company. Balances herein have been rounded to the nearest thousand, unless otherwise indicated.

3.3Basis of measurement

The consolidated financial statements were prepared based on the historical cost, except for certain financial instruments and investments measured at fair value, as described in the respective accounting policies and notes.

3.4Use of estimates and judgments

In the preparation of these consolidated financial statements, Management used judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses of the Company. Actual results may differ from those estimates.

Estimates and assumptions are reviewed on a continuous basis. The revisions to the estimates are recognized prospectively.

3.4.1Judgments

Information about judgment referring to the adoption of accounting policies which significantly impacts the amounts recognized in the consolidated financial statements, except those involving estimates, is included in the following notes:

·Note 4.1 - Basis of consolidation; and
·Note 4.2 - Financial instruments.
3.4.2Uncertainties over assumptions and estimates

Information on uncertainties related to assumptions and estimates with a reasonable possibility of leading to significant adjustments of resulting in a material change within the next financial year is included in the following notes:

·Notes 4.3 and 9 - Sectorial financial assets and liabilities;
·Notes 4.4 and 10 - Accounts receivable related to the concession
·Notes 4.5 and 11 - Contract assets;
·Notes 4.8 and 18 - Property, plant and equipment;
·Notes 4.9 and 19 - Intangible assets;
·Notes 4.10.1 and 7.3 - Expected Credit Losses;
·Notes 4.10.2 and 18.4 - Impairment of assets;
·Notes 4.11 and 30 - Provisions for litigation and contingent liabilities;
·Note 4.12 - Revenue recognition;
   
 F-21 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
·Note 4.14 - Power purchase and sale transactions in the Spot Market (Electric Energy Trading Chamber - CCEE);
·Note 4.15 - Derivative financial instruments;
·Note 4.16.2 and 13.1 - Deferred income tax and social contribution; and
·Note 4.17 and 24 – Post-employment benefits.
3.5Management’s judgment on going concern

Management has concluded that there are no material uncertainties that cast doubt on the Company’s ability to continue as a going concern. No events or conditions were identified that may raise significant doubts on its ability to continue as a going concern.

The main bases of judgment used for such conclusion are: (i) main activities resulting from long-term concessions; (ii) robust equity; (iii) strong operating cash generation, including financial capacity to settle commitments entered into with financial institutions; (iv) historical profitability; and (v) fulfillment of the objectives and targets set forth in the Company’s Strategic Planning, which is approved by Management, monitored and reviewed periodically, seeking the continuity of its activities.

 

 

4.Significant Accounting Policies
4.1Basis of consolidation
4.1.1Calculation of equity in earnings of investees

Investments in joint ventures and associate are recognized in the consolidated financial statements based on the equity method. Under this method, investments are initially recorded at cost and their carrying amount is increased or decreased by the recognition of the investor’s interest in profit, loss and other comprehensive income generated by investees after acquisition. This method must be discontinued from the date the investment ceases to qualify as a jointly controlled or associated company.

Payment of dividends decreases the carrying value of investments.

When required, for calculation of equity in earnings of investees, the investees’ financial statements are adjusted to align their policies with the Company’s accounting policies.

4.1.2Subsidiaries

The subsidiaries are entities to which the Company is exposed to or has a right over the variable returns arising from its involvement with them and has the ability to affect those returns exerting its power over the entities.

The financial statements of the subsidiaries are included in the consolidated financial statements as from the date they start to be controlled by the Company until the date such control ceases.

The balances of the subsidiaries’ assets and liabilities, and profit or loss, are consolidated and transactions between consolidated companies are eliminated. The balances of transactions between continuing operations and discontinued operations are also fully eliminated in the consolidated balance sheet.

   
 F-22 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.1.3Noncontrolling interests

Noncontrolling interests are presented in equity, separately from the equity attributable to the Company’s shareholders. Profits, losses and other comprehensive income are also allocated separately from the ones allocated to the Company’s shareholders, even if this procedure results in negative noncontrolling interest balance.

4.1.4Joint ventures and associates

Joint ventures are entities over which the Company, subject to an agreement, has the ability to affect returns exerting its power in conjunction with other parties, irrespective of the percentage of interest in the voting capital.

Associates are entities over which the Company exerts significant influence regarding financial and operational decisions, without control.

When the share in losses of a joint venture or associate equals or exceeds the accounting balance of the investor’s equity interest in the investee, the investor should discontinue the recognition of its share in future losses. Additional losses will be considered, and a liability will be recognized, only if the investor incurs legal or constructive obligations, or performs payments on behalf of the investee. Should the investee subsequently post profits, the investor should resume the recognition of its interest in these profits only subsequent to the point at which the portion to which it is entitled to in these subsequent profits equals its share in unrecognized losses.

4.1.5Joint operations (consortiums)

Joint operation is a joint business according to which parties that jointly control the business have rights on assets and obligations regarding liabilities related to the business.

Joint operations are recorded in proportion to the share of interest held in their assets, liabilities and profit or loss.

4.1.6Business combination

The acquisition analysis is done on a case-by-case basis to determine whether the transaction represents a business combination or an asset purchase. Transactions between companies under common control do not constitute a business combination.

Assets and liabilities acquired in a business combination are accounted for using the acquisition method and are recognized at their fair value at the acquisition date.

The excess of the acquisition cost over the fair value of the net assets acquired (identifiable assets acquired, net of assumed liabilities) is recognized as goodwill in intangible assets. When the amount generated is negative, the bargain purchase gain is recognized directly in profit or loss.

The amount paid that refers specifically to the concession right acquired in a business combination where the acquired entity is a concession operator, whose right to the concession has a known and defined term, is not characterized as goodwill.

   
 F-23 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

In acquisitions of interests in affiliates and in joint ventures, although they do not constitute a business combination, the net assets acquired are also recognized at fair value. Goodwill is presented in the investment.

4.2Financial Instruments

Financial instruments are recognized immediately on the trade date, that is, when the obligation or right arises. They are initially recorded at fair value, unless it is a trade receivable without a significant financing component, plus, for an item not measured at fair value through profit or loss, any directly attributable transaction costs. An accounts receivable from customers without a significant component of financing is initially measured at the price of the transaction.

Fair values ​​are determined based on market prices for financial instruments with active market, and by the present value method of expected cash flows, for those that have no quotation available in the market.

After initial recognition, financial assets are only reclassified if the Company changes its business model for managing financial assets and this reclassification must be made prospectively.

The Company does not have financial instruments measured at fair value through other comprehensive income. The Company operates with derivative financial instruments as described in
Note 4.15.

The Company’s financial instruments are classified and measured as described below.

4.2.1Financial assets recorded at fair value through profit or loss

Financial assets recorded at fair value through profit or loss include assets classified as held for trading, financial assets designated upon initial recognition as at fair value through profit or loss or financial assets required to be measured at fair value. Financial assets are classified as held for trading if they are acquired for the purpose of being sold or repurchased in the near term. Financial assets with cash flows that are not solely payments of principal and interest are classified and measured at fair value through profit or loss, irrespective of the business model. After initial recognition, transaction costs and attributable interest expenses, when incurred, are recognized through profit or loss.

4.2.2Financial assets measured at amortized cost

These are so classified and measured when: (i) the financial asset is maintained within a business model whose objective is to maintain financial assets in order to receive contractual cash flows; and (ii) the contractual terms of the financial asset give rise, on specified dates, to cash flows that exclusively comprise payments of principal and interest on the principal amount outstanding.

4.2.3Financial liabilities measured at amortized cost

Financial liabilities are measured at amortized cost using the effective interest method. This method is also used to allocate interest expense of these liabilities for the period. The effective interest rate is the rate that discounts estimated future cash flows (including fees paid or received that form an integral part of the effective interest rate, transaction costs and other premiums or discounts) over the expected life of the financial liability or, when appropriate, over a shorter period, for the initial recognition of the net carrying amount.

   
 F-24 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.2.4Financial liabilities measured at fair value through Profit or Loss

These are liabilities designated upon initial recognition as at fair value through profit or loss and those classified as held for trading. Financial liabilities designated fair value through profit or loss are stated at fair value with the respective gains or losses in fair value recognized in the statement of income. Net gains or losses recognized in profit or loss include the interest paid on the financial liability.

4.2.5Derecognition of financial assets and liabilities

The Company derecognizes a financial asset when the contractual rights to the cash flows from the financial asset expire, or it transfers the rights to receive the contractual cash flows in a transaction in which substantially all of the risks and rewards of ownership of the financial asset are transferred or in which the Company neither transfers nor retains substantially all of the risks and rewards of ownership and it does not retain control of the financial asset.

The Company derecognizes financial liabilities only when its obligations are discharged, cancelled or settled. The difference between the carrying amount of the derecognized financial liability and the corresponding disbursement made, or to be made, is recorded to profit or loss.

4.3Net sectorial financial assets and liabilities

According to the amendment to the concession agreement of distribution companies, the Company records changes in sectorial financial assets and liabilities, until the next tariff adjustment/review process, when the Concession Grantor approves the transfer as components of the power tariff and thus, it passes the adjustment on to consumers in the next tariff cycle, which occurs on June 24 of each year.

The balances of the net sectorial financial assets and liabilities comprise: a) Parcel A Variation Compensation Account - CVA, which records the variation between estimated and actual energy purchase and transmission costs and sector charges, and b) financial items, which correspond to energy over-contracting, neutrality of charges and other rights and obligations included in the tariff.

After approval of the Annual Tariff Adjustment and Periodic Tariff Review, the new tariff applied for the tariff year provides for the collection or return of the constituted assets and liabilities.

In the event of termination of the concession for any reason, the residual values of Part A items and other financial components not recovered or returned through tariff are incorporated in the calculation of compensation or deducted from unamortized assets indemnity values, thus protecting rights or obligations of the distribution company to the Concession Grantor.

   
 F-25 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.4Accounts receivable related to the concession

Refer to financial assets of the concessions with unconditional right to receive cash by the Company, guaranteed by the Concession Grantor by contractual clause and specific legislation.

4.4.1Power distribution service concession

The concession agreement for electricity distribution provides that the users of the public service remunerate part of the investments made by the concessionaire and the Concession Grantor at the end of the concession indemnifies the other party. This model provides for the recognition of financial assets, contract assets in the construction period and intangible assets.

The portion recognized as financial asset refers to the indemnity set forth in the public power distribution service concession agreements, which the Company understands as an unconditional right to cash payments from the Concession Grantor upon expiration of the concession. This indemnification aims to reimburse the Company for investments made in infrastructure, without recovery, through the tariff.

The cash flows related to these assets are determined taking into account the Regulatory Compensation Basis (Base de Remuneração Regulatória or BRR), defined by the Concession Grantor, and the fair value is recorded based on the replacement cost methodology of the assets included in the distribution infrastructure linked to the concession.

4.4.2Piped gas distribution service concession

Gas concession agreement follows the bifurcated model, whereby part of the investments made by the concession operator is paid by users of the public service and the other part is indemnified by the Concession Grantor, the State of Paraná, at the end of the concession. This model provides for recognition of a financial asset, a contract asset in the construction period and an intangible asset.

The amount recognized as a financial asset is the amount that will be indemnified by the Concession Grantor corresponding to the investments made in the last ten years prior to the end of the concession as foreseen in the agreement and that, according to Management, assures the unconditional right to receive cash at the end of the concession. The indemnity assumption is based on the replacement cost of the concession assets.

4.4.3Bonus for the grant of quota system generation concession agreement

The quota system generation concession agreement provides for the payment of a bonus for the grant to the Concession Grantor, pursuant to paragraph 7 of article 8 of Law 12,783/2013.

This bonus is recognized as a financial asset because it represents an unconditional right to receive cash, guaranteed by the Concession Grantor during the term of the concession and without risk of demand.

The remuneration of this financial asset is based on the Weighted Average Cost of Capital - WACC defined by the National Energy Policy Council (CNPE) in Resolution 2/2015, which is being presented in the statement of income as operating revenue in accordance with the Company’s business model.

   
 F-26 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.4.4Concession of power generation

The Company has operated and operates concession agreements for power generation that contain indemnification clauses for the infrastructure not depreciated, amortized and/or received during the concession term. After maturity, the residual balances of the assets is transferred to Accounts receivable related to the concession. At the end of each reporting period, Management evaluates the recoverability of the asset, remeasuring its cash flow based on its best estimate.

4.5Contract assets

Represented by the construction in progress or in service of the infrastructure delegated by the Concession Grantor, conditional upon the receipt of revenue not only by the passage of time, but after fulfilling the performance obligation to maintain and operate the infrastructure.

4.5.1Power distribution service concession

Represents the concessionaire’s contractual right related to the works under construction to meet the needs of the concession, accounted for at cost plus financial charges, when applicable.

When the assets are put into operation, the assets are transferred to the intangible asset, in the amount equivalent to what will be remunerated by the user through payment of the fee for the use of the services, or to the accounts receivable associated to the concession, in the amount equivalent to the residual portion of the assets not amortized, which will be reverted to the Concession Grantor through indemnification at the end of the concession.

4.5.2Power gas distribution service concession

Construction in progress for the distribution of piped gas which will be transferred to intangible assets upon their entry in operation and to the extent that the right (authorization) is received to charge the users of the public service. The amount that will not be amortized within the term of the concession is presented in financial assets and indemnified at the end of the concession by the Concession Grantor according to contractual definition.

4.5.3Power transmission concession

Represents the balance of public electricity transmission contracts signed with the Concession Grantor to build, operate and maintain the high voltage lines and substations of the generation centers up to the distribution points.

During the term of the concession agreement, the Company receives, subject to its performance, a remuneration denominated Annual Revenue Allowance (RAP) that remunerates the investments made in the construction of the infrastructure and covers also, the costs of operation and maintenance incurred.

   
 F-27 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

After the beginning of the commercial operation and insofar as the operation and maintenance service - O&M is provided, the portion of RAP referring to O&M revenue is recognized in profit or loss at fair value, on a monthly basis, and billed together with the revenue part recognized in the construction phase, referring to the remuneration of the built-up assets. This amount billed after complying with the O&M performance is reclassified to the financial asset under Customers until its effective receipt.

The Company estimates its revenue in the construction phase at fair value based on the budgeted cost of the work and used by management as a parameter for bidding on the concession auction. Fair value revenue comprises the budgeted cost for the entire construction period plus the construction margin, which represents sufficient profit to cover the costs of managing and monitoring the work.

The remuneration rate of each concession is determined by the projection of the expected cost, of the profit margin on the cost in the construction phase and also of the projection of the RAP to be received in the operational stage, already net of the variable consideration estimate (PV) and the RAP part of the O&M performance. This fair value valuation technique using the income approach discounts cash flow for the entire concession period, determining at initial recognition the implied rate that zeroes the flow over time. This remuneration rate is fixed at the initial period and does not change during the performance of the contract and represents the market rate in effect at the time under the conditions of the negotiation between parties.

The assets arising from the construction of the transmission infrastructure are formed by the recognition of construction revenue, according to the percentage of completion of the construction (Note 4.13), and by their financial remuneration (Note 4.12.2).

The Company recognizes gains and losses due to efficiency or inefficiency in the construction of the infrastructure and due to periodic tariff review (RTP), when incurred, directly in the statement of income for the year.

Upon expiration of the concession, any uncollected amounts related to the construction of infrastructure shall be received directly from the Concession Grantor, as an unconditional right to cash reimbursement pursuant to the concession agreement, as compensation for investments made and not recovered through tariffs (RAP).

Existing System Basic Network - RBSE

The assets that compose the Existing System Basic Network - RBSE include one economic component, referring to the cost of capital of the assets not depreciated in July 2017, and one financial component, resulting from the right for the Annual Permitted Revenue (RAP) of the Concession Agreement No. 060/2001, not received in the period from January 2013 to June 2017, plus monetary adjustment and remuneration interest.

   
 F-28 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.6Accounts payable related to the concession

These refer to the amounts set forth in the concession agreement in connection with the right to explore hydraulic power generation potential (onerous concession), whose agreement is signed as Use of Public Property (Uso do Bem Público or UBP) agreements. The obligation is recognized on the date of signature of the concession agreement corresponding to the present value of future cash payments for the concession. The liability is then remeasured using the effective interest rate and reduced by contractual payments.

4.7Inventories (including property, plant and equipment and contract assets)

Materials and supplies in inventory, classified under current assets, and those assigned for investments, classified under property, plant and equipment, and contract assets, have been recorded at their average acquisition cost. Recorded amounts do not exceed their net realizable value.

4.8Property, Plant and Equipment

The property, plant and equipment related to the public service concession agreement are depreciated according to the straight-line method based on annual rates set forth and reviewed periodically by ANEEL, which are used and accepted by the market as representative of the economic useful lives of the assets related to concession’s infrastructure. Property, plant and equipment related to contracts for the use of public property under the independent electricity producer scheme are depreciated based on annual rates established by ANEEL limited to the concession period. All other property, plant and equipment are depreciated using the straight-line method based on estimates of their useful lives, which is reviewed annually and adjusted if necessary.

Costs directly attributable to construction works as well as interest and financial charges on borrowings from third parties during construction are recorded under property, plant and equipment in progress, if it is probable that they will result in future economic benefits for the Company.

4.9Intangible Assets

These comprise software acquired from third parties and software developed in-house and are measured at acquisition cost and amortized over five years, besides Intangible assets from Concession Agreements below.

4.9.1Onerous concession of electric power generation

Corresponds to acquisition of exploration rights on hydropower potential whose onerous concession contract is signed as Use of Public Property - UBP.

During construction work, this asset is recognized at the present value of future cash disbursements during the Concession Agreement term. When commercial operation starts, the amount starts to be amortized over the concession period.

   
 F-29 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.9.2Hydrological risk renegotiation (Generation Scaling Factor - GSF)

Asset consisting of the renegotiation of the hydrological risk under the terms of Law No. 13,203/2015 and subsequent changes, arising from the amounts recovered from the cost with the adjustment of the Energy Reallocation Mechanism - MRE (GSF). The amount was transformed by ANEEL into an extension of the concession period, which is amortized on a straight-line basis until the end of the new concession period, according to note 1-b.

4.9.3Power distribution service concession

This comprises the right to control infrastructure, built or acquired as part of the electric energy public service concession, and the right to charge fees to the users of the public service.

Intangible assets are recorded at their fair acquisition and construction value, less accumulated amortization and impairment losses, when applicable. The amortization of intangible assets reflects the pattern in which it is expected that future economic benefits will flow to the Company during the concession period.

During the infrastructure construction phase costs are classified as contract assets (Note 4.5).

4.9.4Piped gas distribution service concession

Intangible assets for piped gas distribution services, which correspond to the right to charge users for the gas supply.

This intangible asset was initially recognized at acquisition or construction cost, plus interest and other capitalized finance charges. This asset is amortized using the straight-line basis over its estimated useful life, considering the economic benefits generated by intangible assets.

During the infrastructure construction phase, costs are classified as contract assets (Note 4.5).

4.9.5Intangible assets acquired separately

Intangible assets with a finite useful life, acquired separately, are recorded at cost, less accumulated amortization and accumulated impairment losses. Amortization is recognized using the straight-line method based on the estimated useful lives of the corresponding assets. The estimated useful lives and the amortization method are reviewed at the end of each reporting period, with the effect of any changes in estimate being accounted for on a prospective basis.

4.9.6Derecognition of intangible assets

An intangible asset is derecognized when no future economic benefits are expected from use or disposal. Gains or losses arising from disposal of an intangible asset are recognized in profit or loss, measured as the difference between net disposal proceeds and the carrying amount of the asset.

4.10Impairment of assets

Assets are assessed to detect evidence of impairment.

   
 F-30 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.10.1Financial assets

Provisions for losses on financial assets are based on assumptions about default risk, existing market conditions and future estimates at the end of each year.

The Company applies the simplified approach of IFRS 9 to the measurement of expected credit losses for the entire existence of financial assets that do not have significant financing components, by considering a provision for expected loss over a useful life for all trade accounts receivable. To measure expected credit losses, trade accounts receivable is grouped based on shared credit risk characteristics, numbers of days late, in the amount considered enough to cover losses on the realization of these assets, based on specific criteria of the payment history, collection actions carried out for the credit recovery and relevance of the amount due in the receivable portfolio.

Trade accounts receivable are written off when there is no reasonable expectation of recovery. Evidence for this includes, among other things, the debtor’s inability to participate in a plan to renegotiate its debt with the Company or to make contractual payments on overdue debts.

4.10.2Non-financial assets

Whenever there is a loss resulting from situations where an asset’s carrying value exceeds its recoverable value, defined as the higher of the asset’s value in use or its net selling price, this loss is recognized in profit or loss for the year.

For impairment testing purposes, assets are grouped at the lowest levels for which there are separately identifiable cash flows (Cash Generating Units - CGU).

The amount of the impairment of non-financial assets is reviewed at the reporting date. In case of reversal of impairment losses which had been recorded in prior years, this reversal is recognized in current year’s profit or loss.

Assets under formation arising from onerous concession and concession rights and/or authorization to generate electricity are classified as intangible assets. Impairment is tested along with the other assets of that cash-generating unit.

The Impairment of contract assets in their construction phase are tested immediately, mainly considering the use of the effective interest rate fixed at the beginning of the project and carried to the end of the concession cash flow. After the beginning of the commercial operation, the portion of revenue recognized is tested for impairment in the accounts receivable from customers. For the receivable part conditioned to fulfill the performance obligation to maintain and operate the infrastructure, the Company has no history and no expectation of losses, since amount are subject to guarantee structures, via shared apportionment of eventual default losses among the other members of the national interconnected system managed by the “Operador Nacional do Sistema” (ONS) and by jurisdiction of the sector.

4.11Provisions

Provisions are recognized when: i) the Company has a present obligation (legal, formalized or constructive) resulting from a past event, ii) it is probable (i.e., more likely than not) that an outflow of resources embodying economic benefits will be required to settle the obligation, and iii) a reliable estimate can be made of the amount to settle the obligation.

   
 F-31 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The estimates of outcomes and financial impacts are determined by the Company, which requires use of judgment by Management, supplemented by the experience of similar past transactions and, in some cases, by independent expert reports.

Environmental liabilities are recognized as the Company assumes formal obligations before regulatory agencies or becomes aware of potential risks related to environmental issues, which may lead to cash disbursements that are deemed probable and that may be estimated. During the project implementation phase, the accrued amounts are included in property, plant and equipment (generation), construction cost (transmission) or contract assets (distribution). At the start of operations, all costs included in the Operating License, whose programs will be executed during the concession and the respective disbursement has not yet occurred, are measured and adjusted to present value according to the estimated cash flow of disbursements and recorded as environmental provisions matched against the assets related to the project, being adjusted periodically.

Once the project enters commercial operation, all costs or expenses incurred with environmental programs related to the project’s operation and maintenance licenses are analyzed according to their nature and included in profit or loss for the period.

4.12Revenue recognition
4.12.1Revenue from contracts with customers

Revenue is measured based on the consideration that the Company expects to receive in a contract with the customer, net of any variable consideration. The Company recognizes revenues when it transfers control of the product or service to the customer and when it is probable to receive the consideration considering the client’s ability and intention to pay the consideration when due. The Company’s operating revenue comes mainly from the electricity supply and from the electric network availability.

The revenue from electricity supply is recognized monthly based on the data for billing that are determined by the average MW of contracted electricity and declared with the CCEE. When the information is not available, the Company estimates the revenue considering the contracts’ rules, the price estimate and the volume provided.

For wind power generation companies subject to minimum generation amounts, the Company understands that it is subject to variable consideration, and for this reason, includes a provision for non-performance based on the annual generation estimates, reducing revenue.

Revenue from electric power supply and network availability is recognized monthly based on measured and effectively billed energy. In addition, the Company records unbilled revenue, calculated from the period between the last billing and the end of each month, by estimate based on the last measurement taken. In the concession contract for the public electricity distribution service, non-performance compensations are provided for quality indicators that, when incurred, reduce electricity availability revenue.

   
 F-32 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.12.2Interest income

Interest income is recognized when it is probable that future economic benefits will flow to the Company and its amount can be reliably measured. Interest income is recognized on a straight-line basis and based on time and the effective interest rate on outstanding principal amounts. The effective interest rate is the one that discounts the estimated future cash receipts calculated during the estimated life of the financial asset in relation to initial net carrying amount of that asset.

Regarding the contract assets of the power transmission concession, financial compensation revenue is recognized using the implicit remuneration rate established at the beginning of each project, which is presented in the statement of income as operating income in accordance with the Company’s business model.

4.13Construction revenues and costs

Revenue related to construction services for infrastructure in the power transmission and distribution services, and gas distribution, are recognized over time based on the stage of completion of the work.

The respective costs are recognized when incurred, in the statement of income for the year, as construction cost.

Given that Copel DIS and Compagas outsource the construction of distribution infrastructure to unrelated parties through works carried out in the short term, the construction margin to the power and gas distribution activities is not material.

The construction margin adopted for the transmission activity for the years 2021, 2020 and 2019 was 1.65%, and results from a calculation methodology which considers the respective business risk.

4.14Power purchase and sale transactions in the Spot Market (Electric Energy Trading Chamber - CCEE)

Power purchase and sale transactions in CCEE are recorded on the accrual basis of accounting, based on data released by CCEE, which are calculated by the product of the Differences settlement prices - PLD multiplied by the energy surplus declared with CCEE, or, when such information is not available in a timely manner, by an estimate prepared by Management.

4.15Derivative Financial Instruments
4.15.1Power purchase and sale transactions

The Company negotiates energy purchase and sale agreements and part of its contracts are classified as derivative financial instruments measured at fair value through profit or loss.

Unrealized net gains or losses arising from the mark-to-market of these contracts (the difference between contractual and market prices) are recognized in the statement of income.

4.15.2Non-Deliverable Forward (NDF) contracts

In addition, the Company operates with Non-Deliverable Forward – NDF contracts, which aim exclusively at providing hedge against exchange rate risks associated with cash flows from capital contributions to subsidiaries, when they reflect foreign-currency denominated purchases of projected equipment. They are measured at their fair value, with changes recorded in the statement of income for the year. The fair value is calculated based on the information of each contracted operation and the respective market information on the closing dates of the financial statements.

   
 F-33 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
4.16Taxes
4.16.1Income Tax and Social Contribution

The taxation on profit comprises income tax and social contribution calculated based on the taxable profits (adjusted profit) of each taxable entity at the applicable tax rates according to prevailing legislation, namely, at 15%, plus 10% surtax on the amount exceeding R$240 per year, for income tax and at 9% for social contribution.

Income tax and social contribution losses can be offset against future taxable profits, considering the limit of 30% of the taxable profit for the period, and can be carried forward indefinitely.

4.16.2Deferred income tax and social contribution

The Company, based on its profitability history and the expectation of generating future taxable profits, based on its internal projections prepared for reasonable periods for its business, sets up a deferred tax asset on temporary differences between the tax bases and on tax losses and negative tax basis.

The deferred income tax and social contribution are recognized on temporary differences between the carrying amounts of assets and liabilities in the financial statements and the corresponding tax bases used for tax calculation purposes, to the extent that it is probable that there will be sufficient taxable profits against which the temporary differences can be utilized and the tax losses can be offset.

Deferred tax assets and liabilities may be offset if there is a legal right to offset the current tax assets and liabilities and they relate to the same taxing authority.

4.16.3Other taxes recoverable and other tax obligations

Sales and services revenues are subject to value-added tax (Imposto sobre Circulação de Mercadorias e Serviços or ICMS) and service tax (Imposto sobre Serviços or ISS), at the applicable rates, and to the PIS (Social Integration Program) and COFINS (Contribution for Social Security Funding).

Credits resulting from non-cumulative PIS and COFINS charges are accounted for as reductions to operating costs in the statement of income.

Credits arising from non-cumulative ICMS, PIS and COFINS related to the purchase of assets are presented as reductions to the acquisition cost of these assets.

Prepayments or amounts that can be offset are presented in current and non-current assets, according to their expected realization.

4.17Post-employment benefits

The Company and its subsidiaries sponsor pension plans to supplement retirement and pension plans and the Assistance Plan (medical and dental assistance) for their active employees and their legal dependents. The amounts of these actuarial commitments (contributions, costs, liabilities and/or assets) are calculated annually by an independent actuary, with the base date that coincides with the end of the year. The economic and financial assumptions for the purposes of the actuarial valuation are discussed with the independent actuary and approved by the Company’s Management.

   
 F-34 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The assets of the benefit plans are valued at market value (marked-to-market) by the Company. The value of the net plan liability is recognized at the present value of the actuarial obligation, less the fair value of the plan assets. The adoption of the projected credit unit method adds each year of service as a triggering event for an additional benefit unit, adding up to the calculation of the final obligation.

Other actuarial assumptions are used, which take into account biometric and economic tables in addition to historical data from the benefits plans, obtained from the manager of these plans, Fundação Copel de Previdência e Assistência Social.

Actuarial gains or losses caused by changes in assumptions and/or actuarial adjustments are recognized in other comprehensive income.

4.18Standards applicable to the Company effective January 1, 2021

As of the fiscal year 2021, changes in the following standards are in effect, without impacts on the Company’s financial statements:

(i)Annual review of standards: IFRS 16, IFRS 4, IAS 39, IFRS 7 and IFRS 9, as a result of the definition of the term “Reform of the Reference Interest Rate - Phase 2”;
(ii)Amendment to IFRS 16 - lease concessions related to Covid-19.
4.19New standards that are not yet in effect

As of the 2022 and 2023 financial years, changes in the following standards will be in effect:

(i)IAS 37: specification of costs to fulfill onerous contract (from January 1,2022);
(ii)IAS 16: definitions of resources before their intended use (from January 1,2022);
(iii)IFRS 3: update of the standard, in view of the changes in the Conceptual Framework (from January 1,2022);
(iv)Annual improvements to the 2018–2020 IFRS cycle with changes in standards: IFRS 1, IFRS 9, IFRS 16 and IAS 41 - Agriculture (from January 1,2022);
(v)Changes in IAS 1: classification of liabilities as current or non-current (from January 1,2023);
(vi)IFRS 17: new standards for insurance contracts, replacing IFRS 4 (from January 1,2023);
(vii)IAS 1 amendment to the disclosures of accounting policies (from January 1,2023);
(viii)IAS 8: update of definition of accounting estimates (from January 1,2023);
   
 F-35 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
(ix)IAS 12: amendment to the treatment of deferred tax related to assets and liabilities arising from a single transaction (from January 1,2023);
(x)IFRS 10 and IAS 28: changes related to the sale or contribution of assets between an investor and its associate or joint venture (no defined effective date).

The Company does not expect significant impacts on the Company’s financial statements resulting from these changes in standards.

 

 

5.Cash and Cash Equivalents

     
     
  12.31.2021 12.31.2020
Cash and bank accounts   231,372   228,711
Financial investments with immediate liquidity   3,241,473   2,994,057
    3,472,845   3,222,768

These comprise cash on hand, deposits with banks and short-term highly liquid investments, which can be redeemed in cash within 90 days from the investment date. Temporary short-term investments are recorded at cost at the reporting date, plus earnings accrued. Cash and cash equivalents are subject to an insignificant risk of change in value.

Financial investments of the Company refer to Bank Deposit Certificates - CDBs and Repurchase Agreements, which are the sale of a security with the commitment of the seller (Bank) to repurchase it, and of the purchaser to resell it in the future. Investments have post-fixed interest rates between 78.0% and 99.25% of Interbank Deposit Certificate (“CDI”).

 

 

6.Bonds and Securities

The Company hold securities that yield variable interest rates. The term of these securities ranges from 1 to 48 months from the end of the reporting period.

       
Category Index 12.31.2021 12.31.2020
Units in Funds (a)  CDI  284,852   237,141
Bank Deposit Certificates - CDB  82% to 101% of CDI    61,635  62,638
Financial Treasury Bonds - LFT  Selic    -   751
National Treasury Bills  - LTN  10.92% p.y.    14,571  -
    361,058   300,530
  Current   16,121   1,465
  Noncurrent 344,937   299,065
Interbank Deposit Certificate - CDI
Interest rate equivalent to the reference rate of the Special System for Settlement and Custody - Selic
(a) These are fixed income funds in the Parent Company and reserve accounts intended to comply with contracts with BNDES.

 

   
 F-36 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

7.Trade Accounts Receivable
           
           
  Balances  Overdue  Overdue for more  Total  Total 
  falling due up to 90 days than 90 days 12.31.2021 12.31.2020
Customers          
Residential  523,798   302,191   32,081  858,070  639,424
Industrial  268,586 28,321   33,003  329,910  312,302
Commercial  362,454 69,612   10,836  442,902  335,439
Rural  120,383 28,136  2,940  151,459  109,651
Public Entities   56,669   1,543 320   58,532   37,370
Public lighting    55,850  93   -   55,943   46,615
Public service   61,493   704 153   62,350   41,812
Unbilled - captives  948,418 -   -  948,418  583,209
Energy installments plan - captives (7.1)  252,018 32,431   59,218  343,667  291,847
Low income subsidy - Eletrobras   17,712 -   -   17,712   13,783
Free consumers  171,213   1,760  1,522  174,495  163,786
Other receivables    51,737 23,122   82,667  157,526  168,270
Bonus for voluntary consumption reduction (7.4) (134,890) -   - (134,890)   -
   2,755,441   487,913 222,740  3,466,094  2,743,508
Concessionaires, Permission holder and Trading Companies        
Bilateral contracts  209,230  35  1,367  210,632  590,335
Regulated contracts  217,097   814  5,326  223,237  170,951
CCEE (7.2)  347,864 - 119,665  467,529  328,001
Energy suplies  774,191   849 126,358  901,398  1,089,287
Charges from using transmission grid    346,570   3,143   12,357  362,070  281,508
           
Gas distribution   77,827   1,879   10,759   90,465   70,928
           
Expected credit losses (7.3)  (11,873)   (23,238)   (269,490) (304,601) (365,551)
   3,942,156   470,546 102,724  4,515,426  3,819,680
Current        4,433,193  3,768,242
Noncurrent         82,233   51,438
7.1Energy installments plan – captive customers

The trade accounts receivable renegotiated are discounted to present value as of December 31, 2021, taking into consideration the future value, the maturity dates, the dates of settlement and the discount rate of 1.16% p.m.

7.2Electricity Trading Chamber - CCEE

Balance receivable deriving from the positive position in the monthly settlement of the spot market centralized by CCEE. Amounts are received in the second month following the recognition of revenue or offset against future settlements when the result is negative for the subsidiary.

Of the total presented, R$119,665 refer to the controversial portion resulting from the effects of the injunction for exclusion of responsibility of Colíder HPP. As a result of unforeseeable circumstances and force majeure, the power plant had its commercial start-up delayed, which was initially scheduled for January 2015. The Company is contesting in court, filing a request for exclusion of liability so that the mandatory supply of energy contracted by the plant, in the period in delay, is postponed. Expected credit losses were recorded in the same amount as the receivable balance, as presented in Note 7.3.

   
 F-37 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Copel GeT filed an administrative request for the exclusion of liability at ANEEL, which was denied, and subsequently, at December 18, 2017, it filed an ordinary lawsuit with request for advance protection with the Court, requesting the reversal of the agency’s decision. On April 6, 2018, the Federal Court of the 1st Region fully granted the preliminary injunction applied for in the interlocutory appeal to suspend the enforcement of any burden or penalty to Copel as a result of noncompliance with the deadlines originally provided for in the Concession Agreement until a final unappealable ruling is rendered. The main action awaits its judgment on merits.

The contracted energy of the Colider plant is 125 MW average. For overdue periods the contract was fulfilled and, due to the fact it is awaiting a decision on the merits of the lawsuit, the Company recognized the revenue limited to the financial covenants of the agreement and the regulatory rules, as well as the cost of energy to cover the contractual guarantee.

7.3Expected credit losses

 

 

                       
 

Balance as of January 1, 2019

Additions /

(Reversals)

Reversal of write offs

Balance as of December 31, 2019

Additions /

(Reversals)

Reversal of write offs

Reclassi-

 fication (a)

Balance as of December 31, 2020

Additions /

 (Reversals)

Reversal of write offs

Reclassi-

 fication (a)

Balance as of December 31, 2021

Customers                        
Residential 21,722 71,794 (51,692)  41,824 65,937 (60,365)   - 47,396  117,928  (115,056)   - 50,268
Industrial 87,197 33,772 (23,015)  97,954 22,487 (31,575)   - 88,866 20,413 (66,848)   - 42,431
Commercial 69,717 27,866 (26,658)  70,925 29,092 (31,294)   - 68,723 35,628 (46,057)   - 58,294
Rural 3,810 1,499 (1,920) 3,389   4,788   (4,240)   -   3,937   6,407   (7,384)   -   2,960
Public Entities 4,874 435 (419) 4,890   9   (1,815)   -   3,084   184   (2,887)   -  381
Public lighting 120 (117) - 3 20 (15)   -   8 11   (8)   - 11
Public service 199 145 (79)   265   124   (246)   -  143   (16)   (154)   -   (27)
Unbilled 1,502 (322) - 1,180   409  -   -   1,589   885  -   -   2,474
Adjustment to present value (2,883) 1,442 -   (1,441)   791  -   - (650)  (854)  -   -  (1,504)
  186,258 136,514 (103,783)   218,989  123,657  (129,550)   -  213,096  180,586  (238,394)   -  155,288
Concessionaires, Permission holder and Trading Companies                        
CCEE (7.2) 119,665 - -   119,665 -  -   -  119,665 -  -   -  119,665
Concessionaries and permission holder  9,474 11,608 (657)  20,425   392   (284)   - 20,533   1,224   (1,994)   - 19,763
  129,139 11,608 (657)   140,090   392   (284)   -  140,198   1,224   (1,994)   -  139,428
Telecommunications 3,879 13,292 (12,022) 5,149   3,609   (6,260) (2,498) -   3,042   (3,153)  111 -
Gas distribution 12,112 1,063 (647)  12,528   238   (509)   - 12,257  (2,611) 239   -   9,885
  331,388 162,477 (117,109)   376,756  127,896  (136,603) (2,498)  365,551  182,241  (243,302)  111  304,601
(a) Reclassification to Assets classified as held for sale (Note 41).

 

7.4Incentive program for the voluntary reduction of electricity consumption

Due to the water scarcity scenario in the last years, the Federal Government proposed the creation of the Incentive Program for the Voluntary Reduction of Electricity Consumption, within the scope of the Chamber of Exceptional Rules for Hydroenergetic Management (CREG), with the purpose of encouraging consumers to reduce their energy consumption and thus avoid contracting more expensive plants.

To be entitled to the bonus, the consumer should reduce his electricity consumption in the months from September to December 2021, in such a way that the total consumptions in this period were at least 10% lower than the total consumptions for the same period of 2020. Once the reduction target is reached, the consumer will receive a bonus of R$0.50 per kilowatt-hour (kWh) of the total energy saved from September to December 2021, compared to the same period of 2020. However, the bonus to be credited to the electricity bill is limited to 20% of the energy saved.

   
 F-38 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Consumers eligible to receive the bonus are those of low voltage (group B) and medium and high voltage (group A), only from residential, industrial, commercial, services and other activities, rural and public service consumption classes, including those residential consumers that benefit from the Social Electricity Tariff (TSEE). The costs of the Incentive Program for the Voluntary Reduction of Electricity Consumption will be covered by the System Service Charges (ESS), to be passed on by CCEE to the distributors.

The Company recorded a credit in the amount of R$134,890 in Assets - Consumers, concessionaires and licensees referring to the bonus granted to consumers as a result of the aforementioned program against Assets - Other Receivables.

For eligible consumers, the bonus will be credited to invoices for January, February and March 2022, and reimbursement to distributors will be made in the CCEE accounting for January, February and March, to be settled in March, April and May of the same year. 

 

 

8.CRC Transferred to the Paraná State Government

The Company’s Management and the Paraná State Government maintained an agreement for negotiation of the Account for Compensation of Income and Losses - CRC until August 10, 2021.

On July 14th, 2021, Official Letter No. 443/2021 - GS/SEFA was received, through which the Paraná State Government expressed its intention to fully settle the CRC and on August 10, 2021 the debt balance was fully paid restated on a daily pro rata basis, in the amount of R$1,431,200.

The State of Paraná complied with the agreed terms and made the payments under the contracted conditions.

8.1Changes in CRC

                 
Balance as of   Monetary    Balance as of   Monetary   Balance as of
January 1, 2020 Interest  variations  Amortizations  December 31, 2020 Interest variations Receipts December 31, 2021
  1,350,685  80,788 261,176   (300,025)  1,392,624   52,234   201,756   (1,646,614) -
                 
Current        287,789       -
Noncurrent        1,104,835       -

 

 

   
 F-39 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

 

9.Net Sectorial Financial Assets and Liabilities

 

9.1Compositions of net sectorial financial assets and liabilities balances per tariff cycle

 

         
         
    12.31.2021   12.31.2020
  Current  Noncurrent Current  Noncurrent
Sectorial financial assets - Electricity rate adjustment recoverable 2021      
Portion A        
Electricity purchased for resale - CVA Energ  - - (54,864)   (54,864)
Electricity purchased for resale - Itaipu  - -   231,588  231,588
Transport of energy using the transmission system - basic grid  - -  88,137 88,137
Transport of energy purchased from Itaipu  - - 9,766   9,766
System Service Charges - ESS  - -  11,266 11,266
Energy Development Account - CDE  - -  (903)  (903)
Proinfa  - - (89)   (89)
Other financial components        
Neutrality  - -  27,923 27,923
Overcontracting  - -  78,836 78,836
Hydrological risk  - -  (143,147) (143,147)
Tariff refunds  - - (76,144)   (76,144)
Other   - 1,096   1,096
   - -   173,465  173,465
Sectorial financial assets - Electricity rate adjustment recoverable 2022      
Portion A        
Electricity purchased for resale - CVA Energ  (175,646) (175,646)  - -
Electricity purchased for resale - Itaipu   486,312  486,312  - -
Transport of energy using the transmission system - basic grid  13,211 13,211  - -
Transport of energy purchased from Itaipu  (929)  (929)  - -
System Service Charges - ESS   253,471  253,471  - -
Energy Development Account - CDE (28,186)   (28,186)  - -
Proinfa (99)   (99)  - -
Other financial components        
Neutrality  23,702 23,702  - -
Overcontracting (62,531)   (62,531)  - -
Hydrological risk  (183,739) (183,739)  - -
Tariff refunds (39,014)   (39,014)  - -
Itaipu Bonus  30,553 30,552  - -
Other  66,635 66,636  - -
    383,740  383,740  - -
    383,740  383,740   173,465  173,465
   
 F-40 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

         
    12.31.2021   12.31.2020
  Current  Noncurrent Current  Noncurrent
Sectorial financial liabilities - Electricity rate adjustment recoverable 2020      
Portion A        
Electricity purchased for resale - CVA Energ  - - 9,675 -
ESS  - -   (3,401) -
CDE  - - (66) -
Proinfa  - -  33 -
Transport of energy using the transmission system - basic grid  - -   603 -
Transport of energy purchased from Itaipu  - -   214 -
Other financial components  -      
Offset of energy surplus/deficit under CCEAR bilateral contracts  - -  36,395 -
Hydrological risk  - -  (187,817) -
Tariff refunds  - - (41,381) -
Overcontracting  - - (26,995) -
Neutrality  - -  21,419 -
Other  - - 2,612 -
   - -  (188,709) -
Sectorial financial liabilities - Tariff Review 2021        
Portion A        
Electricity purchased for resale - CVA Energ  (124,550) -  - -
ESS  24,338 -  - -
CDE  37,586 -  - -
Proinfa  10,699 -  - -
Electricity purchased for resale - Itaipu   314,342 -  - -
Transport of energy using the transmission system - basic grid   154,099 -  - -
Transport of energy purchased from Itaipu  15,876 -  - -
Other financial components   -  - -
Refund Pis and Cofins credits  (337,350) -  - -
Hydrological risk  (236,674) -  - -
Tariff refunds (55,116) -  - -
Overcontracting  46,466 -  - -
Neutrality  33,773 -  - -
Offset of energy surplus/deficit under CCEAR bilateral contracts  (184) -  - -
Other (23,075) -  - -
   (139,770) -  - -
Sectorial financial liabilities - Tariff Review 2023        
Financial components        
Tariff refunds  -   (21,951)  - -
Other  -   (87,556)    
   - (109,507)  - -
Sectorial financial liabilities - Tariff Review 2024        
Financial components        
Tariff refunds  -   (21,951)  - -
   -   (21,951)  - -
Sectorial financial liabilities - Tariff Review 2025        
Financial components        
Tariff refunds  -   (21,951)  - -
   -   (21,951)  - -
   (139,770) (153,409)  (188,709) -

   
 F-41 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

9.2Changes in net sectorial financial assets and liabilities
               
               
  Balance as of Operating revenues Financial results Tariff  Statement of Financial Position Balance as of
  December 31, 2020 Constitution Amortization Updating flags   Constitution December 31, 2021
Portion A              
Electricity purchased for resale - Itaipu  463,176 1,133,849   (348,804)   38,745 - -  1,286,966
Electricity purchased for resale - CVA Energ (100,053) 640,205 128,545 (1,303)  (1,143,236) - (475,842)
Transport of energy using the transmission system - basic grid  176,877 164,203   (170,538)  9,979 - -  180,521
Transport of energy purchased from Itaipu 19,746   10,933  (17,746)  1,085 - - 14,018
ESS 19,131 728,954  (23,429)  2,374  (195,750) -  531,280
CDE  (1,872)   22,765  (41,260)  1,581 - -   (18,786)
Proinfa (145)   22,155  (11,812) 303 - - 10,501
Other financial components              
Refunds of Pis and Cofins (Note 13.2.1) -  - 364,650   - -  (702,000) (337,350)
Neutrality 77,265   60,608  (57,925)  1,229 - - 81,177
Offset of energy surplus/deficit under CCEAR bilateral contracts 36,395   (383)  (36,196)   - - - (184)
Hydrological risk (474,111)   (562,663) 443,644  (11,022) - - (604,152)
Tariff refunds (193,669)  (97,684) 100,956 (8,600) - - (198,997)
Overcontracting  130,677  (99,743)  (23,230) (2,220) (84,080) -   (78,596)
Itaipu bonus -   60,065   - 220 -   (86,736)   (26,451)
Others   4,804   89,875   22,330   (213) -  (6,600)  110,196
   158,221 2,173,139 329,185   32,158  (1,423,066)  (795,336)  474,301
Current assets  173,465            383,740
Noncurrent assets  173,465            383,740
Current liabilities (188,709)           (139,770)
Noncurrent liabilities -           (153,409)

 

               
  Balance as of Operating revenues Financial results Write-offs Covid Account Tariff  Balance as of
  January 1, 2020 Constitution Amortization Updating flags   December 31, 2020
Portion A              
Electricity purchased for resale - Itaipu   793,327 893,581   (354,300)   28,197  (897,629)  -  463,176
Electricity purchased for resale - CVA Energ   265,788   (242,246)   (253,482)  1,076   164,804 (35,993) (100,053)
Transport of energy using the transmission system - basic grid  13,038 265,030   48,154  1,715  (151,060)  -  176,877
Transport of energy purchased from Itaipu  24,391   31,762  (10,503) 801   (26,705)  - 19,746
ESS  (264,949)  (72,032) 169,396 (8,854)   249,724 (54,154) 19,131
CDE   152,928   56,608   (102,027)  5,065  (114,446)  -  (1,872)
Proinfa 8,468  (21,615) (8,856)   (181) 22,039  - (145)
Other financial components              
Neutrality  48,506   95,870  (52,843) 187   (14,455)  - 77,265
Offset of energy surplus/deficit under CCEAR bilateral contracts  40,192   75,917  (79,714)   - -  - 36,395
Hydrological risk  (347,160)   (444,291) 322,432 (5,092) -  - (474,111)
Tariff refunds  (194,253)  (83,514)   88,269 (4,171) -  - (193,669)
Overcontracting  (168,123) 274,051 145,853 663  (101,788) (19,979)  130,677
Others  (448) 6,927 (2,375) 700 -  -   4,804
    371,705 836,048  (89,996)   20,106  (869,516)  (110,126)  158,221
Current assets   355,570            173,465
Noncurrent assets   118,419            173,465
Current liabilities  -           (188,709)
Noncurrent liabilities  (102,284)           -

 

 

 

 

10.Accounts Receivables - Concessions

 

     
  12.31.2021 12.31.2020
Power distribution service concession (10.1)   1,200,708   960,518
Piped gas distribution service concession (10.2)   233,026   189,416
Bonus from the grant of concession agreements under the quota system (10.3)   730,851   671,204
Generation concession agreements (10.4)   102,220  81,202
    2,266,805   1,902,340
Current    5,121   4,515
Noncurrent    2,261,684   1,897,825

 

   
 F-42 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

10.1Power distribution service concession
   
Balance as of January 1, 2020  836,818
Transfers from contract assets (Note 11.1) 86,154
Transfers to intangible assets (Note 19.1)   (99)
Transfers to other receivables (assets held for disposal)  (7,428)
Fair value recognition 45,187
Loss on disposal  (114)
Balance as of December 31, 2020  960,518
Transfers from contract assets (Note 11.1)  125,492
Transfers to intangible assets (Note 19.1)   8,385
Transfers to other receivables (assets held for disposal)  (2,407)
Fair value recognition  108,733
Loss on disposal   (13)
Balance as of December 31, 2021   1,200,708

 

The distribution concession agreement amount is measured at fair value and its collection is assured by the Concession Grantor through an indemnity upon the return of these assets at the end of the concession period.

10.2Piped gas distribution service concession

   
Balance as of January 1, 2020 324,385
Transfers from contract assets (Note 11.2) 7,390
Transfers to intangible assets (Note 19.3)   (154,483)
Fair value recognition  12,154
Loss on disposal  (30)
Balance as of December 31, 2020 189,416
Transfers from contract assets (Note 11.2) 8,310
Transfers to intangible assets (Note 19.3) 1,398
Fair value recognition  33,909
Loss on disposal   (7)
Balance as of December 31, 2021 233,026

 

10.3Bonus from the grant of concession agreements under the quota system

   
Balance as of January 1, 2020   647,984
Transfers to electricity grid use charges - customers (71,087)
Interest (Note 32.1)  94,307
Balance as of December 31, 2020   671,204
Transfers to electricity grid use charges - customers (74,835)
Interest (Note 32.1)   134,482
Balance as of December 31, 2021   730,851

On January 5, 2016, Copel GeT entered into a 30-year concession agreement of HPP GPS, in accordance with Law No. 12,783/2013, with payment of the Bonus from the Grant - BO to the Concession Grantor, amounting to R$574,827, as per ANEEL Invitation to Bid 12/2015.

The amount of the bonus for the grant was recognized as a financial asset due to the Copel GeT’s unconditional right to receive the amount paid with inflation adjustment based on IPCA and interest during the concession period.

   
 F-43 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
10.4Power generation concession contract

   
Balance as of January 1, 2020  69,182
Remeasurement    1,518
Reversal of impairment (Note 33.4)  10,502
Balance as of December 31, 2020  81,202
Remeasurement   18,414
Reversal of impairment (Note 33.4)   2,604
Balance as of December 31, 2021   102,220

Residual balance refers to the electricity generation assets of HPP GPS and HPP Mourão I. Copel GeT depreciated the plants until 2015, the expiration date of the concessions, and the remaining balances were reclassified to accounts receivable linked to the concession. Although the Granting Authority has not yet disclosed the form of payment of remuneration of the assets, Management’s expectation about indemnification for these assets indicates the recoverability of the recorded balance, based on the remuneration methodology established by ANEEL.

Copel GeT timely manifested to ANEEL its interest in receiving the indemnifiable amount. Formalization of proof of realization of the respective investments to ANEEL occurred on December 17, 2015.

 

 

11.Contract assets

     
  12.31.2021 12.31.2020
Power distribution service concession (11.1)   1,798,195   1,114,961
Piped gas distribution service concession (11.2) 29,815 27,254
Power transmission concession (11.3)   5,060,038   4,350,582
    6,888,048   5,492,797
Current    148,488   285,682
Noncurrent    6,739,560   5,207,115

 

 

11.1Power distribution service concession contract

       
  Assets Special liabilities  Total 
Balance as of January 1, 2020 875,354  (31,070)   844,284
Acquisitions 1,391,267  -   1,391,267
Customers contributions  -   (112,689)  (112,689)
Provision for legal claims added to the cost of the works 1,522  -   1,522
Transfers to intangible assets (Note 19.1)   (1,016,482) 105,116  (911,366)
Transfers to accounts receivable - concessions (Note 10.1)  (94,978) 8,824   (86,154)
Loss on disposal  (11,903)  -   (11,903)
Balance as of December 31, 2020 1,144,780  (29,819)   1,114,961
Acquisitions 1,765,226  -   1,765,226
Customers contributions  -   (160,826)  (160,826)
Provision for legal claims added to the cost of the works   33,040  - 33,040
Transfers to intangible assets (Note 19.1)   (943,905) 122,346  (821,559)
Transfers to accounts receivable - concessions (Note 10.1)   (140,120)   14,628  (125,492)
Loss on disposal   (7,155)  -  (7,155)
Balance as of December 31, 2021 1,851,866  (53,671)   1,798,195

 

   
 F-44 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

11.2Piped gas distribution service concession contract

   
   
Balance as of January 1, 2020   26,734
Acquisitions   15,187
Transfers to intangible assets (Note 19.3)   (7,277)
Transfers from/to accounts receivable - concessions (Note 10.2)   (7,390)
Balance as of December 31, 2020   27,254
Acquisitions   14,269
Transfers to intangible assets (Note 19.3)   (3,398)
Transfers to accounts receivable - concessions (Note 10.2)   (8,310)
Balance as of December 31, 2021   29,815

 

 

11.3Transmission service concession contract

       
  Concession assets RBSE assets Total
Balance as of January 1, 2020 2,601,929 1,317,706   3,919,635
Realization of gains/losses in business combinations 722  -   722
Transfers to electricity grid use charges - customers   (312,120)   (266,027)  (578,147)
Transfers to property, plant and equipment   (613)  -  (613)
Transfers from litigations   (576)  -  (576)
Remuneration 489,438 291,669   781,107
Construction revenue 255,578  -   255,578
Construction income 4,217  -   4,217
Loss from inefficiency  (11.3.1)   (7,654)  -  (7,654)
Loss on disposal (23,687)  - (23,687)
Balance as of December 31, 2020 3,007,234 1,343,348   4,350,582
Realization of gains/losses in business combinations 722  -   722
Transfers to electricity grid use charges - customers   (315,358)   (250,520)  (565,878)
Transfers to property, plant and equipment   (1,483)  -  (1,483)
Transfers from litigations 3,376  -   3,376
Remuneration 621,366 242,872   864,238
Construction revenue 187,733  -   187,733
Construction income 3,097  -   3,097
Gain from efficiency  (11.3.1) 125,699  91,952   217,651
Balance as of December 31, 2021 3,632,386 1,427,652   5,060,038

 

11.3.1Gain (loss) due to efficiency or inefficiency in the implementation and operation of transmission infrastructure

In the construction and operation of the transmission infrastructure, possible positive or negative impacts are expected due to delays and additional costs due to environmental issues, variation in costs, mainly with cables and structures when indexed to foreign currency, additional easement costs and land negotiations, potential earthworks for unforeseen events, early maturity of commercial transactions and RAP revision/readjustment according to the regulatory standards and contractual provisions. Changes in the original project that affect its profitability are recognized directly in the statement of income when incurred, except for the part of RAP related to the operation and maintenance performance of the assets that is recognized as the services are performed.

In the year 2021, there was an estimated efficiency gain of R$217,651. The main impacts are described as follows:

• Gain of R$91,952 arising from the reprofiling of RBSE assets;

   
 F-45 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

• Gain of R$52,277 from the Periodic Tariff Review of contracts 010/2010 (LT Araraquara – Taubaté), 015/2010 (Cerquilho) and 006/2016 (LT Blumenau – Curitiba Leste);

• Gain of R$24,804 for the success of the partial claim by Copel GeT on the exclusion of liability related to contract 010/2010 (LT Araraquara – Taubaté), in which it was decided to extend 878 days from the end of the concession contract; and

• Efficiency gains in the construction of reinforcements and improvement in the amount of R$48,618 due to the construction cost being lower than expected.

 

11.3.2Assumptions adopted for the calculation of contract assets

         
.   12.31.2021   12.31.2020
  Concession assets RBSE assets Concession assets RBSE assets
Construction income 1.65% N/A 1.65% N/A
Operating and maintenance margin 1.65% N/A 1.65% N/A
Remuneration rate (a)  9.56% p.y.   9.54% p.y.   9.58% p.y.   9.54% p.y. 
Contract correction index  IPCA (b)   IPCA   IPCA (b)   IPCA 
Annual RAP, according to Homologatory Resolution   456,499   192,288   415,455   279,406
 (a) Average rate of contracts 
 (b) Contract 075/2001 - LT 230 kV Bateias - Jaguariaíva, from Copel GET, and contract 002/2005 - LT 525 kV Ivaiporã - Londrina, from Uirapuru, are adjusted by the IGPM. 

 

 

 

12.Other Receivables

  

   
  12.31.2021 12.31.2020
Fair value in the purchase and sale of power (Note 36.2.12)   855,775  689,531
Services in progress (a)   319,179  260,348
Bonus for voluntary consumption reduction (Note 7.4)   134,892 -
Credits on purchases of gas (12.1)  73,229  120,515
CDE Transfer (12.2)  68,999 60,433
Disposals and decommissioning in progress  42,509 36,855
Reimbursement of coal consumption values by CDE  33,107 28,657
Advance payments to employees    20,141 17,785
Advance payments to suppliers (b)  15,528 36,609
Tariff flag - CCRTB 9,892   7,194
Derivatives fair value - forward contract (Note 36.2.3 - b) 2,907 23,308
Advance for real estate indemnity 1,402 14,484
Other receivables  88,862 63,926
 Total Other receivables   1,666,422  1,359,645
Current   749,816  514,185
Noncurrent   916,606  845,460
CCRTB - Centralizing account of Tariff Flag Resources.
(a) This item refers to services currently in progress within the Company, most of which are related to the Research and Development and Energy Efficiency programs, which upon conclusion are offset against the respective liability recorded for this purpose.
(b) Advances to suppliers provided on contractual clauses.

 

12.1Credits on purchases of gas - Compagas

This balance refers to the gas acquisition of contracted and guaranteed volumes, higher than those actually withdrawn and used, and contains a future compensation clause. Compagas has the right to use and offset this gas over the term of the contract up to one year after the closure, currently established in December 2023. According to the contractual provisions and consumption perspectives, derived from the review of the projects

   
 F-46 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

and scenarios for the next years, Compagas estimates to fully offset the contracted volumes in the course of its operation. Contracts with Petrobras provide for the right to assign this asset. In accordance with contractual provisions and consumption perspectives, from the review of projects and scenarios for the coming years, the Company carried out a review of the estimated recoverable value of the ship or pay credit to be offset and recorded impairment, as shown in NE nº 33.4.

12.2CDE Transfer

Values ​​of the Energy Development Account - CDE to be transferred to the Company, to cover the tariff discounts on the tariffs, defined in Law 10,438/2002 and Decree 7,891/2013. The amount transferred for the period from June 2020 to May 2021, in accordance with Aneel Resolution 2,704/2020, was R$47,005 per month.

As of June 2021, the amount was changed to R$47,661 monthly (Aneel Ratifying Resolution 2,886/2021 of June 22, 2021), upon approval of the result of the last Annual Tariff Adjustment. This amount comprises R$2,643, which refers to previous differences and R$45,019 related to the forecast for the 2021-2022 cycle.

 

 

13.Taxes.............

 

13.1Deferred income tax and social contribution

 

                     
                     
        Recognized         Recognized   
  Balance as of Recognized Reclassi- comprehensive Balance as of Recognized    Reclassi- comprehensive Balance as of 
  January 1, 2020 in income fication (b) income December 31, 2020 in income Others (a) fication (b) income December 31, 2021
Noncurrent assets                    
Provisions for legal claims     516,752  (4,391) (12,986) -  499,375   7,291   - (2,205) -  504,461
Post-employment benefits   405,414   7,845   1,583 92,190  507,032  (766)   -   16,875   (93,881)  429,260
Impairment of assets   385,467 (45,146) (29,715) -  310,606  (6,456)   - (1,753) -  302,397
Research and development and energy efficiency programs   165,331 (12,833) - -  152,498 (13,649)   -   - -  138,849
Tax losses and negative tax basis  98,242   146,469 (29,322) -  215,389  54,416 (148,005)  1,210 -  123,010
Provisons for performance and  profit sharing  52,115   108,344 - -  160,459 (45,866)   -   - -  114,593
Expected credit losses   131,821  (6,889)  (1,750) -  123,182 (21,476)   - (2,994) - 98,712
Social security contributions - injunction on judicial deposit  71,200   2,745  (2,953) - 70,992   3,673   - 78 - 74,743
Amortization - concession  58,344 (11,135) - - 47,209   5,220   -   - - 52,429
Voluntary retirement program   958   9,857 - - 10,815  13,493   -   - - 24,308
Concession contracts  22,353  (1,292) - - 21,061  (1,292)   -   - - 19,769
Others   160,340  (3,850)  (6,828) -  149,662   1,457  1,062  5,905 -  158,086
    2,068,337   189,724 (81,971) 92,190  2,268,280  (3,955) (146,943)   17,116   (93,881)  2,040,617
(-) Noncurrent liabilities                    
Concession contracts   711,831   188,674 - -  900,505   808,372   94,221   - -  1,803,098
Deemed cost of property, plant and equipment   381,209 (30,718) - -  350,491 (23,994)   -   - -  326,497
Derivative financial instruments  70,945  46,737 - -  117,682 (12,178)   -   - -  105,504
Accelerated depreciation  50,322  25,633 - - 75,955  26,369   -   - -  102,324
Escrow deposits monetary variation  61,145   1,787  (1,205) - 61,727   3,392   -   - - 65,119
Transaction cost on borrowings and debentures  32,108  (6,867)  (2,038) - 23,203   4,833   -   - - 28,036
Others  42,577 (10,626) - - 31,951 (20,343)   -   - - 11,608
    1,350,137   214,620  (3,243) -  1,561,514   786,451   94,221   - -  2,442,186
Net   718,200 (24,896) (78,728) 92,190  706,766  (790,406) (241,164)   17,116   (93,881) (401,569)
Assets presented in the Statement of Financial Position   1,011,866        1,191,104          963,259
Liabilities presented in the Statement of Financial Position  (293,666)       (484,338)         (1,364,828)
(a) R$148,005 recognized in the Discontinued operation and R$94,221 related to the effects of the first consolidation of Vilas (Note 1.2).
(b) R$17,116 related to the reclassification to Assets classified as held for sale (Note 41).

 

13.1.1Projection for realization of deferred income tax and social contribution:

The projection of deferred tax credits realization recorded in noncurrent assets and liabilities is based on the realization period of each item of deferred assets and liabilities and tax losses, also based on projections of future results. These projections were evaluated by the Supervisory Board and approved by the Board of Directors on April 27, 2022.

   
 F-47 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The criteria used for the realization of each item are related to the predictability of realization of the main value that gave rise to the temporary difference. When the expectation of realization of the item is difficult to predict, mainly because it is not under the control of the Company, such as provisions for litigation, the Company adopts history of realization to project its future realization. The realization of the amounts of income tax and social contribution losses follow the potential compensation considering future profits and the limit defined by the legislation.

Following are the items that were the basis for the setup of the main credits, as well as their form of realization:

- Provisions for post-employment benefits: realized as the payments are made to the Fundação Copel or reversed according to new actuarial estimates;

- Provisions for legal claims: realized according to court decisions or by the reversal when the possible risk of the shares is reviewed;

- Impairment of assets: realized through the amortization and/or depreciation of the impaired asset;

- Provisions for R&D and PEE: realized through the expenses incurred in the projects carried out;

- Deemed cost: realized through the amortization and/or depreciation of the valued asset;

- Amounts related to the concession agreement: realized over the term of the agreement;

- Amounts related to tax losses and negative tax basis: recovered by offsetting against future taxable income;

- Other amounts: realized when they meet the deductibility criteria provided for in tax legislation, or upon reversal of the recorded amounts.

The projected realization of the deferred taxes is shown below:

     
  Assets  Liabilities 
2022   388,826  (161,407)
2023   144,103  (268,255)
2024   145,942  (273,502)
2025   105,389  (194,576)
2026 98,634  (167,543)
2027 to 2029   226,560  (419,476)
2030 to 2031   931,163  (957,427)
    2,040,617  (2,442,186)

 

13.1.2Unrecognized tax credits

As of December 31, 2021, Company did not recognize income tax and social contribution credits on income tax and social contribution tax losses in the amount of R$68,826 (R$131,655, as of December 31, 2020) for not having reasonable assurance of generation of future taxable profits sufficient to allow the utilization of these tax credits.

   
 F-48 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

13.2Other taxes recoverable and other tax obligations
     
     
  12.31.2021 12.31.2020
Current assets    
Recoverable ICMS (VAT)   111,101  89,942
Recoverable PIS/Pasep and Cofins taxes (a)   1,396,645   1,474,119
Other recoverable taxes   1,118   1,262
    1,508,864   1,565,323
Noncurrent assets    
Recoverable ICMS (VAT)   141,951  84,376
Recoverable PIS/Pasep and Cofins taxes (a)   2,967,756   4,421,403
Other recoverable taxes 33,839  33,719
    3,143,546   4,539,498
Current liabilities    
ICMS (VAT) payable     290,627   201,138
PIS/Pasep and Cofins payable 42,340   179,133
IRRF on interest on capital 33,592  43,950
Special Tax Regularization Program - Pert 52,168  50,565
Other taxes  22,206  15,822
    440,933   490,608
Noncurrent liabilities    
Social security contributions - injunction on judicial deposit   220,108   209,145
Special Tax Regularization Program - Pert   369,526   408,738
Other taxes    5,176   4,600
    594,810   622,483
(a) The balance contains amounts referring Pis and Cofins credit on ICMS (Note 13.2.1)

 

13.2.1Pis and Cofins credit on ICMS

Copel Distribuição

On August 12, 2009, Copel DIS filed for writ of mandamus No. 5032406-35.2013.404.7000 with the 3rd Federal Court of Curitiba applying for the granting of an order to stop including ICMS in the PIS and Cofins tax base, as well as to authorize it to proceed with the administrative offsetting of the amounts collected more than due for such social contributions in the last five years.

On June 16, 2020, a final unappealable ruling was handed down by the 2nd Panel of the Federal Regional Court of the 4th Region recognizing Copel DIS’s right to exclude from the PIS and Cofins tax base the full amount of ICMS included in the energy supply and distribution invoices. The ruling also recognized that the limitation period, in this case, is of five years and that, therefore, Copel has the right to recover the amounts that have been paid during the five years preceding the filing of the writ of mandamus until the date of the final unappealable ruling.

Considering the final and unappealable ruling, with a favorable decision for the Company, the entry of economic benefits became virtually certain and, therefore, the asset became realizable. In view of these, Copel DIS recognized the updated tax credit in assets, which will be recovered by offsetting against taxes payable within the statute of limitations period.

   
 F-49 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Additionally, with the assistance of the opinion of its legal counsel, the Company concluded to record the liability to be refunded to consumers for the last 10 years of the credit, as from the date of the unappealable ruling, considering the current legislation, the statute of limitations period defined in the civil code and the jurisprudence of the courts. The refund of PIS and Cofins credits to consumers awaits the conclusion of discussions with Aneel regarding compensation mechanisms and criteria, based on the effective compensation of tax credits, which began in June 2021 with authorizations from the Federal Revenue of Brazil of the credit originating from Cofins.

On February 09, 2021, Aneel opened a public consultation aimed at discussing how to return tax credits to consumers, as described in Note 30.2. Aneel’s proposal is the return of the amounts through a rebate in the electricity bill in each Tariff Cycle (credits with Federal Revenue of Brazil, plus any judicial deposits already received by the concessionaire/permissionaire), allocated according to its consumer class, with shares being defined for each of them at each billing cycle, so that their participation in monthly billing is taken into account. There was also no manifestation by Aneel regarding the statute of limitations for returning the credit to the consumer.

Also, on February 09, 2021, Aneel published Aneel Dispatch No. 361, establishing that, in exceptional situations, in which there is a possibility of a significant tariff increase, prior to the conclusion of a Public Consultation No. 005/2021, part of the PIS and Cofins credits may be utilized in offsetting the tariff increase, limited to 20% (twenty percent) of the total involved in lawsuits filed by distributors.

Considering Aneel Dispatch nº 361/2021, in tariffs readjusted as of June 24, 2021, by means of Ratifying Resolution No. 2,886, R$702,000 were used as a financial item, reducing consumer tariffs in the next twelve months. However, in the tariff process, the Company expressed the right to claim, if necessary, future tariff adjustments to equalize any financial differences observed between the amounts considered herein and the amounts effectively recovered from tax credits, as well as other rights it deems necessary.

On May 13th, 2021, the Supreme Court concluded the judgment of the opposing motion for clarification filed by the Federal Government in Extraordinary Appeal 574.706/PR, partially granting it in the following terms: (i) relating to ICMS excluded from the calculation basis of PIS/Cofins contributions, prevailed the detached ICMS method; and (ii) modulate the effects of the judgment whose production will take place after March 15, 2017, except for the judicial and administrative actions filed up to the date of the session in which the judgment is delivered. Therefore, the final decision on this matter did not impact the final and unappealable decision in favor of the Company, maintaining the treatment and amounts recorded.

The table below shows the impacts of these records on Copel’s statement of financial position and statement of income:

   
 F-50 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

     
  12.31.2021 12.31.2020
Tax credit - principal 2,949,943 3,620,118
Tax credit - monetary update 1,405,322 2,035,636
Effect on assets 4,355,265 5,655,754
     
Pis/Pasep and Cofins to be refunded to consumers   (3,905,398)   (3,805,985)
(-) Transfer to sectorial financial liabilities 578,603   -
Tax liabilities - Pis/Pasep and Cofins payable on financial income   -  (94,657)
Income tax and social contribution   -   (596,738)
Effect on liabilities   (3,326,795)   (4,497,380)
     
EFFECT ON STATEMENT OF FINANCIAL POSITION 1,028,470 1,158,374
     
Net operating revenue   - 810,563
Financial income, net of pis and cofins   21,640 944,549
Income tax and social contribution (7,358)   (596,738)
EFFECT ON THE INCOME STATEMENT   14,282 1,158,374

 

In addition, as mentioned above, in the Tariff Review process of Copel DIS of 06.24.2021, the amount of R$702,000 was transferred to the Sector Financial Liability account, of which R$578,603 referring to the portion of tax credits to be returned to the consumer and R$123,397 that were recorded in the PIS and Cofins account to be refunded to consumers. Part of this balance has already been amortized and the remainder will be paid up to June 2022, when this tariff cycle ends, as shown in Note 9.2.

Compagas

The balance contains the record resulting from the final and unappealable decision of the lawsuit records in which Compagas discussed the exclusion of ICMS from the PIS and Cofins calculation basis. Due to the favorable ruling, Compagas recorded, on September 2019, the credit right of R$107,453. Part of these credits has already been recovered, so that the adjusted balance at updated balance, on December 31, 2021, is R$75,192 (R$83,716 on December 31, 2020).

 

13.3Reconciliation of provision for income tax (IRPJ) and social contribution (CSLL)
       
  12.31.2021 12.31.2020 12.31.2019
Income before IRPJ and CSLL 5,118,677   5,119,537   2,846,923
IRPJ and CSLL (34%)   (1,740,350)  (1,740,643)  (967,954)
Tax effects on:      
Equity in income 124,547  65,806  36,297
Interest on own capital 226,928   276,808   222,848
Dividends 437   243   192
Non deductible expenses  (25,336) (17,133) (15,274)
Tax incentives   43,720  28,572  17,804
Unrecognized income and social contribution tax loss carry-forwards  (29,002) (39,421) (48,892)
Setting up and/or offset of income tax and social contribution      
  losses of prior years   85,723 -  -
Difference between the calculation bases of deemed profit and taxable profit   49,638   121,242  72,175
Others  4,063  19,161 7,143
Current IRPJ and CSLL   (469,226)  (1,260,469)  (416,687)
Deferred IRPJ and CSLL    (790,406) (24,896)  (258,974)
Effective rate - % 24.6% 25.1% 23.7%

 

 

   
 F-51 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

14.Prepaid Expenses

     
  12.31.2021 12.31.2020
Program  for incentive to alternative energy sources - Proinfa   35,837   22,408
Insurance premiums   17,692   14,453
Others 147 170
    53,676   37,031
Current   53,649   36,987
Noncurrent   27   44

 

 

 

15.Dividends Receivable
     
     
  12.31.2021 12.31.2020
Joint ventures    
Matrinchã   10,091   34,460
Guaraciaba   27,198   16,281
Other   30,761   15,828
    68,050   66,569
     
Associates and other temporary investments 112 497
  112 497
    68,162   67,066

 

 

 

16.Judicial Deposits

     
     
  12.31.2021 12.31.2020
Taxes claims (16.1) 405,739   346,659
Labor claims 106,376  72,263
.    
Civil claims    
Civil claims   53,438  57,006
Easements   18,407   7,156
Customers  3,867   3,479
    75,712  67,641
.    
Others  3,304   183
  591,131   486,746

 

16.1Tax judicial deposits

Of the balance, R$218,143 at December 31, 2021 (R$208,871 at December 31, 2020) refers to the challenge in court of the levy of social security contribution (INSS payable) on certain salary amounts. The liability is recorded under Other Tax Obligations, as mentioned in Note 13.2.

 

 

   
 F-52 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
17.Investments

17.1Changes in investments
               
  Balance as of   Investment/ Amorti- Dividends Other Balance as of 
  January 1, 2021 Equity AFAC zation and JSCP (a) December 31, 2021
Joint Ventures (17.3)              
Voltalia São Miguel do Gostoso I   107,721   1,269 - -  -  -  108,990
Voltalia São Miguel do Gostoso - authorization rights 9,671 - -  (367)  -  -   9,304
Caiuá  95,362  13,765 - -   (2,150)  -  106,977
Integração Maranhense   148,581  20,255 - -   (2,273)  -  166,563
Matrinchã   734,503  96,614 - - (19,346)  -  811,771
Guaraciaba   361,170  57,363 - - (10,918)  -  407,615
Paranaíba   203,681  35,112 - - (11,870)  -  226,923
Mata de Santa Genebra   661,430  63,173 - - (13,614)  -  710,989
Cantareira   359,686  53,492  30,870 -   (6,718)  -  437,330
Solar Paraná 6,831   104   100 -  -  -   7,035
    2,688,636   341,147  30,970  (367) (66,889)  -  2,993,497
Associates               
Dona Francisca Energética (17.4)  28,147   8,574 - -   (9,664)  - 27,057
Foz do Chopim Energética (17.4) 9,986  16,596 - -   (7,480)  - 19,102
Other 1,940   (3) - -  -  -   1,937
   40,073  25,167 - - (17,144)  - 48,096
Investment property   808 - -  (5)  -   (262)  541
    2,729,517   366,314  30,970  (372) (84,033)   (262)  3,042,134
(a) Transfer of assets destined for disposal.
AFAC - Advance for future capital increase
JSCP - Interest on capital

 

                 
  Balance as of   Investment/ Capital Amorti- Dividends Other Balance as of 
  January 1, 2020 Equity AFAC  decrease zation and JSCP (a) December 31, 2020
Joint Ventures (17.3)                
Voltalia São Miguel do Gostoso I   110,099 (2,378) - - -  - -  107,721
Voltalia São Miguel do Gostoso - authorization rights  10,038   - - -  (367)  - -   9,671
Caiuá  78,312 (8,964)  26,014 - -  - - 95,362
Integração Maranhense   138,716 13,672 - - -   (3,807) -  148,581
Matrinchã   711,527 25,644 - - -   (2,668) -  734,503
Guaraciaba   337,077 25,528 - - -   (1,435) -  361,170
Paranaíba   173,973 29,708 - - -  - -  203,681
Mata de Santa Genebra   573,357 48,594  39,479 - -  - -  661,430
Cantareira   338,268 42,666 - - - (21,248) -  359,686
Solar Paraná  - (115)   6,946 - -  - -   6,831
              -  
    2,471,367  174,355  72,439 -  (367) (29,158) -  2,688,636
Associates                 
Dona Francisca Energética (17.4)  28,423  9,674 - - -   (9,950) - 28,147
Foz do Chopim Energética (17.4)  12,175  9,629 - - - (11,818) -   9,986
Dominó Holdings   246   (93) - - -  -  (153) -
Other  10,155   (18) -  (228) -  -  (7,969)   1,940
   50,999 19,192 -  (228) - (21,768)  (8,122) 40,073
Investment property   813   - - -  (5)  - -  808
    2,523,179  193,547  72,439  (228)  (372) (50,926)  (8,122)  2,729,517
(a) R$7.969 of Impairment of Estação Osasco Desenvolvimento Imobiliário S.A., an associate of UEG Araucária, and R$153 of liquidation of Dominó.

   
 F-53 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
17.2Subsidiaries with non-controlling interests

17.2.1Summarized financial information
             
  Compagás  Elejor UEG Araucária
  12.31.2021 12.31.2020 12.31.2021 12.31.2020 12.31.2021 12.31.2020
             
 ASSETS  827,901 749,434 813,670 705,233   776,201   554,079
 Current assets  355,500 245,028 166,890 165,150   515,430   392,775
 Noncurrent assets  472,401 504,406 646,780 540,083   260,771   161,304
             
 LIABILITIES  827,901 749,434 813,670 705,233   776,201   554,079
 Current liabilities  220,216 173,144 107,772   95,465   221,853   309,265
 Noncurrent liabilities    99,784   81,230 746,843 596,278  13,771   6,603
 Equity  507,901 495,060  (40,945)   13,490   540,577   238,211
             
                   
  Compagás  Elejor UEG Araucária
  12.31.2021 12.31.2020 12.31.2019 12.31.2021 12.31.2020 12.31.2019 12.31.2021 12.31.2020 12.31.2019
 STATEMENT OF INCOME                   
 Net operating revenue  783,277 535,206 866,884 171,263 194,849 218,421   2,250,577   589,909   52,216
 Operating costs and expenses    (654,643)   (452,495)   (662,306)  (86,871)  (67,323)  (86,237)  (1,879,198)  (647,516)   (131,596)
 Financial results   9,817   (764)   43,186   (171,888)   (172,049)  (92,728)   8,952   203 832
 Equity in earnings of investees    -   -   -   -   -   - - - 916
 Income tax and social contribution   (38,860)  (22,967)  (74,791)   33,061   15,154  (13,331) (42,248) (19,920)  (22,703)
 Net income (loss)    99,591   58,980 172,973  (54,435)  (29,369)   26,125   338,083 (77,324)   (100,335)
 Other comprehensive income  294   (343) (1,277)   -   -   - -  (205) 132
 Total comprehensive income     99,885   58,637 171,696  (54,435)  (29,369)   26,125   338,083 (77,529)   (100,203)
                   
 STATEMENTS OF CASH FLOWS                   
 Cash flows from operating activities  178,800 101,708   54,760 127,510   22,097   51,839   312,676  23,491  (57,585)
 Cash flows from investing activities   (14,273)  (17,120)  (17,531)  (31,095)   (208)   (314) (14,579)   1,317 (1,945)
 Cash flows from financing activities   (64,545)   (115,625)   14,312   - (8,151)  (56,533) (64,331)  32,879   45,133
                   
 TOTAL EFFECTS ON CASH AND CASH EQUIVALENTS    99,982  (31,037)   51,541   96,415   13,738 (5,008)   233,766  57,687  (14,397)
 Cash and cash equivalents at the beginning of the year  110,659 141,696   90,155   51,616   37,878   42,886  64,806   7,119   21,516
 Cash and cash equivalents at the end of the year  210,641 110,659 141,696 148,031   51,616   37,878   298,572  64,806  7,119
 CHANGE IN CASH AND CASH EQUIVALENTS     99,982  (31,037)   51,541   96,415   13,738 (5,008)   233,766  57,687  (14,397)

 

The loss recorded at Elejor is due to the monetary update on Accounts payable related to concession, which increased significantly as a result of the IGPM increase, as shown in Note 27.

   
 F-54 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

17.2.2Changes in equity attributable to non-controlling shareholders
         
Participation in capital stock Compagás
49%
Elejor
30%
UEG Araucária 18,8% Total
Balance as of January 1, 2019 212,962 16,193 74,134 303,289
Net income (loss) 84,758 7,838 (19,673) 72,923
Other comprehensive income (626) - 25 (601)
Additional dividends proposed - (3,335) - (3,335)
Dividends (23,514) (7,838) - (31,352)
Gain with interest variation in Subsidiary - - 4,874 4,874
Balance as of December 31, 2019   273,580 12,858 59,360   345,798
Net income (loss)  28,898  (8,812)   (14,538)   5,548
Other comprehensive income  (168) - (39)  (207)
Additional dividends proposed (51,799) - - (51,799)
Dividends  (7,933) - -  (7,933)
Balance as of December 31, 2020   242,578   4,046 44,783   291,407
Net income (loss)  48,800   (16,331) 63,560  96,029
Other comprehensive income   144 - -   144
Dividends (42,653) -  (6,716) (49,369)
Balance as of December 31, 2021   248,869   (12,285)   101,627   338,211

 

17.3Summarized information on the main joint ventures
                 
                 
Balance as of December 31, 2021 Voltalia Caiuá  Integração Maranhense Matrinchã Guaraciaba Paranaíba Mata de Santa Genebra Cantareira
ASSETS   224,632   284,870   515,495   2,610,094   1,413,231   1,829,340   3,203,892   1,715,776
Current assets   3,711  30,304  65,219   367,428   194,283   193,190   681,494   196,424
Cash and cash equivalents   3,667   6,117  16,501  96,346  70,543  32,665   387,027  52,354
Other current assets  44  24,187  48,718   271,082   123,740   160,525   294,467   144,070
Noncurrent assets   220,921   254,566   450,276   2,242,666   1,218,948   1,636,150   2,522,398   1,519,352
.                
LIABILITIES   224,632   284,870   515,495   2,610,094   1,413,231   1,829,340   3,203,892   1,715,776
Current liabilities   2,206  14,562  53,132   126,211   101,042  85,964   123,884  78,982
Financial liabilities -   7,386  13,169  91,811  34,529  51,453  45,898  52,397
Other current liabilities   2,206   7,176  39,963  34,400  66,513  34,511  77,986  26,585
Noncurrent liabilities -  51,986   122,438   827,205   480,320   817,159   1,660,867   744,285
Financial liabilities -  35,606  52,653   685,525   428,314   522,289   1,630,306   456,180
Other noncurrent liabilities -  16,380  69,785   141,680  52,006   294,870  30,561   288,105
Equity   222,426   218,322   339,925   1,656,678   831,869   926,217   1,419,141   892,509
.                
STATEMENT OF INCOME                
Net operating revenue -  43,128  71,868   396,622   229,117   285,483   426,573   233,888
Operating costs and expenses (64)  (5,609) (10,508) (24,341)  (7,185) (17,537) (72,970) (24,727)
Financial results   162  (2,348)  (3,954) (83,280) (44,131) (62,138)  (162,110) (43,794)
Equity in income of subsidiaries   2,506 - - - - - - -
Income tax and social contribution (17)  (7,078) (16,072) (91,830) (60,617) (62,638) (65,399) (56,201)
Net income (loss)   2,587  28,093  41,334   197,171   117,184   143,170   126,094   109,166
Other comprehensive income - - - - - - - -
Total comprehensive income    2,587  28,093  41,334   197,171   117,184   143,170   126,094   109,166
.                
Investment interest - %  49.0  49.0  49.0  49.0  49.0  24.5  50.1  49.0
Investment book value    108,990   106,977   166,563   811,771   407,615   226,923   710,989   437,330

   
 F-55 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

                 
                 
  Voltalia Caiuá  Integração Maranhense Matrinchã Guaraciaba Paranaíba Mata de Santa Genebra Cantareira
Balance as of December 31, 2020
.                
ASSETS   222,038   267,425   475,734   2,357,028   1,269,378   1,687,613   2,712,737   1,567,577
Current assets   3,623  31,048  59,709   261,168   165,063   179,229   340,382   165,816
Cash and cash equivalents   3,579   6,871  12,696  46,198  25,565  20,820  61,171  34,435
Other current assets  44  24,177  47,013   214,970   139,498   158,409   279,211   131,381
Noncurrent assets   218,415   236,377   416,025   2,095,860   1,104,315   1,508,384   2,372,355   1,401,761
.                
LIABILITIES   222,038   267,425   475,734   2,357,028   1,269,378   1,687,613   2,712,737   1,567,577
Current liabilities   2,199  18,995  51,926   192,512  86,163  78,981   158,350  63,206
Financial liabilities -   7,392  13,180  80,141  28,741  62,143   104,308  41,314
Other current liabilities   2,199  11,603  38,746   112,371  57,422  16,838  54,042  21,892
Noncurrent liabilities -  53,816   120,579   665,528   446,133   777,279   1,234,165   770,317
Financial liabilities -  42,864  65,624   612,413   446,801   545,200   1,215,988   489,784
Other noncurrent liabilities -  10,952  54,955  53,115  (668)   232,079  18,177   280,533
Equity   219,839   194,614   303,229   1,498,988   737,082   831,353   1,320,222   734,054
.                
STATEMENT OF INCOME                
Net operating revenue -  17,927  31,418   328,171   109,978   478,147   364,070   196,039
Operating costs and expenses (66) (34,584)  11,706  (160,795)  (8,317) (18,801)  (125,569) (23,533)
Financial results  32  (3,389)  (5,229) (71,164) (38,883) (48,184) (91,947) (40,630)
Equity in income of subsidiaries  (4,893) - - - - - - -
Income tax and social contribution -   1,752  (9,991) (30,178) (22,084)  (125,646) (49,560) (44,805)
Net income (loss)  (4,927) (18,294)  27,904  66,034  40,694   285,516  96,994  87,071
Other comprehensive income - - - - - - - -
Total comprehensive income   (4,927) (18,294)  27,904  66,034  40,694   285,516  96,994  87,071
.                
Investment interest - %  49.0  49.0  49.0  49.0  49.0  24.5  50.1  49.0
Investment book value    107,721  95,362   148,581   734,503   361,170   203,681   661,430   359,686

 

                 
                 
  Voltalia Caiuá  Integração Maranhense Matrinchã Guaraciaba Paranaíba Mata de Santa Genebra Cantareira
Balance as of December 31, 2019
STATEMENT OF INCOME                
Net operating revenue -  25,180  44,264   250,188   111,912   198,573   357,522   138,259
Operating costs and expenses  (111)  (5,481)  (5,672) (70,886) (29,067) (30,560)  (384,228)  (5,360)
Financial results   146  (4,557)  (6,594) (59,794) (42,548) (54,154) (99,186) (46,190)
Equity in income of subsidiaries  (7,080) - - - - - - -
Income tax and social contribution   (5)  (5,348)  (8,904) (33,103)  (2,926) (47,024)  42,627 (29,498)
Net income (loss)  (7,050)   9,794  23,094  86,405  37,371  66,835 (83,265)  57,211
Other comprehensive income - - - - - - - -
Total comprehensive income   (7,050)   9,794  23,094  86,405  37,371  66,835 (83,265)  57,211

 

On December 31, 2021, Copel’s interest in contingent liabilities classified as a possible loss in its joint ventures is equivalent to R$250,262 (R$227,467 on December 31, 2020), of which the amount of R$187,243 (R$187,183 on December 31, 2020) refers to Mata de Santa Genebra.

   
 F-56 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

17.4Summarized information of the main associates
         
         
  Dona Francisca Foz do Chopim
   12.31.2021   12.31.2020   12.31.2021   12.31.2020 
.        
ASSETS   180,425   128,798  55,900  62,635
Current assets  13,570  14,562  13,308  33,378
Noncurrent assets   166,855   114,236  42,592  29,257
.        
LIABILITIES   180,425   128,798  55,900  62,635
Current liabilities  19,938 4,452 2,495  34,723
Noncurrent liabilities  42,988 2,119  -  -
Equity   117,499   122,227  53,405  27,912
Investment interest - % 23.03 23.03 35.77 35.77
Investment book value 27,057 28,147 19,102 9,986

 

.            
  Dona Francisca Foz do Chopim
   12.31.2021   12.31.2020   12.31.2019   12.31.2021   12.31.2020   12.31.2019 
STATEMENT OF INCOME            
Net operating revenue  66,797  70,314  70,717  60,943  55,740  56,929
Operating costs and expenses (26,605) (26,171) (25,957) (10,775) (21,260) (16,278)
Financial income (expense)   (664) 208 475   (1,703)   (5,527) 621
Income tax and social contribution   (2,298)   (2,343)   (2,454)   (2,060)   (2,035)   (2,346)
Net income   37,230  42,008  42,781  46,405  26,918  38,926
Other comprehensive income  -  -  -  -  -  -
Total comprehensive income   37,230  42,008  42,781  46,405  26,918  38,926

 

As of December 31, 2021, Copel’s interest in the contingent liabilities of its associates is equivalent to R$2,166 (R$1,428 as of December 31, 2020).

 

   
 F-57 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

18.Property, Plant and Equipment
18.1Property, plant and equipment by asset class

             
    Accumulated     Accumulated  
  Cost depreciation 12.31.2021 Cost depreciation 12.31.2020
In service            
Reservoirs, dams and aqueducts  8,161,702 (4,776,639)  3,385,063  8,081,989 (4,600,598)   3,481,391
Machinery and equipment  8,409,689 (2,840,114)  5,569,575  7,644,171 (2,619,939)   5,024,232
Buildings  1,993,695 (1,125,862)  867,833  1,968,591 (1,096,016)   872,575
Land  508,164  (49,046)  459,118  490,177  (38,269)   451,908
Vehicles and aircraft 33,871  (32,756)  1,115 44,617  (42,725)   1,892
Furniture and fixtures 16,400  (10,966)  5,434 22,314  (15,498)   6,816
(-) Impairment (18.4) (710,509)   - (710,509) (925,521)   -  (925,521)
(-) Impairment Copel TEL   -   -   -   (27,928)   - (27,928)
(-) Special Obligations (792)  290 (502) (332) 81  (251)
    18,412,220 (8,835,093)  9,577,127   17,298,078 (8,412,964)   8,885,114
             
In progress            
Cost  752,846   -  752,846  734,507   -   734,507
(-) Impairment (18.4) (187,382)   - (187,382) (120,308)   -  (120,308)
(-) Impairment Copel TEL   -   -   - (3,853)   -  (3,853)
   565,464   -  565,464  610,346   -   610,346
    18,977,684 (8,835,093)   10,142,591   17,908,424 (8,412,964)   9,495,460

 

18.2Changes in property, plant and equipment

 
                 
  Balance as of
January 1, 2021
Additions /
Impairment
Depreciation Loss on
disposal
Transfers  Effects of acquisition
of Vilas Complex 
(Note 1.2)
Copel
Telecom
Disposal (Note 41)
Balance as of
December 31, 2021
In service                
Reservoirs, dams and aqueducts   3,481,391  -   (174,810)   2,147   76,335 -  -  3,385,063
Machinery and equipment   5,647,220  -   (375,430)   (26,345) 174,615   754,557  (605,042)  5,569,575
Buildings   872,575  -  (38,629)  (506)   35,060 -  (667)  867,833
Land   451,908  -  (10,777)  (763)   18,848 - (98)  459,118
Vehicles and aircraft 1,892  -   (835)   (68)  134 -   (8)   1,115
Furniture and fixtures 6,816  - (1,079)   (46)  1,562 -   (1,819)   5,434
(-) Impairment (18.4)  (925,521)   215,012   - -   - -  - (710,509)
(-) Impairment Copel TEL (27,928) 1,989   - -   - -  25,939 -
(-) Special Obligations  (251)  -   89 - (340) -  - (502)
(-) Reclassification (a)  (622,988)  -   - -   41,293 -   581,695 -
    8,885,114   217,001   (601,471)   (25,581) 347,507   754,557  -  9,577,127
In progress                
Cost   795,816   406,173   -   (42,655)   (335,975) - (70,513)  752,846
(-) Impairment (18.4)  (120,308) (67,074)   - -   - -  - (187,382)
(-) Impairment Copel TEL   (3,853) 3,103   - -   - -   750 -
(-) Reclassification (a) (61,309)  -   - - (8,454) -  69,763 -
    610,346   342,202   -   (42,655)   (344,429) -  -  565,464
    9,495,460   559,203   (601,471)   (68,236)  3,078   754,557  - 10,142,591
(a) Reclassification to Assets classified as held for sale (Note 41).          

 

   
 F-58 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
             
             
  Balance as of Additions /
Impairment
  Loss on   Balance as of 
  January 1, 2020 Depreciation disposal Transfers December 31, 2020
In service            
Reservoirs, dams and aqueducts   3,676,692   -   (195,062)   -   (239)  3,481,391
Machinery and equipment   6,003,890   -   (431,088)   (86,550) 160,968  5,647,220
Buildings   908,024   -  (42,593)   (83) 7,227  872,575
Land   462,420   -  (10,617)  (2) 107  451,908
Vehicles and aircraft 3,084   - (1,171) (123) 102   1,892
Furniture and tools 7,949   - (1,559) (238) 664   6,816
(-) Impairment (18.5)  (961,177)   35,656   -   -  - (925,521)
(-) Impairment Copel TEL (81,322)   53,394   -   -  -   (27,928)
(-) Special Obligations (43)   -   46   -   (254) (251)
(-) Reclassification (a)  -   -   -   -   (622,988) (622,988)
   10,019,517   89,050   (682,044)   (86,996)   (454,413)  8,885,114
In progress            
Cost   700,172 273,823   - (8,126)   (170,053)  795,816
(-) Impairment (18.5)  (122,261)  1,953   -   -  - (120,308)
(-) Impairment Copel TEL   (5,325)  1,472   -   -  -  (3,853)
(-) Reclassification (a)  -   -   -   - (61,309)   (61,309)
    572,586 277,248   - (8,126)   (231,362)  610,346
   10,592,103 366,298   (682,044)   (95,122)   (685,775)  9,495,460
(a) Reclassification to Assets classified as held for sale (Note 41).        

 

 

18.3Joint operations - consortiums

The amounts recorded under property, plant and equipment referring to share of interest of Copel GeT in consortiums are show below:

 

         
  Share Annual average     
Joint operations  Copel GeT (%) depreciation rate  (%) 12.31.2021 12.31.2020
HPP Gov. Jayme Canet Júnior (Mauá) - Consórcio        
Energético Cruzeiro do Sul 51.0      
In service      859,926  859,917
(-) Accumulated depreciation   3.43 (263,792) (235,454)
In progress     20,527 24,827
       616,661  649,290
HPP Baixo Iguaçu 30.0      
In service      692,395  691,833
(-) Accumulated depreciation   3.29   (64,519)   (41,803)
In progress       56,027 50,114
       683,903  700,144
       1,300,564  1,349,434

 

18.4Impairment of generation segment assets

Cash-generating units of the generation segment were tested for impairment based on previous evidence of impairment, assumptions representing the best estimates of the Company’s management, the methodology provided for in IAS 36 and measurement of value in use.

The calculation of the value in use was based on discounted operating cash flows over the time of concessions, maintaining the Company’s current commercial conditions. The rate used to discount the cash flows was set and updated considering the WACC (Weighted Average Cost of Capital) methodology and CAPM (Capital Asset Pricing Model) methodology for the generation business, considering usual market parameters.

   
 F-59 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Internal references such as the budget approved by the Company, historical or past data, updating of the timeframe of work and amount of investments for projects in course support the design of key assumptions by Company Management. In the same framework, external references such as level of consumption of electric power and the availability of water resources support the key information about estimated cash flows. In particular, 2020 and 2021 proved to be atypical years in terms of growth of the economic activity in the country and in the world, due to the Covid-19 pandemic and, consequently, due to measures to contain it, which directly had an impact on trade, industry and services.

A number of assumptions used by Company Management when determining future cash flows can be affected by uncertain events, which, in turn, may give rise to variation in results. Changes in the political and economic model, for example, may lead to upward trend when projecting country risk-rating, increasing the discount rates used in tests.

The tests considered the following key assumptions:

·Growth compatible with historical data and perspective for the Brazilian economy growth;
·Updating specific after-tax discount rates for the segment tested, obtained through the methodology usually applied by the market, taking into consideration the weighted average cost of capital;
·Projected revenue in accordance with the agreements in force and future market expectations, without any expectation for renewal of concession/authorization;
·Expenses broken into cash generating units, projected in view of the budget approved by the Company;
·Updating of regulatory charges.

The Company considered all its generation projects as independent cash generating units.

The projects with impairment balances recorded at December 31, 2021 are the following:

 

         
  Property, Plant and Equipment   Value in use
  Cost  Depreciation Impairment 
HPP Colíder   2,489,116 (259,065) (639,529) 1,590,522
Consórcio Tapajós (a) 14,879 -   (14,879)  -
Power plants in Paraná   1,024,841 (109,524) (243,483) 671,834
    3,528,836 (368,589) (897,891) 2,262,356
(a) Project under development        

 

   
 F-60 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The table below shows the changes in the impairment for the year:

Schedule of impairment of property plant and equipment 

           
  Balance as of 

Impairment /

Reversal

Balance as of 

Impairment /

Reversal

Balance as of 
  January 1, 2020 December 31, 2020 December 31, 2021
In service          
UHE Colíder  (777,294)   94,101 (683,193)   43,664 (639,529)
Wind power complex Cutia (54,104)   54,104 -   - -
UEGA  -   (138,777) (138,777) 138,777 -
Power plants in Paraná   (129,779)   26,228 (103,551)   32,571   (70,980)
   (961,177)   35,656 (925,521) 215,012 (710,509)
In progress          
Consórcio Tapajós (14,464)   -   (14,464) (415)   (14,879)
Power plants in Paraná   (107,797)  1,953 (105,844)  (66,659) (172,503)
   (122,261)  1,953 (120,308)  (67,074) (187,382)
   (1,083,438)   37,609 (1,045,829) 147,938 (897,891)

 

18.4.1UHE Colíder

In December 2021, the calculation of value in use took into account the Company’s assumptions and budgets and the discount rate after taxes of 5.77% p.a. (in 2020, 5.70% p.a.), which derives from the WACC methodology for the electricity generation segment. The revision in the expected sale of uncontracted energy offset the increase in operating costs and regulatory charges, reflecting the partial reversal of the impairment balance recognized in prior periods.

18.4.2Wind farms

In December 2021, the calculation of value in use of wind power assets took into account the Company’s assumptions and budgets and the discount rate after taxes of 7.65% p.a. (in 2020, 7.08% p.a.) which derives from the WACC methodology for the electric power generation segment, adjusted for the specific taxation condition of the projects. In particular, for the test of the Vilas Wind Complex, acquired at the end of 2021, the after-tax discount rate of 5.46% p.a. was adopted according to the financing contracted before the acquisition. Based on the calculations of the wind farms, it was verified that these assets are recoverable and that, therefore, there is no need to recognize impairment.

18.4.3UEG Araucária

In December2021, the calculation of the value in use considered the Company’s assumptions and budgets, change of dispatch assumptions, updated of variable cost per unit (CVU) and discount rate after taxes by 7.69% p.a. (in 2020, 7.87% p.a.), which derive from the WACC methodology for the electricity generation segment, plus additional risk associated with revenue variation. By reviewing the assumptions, the impairment recognized in previous periods were fully reversed, mainly in view of the increase in plant’s demand as a result of the unfavorable hydrological conditions associated with the ONS operating policy to guarantee energy supply, including the restoration of the hydroelectric plant’s reservoirs, which makes the UEG Araucária dispatch assumptions take place in a longer period than predicted in previous projections.

   
 F-61 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
18.4.4Figueira Thermoelectric Plant

In December 2021, the calculation of the value in use considered the Company’s assumptions and budgets, the discount rate after taxes of 5.77% p.a. (in 2020, 5.70% p.a.), which derives from the WACC methodology for the electric power generation segment, the postponement of the start of the operation to April 2022 (in 2020 it was considered July 2021), changes in operating costs and remaining investment, review of the coal contract and review of the CCEE subsidy for the plant. By reviewing the set of assumptions, additional impairment was recognized in the period.

18.4.5Other plants in Paraná:

In December 2021, the calculation of the value in use of generation assets in the State of Paraná considered the Company’s assumptions and budgets, the discount rate after taxes at 5.77% p.a. (in 2020, 5.70% p.a.), which derives from the WACC methodology for the electric power generation segment, and the review of regulatory charges and operating costs that were offset by the review of the expected sale of uncontracted energy. By reviewing the set of assumptions, part of the impairment recognized in previous periods was reversed.

18.4.6Cash-generating units that have no impairment

Plants that have no impairment have recoverable amount higher than the carrying amount of property, plant and equipment on December 31, 2021. The following table shows the percentage by which the recoverable amount (“RA”) exceeds the carrying amount (“CA”) of generation assets and also demonstrates the sensitivity analysis, increasing the discount rate by 5% and 10% to assess the risk of impairment of each plant.

   
 F-62 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

           
Cash-generating units Discount   RA/CA-1  RA/CA-1  Impairment
Risk
rate RA/CA-1 (5% Variation) (10% Variation)
Wind power Assets          
São Bento Complex (a) 7.65% 80.49% 75.81% 71.34%  -
Brisa I Complex  (b) 7.65% 71.34% 66.64% 62.15%  -
Brisa II Complex  (c) 7.65% 63.44% 58.25% 53.33%  -
Bento Miguel Complex (d) 7.65% 22.66% 18.74% 15.03%  -
Cutia Complex (e) 7.65% 16.56% 13.14% 9.89%  -
Jandaíra Complex (f) 7.65% 43.93% 36.66% 29.86%  -
Vilas Complex (g) 5.46% 46.30% 41.61% 37.15%  -
Thermal Assets          
UEG Araucária 7.69% 43.69% 41.11% 38.60%  -
Hydric Assets          
Foz do Areia 5.77% 56.43% 55.65% 54.88%  -
Segredo 5.77% 117.89% 114.23% 110.66%  -
Caxias 5.77% 101.02% 97.38% 93.84%  -
Guaricana 5.77% 27.39% 26.01% 24.66%  -
Chaminé 5.77% 51.69% 50.02% 48.37%  -
Apucaraninha 5.77% 35.88% 34.46% 33.06%  -
Chopim I 5.77% 0.00% 25.08% 21.87%  -
Mauá 5.77% 92.51% 87.73% 83.13%  -
Marumbi 5.77% 30.74% 27.70% 24.78%  -
Cavernoso 5.77% 269.53% 261.06% 252.82%  -
Cavernoso II 5.77% 18.04% 14.95% 11.99%  -
Bela Vista 7.65% 40.42% 35.24% 30.37%  -
Elejor 6.00% 15.27% 13.16% 11.11%  -
(a) Contemplates the GE Boa Vista, GE Farol, GE Olho D’Água e GE São Bento do Norte wind farms.
(b) Contemplates the  Nova Asa Branca I, Nova Asa Branca II, Nova Asa Branca III e Nova Eurus IV wind farms.
(c) Contemplates the  Santa Maria, Santa Helena e Ventos de Santo Uriel wind farms.
(d) Contemplates the São Bento do Norte I, São Bento do Norte II, São Bento do Norte III, São Miguel I, São Miguel II and  GE São Miguel III wind farms.
(e) Contemplates the Cutia, Guajiru, Jangada, Maria Helena, Potiguar, Esperança e Paraíso dos Ventos wind farms.
(f) Contemplates the Jandaíra I, Jandaíra II, Jandaíra III e Jandaíra IV wind farms.
(g) Contemplates the Potiguar B61, Potiguar B141, Potiguar B142, Potiguar B143 e Ventos de Vila Paraíba IV wind farms.

 

 

18.5New plants under construction
18.5.1SHPP Bela Vista

With estimated investment of R$224,673, this small hydroelectric power plant (SHPP), with installed capacity of 29.81 MW and physical guarantee of 18.4 MW average, was built on the Chopim River, in the municipalities of São João and Verê, located in the southwest region of the State of Paraná.

The participation in the A-6 auction held on August 31, 2018 led to sale of 14.7 MW average in regulated contracts at the original price of R$195.70/MWh. The energy sale contracts provide for beginning of energy supply on January 1, 2024, with a 30-year term and annual adjustment by reference to IPCA variation.

The works started in August 2019, with the entry into commercial operation of the first and second and third generation units on June 12, 2021, July 10, 2021 and August 15, 2021 respectively. The entry into commercial operation of the fourth unit is scheduled for the first half of 2022.

   
 F-63 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
18.5.2Jandaíra Wind Complex

With estimated investment of R$411,610 this wind farm, with installed capacity of 90.1 MW and physical guarantee of 47.6 MW average, is being built in the municipalities of Pedra Preta and Jandaíra, in the Rio Grande do Norte State.

The participation in the new power generation auction A-6, held on October 18, 2019, led to sale of 14.4 MW average in regulated contracts at the original price of R$98.00/MWh. The energy sale contracts provided for beginning of energy supply on January 1, 2025, with a 20-year term and annual adjustment by reference to IPCA variation.

In all, 26 wind turbines will be installed, divided into four wind farms, and a substation and a 16 km transmission line will also be built next to the farms to drain the electricity to be generated for the National Interconnected System - SIN.

With all the necessary licenses in place, civil works began in the first week of January 2021, and the wind farm is expected to start operating between May and July 2022, on a phased basis, by wind turbine.

   
 F-64 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
18.6Depreciation rates

       
       
Depreciation rates (%)   12.31.2021   12.31.2020   12.31.2019 
Average generation segment rates (Note 18.8.1)      
General equipment   6.25   6.26   6.33
Machinery and equipment   3.68   3.39   3.67
Generations   3.42   3.73   3.38
Reservoirs, dams and ducts   2.56   2.68   2.50
Hydraulic turbines   2.90   2.93   0.29
Gas and steam turbines   -   2.00   2.00
Water cooling and treatment   4.00   4.00   4.00
Gas conditioner   4.00   4.00   4.00
Wind power plant unit   4.98   4.94   5.49
Buildings   3.15   3.15   -
Average rates for central government assets      
Buildings   3.33   3.35   3.35
Machinery and office equipment   6.27   6.25   6.25
Furniture and fixtures   6.30   6.25   6.25
Vehicles 14.29 14.29 14.29

 

In 2021, the Company’s Management reassessed the estimated useful lives of assets in the generation segment, mainly for the effects of the hydrological risk renegotiation - GSF (Note 1 - b). The changes were treated prospectively as of October 2021, including the depreciation quota for this year, together with the amortization of the intangible asset recognized on September 30, 2021, in the amount of R$50,880. Additionally, they will include, on average, the amounts of R$203,517 in 2022, R$205,180 in 2023, R$210,098 in 2024, and R$82,725 from 2025 to 2033.

18.6.1Assets with depreciation rates limited to the concession term

The assets of the original project of the Mauá, Colíder, Baixo Iguaçu, Cavernoso II and SHPP Bela Vista plants, of Copel GeT, and of the Santa Clara and Fundão plants, of Elejor, are considered by the Granting Authority, without full guarantee of indemnification for their residual value at the end of the concession term. This interpretation is based on the Concessions Law No. 8,987/1995 and Decree No. 2,003/1996, which regulate the generation of electricity by independent generators. Accordingly, from the entry into operation of these assets, including land, depreciation is recognized at the highest rate among that determined by the useful lives of the assets or the rate calculated based on the concession period.

As provided for in the concession contracts, subsequent investments not foreseen in the original project, as long as approved by the Granting Authority and not yet amortized, will be indemnified at the end of the concession period and depreciated at the rates established by the useful lives of the assets, as from the date of their entry in operation.

 

   
 F-65 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

19.Intangible assets

     
  12.31.2021 12.31.2020
Concession agreement - distribution of electricity (19.1)   6,596,184   6,203,387
Generation concession agreements/ authorization (19.2)   2,473,858  553,840
Concession agreement - piped gas distribution (19.3) 96,145  132,366
Others (19.4) 49,373 39,863
    9,215,560   6,929,456

 

Management did not identify evidence that would justify the need to recognize impairment of intangible assets in 2021 and 2020.

 

19.1Power distribution service concession
       
       
 

Intangible

asset in service

Special

liabilities in service

Total 
 
Balance as of January 1, 2020   8,487,265   (2,783,579)   5,703,686
Transfers from accounts receivable - concessions (Note 10.1)  99  -  99
Transfers from contract assets (Note 11.1)   1,016,482  (105,116)   911,366
Transfers to other receivables   (1,372)  -  (1,372)
Amortization of quotas - concession (a)  (485,677)   138,596  (347,081)
Amortization of quotas - PIS/Pasep and Cofins credits (10,655)  -   (10,655)
Loss on disposal (52,656)  -   (52,656)
Balance as of December 31, 2020   8,953,486   (2,750,099)   6,203,387
Transfers from accounts receivable - concessions (Note 10.1)  -   (8,385)  (8,385)
Transfers from contract assets (Note 11.1)   943,905  (122,346)   821,559
Transfers to other receivables   (3,563)  -  (3,563)
Quotas amortization  - concession (a)  (522,525)   146,697  (375,828)
Quotas amortization - PIS/Pasep and Cofins credits (10,363)  -   (10,363)
Loss on disposal (30,623)  -   (30,623)
Balance as of December 31, 2021   9,330,317   (2,734,133)   6,596,184
(a) Amortization during the concession period after the transfer to intangible assets in service of useful life of the assets, whichever the lower.

 

The balance refers to the portion of infrastructure that will be used during concession, net of special liabilities. The special liabilities represent the resources related to the financial participation of consumers, the Federal, State and Municipal Governments, destined to investments in projects related to the concession, and are not onerous liabilities or shareholder credits.

   
 F-66 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

19.2Generation concession agreements
    Concession contract (a) Concession and authorization  
  in service  in progress rights/ goodwill  Total 
Balance as of January 1, 2020  209,467  -  373,204  582,671
ANEEL grant - use of public property   - 3,682   -  3,682
Amortization of quotas - concession and authorization (b)  (17,527)  -   (14,986)  (32,513)
Capitalizations for intangible in service  3,682   (3,682)   -  
Balance as of December 31, 2020  195,622  -  358,218  553,840
Effect of acquisition of control of Vilas Complex (Note 1.2)   -  -  277,120  277,120
Goodwill arising from the business combination - Vilas Complex (Note 1.2)   -  - 94,221   94,221
ANEEL grant - use of public property   63,446 1,823   -   65,269
Qutoas amortization - concession and authorization (b)  (72,148)  -   (14,987)  (87,135)
Capitalizations for intangible in service  1,823   (1,823)   -   -
Hydrological Risk Renegotiation - GSF - Note 1-b  1,570,543  -   -  1,570,543
Balance as of December 31, 2021  1,759,286  -  714,572  2,473,858
(a) Includes the balances of use of public asset and hydrological risk renegotiation
(b) Amortization during the concession/authorization as of the start of commercial operations of the enterprises.

 

19.3Piped gas distribution service concession
   
  Total 
Balance as of January 1, 2020  -
Transfers from accounts receivable - concessions (Note 10.2)   154,483
Transfers from contract assets (Note 11.2) 7,277
Amortization of quotas - concession (29,243)
Loss on disposal  (151)
Balance as of December 31, 2020   132,366
Transfers from contract assets (Note 11.2) 3,398
Transfers from accounts receivable - concessions (Note 10.2)   (1,398)
Quotas amortization  - concession (38,221)
Balance as of December 31, 2021  96,145

 

The publication of Complementary Law 205/2017 brought a new interpretation regarding the expiration date of the Compagas concession, which generated a practice adjustment between the accounting records at Compagas, which maintained the expiration date provided for in the concession agreement as a basis, in 2024, and at Copel, which now considers the expiration date provided for by law, in 2019, as the basis for accounting. As of Complementary Law 227/2020, which determined that the expiration date should be in 2024, the difference generated by the practice adjustment made since December 2017 is recorded in intangible assets and will be amortized until the end of the concession.

   
 F-67 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

19.4Other intangible assets
       
  in service  in progress Total 
Balance as of January 1, 2020  31,620  14,634 46,254
Acquisitions   128  10,863 10,991
Transfers from property, plant and equipment   229 2,932   3,161
Capitalizations for intangible in service   7,136   (7,136) -
Amortization quotas (a) (11,584)  -   (11,584)
Amortization quotas - PIS/Pasep and Cofins credits (13)  - (13)
Loss on disposal -   (4)  (4)
(-) Reclassification (b)  (8,307)   (635)  (8,942)
Balance as of December 31, 2020  19,209  20,654 39,863
Effect of acquisition of control of Vilas Complex  10,275  - 10,275
Acquisitions -  10,375 10,375
Transfers from property, plant and equipment   986 482   1,468
Capitalizations for intangible in service   4,453   (4,453) -
Amortization quotas (a)  (7,770)  -  (7,770)
Amortization quotas - PIS/Pasep and Cofins credits   (5)  -  (5)
Partial division of assets  (5,047)   (526)  (5,573)
(-) Reclassification (b)   141 599   740
Balance as of December 31, 2021  22,242  27,131 49,373
(a) Annual amortization rate: 20%.
(b) Reclassification to Assets classified as held for sale (Note 41).

 

 

 

20.Payroll, Social Charges and Accruals

     
  12.31.2021 12.31.2020
Social security liabilities    
Taxes and social contribution    46,245 42,748
Social security charges on paid vacation and 13th salary   17,792 29,742
    64,037 72,490
Labor liabilities    
Vacation 107,471  100,175
Provisons for performance and  profit sharing 364,701  483,110
Voluntary dismissal program   68,601 28,071
Other liabilities   -  200
  540,773  611,556
  604,810  684,046

 

 

 

 

21.Accounts Payable to Suppliers

     
  12.31.2021 12.31.2020
Energy supplies   1,303,386   1,393,899
Materials and supplies   770,629   671,458
Natural gas for resale  60,121 38,574
Charges for use of grid system   576,848   332,521
    2,710,984   2,436,452
Current   2,585,735   2,291,307
Noncurrent   125,249   145,145

 

   
 F-68 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

22.Loans and Financing

                         
                Contractual Effective   12.31.2021 12.31.2020
        Issue Number of  Final Payment financial interest Contract
Contracts Company Allocation Guarantees Date installment maturity of charges  charges p.y. rate p.y. amount
FOREIGN CURRENCY                         
 National Treasury Department (STN - Secretaria do Tesouro Nacional)                        
Par Bond Copel Debt negotiation Guarantees deposited  (22.1).  05.20.1998  1 04.11.2024 Half-yearly 6.0% + 0.20% 6.0% + 0.20% 17,315   89,058   82,933
Discount Bond 05.20.1998 1 04.11.2024 Half-yearly 1.0625% + 0.20% 1.0625% + 0.20% 12,082   61,514   57,404
Total foreign currency                      150,572 140,337
LOCAL CURRENCY                         
Banco do Brasil                        
CCB 306.401.381 (a) Copel HOL Working capital. Credit assignment 07.21.2015 2 03.25.2023 Quarterly 135.00% of DI 145.46% of DI  640,005 641,207 640,177
                      641,207 640,177
Caixa Econômica Federal                        
415.855-22/14  Copel DIS Rural Electricity Program - Luz para Todos. Own revenue; issue of promissory notes and commercial duplicates. 03.31.2015 120 12.08.2026 Monthly 6.0% 6.0% 16,984  9,580   11,496
3153-352 Acquisition of machinery, equipment and IT and automation equipment. Assignment of trade notes receivable. 11.01.2016 36 12.15.2021 Monthly 5.5 % above TJLP 5.5 % above TJLP  1,156   - 165
                       9,580   11,661
Banco do Nordeste do Brasil                        
35202166127989 Jandaíra I Implementation of Jandaíra complex wind. Bank guarantee 05.31.2021 192 06.15.2038 Monthly 2.7086% + IPCA (1) 3.0107% + IPCA 21,687  7,312   -
35202164527986 Jandaíra II 05.31.2021 192 06.15.2038 Monthly 2.7086% + IPCA (1) 3.0107% + IPCA 56,421   18,424   -
35202162927987 Jandaíra III 05.31.2021 192 06.15.2038 Monthly 2.7086% + IPCA (1) 3.0107% + IPCA 65,158   21,645   -
35202160027984 Jandaíra IV 05.31.2021 192 06.15.2038 Monthly 2.7086% + IPCA (1) 3.0107% + IPCA 65,421   22,058   -
35201915725525 Potiguar B141 Implementation of Vilas complex wind. Fiduciary assignment of credit rights; fiduciary assignment of rights under the O&M contract; fiduciary assignment of rights arising from the authorization; pledge of shares; fiduciary alienation of project machinery and equipment; 100% bank guarantee; fiduciary assignment of the Debt Service Reserve Accounts; fiduciary assignment of the operating reserve account (O&M); Shareholder support agreement 04.04.2019 216 04.15.2039 Monthly IPCA + 2.3323% p.y. IPCA + 2.3323% p.y. 92,138   94,781   -
35201922425522 Potiguar B142 04.04.2019 216 04.15.2039 Monthly IPCA + 2.3323% p.y. IPCA + 2.3323% p.y. 92,213   94,809   -
35201926525533 Potiguar B143 04.11.2019 216 04.15.2039 Monthly IPCA + 2.3323% p.y. IPCA + 2.3323% p.y. 92,138   94,453   -
35201910625534 Ventos de Vila Paraíba IV 04.18.2019 216 05.15.2039 Monthly IPCA + 2.3323% p.y. IPCA + 2.3323% p.y. 92,138   96,237   -
352020148727169 Potiguar B61 08.11.2020 216 08.15.2040 Monthly IPCA + 1.4865% p.y. IPCA + 1.4865% p.y.  163,886 176,324   -
                      626,043   -
Banco do Brasil - BNDES Transfer                        
21/02000-0 Copel GeT Implementation of Mauá HPP. Revenue from energy sales from the plant. 04.16.2009 179 01.15.2028 Monthly 2.13% above TJLP 2.13% above TJLP  169,500   72,109   83,936
                        72,109   83,936
(a) Debt renegotiated in March 2021, with changes in the amortization dates and the amount of financial charges.
(1) - IPCA used in the calculation of interest and not in updating the principal.
(continued)

 

   
 F-69 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

                         
                Contractual Effective   12.31.2021 12.31.2020
        Issue Number of  Final Payment financial interest Contract
Contracts Company Allocation Guarantees Date installment maturity of charges  charges p.y. rate p.y. amount
BNDES                        
820989.1  Copel GeT Implementation of Mauá HPP. Revenue from energy sales from the plant. 03.17.2009 179 01.15.2028 Monthly 1.63% above TJLP 1.63% above TJLP   169,500   72,109   83,935
1120952.1 Implementation of transmission line between Foz do Iguaçu and Cascavel Oeste substations. Assignment of receivables; revenue from energy transmission services. 12.16.2011 168 04.15.2026 Monthly 1.82% and 1.42% above TJLP 1.82% and 1.42% above TJLP  44,723   14,431   17,756
1220768.1  Implementation of Cavernoso II SHP. Revenue from energy sales from the plant. 09.28.2012 192 07.15.2029 Monthly 1.36% above TJLP 1.36% above TJLP  73,122   36,593   41,405
13211061 Implementation of Colíder HPP. Assignment of receivables 12.04.2013 192 10.15.2031 Monthly 0% and 1.49% above TJLP 6.43% and 7.68% 1,041,155  680,413  748,083
13210331 Implementation of Cerquilho III substation. 12.03.2013 168 08.15.2028 Monthly 1.49% and 1.89% above TJLP 1.49% and 1.89% above TJLP  17,644  8,758   10,069
15206041 Implementation of transmission line Assis - Paraguaçu Paulista II. 12.28.2015 168 06.15.2030 Monthly 2.42% above TJLP 9.04%  34,265   18,151   20,280
15205921 Implementation of transmission lines Londrina - Figueira and Salto Osório - Foz do Chopim. 12.28.2015 168 12.15.2029 Monthly 2.32% above TJLP 8.93%  21,584   10,822   12,171
18205101 Implementation of Baixo Iguaçu HPP. 11.22.2018 192 06.15.2035 Monthly 1.94% above TJLP 8.5%   194,000  171,447  184,087
19207901- A+B+E+F+G+H Implementation of transmission facilities for the line: substation Medianeira; substation Curitiba Centro and Curitiba Uberaba and substation Andirá Leste.  06.03.2020 279 12.15.2043 Monthly IPCA + 4.8165% IPCA + 4.8570%   206,882  185,532  158,351
19207901- C+D+I+J Implementation of transmission facilities for the line: transmission line Curitiba Leste - Blumenal and Baixo Iguaçu - Realeza.  06.03.2020 267 12.15.2043 Monthly  IPCA + 4.8165%   IPCA + 4.8570%    225,230  162,773  110,699
14205611-A  Copel DIS Preservation of business, improvements, operating support and general investments in the expansion and consolidation of projects and social investment programs of companies (ISE). Surety of Copel; assignment of revenues and indemnity rights under the concession. 12.15.2014 72 01.15.2021 Monthly 2.09% above TJLP 8.37%  41,583   -  585
14205611-B  12.15.2014 6 02.15.2021 Annual 2.09 above TR BNDES 2.09 above TR BNDES  17,821   -  4,329
14205611-C  12.15.2014 113 06.15.2024 Monthly 6.0% 6.0%  78,921   19,595   27,434
14205611-D 12.15.2014 57 02.15.2021 Monthly TJLP TJLP 750   -  2
14.2.1271.1 Santa Maria Construction and implementation of wind generating plants. Surety of Copel; pledge of shares; assignment of receivables and revenues. 06.01.2015 192 08.15.2031 Monthly 1.66% above TJLP 8.26%  71,676   37,771   41,665
14.2.1272.1 Santa Helena 06.01.2015 192 08.15.2031 Monthly 1.66% above TJLP 8.26%  82,973   40,983   45,208
11211521 GE Farol Pledge of shares; assignment of receivables from energy sales from the project; assignment of machinery and equipment.
03.19.2012 192 06.15.2030 Monthly 2.34% above TJLP 2.34% above TJLP  54,100   33,570   37,470
11211531 GE Boa Vista 03.19.2012 192 06.15.2030 Monthly 2.34% above TJLP 2.34% above TJLP  40,050   24,818   27,701
11211541 GE S.B. do Norte 03.19.2012 192 06.15.2030 Monthly 2.34% above TJLP 2.34% above TJLP  90,900   56,287   62,824
11211551 GE Olho D’Água 03.19.2012 192 06.15.2030 Monthly 2.34% above TJLP 2.34% above TJLP  97,000   60,113   67,096
18204611 Cutia Pledge of shares; assignment of receivables. 10.10.2018 192 07.15.2035 Monthly 2.04% above TJLP 8.37%   619,405  563,569  588,169
13212221 - A Costa Oeste Implementation of transmission line between Cascavel Oeste and Umuarama Sul substations and implementation of Umuarama Sul substation. Assignment of receivables; 100% of pledged shares. 12.03.2013 168 11.30.2028 Monthly 1.95% + TJLP 1.95% + TJLP  27,634   14,898   17,046
13212221 - B 12.03.2013 106 09.30.2023 Monthly 3.5% 3.5% 9,086  1,396  2,194
14205851 - A Marumbi Implementation of transmission line between Curitiba and Curitiba Leste and implementation of Curitiba Leste substation. 07.08.2014 168 06.30.2029 Monthly 2.00% + TJLP 2.00% + TJLP  33,460   19,444   22,029
14205851 - B 07.08.2014 106 04.30.2024 Monthly 6.0% 6.0%  21,577  5,285  7,550
                       2,238,758  2,338,138
Total local currency                      3,587,697  3,073,912
                     Gross debt   3,738,269  3,214,249
              (-) Transaction cost  (59,825)  (25,718)
                    Net debt  3,678,444  3,188,531
                     Current   579,770  717,677
                     Noncurrent   3,098,674  2,470,854
DI - Interbank Deposit Rate
IPCA - Inflation Index (Índice Nacional de Preços ao Consumidor Amplo, in Portuguese)

   
 F-70 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
22.1Collateral and Escrow deposits– STN

Recognition of guarantees, in the form of a cash guarantee, Par Bond, in the amount of R$84,163 (R$78,764 at December 31, 2020), and Discount Bond, in the amount of R$58,601 (R$54,757 at December 31, 2020) intended to the repayment of the amount of principal related to the STN contracts, upon maturity on April 11, 2024. The amounts are adjusted by applying the weighted average of the percentage changes of the Zero Coupon Bond prices of the United States of America Treasury, by the percentage share of each series of the instrument in the portfolio of collateral for repayment of principal, recognized pursuant to the Brazilian Financing Plan of 1992. According to Note 15.2, the loan was paid on March 10, 2022.

 

22.2Breakdown of loans and financing by currency and index
           
    12.31.2021  % 12.31.2020  %
Foreign currency - change in currencies in the period (%)        
U.S. Dollar 7.39  150,572   4.09  140,337   4.40
     150,572   4.09  140,337   4.40
Local currency - indexes at period end (%)          
TJLP 5.32   1,916,561 52.11   2,090,340 65.56
CDI 9.15  639,555 17.39  638,431 20.02
IPCA 10.06  935,900 25.44  270,749   8.49
Without indexer (annual fixed rate) - 35,856   0.97 48,674   1.53
      3,527,872 95.91   3,048,194 95.60
      3,678,444   100.00   3,188,531   100.00

 

22.3Maturity of noncurrent installments

       
12.31.2021 Gross debt (-) Transaction cost Net debt
2023  565,417  (3,852)  561,565
2024  391,018  (3,554)  387,464
2025  239,612  (3,550)  236,062
2026  240,120  (3,553)  236,567
2027  240,037  (3,552)  236,485
After 2027   1,477,704   (37,173)   1,440,531
    3,153,908   (55,234)   3,098,674

   
 F-71 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
22.4Changes in loans and financing

 

       
  Foreign currency  Local currency  Total 
Balance as of January 1, 2020   108,983   3,033,400   3,142,383
Funding  -   263,000   263,000
Charges   6,928   176,337   183,265
Monetary and exchange variations  31,189   5,869 37,058
Amortization - principal  -  (253,700)  (253,700)
Payment - charges   (6,763)  (176,712)  (183,475)
Balance as of December 31, 2020   140,337   3,048,194   3,188,531
Effect of acquisition of control of Vilas Complex  -   514,272   514,272
Funding  -   134,313   134,313
(-) Transaction costs  -  (1,647)  (1,647)
Charges   6,218   191,398   197,616
Monetary and exchange variations  10,266  31,091 41,357
Amortization - principal  -  (202,577)  (202,577)
Payment - charges   (6,249)  (187,172)  (193,421)
Balance as of December 31, 2021   150,572   3,527,872   3,678,444

 

22.5Covenants

The Company signed loans and financing agreements containing covenants that require economic and financial ratios to be maintained within pre-determined parameters, requiring annual fulfillment and other conditions to be complied with, such as not changing the Company’s interest in the capital stock of subsidiaries that would represent change of control without prior consent. Failing to fulfill these conditions may lead to accelerated debt repayment and/or fines.

As of December 31, 2021, all ratios and covenants have been fully met.

The financial covenants contained in the agreements are presented below:

       
Company Contract Annual financial ratios Limit
Copel GeT BNDES Finem No. 820989.1 - Mauá EBITDA /  Net financial results  ≥ 1.3
Banco do Brasil No. 21/02000-0 - Mauá
Copel DIS BNDES Finem No. 14205611 Financial indebtedness / adjusted EBITIDA ≤ 4.0
Santa Maria BNDES Finem No. 14212711 Debt service coverage ratio ≥ 1.3
Santa Helena BNDES Finem No. 14212721
São Bento Energia, Investimento e Participações BNDES Assignment Agreement Debt service coverage ratio ≥ 1.3
GE Boa Vista S.A. BNDES Finem No. 11211531
GE Farol S.A. BNDES Finem No. 11211521
GE Olho D´Água S.A. BNDES Finem No. 11211551
GE São Bento do Norte S.A. BNDES Finem No. 11211541
Cutia BNDES Finem No. 18204611 Debt service coverage ratio (a) ≥ 1.2
Costa Oeste BNDES Finem No. 13212221 Debt service coverage ratio ≥ 1.3
Marumbi BNDES Finem No. 14205851 Debt service coverage ratio ≥ 1.3
Financing for businesses - Finem
(a) financial ratio calculated based on the amounts of the consolidated financial statements of Cutia Empreendimentos Eólicos S.A.

 

   
 F-72 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

23.Debentures

Schedule of debentures

                           
                           
                  Contractual Effective   12.31.2021 12.31.2020
          Issue Number of  Final Payment financial interest Contract
Company Issue Characteristics Allocation Guarantees Date installment maturity of charges  charges p.y. rate p.y. amount
Copel 7th  (a) Working capital or used to make investments in the issuer. Personal guarantee 01.19.2018 2 01.19.2021 Half-yearly 119.0% of DI 125.18% of DI   600,000   -   303,101
8th Payment of the 6th issue of debentures and working capital increase 06.14.2019 1 06.14.2022 Half-yearly 106.0% of DI 110.93% of DI   500,000   502,400   500,475
Copel GeT 3rd  (a) Working capital or used to make investments in the issuer. Personal guarantee 10.20.2017 3 10.20.2022 Half-yearly 126.0% of  DI 131.21% of DI   1,000,000   339,767   669,811
4th  Full early redemption of the 4th issue of the Company’s trade promissory notes and partial payment of the 1st amortization installment of the 2nd issue of debentures. 07.23.2018 3 07.23.2023 Half-yearly 126.0% of  DI 133.77% of DI   1,000,000   690,311   1,010,625
5th  (b) Reimbursement of expenses related to the construction of the Transmission Lines Araraquara II - Taubaté, Assis - Londrina and Foz do Chopim. 09.25.2018 5 09.15.2025 Half-yearly IPCA + 7.6475% IPCA+ 8.3295%   290,000   284,483   322,110
6th (1st serie) (c) Full early redemption of the 5th issue of the Company’s trade promissory notes and partial payment of the 2nd amortization installment of the 2nd issue of debentures. 07.15.2019 2 07.15.2024 Half-yearly 109.0% of DI 111.25% of DI   800,000   825,358   807,793
6th (2nd serie) Reimbursement of expenses related to the Colíder HPP and Baixo Iguaçu HPP projects 07.15.2019 1 07.15.2025 Half-yearly IPCA + 3.90% IPCA+ 4.46%   200,000   237,650   215,265
7th (1nd serie) Reinforcement of the Issuer’s working capital; and (ii) the amortization and/or reimbursement of cash, of the principal portion of the debentures of each of the following issues of the Issuer: (a) 3rd (third) issue of the Issuer and (b) 4th (fourth) issue of the Issuer . 10.15.2021 2 10.15.2026 Half-yearly DI + spread 1.38% DI + spread 1.45%   1,133,363   1,148,216   -
7th (2nd serie) Investments for expansion, renovation or improvement and/or reimbursement of expenses within the scope of the Projects: Improvements of Usina Gov. Bento Munhoz da Rocha Netto; Implementation of the Assets of Lot “E”, from Aneel Auction No. 05/2015; Investments in Mata de Santa Genebra Transmissão S.A. and Bela Vista Geração de Energia S.A. 10.15.2021 3 10.15.2031 Half-yearly IPCA + 5.7138% p.y. IPCA + 6.1033% p.y.   366,637   374,658   -
Copel DIS 3rd  (a) Working capital or used to make investments in the issuer. Personal guarantee 10.20.2017 2 10.20.2022 Half-yearly 126.0% of DI 130.85% of DI   500,000   254,824   502,358
4th  Working capital and payment of the 1st installment of amortization of the 2nd issue of debentures. 09.27.2018 3 09.27.2023 Half-yearly DI + spread 2.70% CDI + 3.96%   1,000,000   684,185   1,011,796
5th (1st serie) (c) Investment for expansion, renovation or improvement and reimbursement of expenses of the Issuer’s electricity distribution network linked to concession contract No. 46/1999 of ANEEL. 11.15.2019 3 11.15.2027 Half-yearly IPCA + 4.20% IPCA+ 4.61%   500,000   584,489   529,349
5th (2nd serie) Reinforcement of working capital and recomposition of cash by the final amortization of the 2nd issue of debentures. 11.15.2019 2 11.15.2022 Half-yearly DI + spread 1.45% CDI + 1.65%   350,000   177,187   351,479
6th (1nd serie) Reinforcement of working capital and recomposition of cash by the final amortization of the 2nd issue of debentures. 06.16.2021 2 06.15.2026 Half-yearly CDI + spread 1.95% CDI + 2.02%   1,000,000   1,005,102   -
6th (2nd serie) Reinforcement of working capital and recomposition of cash by the final amortization of the 2nd issue of debentures. 06.16.2021 3 06.15.2031 Half-yearly IPCA + 4.7742% IPCA + 5.1564%   500,000   529,366   -
Brisa Potiguar 2nd (1st serie) (d) Implementation of wind generating plants. Real and personal guarantee and pledge of Copel GeT shares. 03.24.2016 192 07.15.2032 Monthly TJLP + 2.02% TJLP + 2.02%   147,575   100,240   109,677
2nd (2nd serie) 03.24.2016 192 07.15.2032 Monthly IPCA + 9.87% IPCA+ 10.92%   153,258   131,630   130,449
Cutia 1st  (b) Construction and implementation of wind generating plants. Personal guarantee 03.20.2019 26 12.15.2031 Half-yearly IPCA +  5.8813% IPCA+ 6.83%   360,000   370,903   353,166
Compagás 2nd (e) Fund investment plan of the issuer. Floating 04.15.2016 54 12.15.2021 Quarterly TJLP + 2.17% TJLP + 2.17%  33,620   - 3,000
  0     SELIC + 2.17% SELIC + 2.17%   -   - 2,890
3rd  (f) Issuer’s investment plan fund. Real 12.17.2019 18 06.28.2021 Monthly DI + spread 0.88 5.68%  43,000   -  14,475
                       Gross debt    8,240,769   6,837,819
                      (-) Transaction cost   (93,152)   (80,338)
                      Net debt   8,147,617   6,757,481
                       Current    2,144,485   1,881,411
                       Noncurrent    6,003,132   4,876,070
(a) Simple debentures, single series, not convertible into shares, unsecured, for public distribution with restricted placement efforts, according to CVM No. 476. Guarantor: Copel. Trustee: Pentágono S.A. DTVM.
(b) Simple debentures, single series, not convertible into shares, with security interest and additional personal guarantee, for public distribution with restricted efforts, pursuant to CVM Instruction No. 476. Guarantor: Copel. Trustee: Pentágono S.A. DTVM.
(c) Simple debentures, two series, not convertible into shares, unsecured, for public distribution with restricted placement efforts, according to CVM No. 476. Guarantor: Copel. Trustee: Pentágono S.A. DTVM.
(d) Simple debentures, two series, not convertible into shares, issued privately. Companies: Nova Asa Branca I, Nova Asa Branca II, Nova Asa Branca III, Nova Eurus e Ventos de Santo Uriel. Guarantor: Copel. They have no trustee. 
(e) Simple registered debentures, single series, with private issue and exclusive placement by BNDESPAR. Guarantor: Compagás. Trustee: BNDES Participações S.A. BNDESPAR.
(f) Simple and registered debentures, with a single series, in private issue, with public distribution of restricted efforts. Guarantor: Compagás. Trustee: Simplific Pavarini DTVM Ltda.

 

   
 F-73 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
23.1Maturity of noncurrent installments
       
12.31.2021 Gross debt (-) Transaction cost Net debt
2023  1,183,452   (16,356)  1,167,096
2024  514,671   (11,296)  503,375
2025  1,617,055  (9,610)  1,607,445
2026  1,324,561  (7,473)  1,317,088
2027  253,651  (6,328)  247,323
After 2027  1,179,645   (18,840)  1,160,805
   6,073,035   (69,903)  6,003,132

 

23.2Changes in debentures

   
Balance as of January 1, 2020   8,429,710
Charges and monetary variations   453,951
Amortization - principal  (1,046,295)
Payment - charges  (422,295)
Reclassification (a)   (657,590)
Balance as of December 31, 2020   6,757,481
Funding   3,000,000
(-) Transaction costs (35,030)
Charges and monetary variations   658,653
Amortization - principal  (1,852,048)
Payment - charges  (361,073)
Reclassification (a)  (20,366)
Balance as of December 31, 2021   8,147,617
(a) Reclassification to Assets classified as held for sale (Note 41).

 

 

23.3Covenants

Copel issued debentures containing covenants that require the maintenance of certain economic and financial ratios within pre-determined parameters, requiring annual fulfillment and other conditions to be complied with, such as not changing the Company’s interest in the capital stock that would represent change of control without prior consent from the debenture holders; not paying out dividends or interest on capital if it is in arrears in relation to honoring any of its financial obligations or not maintaining the financial ratios as determined without prior written consent of the debenture holders. Failing to fulfill these conditions may lead to accelerated redemption of debentures and regulatory penalties.

As of December 31, 2021, all ratios and covenants have been fully met.

   
 F-74 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The financial covenants contained in the debenture agreements are presented as follows:

 

       
Company Contract Annual financial ratio Limit
Copel 7th issue of Debentures Consolidated net debt / Consolidated EBITDA
Debt service coverage ratio
≤  3.5
≥ 1.5
8th issue of Debentures
Copel GeT 3rd issue of Debentures
4th issue of Debentures
5th issue of Debentures
6th issue of Debentures
7th issue of Debentures
Copel DIS 3rd issue of Debentures
4th issue of Debentures
5th issue of Debentures
6th issue of Debentures
Nova Asa Branca I    Debt service coverage ratio ≥ 1.3
Nova Asa Branca II   
Nova Asa Branca III  2nd issue of Debentures
Nova Eurus IV  
Ventos de Santo Uriel   
Cutia 1st issue of Debentures Debt service coverage ratio (a) ≥ 1.2
(a) financial ratio calculated based on the amounts of the consolidated financial statements of Cutia Empreendimentos Eólicos S.A.

 

 

 

24.Post-employment Benefits

The Company sponsors private retirement and pension plans (Unified Plan and Plan III) and Healthcare Plan for medical and dental care ("ProSaúde II" and "ProSaúde III" Plans) for their active employees and their legal dependents. The lifetime sponsorship of the Healthcare Plan for retirees, pensioners and legal dependents is only applied to "Prosaúde II" plan participants. Fundação Copel de Previdência e Assistência is the entity that manages these plans.

24.1Pension plan

The Unified Plan is a Defined Benefit plan - BD in which the income is predetermined, according to each individual’s salary. This plan is closed for new participants since 1998.

The Plan III is a Variable Contribution plan - CV, being the only plan available for new participants.

24.2Healthcare Plan

The Company allocate resources for the coverage of healthcare expenses incurred by their employees and their dependents, within rules, limits and conditions set in "ProSaúde II" and "ProSaúde III" Plans’ regulations. Coverage includes periodic medical exams in both plans and is extended to all retirees and pensioners for life only in the "ProSaúde II" plan.

   
 F-75 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
24.3Statement of financial position and statement of income

Amounts recognized in liabilities, under Post-employment benefits, are summarized below:

 

     
  12.31.2021 12.31.2020
Pension plans   965   1,124
Healthcare plans   1,294,209   1,492,490
    1,295,174   1,493,614
Current  68,836  69,231
Noncurrent   1,226,338   1,424,383

 

Amounts recognized in the statement of income are shown below:

 

       
  12.31.2021 12.31.2020 12.31.2019
Employees      
Pension plans   59,052   57,977   60,754
Healthcare plan - post employment  116,504   94,349   99,577
Healthcare plan - active employees    71,795   75,192   76,454
  247,351 227,518 236,785
Management      
Pension plans  1,300 977  1,450
Healthcare plan 122 139   91
   1,422  1,116  1,541
  248,773 228,634 238,326

 

 

24.4Changes in post-employment benefits

   
Balance as of January 1, 2020   1,194,936
Appropriation of actuarial calculation   94,349
Appropriation of pension and healthcare contributions   130,129
Adjustment related to actuarial loss   271,343
Amortizations  (197,143)
Balance as of December 31, 2020 1,493,614
Appropriation of actuarial calculation    116,504
Appropriation of pension and healthcare contributions   130,308
Adjustment related to actuarial gains (loss)  (246,626)
Amortizations  (198,626)
Balance as of December 31, 2021   1,295,174

 

24.5Actuarial valuation in accordance with IAS 19
24.5.1Actuarial assumptions

The actuarial assumptions used to determine the amounts of liabilities and costs for 2021 and 2020 are shown below:

   
 F-76 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

         
         
    2021   2020
  Real  Nominal  Real  Nominal 
Economic        
Inflation p.y. - 5.50% - 4.00%
Expected rate of discount/return p.y.        
Unified Plan - Defined Benefit 5.20% 10.99% 2.85% 6.96%
Unified Plan - Balance 5.20% 10.99% 3.20% 7.33%
Plan III 5.30% 11.09% 3.40% 7.54%
Assistance Plan 5.30% 11.09% 3.20% 7.33%
Salary growth/medical costs        
Unified Plan p.y. 0.00% 5.50% 0.00% 4.00%
Plan III p.y. 1.00% 6.56% 1.00% 5.04%
Assistance Plan - Aging Factor 5.80% - 4.60% -
Demographic        
Mortality Table    AT - 2000     AT - 2000 
Mortality table of individuals with permanent disability    WINKLEVOSS     WINKLEVOSS 
Table of new disability benef it vested    TASA 1927     TASA 1927 

 

 

24.5.2Number of participants and beneficiaries

             
  Social Security Plans  
  Unified Plan Plan III Assistance Plan
  12.31.2021 12.31.2020 12.31.2021 12.31.2020 12.31.2021 12.31.2020
Number of active participants   18   22  6,645  7,401  6,276  6,546
Number of Inactive participants  4,229  4,274  5,018  4,646  8,910  9,032
Number of dependent people   -   -   -   -   21,621   21,716
 Total   4,247  4,296   11,663   12,047   36,807   37,294

 

 

24.5.3Life expectancy after the average age of participants - Annuity Table AT-2000 (in years)

The average age of inactive participants of the healthcare and pension plans of the Company is 67.85 and 67.54 years, respectively.

 

     
     
  Unified Plan Plan III
As of December 31, 2021    
Retired participants 11.60   23.47
Pensioner participants 13.22   27.02
As of December 31, 2020    
Retired participants 12.38   23.16
Pensioner participants 14.07   24.98

 

24.5.4Actuarial evaluation

Based on the revision of the assumptions, the amounts of the Unified Plan and Plan III as of December 31, 2021 totaled surplus of R$653,654 and R$10,111 (R$807,444 and R$285,057, respectively as of December 31, 2020). Applicable ruling legislation does not allow any significant reduction in contributions or refunds to the Company based on the current surplus of these plans. For this reason, the Company did not record assets in its balance sheet as of December 31, 2021, reflecting any right to reduce contributions, refund of surplus or other amounts.

 

   
 F-77 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
           
  Unified
 Plan
Plan
 III
Assistance
 Plan
12.31.2021 12.31.2020
Total liabilities or partially covered 6,145,601 3,337,093   1,491,118 10,973,812 11,820,184
Fair value of the plan assets   (6,799,255)   (3,347,204)  (196,909)   (10,343,368)   (11,420,196)
Plan coverage status   (653,654)  (10,111)   1,294,209   630,444   399,988
Unrecognized asset 653,654   10,111 -   663,765   1,092,501
   -  -   1,294,209   1,294,209   1,492,489

 

The Company adjusted their assistance liabilities through the actuarial report issued on December 31, 2021, as presented in the Statements of Comprehensive Income.

 

24.5.5Changes in actuarial liabilities

       
  Unified Plan Plan III Assistance Plan
Present value of net actuarial obligations as of January 1, 2020   6,638,462   3,046,536   1,389,610
Cost of services   578   2,018 20,854
Cost of interest   405,371   183,866 85,561
Benefits paid  (456,151)  (203,342) (74)
Actuarial (gain) losses   172,564   315,645   218,686
Present value of net actuarial obligations as of December 31, 2020   6,760,824   3,344,723   1,714,637
Cost of services   252   2,006   7,368
Cost of interest   481,656   246,256   125,132
Benefits paid  (511,621)  (233,908) -
Actuarial (gain) losses  (585,510)   (21,984)  (356,019)
Present value of net actuarial obligations as of December 31, 2021   6,145,601   3,337,093   1,491,118

 

 

24.5.6Changes in actuarial assets

       
  Unified Plan Plan III Assistance Plan
Fair value of the Plan’s assets as of January 1, 2020   7,546,756   3,137,754  196,211
Return estimated for assets   607,252  224,591   16,474
Contributions and distributions  23,919  136,708   -
Benefits paid  (456,151) (203,341)   -
Actuarial gain (losses)  (153,508)  334,068  9,463
Fair value of the Plan’s assets as of December 31, 2020   7,568,268   3,629,780  222,148
Return estimated for assets   837,120  133,837  6,366
Contributions and distributions  26,661  136,730   -
Benefits paid  (511,621) (233,908)   -
Actuarial gain (losses)  (1,121,173) (319,235)  (31,605)
Fair value of the Plan’s assets as of December 31, 2021   6,799,255   3,347,204  196,909

 

   
 F-78 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
24.5.7Estimated costs

The estimated net periodic plan costs (income) for 2022 for each plan are shown below:

 

       
  Unified Plan Plan III Assistance Plan
Cost of current service 309 4,021  6,172
Estimated cost of interest 673,723 364,900 155,389
Expected return on plan assets   (725,888)   (363,906)  (21,269)
Expected employee contributions   (139)   (2,010)   -
Costs (income or loss)  (51,995) 3,005 140,292

 

24.5.8Sensitivity Analysis

The following tables set out a sensitivity analysis, which shows the effect of a one percent increase or decrease in the assumed care costs, in the aggregate of the cost of service and cost of interest components and the accumulated post-employment benefit obligation.

 

     
     
  Projected scenarios
  Increase by 1% Decrease in 1%
Sensitivity of long-term interest rate    
Impacts on the obligations of the pension (931,718)   899,959
Impacts on the obligations of healthcare program (265,494)   249,212
Sensitivity of growth rate of the medical costs    
Impacts on the obligations of healthcare program   100,689   (97,728)
Impact on cost of service for the following financial year of healthcare program   410  (398)
Sensitivity of the service cost    
Impacts on the obligations of the pension   413  (400)
Impacts on the obligations of healthcare program    1,081  (1,014)

 

24.5.9Benefits payable

The estimated benefits to be paid by the Company in the next five years and the total benefits for the following fiscal years are shown below:

 

         
  Unified Plan Plan III Assistance Plan Total 
2022   508,055  211,442  83,228  802,725
2023   482,445  201,321  83,279  767,045
2024   457,829  191,482  81,297  730,608
2025   434,348  181,975  78,059  694,382
2026   411,209  172,954  74,755  658,918
2027 a 2051 3,557,360  1,995,374   751,681  6,304,415

 

   
 F-79 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
24.5.10Asset allocation and investment strategy

The asset allocation for the Company pension and healthcare plans at the end of 2021 and the allocation goal for 2022, by asset category, are shown below:

 

     
     
  Goal for 2022 (*) 2021
Fixed income 71.1% 69.6%
Variable income 10.0% 7.2%
Loans 1.2% 1.6%
Real estate 2.7% 5.8%
Investment structuring 10.2% 10.5%
Investments abroad 4.8% 5.3%
  100.0% 100.0%
(*) Target based on the total investment of each plan.    

 

In addition, information on the allocation of assets of pension plans sponsored by the Company:

 

         
  Unified Plan Plan III
  target (%)(*) minimum (%) target (%) minimum (%)
Fixed income 83.5% 43.0% 53.0% 22.0%
Variable income 3.0% 2.0% 12.0% 7.0%
Loans 0.5% 0.0% 3.0% 0.0%
Real estate 4.0% 0.0% 8.0% 0.0%
Investment structuring 6.0% 0.0% 16.0% 0.0%
Investments abroad 3.0% 0.0% 8.0% 0.0%

(*) Target 2021.  

Management of Fundação Copel decided to keep a more conservative approach investing in variable income in relation to the allowed legal limit, which is 70%. 

 

24.5.11Additional information

The Company made contributions to Plan III (variable contribution plan) for all active employees at December 31, 2021, 2020 and 2019, in the amounts of R$64,883, R$67,515 and R$70,564, respectively.

 

 

25.Sectorial Charges Payable

     
  12.31.2021 12.31.2020
Energy Development Account - CDE   41,786  5,700
Global Reversal Reserve - RGR   8,834   12,446
Tariff flags 147,766   15,566
  198,386   33,712

 

 

 

26.Research and Development and Energy Efficiency

In accordance with Law No. 9,991/2000 and supplementary regulations, concession operators and licensees of electric power generation and transmission are required to allocate annually the percentage of 1% of their net operating regulatory revenue to research and development of the electricity sector activities, and the electric power distribution concession operators must segregate this same percentage into the research and development and energy efficiency programs of the electricity sector.

   
 F-80 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Provisional Measure No. 998/2020, converted into Law No. 14,120/2021, amends Law No. 9,991/2000 and provides for the allocation of unused resources from Research and Development (R&D) and Energy Efficiency (PEE) to the Energy Development Account (CDE), aiming at low tariffs until 2025, as a measure to mitigate the economic impacts arising from the Covid-19 pandemic. Aneel Order No. 904/2021 determined the payments to CDE as from April 2021.

 

26.1Balances recognized for investment in Research and Development (R&D) activities and the Energy Efficiency Program (EEP)
           
           
  Disbursed and not completed Balance to be collected Balance to disburse Balance as of Balance as of
  12.31.2021 12.31.2020
Research and Development - R&D          
FNDCT   -   7,584   -   7,584   8,085
MME   -   3,790   -   3,790   4,041
R&D  195,059   1,299   89,671   286,029   332,746
   195,059  12,673   89,671   297,403   344,872
Energy efficiency program  - EEP        
Procel   -  19,883   - 19,883   5,855
EEP 94,290   2,574 212,947   309,811   314,284
  94,290  22,457 212,947   329,694   320,139
   289,349  35,130 302,618   627,097   665,011
      Current   292,495   380,186
      Noncurrent   334,602   284,825
National Fund for Scientific and Technological Development - FNDCT

National Program of Electricity Conservation - Procel

 

 

26.2Changes in R&D and EEP balances
             
  FNDCT  MME  R&D  Procel  EEP  Total 
Balance as of January 1, 2020  4,046  2,023   341,658 16,410   294,034 658,171
Additions 37,427 18,716  37,426 10,181  40,724 144,474
Performance agreement   -   - -   -   3,545 3,545
Interest rate (Note 34)   -   -   4,253  1,469   6,828   12,550
Payments   (33,388)   (16,698) -   (21,589) -  (71,675)
Concluded projects (Note 12 - a)   -   - (50,591)   - (31,463)  (82,054)
Balance as of December 31, 2020  8,085  4,041   332,746  5,855   314,284 665,011
Additions 50,804 25,399  50,796 12,801  51,206 191,006
Performance agreement   -   - -   -   3,010 3,010
Interest rate (Note 34)   -   -   3,664  1,227   9,923   14,814
Payments   (51,305)   (25,650) (15,966)   - (56,176)   (149,097)
Concluded projects (Note 12 - a)   -   - (85,211)   - (12,436)  (97,647)
Balance as of December 31, 2021  7,584  3,790   286,029 19,883   309,811 627,097

 

 

   
 F-81 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

27.Accounts Payable Related to Concessions

                 
          Discount Annual    
  Company Grant Signature Closing rate Adjustment 12.31.2021 12.31.2020
HPP Mauá  Copel GeT  06.29.2007   07.03.2007   05.2047  5.65% p.y.  IPCA    20,495   17,213
HPP Colider  Copel GeT  12.29.2010   01.17.2011   01.2046  7.74% p.y.  IPCA    27,376   25,075
HPP Baixo Iguaçu  Copel GeT  07.19.2012   08.20.2012   01.2047  7.74% p.y.  IPCA   8,595  7,841
HPP Guaricana Copel GeT  03.03.2020   03.03.2020   03.2025  7.74% p.y.  IPCA   2,894  3,299
HPP Fundão e HPP Santa Clara  Elejor  10.23.2001   10.25.2001   05.2037  11.00% p.y.  IGPM  844,599 678,436
              903,959 731,864
            Current 104,963   88,951
            Noncurrent 798,996 642,913
Discount rate applied to calculate present value
Real and net discount rate, compatible with the estimated long-term rate, not being linked to the expectation of return from the project.
Payment to the federal government
Monthly installments equivalent to 1/12 of the annual payment restated, as defined in the concession agreement.

 

27.1Changes in accounts payable related to concessions
   
Balance as of January 1, 2020 612,587
Additions 3,682
Adjust to present value  (1,112)
Monetary variations   191,638
Payments   (74,931)
Balance as of December 31, 2020 731,864
Additions  65,269
Adjustment to present value  78,203
Monetary variations   117,053
Payments   (88,430)
Balance as of December 31, 2021 903,959

 

27.2HPP Fundão and HPP Santa Clara

On September 30, 2021, Elejor filed the Term of Acceptance arising from Law No. 14,052/2020, Aneel Normative Resolution No. 895/2020 and Aneel Ratifying Resolution No. 2,932/2021, which deal with the renegotiation of the hydrological risk with extension of the HPP Santa Clara grant until May 10, 2040 and HPP Fundão until June 10, 2040, as detailed in NE 1(b). The present value of future payments of the UBP (Use of Public Property) for the extension period were recognized on this date.

 

27.3Nominal value and present value of accounts payable related to concession
     
  Nominal value  Present value 
2022 109,102 104,963
2023 109,102   93,198
2024 109,102   84,128
2025 108,347   75,371
After 2025  1,606,471 546,299
   2,042,124 903,959

 

 

   
 F-82 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

28.Right-of-use asset and lease liability

 

28.1Right-of-use asset

               
  Balance as of Additions Remeasurement adjustment Amorti- Loss on Reclassification Balance as of
  January 1, 2021 zation  disposal /Others (a) December 31, 2021
               
Real estate  23,384 87,921   10,748   (10,053)   (13,079) 22,008  120,929
Vehicles  90,316   7,920  2,255   (33,000)  (142)   484 67,833
Equipment  18,821   2,424  612  (6,695)  (1,239)   1,371 15,294
    132,521 98,265   13,615   (49,748)   (14,460) 23,863  204,056
(a) Reclassification to Assets classified as held for sale (Note 41) and effect of business combination (Note 1.2)
               
               
  Balance as of Additions Remeasurement adjustment   Loss on Reclassi- Balance as of
  January 1, 2020 Amortization  disposal fication (a) December 31, 2020
               
Real estate  40,155   5,319   75  (18,433) (2,551) (1,181) 23,384
Vehicles  46,400 79,455 1,331  (28,176)   - (8,694) 90,316
Equipment 6,276 18,797  - (4,880)   - (1,372) 18,821
   92,831  103,571 1,406  (51,489) (2,551)  (11,247)  132,521

(a) Reclassification to Assets classified as held for sale (Note 41).   

  

28.2Lease liability

 

28.2.1Changes in lease liability

   
   
   
Balance as of January 1, 2020   96,604
Additions 103,571
Remeasurement adjustment 1,406
Charges     10,528
Amortization - principal  (51,761)
Payment - charges   (7,577)
Loss on disposal   (2,670)
Reclassification (a)  (11,740)
Balance as of December 31, 2020 138,361
Effect of acquisition of control of Vilas Complex   22,381
Additions   98,265
Remeasurement adjustment   13,615
Charges     13,459
Amortization - principal  (53,120)
Payment - charges   (7,145)
Loss on disposal  (14,799)
Reclassification (a) 1,717
Balance as of December 31, 2021 212,734
Current   47,240
Noncurrent 165,494
(a) Reclassification to Assets classified as held for sale (Note 41).  

 

The Company defines the discount rate based on the nominal interest rate applied to the last fundraising, disregarding subsidized or incentivized funding. The interest rates applied range from 3.58% to 10.53% p.a.

   
 F-83 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

28.2.2Maturity of noncurrent installments

   
   
2023   38,090
2024   29,388
2025   12,293
2026   11,235
2027  6,871
After 2027 124,164
Undiscounted amounts 222,041
Embedded interest  (56,547)
Lease liabilities balance 165,494

  

28.2.3Potential right to Pis/Cofins recoverable

The table below shows the potential right to Pis/Cofins recoverable for Pis/Cofins computed in lease consideration payable in the foreseen periods.

 

     
Cash Flows  Nominal value   Present value 
Lease consideration 356,050 212,734
Potencial Pis/Cofins  25,772   16,222

 

28.3Impact of forecast inflation on discounted cash flows

In accordance with IFRS 16, in measuring and remeasuring lease liabilities and right-of-use assets, the Company used the discounted cash flow method without considering forecast future inflation, according to the prohibition imposed by the standard.

However, given the current reality of long-term interest rates in the Brazilian economic environment, the table below shows the comparative balances between the information recorded in accordance with IFRS 16 and the amount that would be recorded considering forecast inflation:

 

       
       
       
  Balance in accordance with IFRS 16 Inflation projected balance %
Lease liabilities   212,734 258,038 21.30%
Right to use assets   204,056 241,514 18.36%
Financial expense  12,687   17,099 34.78%
Amortization expense  46,468   52,274 12.49%

 

28.4Commitments from leases and rentals

For leases of low value assets, such as computers, printers and furniture, short-term leases, as well as for leases of land for development of wind power generation projects, whose payment is made based on variable remuneration, the amounts are recognized in the statement of income as operating costs and/or expenses (Note 33.6). The balance of commitments from leases and rentals is shown below:

 

         
  Less than    Over   
   1 year   1 to 5 years   5 years   12.31.2021 
Commitments from leases and rents  7,662 34,146 162,157   203,965

 

   
 F-84 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

28.5Receivables from leases

         
         
  Less than    Over  Total 
   1 year   1 to 5 years   5 years   12.31.2021 
Facilities sharing  1,031  4,122   16,546  21,699

 

 

 

 

29.Other Accounts Payable
     
     
  12.31.2021 12.31.2020
Fair value in the purchase and sale of power (Note 36.2.12) 545,468 343,406
Generation deviation - wind projects (Note 36.2.11) 108,031   94,089
Investment acquisition   46,361   14,169
Payments/returns to consumers   45,579   49,401
Pledges in guarantee   35,285   16,409
Obligations to customers in gas sales operations (a)   35,130   29,508
Aneel Order No. 084/2017 provision   34,113   29,174
Public lighting rate collected   32,895   48,188
Financial offset for the use of water resources   12,066  9,799
Other liabilities   75,364   71,143
  970,292 705,286
Current 370,383 235,400
Noncurrent 599,909 469,886

(a) Refers to amounts paid for the purchase of contracted gas volumes not yet taken by customers.  

 

 

 

30.Provisions for Legal Claims and Contingent Liabilities

The Company is responsible for several legal and administrative proceedings before different courts. Based on assessments made by the Company’s legal counsel, Management makes provisions for legal claims in which the losses are rated probable, when the criteria for recognition of provisioning, described in Note 4.11, are met.

The Company’s management believes it is impracticable to provide information regarding the timing of any cash outflows related to the lawsuits for which the Company is responsible on the date of preparation of the financial statements, in view of the unpredictability and dynamics of the Brazilian judicial, tax and regulatory systems, and that the final resolution depends on the conclusions of the lawsuits. For this reason, this information is not provided.

   
 F-85 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

30.1Change in provision for legal claims

                 
    Income        
    Provision Construction     Transfers/ Balances as of
  Balances as of  for litigations cost Additions    Others December, 31
  January 1, 2021 Additions Reversals Additions to assets  Settlements (a) 2021
Tax                
Cofins 107,148  4,123 (1,212)   - -  -   - 110,059
Others   66,725 10,046 (205)   - -  (127) (5,383)   71,056
  173,873 14,169 (1,417)   - -  (127) (5,383) 181,115
Labors 596,248 94,845  (21,647)   - -  (105,777)  6,087 569,756
Employee benefits   52,401  4,685  (19,623)   - -  (761)  446   37,148
Civil                
Civil and administrative claims 387,895  129,730 (9,218)   - - (74,989) 19 433,437
Easements 111,553  1,616   -   15,702 36,771 (27,573)   - 138,069
Expropriations and property 133,888  680  (15,031) (7,268) 12,943  (184)   - 125,028
Customers  3,973  895 (706)   - -  (407)   -  3,755
Environmental  7,174  4,992 (4,964)   - -  - (1,300)  5,902
  644,483  137,913  (29,919)  8,434 49,714  (103,153) (1,281) 706,191
Regulatory   88,699 20,694 (5,971)   - -  (267)   - 103,155
   1,555,704  272,306  (78,577)  8,434 49,714  (210,085) (131) 1,597,365
(a) Reclassification mainly to Liabilities associated with assets classified as held for sale (Note 41).

                 
    Income        
    Provision Construction     Transfers/ Balances as of
  Balances as of  for litigations cost Additions    Others December 31,
  January 1, 2020 Additions Reversals Additions to assets  Settlements (a) 2020
Tax                
Cofins   104,284  2,864   -   -  -  -  -  107,148
Others  71,506   47,949  (49,381)   -  -  (244)   (3,105)   66,725
    175,790   50,813  (49,381)   -  -  (244)   (3,105)  173,873
Labors   673,062 102,315 (4,297)   -  -  (145,228)  (29,604)  596,248
Employee benefits  86,297   11,439  (43,524)   -  -  (783)   (1,028)   52,401
Civil                
Civil and administrative claims   336,962   94,500  (20,581)   -  - (22,452)   (534)  387,895
Easements   127,010 286 (543)   (13,748)   667   (2,119)  -  111,553
Expropriations and property   118,757  4,634 (1,217)  6,673 5,202  (161)  -  133,888
Customers 4,956 299 (1,275)   -  -   (7)  -  3,973
Environmental 4,071  3,108 (5)   -  -  -  -  7,174
    591,756 102,827  (23,621) (7,075) 5,869 (24,739)   (534)  644,483
Regulatory  79,808   10,955 (1,033)   -  -   (1,031)  -   88,699
    1,606,713 278,349 (121,856) (7,075) 5,869  (172,025)  (34,271)  1,555,704
(a) Reclassification mainly to Liabilities associated with assets classified as held for sale (Note 41).    

 

30.2Details of provisions for legal claims and contingent liabilities

The table below shows the details of the provisions for registered litigation and, in addition, the amounts of contingent liabilities that are past events for which no provisions are recognized because it is not probable that an outflow of resources embodying economic benefits will be required to settle the obligation.

 

   
 F-86 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
           
           
    Provisions Contingent liabilities
  Description 12.31.2021 12.31.2020 12.31.2021 12.31.2020
Tax          
Cofins Requirement of the Federal Revenue Service for the period from August 1995 to December 1996, due to the termination of a judicial decision that has recognized the Company’s exemption from Cofins.   110,059   107,148   7,914   6,554
INSS Tax requirements related to the social security contribution. 29,813 29,405   107,840   100,165
Federal taxes Administrative requirements and questions from Receita Federal do Brasil (Federal Revenue Service).   1,721 - 77,058 84,027
ICMS (VAT) Administrative requirements and questions from the State regarding the payment of ICMS (VAT) on the Company’s invoices. - - 43,346 97,404
IPTU Tax Requirement on Urban Territorial Property (IPTU) on properties affected by the public electricity service. - -   118,981 98,459
ISS City halls tax requirement as ISS on construction services provided by third parties.   170   3 83,536 73,094
Others Taxes, fees and other federal, state and municipal taxes in which the Company discusses the levy or not, as well as its bases and amounts for payment 39,352 37,317   122,314   116,920
      181,115   173,873   560,989   576,623
Labor Charging of overtime, hazardous work, transfer surcharge, equalization / salary adjustment, among others, by employees and former employees of Copel; collection of indemnity installments and others, by ex-employees of contractors and outsourced companies (subsidiary responsibility).   569,756   596,248   291,633   348,463
Employee benefits Labor claims filed by former retired employees against Fundação Copel, which will consequently cause repercussions for the Company and its wholly-owned subsidiaries, to the extent that additional contributions are required. 37,148 52,401   3,524   9,210
Regulatory          
Aneel Order nº 288/2002 Legal actions against Aneel Dispatch No. 288/2002 involving the companies Companhia Estadual de Energia Elétrica - CEEE and Dona Francisca Energética S.A. 82,670 70,188 - -
ESBR ESBR filed Ordinary Lawsuit No. 10426-71.2013.4.01.4100 against ANEEL in the Federal Court of Rondônia, whose ruling: (i) acknowledged the exclusion of liability for the 535-day schedule overrun in the construction of the Jirau Hydropower Station; (ii) declares any obligations, penalties and costs imposed on ESBR as a result of the schedule overrun to be unenforceable, and (iii) annuls ANEEL Resolution 1,732/2013, which had recognized a schedule overrun of only 52 days. An appeal has been brought by ANEEL, pending judgment by the Federal Court of the 1st Region. The practical consequence of the ruling was, at the time it exempted ESBR, to expose the distributors with whom it entered into power trading contracts (CCEARs) to the Short-Term Market and to the high value of the Settlement Price of the Differences (Preço de Liquidação das Diferenças - PLD, in Portuguese) in the period, including Copel DIS. This occurred because the rules for the sale of electricity require that all energy consumed should have a corresponding contractual coverage. If the lawsuits are judged unfavorably against Copel, the amount will be classified as Sectorial Financial Asset to be recovered through tariff rates. - -   1,066,486   942,640
Excludente Colíder Discussion on the value of the Tariff for use of the transmission system - TUST and monetary adjustment on energy values ​​referring to the exclusion of liability period.
As a result of the court injunction that excluded the delay period for the Colíder HPP from being responsible for the delivery of energy contracted in the Regulated Contracting Environment - ACR, CCEE proceeded to credit, valued to PLD, the energy previously backed to comply with ACR. However, in the event of failure in the lawsuit, the Company must return the amounts credited, updated by the IGPM.
- -   295,931   216,353
Others Aneel’s notifications about possible breaches of regulatory standards 20,485 18,511 38,099 -
      103,155 88,699   1,400,516   1,158,993
(to be continued)
   
 F-87 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
           
           
    Provisions Contingent liabilities
  Description 12.31.2021 12.31.2020 12.31.2021 12.31.2020
Civil          
Tobacco growers Actions whose main cause is the lack of electricity causing loss of production.   79,092   50,330   68,104   41,258
Department of Roads and Roadworks The Department of Roads and Roadworks (Departamento de Estradas e Rodagens - DER, in Portuguese) - issued a tax assessment notice to Copel Distribuição which, in turn, filed a lawsuit challenging DER’s Charge for Use or Occupancy of Highway Domain Range, since the Company understands that this charge is unconstitutional because it has a confiscatory nature. The Company had a favorable appealable decision.   -   -   -   95,669
Arbitration Discussion by arbitration under secrecy and confidentiality, in the discovery phase, with no decision having been handed down to date.  165,158  125,719  670,704  510,543
PIS / COFINS credit on ICMS Referring to estimated contingent liability, as per Management’s judgment and the opinion of its legal counsel, regarding the adventitious filing of claims by consumers in connection with the recognized tax credit, as detailed in Note 13.2.1, referring to the period infringing the tax neutrality rule, between the 11th and the 16th years, of a total of 16 years considered in the action. On February 9, 2021, Aneel opened Public Consultation 005/2021 in order to improve the proposal to return these tax credits to consumers. Aneel’s technical areas prepared a technical note to the Public Consultation, delimiting its scope to the economic-financial analysis, but without discussing the legal aspects. Within the scope of that Public Consultation and after receiving the contributions sent by the interested parties, on March 4, 2022, an Opinion was issued by the Federal Prosecutor’s Office with Aneel, which answered questions formulated by the superintendencies of Aneel that evaluate the topic. The regulatory agency has not yet concluded its analysis within the scope of the Public Consultation and, so far, there is no final decision at the administrative level. The Company and its legal advisors evaluated the documents made available in Public Consultation 005/2021 and the Federal Prosecutor’s Opinion, not identifying changes in its previous understanding on the matter, and await analysis by Aneel of their contributions in order to solidify this understanding and protect the Company’s rights.   -   -  1,775,347  1,755,112
Civil and administrative law Other actions involving billing, supposed irregular procedures, administrative contracts and contractual fines, indemnity for accidents with the electric power network and accident with vehicles.  131,519  133,560  233,925  282,794
Indemnification to third parties (civil) Actions for indemnity for resulting from damages caused during the construction of power plants   57,663   82,146   65,888   38,127
Easements Discussion between the amount determined by Copel for payment and the amount claimed by the property owner and/or when when the owner’s documentation supporting title to the property may not be registered (when probate proceedings are still in progress, properties have no registry number with the land registry, etc.), intervention in third-party adverse possession, either as a confronter, or in case of a property where there are areas of easement of passage, in order to preserve the limits and boundaries of expropriated areas.  138,075  110,652   29,100   26,001
Expropriations and property Discussion between the amount assessed by Copel for payment and the amount claimed by the owner, and / or when the owner’s documentation does not present conditions for registration (inventories in progress, properties without registration, among others); actions for repossession of real estate owned by the concessionaire; intervention in the adverse possession of third parties, as a confrontant, in order to preserve the limits and confrontations of the expropriated areas.   93,679   86,207  194,787  138,341
Indemnification to third parties (expropriations) Expropriation lawsuit for construction of electric substation and expropriation of property flooded of power plant.   31,348   44,775   -   45,196
Consumers Lawsuits seeking compensation for damages caused in household appliances, industrial and commercial machines, lawsuits claiming damages for pain and suffering caused by service interruption and lawsuits filed by industrial consumers, challenging the lawfulness of the increase in electricity prices while Plano Cruzado (anti-inflation economic plan) was in effect and claiming reimbursement for the amounts paid by the Company.  3,755  3,920  3,964  3,768
Environmental Public civil and class actions whose purpose is to obstruct the progress of environmental licensing for new projects or to recover permanent preservation areas located around the hydroelectric power plant dams unlawfully used by private individuals. If the outcome of the lawsuits is unfavorable to the Company, Management estimates only the cost to prepare new environmental studies and to recover the areas owned by Copel GeT. They also include the Commitment Agreements (Termos de Ajuste de Conduta - TAC, in Portuguese), which refer to the commitments agreed-upon and approved between the Company and the relevant bodies, for noncompliance with any condition provided for by the Installation and Operating Licenses.  5,902  7,174  206,647  180,068
     706,191  644,483  3,248,466  3,116,877
     1,597,365  1,555,704  5,505,128  5,210,166

 

 

   
 F-88 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

31.Equity.............
31.1Capital

Capital consists of common and preferred shares. Each common share entitles its holder to one vote in the general shareholders’ meetings. Preferred shares have two classes “A” and “B” and have restricted voting rights as per § 7 of article 5 of the Bylaws.

According to Article 17 and following paragraphs of Federal Law No. 6,404/1976, dividends paid to preferred shares must be at least 10% higher than those paid to common shares.

Class “A” preferred shares have priority in the reimbursement of capital and in the distribution of minimum dividends of 10% p.a. (non-cumulative), calculated based on the capital represented by this class of shares.

Class “B” preferred shares have priority in the reimbursement of capital and the right to the distribution of dividends, calculated as 25% of adjusted profit or loss for the year, pursuant to the corporate legislation and to the Company’s Bylaws, calculated proportionately to the capital represented by the shares of this class. Dividends for Class “B” have priority only over the common shares and are only paid out of the remaining profits payment of priority dividends of class “A” shares.

On March 11, 2021, the General Meeting approved the submission of the proposal for comprehensive amendment and consolidation of the Company’s Bylaws, including, among other changes, the share split of the Company, in the proportion of one share for ten shares, so that, for every one share issued by the Company, nine new shares of the same class and type will be credited.

In 2021, the Company implemented the UNITs Program, which consists of the formation of Share Deposit Certificates, or UNITs, comprising one common share (CPLE3) and four class “B” preferred shares (CPLE6). The program was approved by Copel’s Board of Directors on April 23, 2021 and its operations started on April 26, 2021 in the Brazilian market.

On December 31, 2021, paid in capital is R$10,800,000 (R$10,800,000 as of December 31, 2020). It includes shares (with no par value) and the main shareholders are presented below:

                 
              Number of shares in units
Shareholders Common Class "A” Preferred  Class “B” preferred  Total 
  number of share  % number of share  % number of share  % number of share  %
State of Paraná  734,304,512  69.66 -  -    115,969,784   6.91  850,274,296 31.07
BNDES  131,161,562  12.44 -  -    524,646,248  31.24  655,807,810 23.96
Eletrobras 15,307,740   1.45 -  -   -  -   15,307,740   0.56
Free float:                
B3  126,653,784  12.02  661,760  21.16  863,944,649  51.44  991,260,193 36.23
NYSE 43,115,100   4.09 -  -    172,460,400  10.27  215,575,500   7.88
Latibex  228,667   0.02 -  -    1,782,043   0.11  2,010,710   0.07
City Halls  1,783,930   0.17 93,260   2.98 34,710  -    1,911,900   0.07
Other shareholders  1,535,165   0.15  2,372,980  75.86  497,456   0.03  4,405,601   0.16
   1,054,090,460   100.00  3,128,000   100.00  1,679,335,290   100.00  2,736,553,750  100.00

   
 F-89 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
31.2Equity valuation adjustments

Fair values of fixed assets – deemed costs – were recognized on the first-time adoption of IFRS. The line item “Equity value adjustments” was the balancing item of this adjustment, net of deferred income tax and social contribution. The realization of such adjustments is recorded in the retained earnings line item, to the extent of the depreciation or possible disposal of the measured fixed assets.

Adjustments arising from the changes in fair value involving financial assets, as well as actuarial gains and losses, are also recorded in this line item:

   
   
Balance as of January 1, 2020  591,927
Actuarial liabilities  
Post employment benefits (271,345)
Taxes on adjustments 92,190
Realization of equity evaluation adjustment  
Deemed cost of fixed assets   (90,347)
Taxes on adjustments 30,717
Attributed to non-controlling interest  207
Balance as of December 31, 2020  353,349
Actuarial liabilities  
Post employment benefits  246,626
Taxes on adjustments (a)   (93,881)
Realization of equity evaluation adjustment  
Deemed cost of fixed assets   (70,569)
Taxes on adjustments 23,994
Actuarial liability - investment realization   (33,205)
Attributed to non-controlling interest (144)
Balance as of December 31, 2021  426,170
(a) Derecognition of deferred tax assets on actuarial liabilities of Copel SER because there is no reasonable certainty that sufficient future taxable income w ill be generated for its absorption.

31.3Legal reserve and profit retention reserve

The amount of 5% of profit for the year is allocated to the legal reserve, before any other allocation, limited to 20% of capital.

The profit retention reserve is earmarked for covering the Company’s investment program, according to Article 196 of Law No. 6,404/1976. It is funded by retaining the remaining profit or loss after setting up the legal reserve, interest on capital and dividends proposed.

   
 F-90 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
31.4Proposed dividend distribution

       
       
Parent Company 12.31.2021 12.31.2020 12.31.2019
Calculation basis for dividends      
Net income for the year   4,952,573   3,904,202   1,989,946
Legal Reserve (5%) (247,629) (195,210)   (99,497)
Realization of equity evaluation adjustment  46,575  59,630  66,226
    4,751,519   3,768,622   1,956,675
Proposed dividends      
Interest on own capital - gross value (a)   522,809   807,500   643,000
Interim dividends (b)   1,197,003   -   -
Complement to reach the mandatory minimum   -   211,057   -
Additional proposed dividends   1,368,675   1,507,449   -
    3,088,487   2,526,006   643,000
Gross value of dividends per class of shares:      
Ordinary shares   1,120,747   1,278,126   325,210
Class “A” preferred shares 3,658 4,155 1,291
Class “B” preferred shares   1,964,082   1,243,725   316,499
Gross value of dividends per share:      
Ordinary shares   1.06323   0.88128   0.22423
Class “A” preferred shares   1.16956   1.27172   0.39466
Class “B” preferred shares   1.16956   0.96941   0.24669
       
Gross value of dividends per share - Units (c)    5.74147  -    -
(a) R$239,636 approved by the Board of Directors on 9/17/2021, paid on 11/30/2021, and R$283,173 approved by the Board of Directors on 12/8/2021, with payment date to be defined at the AGM.
(b) Dividend approved by the Board of Directors on 9/17/2021, paid on 11/30/2021.
(c) The Units are made up of 1 common share and 4 class "B" preferred shares

In accordance with the legal and statutory provisions in effect, the basis for calculating mandatory dividends is obtained from net income, less the quota allocated to the legal reserve. However, Management has the practice of adding to the calculation basis the realization of the equity valuation adjustments, which is dealt with in IAS 16, 40 and IFRS 1, in order to void the effect of the increase in depreciation expense arising from the adoption accounting standards, as well as IAS 16 - Property, Plant and Equipment. This procedure reflects the Company’s shareholder remuneration policy, which will be practiced during the realization of the entire reserve for equity valuation adjustments.

   
 F-91 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
31.5Earnings per share - basic and diluted

                   
                   
Parent company  Continuing Discontinued Total Continuing Discontinued Total Continuing Discontinued Total
  operations operations 12.31.2021 operations operations 12.31.2020 operations operations 12.31.2019
Basic and diluted numerator                  
Basic and diluted earnings allocated by classes of shares, allocated to controlling shareholders:                
Common shares 1,417,379 482,241 1,899,620 1,935,144   40,607 1,975,751 1,051,809 (44,707) 1,007,102
Class “A” preferred shares   4,478  1,430  5,908  5,783  100  5,883  2,920   (111)  2,809
Class “B” preferred shares  2,345,340 701,705 3,047,045 1,883,054   39,514 1,922,568 1,023,538 (43,503) 980,035
  3,767,197 1,185,376 4,952,573 3,823,981   80,221 3,904,202 2,078,267 (88,321) 1,989,946
Basic and diluted denominator                  
Weighted average of shares (in thousands):                  
Common shares   1,176,755,935   1,176,755,935   1,176,755,935   1,450,310,800   1,450,310,800   1,450,310,800   1,450,310,800   1,450,310,800   1,450,310,800
Class “A” preferred shares  3,171,194 3,171,194 3,171,194 3,268,067 3,268,067 3,268,067 3,273,682 3,273,682 3,273,682
Class “B” preferred shares    1,556,626,621   1,556,626,621   1,556,626,621   1,282,974,883   1,282,974,883   1,282,974,883   1,282,969,268   1,282,969,268   1,282,969,268
    2,736,553,750   2,736,553,750   2,736,553,750   2,736,553,750   2,736,553,750   2,736,553,750   2,736,553,750   2,736,553,750   2,736,553,750
                   
Basic and diluted earnings per share attributable to controlling shareholders                
Common shares 1.20448 0.40981 1.61429 1.33430 0.02800 1.36229 0.72523  (0.03083) 0.69440
Class “A” preferred shares  1.41173 0.45079 1.86252 1.76982 0.03080 1.80062 0.89086  (0.03391) 0.85790
Class “B” preferred shares  1.50668 0.45079 1.95747 1.46773 0.03080 1.49852 0.79778  (0.03391) 0.76388

 

 

 

32.Net Operating Revenue

 

                 
            Net revenues
  Gross PIS/Pasep    Sectorial  Service tax      
  revenues and Cofins  ICMS (VAT) charges  (ISSQN) 12.31.2021 12.31.2020 12.31.2019
Electricity sales to final customers  12,296,456  (909,527)  (2,465,992)  (1,683,260) -  7,237,677  6,652,824  6,426,016
Electricity sales to distributors 7,034,152  (885,904) (22,121) (74,273) -  6,051,854  3,779,830  2,865,866
Use of the main distribution and transmission grid  10,088,231  (707,904)  (2,334,029)  (1,751,224) -  5,295,074  4,372,596  4,138,771
Construction income 1,951,559 - - - -  1,951,559  1,414,067  1,132,884
Fair value of assets from the indemnity for the concession   142,642 - - - -  142,642 57,341 36,646
Distribution of piped gas   950,850 (75,357)  (162,710) - (516)  712,267  502,655  843,183
Sectorial financial assets and liabilities result 2,502,324  (231,465) - - -  2,270,859  676,939 18,631
Other operating revenue    358,997 (29,556) (93) -  (6,993) 322,355 366,434 407,248
Recovery of Pis/Pasep and Cofins on ICMS   - - - - -   - 810,563   -
   35,325,211  (2,839,713)  (4,984,945)  (3,508,757)  (7,509)   23,984,287   18,633,249   15,869,245

 

   
 F-92 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

32.1Revenue by type and/or class of customers

       
  12.31.2021 12.31.2020 12.31.2019
Electricity sales to final customers  12,296,456 9,524,897   10,481,794
Residential 4,098,156 3,098,969 3,336,432
Industrial 1,230,945   970,638 1,276,105
Trade, services and other activities 2,202,475 1,701,260 2,179,510
Rural 873,560   613,419 631,527
Public entities 276,383   195,259 279,495
Public lighting 339,524   233,558 274,250
Public service 400,341   290,482 332,414
Free consumers 2,203,320 1,729,603 1,431,274
Donations and grants 671,752   691,709 740,787
Electricity sales to distributors 7,034,152 4,330,982 3,301,336
Bilateral contracts 2,390,859 2,386,929 1,998,617
Regulated contracts 1,026,124   916,377 854,239
Electric Energy Trade Chamber - CCEE 3,482,687   933,369 357,076
Effective interest - grant bônus (Note 10.3) 134,482  94,307   91,404
Use of the main distribution and transmission grid  10,088,231 8,780,612 8,270,996
Residential 3,011,507 2,788,725 2,585,892
Industrial 1,456,377 1,273,320 1,280,168
Trade, services and other activities 1,771,496 1,628,098 1,713,632
Rural 623,280   548,682 467,044
Public entities 205,247   180,814 217,027
Public lighting 213,433   205,904 206,492
Public service 214,501   195,597 174,414
Free consumers 1,440,922 1,164,020 1,052,535
Concessionaires and generators  79,493  61,720   62,414
Operating and maintenance income - O&M and interest income  1,071,975   733,732 511,378
Construction income 1,951,559 1,414,067 1,132,884
Power distribution service concession 1,700,889 1,154,488 904,023
Power gas distribution service concession  11,222 7,438   12,153
Power transmission concession  (a) 239,448   252,141 216,708
Fair value of assets from the indemnity for the concession 142,642  57,341   36,646
Distribution of piped gas 950,850   679,304 1,003,790
Sectorial financial assets and liabilities result 2,502,324   746,052   25,057
Other operating revenue  358,997   406,539 438,876
Leasing and rent (32.2) 253,049   176,452 141,315
Fair value in the purchase and sale of power   -   137,463 204,876
Income from rendering of services  91,932  44,182   51,780
Other income  14,016  48,442   40,905
GROSS OPERATING REVENUE  35,325,211  25,939,794   24,691,379
(-) Pis/Pasep and Cofins   (2,839,713)   (2,038,541)   (2,243,383)
Recovery of Pis/Pasep and Cofins on ICMS (Note 13.2.1)  -   810,563 105,184
(-) ICMS (VAT)   (4,984,945)   (4,216,720)   (4,518,791)
(-) Service tax (ISSQN)   (7,509)   (4,504) (3,333)
(-) Sectorial charges (32.3)   (3,508,757)   (1,857,343)   (2,161,811)
 NET OPERATING REVENUE   23,984,287  18,633,249   15,869,245

 (a) The balance contains the amount of construction revenue, the construction margin and the efficiency gain or loss as detailed in Note 11.3 

 

   
 F-93 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
32.2Leases and rentals

 

32.2.1Revenue from leases and rentals

       
  12.31.2021 12.31.2020 12.31.2019
Equipment and structures 251,953 175,673  140,053
Facilities sharing 738 415   1,046
Real estate 358 364  216
  253,049 176,452  141,315

 

 

32.3Regulatory charges

       
  12.31.2021 12.31.2020 12.31.2019
Energy Development Account - "CDE " - Power distribution service concession (32.3.1) 1,737,716 1,530,998 1,654,157
Other charges - rate flags 1,480,361   81,159 280,286
Research and development and energy efficiency - R&D and EEP 191,006 144,474 127,432
Global Reversion Reserve - RGR quota   44,372   62,057   63,918
Energy Development Account - "CDE "  - Power transmission concession   42,973   27,315   25,271
Inspection fee   12,329   11,340   10,747
   3,508,757  1,857,343  2,161,811

32.3.1Energy Development Account - CDE - power distribution concession

The CDE, created by Law 10,438/2002 and amended by Law 12,783/2013, has among its sources of funds, in order to meet its objectives, the quotas paid by agents that negotiate energy with final consumers, by average of a charge included in the tariffs. The Company makes payments for the “CDE USO” charge, intended to cover the CDE’s objectives set forth by law. The annual quotas for each distributor are defined by Aneel through resolutions enacted by it.

As of June 2021, the Company started to pay monthly the quota related to CDE Covid Account in the amount of R$29,032, segregated between “CDE USO” and “CDE ENERGIA”. This charge, passed on in the tariff to consumers, is due by distribution concessionaires and licensees according to Order No. 939/2021 and has the purpose of amortizing the credit operation contracted by the CCEE in the management of the Covid Account, under the terms of Normative Resolution No. 885/2020.

The balance is as follows:

     
Resolutions Period 12.31.2021
CDE USO    
Resolution No. 2,814/2020 January   163,843
Resolution No. 2,814/2021 February   157,766
Resolution No. 2,834/2021 March and April   277,844
Resolution No. 2,864/2021 May to December   935,037
Order No. 939/2021  June to December    107,009
      1,641,499
CDE ENERGIA    
Order No. 939/2021  June to December   96,217
     
      1,737,716
   
 F-94 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
     
Resolutions Period 12.31.2020
CDE USO    
Resolution No. 2,664/2019 January to December   1,531,713
(-) Preliminary injunctions January to December  (715)
     
      1,530,998

     
Resolutions Period 12.31.2019
CDE USO    
Resolution No. 2,510/2018 January to June   1,269,498
(-) Preliminary injunctions January to June  (3,346)
      1,266,152
CDE ENERGIA    
Resolution No. 2,231/2017  June to February  98,725
Resolution No. 2,521/2019  March to August    296,174
Return - Order No. 2,755/2019     (46,722)
      348,177
CDE ENERGIA    
Resolution No. 2,510/2018 January to March 41,431
(-) Preliminary injunctions January to March  (1,603)
    39,828
      1,654,157

32.4Copel DIS anual tariff adjustment

ANEEL approved the result of Copel DIS’s 5th Periodic Tariff Review Cycle 2021 through Ratifying Resolution No. 2,886, dated June 22, 2021, authorizing average adjustment of 9.89% (0.41% in 2020) applied to consumers and whose application occurred in full to tariffs as from June 24, 2021. For high voltage consumers the average readjustment was 9.57% and for low voltage consumers it was 10.04%.

Copel Distribuição’s net Regulatory Compensation Basis - BRR, in the 2021 Periodic Tariff Review, was ratified at R$8,362,118. The return on capital reached R$985,623, at a rate of 10.64% before taxes, and the Regulatory Reintegration Quota - QRR, which aims to restore the assets related to the provision of the service throughout its useful life, was R$438,786, average rate of 3.73%.

   
 F-95 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

33.Operating Costs and Expense

           
      General and Other  
  Operational Selling administrative operating  
  costs expenses expenses expenses, net 12.31.2021
Electricity purchased for resale (33.1)  (9,503,743)   -  -  -  (9,503,743)
Charge of the main distribution and transmission grid  (2,501,641)   -  -  -  (2,501,641)
Personnel and management (33.2)  (1,011,191)   (12,526)   (527,140)  -  (1,550,857)
Pension and healthcare plans (Note 24.3)  (170,289) (1,644) (76,840)  -  (248,773)
Materials and supplies   (63,692)   (21)   (6,109)  - (69,822)
Materials and supplies for power electricity  (1,854,948)   -  -  -  (1,854,948)
Natural gas and supplies for gas business  (506,065)   -  -  -  (506,065)
Third-party services (33.3)  (538,994) (6,559)   (161,046)  -  (706,599)
Depreciation and amortization  (1,016,466)  (2) (50,717) (15,354)  (1,082,539)
Credit losses, provisions and reversals  (33.4)   134,854 (181,023)  -  (194,618)  (240,787)
Construction cost (33.5)  (1,899,844)   -  -  -  (1,899,844)
Hydrological risk renegotiation (Note 1-b) -   -  - 1,570,543   1,570,543
Other operating costs and expenses, net (33.6)  (187,618)  6,777   (102,709) (25,938)  (309,488)
    (19,119,637) (194,998)   (924,561) 1,334,633   (18,904,563)

           
      General and Other  
  Operational Selling administrative operating  
  costs expenses expenses expenses, net 12.31.2020
Electricity purchased for resale (33.1) (6,829,530)  -  -  - (6,829,530)
Charge of the main distribution and transmission grid (1,525,567)  -  -  - (1,525,567)
Personnel and management (33.2) (1,143,323) (12,567)   (446,005)  - (1,601,895)
Pension and healthcare plans (Note 24.3) (161,257)   (1,615) (65,762)  - (228,634)
Materials and supplies    (65,357) (95)   (7,228)  -  (72,680)
Materials and supplies for power electricity (404,496)  -  -  - (404,496)
Natural gas and supplies for gas business (354,701)  -  -  - (354,701)
Third-party services (33.3) (406,109)   (4,913)   (147,019)  - (558,041)
Depreciation and amortization (945,595)  - (48,963) (15,355) (1,009,913)
Credit losses, provisions and reversals  (33.4)   40,143  (128,466)  -  (148,971) (237,294)
Construction cost (33.5) (1,417,504)  -  -  - (1,417,504)
Other operating costs and expenses, net (33.6) (134,526) (12,169) (94,431) (92,149) (333,275)
   (13,347,822)  (159,825)   (809,408)  (256,475)  (14,573,530)

           
      General and Other  
  Operational Selling administrative operating  
  costs expenses expenses expenses, net 12.31.2019
Electricity purchased for resale (33.1)  (6,105,274)   -  -  -  (6,105,274)
Charge of the main distribution and transmission grid  (1,249,275)   -  -  -  (1,249,275)
Personnel and management (33.2)  (945,312)  (13,937)   (366,133)  -  (1,325,382)
Pension and healthcare plans (Note 24.3)  (169,476) (1,914) (66,936)  -  (238,326)
Materials and supplies   (74,071) (253)   (5,873)  - (80,197)
Materials and supplies for power electricity (49,352)   -  -  - (49,352)
Natural gas and supplies for gas business  (585,233)   -  -  -  (585,233)
Third-party services (33.3)  (371,835) (7,711)   (146,462)  -  (526,008)
Depreciation and amortization  (892,813) (3) (43,190) (14,720)  (950,726)
Credit losses, provisions and reversals  (33.4)   120,689   (140,348)  -  (240,392)  (260,051)
Construction cost (33.5)  (1,091,396)   -  -  -  (1,091,396)
Other operating costs and expenses, net (33.6) (50,800)  (11,606) (82,695) (67,394)  (212,495)
    (11,464,148)   (175,772)   (711,289)  (322,506)   (12,673,715)

   
 F-96 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

33.1Electricity purchased for resale
       
  12.31.2021 12.31.2020 12.31.2019
Purchase of Energy in the Regulated Environment - CCEAR  3,872,427  3,107,956  2,880,115
Itaipu Binacional  1,787,691  1,766,058  1,316,524
Electric Energy Trade Chamber - CCEE  1,673,116  1,176,798  1,405,497
Bilateral contracts  2,578,241  1,087,439  754,070
Program for incentive to alternative energy sources - Proinfa  271,435  221,406  268,063
Micro and mini generators and repurchase of customers  360,371  161,324   52,871
Fair value in the purchase and sale of power   35,818   - - 
(-) PIS/Pasep/Cofins taxes on electricity purchased for resale (1,075,356) (691,451) (571,866)
    9,503,743   6,829,530   6,105,274

 

 

33.2Personnel and management
       
  12.31.2021 12.31.2020 12.31.2019
Personnel      
Salaries and management fees   691,660 696,837   746,415
Social charges on payroll   227,381 227,485   241,025
Meal and education allowance   102,957 107,052   113,021
Voluntary retirement program   139,232  66,905  43,517
    1,161,230 1,098,279   1,143,978
Management      
Salaries and management fees  18,118  18,465  19,867
Social charges on payroll   3,832 3,233   5,745
Other expenses   254 237   248
   22,204  21,935  25,860
       
Provisions for performance and profit sharing      
of employees and administrators   367,423 481,681   155,544
       
   1,550,857   1,601,895  1,325,382

 

 

33.3Third party services
       
       
  12.31.2021 12.31.2020 12.31.2019
Maintenance of electrical system   319,162   206,688  164,510
Maintenance of facilities   103,726  97,889  102,295
Communication, processing and transmission of data  64,772  42,244 51,919
Consumer service  60,205  54,713 35,548
Meter reading and bill delivery   52,831  48,895 45,515
Consulting and audit  38,832  41,043 20,456
Other services  67,071  66,569  105,765
   706,599  558,041 526,008

 

 

   
 F-97 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

33.4Credit losses, provisions and reversals
       
       
  12.31.2021 12.31.2020 12.31.2019
Provision for legal claims (a) 190,071   150,269   243,848
Impairment of assets      
  Power generation concession contract (Note 10.4) (2,604) (10,502)  (2,945)
  QNPR gas impairment (amount paid and not withdrawn) (b)   15,688 - -
  Property, plant and equipment - generation segment (Note 18.4)   (147,938) (37,609)  (117,744)
Expected credit losses (Trade accounts and Other receivables) 181,023   128,466   140,348
Tax credits estimated losses  4,547  (1,298)  (3,456)
Provision for losses on equity interests   -   7,968 -
  240,787   237,294   260,051
(a)The variation in provisions for legal claims occurred due to the review of the assessment of the Company’s legal advisors, mainly in civil claims. The details of the actions are shown in Note 30.
(b)The contracts between Petrobras and Compagás were offset by the volume of 55,770,890 m³, disregarding the difference in gas pricing between the contracts (NE 12.1). However, the parties have not reached a consensus to this date, and the amount of R$15,688 remains in dispute. In view of the compensation made by Petrobras and the uncertainty in the reimbursement of the difference in Brazilian reais of the referred Assignment, impairment was recorded for this amount until the end of the transaction.

 

 

33.5Construction costs
       
       
  12.31.2021 12.31.2020 12.31.2019
Materials and supplies   1,088,808   781,807   548,336
Third party services   626,540   460,952   395,607
Personnel   155,182   140,108   125,777
Others (a) 29,314  34,637 21,676
   1,899,844   1,417,504   1,091,396

(a) The balance includes the reversal amount of provisions for legal claims, in the total amount of R$ 6,921.

 

   
 F-98 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

33.6Other operating costs and expenses, net
       
  12.31.2021 12.31.2020 12.31.2019
Financial offset for the use of water resources   85,545   63,841 103,737
Collection charge   50,371   49,903   51,156
Compensation   48,679   38,423   63,628
Taxes   43,308   37,847   28,651
Donations, contributions, grants, tax incentives (a)   41,152   22,136   12,829
Leasing and rent   21,067  9,705  8,536
Net losses (gains) in the decommissioning and disposal of assets  (61)   44,020   38,151
Advertising and publicity      
Associação das Emissoras de Radiodifusão do Paraná - AERP   11,400   11,455   10,862
Talento Olímpico Paranaense - TOP  4,750  4,750  4,719
Sponsorship 897  1,126  2,460
Publicity   11,953  9,598  7,206
Other net income, costs and expenses (9,573)   40,471   (119,440)
  309,488 333,275 212,495

 

 

(a) The balance includes the Company’s social investments in education, culture, health, sports, among others, including incentive donations used as a tax benefit.

 

 

   
 F-99 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

34.Financial Results

       
       
  12.31.2021 12.31.2020 12.31.2019
Financial income      
Arrears charges on bills  326,217   271,966  215,522
Interest and monetary variation of CRC transfer (Note 8.1)  255,777   341,964  192,724
Return on financial investments  163,888 80,704  119,622
Remuneration of net sectorial assets and liabilities (Note 9.2)   35,902 20,168   47,378
Monetary variation over the Itaipu power purchase   30,043 42,729   26,332
Recognition of tax credit (Note 13.2.1)   21,640   944,549   38,434
Exchange variation on loan collateral  9,243 35,089   -
Monetary variation and adjustment to present value of accounts       
payable related to the concession (Note 27.1)  5,373   2,322  1,462
Derivatives fair value - forward contract (Note 36.2.3 - b)   - 24,511   -
Other financial income  125,594   160,100  121,283
(-) Pis/Pasep and Cofins taxes on interes on capital  (41,628)   (84,434)  (33,251)
   932,049   1,839,668  729,506
( - ) Financial expenses      
Monetary and exchange variation and debt charges  855,814   607,569  853,880
Monetary variation and adjustment to present value of accounts       
payable related to the concession (Note 27.1)  200,629   192,848  100,455
Monetary variation over the Itaipu power purchase   58,814 75,478   29,547
PIS/Pasep/Cofins taxes on interest on capital   34,382 27,748   71,549
Derivatives fair value - forward contract (Note 36.2.3 - b)   20,401 -  1,203
Interest on R&D and EEP (Note 26.2)   14,814 12,550   24,570
Remuneration of net sectorial assets and liabilities (Note 9.2)  3,744  62  5,753
Interest and monetary variation of CRC transfer (Note 8.1)  1,787 -  8,495
Other financial expenses   69,025 57,142   89,418
   1,259,410   973,397  1,184,870
Net (327,361)   866,271 (455,364)

 

 

 

35.Operating Segments

Operating segments are business activities that generate revenues and incur expenses, whose operating results are regularly reviewed by the executive boards of the Company and by key strategic decision-maker responsible for allocating funds and assessing performance.

35.1Products and services from which the reportable segments have their revenues generated

The Company operates in reportable segments identified by Management, through the chief officers of each business area, taking into consideration the regulatory environments, the strategic business units and the different products and services. These segments are managed separately, since each business and each company require different technologies and strategies.

   
 F-100 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Until December 31, 2021, all sales have been to customers within the Brazilian territory, in addition, all noncurrent assets are also located in the national territory. The Company does not identify any customer who individually accounts for more than 10% of their total net revenue until December 31, 2021.

The Company evaluates the performance of each segment, based on information derived from the accounting records. The accounting policies of the operating segments are the same as those described in Note 4 of these financial statements.

35.2Company’s reportable segments

The reportable segments of the Company, in accordance with IFRS 8, are:

Power generation and transmission (GET) - its attribution is to produce electricity from hydraulic, wind, and thermal projects (GER) and to provide services of transmission and transformation of electric power, being responsible for the construction, operation and maintenance of substations, as well for the energy transmission lines (TRA); for managers, the assets and liabilities of the generation and transmission segments are shown on an aggregate basis while their result is presented separately;

Power distribution (DIS) - its attribution is to provide public electricity distribution services, being responsible for the operation and maintenance of the distribution infrastructure, as well as providing related services;

Telecommunications (TEL) - its attribution is to provide telecommunications and general communication services. The segment was discontinued after the completion of the divestment process of Copel Telecomunicações, detailed in Note 41;

GAS - its attribution is to provide public service of piped natural gas distribution;

Power sale (COM) - its attribution is to trade energy and related services;

Holding Company (HOL) - its attribution is to participate in other companies.

 

35.3Assets by reportable segment

                   
ASSETS Electric Energy TEL GAS HOL Reclassi-
fications
Note 41
Intersegment operations Total
12.31.2021 GET DIS COM
TOTAL ASSETS 24,844,335 20,804,701 1,519,017  - 827,901 3,243,736 (1,451,159) (250,996) 49,537,535
CURRENT ASSETS   3,316,406   6,448,051 755,227  - 355,500 2,356,145 (652,886) (1,388,571) 11,189,872
NON-CURRENT ASSETS   21,527,929 14,356,650 763,790  - 472,401 887,591 (798,273)  1,137,575 38,347,663
Long term assets   6,639,545   7,664,328 757,873  - 362,649 694,197 (129,077) (246,193) 15,743,322
Investments   2,887,272   540  -  -  - 154,322   -   -  3,042,134
Property, plant and equipment 10,123,352 - 305  -  -  18,934 (651,458)  651,458 10,142,591
Intangible assets   1,799,391   6,596,184 4,038  -  96,145 5,230 (8,202)  722,774  9,215,560
Right-of-use asset 78,369 95,598 1,574  -  13,607  14,908 (9,536)  9,536  204,056
                   
                   

 

                   
ASSETS Electric Energy TEL GAS HOL Reclassi-
fications
Note 41
Intersegment operations Total
12.31.2020 GET DIS COM
TOTAL ASSETS 20,945,910 20,407,088 1,053,099 1,565,593 749,434 4,733,847 (1,230,546) (1,439,761) 46,784,664
CURRENT ASSETS   3,137,219   6,198,414 390,695 666,654 245,028 2,543,995 (380,954) (1,393,620) 11,407,431
NON-CURRENT ASSETS   17,808,691 14,208,674 662,404 898,939 504,406 2,189,852 (849,592)  (46,141) 35,377,233
Long term assets   5,561,545   7,915,662 660,229 136,527 358,719 2,007,064 (110,834) (438,633) 16,090,279
Investments   2,574,402   808  -  -  - 154,307   -   -  2,729,517
Property, plant and equipment   9,420,859 - 224 734,172  -  24,500 (716,924)   32,629  9,495,460
Intangible assets  223,222   6,203,387 1,833  16,993 132,366 2,379   (10,587)  359,863  6,929,456
Right-of-use asset 28,663 88,817 118  11,247  13,321 1,602   (11,247)   -  132,521

 

   
 F-101 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

35.4Statement of income by reportable segment
                     
STATEMENT OF INCOME Electric Energy TEL GAS HOL Reclassi-
fications
Note 41
Inter-
segment operations
Total
  GET    
12.31.2021 GER TRA DIS COM
                     
NET OPERATING REVENUES  6,185,468 1,541,080   14,836,392  4,536,414  243,611 783,277   40,478 (228,379) (3,954,054)   23,984,287
Net operating revenues - third-parties  3,823,917 1,181,374   14,785,432  3,395,592  228,379 757,494   40,478 (228,379) -   23,984,287
Net operating revenues - between segments  2,361,551 359,706   50,960  1,140,822 15,232   25,783  - - (3,954,054)   -
OPERATING COSTS AND EXPENSES (3,312,461)   (457,137)  (13,669,382) (4,478,439) (222,883)   (654,643)   (246,871) 81,805  4,055,448  (18,904,563)
Energy purchased for resale (1,279,857)  -   (7,277,499) (4,450,586) -   -  - -  3,504,199   (9,503,743)
Charges for use of the main transmission grid (524,562)  -   (2,363,451) - -   -  - -  386,372   (2,501,641)
Personnel and management (281,498)   (167,041)   (905,338)   (18,568)   (39,365)  (39,121)  (99,926) - -   (1,550,857)
Pension and healthcare plans   (44,166)  (27,954)   (155,774)  (1,547)  (6,289) (5,154)   (7,889) - -   (248,773)
Materials and supplies  (9,863)   (4,161)  (51,722)   (17) (965) (3,590)   (471)  965   2  (69,822)
Raw materials and supplies for generation  (1,878,815)  -   - - -   -  - - 23,867   (1,854,948)
Natural gas and supplies for gas business -  -   - - -   (506,065)  - - -   (506,065)
Third party services (203,823)  (30,699)   (450,752)  (2,925)   (38,690)  (13,850)  (26,147) 38,690 21,597   (706,599)
Depreciation and amortization (616,267)  (11,431)   (406,632) (234)   (77,901)  (41,178)   (3,515)   1,893 72,726   (1,082,539)
Provision (reversal) for litigations   (25,238)   (9,151)  (89,662) (295)   4,845  (15,510)  (50,215)  (4,845) -   (190,071)
Impairment of assets  150,697   (155)   - -   5,156  (15,688)  -  (5,156) - 134,854
Other estimated losses, provisions and reversals  (1,975)   (3,498)   (182,197) (511)  (8,612)  2,611  (28,662)   8,612 28,662   (185,570)
Construction cost -   (187,733)   (1,700,889) - -  (11,222)  - - -   (1,899,844)
Hydrological Risk Renegotiation - GSF  1,570,543  -   - - -   -  - - - 1,570,543
Other operating costs and expenses, net (167,637)  (15,314)  (85,466)  (3,756)   (61,062) (5,876)  (30,046) 41,646 18,023   (309,488)
EQUITY IN EARNINGS OF INVESTEES 16,596 339,774   - - -   - 9,944 - - 366,314
PROFIT (LOSS) BEFORE FINANCIAL                    
 INCOME AND TAX   2,889,603 1,423,717 1,167,010 57,975 20,728 128,634   (196,449) (146,574)  101,394 5,446,038
Financial income  128,461   19,542 457,697 14,151 19,183   19,422 313,617   (19,180)   (20,844) 932,049
Financial expenses (506,541)   (160,961)   (391,228) (211)   (44,928) (9,605)   (211,708) 44,928 20,844   (1,259,410)
OPERATING PROFIT (LOSS)  2,511,523 1,282,298 1,233,479 71,915  (5,017) 138,451  (94,540) (120,826)  101,394 5,118,677
Income tax and social contribution   (675,107)   (262,395)   (375,597)   (18,190)  (6,284)  (38,860)   93,879 47,648   (24,726)   (1,259,632)
NET INCOME (LOSS) FROM CONTINUING OPERATIONS  1,836,416 1,019,903 857,882 53,725   (11,301)   99,591   (661)   (73,178) 76,668 3,859,045
Result of discontinued operations -  -   - - -   - 1,116,379 73,178 - 1,189,557
NET INCOME (LOSS)  1,836,416 1,019,903 857,882 53,725   (11,301)   99,591 1,115,718 - 76,668 5,048,602

 

                     
                     
STATEMENT OF INCOME Electric Energy TEL GAS HOL Reclassi-
fications
Note 41
Inter-
segment operations
Total
  GET    
12.31.2020 GER TRA DIS COM
                     
NET OPERATING REVENUES  4,030,979 1,186,215  12,363,459  386,634  535,206   2,420,657 - (355,843) (1,934,058)  18,633,249
Net operating revenues - third-parties  2,599,807 875,240  12,312,047  355,845  522,328   2,323,825 - (355,843)   -  18,633,249
Net operating revenues - between segments  1,431,172 310,975   51,412 30,789 12,878 96,832 - - (1,934,058)  -
OPERATING COSTS AND EXPENSES (2,348,409)   (536,968) (10,674,981) (363,673) (452,495)  (2,262,053) (107,059)  203,779  1,968,329 (14,573,530)
Energy purchased for resale (260,650)  -   (5,856,372) - -  (2,239,388) - -  1,526,880   (6,829,530)
Charges for use of the main transmission grid (489,921)  -   (1,370,814) - - - - -  335,168   (1,525,567)
Personnel and management (277,905)   (168,828)   (994,037)   (82,817)   (35,998)   (15,007)   (27,303) -   -   (1,601,895)
Pension and healthcare plans   (38,196) (23,972)   (146,422)   (11,207)  (4,663)  (1,493)  (2,681) -   -   (228,634)
Materials and supplies (9,695)   (3,466)  (58,196)  (1,364) (580) (28) (715)   1,364   -  (72,680)
Raw materials and supplies for generation  (415,405)  -  - - - - - - 10,909   (404,496)
Natural gas and supplies for gas business   -  -  - - (354,701) - - -   -   (354,701)
Third party services (118,562) (24,863)   (405,854)   (66,426)   (11,633)  (1,493)   (32,025) 66,426 36,389   (558,041)
Depreciation and amortization (583,958) (11,812)   (374,851) (147,190)   (31,452) (75)  (2,345)  107,497 34,273   (1,009,913)
Provision (reversal) for litigations   (53,216) (24,529)  (55,118)  336   (85) (62)   (17,259) (336)   -   (150,269)
Impairment of assets 48,111  -  - 54,945 - - -   (54,945)   -   48,111
Other estimated losses, provisions and reversals (5,930)   (4,149)   (123,980)   (18,088) (238)  (839) - 18,088   -   (135,136)
Construction cost   -   (255,578)   (1,154,488) -  (7,438) - - -   -   (1,417,504)
Other operating costs and expenses, net (143,082) (19,771)   (134,849)   (91,862)  (5,707)  (3,668)   (24,731) 65,685 24,710   (333,275)
EQUITY IN EARNINGS OF INVESTEES  9,629 176,848  - - - (93)   7,163 -   - 193,547
PROFIT (LOSS) BEFORE FINANCIAL                    
 INCOME AND TAX   1,692,199 826,095 1,688,478 22,961 82,711   158,511   (99,896) (152,064) 34,271 4,253,266
Financial income  121,129  21,977 1,334,983 24,968 13,599 11,469  340,404   (24,939) (3,922) 1,839,668
Financial expenses (408,795) (97,417)   (291,002)   (58,317)   (14,363) (96) (165,647) 58,317  3,923   (973,397)
OPERATING PROFIT (LOSS)  1,404,533 750,655 2,732,459   (10,388) 81,947   169,884 74,861 (118,686) 34,272 5,119,537
Income tax and social contribution   (337,564)   (149,962)   (878,278)   2,357   (22,967)   (57,947)  125,293 43,108 (9,405)   (1,285,365)
NET INCOME  (LOSS) FROM CONTINUING OPERATIONS  1,066,969 600,693 1,854,181  (8,031) 58,980   111,937  200,154   (75,578) 24,867 3,834,172
Result of discontinued operations   -  -  - - - - - 75,578   -   75,578
NET INCOME (LOSS)  1,066,969 600,693 1,854,181  (8,031) 58,980   111,937  200,154 - 24,867 3,909,750
   
 F-102 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
                     
                     
STATEMENT OF INCOME Electric Energy TEL GAS HOL Reclassifi-
cations
Note 41
Intersegment operations Total
  GET    
12.31.2019  GER TRA DIS COM
NET OPERATING REVENUES 3,368,375 871,510   10,401,301 1,810,901 418,030 866,884 -   (375,028)  (1,492,727) 15,869,246
Net operating revenues - third-parties 2,233,367 643,596   10,352,690 1,773,765 375,030 865,826 -   (375,028)   - 15,869,246
Net operating revenues - between segments 1,135,008 227,914 48,611   37,136   43,000  1,058 - -  (1,492,727)  -
OPERATING COSTS AND EXPENSES   (1,659,225)   (479,538)   (9,579,915)   (1,608,245)   (604,616)   (662,306)  (59,232) 486,633 1,492,727  (12,673,717)
Energy purchased for resale   (262,288) -   (5,424,207)   (1,590,272) - - - - 1,171,493 (6,105,274)
Charges for use of the main transmission grid   (451,107) -   (1,044,135) - - - - - 245,967 (1,249,275)
Personnel and management   (217,792)   (139,662)   (822,772)  (13,041)  (73,890)  (36,932)  (21,293) -   - (1,325,382)
Pension and healthcare plans  (37,955)  (25,027)   (155,784) (1,481)  (11,384) (4,122) (2,573) -   - (238,326)
Materials and supplies  (10,987) (3,766)  (64,419)   (15) (1,955) (217) (793)  1,955   -   (80,197)
Raw materials and supplies for generation   (50,388) -  - - - - - -  1,036   (49,352)
Natural gas and supplies for gas business - -  - - -   (585,233) - -   - (585,233)
Third party services   (108,309)  (38,092)   (397,390) (1,718)  (87,113)  (12,971)  (16,734)   87,113   49,206 (526,008)
Depreciation and amortization   (551,576)  (12,987)   (343,597)   (44)   (152,863)  (30,480) (2,289) 143,108   - (950,728)
Provision (reversal) for litigations  (45,212)  (24,398)   (164,705) (156)  (14,072) (292) (9,086)   14,072   - (243,849)
Impairment of assets 117,648 -  - - - -  3,041 -   -   120,689
Other estimated losses, provisions and reversals   43,207  (41,350)   (137,680)  (4)   (100,691) (1,063)  (2) 100,691   - (136,892)
Construction cost -   (175,220)   (904,023) - -  (12,153) - -   - (1,091,396)
Other operating costs and expenses, net  (84,466)  (19,036)   (121,203) (1,514)   (162,648)   21,157 (9,503) 139,694   25,025 (212,494)
EQUITY IN EARNINGS OF INVESTEES   14,840   85,752  - (280) - -  6,445 -   -   106,757
PROFIT (LOSS) BEFORE FINANCIAL                    
 INCOME AND TAX  1,723,990 477,724  821,386 202,376   (186,586) 204,578  (52,787) 111,605   -   3,302,286
Financial income   80,632   20,637  355,152  3,004   20,760   53,625 217,057  (20,735)   (626)   729,506
Financial expenses   (457,528)   (138,947)   (273,909) (220)  (53,857)  (10,439)   (304,453)   53,857  626 (1,184,870)
OPERATING PROFIT (LOSS) 1,347,094 359,414  902,629 205,160   (219,683) 247,764   (140,183) 144,727   -   2,846,922
Income tax and social contribution     (289,831)  (54,695)   (201,236)  (69,854)   68,644  (74,791)  (17,563)  (36,334)   - (675,660)
OPERATING PROFIT (LOSS) 1,057,263 304,719  701,393 135,306   (151,039) 172,973   (157,746) 108,393   -   2,171,262
Income tax and social contribution   - -  - - - - -   (108,393)   - (108,393)
NET INCOME (LOSS) 1,057,263 304,719  701,393 135,306   (151,039) 172,973   (157,746) -     2,062,869

 

 

35.5Additions to noncurrent assets by reportable segment

               
               
  Electric Energy TEL GAS HOL Total
12.31.2021 GET DIS COM
               
 Contract assets  -   1,604,400 - - 14,269 -   1,618,669
 Property, plant and equipment   497,773 -   126 59,292 -   2,012  559,203
 Intangible assets    5,607 -   2,300   179 -   2,289 10,375
 Right-of-use asset  37,987 40,469   1,536 11,406   3,243   3,624 98,265
               
               
  Electric Energy TEL GAS HOL Total
12.31.2020 GET DIS COM
               
Contract assets -   1,278,578 - - 15,187 -   1,293,765
Property, plant and equipment  236,914 -   203  127,381 -   1,800  366,298
Intangible assets   7,397 -   1,741   808 -   1,045 10,991
Right-of-use asset 19,231 72,421   135 10,135   623   1,026  103,571
               

 

 

   
 F-103 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

 

 

36.Financial Instruments
36.1Categories and determination of fair value of financial instruments

 

             
        12.31.2021   12.31.2020
  Note Level Book value Fair value Book value Fair value
Financial assets            
Fair value through profit or loss            
Cash and cash equivalents (a) 5 1 3,472,845 3,472,845 3,222,768 3,222,768
Bonds and securities (b) 6 1  14,571  14,571 751 751
Bonds and securities (b) 6 2   346,487   346,487   299,779   299,779
Accounts receivable - distribution concession (c) 10.1 and 10.2 3 1,433,734 1,433,734 1,149,934 1,149,934
Accounts receivable - generation concession (d) 10.4 3   102,220   102,220  81,202  81,202
Derivatives fair value - forward contracts (e) 12 3 2,907 2,907  23,308  23,308
Fair value in the purchase and sale of power (e) 12 3   855,775   855,775   689,531   689,531
Other temporary investments (f)   1  14,072  14,072  14,910  14,910
Other temporary investments (f)   2 5,913 5,913 7,475 7,475
      6,248,524 6,248,524 5,489,658 5,489,658
Amortized cost            
Collaterals and escrow accounts (a)     182 182 197 197
Collateral and escrow deposits - STN (g) 22.1     142,764   115,643   133,521   113,477
Trade accounts receivable (a) 7   4,515,426 4,515,426 3,819,680 3,819,680
CRC Transferred to the Paraná State Government (h) 8    -  - 1,392,624 1,496,016
Sectorial financial assets (a) 9     767,480   767,480   346,930   346,930
Accounts receivable - concessions - bonus from             
  the grant (i) 10.3     730,851   828,673   671,204   763,070
      6,156,703 6,227,404 6,364,156 6,539,370
Total financial assets      12,405,227  12,475,928  11,853,814  12,029,028
Financial liabilities            
Fair value through profit or loss            
Fair value in the purchase and sale of power (e) 29 3   545,468   545,468   343,406   343,406
        545,468   545,468   343,406   343,406
Amortized cost            
Sectorial financial liabilities (a) 9     293,179   293,179   188,709   188,709
Special Tax Regularization Program - Pert (g)  13.2     421,694   361,080   459,303   377,375
PIS and Cofins to be refunded to consumers (a) 13.2.1   3,326,795 3,326,795 3,927,823 3,927,823
Accounts payable to suppliers (a) 21   2,710,984 2,710,984 2,436,452 2,436,452
Loans and financing (g) 22   3,738,269 3,313,645 3,214,249 2,956,696
Debentures (j) 23   8,240,769 8,240,769 6,837,819 6,837,819
Accounts payable related to concession (k) 27     903,959 1,009,867   731,864   811,329
       19,635,649  19,256,319  17,796,219  17,536,203
Total financial liabilities      20,181,117  19,801,787  18,139,625  17,879,609
Different levels are defined as follows:
Level 1: Obtained from quoted prices (not adjusted) in active markets for identical assets and liabilities;
Level 2: obtained through other variables in addition to quoted prices included in Level 1, which are observable for the assets or liabilities;
Level 3: obtained through assessment techniques which include variables for the assets or liabilities, which however are not based on observable market data. 

Determining fair values

a)Equivalent to their respective carrying values due to their nature and terms of realization.
b)Fair value is calculated based on information made available by the financial agents and the market values of the bonds issued by the Brazilian government
c)The criteria are disclosed in Note 4.4 to these financial statements.
d)The fair values of generation assets approximate their carrying amounts, according to Note 4.4 to these financial statements.
   
 F-104 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
e)The fair values of assets and liabilities are equivalent to their carrying amounts according to Note 4.15 to these financial statements.
f)Investments in other companies, stated at fair value, which is calculated according to the price quotations published in an active market, for assets classified as level 1 and determined in view of the comparative assessment model for assets classified as level 2.
g)The cost of the last issue of Copel’s debentures, CDI + 1.38%, is used as a basic assumption for discount of the expected payment flows.
h)The Company based its calculation on the comparison with a long-term and post-fixed National Treasury Bond (NTN-B) maturing on August 15, 2026, which yields approximately 3.87% p.a. plus the IPCA inflation index.
i)Receivables related to the concession agreement for providing electricity generation services under quota arrangements, having their fair value calculated by expected cash inflows, discounted at the rate established by ANEEL auction notice 12/2015 (9.04%).
j)Calculated from the Unit Price quotation (PU) for December 31, 2021, obtained from the Brazilian Association of Financial and Capital Markets (ANBIMA), net of unamortized financial cost.
k)Actual net discount rate of 8.75% p.a., in line with the Company’s estimated rate for long-term projects.

 

36.2Financial risk management

The Company’s business activities are exposed to the following risks arising from financial instruments:

36.2.1Credit risk

Credit risk is the risk of the Company incurring losses due to a customer or counterparty in a financial instrument, resulting from failure in complying with their contractual obligations.

     
Exposure to credit risk 12.31.2021 12.31.2020
Cash and cash equivalents (a) 3,472,845 3,222,768
Bonds and securities (a) 361,058 300,530
Pledges and restricted deposits linked (a) 142,946 133,718
Trade accounts receivable (b) 4,515,426 3,819,680
CRC Transferred to the Paraná State Government (c)   - 1,392,624
Sectorial financial assets (d) 767,480 346,930
Accounts receivable - distribution concession (e) 1,433,734 1,149,934
Accounts receivable - concessions - Bonus from the grant (f) 730,851 671,204
Accounts receivable - generation concessions (g) 102,220   81,202
Other temporary investments (h)   19,985   22,385
    11,546,545   11,140,975
a)The Company manages the credit risk of its assets in accordance with the Management’s policy of investing virtually all of its funds in federal banking institutions. As a result of legal and/or regulatory requirements, in exceptional circumstances the Company may invest funds in prime private banks.
   
 F-105 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
b)The risk arises from the possibility that the Company might incur losses resulting from difficulties to receive its billings to customers. This risk is directly related to internal and external factors to Copel. To mitigate this type of risk, the Company manages its accounts receivable, detecting the classes of consumers most likely to default, implementing specific collection policies and suspending the supply and/or recording of energy and the provision of service, as established in contract and regulatory standards.
c)There is no risk considering that the balance was settled in 2021.
d)Management considers the risk of this credit to be reduced, since the agreements signed guarantee the unconditional right to receive cash at the end of the concession to be paid by the Concession Grantor, corresponding to the costs not recovered through the tariff.
e)Management considers the risk of this credit to be reduced, since the agreements signed guarantee the unconditional right to receive cash at the end of the concession to be paid by the Concession Grantor, referring to investments in infrastructure not recovered through the tariff.
f)Management considers the risk of such credit to be low, as the contract for the sale of energy by quotas guarantees the receipt of an Annual Generation Revenue - RAG, which includes the annual amortization of this amount during the concession term.
g)For the generation concession assets, ANEEL published Normative Resolution 596/2013, which deals with the definition of criteria for calculating the New replacement value (Valor novo de reposição – VNR), for the purposes of indemnification. In July 2021, Normative Resolution No. 942/2021 was published, regulating the calculation of these amounts through the presentation of appraisal reports to be prepared by accredited companies. Management’s expectation of indemnification for these assets supports recoverability of the balances recorded.
h)This risk arises from the possibility that the Company might incur losses resulting from the volatility on the stock market. This type of risk involves external factors and has been managed through periodic assessment of the variations occurred in the market.

 

36.2.2Liquidity risk

The Company’s liquidity risk consists of the possibility of having insufficient funds, cash or other financial assets, to settle obligations on their scheduled maturity dates.

The Company manages liquidity risk relying on a set of methodologies, procedures and instruments applied to secure ongoing control over financial processes to ensure proper management of risks.

Investments are financed by incurring medium and long-term debt with financial institutions and capital markets.

Short, medium and long-term business projections are made and submitted to Management bodies for evaluation. The budget for the next fiscal year is annually approved.

   
 F-106 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Medium and long-term business projections cover monthly periods over the next five years. Short-term projections consider daily periods covering only the next 90 days.

The Company permanently monitors the volume of funds to be settled by controlling cash flows to reduce funding costs, the risk involved in the renewal of loan agreements and compliance with the financial investment policy, while concurrently keeping minimum cash levels.

The following table shows the expected undiscounted settlement amounts in each time range. Projections were based on financial indicators linked to the related financial instruments and forecast according to average market expectations as disclosed in the Central Bank of Brazil’s Focus Report, which provides the average expectations of market analysts for these indicators for the current year and for the next 3 years. As from 2026, 2025 indicators are repeated on an unaltered basis throughout the forecast period.

 

               
               
    Less than 1 to 3 3 months 1 to 5 Over  
   Interest (a)   1 month    months   to 1 year    years   5 years   Total  
12.31.2021              
Loans and financing Note 22  37,039  97,025   729,794  2,047,981   2,234,468  5,146,307
Debentures Note 23  65,956  56,696   2,727,331  6,362,806   2,029,487   11,242,276
Accounts payable related  Rate of return +            
  to concession IGP-M and IPCA   8,948  17,904  82,977  500,875   2,431,666  3,042,370
Accounts payable to suppliers -   2,355,760   236,941  51,322   66,961 -  2,710,984
PIS and Cofins to be refunded              
  to consumers - -  - -  3,363,440 -  3,363,440
Special Tax Regularization Program - Pert  Selic   4,375 8,829  41,411  258,120   232,257  544,992
Sectorial financial liabilities Selic  11,736  23,760   112,857  182,395 -  330,748
Lease liability Note 28   5,444  10,919  48,886  119,212   207,099  391,560
      2,489,258   452,074   3,794,578   12,901,790   7,134,977   26,772,677
(a) Effective interest rate - weighted average.

 

As disclosed in Notes 22.5 and 23.3, the Company has loans and financing agreements and debentures with covenants that if breached may have their payment accelerated.

36.2.3Market risk

Market risk is the risk that the fair value or the future cash flows of a financial instrument shall oscillate due to changes in market prices, such as currency rates, interest rates and stock price. The purpose of managing this risk is to control exposures within acceptable limits, while optimizing return.

a)Foreign currency risk (US Dollar)

This risk comprises the possibility of losses due to fluctuations in foreign exchange rates, which may reduce assets or increase liabilities denominated in foreign currencies.

The Company’s foreign currency indebtedness is not significant, and it is not exposed to foreign exchange derivatives. The Company monitors all relevant foreign exchange rates.

The effect of the exchange rate variation resulting from the power purchase agreement with Eletrobras (Itaipu) is transferred to customers in Copel DIS’s next tariff adjustment.

   
 F-107 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The exchange rate risk posed by the purchase of gas arises from the possibility of Compagas reporting losses on the fluctuations in foreign exchange rates, increasing the amount in Reais of the accounts payable related to the gas acquired from Petrobras. This risk is mitigated by the monitoring and transfer of the price fluctuation through tariff, when possible. The Company monitors these fluctuations on an ongoing basis.

Sensitivity analysis of foreign currency risk

The Company has developed a sensitivity analysis in order to measure the impact of the devaluation of the US dollar on its loans and financing subject to currency risk.

The valuation of the financial instruments considers the possible effects on profit and loss and equity of the risks evaluated by the Company’s Management on the reporting date for the financial instruments, as recommended by IFRS 7 - Financial Instruments: Disclosure. Based on the equity position and the notional value of the financial instruments outstanding at the date of these financial statements, it is estimated that these effects will approximate the amounts stated in the above table in the column for the forecast probable scenario, since the assumptions used by the Company are similar to those previously described.

The baseline scenario takes into account the existing balances on the date of these financial statements and the probable scenario assumes a variation in the foreign exchange rate - prevailing at the end of the period (R$/US$5.50) based on the median market expectation for 2022 according to the Focus Report of February 18, 2022, issued by the Central Bank of Brazil, with the exception of the amounts related to the STN, which for the probable scenario considered the balances effectively realized, since the operation was settled on March 10, 2022. Additionally, the Company continues to monitor scenarios 1 and 2, which consider a deterioration of 25% and 50%, respectively, in the main risk factor of the financial instrument in relation to the level used in the probable scenario, as a result of extraordinary events that may affect the economic scenario.

 

           
           
.   Baseline  Projected scenarios
Foreign exchange risk Risk 12.31.2021 Probable   Scenario 1 Scenario 2
.          
Financial assets          
Collaterals and escrow accounts - STN USD depreciation 142,764 (14,967)  (a)   (a) 
.   142,764 (14,967)    
Financial liabilities          
Loans and financing - STN USD appreciation   (150,572)  13,425  (a)   (a) 
Suppliers          
Eletrobras (Itaipu) USD appreciation   (304,215) 4,388  (70,568)   (145,525)
Acquisition of gas USD appreciation  (60,121) 867  (13,946)  (28,759)
           
      (514,908)  18,680  (84,514)   (174,284)

(a) Projected scenarios not evaluated. Probable value reflects the settlement value of the transaction, which took place on March 10, 2022.

 

   
 F-108 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
b)Foreign exchange risk - euro

This risk arises from the possibility of loss due to fluctuations in exchange rates affecting fair value of Non-Deliverable Forward (NDF) transactions. These derivatives were contracted considering that in the supply contracts for wind turbines of companies in the Jandaíra wind complex, controlled by Copel GeT, disbursement installments in Euro are foreseen. Sporadic gains and losses are recognized in the Company’s statement of income.

Based on the notional amount of €2.200 outstanding at the date of these financial statements, the fair value was estimated by the difference between the amounts contracted under the respective terms and the forward currency quotations (B3 reference rates), discounted to present value at the fixed rate. The net asset balance recorded is shown in Note 12.

Sensitivity analysis of operations with derivative financial instruments

The Company developed a sensitivity analysis in order to measure the impact from exposure to fluctuation in exchange rate to Euro (€).

For the base scenario, the accounting balances recorded on the date of these financial statements were considered and for the probable scenario, the balances effectively carried out.

 

           
  Exchange Baseline  Projected scenarios
   rate variation 12.31.2021 Probable   Scenario 1 Scenario 2
           
Gains (losses) on operations with derivative financial instruments  Increase   2,907 996  (a)   (a) 
         
    Decrease   2,907 996  (a)   (a) 
(a) Projected scenarios not evaluated. Probable value reflects the settlement value of the transaction, which took place on March 10, 2022.

 

c)Interest rate and monetary variation risk

This risk comprises the possibility of losses due to fluctuations in interest rates or other indicators, which may reduce financial income or increase the financial expenses related to the assets and liabilities raised in the market.

The Company has not entered into derivative contracts to cover this risk but has been continuously monitoring interest rates and market indexes in order to observe any need for contracting.

Sensitivity analysis of interest rate and monetary variation risk

The Company has developed a sensitivity analysis in order to measure the impact of variable interest rates and monetary variations on its financial assets and liabilities subject to these risks.

   
 F-109 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The valuation of the financial instruments considers the possible effects on profit and loss and equity of the risks evaluated by the Company’s Management on the reporting date for the financial instruments, as recommended by IFRS 7 - Financial Instruments: Disclosure. Based on the equity position and the notional value of the financial instruments outstanding at the date of these financial statements, it is estimated that these effects will approximate the amounts stated in the above table in the column for the forecast probable scenario, since the assumptions used by the Company are similar to those previously described.

The baseline scenario takes into account the existing balances on the date of these financial statements and the probable scenario assumes balances reflecting varying indicators (CDI/Selic - 12.25%, IPCA - 5.56%, IGP-DI - 8.09%, IGP-M - 8.12% and TJLP - 6.55%) estimated as market average projections for 2022 according to the Focus Report of February 18, 2022, issued by the Central Bank of Brazil, except IGP-DI and TJLP that considers the Company’s internal projection. Additionally, the Company continues to monitor scenarios 1 and 2, which consider a deterioration of 25% and 50%, respectively, in the main risk factor of the financial instrument in relation to the level used in the probable scenario, as a result of extraordinary events that may affect the economic scenario.

 

           
.   Baseline  Projected scenarios
Interest rate risk and monetary variation Risk 12.31.2021 Probable   Scenario 1 Scenario 2
.          
Financial assets          
Bonds and securities Low CDI/SELIC   361,058  41,522  31,159  20,760
Collaterals and escrow accounts Low CDI/SELIC   182   21   15   11
Sectorial financial assets Low Selic   767,480  94,016  70,512  47,008
Accounts receivable - concessions Low IPCA   2,164,585 120,351  90,263  60,175
Accounts receivable - generation concessions Undefined (a)   102,220  -  -  -
      3,395,525 255,910 191,949 127,954
Financial liabilities          
Loans and financing          
  Banco do Brasil High CDI  (641,207) (78,548) (98,185)   (117,822)
  BNDES High TJLP  (1,864,177)   (122,023)   (152,529)   (183,035)
  BNDES High IPCA  (348,305) (19,366) (24,207) (29,049)
  Banco do Nordeste High IPCA  (626,043) (76,690) (95,863)   (115,035)
  Banco do Brasil - BNDES Transfer High TJLP   (72,109)   (4,720)   (5,900)   (7,080)
  Other No risk   (35,856)  -  -  -
Debentures High CDI/SELIC  (5,627,350)   (689,350)   (861,688)   (1,034,026)
Debentures High IPCA  (2,513,179)   (139,733)   (174,666)   (209,599)
Debentures High TJLP  (100,240)   (6,561)   (8,202)   (9,842)
Sectorial financial liabilities High Selic  (293,179) (35,914) (44,893) (53,872)
Special Tax Regularization Program - Pert  High Selic  (421,694) (51,658) (64,572) (77,486)
Accounts payable related to concession High IGP-M  (844,599) (68,581) (85,727)   (102,872)
Accounts payable related to concession High IPCA   (59,360)   (3,300)   (4,125)   (4,951)
.     (13,447,298)   (1,296,444)   (1,620,557)   (1,944,669)
(a) Risk assessment still requires ruling by the Concession grantor.

 

36.2.4Electricity shortage risk

Approximately 64% of installed capacity in Brazil currently comes from hydroelectric generation, as informed by the Generation Information Bank of ANEEL, which makes Brazil and the geographic region in which we operate subject to unpredictable hydrological conditions, due to non-cyclical deviations of mean precipitation. Unsatisfactory hydrological conditions may cause, among other things, the implementation of comprehensive programs of electricity savings, such as rationalization or even a mandatory reduction of consumption, which is the case of rationing.

   
 F-110 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

From September 2020, the National Interconnected System has been presenting the worst record of Affluent Natural Energies in the aggregate of its uses. The Ministry of Mines and Energy and other sector bodies are working to mitigate the risks of rationing, with emphasis on a high thermoelectric dispatch outside the order of cost merit, as well as the relaxation of restrictions on the system’s hydroelectric operation. Additionally, considering the strong wind generation in the Northeast and the generation of biomass in the Southeast, it is estimated that the risk of energy shortages in 2021 and 2022 will be minimized, according to official information published so far.

In order to mitigate the risk of meeting instant demand, the MME is managing large energy consumers in order to migrate their consumption from periods of greater demand. Which, in general, means moving production into the early morning hours. This guarantees the service to consumers with greater economy, since the operation in periods of high demand is very expensive.

The Electric Sector Monitoring Committee (CMSE) has maintained the energy deficit risk indicators within the safety margin in short-term projections, with the authorization of a reduced dispatch of thermal generation outside the order of merit of cost by ONS, which for in turn, it has dispatched the amounts necessary for a safe operation to the National Interconnected System.

Although dam storage levels are not ideal, from the standpoint of the bodies responsible for planning the operation of the system, when combined with other variables, such as affluent flows, wind and solar generation, they are sufficient to keep the risk of deficit within the safety margin established by the National Energy Policy Council (CNPE) in all subsystems (maximum risk of 5%).

36.2.5Risk of GSF impacts

The Energy Reallocation Mechanism (Mecanismo de Realocação de Energia - MRE, in Portuguese) is a system of redistribution of electric power generated, characteristic of the Brazilian electric sector, which has its existence by the understanding, at the time, that there is a need for a centralized operation associated with a centrally calculated optimal price known as PLD. Since generators have no control over their production, each plant receives a certain amount of virtual energy which can be compromised through contracts. This value, which enables the registration of bilateral contracts, is known as Physical Guarantee (Garantia Física - GF, in Portuguese) and is also calculated centrally. Unlike PLD, which is calculated on a weekly basis, GF, as required by Law, is recalculated every five years, with a limit of increase or decrease, restricted to 5% by revision or 10% in the concession period.

The contracts need to have an energy physical guarantee basis. This is done, especially, through the allocation of power generated received from the MRE or purchase. The GSF is the ratio of the entire hydroelectric generation of the MRE participants to the GF sum of all the MRE plants. Basically, the GSF is used to calculate how much each plant will receive from generation to back up its GF. Thus, knowing the GSF of a given month the company will be able to know if it will need to back up its contracts through purchases.

   
 F-111 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Whenever GSF multiplied by GF is less than the sum of contracts, the company will need to buy the difference in the spot market. However, whenever GSF multiplied by GF is greater than the total contracts, the company will receive the difference to the PLD.

The low inflows that have been recorded since 2014, as well as problems with delays in the expansion of the transmission system have resulted in low GSF values, resulting in heavy losses for the companies holding MRE participating hydroelectric projects.

For plants with contracts in the Free Contracting Environment - ACL, the main way to manage the low GSF risk is not to compromise the entire GF with contracts, as well as the timely repurchase of intra-annual energy approaches currently adopted by the Company.

For the contracts in the ACR, Law 13,203/2015 allowed the generators to contract insurance for electricity demand (load), by means of payment of a risk premium. Copel adopted this approach to protect contracts related to energy generated by the Mauá, Baixo Iguaçu and Colíder Thermoelectric Plants and Cavernoso II Small HPP.

For the distribution segment, the effects of the GSF are perceived in the costs associated with quotas of Itaipu, of Angra and the plants whose concessions were renewed in accordance with Law 12,783/2013, as well as in the costs of the contracts for power availability with thermoelectric plants. This is a financial risk, since there is guarantee of neutrality of expenses with energy purchases through a tariff transfer.

36.2.6Risk of non-renewal of concessions - generation and transmission

The extension of energy generation and transmission concessions, achieved by Law No. 9,074/1995, is regulated by Law No. 12,783/2013, which was amended by Law No. 14,052/2020, regarding the deadline for requesting an extension of concessions.

According to the new law, the concession operator should request extension of concession at least 36 months before the final contract date or after granting of concessions to hydroelectric power generation and electric power transmission and distribution plants, and of up to 24 months for thermoelectric plants. The Concession Grantor may advance effects of extension by up to 60 months counted as of contract or grant date and may also define initial tariff or revenue, which includes the definition of the tariff or initial revenues for the generation and transmission ventures (RAG - Annual Generation Revenue and RAP - Permitted Annual Revenue, respectively).

Concessions for hydroelectric power generation and electric power transmission may be extended, at the discretion of the granting authority, only once, for a period of up to 30 years. Thermoelectric power generation concessions have an extension term limited to 20 years.

   
 F-112 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

In 2019, Decree No. 10,135/2019 was published, which regulated the granting of concession contracts in the electricity sector associated with privatization through sale of control by holder of a public service concession for electricity generation, having as one of the conditioning factors the alteration of the exploration regime to Independent Power Producer (IPP). According to the Decree, the manifestation of sale of the concession must take place within up to 42 months from the date of the related formal agreement, and any sale must take place within up to 18 months from the concession end date. If sale of control of the venture does not occur within the specified period, the plant must be subject to auction by the granting authority and the same concessionaire can participate in the auction, if it meets the qualification conditions.

Compensation was established through the extension of the concession period of the plants contemplated by Law No. 13,203/2015, ratification of the period of extension of the concession of these plants through Ratification Resolutions No. 2919/2021 and No. 2932/2021 (Note 1-b).

For HPP Governador Bento Munhoz da Rocha Netto - HPP GBM (1,676 MW), whose concession will end in 2024, the Company has not expressed any interest in extending the concession, as internal studies have shown that the extension through early change of the exploration regime would be economically and financially disadvantageous in relation to exploration of the plant under the current regime until concession end. On March 3, 2020, Copel GeT transferred the concession of HPP GBM to subsidiary F.D.A. Geração de Energia Elétrica S.A. with the purpose of, if the studies carried out by Copel GeT point to the advantage of the operation, divesting the control of this concessionaire and, thus, allow a new concession grant for 30 years.

With respect to HPP São Jorge, whose concession ends in 2026, Copel did not express interest in the renewal and intends, at the end of the concession, to request ANEEL to convert the granting of concession into granting of registration.

Regarding the Figueira HPP concession, expired in March 2019, the Company awaits the conclusion of the related ANEEL and MME procedural steps to execute any amendment to the Concession Agreement. The plant is undergoing a modernization process and will have as direct benefits the improvement in energy efficiency and the reduction of pollutant emissions in the atmosphere, in comparison with the old plant.

According to the new law, the Company may express its intention to extend the concession of the Apucaraninha HPP until January 2024, and the Guaricana and Chaminé HPPs until July and August, 2025, respectively. If the Company does not express an interest in the extension of the current regime at its final term, be granted to the Company in the condition of registration, and the other concessions, at their final term, must be returned to the Concession Grantor.

Copel GeT has no transmission concession to expire in the next ten years.

   
 F-113 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
36.2.7Risk on non-renewal of concessions – distributions of electricity

The fifth amendment to Copel DIS’s concession contract No. 46/1999 imposes economic and financial efficiency covenants and indicators that consider the duration and frequency of service interruptions (DECi and FECi). Failure to comply with the conditions will result in termination of the concession (clause eighteen, subclause one), with due regard for the provisions of the contract, particularly the right to full defense and adversary system.

On November 17, 2020, Aneel approved Normative Resolution 896, which establishes the indicators and procedures for monitoring efficiency in relation to the continuity of supply and the economic-financial management of public electricity distribution service concessions from the year 2021.

Indicators and penalties

       
       
Year Indicator Criteria Penalties
Until 2020 Economic - financial efficiency and quality 2 consecutive years or at the end of the 5-year period (2020) Concession termination
Quality Indicators 2 consecutive years or 3 times in 5 years Limitation of dividend and interest on equity distribution
Economic - financial efficiency in the base year Capital Increase (a)
Limitation of dividend and interest on equity distribution
Restrictive regime for contracts with related parties
From the 6th year of (2021) Economic - financial efficiency 2 consecutive years Concession termination
Quality Indicators 3 consecutive years
(a) Within 180 days from the end of each fiscal year, in the totality of the insufficiency that occurs to reach the Minimum Economic and Financial Sustainability Parameter.

 

Targets for Copel Distribuição in 2021

 

The criterion of efficiency in relation to economic-financial management will not be complied when what is determined in the table below is not achieved, or even when the EBITDA is lower than the QRR. The calculation of results occurs at the end of each year, when the results are disclosed in the Regulatory Financial Statements.

             
      Quality - limits Quality (Performed)
Year Economic and Financial Management Realized DECi FECi  DECi  FECi 
2021 {Net Debt / [EBITDA (-) QRR ≥ 0]} ≤ 1 / (1,11 * Selic)  -   9.29   6.84   7.20   4.76

 

             
Net Debt Gross Debt deducted from Financial Assets, with the exception of Financial Assets and Financial Liabilities in administrative or judicial discussion. The accounts that make up the Gross Debt and Financial Assets are defined in the attachment to Resolution No 896/20.
QRR Regulatory Reinstatement Share or Regulatory Depreciation Expense. This value will be the one defined in the last Periodic Tariff Review, updated by the variation of the Regulatory Portion B and calculated on a pro rata basis.
Recurring EBITDA: Recurring: refers to Earnings Before Interest (Financial Result), Taxes (Income Taxes), Depreciation and Amortization.

 

   
 F-114 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

Targets for Copel Distribuição from 2016 to 2020

             
             
      Quality - limits (a) Quality (Performed)
Year Economic and Financial Management Realized DECi (b)  FECi (b)  DECi  FECi 
             
2016       13.61 9.24   10.80   7.14
2017  EBTIDA ≥ 0 (c)    661,391   12.54 8.74   10.41   6.79
2018  EBTIDA (-) QRR ≥ 0 (d)    550,675   11.23 8.24   10.29   6.20
2019  {Net Debt / [EBTIDA (-) QRR]} ≤ 1 / (0.8 * SELIC) (d)    822,386   10.12 7.74 9.10   6.00
2020  {Net Debt / [EBTIDA (-) QRR]} ≤ 1 / (1.11 * SELIC) (e)    1,624,821 9.83 7.24 7.81   5.55
(a) According to Aneel’s Technical Note No. 0335/2015.
(b) DECi - Equivalent Time of Interruption Caused by Internal Source per Consumer Unit; and FECi - Equivalent Frequency of Interruption Caused by Internal Source per Consumer Unit.
(c) Regulatory EBTIDA adjusted for non-recurring events (Voluntary retirement program, post-employment benefit, provisions and reversals) according to sub-clause six, of the Fifth Amendment to the Concession Agreement.
(d) QRR: Regulatory Reintegration Quota or Regulatory Depreciation Expense. This is the value defined in the most recent Periodical Tariff Review (RTP), plus General Market Price Index (IGPM) variation between the month preceding the RTP and the month preceding the twelve-month period of the economic and financial sustainability measurement.
(e) Selic: limited to 12.87% p.a.

 

36.2.8Risk of non-extension of the gas distribution concession

In the event of termination of the concession at the end of the contractual term, Compagas will be entitled to compensation for investments made in the last 10 years prior to the end of the concession at their depreciated replacement value, according to the contractual clause.

36.2.9Risk of overcontracting and undercontracting of electricity

Under the current regulatory model, the agreement for purchase of electric power by distributors is regulated by Law 10,484/2014 and Decree 5,163/2004, which determine that the purchase of energy must be in the volume necessary to serve 100% of the distributor’s market.

The difference between the costs remunerated by the tariff and those actually incurred in the power purchases are fully passed on to captive consumers, as long as the distributor presents a contracting level between 100% and 105% of its market. However, if distributors determine contracting levels lower or higher than the regulatory limits, there is the assurance of neutrality if it is identified that such violation derives from extraordinary and unforeseen events that are not manageable by the buyer.

In the last years, the distribution segment has been exposed to a general overcontracting scenario, as most companies determined contracting levels higher than 105%. Considering that several factors that have contributed to this situation are extraordinary and unavoidable by the distributors, such as the involuntary allocation of physical guarantee quotas and the broad migration of consumers to the free market and more recently, from 2020, the effects on the market of the governmental measures of social isolation implemented in the fight against the pandemic of the coronavirus Sars-CoV-2 (Covid-19), which caused a significant retraction in the market of distribution concessionaires, ANEEL and MME implemented a series of measures aiming at the mitigation of overcontracting.

   
 F-115 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

In relation 2021, the scenarios of supply and demand indicate the occurrence of overcontracting in relation to the contracted portion above the regulatory limits in the calendar year. However, the distributor will continue to exercise continuous vigilance in relation to its contracting levels and occurrences of involuntary events beyond its management, such as the migration of consumers to the free market and load reduction.

36.2.10Gas shortage risk

The natural gas market in Paraná covers Compagas consumers (non-thermoelectric market) and the Araucária Thermoelectric Plant (UEG Araucária). This market is currently supplied by contracts with Petrobras, which uses the transport infrastructure of the Brazil-Bolivia gas pipeline (Gasbol). As a result of the public call in 2021, Compagas signed a new contract with Petrobras for the supply of natural gas, effective from 2022 to 2025, which will make it possible to meet the demand that was uncontracted for 2022, as well as part of the estimated demand between 2023 and 2025. On the other hand, UEG Araucária negotiates and enters into short-term natural gas contracts as it does not have electricity generated under contract in the regulated environment.

In the current situation of the natural gas sector in Brazil, the New Gas Market program is coordinated by the Ministry of Mines and Energy together with the Civil House of the Presidency of the Republic, the Ministry of Economy, the Administrative Council for Economic Defense, the National Petroleum Agency and the Energy Research Company - EPE, whose purpose is to open the natural gas market in order to make it dynamic, competitive, integrated with the electric and industrial sector. This program is advancing, but still requires improvement of the sector’s regulation.

In the current natural gas market, there is already a growing supply of natural gas and diversified sources, having as alternatives the import of gas from Bolivia, import of liquefied natural gas (LNG), use of natural gas explored in onshore basins and greater use of natural gas from the pre-salt layer, which has large volumes to be explored. The biggest challenge of the sector still is enabling new producers and traders to access the infrastructure and the consumer market, currently mostly served by Petrobras.

Regarding the transport network, changes in regulation allow new shippers to access the gas pipelines, through public calls carried out by TBG (Gasbol transporter) with the purpose of offering the contracting of capacity in the gas pipeline. In addition, it is important to highlight the periodic updating of the Indicative Gas Pipeline Plan (PIG) coordinated by the EPE, which provides a vision of better structuring of the natural gas transport sector and adequate planning to meet current and future demands, even if for these latter significant investments are required.

Additionally, the new gas law, Law No. 14,134/2021, which replaces Law No. 11,909/2009, was signed, representing another important step in opening the Brazilian gas market, in order to make it more competitive and with greater potential expansion, in view of the fact that brings agility to the authorization, implantation and expansion of new ventures, as well as the possibility of third party access to existing infrastructures.

   
 F-116 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

A possible shortage in gas supply could result in losses to Copel due to a reduction in revenue from the natural gas distribution service provided by Compagas, as well as any penalty resulting from non-compliance with the obligations contained in the concession contract. In addition, in this scenario, UEG Araucária would probably be kept out of operation. However, this risk is considered low in view of the situation of the New Gas Market and the Law No. 14,134/2021.

36.2.11Risk of non-performance of windfarms

The power generation purchase and sale contracts for wind power are subject to performance clauses, which provide for a minimum annual and four-year generation of the physical guarantee committed in the auction. Ventures are subject to climatic factors associated with wind velocity uncertainties. Non-compliance with what is stated in the agreement may jeopardize future revenues of the Company. The balance recorded in liabilities referring to the non-performance is demonstrated in note 29.

36.2.12Risk related to price of power purchase and sale transactions

The Company operates in the electricity purchase and sale market with the objective of achieving results with variations in the price of electricity, respecting the risk limits pre-established by Management. This activity, therefore, exposes the Company to the risk of future electricity prices.

Future electricity purchase and sale transactions are recognized at fair value through profit or loss, based on the difference between the contracted price and the market price of operations on the balance sheet date.

Based on the notional amounts of R$7,530,281 (R$6,065,065 in 2020) for electricity purchase contracts and R$7,881,880 (R$6,634,477 in 2020) for electricity sales contracts, outstanding at the date of these financial statements, the fair value was estimated using the prices defined internally by the Company, which represented the best estimate of the future market price. The discount rate used is based on the NTN-B rate of return disclosed by ANBIMA, adjusted for credit risk and additional project risk.

The balances referring to these outstanding transactions at the date of these financial statements are stated below.

 

       
       
  Assets  Liabilities Net
Current   112,057   (106,889) 5,168
Noncurrent   743,718   (438,579)   305,139
    855,775   (545,468)   310,307

 

Sensitivity analysis on the power purchase and sale transactions

The Company developed a sensitivity analysis in order to measure the impact of changes in future prices. For the base scenario, the accounting balances recorded on the date of these financial statements were considered and for the probable scenario, the balances updated with the market price curve and NTN-B rate of December 31, 2021 were considered. Additionally, the Company continues to monitor scenarios 1 and 2, which consider the 25% and 50% rise or fall applied to future prices considered in the probable scenario, as a result of extraordinary events that may affect the economic scenario.

   
 F-117 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

           
  Price Baseline  Projected scenarios
  variation 12.31.2021 Probable   Scenario 1 Scenario 2
           
Unrealized gains (losses) on purchase and sale of energy  Increase  310,307 299,404 347,905 396,407
         
    Decrease  310,307 299,404 250,900 202,398

 

36.2.13Counterparty risk in the energy market

Since free energy market still does not have a counterparty acting as guarantor of all agreements (clearing house), there is a bilateral risk of default. Thus, the Company is exposed to the risk of failure in the supply of energy contracted by the seller. In the event of such failure, the Company must buy energy at the spot market price, being further subject to regulatory penalties and loss of amounts paid.

The Company follows a policy that establishes limits for possible operations with each counterparty, after analyzing its credit worthiness, maturity and history.

In addition, even if our policy is more restrictive and the counterparties present good financial condition, the Company is exposed to systemic events in which the default of one agent ends up affecting other energy trading companies in a "domino effect" until reaching the Company’s counterparties.

36.3Capital management

The Company seeks to keep a strong capital base to maintain the trust of investors, creditors and market and ensure the future development of the business. Management also strives to maintain a balance between the highest possible returns with more adequate levels of borrowings and the advantages and the assurance afforded by a healthy capital position. Thus, it maximizes the return for all stakeholders in its operations, optimizing the balance of debts and equity.

The Company monitors capital by using an index represented by adjusted net debt divided by adjusted EBITDA (Earnings before interest, taxes, depreciation and amortization), for the last twelve months. The corporate limit established in the debt indentures provides for maintenance of ratio below 3.5 while any expectation of failing to meet this target will prompt Management to take steps to correct its course by the end of each reporting period.

   
 F-118 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

As of December 31, 2021 and 2020, the ratio attained is shown below:

 

     
     
  12.31.2021 12.31.2020
Loans and financing 3,678,444 3,188,531
Debentures  8,147,617 6,757,481
(-) Cash and cash equivalents   (3,472,845)   (3,222,768)
(-) Bonds and securities (current) (16,121)   (1,465)
(-) Bonds and securities (noncurrent) - debt contract guarantees   (237,183)   (175,901)
(-) Collaterals and escrow accounts STN   (142,764)   (133,521)
Adjusted net debt 7,957,148 6,412,357
Net income from continuing operations 3,859,045 3,834,172
Equity in earnings of investees   (366,314)   (193,547)
Deferred IRPJ and CSLL 790,406  24,896
Provision for IRPJ and CSLL 469,226 1,260,469
Financial expenses (income), net 327,361   (866,271)
Depreciation and amortization 1,082,539 1,009,913
Ebitda from discontinued operations 1,872,381 259,560
Adjusted ebitda 8,034,644 5,329,192
Adjusted net debt/Adjusted ebitda   0.99   1.20

 

 

36.3.1Debt to equity ratio:
     
Indebtedness 12.31.2021 12.31.2020
Loans and financing  3,738,269  3,168,710
Debentures  8,240,769  8,540,366
(-) Cash and cash equivalents  3,472,845  3,222,768
(-) Bonds and securities  361,058  300,530
Net debt  8,145,135  8,185,778
Equity 22,175,235 20,250,518
Debt to equity ratio 0.37 0.40

 

   
 F-119 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

37.Related Party Transactions

                     
    Assets    Liabilities       Revenue      Cost / Expense 
 Related parties / Nature of operation  12.31.2021 12.31.2020 12.31.2021 12.31.2020 12.31.2021 12.31.2020 12.31.2019 12.31.2021 12.31.2020 12.31.2019
Controlling shareholder                    
State of Paraná - dividends payable   - - 916,379 749,338   -   -   -   -   -   -
CRC Transfer (Note 8)   -   1,392,624   -   - 253,990 341,964 184,229   -   -   -
Luz Fraterna Program (a)  5,590   6,682   -   -   -   -   -   -   -   -
Tarifa Rural Noturna Program (a)   10,378   8,168   -   -   -   -   -   -   -   -
Morar Bem Paraná Program (a)   -   1,057   -   -   -   -   -   -   -   -
Employees transferred (b)   19  87   -   -   -   -   -   -   -   -
Telecommunication services (c)     -  13,686   -   -   19,201   43,248   43,011   -   -   -
Meteorological System of Paraná  - Simepar (c) (d)   - 2 938 855   18   48   -  (10,759) (8,573) (7,087)
                     
Entities with significant influence                    
BNDES and BNDESPAR - dividends payable (e)   - - 733,939 568,315   -   -   -   -   -   -
Financing (Note 22)   - - 2,216,516 2,314,166   -   -   -   (174,210)   (151,850)   (175,461)
Debentures - Compagás (Note 23)   - -   -  5,890   -   -   -   (312) (1,681) (1,194)
Debentures - wind farms (Note 23) (f)   - - 231,071 239,249   -   -   -  (32,249)  (25,891)  (28,240)
                     
State of Paraná investee                    
Sanepar (c) (g)   -   223  436  582  2,164  4,956  4,710 (8,256) (6,598) (5,852)
Use of water taken from plants’ reservoirs   - -   -   -  477  620  480   -   -   -
                     
Joint ventures                    
Voltalia São Miguel do Gostoso - dividends  1,032   1,032   -   -   -   -   -   -   -   -
                     
Caiuá Transmissora de Energia  (c) (h) (i) (j) 279   261  1,144  1,401  3,275  3,114  2,792  (17,439)  (16,267)  (14,233)
Dividends  2,150   4,443   -   -   -   -   -   -   -   -
                     
Integração Maranhense Transmissora (i) (j)   - - 183 160   -   -   - (2,294) (2,029) (1,938)
Dividends  2,274   3,806   -   -   -   -   -   -   -   -
                     
Matrinchã Transmissora de Energia (i) (j)   - -  1,065 959   -   -   -  (13,442)  (11,259)  (10,137)
Dividends   10,091  34,460   -   -   -   -   -   -   -   -
                     
Guaraciaba Transmissora de Energia (i) (j)   - -  489 436   -   -   - (6,185) (5,348) (4,853)
Dividends   27,198  16,281   -   -   -   -   -   -   -   -
                     
Paranaíba Transmissora de Energia (i) (j)   -  -  726 649   -   -   - (9,170) (8,141) (6,514)
Dividends  4,973 -   -   -   -   -   -   -   -   -
                     
Cantareira Transmissora de Energia (i) (j)   - -  596  468   -   -   - (6,569) (5,912) (5,403)
Dividends  6,718   6,547   -   -   -   -   -   -   -   -
                     
Mata de Santa Genebra Transmissão (i) (j) (k)  1,473   4,034  1,245  990 18,795   17,636   16,449   (12,390) (7,636)   (340)
Dividends   13,614 -   -   -   -   -   -   -   -   -
                     
Associates                    
Dona Francisca Energética S.A. (l)   15  13  2,745  1,436  164 162 145   (16,239)  (17,078)  (16,905)
Dividends   86  97   -   -   -   -   -   -   -   -
                     
Foz do Chopim Energética Ltda. (c) (m) 518   216   -   -  3,010  2,675  2,538   -   -   -
                     
Key management staff                    
Fees and social security charges (Note 33.2)   - -   -   -   -   -   -   (22,204)  (21,935)  (25,860)
Pension and healthcare plans (Note 24.3)   - -   -   -   -   -   - (1,422) (1,116) (1,560)
                     
Other related parties                    
Fundação Copel  (c)    -  40   -   -  173 315 285   -   -   -
Administrative property rental   - - 84,367  1,836   -   -   - (6,996) (1,285) (2,520)
Pension and healthcare plans (Note 24.3)   - -  1,295,174  1,493,614   -   -   -   -   -   -
                     
Lactec (c) (n)  5 5  2,385  2,747 619  771  746 (4,002) (2,702) (2,787)
                     
Tecpar (c) (o)   -  11   -   -  2,056  862   -   -   -   -
                     
Celepar (c) (p)   - 4   -   2   23 51   - (9)  (50) (5)
a)The Luz Fraterna Program created under Law 491/2013 and 17,639/2013 establishes the payment of electricity consumption to benefit low-income families, residing in the State of Paraná, whose properties - consumer units - are used exclusively for residential purposes, whether in urban or rural areas, and fulfill the requirements established in articles 3 and 4 of this law.
   
 F-120 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

In March 2018, the amount of R$159,274 was settled. The principal interest, fine and monetary restatement totaled R$158,849. For these charges on electricity bills for the period of September 2010 to June 2015, a lawsuit was filed against the State of Paraná on November 5, 2018, relating to the payment of invoices pursuant to State Law 14,087/2003. We highlight that despite the negotiations maintained by Management, seeking to settle this debt, uncertainties still exist regarding the realization of this asset and therefore, this asset was not recognized, therefore, in accordance with the current accounting standards. For the tax treatment, as determined by the Federal Revenue of Brazil in the Normative Instruction 1,753/2017, the Company has taxed this revenue. The State of Paraná filed a Request for Amendment of Judgment in November 2021. Copel is awaiting a summons to access the case records and, after that, a decision on the appeal by the judge. Management further emphasizes that it is making all necessary efforts and taking all necessary measures to preserve the Company’s interests.

The Tarifa Rural Noturna Program, regulated by Decree 1,288/2019, provides for the payment to Copel Distribuição, by the State Government, of the amount corresponding to 60% of the active electricity tariff and of the charges resulting from this service, including the additional tariff flag, owned by the beneficiary consumers, included in the denominated night period consumption, as specified in the decree.

The Morar Bem Paraná Program, established by Decree 2,845/2011, is an agreement between the Paraná State Government, the Companhia de Habitação do Paraná - Cohapar and Copel DIS, which is managed by Cohapar. Copel’s main assignment in this agreement is the construction of electricity distribution networks and service entrances for consumer units of housing estates.

b)Reimbursement of wages and social charges for employees transferred to the Paraná State Government. Balances presented are net of expected credit loss.
c)Revenue of Copel TEL from telecommunications services and lease of equipment and infrastructure. The balances presented are net of expected credit losses.
d)The Sistema Meteorológico do Paraná - Simepar is a supplementary unit of the Independent Social Service Paraná Technology, linked to the State Department of Science, Technology and Higher Education. Simepar has contracts with Copel for services of weather forecast, meteorological reports, ampacity analysis, mapping and analyses of winds and atmospheric discharges.
e)BNDES is the parent company of BNDES Participações S.A. - BNDESPAR, which owns Copel shares (Note 31.1). On December 22, 2018, the shareholder agreement between the State of Paraná and BNDESPAR, signed on December 22, 1998, was ended.
f)BNDES and BNDESPAR acquired all the debentures issued by the subsidiaries Nova Asa Branca I, Nova Asa Branca II, Nova Asa Branca III, Nova Eurus IV and Ventos de Santo Uriel.
g)Basic sanitation provided by Sanepar.
h)Operation and maintenance services agreement provided by Copel GeT, maturing on May 10, 2026. Transmission System Connection Agreement - CCT executed by Copel DIS, expiring by the end of the concession agreement of the distribution or transmission company, whichever takes place first.
i)Charges for use of the transmission system due by Copel GeT, UEG Araucária and wind farms.
   
 F-121 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
j)Copel DIS maintains a Contract for the Use of Transmission System (Cust) with ONS and power transmission concession operators whose subject matter is the contracting of Transmission System Use Amount (Must). Contracting is permanent and is regulated by ANEEL Normative Resolution 666/2015. Amounts are defined for four subsequent years, with annual reviews.
k)Agreements entered by Copel GeT: for operation and maintenance services, maturing on February 1, 2023, rendering of owner’s engineering services, advisory and consulting services, expired on November 2020, and facility sharing, maturing on January 1, 2043.
l)Connection to the transmission system contracts entered by Copel GeT, Costa Oeste and Marumbi, maturing on August 17, 2031 until July 21, 2048. Power purchase and sale agreement made by Copel GeT, maturing on March 31, 2025.
m)Contracts entered into by Copel GeT: for operation and maintenance, maturing on May 23rd, 2025, and connection to the transmission system, maturing on January 1, 2043.
n)The Institute of Technology for Development (Lactec) is a Public Interest Civil Society Organization (OSCIP), in which Copel is an associate. Lactec has service and R&D contracts with Copel GeT, UEGA and Copel DIS, which are subject to prior or later control and approval by ANEEL. Copel COM provides services and sells energy to the institute.
o)Energy sale agreement signed between Copel COM and the Paraná Institute of Technology (Tecpar), a public company of the State Government that supports innovation and economic and social development in Paraná and Brazil.
p)Service agreements entered into with the Paraná Information Technology Company (Celepar), a mixed capital company that is part of the indirect administration of the State Government.

 

 

The relevant transactions with related parties are shown above. Transactions arising from operations in a regulated environment are billed according to the criteria and definitions established by the regulatory agents and other transactions are recorded according to the market prices practiced by the Company.

Copel’s direct and indirect subsidiaries have short and long-term energy purchase and sale agreements entered into with each other, carried out in accordance with the criteria and definitions of the regulated environment. Both the balances of the transactions and of the commitments are eliminated in the consolidated financial statements of the Company.

In addition, Copel GeT has energy purchase commitments with Dona Francisca in the amount of R$63,899, and Copel COM has energy sale commitments signed with agencies and / or entities related to the Paraná State Government, totaling R$31,309.

With regard to the compensation of key management personnel, the Company does not have additional obligations beyond the short-term benefits disclosed in the table above and in the notes referenced.

   
 F-122 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
37.1Guarantees awarded to related parties

Sureties and guarantees granted by Copel to its subsidiaries for financing and debentures are informed in Notes 22 and 23.

Copel provided financial guarantees, in the form of corporate guarantee letter, for power purchase and transport agreements made by Copel GeT and its subsidiaries, in the total amount of R$4,339 (R$4,307 at December 31, 2020) and made by Copel Energia, in the amount of R$192,707 (R$112,069 at December 31, 2020).

Sureties and guarantees granted by Copel and Copel GeT for financing, debentures and insurance contracts of joint ventures are shown below:

Schedule of sureties and guarantees granted 

               
               
      Final Amount Balance (a) Interest Amount
Company Operation maturity approved % guarantees
(1) Caiuá Transmissora (b) Financing BNDES  02.15.2029   84,600 34,887 49.0 5,956
(2) Cantareira Transmissora Debentures 08.15.2032   100,000 95,734 49.0  46,910
(3) Financing  09.15.2032   426,834 393,860  (c) 
(4) Guaraciaba Transmissora  Financing BNDES 01.15.2031   440,000 315,771 49.0   154,728
(5) Debentures 12.15.2030   118,000 129,481  63,446
(6) Matrinchã Transmissora Financing BNDES 06.15.2029   691,440 381,197 49.0   186,787
(7) Debentures (2nd) 06.15.2029   180,000 219,345  (c) 
(8) Debentures (3rd) 12.15.2038   135,000 143,274  (d) 
(9) IMTE Transmissora Financing  02.12.2029   142,150 60,694 49.0  (c) 
(10) Mata de Santa Genebra Debentures (2nd) 11.15.2030   210,000 211,926 50.1   106,175
(11) Debentures (3rd) 11.15.2041 1,500,000 1,511,366   757,194
(12) Paranaíba Transmissora Financing  10.15.2030   606,241 445,168 24.5  (c) 
(13) Debentures 03.15.2028   120,000 95,868  23,488
              1,344,684
(a) Gross debt balance, discounted from restricted cash that is already guaranteed by the companies themselves.
(b) Guarantee awarded of fixed amount pursuant to the contractual provisions and formal requirements of the financial institution
(c) For these contracts, the corporate guarantee and/or the letter of guarantee were exonerated, leaving only the pledge of Copel GeT shares.
(d) The guarantees to be provided in the 3rd issue will only be presented after the maturity of the Debentures of the 2nd issue and the Financing with BNDES.
Letter of guarantee, provided by Copel GeT: (1)     
Corporate guarantee provided by Copel: (2) (4) (5) (6) (10) (11) (13)    

Operation guarantee: pledge of shares held by Copel Get in the ventures.

 

    

   
 F-123 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

38.Commitments

The main commitments related to long-term contracts not yet incurred, and therefore not recognized in these financial statements, are as follows:

 

     
  12.31.2021 12.31.2020
Energy purchase and transportation contracts  132,307,398  132,879,053
Additions to property, plant and equipment     
Construction of transmission lines and substations  - 12,062
Construction of Jandaíra wind farm complex   147,682   330,257
Construction of SHP Bela Vista   - 23,717
Telecommunications works  -   132,430
Acquisition of assets for electricity distribution   1,374,177   978,189
Gas purchase contracts   1,841,767   655,422

 

 

 

39.Insurance.......

The specification by risk modality and effective date of the main insurance policies can be seen below:

 

     
  End Insured 
Policy of term amount
Operational risks - HPP Baixo Iguaçu 05.30.2022   2,250,207
Operational risks - Cutia and Bento Miguel 03.29.2023   2,196,012
Named perils 08.24.2022   2,089,718
Operational risks - HPP Colíder 12.01.2022   1,892,320
Operational risks - HPP Governador Jayme Canet Junior 01.22.2023   1,594,472
Fire - owned and rented facilities  08.24.2022   878,937
Operational risks - Brisa Potiguar 06.27.2022   743,616
Operational risks - Elejor  03.11.2023   728,426
Operational risks - UEG Araucária (a) 11.30.2022   699,136
Operational risks - São Bento 06.27.2022   510,557
(a)  The insured amount of operational risks - UEG Araucária have been translated from USD into BRL, with the current  rate R$5,5805 as of December 31, 2021.

In addition to the insurance policies listed above, the Company takes out other insurance policies with lower values, such as: Directors and Officers liability (D&O), general civil liability, court award payment guarantee, sundry perils, national and international transportation, life, aircraft and vehicles. The guarantee insurance taken out by the subsidiaries, joint ventures and associates have Copel and/or Copel GeT as guarantor, within the limits of their share of interest in each project.

 

 

   
 F-124 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

40.Additional information to the Statement of Cash Flows
40.1Transactions not involving cash

Of the total additions of Contract assets (shown in Notes 11.1 and 11.2) and acquisitions of property, plant and equipment (shown in Note 18.2), R$240,718 (R$104,834 on December 31, 2020 and R$48,068 on December 31, 2019) and R$19,855 (R$21,773 on December 31, 2020 and R$52,446 on December 31, 2019), respectively, represent the amount of purchases made in installments and not settled through the end of the reporting period.

As described in Note 28.1, the additions and remeasurement adjustment occurred in right-of-use assets totaled R$111,880 (R$104,977 on December 31, 2020 and R$13,237 on December 31, 2019), which were recognized matched against lease liabilities.

The mentioned transactions did not involve cash and, for this reason, are not being presented in the statement of cash flows.

 

 

41.Assets held for sale and discontinued operations

On July 15, 2020, through Relevant Event 07/2020, Copel communicated the approval of the divestment of 100% of the interest in Copel Telecomunicações by the Board of Directors. On this occasion, the beginning of the external phase was also approved, which included: (i) the opening of a Virtual Data-Room (“VDR”) with detailed information on the divestment; (ii) sending Paraná State Court of Auditors - TCE-PR the complete file for analysis; and (iii) the scheduling and holding of a virtual public hearing on the divestment, to be operated jointly with B3 SA - Brasil, Bolsa, Balcão.

On September 16, 2020, Relevant Event 10/2020 announced that the Company’s Board of Directors authorized the publication of the Copel Telecomunicações Divestment Auction Notice with the minimum divestment price of R$1,401,090 for Equity Value. On this date, Management understood that the criteria determined by IFRS 5 were met to classify the asset as held for sale and for the disclosure of a discontinued operation.

On November 9, 2020, there was a public auction session related to the sale of 100% of the shares issued by Copel Telecomunicações owned by the Company. The Bordeaux Investment Fund in Multi-Strategic Participations was declared the winner of the event, after presenting the highest offer, in the amount of R$2,395,000, representing a goodwill of 70.94% in relation to the minimum bid amount.

On January 14, 2021, the Share Purchase and Sale Agreement (CCVA) was signed with Bordeaux Participações S.A., a company belonging to Bordeaux Fundo de Investimento em Participações Multiestratégia, the winner of the auction.

   
 F-125 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

On August 3, 2021, the sale operation was concluded, as informed in relevant fact 13/21, after compliance with the conditions defined in the Notice and the CCVA, which included, among others, the approvals of CADE and Anatel. Besides that, the updated amount of R$2,506,837 was received for the full divestment of Copel Telecomunicações shares, share transfer registration, signature of the closing agreement for the deal and the resignation of the current administrators. Therefore, on August 03, 2021, Copel no longer controlled Copel Telecomunicações, transferring its assets and liabilities and the direction of its business to the acquirer.

The revenues, costs and expenses as well as the cash flow movement resulting from these assets and liabilities were presented in separate lines, as discontinued operation, both in the Statement of Income and Statement of Cash Flows.

It should also be noted that as of October 1, 2020, the depreciation and amortization of assets that have been sold have ceased, after their reclassification to current assets, in the line item Assets held for sale, in compliance with what determines IFRS 5.

The details of these amounts, as well as the profit resulting from this operation are presented in the following tables:

       
       
Statements of Income from discontinued operations 12.31.2021 12.31.2020 12.31.2019
       
Net operating revenue   228,379 355,843 375,028
Operating costs   (19,266)   (100,684)   (296,028)
Gross profit   209,113 255,159   79,000
       
Selling expenses   (16,745)  (31,244)  (31,286)
General and administrative expenses   (16,213)  (21,333)  (23,010)
Other operational income (expenses)   (29,581)  (50,518)   (136,310)
    (62,539)   (103,095)   (190,606)
       
Profit (loss) before financial results and taxes    146,574 152,064   (111,606)
Financial results   (25,748)  (33,378)  (33,122)
Operating profit (loss)   120,826 118,686   (144,728)
Income tax and social contribution   (47,648)  (43,108)   36,335
Net income (loss) 73,178   75,578   (144,728)
Gain on the share sales operation   1,723,913   -   -
Income tax on sales gains  (446,716)   -   -
Deferred income tax on sales gains  (160,818)   -   -
Net income from discontinued operations   1,189,557   75,578   (144,728)

 

 

  

       
       
Statements of Cash Flows from discontinued operations 12.31.2021 12.31.2020 12.31.2019
       
Net income   1,189,557   75,578   (108,393)
Adjustments to reconcile net income  (803,687)  282,914 419,093
Changes in assets and liabilities (19,255)  (16,958)  (38,821)
Taxes and charges paid (18,044)  (73,050)  (51,464)
Cash flows from operational activities   348,571  268,484 220,415
Additions to property, plant and equipment and intangible assets (62,485)  (73,573)   (175,569)
Disposal Copel Telecom receipt   2,506,837   -   -
Cash flows from investment activities   2,444,352  (73,573)   (175,569)
Issue of Debentures -   - 210,000
Payment of loans and financing and lease  (1,850)  (20,038) (9,260)
Cash flows from financing activities  (1,850)  (20,038) 200,740
Changes in cash and cash equivalents   2,791,073  174,873 245,586

 

 

   
 F-126 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

 

42.Subsequent events
42.1Water shortage account

On January 13, 2022, Decree 10,939 regulated MP 1,078/2021, which provided for measures to address the financial impacts on the electricity sector arising from the situation of water scarcity and deferrals applied in previous tariff processes, authorizing the contracting of financial operation to face this scenario. On March 15, 2022, Aneel approved a resolution that presents the criteria and procedures for managing the Water Scarcity Account, in which resources will be allocated to cover, in whole or in part, the additional costs temporarily assumed by distribution concessionaires and licensees related to: I – estimate of the balance of the Centralizing Account of Tariff Flag Resources for April 2022; II – costs associated with the Incentive Program for the Voluntary Reduction of Electricity Consumption III; – cost of importing electricity in a decision approved by CREG for the period from July and August 2021; IV – deferrals referred to in § 1-I of art. 13 of Law 10,438/2002; V - fixed revenue for the period from May to December 2022 of the Simplified Competitive Procedure - PCS of 2021. The distributors must declare the amounts of their resources to Aneel within 10 days after the publication of the resolution, and the agency will evaluate and approve the amounts and authorize the CCEE to make the transfers. Upon receipt of the declared amount, Copel DIS will write off the registered sectoral financial asset.

 

 

43.Condensed individual financial information of Companhia Paranaense de Energia - Copel

In order to attend Rule 12-04 of Regulation S-X of the Securities and Exchange Commission (the “SEC”), Management has incorporated the condensed individual financial information of Companhia Paranaense de Energia - Copel in these financial statements, as part of the Form 20-F. These information were prepared considering the same accounting policies as described in Note 3 and 4 to Company’s consolidated financial statements.

   
 F-127 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

(a)  Condensed statements of financial position as of December 31, 2021 and 2020

     
ASSETS 12.31.2021 12.31.2020
Current assets    
Cash and cash equivalents   626,052  42,700
Bonds and securities  91  90
Dividends receivables 1,558,212 1,290,114
CRC transferred to the State Government of Paraná   -   287,789
Other current receivables 1,150 1,025
Income tax and social contribution 3,991  12,171
Prepaid expenses 528 150
Receivable from related parties 5,374  40,298
  2,195,398 1,674,337
Assets classified as held for sale   -   758,742
 Subtotal 2,195,398 2,433,079
     
Noncurrent assets    
Other temporary investments  19,985  22,385
CRC transferred to the State Government of Paraná   - 1,104,835
Judicial deposits   131,519   125,738
Other current receivables 7,658 7,443
Income Tax and Social Contribution  30,000   117,682
Deferred tax assets   165,484   282,132
Other noncurrent recoverable taxes  38,659  88,331
Receivables from related parties   150,572   140,337
    543,877 1,888,883
     
Investments  21,144,478  18,807,102
Property, Plant and Equipment, net 4,112 2,725
Intangible Assets 3,473 2,041
Right-of-use asset 3,165 962
     
 Total non current asset  21,699,105  20,701,713
     
Total assets  23,894,503  23,134,792

 

   
 F-128 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 
     
     
LIABILITIES 12.31.2021 12.31.2020
Current liabilities    
Payroll, social charges and accruals  36,454  16,759
Related parties 2,292   283,650
Suppliers  3,353 3,184
Income tax and social contribution 1,813   -
Other taxes payable  34,956 952
Loans and financing   321,157   512,086
Debentures   501,716   301,972
Dividends payable   260,995   944,274
Post employment benefits   229 226
Lease liability 301 279
Other accounts payable 548 567
 Total current liabilities 1,163,814 2,063,949
     
Noncurrent liabilities    
Related parties 5,851 5,851
Other taxes due 3,260 2,978
Loans and financing   468,970   266,682
Debentures   -   499,317
Post employment benefits  13,922 9,929
Lease liability 2,957 707
Other accounts payable  50,943 1,936
Provisions for legal claims   347,762   324,332
Noncurrent liabilities   893,665 1,111,732
     
Equity    
Share capital  10,800,000  10,800,000
Equity valuation adjustments   426,170   353,349
Legal reserves 1,457,087 1,209,458
Retained earnings 7,785,092 6,088,855
Additional dividend from non-capitalized earnings reserve 1,368,675 1,507,449
 TOTAL EQUITY  21,837,024  19,959,111
     
Total liabilities and equity  23,894,503  23,134,792

 

   
 F-129 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

(b) Condensed statements of income for the years ended December 31, 2021, 2020 and 2019

       
       
  12.31.2021 12.31.2020 12.31.2019
Operating revenues (expenses)      
General and administrative expenses  (126,172)   (79,762)   (59,907)
Other revenues (expenses), net (86,344)   (24,423)   1,244
Result of equity in investees   3,689,345   3,551,254   2,177,629
    3,476,829   3,447,069   2,118,966
       
Operating income before financial results   3,476,829   3,447,069   2,118,966
       
Financial income (expenses)      
Financial revenues   304,809   335,485   209,679
Financial expenses  (112,332)   (86,076)  (235,033)
    192,477   249,409   (25,354)
       
Operating income   3,669,306   3,696,478   2,093,612
       
Income tax and social contribution      
Income tax and social contribution  67,641  -   (21,195)
Deferred income tax and social contribution  30,250   127,503   5,850
   97,891   127,503   (15,345)
       
Net income from continuing operations   3,767,197   3,823,981   2,078,267
       
Discontinued operations      
Net income (loss) from discontinued operations   1,185,376 80,221   (88,321)
       
Net income   4,952,573   3,904,202   1,989,946
       
Basic and diluted net earning per share attributed to controlling shareholders - continuing operations - expressed in Brazilian Reais      
Common shares   1.20448   1.33430   0.72523
Class A preferred shares   1.41173   1.76982   0.89086
Class B preferred shares   1.50668   1.46773   0.79778
       
Basic and diluted net earning per share attributed to controlling shareholders - expressed in Brazilian Reais      
Common shares   1.61429   1.36229   0.69440
Class A preferred shares   1.86252   1.80062   0.85790
Class B preferred shares   1.95747   1.49852   0.76388

 

   
 F-130 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

(c)  Condensed statement of comprehensive income for the years ended December 31, 2021, 2020 and 2019

 

       
  12.31.2021 12.31.2020 12.31.2019
NET INCOME   4,952,573   3,904,202   1,989,946
 Other comprehensive income       
 Items that will never be reclassified to profit or loss       
 Gain (losses) on actuarial liabilities       
Post employment benefits   (3,257)  (779)  (3,371)
Post employment benefits - equity    154,751  (178,434)  (120,358)
 Taxes on other comprehensive income    1,107   265   1,146
 Items that are or maybe reclassified to profit or loss       
Subsidiary loss with interest variation - -  (4,874)
 Total comprehensive income, net of taxes    152,601  (178,948)  (127,457)
TOTAL COMPREHENSIVE INCOME    5,105,174   3,725,254   1,862,489

 

(d) Condensed statements of cash flows for the years ended December 31, 2021, 2020 and 2019

       
  12.31.2021 12.31.2020 12.31.2019
Net cash generated from operating activities   2,892,312 761,050 688,443
       
Cash flow from investing activities      
Financial investments    2,399  5,349 115,376
Loans and financing granted to related parties    -  (40,000)  (24,410)
Receipt of loans and financing granted to related parties    33,899  7,015   24,512
Additions in investments    (503,202)  (68,127)   (271,968)
Capital reduction of investees.  82,330 228 -
Additions to property, plant and equipment   (1,847) (1,800)   (285)
Additions to intangible  (1,771) (1,045)   (271)
       
Net cash used in investing activities      
  from continuing operations   (388,192)  (98,380)   (157,046)
       
Net cash generated by investment activities      
from discontinued operations   2,506,837 - -
       
Net cash generated (used) from investing activities   2,118,645  (98,380)   (157,046)
       
Cash flow from financing activities      
Issue of Debentures  - - 500,000
Issue of loans with related parties  - 280,000   48,000
Amortization of principal - loans and financing    -  (38,500)   (115,500)
Amortization of principal - debentures  (300,000)   (300,000)   (853,400)
Amortization of loans obtained from related parties  (280,000) -  (48,000)
Amortization of principal - Lease liabilities  (317)   (329)   (141)
Dividends and interest on capital paid  (3,847,288)   (586,445)   (352,055)
       
Net cash used in financing activities  (4,427,605)   (645,274)   (821,096)
       
Total effects on cash and cash equivalents   583,352   17,396   (289,699)
       
Cash and cash equivalents at the beginning of the period  42,700   25,304 315,003
Cash and cash equivalents at the end of the period   626,052   42,700   25,304
       
Change in cash and cash equivalents   583,352   17,396   (289,699)

 

   
 F-131 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

Additional individual information related to Companhia Paranaense de Energia - Copel are presented below:

·   Related Parties: Copel has the following balances outstanding with related parties:

     
  12.31.2021 12.31.2020
Assets    
Copel Distribuição (a) 150,572 140,337
UEG Araucária - mutual -   33,572
Investees and Subsidiaries - Structure sharing  5,374  6,726
  155,946 180,635
Liabilities    
Copel CTE - mutual - 282,817
Investees and Subsidiaries - Structure sharing  2,292 833
Elejor advance  5,851  5,851
   8,143 289,501

 

 

(a) Copel DIS - Financing transferred - STN

Copel transferred loans and financing to its wholly-owned subsidiaries at the time of its establishment in 2001. However, since the contracts for the transfers to the subsidiaries were not subject to formalization with the financial institutions, these commitments are also recorded in the Parent company.

The balance with Copel DIS refers to the National Treasury Department - STN financing, transferred with the same levy of charges assumed by the Company (Note 22) and shown as obligations for loans and financing at Copel DIS.

On March 10, 2022, seeking to reduce costs and improve the Company’s leverage, the debt was redeemed in advance, in the amount of R$9,350, corresponding to the principal plus interest incurred, net of the collateral and escrow deposits (Note 22.1).

·   Investments - As of December 31, 2021 and 2020, investments in subsidiaries are comprised as follows:

       
    12.31.2021 12.31.2020
 Copel Geração e Transmissão    12,662,224 10,732,734
 Copel Distribuição      7,558,556   7,212,915
 Copel Telecomunicações     -  757,799
 Copel TEL - Reclassification (a)     - (758,742)
 Copel Energia     389,863  356,922
 Compagas     259,031  252,481
 UEG Araucária     109,737 48,355
 Other investments    10,744 50,328
    20,990,155 18,652,792
(a) Reclassification to Assets classified as held for sale.      

 

   
 F-132 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The information regarding joint ventures, associates and other investments are presented in note 17.1 – Changes in investments.

·   Dividends receivable - The dividends receivable is comprised as follows:

     
  12.31.2021 12.31.2020
Investees and subsidiaries    
Copel Geração e Transmissão  638,378  769,108
Copel Distribuição  824,833  440,368
Copel Comercialização 20,785 29,803
Compagas 65,821 43,164
UEG Araucária   7,251   6,143
     
Joint Ventures and Associates    
Voltália   1,032   1,032
Dona Francisca 86 97
     
Other investments 26   399
    1,558,212   1,290,114

 

 

·Provisions for Legal Claims - Copel recorded provisions for Legal Claims, as follows:

     
  12.31.2021 12.31.2020
Regulatory   25,174   21,373
Labor  2,437  2,466
Employee benefits  587 -
Civil 175,356 163,940
Tax Claim 144,208 136,553
  347,762 324,332

 

·   Restriction of transfer of funds from subsidiaries - The subsidiaries described below qualify as either concessionaires of public services or independent power producers. As such, any transfer of funds to the respective parent company, in the form of loans or advances, requires approval by Aneel. This regulatory restriction does not apply to cash dividends determined in accordance with the Brazilian Corporate Law.

As of December 31, 2021, total restricted subsidiaries net assets amount to R$20,720,412 composed as follows:

 

     
     
  12.31.2021 12.31.2020
Copel Geração e Transmissão S.A. 12,662,224 10,732,735
Copel Distribuição S.A.  7,558,556  7,212,914
UEG Araucária Ltda.  540,577  238,211
Centrais Elétricas Rio Jordão - Elejor   (40,945) 13,490
  20,720,412 18,197,350

 

 

   
 F-133 

COMPANHIA PARANAENSE DE ENERGIA – COPEL and Subsidiaries

Notes to the Consolidated Financial Statements

For the years ended December 31, 2021, 2020 and 2019

All amounts expressed in thousands of Brazilian reais, unless otherwise stated

 

The following table shows the expected undiscounted settlement values of the Copel liabilities, in each time range:

 

               
  Interest (a) Less than
1 month
1 to 3 months 3 months to 1 year 1 to 5 years Over
5 years
Total
12.31.2021              
Loans and financing  Note 21  -   19,661 393,857 487,755 - 901,273
Debentures  Note 22  14 - 531,219 - - 531,233
Suppliers  -   3,331 22 - - -  3,353
     3,345   19,683 925,076 487,755 - 1,435,859

(a) Effective interest rate - weighted average.

 

 

   
 F-134