EX-99.1 2 ex99-1.htm EX-99.1

 

 

Technical Report Summary on the El Porvenir Mine, Department of Pasco, Peru

SLR Project No: 233.03259.R0000

 

Prepared by

SLR Consulting (Canada) Ltd.

55 University Ave., Suite 501

Toronto, ON M5J 2H7

for

 

Nexa Resources S.A.

Rúa Guaicuí, 20 – 14° Andar

Belo Horizonte/MG

30380-380

 

Effective Date – December 31, 2020

Signature Date - January 15, 2021

Amended Date – October 18, 2021

 

 

 

FINAL

 

Distribution:

 

1 copy – Nexa Resources S.A.

   

1 copy – SLR Consulting (Canada) Ltd.

 

 

 

Contents

1.0   Executive Summary 1-1
1.1   Summary 1-1
1.2   Economic Analysis 1-7
1.3   Technical Summary 1-12
2.0   Introduction 2-1
2.1   Site Visits 2-1
2.2   Sources of Information 2-2
2.3   List of Abbreviations 2-2
3.0   Property Description 3-1
3.1   Location 3-1
3.2   Land Tenure 3-1
3.3   Royalties 3-8
3.4   Surface Rights and Easements 3-9
3.5   Material Government Consents 3-12
4.0   Accessibility, Climate, Local Resources, Infrastructure and Physiography 4-1
4.1   Accessibility 4-1
4.2   Climate 4-1
4.3   Local Resources 4-1
4.4   Infrastructure 4-1
4.5   Physiography 4-2
5.0   History 5-1
5.1   Ownership, Exploration and Development History 5-1
5.2   Past Production 5-2
6.0   Geological Setting, Mineralization, and Deposit 6-1
6.1   Regional Geology 6-1
6.2   Local Geology 6-5
6.3   Property Geology 6-12
6.4   Alteration 6-15
6.5   Mineralization 6-15
6.6   Deposit Types 6-16
6.7   Skarn 6-16
6.8   Hydrothermal Vein and Breccia 6-17
6.9   Stratabound 6-18
7.0   Exploration 7-1

 

 

 

7.1   Exploration 7-1
7.2   Integration of El Porvenir and Atacocha 7-1
7.3   2019 El Porvenir Exploration 7-3
7.4   2020 Exploration Program 7-3
7.5   2021 Exploration Program 7-11
7.6   Drilling 7-11
7.7   Hydrogeology Data 7-22
7.8   Geotechnical Data 7-22
8.0   Sample Preparation, Analyses, and Security 8-1
8.1   Density Determinations 8-1
8.2   Sample Preparation and Analysis 8-3
8.3   Quality Assurance and Quality Control 8-6
8.4   QA/QC Recommendations 8-30
8.5   Data Management 8-30
8.6   Sample Security 8-30
9.0   Data Verification 9-1
9.1   Databases and Internal Verification 9-1
9.2   Previous Verification 9-1
9.3   SLR Verification 9-2
10.0   Mineral Processing and Metallurgical Testing 10-1
10.1   Test Work 10-1
10.2   Operational Performance 10-5
10.3   Deleterious Elements 10-7
11.0   Mineral Resource Estimates 11-1
11.1   Summary 11-1
11.2   Resource Database 11-2
11.3   Geological Interpretation 11-5
11.4   Geological Modelling 11-8
11.5   Domain Modelling 11-14
11.6   Resource Assays 11-23
11.7   Treatment of High Grade Assays 11-24
11.8   Compositing 11-42
11.9   Trend Analysis 11-56
11.10   Search Strategy and Grade Interpolation Parameters 11-62
11.11   Bulk Density 11-65
11.12   Block Models 11-69
11.13   Net Smelter Return and Cut-Off Value 11-69
11.14   Classification 11-73

 

 

11.15   Block Model Validation 11-79
11.16   Mineral Resource Reporting 11-87
11.17   Comparison to Previous Mineral Resource Estimates 11-91
12.0   Mineral Reserve Estimates 12-1
12.1   Summary 12-1
12.2   Dilution 12-2
12.3   Net Smelter Return 12-4
12.4   Cut-Off Grade 12-7
13.0   Mining Methods 13-1
13.1   Introduction 13-1
13.2   Mine Design and Mining Methods 13-3
13.3   Geomechanics and Ground Support 13-17
13.4   Hydrogeology 13-23
13.5   Infrastructure and Mine Services 13-23
13.6   Mine Equipment 13-47
13.7   Personnel 13-48
13.8   Life of Mine Plan 13-49
14.0   Processing and Recovery Methods 14-1
14.1   Process Description 14-1
14.2   Energy, Water, and Process Materials Requirements 14-2
14.3   Manpower 14-2
15.0   Infrastructure 15-1
15.1   Power Plant and Distribution 15-1
15.2   On-Site Roads 15-1
15.3   Utilities and Services 15-1
15.4   Sewage Collection and Disposal 15-2
15.5   Site Security 15-2
15.6   Communication and IT Systems 15-2
15.7   Vehicle Fueling Facility and Mine Equipment Ready Line 15-2
15.8   Site Buildings and Facilities 15-2
15.9   Tailings Storage 15-5
15.10   Waste Rock Storage Facilities 15-10
16.0   Market Studies 16-1
16.1   Markets 16-1
16.2   Contracts 16-6
17.0   Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups 17-1

 

 

 
17.1   Environmental Aspects 17-1
17.2   Mine Waste and Water Management 17-8
17.3   Project Permitting 17-12
17.4   Social or Community Requirements 17-17
17.5   Mine Closure Requirements 17-23
18.0   Capital and Operating Costs 18-1
18.1   Capital Costs 18-1
18.2   Operating Costs 18-2
19.0   Economic Analysis 19-1
19.1   Economic Criteria 19-1
19.2   Cash Flow 19-3
19.3   Sensitivity Analysis 19-8
20.0   Adjacent Properties 20-1
21.0   Other Relevant Data and Information 21-1
22.0   Interpretation and Conclusions 22-1
22.1   Geology and Mineral Resources 22-1
22.2   Mining and Mineral Reserves 22-1
22.3   Mineral Processing 22-1
22.4   Environmental, Permitting and Social Considerations 22-2
22.5   Costs and Economic Analysis 22-3
23.0   Recommendations 23-1
23.1   Geology and Mineral Resources 23-1
23.2   Mining and Mineral Reserves 23-2
23.3   Mineral Processing 23-2
23.4   Environmental, Permitting and Social Considerations 23-2
23.5   Costs and Economic Analysis 23-3
24.0   References 24-1
25.0   Reliance on Information Provided by the Registrant 25-1
26.0   Date and Signature Page 26-1

 

TABLEs

Table 1-1:   ROM Production – Years 2015 to 2020 1-2
Table 1-2:   After-Tax Cash Flow Summary 1-10
Table 1-3:   Summary of Mineral Resources – December 31, 2020 1-14
Table 1-4:   Mineral Reserves –December 31, 2020 1-15
Table 1-5:   Mine Production Schedule 1-16
Table 1-6:   Life of Mine Capital Budget 1-19
Table 1-7:   Operating Budget 1-20
Table 3-1:   El Porvenir Mining Concessions 3-2
Table 3-2:   Payments Made for Concessions in 2020 3-7
Table 3-3:   Concessions Subject to Royalties Payable to Nexa Atacocha 3-9
Table 3-4:   Royalty Payments to Nexa Atacocha 3-9
Table 3-5:   Main Government Consents 3-12
Table 5-1:   History of the El Porvenir Mine 5-1
Table 5-2:   Mine Production History 5-2
Table 5-3:   Concentrate Production – 2016 to 2020 5-4
Table 7-1:   Drilling Summary at Porvenir 7-12
Table 7-2:   Summary of Drilling Excluded from Mineral Resource Estimate 7-12
Table 7-3:   Summary of Drilling Included in Mineral Resource Estimate 7-13
Table 7-4:   Channel Sampling Summary at Porvenir 7-13
Table 7-5:   Core Recovery by Domain – 2017 to 2020 7-19
Table 8-1:   Number of Density Measurements by Sample Type and Year 8-1
Table 8-2:   Laboratory Detection Limits 8-3
Table 8-3:   Control Sample Insertion Rate and Failure Criteria 8-7
Table 8-4:   QC Insertion Rates 8-7
Table 8-5:   CRMs Used at Porvenir Since 2014 8-9
Table 8-6:   2014 to 2017 CRMs Performance 8-10
Table 8-7:   2017 to 2020 CRM Performance 8-13
Table 8-8:   2017 to 2020 Fine Blank Results 8-19
Table 8-9:   2017 to 2020 Coarse Blank Results 8-19
Table 8-10:   Duplicate Types and Descriptions 8-21
Table 8-11:   2017 to 2020 Porvenir Duplicate Performance 8-23

 

Table 8-12:   2017 to 2020 Porvenir External Check Performance 8-27
Table 9-1:   SLR Assay Certificate Verification Results 9-2
Table 10-1:   Concentrator Operational Performance 10-6
Table 11-1:   El Porvenir Mineral Resources - December 31, 2020 11-1
Table 11-2:   Individual Mineralization Domains 11-10
Table 11-3:   Mineralization Group Zone Domains 11-11
Table 11-4:   Zn, Cu, Ag, and Pb Grade Domains 11-14
Table 11-5:   Zinc Estimation Domains 11-17
Table 11-6:   Lead-Silver Estimation Domains 11-18
Table 11-7:   Copper Estimation Domains 11-19
Table 11-8:   Capping Levels by Mineralization Domains 11-25
Table 11-9:   Estimation Domain Capped and Raw Assay Statistics for Zinc (Zn %) 11-28
Table 11-10:   Estimation Domain Capped and Raw Assay Statistics for Lead (Pb %) 11-32
Table 11-11:   Estimation Domain Capped and Raw Assay Statistics for Silver (Ag g/t) 11-35
Table 11-12:   Estimation Domain Capped and Raw Assay Statistics for Copper (Cu %) 11-38
Table 11-13:   Estimation Domain Composite Statistics for Zinc (Zn %) 11-42
Table 11-14:   Estimation Domain Composite Statistics for Lead (Pb%) 11-46
Table 11-15:   Estimation Domain Composite Statistics for Silver (Ag g/t) 11-50
Table 11-16:   Estimation Domain Composite Statistics for Copper (Cu %) 11-53
Table 11-17:   Zinc Variogram Parameters 11-58
Table 11-18:   Zinc Estimation Parameters 11-63
Table 11-19:   Silver Estimation Parameters 11-64
Table 11-20:   Density Data Statistics 11-66
Table 11-21:   Block Model Setup 11-69
Table 11-22:   NSR Data 11-69
Table 11-23:   Cut-Off Grade Calculation by Mining Zone and Method 11-72
Table 11-24:   Nexa Search Ellipse Ranges for Classification Criteria 11-75
Table 11-25:   Comparison of ID3, OK, and NN Zinc Grades – Measured and Indicated Blocks 11-79
Table 11-26:   EL Porvenir Underground Comparison of 2020 versus 2019 Mineral Resources 11-92
Table 12-1:   El Porvenir Mining Zones 12-1
Table 12-2:   Mineral Reserves – December 31, 2020 12-2
Table 12-3:   NSR Data 12-4
Table 12-4:   Cut-Off Grade Calculation by Mining Zone and Method 12-8

 

Table 13-1:   Mining Methods in Active Mining Zones 13-1
Table 13-2:   Long Term Stope Design Parameters 13-3
Table 13-3:   Development Design Parameters 13-3
Table 13-4:   Long Term Production Rate Parameters 13-4
Table 13-5:   Long Term Parameters For Dilution And Recovery 13-4
Table 13-6:    Mine Production -- Years 2018 to 2020 13-5
Table 13-7:   Development Advance - Years 2017 to 2020 13-5
Table 13-8:   Cut and Fill Mining Method at El Porvenir 13-6
Table 13-9:   Advantages and Disadvantages of Avoca Compared with Cut and Fill 13-12
Table 13-10:   Sublevel Stoping Method at El Porvenir 13-15
Table 13-11:   Rock Mass Characteristics 13-18
Table 13-12:   Magnitude and Azimuth of the In-Situ Stresses 13-18
Table 13-13:   Seismic Events 13-19
Table 13-14:   Ground Support Procedures 13-22
Table 13-15:   Mine Infrastructure 13-23
Table 13-16:   Ventilation Balance - Intake Airflow 13-26
Table 13-17:   Ventilation Balance - Return Airflow 13-26
Table 13-18:   Ventilation Requirement 13-27
Table 13-19:   Main Ventilation Fans 13-27
Table 13-20:   Main Ventilation Branches 13-28
Table 13-21:   Dewatering System 13-32
Table 13-22:   Water Tanks 13-34
Table 13-23:   Hydraulic Backfill Preparation and Distribution 13-35
Table 13-24:   Design Criteria of Hydraulic Backfill 13-36
Table 13-25:   Exits to Surface 13-37
Table 13-26:   Supply of Electric Power 13-39
Table 13-27:   Picasso Shaft 13-46
Table 13-28:   Trackless Mobile Equipment 13-47
Table 13-29:   Track Equipment 13-48
Table 13-30:   Required Mechanical Availability for Strategic Equipment 13-48
Table 13-31:   Nexa Personnel - Underground Mine 13-49
Table 13-32:   Mine Production Schedule 13-49
Table 13-33:   Mine Production by Mining Method 13-50

 

Table 13-34:   Production by Mining Zone 13-50
Table 13-35:   Development Schedule 13-51
Table 16-1:   Third Party Contractors 16-6
Table 16-2:   Quality of El Porvenir Zinc Concentrate 16-8
Table 16-3:   Contaminant Element Penalties - Lead Concentrate 16-8
Table 16-4:   Contaminant Element Penalties - Copper Concentrate 16-8
Table 17-1:   Summary of Key Environmental Effects and Management Strategies 17-6
Table 17-2:   Water Quality Monitoring Locations 17-11
Table 17-3:   Environmental, Mine Closure, and Tailings Disposal Licences 17-13
Table 17-4:   Summary of Main Closure Activities 17-25
Table 18-1:   Life of Mine Capital Budget 18-1
Table 18-2:   Operating Budget 18-2
Table 18-3:   Nexa Personnel at El Porvenir Mine – December 31, 2020 18-3
Table 19-1:   After-Tax Cash Flow Summary 19-4
Table 19-2:   Cash Flow Analysis 19-8
Table 19-3:   After-Tax Sensitivity Analysis 19-9
Table 20-1:   Production - Atacocha Mine 20-1

FIGURES

Figure 3-1:   Mine Location 3-4
Figure 3-2:   Land Tenure 3-5
Figure 3-3:   Surface Rights 3-11
Figure 4-1:   Typical Landscape at El Porvenir 4-2
Figure 6-1:   Simplified Geological Map of Peru 6-3
Figure 6-2:   Morphostructural Map of Peru 6-4
Figure 6-3:   Local Geology 6-7
Figure 6-4:   Generalized Stratigraphic Column 6-8
Figure 6-5:   Regional Geological Setting with Major Structural Features 6-11
Figure 6-6:   Representative Cross Sections through El Porvenir Area 6-14
Figure 6-7:   Schematic Diagram of Skarn, Replacement and Hydrothermal Vein Mineralization 6-18
Figure 6-8:   Schematic Diagram of Stratabound Deposit at El Porvenir 6-19
Figure 7-1:   El Porvenir and Atacocha Mines with Underground Workings 7-2

 

Figure 7-2:   Sara Project Location Map and Example Section 7-4
Figure 7-3:   Remote Sensing and Alteration Anomalies 7-6
Figure 7-4:   Geology, Flight Plan, and 3D Geophysical Model 7-7
Figure 7-5:   Geophysical Anomalies at Level 2700 7-8
Figure 7-6:   Brownfield Targets of the Cerro Pasco Complex 7-10
Figure 7-7:   Plan View of Drill Holes 7-15
Figure 7-8:   Cross Section Showing Drill Holes and Geological Interpretation 7-16
Figure 7-9:   Plan View of Channel Sampling 7-17
Figure 8-1:   Distribution of Density Samples Used for 2020 Mineral Resource Estimate by Year Analyzed 8-2
Figure 8-2:   Schematic Flow Chart for Sample and Data Controls 8-6
Figure 8-3:   CRMs PEPSSTD001 and PEPSSTD002 Results for Zinc –Inspectorate EP (2018 to 2019) 8-16
Figure 8-4:   CRMs PEPSSTD002 and PEPSSTD003 Results for Lead –Inspectorate EP (2018 to 2019) 8-17
Figure 8-5:   2017 to 2020 Porvenir Blank Zn and Pb Assays – Inspectorate EP Laboratory 8-20
Figure 8-6:   2017 to 2020 Porvenir Field Duplicates for Zn and Pb Assays – Inspectorate EP Laboratory 8-24
Figure 8-7:   2017 to 2020 Porvenir Coarse Reject Duplicates for Zn and Pb Assays – Inspectorate EP Laboratory 8-25
Figure 8-8:   2017 to 2020 Porvenir Pulp Duplicates for Zn and Pb Assays – Inspectorate EP Laboratory 8-26
Figure 8-9:   2017 to 2020 Porvenir External Checks for Zn and Pb Assays – Inspectorate EP Laboratory 8-29
Figure 9-1:   Assay Sampling Coverage (Zn) 9-4
Figure 9-2:   Density Sampling Coverage 9-6
Figure 10-1:   Bulk Mineralogical Analysis 10-2
Figure 10-2:   Sulphide Mineral Breakdown 10-3
Figure 10-3:   Historical Recovery to Concentrate 10-7
Figure 11-1:   3D View of El Porvenir Mineralized Solids and Drill holes 11-4
Figure 11-2:   El Porvenir Lithological and Control Type Domains 11-6
Figure 11-3:   El Porvenir Structure and Emplacement Type Domains 11-7
Figure 11-4:   OB_Vcn3 showing drill holes and updated mapping 11-9
Figure 11-5:   El Porvenir Mineralization Group Zone Domains – Plan view 11-12
Figure 11-6:   El Porvenir Mineralization Group Zone Domains – Cross Section 11-13
Figure 11-7:   Plan and Cross Section Copper Grade Domains for VCN3 11-15

 

Figure 11-8:   Zinc Domains 11-20
Figure 11-9:   Lead-Silver Domains 11-21
Figure 11-10:   Copper Domains 11-22
Figure 11-11:   Zn Capping Analysis for 1300 (VCN3EI1) Domain 11-24
Figure 11-12:   Composite Length Comparison 11-42
Figure 11-13:   Zinc Normal Score Experimental and Modelled Variograms for Domain Progreso 307 11-57
Figure 11-14:   3D View of Density Domains 11-67
Figure 11-15:   3D View of Density Values 11-68
Figure 11-16:   Zinc Recovery Curve 11-71
Figure 11-17:   Lead Recovery Curve 11-71
Figure 11-18:   Copper Recovery Curve 11-72
Figure 11-19:   Histogram of Distance (M) by Category and Continuity Zone 11-76
Figure 11-20:   Final Classification Designation – Plan View 11-77
Figure 11-21:   Final Classification Designation – Longitudinal Section 11-78
Figure 11-22:   Vertical Section Showing Zn Blocks Versus Composite Grades 11-82
Figure 11-23:   Vertical Section Showing Pb Blocks Versus Composite Grades 11-83
Figure 11-24:   Vertical Section Showing Ag Blocks Versus Composite Grades 11-84
Figure 11-25:   Vertical Section Showing Cu Blocks Versus Composite Grades 11-85
Figure 11-26:   Swath Plot: Zn Grade Variation Along X, Y, and Z 11-86
Figure 11-27:   Zn OK, ID3, Nn Blocks Versus Zn Composite Histograms 11-87
Figure 11-28:   Plan View of Mineral Resources Inclusive and Exclusive of Mineral Reserves 11-89
Figure 11-29:   Longitudinal Section of Mineral Resources Inclusive and Exclusive of Mineral Reserves 11-90
Figure 12-1:   Schematic Section View of Stope Illustrating Dilution and Extraction Values in a Stope 12-3
Figure 12-2:   Zinc Recovery Curve 12-6
Figure 12-3:   Lead Recovery Curve 12-6
Figure 12-4:   Copper Recovery Curve 12-7
Figure 13-1:   Active Mining Zones 13-2
Figure 13-2:   Cut and Fill Stoping – Longitudinal View 13-7
Figure 13-3:   Sublevel Stoping – Longitudinal View 13-8
Figure 13-4:   Cut and Fill Mining Cycle 13-9
Figure 13-5:   Access to Cut and Fill Stopes 13-11

 

Figure 13-6:   Avoca Mining Method 13-13
Figure 13-7:   Sublevel Stoping Mining Cycle 13-14
Figure 13-8:   Typical Layout for Longhole Drilling 13-17
Figure 13-9:   Procedures for Seismic Events 13-21
Figure 13-10:   Ventilation System 13-25
Figure 13-11:   Main Ventilation Fan 13-28
Figure 13-12:   Ventilation Ducting Used to Ventilate Work Headings 13-29
Figure 13-13:   Mine Dewatering System 13-30
Figure 13-14:   Dewatering Sequence 13-31
Figure 13-15:   Drainage from Backfilling Stopes 13-33
Figure 13-16:   Hydraulic Backfill System 13-35
Figure 13-17:   Hydraulic Backfill Plant 13-37
Figure 13-18:   Emergency Egress Routes and Refuge Stations 13-38
Figure 13-19:   One-Line Diagram of the El Porvenir Electrical System 13-41
Figure 13-20:   Standard Layout for an Underground Electrical Substation – Plan View 13-43
Figure 13-21:   Electrical Equipment in a Typical Substation 13-44
Figure 14-1:   Process Flow Sheet 14-3
Figure 15-1:   Site Layout 15-4
Figure 15-2:   Tailings Storage Facility Layout with Dam at Elevation 4,064 MASL 15-6
Figure 15-3:   Tailings Storage Facility Main Dam Layout at Elevation 4,064 MASL 15-7
Figure 15-4:   Tailings Storage Facility Main Dam Section to Elevation 4,100 MASL 15-9
Figure 16-1:   Zinc Price Outlook (2020-2025) 16-2
Figure 16-2:   Refined Copper Market Balance (2020-2025) 16-3
Figure 16-3:   Copper Price Outlook (2020-2025) 16-4
Figure 16-4:   Lead Price Outlook (2020-2025) 16-5
Figure 16-5:   Silver Price Outlook (2020-2025) 16-6
Figure 19-1:   After-Tax NPV Sensitivity Graph 19-10
Figure 20-1:   Mining Concessions in the Vicinity of El Porvenir 20-3

 

 

1.0Executive Summary
1.1Summary

SLR Consulting Ltd. (SLR) was retained by Nexa Resources S.A. (Nexa) to prepare an independent Technical Report Summary on the El Porvenir Mine (the Mine or El Porvenir), located in Pasco Province, central Peru. The purpose of this Technical Report Summary is to support the public disclosure of updated Mineral Reserve and Mineral Resource estimates. This Technical Report Summary conforms to United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96) Technical Report Summary. SLR personnel visited the site from September 5 to 7, 2018. SLR has prepared this amended Technical Report Summary to disclose Mineral Resources and Mineral Reserves attributable to Nexa only, provide additional information about metallurgical recoveries and lead and silver markets, and to disclose the accuracy of the cost estimates. SLR notes that the effective date of the technical information contained herein remains December 31, 2021.

Nexa is a publicly traded company on the Toronto Stock Exchange (TSX) and the New York Stock Exchange (NYSE). Nexa is a reporting issuer in all provinces and territories of Canada and is under the jurisdiction of the Ontario Securities Commission.

Nexa is a large-scale, low-cost, integrated zinc producer with over 60 years of experience developing and operating mining and smelting assets in Latin America. Nexa has a diversified portfolio of polymetallic mines (zinc, lead, copper, silver, and gold) and also greenfield projects at various stages of development in Brazil and Peru. In Brazil, Nexa owns and operates two underground mines, Vazante and Morro Agudo (Zn and Pb). Nexa also operates two zinc smelters in Brazil (Três Marias and Juiz de Fora). In Peru, Nexa operates the El Porvenir (Zn, Pb, Cu, and Ag), Cerro Lindo (Zn, Cu, Pb, and Ag), and Atacocha (Zn, Cu, Pb, Au, and Ag) mines, as well as the Cajamarquilla zinc smelter near Lima. Nexa’s development projects in Peru include Magistral, Shalipayco, Florida Canyon (JV with Solitario), Hilarión, and Pukaqaqa. In Brazil, Nexa is developing the Aripuanã Zinc Project (Zn, Pb, Cu, Au, and Ag), which is currently under construction and is owned by Mineração Dardanelos Ltda. (Dardanelos), a wholly-owned subsidiary of Nexa.

El Porvenir is an underground, polymetallic mine located in Peru’s Central Andes mountain region at an elevation of approximately 4,200 metres above sea level (MASL). El Porvenir is situated 315 km by road northeast of Lima, the capital city, and 13 km from the city of Cerro de Pasco. The Mine began operations in 1949, and recent production has been at a rate of approximately 6,000 tonnes per day (tpd). Table 1-1 presents El Porvenir's run of mine (ROM) production for the years 2015 to 2020. The processing plant has a capacity for treating ore at a rate of approximately 2.28 million tonnes per annum (Mtpa).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-1

Table 1-1: ROM Production – Years 2015 to 2020

Nexa Resources S.A. – El Porvenir Mine

Item  Unit  2015  2016  2017  2018  2019  2020
Tonnes  t  2,108,821  2,154,151  1,834,511  2,149,927  2,120,765  1,502,618
Zn  %  3.21  3.22  2.86  3.04  2.92  2.65
Pb  %  0.93  0.99  1.04  0.98  1.01  0.93
Cu  %  0.17  0.14  0.13  0.15  0.15  0.17
Ag  g/t  54.38  60.24  63.61  59.68  64.64  62.28

Production in 2020 was significantly lower than in 2019 due to the effects of the COVID-19 pandemic and associated production interruptions. On March 15, 2020, the Peruvian Government declared a national emergency and imposed operating business restrictions, including on the mining sector. The quarantine period was initially expected to last until the end of March 2020 but was subsequently extended up to May 10, 2020. In light of the government restrictions, Nexa suspended production at El Porvenir. During this period, mining activities were limited to critical operations with a minimum workforce to ensure appropriate maintenance, safety, and security. On May 6, 2020, the Peruvian Government announced the conditions for the resumption of operations for different sectors, including mining operations above 5,000 tpd. As a result, operations at El Porvenir, which have been suspended since March 18, 2020, restarted production on May 11, 2020, following the end of the quarantine period. Following the resumption of operations, El Porvenir ramped up production to pre-pandemic levels by June 2020.

Nexa holds a total of 80.16% that corresponds to the sum of Nexa’s direct interest in Nexa Resources Peru S.A.A. (0.17%) (Nexa Peru) and indirect participation of Nexa in Nexa Peru and Pampa de Cobre S.A.C. (80.06%) through its controlled company Nexa Resources Cajamarquilla S.A. (99.91%), and the remaining 19.76% are floating shares. The Mine is comprised of 25 concessions covering approximately 4,846.8 hectares (ha) and a beneficiation plant. El Porvenir’s surface properties include a 450.8 ha mine site and areas for the tailings storage facility (TSF), accommodations, and other ancillary infrastructure.

1.1.1Conclusions

SLR has the following conclusions by area.

1.1.1.1Geology and Mineral Resources
·As of December 31, 2020, exclusive of Mineral Reserves, Measured Mineral Resources are estimated to total 0.18 million tonnes (Mt) at 2.59% Zn, 0.99% Pb, 0.23% Cu, and 63.46 g/t Ag and Indicated Mineral Resources are estimated to total 1.07 Mt at 2.93% Zn, 0.89% Pb, 0.20% Cu, and 63.33 g/t Ag. In addition, Inferred Mineral Resources are estimated to total 6.79 Mt at 3.60% Zn, 0.95% Pb, 0.23% Cu, and 78.37 g/t Ag. Mineral Resources are reported on an 80.16% Nexa attributable ownership basis.
·El Porvenir has features of skarn, hydrothermal vein/breccia-style, and stratabound deposits.
·The control of mineralization is lithological, mineralogical, and structural.
·Protocols for drilling, sampling, analysis, verification, and security meet industry standard practices. The drill hole database was verified by SLR and is suitable for Mineral Resource estimation.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-2
·The geological models are reasonably constructed using available geological information and are appropriate for Mineral Resource estimation.
·The assumptions, parameters, and methodology used for the El Porvenir Mineral Resource estimate are appropriate for the style of mineralization and proposed mining methods.
·Nexa’s exploration strategy, practices, and procedures are in line with industry standards.
·A number of polymetallic prospects located near the deposits have been outlined and warrant additional exploration.
1.1.1.2Mining and Mineral Reserves
·As of December 31, 2020, Proven and Probable Mineral Reserves are estimated to total 11.10 Mt at 3.75% Zn, 0.88% Pb, 0.23% Cu, and 63 g/t Ag. Mineral Reserves are reported on an 80.16% Nexa attributable ownership basis.
·The assumptions, parameters, and methodology used for the El Porvenir Mineral Reserve estimate meet industry standard practices and are appropriate for the style of mineralization and proposed mining methods.
·Most of El Porvenir’s ore production comes from mechanized cut and fill (C&F), which has proven to be an effective method for mining its deposits for decades. An increasing share of the Mine’s production comes from sublevel stoping (SLS) in those areas that are suitable for the method. SLS is a lower-cost method than C&F, and provides an efficient means for disposing of development waste. According to the life of mine (LOM) plan, SLS’s share of El Porvenir’s output will increase from approximately 16% in 2021 to 46% in 2025.
1.1.1.3Mineral Processing
·Test work has been conducted in order to produce a geometallurgical model to predict metallurgical response during future processing at El Porvenir and relationships based on the ore source at El Porvenir having been derived to predict throughput, grinding media consumption, recovery, and concentrate quality.
·Review of historical production indicates that recoveries of copper, lead, and zinc are related to their head grades, while the majority of silver is recovered to the lead concentrate.
·Average LOM planned head grades of zinc and copper are forecast to be similar to or higher than average head grades for the past three years, while the average planned lead head grade is forecast to decrease slightly compared to recent head grades. Forecast recoveries are in line with those achieved in recent years.
·No fundamental changes to the concentrator feed are anticipated, and in the SLR Qualified Person’s (QP) opinion, based on recent processing plant performance, the forecast recoveries and concentrate qualities for the near future are reasonable.
1.1.1.4Environmental, Permitting and Social Considerations
·No environmental issues were identified from the documentation available for review that could materially impact the ability to extract the Mineral Resources and Mineral Reserves. The El Porvenir operation complies with applicable Peruvian permitting requirements. The approved permits address the authority’s requirements for operation of the underground mine, TSFs, waste rock dumps (WRD), concentrator plant, water usage, and effluents discharge.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-3
·The monitoring program at El Porvenir includes meteorology, air quality, non-ionized radiation, noise, surface water quality, groundwater quality (only one location), spring water quality, effluent discharges, fauna and flora, and TSF physical stability. El Porvenir reports the results of its monitoring program to the authorities according to the frequency stated in the approved resolutions. SLR is not aware of any non-compliance issues raised by the authorities.
·In the SLR QP’s opinion, the Environmental Management Plan for El Porvenir is adequate to address potential issues related to environmental compliance. A recommendation has been provided regarding the groundwater quality monitoring program (see Section 1.1.2.4).
·Nexa utilizes an Integrated Dam Management System (referred to as SIGBar) for the El Porvenir TSF, which provides guidelines for document management, monitoring, evaluation, risk analysis, compliance with standards and legislation, training of personnel, operation of structures and other provisions.
·The safety of operating a centerline raised tailings dam depends on the ability to maintain wide tailings beaches and a low phreatic level in the dam shell for stability. No issues with regard to crest settlements were noted in recent dam safety monitoring reports. SLR notes, however, that bedrock foundation grouting of the left and right abutments carried out in 2015 observed very significant grout takes in numerous grouthole stages indicating the filling of voids. A series of seepage collection sub-drainage pipes were also installed on the downstream shell of the dam prior to raising the rockfill to crest elevation 4,056 MASL. The dam monitoring consists of instrument measurements and field inspections.
·A Mine Closure Plan has been developed for all the Mine components within the context of Peruvian legislation and is periodically updated. The most recent modification to the Mine Closure Plan and update to the closure cost estimate are from January 2020.
·SLR’s social review indicates that, at present, Nexa’s operations at El Porvenir are a positive contribution to sustainability and community well-being. Nexa has established and continues to implement its various corporate policies, procedures, and practices in a manner consistent with relevant International Finance Corporation (IFC) Performance Standards. Nexa has, and continues to make, a positive contribution to the communities most affected by the site operations and has done a thorough job in documenting potential effects on stakeholders and protecting the rights, health, and safety of its employees.
·In the SLR QP’s opinion the grievance mechanism in place and the Community Relations Plan, in combination with Nexa’s Social Management Policy and Nexa’s Management Procedures on negotiation for land access, monitoring of social commitments, management of social crisis, promotion of local hiring, and communication with stakeholders, are adequate to address potential issues related to local communities.
·Nexa established commitments with the communities San Juan de Milpo and San Francisco de Asis de Yarusyacan to employ direct and indirect local workforce, dependent on employment opportunities required by the mine operations for qualified and non-qualified workforce.
1.1.1.5Costs and Economic Analysis
·The LOM operating cost forecast reflects the existing operating status of the Mine. The SLR QP has reviewed recent operating costs and is of the opinion that the forecast is appropriate for the El Porvenir operation. Nexa also continue to assess operating efficiencies and approaches in efforts to improve operating costs in the different cost centres.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-4
·The economics of the El Porvenir operation are positive over the LOM, confirming that the Mineral Reserves are economically viable. The economic analysis shows an after-tax net present value (NPV), at an 9% base discount rate, of $130 million, on a 100% Mine basis (Nexa owns 80.16%).
1.1.2Recommendations

SLR has the following recommendations by area.

1.1.2.1Geology and Mineral Resources
1.Improve the reconciliation processes by implementing a formal procedure and forming a multi-disciplinary team to organize and analyze reconciliation results so that production data can be used to calibrate future resource and reserve models.
2.Divide mineralization domains where groups of wireframes have been merged to avoid sharing of samples.
3.Review the inclusion of additional grade domains considering spatial and statistical correlations, to prevent smearing of high grades into low grade areas and vice versa.
4.Update the 2018 lithological model and build a litho-structural model with the main lithologies and faults that are controlling the mineralization to help define the geometry and boundaries of the mineralization. An updated lithological model would also be beneficial to evaluate and define density values by rock and by domain.
5.Until there is a well-established reconciliation process, monitor the silver and lead grades in the model with grade control and head grade to calibrate capping values and confirm if the higher silver and lead capping values are appropriate.
6.Investigate if capping levels should be applied based on high grade and low grade domains for zinc, lead, copper, and silver.
7.Increase the number of density samples in areas that currently have insufficient density tests available.
8.Use the production data to monitor the chosen drill spacing for the minor continuity zones to determine if sufficient confidence is provided to support detailed mine planning, as these domains show less grade and geological continuity.
9.Review and adjust resource and reserve shapes to follow the mineralization trend. Currently, there are a small number of shapes that do not follow the mineralization trend.
10.Re-evaluate some of the zones that were not included in the Mineral Resources and Mineral Reserves, on an ongoing basis, to potentially include part of these tonnes with continuous blocks that have the potential to be recoverable, to generate resource shapes and possibly reserve stopes.
11.Document all the supporting data used to define non-recoverable solids and document any changes.
12.Improve the survey accuracy of the mineralized mined-out stopes and development to guide the mineralization solid geometries and trends, and clean up the mined-out solids, particularly, overlapping areas.
13.Complete the 2021 exploration program, consisting of a 18,000 m drill program to define new Inferred Resources. The 2021 exploration program budget is approximately US$3.1 million.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-5
1.1.2.2Mining and Mineral Reserves
1.Consider upgrading the Mine’s underground communication system by replacing the present leaky-feeder system with a high speed digital network based on Wi-Fi or LTE technology. The upgrade would permit implementing the following:
oCentralized control and monitoring of underground operations from a control room on surface, including real-time tracking of personnel and equipment, telemetry, ventilation on demand (VOD), seismic monitoring, and closed-circuit television, among other applications.
oAutomated and tele-remote technology to operate equipment from control stations on surface for mucking development headings during shift changes, crushing, and operating rockbreakers, among other applications.
2.As the Mine has extensive existing workings, a private 4G-LTE network could be an attractive option. A private 4G-LTE network can provide substantial level coverage with a lower installation requirement than alternative systems as it sends a reliable signal over long distances without coaxial cables, amplifiers, or access points. Furthermore, it is not limited to line-of-site transmission.
1.1.2.3Mineral Processing
1.Evaluate the potential benefits that may be derived from a geometallurgical model to determine whether additional test work and further development of a geometallurgical model will provide more valuable information than what is already available from test work results.
1.1.2.4Environmental, Permitting and Social Considerations
1.Due to uncertainty regarding the potential for acid generation of the waste rock, geochemical evaluation (including static and kinetic geochemical testing on waste rock samples) should be carried out prior to closure to inform closure planning and water quality predictions for post-closure. Water quality monitoring should continue during operations to verify compliance with the national environmental standards and the appropriateness of the waste rock disposal and water management procedures that are in place.
2.Expand the groundwater quality monitoring program to include additional stations for collection of groundwater quality samples (and subsequent analysis). At a minimum, consideration should be given to the installation of one station upstream of the El Porvenir site.
3.Implement a water balance for ongoing operations to be updated by Mine personnel using meteorological and water monitored data on a regular basis (at least monthly). The water balance is an important tool to track trends and conduct short term predictions through simulation of variable operating and/or climatic scenarios to support decision making associated with tailings pond operation (e.g., maintaining adequate freeboard at all times).
4.Develop an integrated water balance that reflects the interaction between the El Porvenir and Atacocha operations from a water balance perspective to identify and predict possible scenarios of interruption of mine operations due to water management issues and/or dam safety concerns (e.g., not maintaining adequate dam freeboard).
5.Investigate opportunities for optimization of construction, tailings deposition, and water management between the Atacocha and El Porvenir operations in order to prevent situations where potential problems with one of the tailings dams could impact continuity of the sister operation.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-6

6.The following recommendations are proposed for the TSF:
oClassification of the TSF in terms of the Global Tailings Standard or the Canadian Dam Association. The classification may require more conservative design criteria in terms of flood management and seismic loading.
oA dam breach analysis to inform the TSF classification and emergency preparedness plan.
oA trigger alert response plan (TARP) for the piezometers for inclusion in the monitoring plan.
oCapacity assessments of the TSF completed on a bi-annual basis with topographic and bathymetric surveys.
oComplete long term geochemical kinetic testing of the tailings.
oImplement a groundwater monitoring program at the TSF to determine levels of metals and sulphates.
oMonitor the water quality from the TSF subsurface drains.
1.1.2.5Costs and Economic Analysis
1.Continuously monitor costs and lock in costs as soon as possible to eliminate economic uncertainty.
2.Continue efforts towards improving efficiencies and approaches to mining and development operations as opportunities arise in these areas.
1.2Economic Analysis

The economic analysis contained in this Technical Report Summary is based on El Porvenir’s Mineral Reserves reported on a 100% ownership basis (Nexa owns 80.16%), economic assumptions provided by Nexa for El Porvenir, and the capital and operating costs as presented below.

1.2.1Economic Criteria
1.2.1.1Physicals
·Mine life: 8 years (between 2021 and 2028):
·Underground ore tonnes mined: 13.85 Mt
oCu grade:      0.23%Cu
oZn grade:      3.75% Zn
oPb grade:      0.88% Pb
oAg grade:      62.8 g/t Ag
·Processed:
oTotal Ore Feed:      13.85 Mt
§Cu grade:      0.23% Cu

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-7
§Zn grade:      3.75% Zn
§Pb grade:      0.88% Pb
  §  Ag grade:     62.8 g/t Ag
oContained Metal:
§  Cu:     31,500 t Cu
§  Zn:     518,900 t Zn
§  Pb:     122,400 t Pb
§  Ag:     27.966 million ounces (Moz) Ag
oMetallurgical Recoveries at LOM average grades (recoveries vary as a function of head grade):
§Cu recovery      14.3%
§Zn recovery      89.6%
§Pb recovery      79.2%
§Ag in Cu recovery      3.8%
§Ag in Zn recovery      14.6%
§Ag in Pb recovery      59.1%
oRecovered Metals:
§  Cu:     4,500 t Cu
§  Zn:     464,700 t Zn
§  Pb:     96,800 t Pb
§  Ag:     21.676 Moz Ag
oPayable Metals:
§  Cu:     4,300 t Cu
§  Zn:     390,700 t Zn
§  Pb:     91,200 t Pb
§  Ag:     16.664 Moz Ag
1.2.1.2Revenue
·Revenue is estimated based on the following LOM weighted average metal prices:
oCu price:       US$6,388/t Cu
oZn price:       US$2,511/t Zn
oPb price:      US$1,977/t Pb
oAg price:      US$17.20/oz Ag

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-8
·Net Revenue includes the benefit of additional US$128.7/t Zn selling price and zinc smelting at cost (rather than at commercial third-party terms), due to integration with Nexa’s Cajamarquilla refinery.
·Logistics, Treatment (TC), and Refining (RC) charges:
oLOM average Transportation/Logistics charges:
§Cu concentrate:      US$127.05/t concentrate for export
§Zn concentrate:      US$38.03/t concentrate to Cajamarquilla refinery
§Pb concentrate:      US$123.84/t concentrate for export
oTreatment Charges:
§TC+RC Cu concentrate:      US$111.68/t concentrate
§TC Zn concentrate for export:      US$238.72/t concentrate
§TC Pb concentrate:      US$201.68/t concentrate
§Refined Zn conversion costs at Cajamarquilla:      US$509.73/t
oRefining Charges:
§Ag in Cu concentrate:      US$0.50/oz
§Ag in Pb concentrate:      US$1.00/oz
·Net Smelter Return (NSR) Revenue after logistics, treatment, and refining charges is US$1,306 million.
1.2.1.3Capital Costs
·LOM sustaining capital costs of US$221.1 million.
·Closure costs of US$25.2 million were included at the end of the Mineral Reserves based LOM in year 2029.
1.2.1.4Operating Costs
·LOM unit operating cost average of:
oMine Development:       US$6.56/t mined
oUnderground Mining:      US$32.81/t mined
oProcessing:       US$12.72/t milled
oGeneral and administrative (G&A):      US$7.30/t milled
·Total unit operating costs of US$59.39/t milled.
·LOM operating costs of US$822.5 million.
1.2.1.5Taxation and Royalties
·Corporate tax rate in Peru is 29.50%.
·Special Mining Tax (IEM/GEM) LOM average rate: 4.3%.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-9
·Mining royalties LOM average rate: 4.3%.
·Employees participation: 8%.
·SLR has relied on a Nexa taxation model for calculation of income taxes applicable to the cash flow.
1.2.2Cash Flow Analysis

SLR developed a LOM after-tax cash flow model for El Porvenir to confirm the economics of the LOM plan. The model is based on Nexa’s TR EP 2020 v6 Final model. The model does not take into account the following components:

·Financing costs
·Insurance
·Overhead cost for a corporate office

The economic analysis confirmed that the El Porvenir Mineral Reserves are economically viable. The pre-tax NPV at a 9% discount rate is US$155 million and the after-tax NPV at a 9% discount rate is US$130 million, on a 100% Mine basis (Nexa owns 80.16%).

A cash flow summary is presented in Table 1-2. All costs are in Q4 2020 US dollars with no allowance for inflation.

Table 1-2: After-Tax Cash Flow Summary

Nexa Resources S.A. – El Porvenir Mine

  Units Total LOM
Production    
LOM years 8
UG Production 000 tonnes 13,850
Ag Grade g/t 2.02
Cu Grade % 0.23%
Pb Grade % 0.88%
Zn Grade % 3.75%
Concentrate Production    
Cu Concentrate dmt 22,662
Pb Concentrate dmt 185,932
Zn Concentrate dmt 925,961
Recovered    
Ag oz 21,676,261
Cu tonnes 4,496
Pb tonnes 96,796
Zn tonnes 464,740
Metal Prices    
LOM average - Ag US$/oz 17.20

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-10

 

LOM average -  Cu US$/tonne 6,388
LOM average -  Pb US$/tonne 1,977
LOM average -  Zn US$/tonne 2,511
Cash Flow    
Gross Revenue US$ million 1,652,150
Transport / TC-RC  Charges US$ million (345,843)
Royalties US$ million (19,648)
Net Revenue US$ million 1,286,659
Operating Costs    
Mining Costs US$ million (545,237)
Processing Costs US$ million (176,174)
G&A US$ million (101,109)
Other Costs US$ million (10,624)
Operating Cash Flow US$ million 453,516
Direct Capital Costs US$ million -
Sustaining Capital Costs US$ million (221,075)
Reclamation & Closure US$ million (25,196)
Change Working Capital US$ million -
Pre-Tax Net Cash Flow US$ million 207,245
Taxes - Income Tax US$ million (28,339)
Taxes - IEM/GEM US$ million (2,541)
After-Tax Cashflow US$ million 176,364
Project Economics    
Pre-Tax    
Pre-tax NPV at 7% US$ million 164,845
Pre-tax NPV at 8% US$ million 159,759
Pre-tax NPV at 9% US$ million 154,883
After-Tax    
After-Tax NPV at 7% US$ million 139,026
After-Tax NPV at 8% US$ million 134,246
After-tax NPV at 9% US$ million 130,143
1.2.3Sensitivity Analysis

SLR conducted cash flow sensitivity analyses on after-tax NPV at a 9% discount rate, to identify project risks, using metal prices, head grade, metallurgical recovery, capital costs, and operating costs.

The Mine after-tax NPV is most sensitive to metal prices and head grade, followed by metallurgical recovery, operating costs, and capital costs.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-11
1.3Technical Summary
1.3.1Property Description and Location

The El Porvenir mining operation is located in Peru’s Central Andes region at an elevation of approximately 4,200 MASL. The Mine is situated in the districts of San Francisco de Asís de Yarusyacán and Yanacancha, in the province and department of Pasco. El Porvenir is located 13 km from the city of Cerro de Pasco, which is located approximately 315 km by road from the national capital, Lima, when travelling by the Carretera Central and the La Oroya-Huánuco highway.

1.3.2Land Tenure

El Porvenir’s mineral rights consist of 25 mining concessions covering an area of 4,846.77 ha and one beneficiation concession. None of these concessions are in urban expansion areas, protected natural areas, or archaeological sites. These concessions are subject to annual fees and penalties. Nexa reports that all fees and penalties have been paid in full up to 2020. Most of the concessions are subject to royalties according to a lease agreement signed on January 2, 2006.

1.3.3History

El Porvenir has a long history in the Peruvian mining sector, extending over 70 years. The Mine began operating as a small-scale artisanal mine in 1949, and Compañía Minera Milpo S.A. (Milpo) was incorporated the same year to operate the Mine. A gravity separation plant was built at the site in 1953, and a flotation plant was completed in 1979. The Mine’s output increased steadily over the decades, attaining its current production rate of approximately 5,600 tpd in 2014. Milpo acquired the adjacent Atacocha Mina in 2008. In 2010, Nexa, then Grupo Votorantim, gained control of Milpo and its assets, including El Porvenir. In 2014, Nexa company began integrating the El Porvenir and Atacocha operations, including administration, the TSFs, and the electrical power supply. El Porvenir’s operations were interrupted from March 10, 2020 to May 15, 2020, due to the COVID-19 pandemic.

1.3.4Geology and Mineralization

El Porvenir is situated in the Pasco region of the Western Cordillera of the Andes, within the Eocene-Miocene Polymetallic and Miocene Au-Ag Epithermal Belts.

Within the property area, the stratigraphic units of primary interest are the Pucará and the Goyllarisquizga groups. The Goyllarisquizga Group outcrops in the area of the deposit comprising quartz rich sandstone, corresponding to the Goyllarisquizga Formation. Sandstones may vary from quartz arenite to arkose. The matrix is argillaceous to siliceous. Above the 4000 Level, the lithology and stratification are well defined and easy to recognize. Below the 4000 Level, strong alteration has obliterated the original rock intensity forming siliceous breccias and massive silica where it is still possible to recognize quartz grains and in few places the stratification.

Intrusive rocks within the property are variably porphyritic dacite to quartz diorite with hornblende and biotite phenocrysts. The Milpo-Atacocha fault is a major structural feature in the region, which can be traced for nearly 15 km from Yarusyacán in the north to Carmen Chico in the south.

Mineralization is characterized as a skarn, intermediate sulphidation epithermal vein/breccia-style, or stratabound mineralization in the Goyllarisquizga Formation:

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-12

Skarn-related mineralization is commonly associated with the garnet and silica-skarn-chlorite assemblages, comprising pyrite, chalcopyrite, sphalerite, galena and minor pyrrhotite, pyrite, bornite, covellite, orpiment, and realgar within the Pucará Group sediments around the Milpo stock.

The silica breccia consists of sub-rounded to sub-angular white to milky grey opaline silica clasts, millimetres to centimetres in size, and to a lesser extent, sandstone, and limestone clasts. The silica breccia clasts are cemented by white granular silica, with occasional cross-cutting veins of white silica. Breccias include massive (siliceous) breccias, granular (siliceous) breccias, and Ag-Pb-Zn breccias sub-divided into calcareous, polymictic-monomictic, and karst (collapse). Breccia clasts include limestone, marble, silica (massive), and skarn; the composition of the clasts indicates that brecciation occurred later than skarn development.

The stratabound Pb-Ag-Zn mineralization occurs in the sandstone strata (mantos) at the base of the Goyllarizquisga Formation (near the contact with the Pucará Group). Several disseminated sulphide mantos have recently been identified at Sara and Porvenir 2W within the quartz sandstone, generally in contact with layers of silt and microconglomerates. The minerals include galena with silver content, sphalerite, and pyrite. Gold is also present.

1.3.5Exploration Status

As of February 15, 2020, a total of 4,664 drill holes totalling 762,848.57 m, have been completed at El Porvenir. Nexa’s exploration program is based on an integrated strategy of geological and structural interpretation, combined with remote sensing for alteration and magnetic patterns and anomalies. The 2020 exploration program, including an additional 36 drill holes totalling 14,246.80 m, confirmed the continuity of the mineralization at Sara, and the magnetometry program defined five geophysical anomalies (Tingo, Carmen Chico NW, Carmen Chico W, La Quinua, and Chicri), which will be studied through mapping programs, surface sampling, and diamond drilling in the next three years. Based on surface mapping, remote sensing and geophysics, six brownfield exploration projects were defined (Machcan, Curiajasha, Longreras, Manuel 05 and Pique Estrella, La Churca, and La Quinua Chicrin Corridor). The exploration work planned for 2021 involves a budget of $3.1 million, and includes 18,000 m of diamond drilling, focused on defining new Mineral Resources in the Sara corridor, comprising the eastern part of the Milpo syncline in the Goyllarisquizga Formation, and the Integration Zone at the 3,300 Level of the Mine.

1.3.6Mineral Resources

The Mineral Resources in El Porvenir are contained in four zones: Zona Alta (Upper Zone), Zona Intermedia (Intermediate Zone), Zona Baja (Lower Zone), and Profundizacion Zona (Mine Deepening Zone).

The Mineral Resource estimate for El Porvenir, as of December 31, 2020, is summarized in Table 1-3. Mineral Resources have been classified in accordance with the definitions for Mineral Resources in S-K 1300, which are consistent with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves dated May 10, 2014 (CIM (2014) definitions.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-13

Table 1-3: Summary of Mineral Resources – December 31, 2020

Nexa Resources S.A. – El Porvenir Mine

      Grade  Contained Metal
Category  Tonnage
(Mt)
  (% Zn)  (% Pb)  (% Cu)  (g/t Ag)  (000 t Zn)  (000 t Pb)  (000 t Cu)  (000 oz Ag)
Measured  0.18  2.59  0.99  0.23  63.46  4.8  1.8  0.4  378
Indicated  1.07  2.93  0.89  0.20  63.33  31.3  9.5  2.1  2,176
M+I  1.25  2.87  0.91  0.20  63.35  36.1  11.4  2.6  2,554
Inferred  6.79  3.60  0.95  0.23  78.37  244.5  64.8  15.9  17,110

Notes:

1.The definitions for Mineral Resources in S-K 1300 were followed for Mineral Resources, which are consistent with CIM (2014) definitions.
2.Mineral Resources are reported on an 80.16% Nexa attributable ownership basis.
3.Mineral Resources are estimated at NSR cut-off values of US$60.06/t for the Upper Zone, US$61.09/t for the Intermediate Zone, US$59.75/t for the Lower Zone, and US$63.37/t for the Mine Deepening Zone for C&F resource shapes.
4.Mineral Resources are estimated using average long term metal prices of Zn: US$2,869.14/t (US$1.30/lb); Pb: US$2,249.40/t (US$1.02/lb); Cu: US$7,426.59/t (US$3.37/lb); and Ag: US$19.38/oz.
5.Metallurgical recoveries are accounted for in the NSR calculations based on historical processing data and are variable as a function of head grade. Recoveries at the LOM average head grades are 89.6% for Zn, 79.2% for Pb, 14.3% for Cu, and 77.5% for Ag.
6.A minimum mining width of 4.0 m was used for C&F resource shapes.
7.Bulk density varies depending on mineralization domain.
8.Mineral Resources are exclusive of Mineral Reserves.
9.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
10.Numbers may not add due to rounding.

The SLR QP is of the opinion that, with consideration of the recommendations summarized in this section, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.

The Mineral Resource estimate was completed using Datamine Studio RM and Leapfrog Geo software. Wireframes for geology and mineralization were constructed in Leapfrog Geo based on geology sections, assay results, lithological information, underground mapping, and structural data. Assays were capped to various levels based on exploratory data analysis and then composited to two metre lengths. Wireframes were filled with blocks and sub-celling at wireframe boundaries. Blocks were interpolated with grade using ordinary kriging (OK) and inverse distance cubed (ID3) interpolation algorithms. Block estimates were validated using industry standard validation techniques. Classification of blocks used distance-based and mineralization continuity criteria.

Mineral Resources at El Porvenir are reported using all the material within resource shapes generated in Deswik Stope Optimizer (DSO) software, satisfying minimum mining size, NSR cut-off values of US$60.06/t for the Upper Zone, US$61.09/t for the Intermediate Zone, US$59.75/t for the Lower Zone, and US$63.37/t for the Mine Deepening Zone for C&F resource shapes, and continuity criteria.

1.3.7Mineral Reserves

Table 1-4 presents an updated Mineral Reserve estimate effective December 31, 2020 prepared by Nexa and reviewed by SLR. This Mineral Reserve estimate complies with CIM (2014) definitions, which are

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-14

consistent with the definitions for Mineral Reserves in S-K 1300 Subpart 229.1300. Measured and Indicated Mineral Resources were converted into Proven and Probable Mineral Reserves, respectively.

Dilution and NSR cut-off values were two critical factors used in the Mineral Reserve estimate. Dilution includes waste originating from internal and planned sources. The NSR cut-off values vary with the mining zones, the mining method, and whether a block is considered marginal.

The Mineral Reserves are grouped into four mining zones, and the mining methods are mechanized C&F and SLS. The NSR calculations consider the metal grades of the mining blocks, metal prices, metallurgical recoveries, commercial terms and conditions, and mining, processing, and G&A costs. The payable metals in concentrates include concentrate treatment, transportation, refining charges, deductions, and penalties. The prices are based on 10 year averages of London Metal Exchange (LME) projections.

Table 1-4: Mineral Reserves –December 31, 2020

Nexa Resources S.A. – El Porvenir Mine

      Grade  Contained Metal
Category  Tonnage
(000 t)
  (% Zn)  (% Pb)  (% Cu)  (g/t Ag)  (000 t Zn)  (000 t Pb)  (000 t Cu)  (000 oz Ag)
Proven  3,017  3.76  0.98  0.25  62.9  113.3  29.6  7.6  6,094
Probable  8,085  3.74  0.85  0.22  62.8  302.7  68.5  18.0  16,324
Total  11,102  3.75  0.88  0.23  62.8  416.0  98.1  25.6  22,418

Notes:

1.The definitions for Mineral Reserves in S-K 1300 were followed for Mineral Reserves which are consistent with CIM (2014) definitions.
2.Mineral Reserves are reported on an 80.16% Nexa attributable ownership basis.
3.Mineral Reserves are estimated at cut-off grades depending on the zone and mining method.
4.Mineral Reserves are estimated using average long term prices of Zn: US$2,494.90/t (US$1.13/lb); Pb: US$1,956.00/t (US$0.89/lb); Cu: US$6,457.90/t (US$2.93/lb); Ag: US$16.85/oz.
5.Metallurgical recoveries are accounted for in the NSR calculations based on historical processing data and are variable as a function of head grade. Recoveries at the LOM average head grades are 89.6% for Zn, 79.2% for Pb, 14.3% for Cu, and 77.5% for Ag.
6.A minimum mining width of 5 m was used.
7.Density is 3.12 t/m3.
8.Numbers may not add due to rounding.

The SLR QP is not aware of any risk factors associated with or changes to any aspect of the modifying factors such as mining, metallurgical, infrastructure, permitting, or other relevant factors that could materially affect the Mineral Reserve estimate.

1.3.8Mining Method

El Porvenir mined 2.11 Mt of zinc-lead-copper ore in 2019 and 1.52 Mt in 2020. Dilution accounted for 34% of the ore tonnage produced. Mine production is presently underway in the Upper Zone, the Intermediate Zone, the Lower North Zone, and the Lower West (El Porvenir 9) Zone.

El Porvenir uses two mining methods: mechanized overhand C&F and SLS. C&F is the predominant method, accounting for over 80% of the mine’s production. El Porvenir uses a version of SLS called Avoca, also referred to as longitudinal longhole retreat mining.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-15

C&F and SLS have similar development requirements as they both involve dividing a mining zone into horizons between sublevels and excavating the ore in an ascending fashion. Sublevels are typically spaced at 20 m vertical intervals and accessed via spiral ramps. The development on each sublevel includes an access drift, a footwall drive, and crosscuts or attack ramps, which provide access to the orebody. For SLS, the footwall drive can be as close as 15 m from the footwall contact, whereas for C&F, the footwall drives have to be offset from it by 60 m to provide sufficient distance for fanning the attack ramps.

The geotechnical conditions at El Porvenir result from the rock mass’s characteristics and the Mine’s depth. The host rock and the mineralized zones are generally classified as fair to good, with rock mass ratings (RMR) ranging from 40 to 60. El Porvenir is one of South America’s deepest mines, extending more than 1,800 m below the main access level. Its depth contributes to the occurrence of seismic events, including rockbursts.

Table 1-5 presents the LOM production schedule broken down by metal grades on an annual basis until 2028. Mine output remains stable at present levels until 2024 but then declines progressively in subsequent years.

Table 1-5: Mine Production Schedule

Nexa Resources S.A. – El Porvenir Mine

   Units  Total  2021  2022  2023  2024  2025  2026  2027  2028
Ore Total  000 t  13,850  2,161  2,222  2,220  2,036  1,658  1,380  1,371  802
Stopes  000 t  12,743  2,001  2,008  2,029  1,879  1,524  1,270  1,309  724
Develop  000 t  1,107  160  214  191  157  134  110  62  79
Zn  %  3.75  3.28  3.69  3.57  3.82  4.11  4.25  4.01  3.39
Pb  %  0.88  1.12  0.92  1.02  0.96  0.71  0.67  0.66  0.70
Cu  %  0.23  0.17  0.21  0.24  0.25  0.24  0.27  0.28  0.21
Ag  g/t  62.8  72.5  61.6  66.6  61.9  52.3  56.6  59.1  70.0
NSR  US$/t  98.54  95.91  97.27  98.20  100.48  99.56  103.22  99.99  92.61
1.3.9Mineral Processing

El Porvenir processing plant is located adjacent to the Mine at an altitude of 4,100 MASL to 4,200 MASL. The concentrator has an ore processing capacity of approximately 2.2 Mtpa. El Porvenir copper and lead concentrates are sold to traders and delivered by road and rail to Callao (approximately 270 km by road) for shipping overseas, while zinc concentrate is transported by road and rail to Nexa’s Cajamarquilla zinc refinery east of Lima. El Porvenir is approximately 315 km from Lima by road. The current LOM plan continues to 2028. Processing consists of conventional crushing, grinding, and flotation to produce separate copper, lead, and zinc concentrates.

Tailings are cycloned and the coarse fraction is used for mine backfill, which constitutes approximately 50% of tailings produced. Water from tailings dewatering is returned to the process. Overflow from the cyclones containing the fine tailings is deposited in the conventional TSF adjacent to the Mine and processing plant. Tailings can be discharged at various points in the TSF by means of valved discharge points on the tailings line. Clarified water discharged from the TSF joins natural water flows.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-16

Make-up water is supplied from various streams around the TSF, as well as the Carmen Chico River, approximately 3.2 km south of the processing facility.

El Porvenir lead and zinc concentrates are generally clean and do not attract penalty charges for deleterious elements. The copper concentrate attracts penalties due to elevated lead and zinc content (approximately 15% to 20% combined). The penalty charges are approximately US$17.00/dmt.

1.3.10Infrastructure

The El Porvenir infrastructure consists of the following facilities:

·Approximately 6,000 tpd underground mine
·A 2.2 Mtpa processing plant with associated laboratory and maintenance facilities
·Power plant
·Access roads
·Offices and warehouses
·Accommodations
·Waste rock facilities
·Temporary ore stockpiles
·Hydraulic backfill plant
·TSF

The power supply for the Mine comes from two sources, the national power grid and the La Candelaria Hydroelectric Plant.

Raw water is sourced from Tingovado Creek, as well as from other creeks around the TSF. Fresh water supply is obtained from the Carmen Chico River, approximately 3.2 km south of the processing facility.

The EL Porvenir TSF receives tailings generated by both El Porvenir and the Atacocha concentrator plants. A portion of tailings is used for hydraulic backfill at El Porvenir. The TSF was originally constructed in the 1970s, and the current elevation of the dam crest is 4,060 MASL and the dam height is 140 m.

Waste rock from the underground operations is either used as backfill underground or stockpiled on surface. If waste rock is brought to surface in the future, it will be deposited in a designated area near the secondary TSF embankment southwest of the concentrator plant area.

1.3.11Market Studies

The principal commodities produced at El Porvenir, zinc, lead, copper, and silver, are freely traded, at prices and terms that are widely known, so that prospects for sale of any Nexa production are virtually assured. Zinc and copper represent 72% of El Porvenir’s gross revenue, while lead and silver contribute 28% of the revenue. El Porvenir is an operating mine with concentrate sales contracts in place for copper and lead concentrates, while zinc concentrate is consumed by Nexa’s Cajamarquilla smelter according to their internal planning.

Market information is based on the industry scenario analysis prepared by Nexa’s Market Intelligence team in July 2020 using information sourced from different banks and independent financial institutions, economy and politics research groups, and metals consultants.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-17
1.3.12Environmental and Social Considerations

El Porvenir has a net positive water balance that results in surplus water collected on-site being discharged from the TSF to the receiving environment through a decant structure. Clean (non-contact) surface runoff water is managed through upstream diversion ditches that prevent its entrance to the TSF, and convey it downstream to the Lloclla River, a tributary of the Huallaga River. Contact water collected in the tailings pond is recycled via a decant pumping system to the concentrator plant for use in the process. A lined seepage collection monitoring pond is located at the downstream toe of the main embankment of the TSF.

The El Porvenir TSF (originally constructed in the 1970s) receives tailings generated by both Atacocha and El Porvenir concentrator plants. A portion of tailings is used for hydraulic backfill at El Porvenir. The tailings disposal is performed in subaerial conditions which allows a beach with a gentle slope towards the water or supernatant pond (settling pond). The tailings discharge locations allow for the settling pond to be centrally located within the TSF and a tailings beach to form in front of the main embankment.

Various Environmental Impact Assessments (EIA) and supporting technical reports have been submitted and approved between 2001 and 2020 to identify potential environmental effects resulting from project activities for the construction, operation, and closure stages. The most recent modification of the EIA was approved by the Peruvian authorities in 2012 to grant authorization for a maximum production rate of 7,500 tpd. The most recent update of the environment management plan was presented in the sixth supporting technical report issued in 2020. The monitoring program implemented at the Mine includes monitoring of meteorology, air quality, non-ionizing radiation, noise, surface water quality, springs water quality, effluent discharges, fauna and flora, and physical stability of the tailings dam. The results of the monitoring program for air quality, ambient noise, non-ionizing radiations, and water quality are reported to the Peruvian authorities quarterly.

El Porvenir holds a number of permits in support of the current operations. The permits are Directorial Resolutions issued by the Peruvian authorities upon approval of mining environmental management instruments filed by the mining companies. Nexa maintains an up to date record of the legal permits obtained to date.

The communities located within the area of influence of the Mine are:

·        Comunidad de San Francisco de Asís de Yarusyacán (20 Anexos)

·        Comunidad de Titaclayán

·        Comunidad de Cajamarquilla

·        Comunidad de Malauchaca

·        Comunidad Santa Rosa de Pitic

·        Comunidad San Miguel

·        Comunidad La Candelaria

·        Centro Poblado La Quinua

·        Comunidad 30 de Agosto

·        Comunidad San Juan de Yanacachi

·        Comunidad San Juan de Jarapampa

·        Cooperativa Pucayacu

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-18

Nexa adheres to international standards to provide best practices for public reporting on economic, environmental, and social impacts in order to help Nexa and its shareholders and stakeholders understand their corporate contribution to sustainable development. Corporately, Nexa has made several commitments to improve community health and safety as well as the overall well-being of community members.

A conceptual Mine Closure Plan was approved in 2007 for the Mine components within the context of the Peruvian legislation and has subsequently been amended or updated four times. The Mine Closure Plan addresses temporary, progressive, and final closure actions, and post-closure inspection and monitoring. A closure cost estimate was developed and included in the Mine Closure Plan. The total financial assurance for progressive closure, final closure, and post-closure is calculated by Nexa according to the Peruvian regulations (Supreme Decree D.S. N° 262-2012-MEM/DM).

1.3.13Capital and Operating Costs

The capital costs for the Mine are shown in Table 1-6. El Porvenir is an operating mine, hence all capital costs are considered sustaining cost.

Table 1-6: Life of Mine Capital Budget

Nexa Resources S.A. – El Porvenir Mine

Cost
(US$000)
  Total  2021  2022  2023  2024  2025  2026  2027  2028
Tailing Dam & Waste Deposit                           
Raising  53,858  10,808  18,149  24,900  -  -  -  -  -
New Dam  13,246  2,700  1,000  -  5,000  4,546  -  -  -
Tailing Treatment  3,782  3,782  -  -  -  -  -  -  -
Heavy Mobile Equipment                           
Replacement  23,284  1,838  50  3,567  4,781  5,593  3,641  3,815  -
Addition  3,335  850  1,600  -  -  -  -  -  -
Asset Integrity                           
Asset Integrity – Plant  11,365  6,605  2,805  475  575  705  100  100  -
Asset Integrity – Mine  150  -  -  -  -  150  -  -  -
Other Sustaining                           
Others  1,340  110  550  250  290  100  0  40  -
Civil Construction  200  200  -  -  -  -  -  -  -
Mining Facilities                           
Communication system  2,450  550  700  600  300  300  -  -  -
Pumping  2,500  700  300  300  300  300  300  300  -
Electrical Substation  1,650  1,000  200  450  -  -  -  -  -
Ventilation / Cooling  950  100  150  100  150  150  150  150  -

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-19

 

Cost
(US$000)
  Total  2021  2022  2023  2024  2025  2026  2027  2028
Operation Unit Projects                           
Improvements  4,631  1,821  1,110  1,700  -  -  -  -  -
Audit & Inspection  2,380  390  890  1,100  -  -  -  -  -
Other Expenditures                           
Expansion Projects  -  -  -  -  -  -  -  -  -
Information Technology  1,020  480  150  130  130  130  -  -  -
Automation Project  2,190  874  1,166  150  -  -  -  -  -
Mine Development Capital Cost                           
Underground Mine Development  92,745  17,170  16,073  16,941  18,954  13,124  6,521  1,934  2,030
Total  221,075  49,977  44,894  50,663  30,479  25,982  10,712  6,338  2,030

The Mine Closure Plan was prepared to meet the Peruvian national requirements with the closure and reclamation cost assessed at US$25.2 million.

Table 1-7 presents El Porvenir operating costs based on a LOM period of eight years.

Table 1-7: Operating Budget

Nexa Resources S.A. – El Porvenir Mine

All-In Cost
(US$000)
  Total  2021  2022  2023  2024  2025  2026  2027  2028
Mine Underground  454,350  63,077  64,320  64,742  61,913  55,796  51,610  51,569  41,323
High Zone C&F  127,409  22,074  19,242  20,828  15,955  8,275  13,293  13,374  14,369
High Zone SLS  4,947  301  1,818  2,354  473  -  -  -  -
Intermediate C&F  49,425  19,329  11,914  12,146  4,161  1,874  -  -  -
Intermediate SLS  90,866  8,801  11,734  11,978  21,170  17,064  3,651  3,673  12,795
Low Zone C&F  30,666  11,827  11,445  4,944  13  861  1,577  -  -
Low Zone SLS  8,855  636  366  797  3,358  3,698  -  -  -
Deepening C&F  98,132  -  5  5,621  15,239  19,778  21,641  23,630  12,218
Deepening SLS  44,050  109  7,795  6,074  1,546  4,246  11,448  10,892  1,941
Processing  176,174  23,274  23,452  23,446  22,910  21,808  20,998  20,972  19,314
G&A  101,109  15,774  16,219  16,206  14,861  12,103  10,076  10,011  5,858
Development Operating Cost  90,887  17,162  15,971  14,837  13,065  10,602  8,673  6,244  4,332
Total  822,519  119,288  119,961  119,231  112,750  100,309  91,356  88,797  70,827

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

 1-20
2.0Introduction

SLR Consulting Ltd (SLR) was retained by Nexa Resources S.A. (Nexa) to prepare an independent Technical Report Summary on the El Porvenir Mine (the Mine or El Porvenir), located in Pasco Province, central Peru. The purpose of this Technical Report Summary is to support the public disclosure of updated Mineral Reserve and Mineral Resource estimates. This Technical Report Summary conforms to United States Securities and Exchange Commission’s (SEC) Modernized Property Disclosure Requirements for Mining Registrants as described in Subpart 229.1300 of Regulation S-K, Disclosure by Registrants Engaged in Mining Operations (S-K 1300) and Item 601 (b)(96) Technical Report Summary. SLR has prepared this amended Technical Report Summary to disclose Mineral Resources and Mineral Reserves attributable to Nexa only, provide additional information about metallurgical recoveries and lead and silver markets, and to disclose the accuracy of the cost estimates. SLR notes that the effective date of the technical information contained herein remains December 31, 2021.

Nexa is a publicly traded company on the Toronto Stock Exchange (TSX) and the New York Stock Exchange (NYSE). Nexa is a reporting issuer in all provinces and territories of Canada and is under the jurisdiction of the Ontario Securities Commission.

Nexa is a large-scale, low-cost, integrated zinc producer with over 60 years of experience developing and operating mining and smelting assets in Latin America. Nexa has a diversified portfolio of polymetallic mines (zinc, lead, copper, silver, and gold) and also greenfield projects at various stages of development in Brazil and Peru. In Brazil, Nexa owns and operates two underground mines, Vazante and Morro Agudo (Zn and Pb). It also operates two zinc smelters in Brazil (Três Marias and Juiz de Fora). In Peru, Nexa operates the El Porvenir (Zn, Pb, Cu, and Ag), Cerro Lindo (Zn, Cu, Pb, and Ag), and Atacocha (Zn, Pb, Au, and Ag) mines, as well as the Cajamarquilla zinc smelter near Lima. Nexa’s development projects in Peru include Magistral, Shalipayco, Florida Canyon (JV with Solitario), Hilarión, and Pukaqaqa. In Brazil, Nexa is developing the Aripuanã Zinc Project (Zn, Pb, Cu, Au and Ag), which is currently under construction and is owned by Mineração Dardanelos Ltda. (Dardanelos), a wholly-owned subsidiary of Nexa.

El Porvenir began operations as a small-scale artisanal mine in 1949. The operation’s capacity increased almost continuously over the decades, and in 2012, its production reached its current capacity of approximately 6,000 tonnes per day (tpd) in 2013, Nexa commenced the process of integrating the El Porvenir and Atacocha mining operations. To date, integration has been achieved for the administrative function, the electric power supply, and the tailings facility. El Porvenir comprises 25 mining concessions (totalling 4,846.77 ha) and a beneficiation concession, located in the districts of San Francisco de Asís de Yarusyacán and Yanacancha, province and department of Pasco in Peru.

Nexa holds a total of 80.16% that corresponds to the sum of Nexa’s direct interest in Nexa Resources Peru S.A.A. (0.17%) (Nexa Peru) and indirect participation of Nexa in Nexa Peru and Pampa de Cobre S.A.C. (80.06%) through its controlled company Nexa Resources Cajamarquilla S.A. (99.91%), and the remaining 19.76% are floating shares.

2.1Site Visits

An SLR geologist, mining engineer, and metallurgical engineer, all of whom are Qualified Persons (QP), visited the site from September 5 to 7, 2018.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

2-1
2.2Sources of Information

During the preparation of this Technical Report Summary and the site visit, discussions were held with the following personnel from Nexa:

·Thiago Nantes Teixeira, Manager of Internal Commission of Resources and Reserves
·Priscila Artioli, Internal Commission of Resources and Reserves
·Fernando Madeira Perisse, Technical Services Manager
·Paulo Henrique Araujo Calazans, Mining Engineer
·Eliott Hidalgo, Resource Chief – Nexa Peru
·Nydia Mendizabal, Database Administrator at El Porvenir
·Daniel Arias, Modeller Geologist
·Daniel Saenz, Modeller Geologist – Anglo Peruana Terra
·Carlos Uchuquicaña, Chief Geologist at El Porvenir
·José Antonio Lopes, Corporate Resource Manager
·Cristian Mendoza, Exploration Chief Geologist
·Mervin Tapia, Brownfield Exploration Manager
·Roberto Bados, Geology Manager at El Porvenir
·Philipe Innecco Rosa, Mine Planning Engineer
·Paulo Henrique Calazans, Mine Planning Consultant
·Jorge Carbajal Diéguez, Corporative Planning Engineer – Long Term
·Julio Cesar Luna Caballero, Technical Services Manager
·Milena Alves Moreira, Environmental Manager
·Jose Madrid, Environmental Chief – El Porvenir
·Walter Heredia, Social Management Manager
·Miluska Minaya, Community Relationship Coordinator
·Camila Silva, Metallurgical Plant Chief
·Juliana Siqueira, Metallurgical Plant Manager
·Julio Cesar Luna Caballero, Technical Services Manager

The documentation reviewed and other information sources of information are listed in Section 24 (References) at the end of this Technical Report Summary.

2.3List of Abbreviations

Units of measurement used in this report conform to the metric system. All currency in this report is US dollars (US$) unless otherwise noted.

m  micron  kVA  kilovolt-amperes
mg  microgram  kW  kilowatt
a  annum  kWh  kilowatt-hour
A  ampere  L  litre

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

2-2

 

bbl  barrels  lb  pound
Btu  British thermal units  L/s  litres per second
°C  degree Celsius  m  metre
C$  Canadian dollars  M  mega (million); molar
cal  calorie  m2  square metre
cfm  cubic feet per minute  m3  cubic metre
cm  centimetre  MASL  metres above sea level
cm2  square centimetre  m3/h  cubic metres per hour
d  day  mi  mile
dia  diameter  min  minute
dmt  dry metric tonne  mm  micrometre
dwt  dead-weight ton  mm  millimetre
°F  degree Fahrenheit  mph  miles per hour
ft  foot  MVA  megavolt-amperes
ft2  square foot  MW  megawatt
ft3  cubic foot  MWh  megawatt-hour
ft/s  foot per second  oz  Troy ounce (31.1035 g)
g  gram  oz/st, opt  ounce per short ton
G  giga (billion)  ppb  part per billion
Gal  Imperial gallon  ppm  part per million
g/L  gram per litre  psia  pound per square inch absolute
Gpm  Imperial gallons per minute  psig  pound per square inch gauge
g/t  gram per tonne  RL  relative elevation
gr/ft3  grain per cubic foot  s  second
gr/m3  grain per cubic metre  st  short ton
ha  hectare  stpa  short ton per year
hp  horsepower  stpd  short ton per day
hr  hour  t  metric tonne
Hz  hertz  tpa  metric tonne per year
in.  inch  tpd  metric tonne per day
in2  square inch  US$  United States dollar
J  joule  USg  United States gallon
k  kilo (thousand)  USgpm  US gallon per minute
kcal  kilocalorie  V  volt
kg  kilogram  W  watt
km  kilometre  wmt  wet metric tonne
km2  square kilometre  wt%  weight percent
km/h  kilometre per hour  yd3  cubic yard
kPa  kilopascal  yr  year

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

2-3
3.0Property Description
3.1Location

El Porvenir’s coordinates are 10°36'36" S, 76°12'37" W (Latitude/Longitude decimals -10.6100, -76.2102). The Mine is located in Peru’s Central Andes region at an elevation of approximately 4,200 MASL. The Mine is situated in the districts of San Francisco de Asís de Yarusyacán and Yanacancha, in the province and department of Pasco. El Porvenir is located 13 km from the city of Cerro de Pasco, which is located approximately 315 km by road from the national capital, Lima, when travelling by the Carretera Central and the La Oroya-Huánuco highway. Figure 3-1 shows El Porvenir’s location in the province of Pasco.

3.2Land Tenure

Nexa holds a total of 80.16% that corresponds to the sum of Nexa’s direct interest in Nexa Peru (0.17%) and indirect participation of Nexa in Nexa Peru and Pampa de Cobre S.A.C. (80.06%) through its controlled company Nexa Resources Cajamarquilla S.A. (99.91%), and the remaining 19.76% are floating shares. As of December 31, 2020, the concessions are held in the name of Nexa Resources El Porvenir S.A.C. (Nexa El Porvenir), Nexa Resources Atacocha S.A.A. (Nexa Atacocha), Nexa Peru, and S.M.R.L. CMA No. 54 (50% Nexa El Porvenir and Nexa Atacocha).

El Porvenir’s mineral rights consist of 25 mining concessions covering an area of 4,846.77 ha and one beneficiation concession. The relevant mineral rights information, including the code number and concession name, titleholder, status, date, public registry record, and available area for each of the mineral concessions, can be found in Table 3-1 and is shown in Figure 3-2 (Nexa, 2020a). None of these concessions are in urban expansion areas, protected natural areas, or archaeological sites.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-1

Table 3-1: El Porvenir Mining Concessions

Nexa Resources S.A. – El Porvenir Mine

No.  Code  Concession  Titleholder  Status  Date  Public Registry Record  Area
(ha)
1  010000515L  Acumulación El Porvenir  Nexa Resources El Porvenir S.A.C.  Acumulación D.M. Titulada  03/04/1877  P-11248335  4,600.52
2  010000116L  Acumulación El Porvenir 1  Nexa Resources El Porvenir S.A.C.  Acumulación D.M. Titulada  25/01/2016  P-11242512  7.99
3  04013393X01  Carlitos  Nexa Resources El Porvenir S.A.C.  D. M. Titulado D.L. 109  04/05/1987  P-20002989  20.00
4  04013362X0 1  Pucayacu  Nexa Resources El Porvenir S.A.C.  D. M. Titulado D.L. 109  17/06/1986  P-20002923  36.00
5  04005441X01  Angelica Segunda  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  06/11/1915  P-0 2005830  2.00
6  04010070X01  Atacocha No. 1  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  09/11/1954  P-20000404  1.60
7  04010249X01  Atacocha No. 2  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  09/12/1955  P-0 2014333  2.77
8  040 10074X0 1  C.M.A. No. 41  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  13/11/1954  P-0 2013928  65.91
9  04010073X01  C.M.A. No. 42  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  11/11/1954  P-0 2013917  3.00
10  04010071X01  C.M.A. No. 43  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  10/11/1954  P-0 2010565  4.99
11  04010072X01  C.M.A. No. 44  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  11/11/1954  P-0 2013919  7.99
12  04010063X02  C.M.A. No. 45  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  13/11/1954  P-0 2014009  23.97
13  04010149X01  C.M.A. No. 55  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  04/06/1955  P-0 2016190  1.00
14  04005426X0 1  Ithaca  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  07/10/1915  P-0 2010173  3 .99
15  040024 71X01  Kathleen  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  03/06/1905  P-0 20105 53  5.99
16  0400273 1X01  Kitty  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  24/02/1906  P-0 2010298  5.99
17  040053 56X01  La Tunda  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  28/10/1935  P-0 2010176  5.99
18  0400 5383X0 1  Manuel Numero Dos  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  19/06/1915  P-0 2005462  7.99
19  0400 5372X0 1  Melbourne  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  27/05/1915  P-0 2010281  11.98
20  04005505X01  Tralee  Nexa Resources Atacocha S.A.A.  D. M. Titulado D.L. 109  23/02/1916  P-0 2010297  2.00

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-2

 

No.  Code  Concession  Titleholder  Status  Date  Public Registry Record  Area
(ha)
21  04012874X0 1  C.M.A. No. 95  Nexa Resources Atacocha S.A.A. / Nexa Resources Peru S.A.A.  D. M. Titulado D.L. 109  07/12/1978  P-20000331  3.96
22  04012875X01  C.M.A. No. 96  Nexa Resources Atacocha S.A.A. / Nexa Resources Peru S.A.A.  D. M. Titulado D.L. 109  07/12/1978  P-20000332  3.99
23  010079393  Macapata  Nexa Resources Peru S.A.A.  D. M. Titulado D.L. 708  27/05/1993  P- 200048 29  14.17
24  04010148X0 1  C.M.A. No. 54  S.M.R.L. CMA No. 54  D. M. Titulado D.L. 109  04/06/1955  P- 11105479  2.00
25  04012134 X01  Demasi A AM-No. 1  S.M.R.L. CMA No. 54  D. M. Titulado D.L. 109  13/03/1973  P-20001500  1.00

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-3

Figure 3-1: Mine Location

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-4

 

Figure 3-2: Land Tenure

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-5

 

According to the files of the titles granted by the Peruvian Institute of Geology, Mining and Metallurgy (INGEMMET), mineral rights “Acumulación El Porvenir”, “C.M.A. No. 44”, “C.M.A. No. 45”, “Carlitos”, and “Pucayacu” overlap roads, rivers, and a power transmission line. If any such infrastructure or water bodies are affected by exploration or mining activities, Nexa will need to obtain the relevant approvals prior to undertaking any activities.

3.2.1Mineral Rights

According to Peruvian General Mining Law (the Law):

a.Mineral concessions grant their holder the right to explore, develop, and mine metallic or non-metallic minerals located within their internal boundaries.
b.A mineral claim is an application to obtain a mineral concession. Exploration, development, and exploitation rights are obtained once the title to the concession has been granted, except in those areas that overlap with priority claims or priority mining concessions. Upon completion of the title procedure, resolutions awarding title must be recorded with the Public Registry to create enforceability against third parties and the Peruvian State.
c.The beneficiation concession grants the right to use physical, chemical, and physical-chemical processes to concentrate minerals or purify, smelt, or refine metals.
d.Mineral rights are separate from surface rights. They are freely transferable.
e.A mineral concession by itself does not authorize the titleholder to carry out exploration or exploitation activities, but rather the titleholder must first:
(i)Obtain approval from the Culture Ministry of the applicable archaeological declarations, authorizations, or certificates.
(ii)Obtain the environmental certification issued by the competent environmental authority, subject to the rules of public participation.
(iii)Obtain permission for the use of land (i.e., obtain surface rights) by agreement with the owner of the land or the completion of the administrative easement procedure, in accordance with the applicable regulation.
(iv)Obtain the applicable governmental licences, permits, and authorizations, according to the nature and location of the activities to be undertaken.
(v)Carry out consultations with Indigenous Peoples under the Culture Ministry, should there be any communities affected by potential exploitation of the mineral concession, as per International Labour Organization (ILO) Convention 169.
f.Mineral rights holders must comply with the payment of an annual fee equal to $3.00/ha, on or before June 30 of each year.
g.Holders of mineral concessions must meet a Minimum Annual Production Target or a Minimum Annual Investment before a statutory deadline. When such deadline is not met, a penalty must be paid as described below:
(i)Mineral concessions must meet a statutory Minimum Annual Production Target of 1 Tax Unit (Unidad Impositiva Tributaria, or UIT) per hectare per year for metallic concessions, within a statutory term of ten years from the title date. The applicable penalty is 2% of the Minimum Annual Production Target per hectare per year as of the 11th year until the 15th year. Starting in the 16th year and until the 20th year, the applicable penalty is 5% of the Minimum Annual Production Target per year and starting in the 21st year until the 30th year, the applicable penalty is 10% of the Minimum Annual Production Target per year. After the 30th year, if the Minimum Annual Production Target is not met, the mining concession will lapse automatically.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-6

h.Mineral concessions may not be revoked as long as the titleholder complies with the Good Standing Obligations according to which mineral concessions will lapse automatically if any of the following events take place:
(i)The annual fee is not paid for two consecutive years.
(ii)The applicable penalty is not paid for two consecutive years.
(iii)A concession expires if it does not reach the minimum production in Year 30 and cannot justify the non-compliance up to five additional years due to reasons of force majeure described in the current legislation.
i.Agreements involving mineral rights (such as an option to acquire a mining lease or the transfer of a mineral concession) must be formalized through a deed issued by a public notary and must be recorded with the Public Registry to create enforceability against third parties and the Peruvian State.
3.2.2Annual Fees and Penalties

Pursuant to Table 3-1, all annual fees applicable to the 25 mineral concessions and the beneficiation concession comprising the Mine have been paid in full up to 2020, as detailed in Table 3-2.

Certain mineral concessions comprising the Mine were subject to a penalty since the minimum required levels of production or exploration expenditures were not met as stated in the previous subsection (Mineral Rights). The minimum annual production is equal to a UIT per granted hectare. The minimum annual investment is the penalty to be paid multiplied by 10. All penalties applicable to the mineral concessions comprising the Mine, have been paid as indicated in Table 3-2. Penalties were incurred for concessions numbered 6 through 25 for not achieving the required production or exploration expenditures, while concessions 1 through 5 were not subject to penalties as the required annual production levels were met. The penalty amounts shown in Table 3-2 for concessions 1 through 5 represent the annual amounts that would be payable if the Minimum Annual Production Target was not met.

Table 3-2: Payments Made for Concessions in 2020

Nexa Resources S.A. – El Porvenir Mine

No.  Code  Concession  Annual Fee
(US$)
  Penalty
(US$)
  Total Payment
2020
(US$)
1  04010070X01  Atacocha No. 1  4.79  38.98  4.79
2  010000515L  Acumulacion El Porvenir  13,801.55  112,338.19  13,801.55
3  010 00011 6L  Acumulacion El Porvenir 1  23.96  194.99  23.96
4  04010149X01  C.M.A. No. 55  3.00  24.39  3.00

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-7

 

No.  Code  Concession  Annual Fee
(US$)
  Penalty
(US$)
  Total Payment
2020
(US$)
5  04002731X01  Kitty  17.98  146.32  17.98
6  04010148X01  C.M.A. No. 54  5.99  79.88  85.87
7  04012134X01  Demasia AM-No. 1  3.00  39.94  42.94
8  04005426X01  Ithaca  11.98  159.80  171.78
9  04002471X01  Kathleen  17.98  239.68  257.66
10  04005356X01  La Tunda  17.98  239.68  257.66
11  04005372 X01  Melbourne  35.95  479.38  515.33
12  04005505X01  Tralee  5.99  79.90  85.89
13  04005441X01  Angelica Segunda  5.99  48.77  54.76
14  04010249X01  Atacocha No. 2  8.30  67.52  75.82
15  04010074X01  C.M.A. No. 41  197.72  1,609.33  1,807.05
16  04010073X01  C.M.A. No. 42  8.99  73.15  82.14
17  04010071X01  C.M.A. No. 43  14.98  121.93  136.91
18  04010072X01  C.M.A. No. 44  23.97  195.07  219. 04
1 9  04010063X0 2  C.M.A. No. 45  71.90  585.22  6 57.12
20  04012874X01  C.M.A. No. 95  11.89  96.76  108.65
21  04012875X01  C.M. A. No. 96  11.98  97.53  109.51
22  04013393X0l  Carlitos  60.00  48.84  108.84
23  010079393  Macapata  42.23  343.77  386.00
24  04005383X01  Manuel Numero Dos  23.97  195.10  219.07
25  040 13362X01  Pucayacu  108.00  87.91  195.91
26  P000000613  Acumulacion Aquiles 101
(Beneficiation Concession)
  4,587.50  N/A  4,587.50

Note. Exchange rate of 3.44 Peruvian Neuvo Sol (PEN or S/.)/ USD based on SUNAT Exchange Rate as of May 29, 2020.

3.3Royalties

According to a lease agreement signed on January 2, 2006, the concessions listed in Table 3-3 are subject to the royalties presented in Table 3-4.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-8

Table 3-3: Concessions Subject to Royalties Payable to Nexa Atacocha

Nexa Resources S.A. – El Porvenir Mine

  Angelina Segunda C.M.A. No. 44
  Atacocha No. 1 C.M.A. No. 45
  Atacocha No. 2 Ithaca
  C.M.A. No. 41 Kathleen
  C.M.A. No. 42 Manuel Numero Dos
  C.M.A. No. 43 Melbourne
  C.M.A. No. 55 La Tunda
  Kitty Tralee
     
50% of the Amount Indicated in the Royalty Schedule
  C.M.A. No. 95 C.M.A. No. 96
  Demasia AM No. 1 CMA No. 54

Source: Nexa, 2020a

Table 3-4: Royalty Payments to Nexa Atacocha

Nexa Resources S.A. – El Porvenir Mine

Percentage  Mineral Value Range
7%  Up to US$40/t of mineral value
8%  Above US$40/t and up to US$50/t of mineral value
10%  Above US$50/t and up to US$60/t of mineral value
12%  Above US$60/t and up to US$70/t of mineral value
13%  Above US$70/t and up to US$80/t of mineral value
15%  Above US$80/t and up to US$100/t of mineral value
18%  Above US$100/t of mineral value
3.4Surface Rights and Easements

El Porvenir has the following surface rights:

·On June 30, 1988, Nexa obtained the free right of use of 450.66 ha for the mine site from the Peruvian State.
·On August 5, 1991, the Ministry of Energy and Mines expropriated 18 ha from the Peasant Community of San Francisco de Asís de Yarusyacán and granted Nexa its surface-property rights for the tailings deposit and other facilities.
·On February 27, 2012, Nexa purchased six properties totalling 128 ha from the Peasant Community of San Francisco de Asís de Yarusyacán for expanding the tailings deposit, developing an access road, and installing a 138 kV power transmission line. One of the properties (1.05 ha) has not been registered in the Public Registry pending validation of its boundaries. On January 21, 2014, the Peasant Community of San Francisco de Asís de Yarusyacán filed a civil suit against Nexa to cancel the sale of the 128 ha. On November 20, 2016, the community filed another lawsuit against Nexa regarding the same property to void the sales agreement, pay them S/. 1,000,000 for damages, and return the properties. Nexa achieved favourable interim rulings on the first claim.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-9

·On December 19, 2012, Nexa El Porvenir obtained an easement of 105,458.50 m2 for 30 years from the Peasant Community of San Antonio de Rancas to install, operate, and maintain ten high voltage towers and other related facilities for a 200 kV power transmission line.
·On December 20, 2012, Nexa El Porvenir obtained an easement of 94,801.7919 m2 for 30 years from Cooperativa Agraria de Producción Pucayacu Número 004 – Yanacancha to install, operate, and maintain ten high voltage towers and other related facilities for a 200 kV power transmission line.
·On July 24, 2014, Nexa transferred the La Candelaria Power Station and related infrastructure to Nexa El Porvenir. Nexa believes that Nexa El Porvenir has the right to claim property rights over this land through the acquisitive prescription of domain, as it has been in possession of it as an owner for more than ten years.
·Other surface rights include Predio Carmen Chico and surface rights purchased from the Colqui family.

Figure 3-3 illustrates Nexa’s surface rights.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-10

 

Figure 3-3: Surface Rights

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-11

 

3.5Material Government Consents

This subsection details the material Governmental Consents required to carry out the operation in compliance with applicable Peruvian laws and regulations. These material Governmental Consents correspond to those permits, licences, authorizations, etc., issued by the applicable governmental authorities, which entitle Nexa Peru to build the components and/or perform the activities that are critical and typical to a mining operation. These components/activities may include: (i) mining activities and related facilities; (ii) beneficiation plant and related activities; (iii) water supply; (iv) effluent discharge and related facilities; (v) use of explosives; and (vi) power supply (Table 3-5). Of note, the third amendment to the Mine Closure Plan is currently under review and approval process by the Peruvian Authorities.

Table 3-5: Main Government Consents

Nexa Resources S.A. – El Porvenir Mine

#  Government Consent  Resolution  Approval Date
Environmental Certification
1  Adaptation and Environmental Management Program approval.  RD 23-97-EM/DGM  17/01/1997
2  Modification of the Adaptation and Environmental Management Program – Candelaria Power Station.  RD 28-1997-EM/DGM  23/01/1997
3  El Porvenir Environmental Impact Assessment (EIA).  RD 379-2001-EM/DGAA  26/11/2001
4  First amendment to El Porvenir EIA (expansion of processing capacity to 5,500 tpd).  RD 271-2011-MEM/AAM  02/09/2011
5  Second amendment to El Porvenir EIA (expansion of processing capacity to 7,500 tpd).  RD 203-2012-MEM/AAM  25/06/2012
6  EIA for the power supply components (transmission power line).  RD 110-2013-MEM/AAM  17/04/2013
7  Supporting Technical Report to Directorial Resolution 110-2013- MEM/AAM (optimization of the design of the power transmission line).  RD 159-2014-MEM/DGAAM  02/04/2014
8  Supporting Technical Report to Directorial Resolution 203-2012- MEM/AAM (integrate the tailings disposal from the Atacocha and El Porvenir operations).  RD 526-2014-MEM-DGAAM  20/10/2014
9  Supporting Technical Report to Directorial Resolution 110-2013- MEM/AAM (optimization of the design of the power transmission line).  RD 271-2015-MEM-DGAAM  09/07/2015
10  Supporting Technical Report for expansion of processing capacity to 9,000 tpd.  RD 319-2017-SENACE-DCA  24/10/2017
11  Supporting Technical Report for modifications of ancillary components.  RD 058-2018-SENACE- PE/DEAR  13/12/2018
12  Supporting Technical Report for modification of the 9,000 tpd expansion and tailings pipe connection to Atacocha.  RD 051-2020-SENACE-PE/DEAR  10/03/2020

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-12

 

#  Government Consent  Resolution  Approval Date
Mine Closure Plan
1  El Porvenir Mine Closure Plan.  RD 166-2009-MEM/AAM  17/06/2009
2  First Amendment to the Mine Closure Plan.  RD 286-2011-MEM/AAM  15/09/2011
3  Updated Mine Closure Plan.  RD 034-2013-MEM/AAM  30/01/2013
4  Second Amendment to the Mine Closure Plan.  RD 277-2016-MEM-DGAAM  15/09/2016
Beneficiation Plant and Tailings Storage Facilities (TSF)
1  Beneficiation Concession Title.  RD 1058-1965  31/12/1965
2  Authorization to operate the beneficiation plant with 2,000 tpd Capacity.  RD 180-79-EM/DCFM  01/10/1979
3  Beneficiation Concession Titles “AQUILES 104” (tailings disposal over 18 ha).  RD 280-97-EM/DGM  12/08/1997
4  Beneficiation Concession Titles “AQUILES 103” (tailings disposal over 48 ha).  RD 281-97-EM/DGM  12/09/1997
5  Authorization to operate the beneficiation plant at 2,850 tpd.  RD S/N-99-EM-DGM/DPDM  03/03/1999
6  Authorization to operate the beneficiation plant at 4,000 tpd.  Auto Directorial AD 113-2004-MEM-DGM/DPM  08/03/2004
7  Authorization to operate the tailing deposit “El Porvenir” to a height of 4,043 MASL  RD 178-2010-MEM  07/04/2010
8  Authorization to operate the beneficiation plant at 4,700 tpd.  RD 206-2011-MEM-DGM/V  23/06/2011
9  Authorization to operate additional components for the beneficiation plant without extending the processing capacity.  RD 37-2012-MEM-DGM/V  18/01/2012
10  Authorization to operate the beneficiation plant at 5,600 tpd.  RD 235-2013-MEM-DGM/V  30/05/2013
11  Beneficiation concession “ACUMULACION AQUILES 101” (gather beneficiations concessions “AQUILES 104” and “AQUILES 103”).  RD 178-2013-MEM/DGM  04/07/2013
12  Authorization to construct the tailing deposit “El Porvenir” to a height of 4,115 MASL.  RD 429-2013-MEM-DGM/V  15/11/2013
13  Authorization to operate the tailings deposit “El Porvenir” at a height of 4,047 MASL and extend the area of such beneficiation concession to a total of 323.7932.  RD 612-2015-MEM/DGM  12/06/2015
14  Authorization to operate additional components that integrate the tailings disposals from Atacocha and El Porvenir operations.  RD 251-2015-MEM-DGM/V  19/06/2015
15  Authorization to operate the beneficiation plant at 6,700 tpd.  RD 597-2015-MEM-DGM/V  03/12/2015

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-13

 

#  Government Consent  Resolution  Approval Date
16  Authorization to operate additional components for the beneficiation plant without extending the processing capacity.  RD 635-2015-MEM-DGM/V  12/12/2015
17  Authorization to operate the tailings deposit “El Porvenir” to a height of 4,048.5 MASL.  RD 0499-2016-MEM-DGM/V  18/08/2016
18  Authorization to operate the tailings deposit “El Porvenir” to a height of 4,056 MASL.  RD 828-2017-MEM-DGM/V  25/09/2017
19  Authorization to increase the tailings deposit “El Porvenir” to a height of 4,060 MASL.  RD 0498-2019-MINEM-DGM/V  07/10/2019
Water Abstraction, Transportation and Usage Facilities
1  License to use surface water from Huarmipuquio, Quebrada Pucayacu for population purposes.  RD 264-2015-ANA-AAA-X-MANTARO  06/04/2015
2  License to use surface water from the rivers “Lloclla”, “Yanacachi”, “Chuncana”, and “Tulluraica” for power supply purposes.  RD 86-2016-ANA/AAA-HUALLAGA  11/02/2016
3  Licence to use surface water from the ravines.
“Pucayacu – Huarmipuquio” and “Pucayacu – Carmen Chico” for mining purposes.
  RD 399-2016-ANA/AAA-HUALLAGA  13/06/2016
4  Authorization to reuse treated domestic effluents from the camp of the operation for mining purposes.  RD 600-2019-ANA/AAAHUALLAGA  06/07/2019
5  Update to the Licence to use surface water from the ravines “Pucayacu – Huarmipuquio” and “Pucayacu – Carmen Chico” for mining purposes due to titleholder name change.  RA 322-2019-ANA/AAA-HUALLAGA-ALA ALTO HUALLAGA  03/10/2019
Effluent Discharge to the Environment
1  Authorization to discharge treated industrial effluents to rivers “Huallaga” and “Lloclla”.  RD 192-2019-ANA-DGCRH  16/06/2019
Power Generation and Transmission Lines
1  Authorization to generate electricity for 1,936 kW in the hydroelectric plant “Candelaria”.  Ministerial Resolution RM 395-93-EM/DGE  31/12/1993
2  Authorization to auto-generate electricity in the thermoelectric plant “Milpo”.  Ministerial Resolution RM 394-93-EM/DGE  31/12/1993
3  Authorization to generate electricity for 3,187.50 kW in the hydroelectric plant “Candelaria”.  Ministerial Resolution RM 541-98-MEM/VME  03/11/1998
4  Power transmission concession for the 50 kV Power Transmission Line – Hydroelectric Plant “Candelaria” – S.E. N° 3 at El Porvenir.  Supreme Resolution RS 75-2010-EM  25/11/2010
5  Approve the transfer of the power transmission concession to Nexa El Porvenir.  Supreme Resolution RS 004-2015-EM  06/03/2015

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-14

 

#  Government Consent  Resolution  Approval Date
6  Power transmission concession for the 138 kV Power Transmission Line – Paragsha II – S.E. Milpo and 50 kV Power Transmission Line S.E. Milpo – V1C.  Ministerial Resolution RM 361-2016-MEM/DM  31/08/2016
Use of Explosives
1  Authorization to operate an underground magazine – Explosives  RD 304-2020-SUCAMEC/GEPP  05/02/2020
2  Authorization to operate an underground magazine – Accessories  RD 305-2020-SUCAMEC/GEPP  05/02/2020
3  Authorization to operate an underground magazine – Accessories  RD 306-2020-SUCAMEC/GEPP  05/02/2020
4  Authorization to use and acquire explosives for UEA Milpo No. 1  RD 308-2020-SUCAMEC/GEPP  05/02/2020

Source: Nexa, 2020a

The SLR QP is not aware of any environmental liabilities on the property. Nexa has all required permits to conduct the proposed work on the property. The SLR QP is not aware of any other significant factors and risks that may affect access, title, or the right or ability to perform the proposed work program on the property.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

3-15
4.0Accessibility, Climate, Local Resources, Infrastructure and Physiography
4.1Accessibility

El Porvenir is located 13 km northeast of Cerro de Pasco via an unpaved road. Cerro de Pasco is situated approximately 315 km from Lima, the national capital, when travelling via the Carretera Central and La Oroya-Huanuco highways, which are paved roads. Alternatively, Highway 20A provides a shorter drive from Lima but is mostly unpaved. The nearest airport to the Mine is Alférez FAP David Figueroa Fernandini Airport (HUU which is located approximately 130 km to the north of El Porvenir, just outside of Huanuco. Two regional airlines provide daily flights between the airport and Lima.

4.2Climate

The climate at El Porvenir is cold and humid and is generally typical of the Central Andes Mountain Region, where elevations exceed 4,000 MASL. The temperature is relatively uniform throughout the year averaging approximately 6°C and ranging from -4°C to +13°C. Precipitation in the region totals approximately 1,000 mm annually, mainly falling during the rainy season from November to March, conversely the months of June and July are mostly dry. Snowfall occurs at any time of the year, most commonly at dawn. Relative humidity is relatively uniform throughout the year averaging 78%. Mining operations are not affected by the climate and are carried out year-round.

4.3Local Resources

The El Porvenir site is situated adjacent to the small municipality of San Juan de Milpo. The nearest city to the Mine is Cerro de Pasco, which has a population of approximately 60,000. Huanuco has a population of approximately 190,000. Most supplies used in the mining operation are delivered by truck from Lima.

4.4Infrastructure

The El Porvenir infrastructure consists of the following facilities:

·Approximately 6,000 tpd underground mine
·A 2.2 million tonnes per annum (Mtpa) processing plant with associated laboratory and maintenance facilities
·Power plant
·Access roads
·Offices and warehouses
·Accommodations
·Waste rock facilities
·Temporary ore stockpiles
·Hydraulic backfill plant
·TSF

Additional information on infrastructure is provided in Sections 15 and 17.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

4-1
4.5Physiography

El Porvenir is situated in a glacial valley flanked by mountains on each side (Figure 4-1). The Mine’s TSF, processing plant, and other buildings are located at the valley’s base. A creek running through the valley drains into the Huallaga River further downstream at the village of La Quinua. The physiography of the area is typical of the Central Andes Mountain Region.

Figure 4-1: Typical Landscape at El Porvenir

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

4-2
5.0History
5.1Ownership, Exploration and Development History

El Porvenir has a long history in the Peruvian mining sector, extending over 70 years. The Mine began operating as a small scale artisanal mine in 1949, and Compañía Minera Milpo S.A. (Milpo) was incorporated the same year to operate the Mine. A gravity separation plant was built at the site in 1953, and a flotation plant was completed in 1979. The Mine’s output increased steadily over the decades, attaining its current production rate of 5,600 tpd in 2014.

No documentation on exploration is available prior to 2006. Exploration was conducted simultaneously with underground development and included geological mapping, diamond core drilling, and channel sampling (SRK, 2017). Milpo acquired the adjacent Atacocha Mine in 2008. In 2010, Nexa, then Grupo Votorantim (Votorantim), gained control of Milpo and its assets, including El Porvenir. In 2014, Nexa began integrating the El Porvenir and Atacocha operations, including administration, the TSFs, and the electrical power supply. El Porvenir’s operations were recently interrupted from March 10, 2020 to May 15, 2020, due to the COVID-19 pandemic.

Table 5-1 lists chronologically the most significant events in the operation’s history.

Table 5-1: History of the El Porvenir Mine

Nexa Resources S.A. – El Porvenir Mine

Year  Work Description
1939  The El Porvenir site is granted June 30, 1939 through Resolución Jefatural
N° 076-88-EM-DGM/JRMCP.
1949  El Porvenir began operating as a small scale artisanal mine.
Milpo was incorporated on April 6, 1949, by founders Mr. Aquiles Venegas, Mr. Amador Nycander, Mr. Ernesto Baertl, Mr. Manuel Montori, and Mr. Luis Cáceres P.
1953  Milpo built a gravity separation plant, which had a capacity 54,000 t/month.
The plant was expanded several times until 1978.
1979  Construction of the flotation plant was completed, capacity 1,800 tpd.
1997  A new mineralized zone called Porvenir Nueve was discovered.
1999  Production increased to 3,000 tpd.
2008  Milpo acquired the Atacocha Mine.
2010  Votorantim (now Nexa) gained control of Milpo and its assets, including El Porvenir.
2012  El Porvenir’s production increased to 5,600 tpd.
2013  Votorantim initiated the process of integrating the Atacocha and El Porvenir mines, forming the Cerro Pasco Mining Complex.
2014  The 1st stage integration was initiated, which consisted of integrating the administrative functions of the two operations.
2015  The 2nd stage integration was initiated, which consisted of integrating TSFs of Atacocha and El Porvenir.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

5-1

 

Year  Work Description
2016  The 3rd stage integration was initiated, which consisted of integrating the electric power supply of the two mines.
2017  Votorantim changed its name to Nexa.
The integration process continued:

The two underground mines were connected by a drift allowing an exploration program to proceed in the integration area.
2018  Nexa implemented the Avoca version of the sublevel stoping (SLS) mining method at El Porvenir.
Discovery of the Sara Deposit, in which the mineralization occurs in sandstone.
2019  The tailings dam level was increased to the 4,060 MASL elevation, which extended it useful life by an additional five years.
The Avoca/SLS mining method contributed to 6% of El Porvenir’s total production.
Nexa initiated a program called the Nexa Way Experience (La Manera Nexa Experience) aiming to optimize organizational performance through autonomous work groups and employee self-management.
2020  The Nexa Way Experience program continued and, at El Porvenir, focused on lowering costs by reducing shotcrete consumption.
El Porvenir’s operations were halted from March 18 to May 15 due to the COVID-19 pandemic.
Operations were reinitiated with the application procedures and sanitary controls to prevent the spread of the contagion.
5.2Past Production

Table 5-2 presents El Porvenir’s annual mine production since the beginning of operations. Table 5-3 provides information about the operation’s yearly concentrate production from 2016 to 2020.

Table 5-2: Mine Production History

Nexa Resources S.A. – El Porvenir Mine

      Grade        Grade
Year  Dry Tonnes
(t)
  (oz/t Ag)  (% Pb)  (% Zn)  Year  Dry Tonnes
(t)
  (oz/t Ag)  (% Pb)  (% Zn)
1950  5,144  15.90  10.30  13.60  1985  661,298  4.40  3.20  5.60
1951  13,068  12.10  8.20  11.10  1986  640,133  4.30  3.20  5.50
1952  27,478  10.90  7.10  9.20  1987  597,611  4.20  3.10  4.80
1953  33,220  7.60  6.10  7.90  1988  472,414  4.30  3.10  4.80
1954  52,747  8.10  6.50  7.50  1989  679,647  4.50  3.60  4.60
1955  72,662  7.90  6.10  7.30  1990  763,860  4.50  3.40  5.30
1956  101,172  6.90  6.10  7.50  1991  788,234  4.10  2.80  5.50
1957  118,167  6.90  6.40  6.90  1992  747,455  3.80  2.80  5.30
1958  122,740  6.40  6.20  6.40  1993  776,051  4.00  3.20  5.70
1959  135,005  5.90  6.30  6.50  1994  781,893  3.90  3.00  5.60
1960  157,174  6.60  6.10  6.70  1995  784,090  4.30  3.50  5.70

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

5-2

 

      Grade        Grade
Year  Dry Tonnes
(t)
  (oz/t Ag)  (% Pb)  (% Zn)  Year  Dry Tonnes
(t)
  (oz/t Ag)  (% Pb)  (% Zn)
1961  178,360  5.90  5.70  7.00  1996  874,890  3.80  2.70  6.20
1962  180,577  5.30  5.60  6.20  1997  968,023  3.70  2.40  6.70
1963  176,475  5.20  5.70  6.50  1998  938,549  3.09  2.23  6.62
1964  186,642  5.00  5.10  5.70  1999  1,010,627  3.40  2.50  7.40
1965  181,240  5.30  5.10  6.00  2000  1,049,857  3.30  2.10  7.30
1966  204,800  5.50  5.20  5.60  2001  1,067,890  3.35  2.33  7.70
1967  224,656  5.30  5.40  5.80  2002  1,217,291  3.65  2.58  8.02
1968  244,647  4.80  5.20  6.20  2003  1,313,346  3.51  2.45  7.69
1969  265,264  4.70  4.80  6.20  2004  1,342,451  2.21  1.41  7.61
1970  268,048  4.70  4.70  6.70  2005  1,395,991  2.44  1.64  6.87
1971  274,516  4.90  4.90  6.90  2006  1,390,940  2.51  1.68  6.10
1972  280,265  4.40  4.50  6.60  2007  1,333,313  1.90  1.19  5.31
1973  307,683  4.30  4.30  6.50  2008  1,389,947  1.60  0.88  4.23
1974  312,529  4.40  4.20  6.70  2009  1,712,188  1.30  0.68  4.07
1975  278,680  4.10  3.80  6.40  2010  1,712,188  1.23  0.60  4.04
1976  309,518  4.20  3.70  6.50  2011  1,742,129  1.23  0.54  4.00
1977  296,578  4.00  3.20  7.00  2012  1,898,901  1.13  0.48  4.04
1978  336,790  4.40  3.00  7.40  2013  1,943,490  1.37  0.82  3.48
1979  389,830  4.30  3.20  7.20  2014  2,107,212  1.49  0.88  3.39
1980  444,230  4.20  3.00  6.50  2015  2,106,519  1.75  0.93  3.21
1981  470,735  3.90  2.60  5.70  2016  2,154,152  1.94  0.98  3.22
1982  521,859  4.30  2.90  5.60  2017  1,834,511  2.05  1.04  2.86
1983  633,861  4.50  3.10  5.60  2018  2,149,928  1.92  0.98  3.04
1984  574,354  4.40  3.10  6.00  2019  2,120,765  2.08  1.01  2.92
               2020  1,502,618  2.00  0.93  2.65

Source: Nexa, 2020

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

5-3

Table 5-3: Concentrate Production – 2016 to 2020

Nexa Resources S.A. – El Porvenir Mine

   2016  2017  2018  2019  2020
Treatment Ore (in tonnes)  2,154,151  1,834,511  2,149,927  2,120,765  1,502,618
Average Ore Grade               
Zinc (%)  3.22  2.86  3.04  2.92  2.65
Copper (%)  0.14  0.13  0.15  0.15  0.17
Lead (%)  0.99  1.04  0.98  1.01  0.93
Silver (ounces per tonne)  2.01  2.05  1.92  2.08  2.00
Metal Contained in Concentrate Production               
Zinc (in tonnes)  62,534  46,154  57,872  54,689  34,867
Copper (in tonnes)  653  493  567  465  334
Lead (in tonnes)  17,164  14,818  16,641  16,914  10,858
Silver (in oz)  2,715,143  2,357,442  2,533,801  3,412,656  2,315,000

Source: SEC Form 20-Fs for 2019 and 2018 and Nexa 2020

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

5-4
6.0Geological Setting, Mineralization, and Deposit
6.1Regional Geology

The South American Platform is mainly composed of metamorphic and igneous complexes from the Archean/Proterozoic era and constitutes the continental interior of South America. The Platform was consolidated during late Proterozoic to early Paleozoic times in the course of the Brasilian/Pan-African orogenic cycle during which the union of different continents and micro-continents with the closure of several ocean basins led to the formation of the supercontinent Gondwana. Archaean and Proterozoic rocks are exposed in three main shield areas within the framework of the Neoproterozoic folding strips (Guiana, Central Brazil, and Atlantic Shields). The western continental margin of the South American Plate developed from approximately Neoproterozoic to early Paleozoic times and constitutes a convergent margin, along which the eastward subduction of the Pacific oceanic plates takes place under the South American plate. Through this process, the Andean Range was developed. The eastern margin of the South American Plate forms a divergent margin more than 10,000 km long, which developed as a result of the separation of the South American Plate and the African Plate from the Mesozoic through the opening of the South Atlantic and the rupture of Gondwana. The northern and southern margins of the South American Plate developed along transform faults in transient tectonic regimes due to the collision of the South American Plate with the Caribbean and Scottish plates. The South American Plate reveals a long and complex geological history (Engler, 2009).

Most of the stratigraphy, tectonics, magmatism, volcanism, and mineralization in Peru is spatially and genetically related to the evolution of the Andean Cordillera off the western coast of South America. The mountain range was formed by actions related to important events (for example subduction) that have continued to the present since approximately the Cambrian (Peterson, 1999) or the late Precambrian (Clark et al., 1990; Benavides-Cáceres, 1999). The formation of the Andean Cordillera is, however, the result of a narrower period extending from the Triassic to the present when the division of the African and South American continents formed the Atlantic Ocean. Two periods of this subsequent subduction activity have been identified (Benavides-Cáceres, 1999): Mariana-type subduction from the late Triassic to the late Cretaceous; and Andean-type subduction from the late Cretaceous to the present.

The geology of Peru, from the Peru-Chile trench in the Pacific to the Brazilian Shield, is defined as three main parallel regions, from west to east: the Andean Antearco, the high Andes, and the Andean Antepaís Basin. All three regions were formed during the Meso-Cenozoic evolution of the central Andes. The property is located within the high Andes region. A simplified geological map of Peru is shown in Figure 6-1 and a regional morphostructural map is shown in Figure 6-2.

The Andes can be divided into three sections, from west to east:

·The Western Cordillera is formed by rocks of the Mesozoic-Tertiary age, dominated by the coastal batholith, which consists of multiple intrusions with ages ranging from the Lower Jurassic to the Upper Eocene. The belt is up to 65 km long and 1,600 km long and extends in a sub-parallel direction from the Pacific coast to Ecuador and Chile. El Porvenir is located within the Western Cordillera.
·The Altiplano is a high plain with internal drainage located at an average elevation of almost 4,000 m, slightly below the average altitudes of the Western and Eastern Cordillera. It is 150 km wide and 1,500 km long, stretching from the north of Argentina to the south of Peru.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-1
·The Eastern Cordillera forms a plateau 4,000 m high and 150 km wide. During the Cenozoic era, the arch has risen forming the Eastern Cordillera. Stratigraphically, the zone of the high Andes is composed, from west to east, of an intra-arch channel, a deep basin, a continental shelf, and the Marañón metamorphic complex (the Marañón complex). In general, the formations are progressively older from west to east, spanning from the mid-Tertiary to the Neoproterozoic-Paleozoic.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-2

 

Figure 6-1: Simplified Geological Map of Peru

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-3

 

Figure 6-2: Morphostructural Map of Peru

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-4
6.2Local Geology

The following section is abridged from SRK (2017), with updates from Nexa (2020). Figure 6-3 illustrates the local geology.

El Porvenir is situated in the Pasco region of the Western Cordillera of the Andes, within the Eocene-Miocene Polymetallic and Miocene Au-Ag Epithermal Belts.

6.2.1Stratigraphy

The oldest rocks in the region are part of the Devonian Excelsior Formation, comprising metamorphosed siliciclastic sediments or phyllite and quartzite.

The Upper Permian-Middle Triassic Mitu Group comprises clastic and volcanic sediments, including red sandstone, shale, and minor conglomerate. At the base of the Mitu Group there is a polymictic conglomerate unit which is approximately 45 m thick. Conglomerate clasts are subangular, comprising shale, phyllite, quartzite, and minor limestone. The conglomerate matrix is a well cemented, fine grained, reddish sandy material. Thin, grey to reddish siltstone layers are also present, and exhibit laminar stratification. The middle part of the Mitu Group comprises sequences of fine grained, reddish sandstone, with cross-stratification and interbedded with polymictic conglomerate layers. The Mitu Group was deposited during the Late Hercynian Tectonic Phase (based on the fossil record, and radiometric age dating). An angular unconformity exists between the underlying Excelsior Formation and overlying Mitu Group. The sediment package has accumulated with increasing thickness to the east, locally up to approximately 2,000 m, thinning to possibly as little as 100 m thickness in areas.

The Norian-Toarcian Pucará Group was deposited in the Pucará Basin, a north-northwest trending trough associated with a transtensional shear zone accommodating rifting and sinistral movement, on the Mitu Group with an erosional and angular unconformity. The Pucará Group is dominated by carbonate platform sequences which were primarily deposited in a shallow water environment during the first marine progression of the Andean Orogenic Cycle from the Upper Triassic to Lower Jurassic. The Pucará comprises interbedded grey to black limestone, dolostone, and shale with varying thicknesses of up to 60 cm, and is sub-divided into three formations: Chambará, Aramachay, and Condorsinga (Megard, 1968).

The Norian to Rhaetian Chambará Formation overall comprises massive, grey to pale limestone beds with some layers containing chert nodules, and horizons of grey to beige calcareous siltstone with variable oxides and red shale. Thicknesses vary from approximately 600 m to over 3,000 m. This formation is further sub-divided into stratigraphic units at the project scale.

The Hettangian to Sinemurian Aramachay Formation is characterized by dark grey bituminous calcareous shales and limestone beds over 15 cm thick. This formation was deposited in a deeper-water environment.

The Sinemurian to Toarcian Condorsinga Formation comprises beige to grey, thin to massive, interbedded limestone and dolostone. The thicknesses vary from approximately 500 m to over 1,500 m.

The Hauterivian to Aptian Goyllarisquizga Group, composed of siliciclastic sediments, vary from 150 m to 600 m thick and was deposited during the Lower Cretaceous with an erosional and angular unconformity over the Pucará Group during the Lower Cretaceous. Variable and discontinuous units of conglomerate, chert, and/or shale with carbonaceous fragments occur at the base of this group, which correlates with the Chimú Formation. A sequence of approximately 40 m thick comprising bitumen-bearing siltstone, with carbonaceous layers and laminar stratification is located above the Chimú Formation. Continuing up in the stratigraphic sequence is a section approximately 25 m thick comprising medium grain, reddish

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-5

sandstone with thin micro-conglomerate layers, alternating with white sandstone further up in the sequence. These sequences correlate with the Santa and Carhuaz formations. The majority of the Goyllarisquizga Group comprises cross-bedded grey to white, medium to coarse grained, quartz-rich sandstone, approximately 90 m thick or more, which correlates with the Farrat Formation. Over one metre thick limestone units are present locally in the upper parts of this formation. Thin terrestrial red beds and basalt layers one to two metres thick may be interbedded near the upper contact.

A discontinuous, predominantly basaltic flow occurs in the Goyllarisquizga Group. Thin, red beds of sandstone and shale occur within the basalt unit.

The equivalent Machay and Chicrín formations comprise of approximately 250 m of massive to thinly interbedded grey calcareous sandstone, grey to brown marly limestone, grey calcareous conglomerate with clasts of fine to muddy sandstone, and fine grained red sandstone. These rocks were deposited onto the basalt flows during the Middle Cretaceous.

Another unit of predominantly basalt flows with thin beds of red sandstone and shale was disconformably deposited on top of the Machay/Chicrín formation.

The Upper Eocene Pocobamba Formation comprises breccias with sub-angular to sub-rounded limestone clasts derived from the Pucará Formation; subdivided into the Cacuán and Shuco members. The Pocobamba Formation was deposited as debris in a continental environment.

The regional stratigraphic column is shown in Figure 6-4.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-6

 

Figure 6-3: Local Geology

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-7

 

Figure 6-4: Generalized Stratigraphic Column

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-8
6.2.2Intrusive Rocks

Two generations of magmatism are recognized in the region, including the Milpo-Atacocha-Vinchos (29-26 Ma) and Cerro de Pasco-Colquijirca (16-10 Ma) belts (Cobeñas, 2008, and references therein). Both magmatic belts are oriented north-northeast to south-southwest, approximately parallel to the Andean trend.

The Milpo-Atacocha-Vinchos intrusive rocks are characterized as small hypabyssal stocks (less than one square kilometre), dikes, and sills of granodiorite (dacite) to diorite and tonalite composition and occur within high-K Calc-Alkaline Series and Shoshonitic Series. These intrusive rocks generally exhibit a porphyritic texture with plagioclase as the dominant mineral forming the matrix, and variable phenocrysts of quartz, hornblende, biotite, and pyroxenes. The matrix comprises fine-grained quartz and feldspar-plagioclase.

Magmatic emplacement occurred during the Oligocene based on two K-Ar age dates of porphyritic granodioritic samples with partially carbonate and sericite altered plagioclase (29.3±2.5 Ma and 25.9±1.5 Ma) (Soler and Bonhomme, 1988). Recently, 12 intrusive rocks samples from the El Porvenir and Atacocha areas were analyzed by U-Pb geochronology at the University of Tasmania and provided age dates of intrusive crystallization from 28.58 ± 0.38 Ma to 30.11 ± 0.23 Ma.

Intrusives in the region exhibit an elongate geometry, trending north-south to northwest-southeast, parallel to the regional fold axis, and are mostly spatially associated with the Milpo-Atacocha fault, suggesting that there is an apparent structural control on magmatic emplacement.

Metamorphic contact aureoles are variably formed around these intrusive bodies. The most intense contact aureole is recognized in the Atacocha area, where Pucará Group rocks are completely silicified with pyrite impregnations for up to 200 m.

The Cerro de Pasco-Colquijirca volcanic to sub-volcanic intrusive rocks are characterized by dacitic, trachytic, and monzonitic composition. Texture varies from porphyritic to aphanitic. Composition is dominated by quartz and plagioclase, with lesser amphiboles, biotite, and K-feldspar. Age dating from the Cerro de Pasco, Marcapunta, and Yanamate complexes reveals ages ranging from 16 Ma to 10 Ma.

6.2.3Structure

Regional tectonics during the Mesozoic and Cenozoic are collectively referred to as the Andean Cycle which comprises multiple sedimentation and deformational events. The Andean Cycle is sub-divided into at least seven deformational phases (Ellison et al., 1989):

·Peruana (Upper Cretaceous);
·Incaica (Paleogene/Eocene);
·Quechua 1 (early Oligocene);
·Quechua 2 (late Oligocene to early Miocene);
·Quechua 3 (middle Miocene);
·Quechua 4 (late Miocene); and
·Quechua 5 (late Miocene).

Three episodes of regional folding are recognized occurring during the Paleogene and possibly earlier and are separated by periods of tension. Throughout the region, the tectonics are characterized by northeast-southwest to east-west oriented compression, which occurred during the second Andean deformation

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-9

phase (Incaico), from the Eocene to Oligocene. Most Mesozoic rocks appear to have been folded conformably generally forming a series of anticlines and synclines, parallel to the principal Andean trend, with a north-northwest to south-southeast oriented fold-axis, plunging to the south. Most folds described throughout the region have gently to moderately dipping (<60°) limbs.

The Milpo-Atacocha fault is a major structural feature in the region, which can be traced for nearly 15 km from Yarusyacán in the north to Carmen Chico in the south. The Milpo-Atacocha fault strikes north-south, dipping steeply to the east, with as much as 2,000 m of reverse displacement (east-block up) and probable sinistral movement. Megard (1968) considers that the Milpo-Atacocha fault may be part of a fault system active since at least the Triassic, and during the Upper Cretaceous.

A series of fracture sets reportedly formed in response to the northeast-southwest tectonic compression, including:

1.North-northeast trending dextral faults;
2.Southwest trending sinistral faults;
3.Northeast trending tensional joints;
4.Northwest trending tensional joints.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-10

 

Figure 6-5: Regional Geological Setting with Major Structural Features

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-11

 

6.3Property Geology

This section is based on SRK (2017) and Nexa (2020).

The geology of El Porvenir was compiled based on various internal Milpo reports. Figure 6-6 shows two representative geologic cross sections through the El Porvenir area.

Within the property area, the stratigraphic units of primary interest are the Pucará and the Goyllarisquizga groups.

The Pucará Group is subdivided into six units: A, B, C, D, which correspond to the Chambará Formation; and E and F, which correspond to the Aramachay and Condorsinga formations, respectively:

·Unit A is located to the east of the Atacocha fault. It consists of a grey to dark grey limestone with thin dolomite layers, calcarenites and fine, greenish volcanic siltstones at the base of the Chambará Formation. Yellowish grey limonites to compact dolomicrites are also observed.
·Unit B is located to the east of, and stratigraphically above, Unit A. Dark grey to black coloured limestones, dolomicrites, and micrites are observed in thin layers to tabular strata with lenticular bituminous horizons. It can be seen in many parts of the mine due to its obliteration of marble and silicification. The more competent rocks are located at the intermediate zone in the Chambará Formation.
·Unit C is located to the east of the mine area. Monotonous grey chertic limestones in metric strata are observed. The unit also contains dolomitic horizons. Its lithologic sequences are hard and it represents the intermediate zone of the Chambará Formation.
·Unit D is widely distributed within the Atacocha and Santa Bárbara sections. The limestones are beige varying from mudstone to grainstone with light beige dolomitic intercalations. Cherts and bituminous horizons are also observed. Unit D corresponds to the upper zone of the Chambará Formation.
·Unit E consists of black micritic limestones and black lutite. In many places, this package is obliterated by marble, silica, silica-sericite-clay, etc. In many places of the mine, the rock is altered becoming recrystallized and discoloured, adopting clearer tones without converting to marble (loss of calcium). These rocks correspond to the Aramachay Formation of the Pucará Group.
·Unit F is grey to light grey limestones, mudstone to packstone, with fossil horizons and dolomitic levels.

The Goyllarisquizga Group outcrops in the area of the deposit comprising quartz rich sandstone, corresponding to the Goyllarisquizga Formation. Sandstones may vary from quartz arenite to arkose. The matrix is argillaceous to siliceous. Above the 4000 Level, the lithology and stratification are well defined and easy to recognize. Below the 4000 Level, strong alteration has obliterated the original rock intensity forming siliceous breccias and massive silica where it is still possible to recognize quartz grains and in few places the stratification.

Localized basalt units are observed in some drill holes to the southwest of the mine, below the Cherchere and San Gerardo zones. The units consist of grey to greenish basalt with green vacuoles of zeolites with traces of flows with olivine phenocrystals, limonite, and magnetite.

Intrusive rocks within the property are variably porphyritic dacite to quartz diorite with hornblende and biotite phenocrysts. Dacitic dikes are subdivided into two units: porphyritic with feldspar phenocrysts and minor quartz restricted to the groundmass; and porphyritic with abundant quartz phenocrysts, with minor biotite and hornblende. The quartz diorite comprises feldspar phenocrysts up to 6 mm long, with variable

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-12

quartz “eyes”, and aggregates of biotite and hornblende. The groundmass is microcrystalline quartz and plagioclase. These intrusive rocks generally form dikes trending north-south and are observed in three areas: Santa Bárbara/central, south along/parallel to the Atacocha fault, and the southern Section 3. These intrusive rocks are part of the Milpo-Atacocha-Vinchos Belt (28 Ma to 30 Ma).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-13

 

Figure 6-6: Representative Cross Sections through El Porvenir Area

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-14
6.4Alteration

Skarn-related alteration has been characterized according to dominant key mineral assemblages: silica-wollastonite, garnet, silica, and pyrite-argillic.

Garnet-skarn is dominated by >50% garnet (by volume), generally brown to greenish and medium to fine grained, or light brown to yellowish (andradite) and light green (grosularia). Pyroxene, where present, is light green, very fine grained, and associated with minor sulphides. Magnetite is spatially associated with green garnet areas, as well as lesser pyrite and pyrrhotite.

Silica-skarn is defined where silica content exceeds 50%. Silica may occur in veinlets or as disseminations. Silica-wollastonite alteration appears to form a sub-division of the silica-dominant group, and forms light grey to milky white zones with brecciated to massive/patchy textures. Wollastonite may form radiating fibrous crystals. Locally, a silica-skarn-chlorite assemblage may be present, exhibiting strong structural controls. White to grey silica developed early, followed by green skarn with variably associated chlorite and hematite.

Pyrite-argillic skarn comprises 30% to 80% massive pyrite, with 10% to 30% undistinguished whitish clays, and up to 20% greenish garnet. Locally, pyrite appears to be pseudomorphic replacing garnet.

An alteration assemblage comprising silica-sericite-argillic (halloysite, montmorillonite, and kaolinite) is associated with hydrothermal mineralization. Locally this alteration assemblage is strong, and possibly replaces original rocks completely in areas below the 4000 Level.

West of the Milpo-Atacocha fault below the 4000 Level, strong siliceous alteration has variably obliterated the original rock; within the Goyllarisquizga Group it is possible to recognize quartz grains and stratification in a few places. Locally siliceous cemented breccias with silica-sericite-clays matrix (halloysite, montmorillonite, and kaolinite) and massive silica hydrothermal breccias have formed.

Marbleization of limestone and dolomite units appears to be spatially associated with intrusive units and skarn related alteration.

6.5Mineralization

At El Porvenir, mineralization is characterized as a skarn, intermediate sulphidation epithermal vein/breccia style, or stratabound mineralization in the Goyllarisquizga Formation.

Skarn related mineralization associated with the Milpo stock is paragenetically earlier, followed by hydrothermal mineralization. Skarn-related mineralization is commonly associated with the garnet and silica-skarn-chlorite assemblages, comprising pyrite, chalcopyrite, sphalerite, galena and minor pyrrhotite, pyrite, bornite, covellite, orpiment, and realgar within the Pucará Group sediments around the Milpo stock. Molybdenite may occur proximal to the skarn related mineralization. Elevated Bi and Au contents are reported to be associated with skarn related mineralization. Veins and veinlets with pyrite, chalcopyrite, sphalerite, galena, quartz, and carbonates occur within marble units, and are spatially associated with skarn bodies.

The silica breccia consists of sub-rounded to sub-angular white to milky grey opaline silica clasts, millimetres to centimetres in size, and to a lesser extent, sandstone, and limestone clasts. The silica breccia clasts are cemented by white granular silica, with occasional cross-cutting veins of white silica.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-15

The massive (siliceous) breccia forms zones of pervasive alteration comprising predominantly fine grained and massive white silica.

The granular (siliceous) breccia comprises loose white to grey grains of silica within a poorly cemented (undifferentiated) clay matrix.

The Ag-Pb-Zn breccias are subdivided into calcareous, polymictic-monomictic, and karst (collapse). Breccia clasts include limestone, marble, silica (massive), and skarn; the composition of the clasts indicates that brecciation occurred later than skarn development. Massive silica alteration may cross-cut skarns.

The calcareous breccia comprises sub-angular to sub-rounded clasts of limestone and marble, cemented by a grey to dark grey calcareous matrix, with occasional bituminous material and rare pyrite. Pyrite, sphalerite, galena, and other sulphides including orpiment, realgar, tetrahedrite, alabandite, stannite, as well as quartz, calcite, rhodochrosite and rhodonite occur within the matrix. The geochemical-mineralogical zoning is evident whereby galena (Pb) and Mn bearing minerals are more abundant distally relative to sphalerite (Zn). Bi and Sn bearing minerals are most elevated in the magmatic-hydrothermal system.

The polymictic to monomictic breccias are overall grey and comprise sub-angular clasts of black limestone, shale, white silica with veins of silica-pyrite, and marble with silica, wollastonite, and calcite. Monomictic breccias comprise sub-angular limestone or intrusive clasts. Polymictic and monomictic breccia clasts vary in size and are cemented with an amorphous black material with disseminated pyrite. Pyrite, chalcopyrite, sphalerite, galena, and possibly other sulphides occur within the matrix, forming veins/veinlets, pockets, or disseminations. Karst breccias contain clasts of limestone, marble, silica, skarn, and intrusive rocks. They are sub-angular to sub-rounded, occurring within a matrix of sub-horizontal laminated limestone and silica-sericite-clay material.

The stratabound Pb-Ag-Zn mineralization occurs in the sandstone strata (mantos) at the base of the Goyllarizquisga Formation (near the contact with the Pucará Group). Several disseminated sulphide mantos have recently been identified at Sara and Porvenir 2W within the quartz sandstone, generally in contact with layers of silt and microconglomerates. The minerals include galena with silver content, sphalerite, and pyrite. Gold is also present.

6.6Deposit Types

Three types of mineral deposits are recognized at El Porvenir:

·Skarn (exoskarn and endoskarn),
·Intermediate sulphidation epithermal veins and breccias, and
·Stratabound.

The description of the skarn deposit is largely derived from Einaudi and Burt (1982), Hammarstrom et al. (1991), and references therein. The hydrothermal vein deposit description is largely derived from Baumgartner et al. (2008) and references therein.

6.7Skarn

Skarn deposits are generally considered as replacement style mineralization within or associated with carbonate dominant rocks. Skarns are classified as either endoskarn or exoskarn, referring to the location of skarn related mineralization either within an associated intrusive unit, or within carbonate lithology,

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-16

respectively. Additionally, skarns can be divided into two broad groups: magnesian and calcic skarns, based on a dolomite dominated or limestone-dominated host lithology, respectively.

Skarn development commonly includes metamorphic and metasomatic processes associated with carbonate and intrusive rocks, and an associated hydrothermal system. Mineralization occurs via a physio-chemical reaction between circulating hydrothermal fluids and the host lithology, and results in irregular shaped bodies. The hydrothermal system is generally believed to be related to and expelled from a cooling igneous body, which then undergoes a chemical reaction and cools as the fluid interacts with the usually carbonate dominant host lithology. The lithochemistry of the host rocks (i.e., Ca or Mg rich carbonate, or calc-silicate assemblage) strongly controls or influences mineralization. Replacement mineralogy commonly comprises Ca and Mg bearing silicates, however, Fe , Al, and Mn bearing minerals may also be important. Mineral and metal zonation is common. Three generalized dynamic processes responsible for the formation of all skarns are described as:

1.Isochemical contact metamorphism during pluton emplacement;
2.Prograde metasomatic (infiltration) skarn formation as the pluton cools and an ore fluid develops; and,
3.Retrograde alteration of earlier formed mineral assemblages.

The style of mineralization at El Porvenir appears to be best represented by the base and precious metal skarn category of the calcic skarn group. In terms of a conceptual model, Zn + Pb combined may average 10% to 15%, commonly with significant Ag (from 30 g/t to 300 g/t) as well as Cu, Au, and W. Copper mineralization commonly occurs proximal to the associated intrusive unit, whereas Zn and Pb mineralization typically occurs more distally to the associated intrusive. Mineralization commonly occurs as sulphides, including sphalerite, galena, chalcopyrite, and a variety of Ag-bearing sulphosalts. Gangue mineralogy may be dominated by Mn-bearing pyroxenes and garnet. Mineral textures vary from commonly coarse grained, associated with Ca rich host lithology and in close proximity to the related intrusion, to fine-grained, more distal and associated with calc-silicate rocks.

The tectonic setting of Zn-Pb skarns are commonly reported at continental margins and formed during syn- to late orogenic processes. Plutons are commonly absent but, if present, occur as stocks and dikes and may vary in composition from granite to granodiorite to syenite to diorite. Replacement mineralogy within carbonates is usually Fe, Mn, and S rich, and low in Al; and alteration within associated intrusions may comprise locally intense epidote, pyroxene, and garnet.

6.8Hydrothermal Vein and Breccia

The hydrothermal veins and breccias at El Porvenir fall into a class of epithermal polymetallic base metal deposits (also referred to as Cordilleran base metal veins), which form in the upper parts of a magmatic-hydrothermal system (i.e., porphyry environment).

The Cordilleran base metal deposits have the following features:

·Close temporal and spatial association with calc-alkaline intrusions;
·Mineralization occurred under epithermal conditions (i.e., near Earth’s surface);
·Sulphide-rich mineralogy, including a Cu-Zn-Pb-(Ag-Au-Bi) metal suite, and high Ag/Au ratio;
·Well-developed mineral zonation and alteration minerals, with Zn-Pb mineralization formed more distally (Pb-Ag-Au assemblage in the upper zone and Cu-Au association in the deeper zones);
·Early pyrite-quartz associated with low sulphidation mineralogy;

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-17
·Mineralization textures may be open-spacing filling in silicate host rocks, or as replacement in carbonate rocks; and
·Mineralization occurred late in the temporal evolution of the magmatic-hydrothermal system.

Figure 6-7 is a schematic diagram showing the spatial relationship of skarn, replacement, and hydrothermal vein mineralization with intrusive rocks.

Figure 6-7: Schematic Diagram of Skarn, Replacement and Hydrothermal Vein Mineralization

Modified from Gilbert and Lowell, 1974

6.9Stratabound

Stratabound deposits have been described by Fontboté, Amstutz, Cardozo et al. (1990), Fontboté defined stratabound deposit model as deposits formed through volcanogenic, hydrothermal, metamorphic, diagenetic, and sedimentary processes both penecontemporaneously and much later than the host rock, which can be volcanic or sedimentary.

The empirical link of ore and host rock can be used to classify the stratabound ore deposit according to the age and geotectonic position of the enclosing rock. A systematic classification could be achieved with ore deposits hosted by rocks of the Andean Cycle (Mesozoic-Recent) because the regional geology and geotectonic interpretation of the rocks of this period are well known. According to Fontboté (1990), three metallogenic “stages” can be distinguished in the Central Andes. Each stage is characterized by its tectonic style, magmatic activity, and basin evolution; and in each stage, characteristic types of stratabound deposits occur.

The sandstone hosted stratiform lead-zinc occurrences in the Goyllarisquizga Formation near Milpo were included by Samaniego (1982) in the Santa Metallotect, however, the possibility that they were formed by impregnation in relation with the Tertiary skarn deposits of the Milpo-Atacocha district (Soler 1986) is supported by lead isotopic data (Gunnesch and Baumann 1990).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-18

 

Figure 6-8: Schematic Diagram of Stratabound Deposit at El Porvenir

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

6-19
7.0Exploration
7.1Exploration

All exploration work at El Porvenir must be considered in the broader context of an integrated exploration program for the greater Atacocha Mine region. Nexa has been conducting exploration and development work at El Porvenir since 1949. The majority of this work is generally conducted simultaneously with underground development, which involves diamond core drilling, and channel sampling following underground drifting. Since 2019, surface diamond drilling has been carried out to identify mineralization in new areas, such as the Sara deposit which was discovered at the end of 2018. Prior to 1997, minor and sporadic exploration drilling was completed. No channel sampling is documented before 2001.

7.2Integration of El Porvenir and Atacocha

In 2017, Nexa developed an underground connection (and integration) of the El Porvenir and Atacocha mines at the 3370 Level. At least four more of these connections were planned, and allow ample opportunities to conduct underground exploration drilling to test the volume which lies between the two mines. Figure 7-1 presents the El Porvenir and Atacocha mines with underground workings in relation to resource classifications and relevant infrastructure. In 2018, the Integration Zone was discovered at the 3300 Level, which consists of two mineralized zones, one hosted in hydrothermal breccias and one in skarn, and Nexa plans to continue exploration towards levels lower and higher than the 3300 Level.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-1

 

Figure 7-1: El Porvenir and Atacocha Mines with Underground Workings

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-2

 

7.32019 El Porvenir Exploration

Exploration in 2019 included 47,000 m of diamond core drilling, focused on defining new Inferred Mineral Resources at nine different targets such as Don Lucho, Exito, and Integration Zone underground, and Sara at surface. Nexa’s diamond exploration activities from the surface and underground at El Porvenir is generally carried out simultaneously with the underground development, which involves diamond drilling, mapping, sampling, interpretations of known mineralized zones extensions and Brownfield-type satellite targets. The El Porvenir exploration team carried out the following work during 2019:

·Diamond drill core density sampling (10 cm to 15 cm, paraffin method) carried out at the Lima (ALS) laboratory.
·Incorporation of Terraspec Halo logging, to obtain better knowledge of alteration and identify correlations of grade with any preferential alteration.
·Measure orientations of existing core, in order to generate a better interpretation of the mineralized trends, faults, veins and strata.
7.42020 Exploration Program

Exploration activities for 2020 at El Porvenir were projected to complete 18,000 m of diamond drilling, however, only 16,126 m in 42 holes were completed due to COVID-19 pandemic restrictions. The drilling programs focused on the extensions of the Sara mineralized zone from surface, as well as the exploration to the north of Sara mineralization, from underground at the 4050 Level. A location map of the Sara deposit is shown in Figure 7-2.

As part of the “Full Potential” Program, exploration data acquisition and interpretation activities for 2020 focused on mineralogical alteration patterns and a surface magnetometric geophysical program, aiming to identify and define Brownfield exploration targets (Figure 7-3).

7.4.1Sara Project

The Sara deposit, located to the southwest of the El Porvenir operation area, is hosted in the sandstones of the Gollarizquisga Group and consists of mineralization with intermediate sulphidation characteristics. Nexa staff have recognized two mantles with galena and sphalerite containing significant silver and, to a lesser extent, gold.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-3

 

Figure 7-2: Sara Project Location Map and Example Section

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-4

 

7.4.2Alteration Studies

The following techniques to obtain a better definition of mineralogical alterations were carried out:

Remote sensing and advanced spaceborne thermal emission and reflection radiometer (ASTER) data analysis, to obtain superficial alteration anomalies, using the Crosta technique based on Principal Component Analysis (Figure 7-3).

TerraSpec Halo (a full-range near-infrared spectrometer) data collection and analysis, carried out within the Sara project, to identify alteration minerals and to delineate alteration anomalies.

7.4.3Geophysics

In 2020, Nexa commissioned a MAGDRONE magnetometry program covering 488 km of lines over a 7,200 ha area in the Cerro Pasco Complex district extending from the Machcan area to the south of El Porvenir (Figure 7-4). The geophysical survey indicated the possible presence of subcropping intrusives as new exploration targets.

Level 2700 represents an important area for the expansion of El Porvenir. A plan section of the magnetometry data for Level 2700 is shown in Figure 7-5(a), projected to surface in Figure 7-5(b). Magnetometry showed five geophysical anomalies (Tingo, Carmen Chico NW, Carmen Chico W, La Quinua and Chicri), which will be studied through geological mapping programs, surface sampling, and diamond drilling in the next three years.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-5

 

Figure 7-3: Remote Sensing and Alteration Anomalies

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-6

 

Figure 7-4: Geology, Flight Plan, and 3D Geophysical Model

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-7

 

Figure 7-5: Geophysical Anomalies at Level 2700

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-8

 

7.4.4Brownfield Exploration

The following brownfield projects (Figure 7-6) have been recognized through surface mapping and through subsequent work, including remote sensing process and geophysics:

·Machcan: Vein outcrops and Angelica mantle with Ag, Pb, and Zn mineralization and magnetic anomalies.
·Curiajasha: Northwest faulting, concordant with the dikes and with magnetic anomalies.
·Longreras: Silicic breccia extending for more than two kilometres; the presence of Pb and Ag anomalies on surface and a magnetic anomaly to the south.
·Manuel 05 and Pique Estrella: Follow the northwest structural trend; with some historic holes cutting vein mineralization.
·La Churca: The intersection of the north-south Longreras fault and the east-west La Churca fault, and the presence of northeast oriented dikes on the surface, indicate good exploration potential.
·La Quinua Chicrin Corridor: Remote sensing anomalies, with the presence of alunite, illite, and kaolinite, and the sandstone host rock in combination with a geophysical anomaly at depth indicate a high exploration potential.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-9

 

Figure 7-6: Brownfield Targets of the Cerro Pasco Complex

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-10

 

7.52021 Exploration Program

The exploration work planned for 2021 has a budget of $3.1 million and includes 18,000 m of diamond drilling, focused on defining new Mineral Resources in the Sara corridor, comprising the eastern part of the Milpo syncline in the Goyllarisquizga Formation, and the Integration Zone at the 3,300 Level underground.

The exploration criteria for 2021 drilling will be based on four components:

·Stratigraphic correlation: It is evident that the Sara mineralization is hosted in a horizon of medium to coarse grained sandstones; therefore, exploration is focused on locating similar horizons.
·Structural analysis: Exploration drilling is focused on identifying extensions of known deposits based on structural geology and interpretation.
·Alteration: At Sara, Nexa identified that the alteration related to mineralization is associated with the presence of Illite and muscovite. Nexa will incorporate this new interpretation as a guide for exploration for this type of intermediate sulphidation, stratabound deposit.
·Geophysics: Exploration at Sara showed that mineralization can be located at transitions between high and low magnetic values.

The SLR QP is of the opinion that Nexa’s exploration strategy, practice, and procedures are consistent with industry standards, and notes that Nexa’s strategy has delineated several targets which may expand production.

7.6Drilling
7.6.1Drilling Summary

As of February 15, 2020, a total of 4,664 drill holes for 762,848.57 m are included in the El Porvenir drilling database (Table 7-1). All drilling was diamond drilling (DDH), with the majority of the holes (4,598) completed from underground workings, and 66 holes completed from surface. Drilling has been done by various contractors.

A total of ten historic holes, with no survey records, missing geological data, and causing grade discrepancy with overlapped new holes, were excluded from the Mineral Resource estimate. In addition to this exclusion, a total of 11 holes were relocated into the Atacocha database, as they were drilled within the Atacocha concession. SLR concurs with Nexa’s list of holes excluded from the Mineral Resource estimate. Table 7-2 lists the drilling excluded from the Mineral Resource estimate, and Table 7-3 lists the drilling included in the Mineral Resource estimate.

In addition to drilling, a total of 17,127 channel samples were completed for 97,104.81 m between 1900 and 2017 (Table 7-4).

From February 16, 2020 to December 31, 2020, an additional 36 exploration diamond drill holes were completed for a total length of 14,246.80 m.

Figure 7-7 illustrates the locations of the drill holes at Porvenir. Figure 7-8 is a cross section illustrating the selected drill holes and related geological interpretation and Figure 7-9 shows channel sampling locations at the Mine (1900-2017).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-11

 

Table 7-1: Drilling Summary at Porvenir

Nexa Resources S.A. – El Porvenir Mine

   Surface Holes  Underground Holes  Total
Year  Number  Metres  Type  Number  Metres  Type  Number  Metres  Type
Pre-2006           789  145,120.07  DDH  789  145,120.07  DDH
2006           22  2,915.45  DDH  22  2,915.45  DDH
2008  14  638  DDH  87  17,554.74  DDH  101  18,192.74  DDH
2009  2  253.4  DDH  140  22,623.80  DDH  142  22,877.20  DDH
2010  4  376.1  DDH  143  23,651.37  DDH  147  24,027.47  DDH
2011           263  47,391.67  DDH  263  47,391.67  DDH
2012           323  56,550.90  DDH  323  56,550.90  DDH
2013           270  44,026.55  DDH  270  44,026.55  DDH
2014           258  37,782.60  DDH  258  37,782.60  DDH
2015           301  48,859.12  DDH  301  48,859.12  DDH
2016           386  64,204.70  DDH  386  64,204.70  DDH
2017           450  54,645.80  DDH  450  54,645.80  DDH
2018           459  72,236.10  DDH  459  72,236.10  DDH
2019  2  1,123.20  DDH  426  65,812.70  DDH  428  66,935.90  DDH
2020  44  16,885.90  DDH  281  40,196.40  DDH  325  57,082.30  DDH
Totals  66  4.00     4,598  743,571.97     4,664  762,848.57   

Table 7-2: Summary of Drilling Excluded from Mineral Resource Estimate

Nexa Resources S.A. – El Porvenir Mine

   Underground Holes  Total
Year  Number  Metres  Type  Number  Metres  Type
Pre-2006  13  3,892.05  DDH  13  3,892.05  DDH
EP2008  1  244.98  DDH  1  244.98  DDH
EP2011  2  361.2  DDH  2  361.2  DDH
EP2012  3  571.6  DDH  3  571.6  DDH
EP2013  1  170.7  DDH  1  170.7  DDH
EP2016  1  17.9  DDH  1  17.9  DDH
Totals  21  5,258.43     21  5,258.43   

Note. The drilling was excluded due to discrepancy with new holes and some of them were relocated to Atacocha database.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-12

Table 7-3: Summary of Drilling Included in Mineral Resource Estimate

Nexa Resources S.A. – El Porvenir Mine

   Surface Holes  Underground Holes  Total
Year  Number  Metres  Type  Number  Metres  Type  Number  Metres  Type
Pre-2006           776  141,228.02  DDH  776  141,228.02  DDH
2006           22  2,915.45  DDH  22  2,915.45  DDH
2008  14  638  DDH  86  17,309.76  DDH  100  17,947.76  DDH
2009  2  253.4  DDH  140  22,623.80  DDH  142  22,877.20  DDH
2010  4  376.1  DDH  143  23,651.37  DDH  147  24,027.47  DDH
2011           261  47,030.47  DDH  261  47,030.47  DDH
2012           320  55,979.30  DDH  320  55,979.30  DDH
2013           269  43,855.85  DDH  269  43,855.85  DDH
2014           258  37,782.60  DDH  258  37,782.60  DDH
2015           301  48,859.12  DDH  301  48,859.12  DDH
2016           385  64,186.80  DDH  385  64,186.80  DDH
2017           450  54,645.80  DDH  450  54,645.80  DDH
2018           459  72,236.10  DDH  459  72,236.10  DDH
2019  2  1,123.20  DDH  426  65,812.70  DDH  428  66,935.90  DDH
2020  44  16,885.90  DDH  281  40,196.40  DDH  325  57,082.30  DDH
Totals  66  19,276.60     4,577  738,313.54     4,643  757,590.14   

Note. For the Leapfrog model all validated drill holes were used.

Table 7-4: Channel Sampling Summary at Porvenir

Nexa Resources S.A. – El Porvenir Mine

Year  Quantity  Metres  Type
Pre-2006  2,906.00  19,441.57  CHNL
2006  6,317.00  18,901.31  CHNL
2007  998.00  8,915.38  CHNL
2008  799.00  7,294.64  CHNL
2008  1,097.00  6,982.46  CHNL
2011  1,180.00  8,780.62  CHNL
2012  1,153.00  7,740.19  CHNL
2013  637.00  3,618.37  CHNL
2014  607.00  3,701.95  CHNL
2015  968.00  7,212.40  CHNL

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-13

 

Year  Quantity  Metres  Type
2016  437.00  4,026.30  CHNL
2017  28.00  489.62  CHNL
Totals  17,127  97,104.81   

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-14

 

Figure 7-7: Plan View of Drill Holes

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-15

 

Figure 7-8: Cross Section Showing Drill Holes and Geological Interpretation

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-16

 

Figure 7-9: Plan View of Channel Sampling

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-17

 

7.6.2Drilling Procedures

Drilling procedures are coordinated and supervised by company geologists (mine/production or exploration) and overseen by the Superintendent of Geology and Exploration. Drilling procedures are as follows:

Initially, drill hole collar coordinates and orientation are communicated to a mine surveyor to accurately position the drill hole and are then certified by the surveyor and validated by the responsible geologist. The coordinates and collar orientation data are entered into a master CSV file, subsequently imported into the database (Fusion) and geological/mine/modelling software program. Drill hole (and channel sample) identification is generated in a systematic and specific format, including codes to reference: country, mining unit, year, and sequential number. All related drill hole data generated is similarly referenced to the corresponding drill hole collar. Basic drill hole information (i.e., collar and survey) should be entered into the database and archived within four days of completing the drill hole.

Daily drilling logs completed and provided by the various contracted drilling companies are archived in PDF format.

Drill hole survey data is collected by various drilling contractors. The survey is generally carried out after the completion of the drill hole. Various survey equipment (i.e., Gyro, Reflex, Flexit, etc.) may be used depending on the drilling contractor and equipment availability; Gyro survey deviation information is archived in pdf format. Survey data are collected between approximately 5 m and 10 m downhole, depending on the drilling objective (infill and brownfield). Original survey data is marked on paper, and provided to the supervising geologist, signed by the driller in charge. Survey data is validated by the responsible geologist and entered into a master CSV file, subsequently imported into the database, and geological/mine/modelling software program.

Following the completion of a drill hole, the logging and core sampling procedures are carried out by a team of logging geologists. Core logging is completed using a set of geological, lithological, mineralogical, and alteration terms. Core logs are entered into logging software (Fusion). A complete series of core photos are taken for each drill hole and stored in JPEG or PDF format. Core sampling for geochemical analysis is essentially completed at the same time as core logging; see Section 8 for detailed description of drill core sampling procedures. Logging is completed within 48 hours after a drill hole is completed.

The company personnel responsible for managing the database incorporates the core logging and core sampling information, as well as the subsequent assay results once the analytical work is completed. Sample and assay data are initially combined in a master CSV file, subsequently imported into the database, and geological/mine/modelling software program.

Drilling information is stored in a structured directory and backed up on a central server (Brazil). Data available in the drill hole database includes drill hole location (Collar), downhole survey (Survey), sampling and geochemical analysis (Assay), recovery (Geotech), density (Density), and geological characteristics (Lithology, Alteration, Mineralization). Drill core diameter varies, including: BQ (36.4 mm), NQ (47.6 mm), HQ (63.5 mm), and TT-46 (35.3 mm).

7.6.3Drilling Pattern and Density

Exploration drilling is generally completed over a 50 m by 50 m grid, whereas infill drilling is designed to cover a 15 m by 15 m grid. The overall distribution of drill holes and channel samples has been concentrated around the Carmen Norte 3, Exito, and Sara zones.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-18
7.6.4Drill Rigs

At El Porvenir, there are two main categories of drilling: exploration and resource definition diamond drilling. Drilling is performed by the contractor Explomin.

7.6.4.1Exploration Diamond Drilling

Exploration drilling is planned by the exploration team and its main objective is to discover new resources. It consists of underground (mine) drilling and surface drilling using Sandvik DE140 and versadrill 1.4U drilling machines, respectively. Exploration drilling is carried out with large drill rigs with a depth range of up to 1,000 m and HQ (63.5 mm) and NQ (47.6 mm) core sizes, and as required BQ (36.6 mm), are used.

7.6.4.2Resource Definition Diamond Drilling

Resource definition drilling is the responsibility of the geological team and has the objective to upgrade known Inferred Mineral Resources to Measured or Indicated and thus increase the Mineral Reserves at Porvenir. This drilling consists of:

Recategorization, focused on the recategorization and definition of bodies where there is little drilling information.

Infill focused on providing additional information from short to long term planning to ensure the reliability of production programs.

Small drill rigs called drillcats are used with depth ranges of up to 400 m. Infill drilling generally uses BQ core size (to a depth of 240 m) and recategorization drilling uses NQ or BQ core size (to a depth of 400 m).

7.6.5Core Recovery

Core recovery and rock quality designation (RQD) are measured and recorded for each hole. Core runs are 3.0 m for HQ and NQ and 1.5 m for BQ core size. Measurements are reviewed by geologists and the database administrator and then exported to the Fusion database.

Table 7-5 summarizes core recovery by domain from 2017 to 2020.

Table 7-5: Core Recovery by Domain – 2017 to 2020

Nexa Resources S.A. – El Porvenir Mine

      Minimum  Maximum  Mean         
Domain  No. Samples  (%)  (%)  (%)  Variance  Std.
Deviation
  CV
Don Ernesto  279  33.33  100  94.07  170.74  13.07  0.14
Don Lucho  469  2.23  100  93.41  319.73  17.88  0.19
Integración Ata Ep  386  48.85  100  97.43  54.64  7.39  0.08
Porvenir 3  815  32.63  100  98.23  71.25  8.44  0.09
Porvenir 2 Sur Este  1002  0.00  100  98.12  59.00  7.68  0.08
Porvenir 2 Sur Oeste  896  33.33  100  98.64  9.42  3.07  0.03
Sara  739  14.70  100  96.04  118.73  10.90  0.11
Socorro 2 and 4  265  81.82  100  99.23  2.59  1.61  0.02

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-19

 

      Minimum  Maximum  Mean         
Domain  No. Samples  (%)  (%)  (%)  Variance  Std.
Deviation
  CV
Veta Am  529  20.00  100  98.04  54.01  7.35  0.07
Veta Carmen Norte 1  276  13.33  100  97.07  108.34  10.41  0.11
Veta Carmen Norte 3  1798  6.72  100  97.92  63.02  7.94  0.08
Veta Carmen Norte 4  197  86.21  100  98.43  6.46  2.54  0.03
Veta Carmen 2  104  88.33  100  98.74  9.00  3.00  0.03
Veta Carmen 3  321  54.55  100  98.73  15.46  3.93  0.04
Veta Progreso  15  98.59  100  99.71  0.26  0.51  0.01
Veta 1204  307  40.00  100  96.10  132.14  11.50  0.12
Veta 1204 Inferior  3  100.00  100  100.00  -  -  -
Veta 1204 Superior  3604  0.00  100  97.87  95.21  9.76  0.10
Veta 5  687  50.00  100  98.10  30.28  5.50  0.06
Éxito  3749  0.00  100  98.55  44.26  6.65  0.07

Notes:

Data encoded within the model.

For this analysis, 1,043 of 4,643 drill holes (22%) were used.

Based on core recovery statistics reviewed, and from the inspection of a number of drill holes, the SLR QP is of the opinion that the core recovery at Porvenir is excellent, generally greater than 95%, and provides a reliable reflection of the mineralization in the mining operation.

7.6.6Drill Core Sampling

Drill core sampling is carried out under the supervision of the Sampling Geologist Supervisor and completed after the geotechnical and geological logging, and photographing the whole core following the Standard Operation Procedure (SOP) PO-EXP-GTO-009-PT.

The length of the samples varies between 0.30 m and 2.00 m depending on the structure and lithology. Once the sample length and cut-line have been defined by the supervising geologist, the core is cut longitudinally into two equal parts using an electric diamond drill core saw. If the core is very fractured, the sampler separates and removes 50% of the fragmented material for the sample. The fragments are deposited in a pre-coded polyethylene bag and transported to the laboratory.

Current exploration core sampling follows written protocols and consists of half-core sampling of HQ-or NQ sized core on (usually systematic) 1.5 m intervals. The remaining half-core is kept as backup. Major mineralized body contacts are respected.

Infill or resource definition drilling is typically BQ-sized core and is sampled in its entirety on 1.5 m intervals.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-20
7.6.7Channel Sampling

Channel samples are treated as drill holes in the database, with a location, survey (direction: azimuth and inclination), and associated sampling/assay data. Table 10-4 lists the amount of channel sampling completed by year. Figure 7-9 illustrates the distribution of the channel sampling.

Channel chip samples are generally collected from the face of newly exposed underground workings. The entire process is carried out under the inspection of the sampling supervisor geologist.

Channel samples are collected between the hanging wall and footwall contacts of mineralized zones. A channel sample area is marked, oriented perpendicular to the strike of the mineralized structure. In general, the spacing between each channel sample is 2.0 m. The width of each channel sample is approximately 0.2 m to 0.3 m wide, and 2.0 cm deep. The sample area is first washed down to provide a clear view of the vein. The channel is sampled by taking a succession of chips in sequence from the hanging wall to the footwall. If the width of the vein, or length of the channel sample, is longer than 1.5 m, sample lengths shorter than 1.5 m are collected. If the width of the vein is smaller than 0.2 m, the width of the sample is increased to 0.4 m to obtain a sufficient sample size.

Sample collection is normally performed by two samplers, one using the hammer and chisel, and the other holding the receptacle cradle to collect the rock fragments. The cradle consists of a sack, with the mouth kept open by a wire ring. The collected sample material is then placed on a mat measuring 1.0 m by 1.2 m; the larger sample fragments are then broken down to smaller fragments, less than approximately 2.0 cm, using a four- or six-pound hammer. Subsequently, the sample material is mixed, and approximately one quarter of the mixed material is separated to obtain a representative sample (cone-and-quarter method), with a target weight of between 2.5 kg and 3.0 kg. The final sample is placed in a bag with a coded ticket and shipped to the Inspectorate laboratory at the mine site. Channel sampling was discontinued in 2017. In November 2019, Nexa re-started a channel sampling pilot, however, by the time of the database closure, the program was still in a preliminary stage and the channel samples were not included in the resource database. From November 2019 to February 15, 2020, a total of 187 channel totalling 1,028.05 m were sampled. Nexa reviewed this information and noted that overall there was good agreement with the resource model. SLR agrees with Nexa and recommends validating all channel samples collected between November 2019 and February 2020 to be included in the next Mineral Resource update. The SLR QP is of the opinion that the new information is not material to significantly impact the resource estimate.

7.6.8Drilling and Channel Sampling Results

The results of analysis and interpretation of drilling data, and prior to 2017 channel sampling data, have been continually incorporated into the El Porvenir 3D geological model.

The database is used by modelling geologists who work together with the mine/production and exploration geologists to continually construct and update the 3D geological model. The 3D geological models are built in Leapfrog, primarily using geochemical assay results, particularly for Zn, Pb, Cu, and Ag, as well as underground geological level plan maps and interpreted cross sections and transverse sections.

In the SLR QP’s opinion, the drilling, logging, and drill core and channel sampling procedures meet industry standards. The SLR QP is not aware of any drilling, sampling, or recovery factors that could materially impact the accuracy and reliability of the results.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-21
7.7Hydrogeology Data

The El Porvenir Mine does not produce significant quantities of water. Details related to Hydrogeology are covered in Section 13.4.

7.8Geotechnical Data

Geotechnical studies have been conducted at the El Porvenir Mine to characterize the quality of the rock mass to predict the stope and mine workings stability. Underground geotechnical mapping, geotechnical core logging and laboratory tests are part of Nexa geotechnical procedures. Nexa has performed laboratory testing in combination with geotechnical mapping and geotechnical logging to monitor the ground stability and to define parameters for ground support design of the underground workings as it is described in Section 13.3. The geotechnical logging, mapping, testing and data analysis protocols include industry-standard practices.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

7-22
8.0Sample Preparation, Analyses, and Security
8.1Density Determinations

A total of 4,876 density samples were taken from 2009 to 2020 at the El Porvenir deposit and were tested by various laboratories. Nexa used Certimin and ALS as independent laboratories for density determinations. A summary of the density measurements taken is presented in Table 8-1.

Density samples were 10 cm to 20 cm lengths of the entire core, taken from a variety of lithological and mineralogical types. Photographs and brief descriptions were taken before sending the samples to the laboratory for density determinations. Density data is recorded in the main database.

A total of 1,131 samples were collected from mineralized zones (Figure 8-1) and a total of 3,745 samples were collected from waste rocks. For the mineralized zones, an average density value was applied. In the absence of sufficient data, Nexa has assigned an average density value of surrounding mineralized zones or the global average density value of all the mineralized zones.

ALS Peru S.A. and Certimin laboratories use the water immersion method to determine the density of the provided samples. This method consists of coating the sample in paraffin wax, weighing the sample in air, then suspending the sample in water, and weighing the sample again.

From 2014 to 2016, an on-site trained technician weighted the sample in air, then suspended the sample in water and measured the volume of displaced water. Currently density measurements are performed by external laboratories.

Table 8-1: Number of Density Measurements by Sample Type and Year

Nexa Resources S.A. – El Porvenir Mine

Phase  Sample Type  All No. Samples  No. Samples within
Mineralization Zones
LOM2009  Drill Holes  5  -
LOM2011  Rock  686  246
LOM2012  Rock  18  6
LOM2014  Drill Holes  267  72
   Rock  62  2
LOM2015  Drill Holes  536  120
   Rock  229  50
LOM2016  Drill Holes  375  117
   Rock  236  53
LOM2017  Drill Holes  386  99
LOM2018  Drill Holes  317  75
   Rock  86  20
LOM2019  Drill Holes  834  105
LOM2020  Drill Holes  839  166
Total     4876  1,131

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-1

 

Figure 8-1: Distribution of Density Samples Used for 2020 Mineral Resource Estimate by Year Analyzed

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-2

 

8.2Sample Preparation and Analysis

The core and channels samples are sent to several independent laboratories including Inspectorate (at the Mine, referred to subsequently as Inspectorate EP), SGS (at the Mine), ALS (Lima), and Certimin (Lima). Testing protocols among these laboratories differ in their detection limits and methods applied. El Porvenir has a contract with Inspectorate, which began its operations in 2011, and with ALS in 2018. SGS served as the Mine laboratory from 2006 to 2009. Exploration samples were sent to Certimin in 2017 and 2018.

Inspectorate is an independent and commercial laboratory, and is part of the Bureau Veritas, which is a global leader in testing, inspection, and certification. Certimin Lima holds ISO 9001 and NTP-ISO/IEC 17025 and 17021 certifications and is accredited by the Organismo Peruano de Acreditación (INACAL). ALS geochemical laboratories are accredited to ISO/IEC 17025:2005 for specific analytical procedures. Both Certimin and ALS laboratories are independent of Nexa.

Sampling was completed by Nexa geologists following standard operating procedures. Figure 8-2 illustrates a schematic flow chart of sample control, as well as the transfer of related data, and personnel units responsible for each respective area.

Exploration drilling samples are sent to ALS Lima, and mine drilling samples are sent to Inspectorate EP for preparation and analysis. Prepared samples are assayed principally for a suite of seven elements: Zn, Pb, Cu, Ag, Au, Bi, and Mn. Samples are initially coded and dried at 105°C to a maximum of 120°C. Following drying, the samples are crushed to a minimum of 70% passing minus two millimetres. The crushed samples are then reduced in size by passing the entire sample through a riffle splitter until 200 g to 250 g is obtained. The split samples are then pulverized to a minimum of 85% passing 75 μm. The pulverized samples are subsequently analyzed using an aqua regia digestion and atomic absorption spectroscopy (AAS).

Detection limits for Inspectorate EP, ALS Lima, and Certimin are summarized in Table 8-2.

Table 8-2: Laboratory Detection Limits

Nexa Resources S.A. – El Porvenir Mine

Laboratory  Element  Unit  Method  Detection
Lower
Limit
  Detection
Upper
Limit
  1st  Upper Limit Default
Method
  2nd Upper
Limit Default
Method
Inspectorate EP  Ag  ppm  F-AA  4  -  GRA  -
   Cu  per  F-AA  0.01  30  VOL  -
   Fe  per  F-AA  0.01  -  -  -
   Mn  per  F-AA  0.01  -  -  -
   Pb  per  F-AA  0.01  30  VOL  -
   Zn  per  F-AA  0.01  30  VOL  -

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-3

 

Laboratory  Element  Unit  Method  Detection
Lower
Limit
  Detection
Upper
Limit
  1st  Upper Limit Default
Method
  2nd Upper
Limit Default
Method
ALS  Au  ppm  Au-AA23  0.005  10  Au-GRA21  -
   Ag  ppm  ME-ICP41  0.2  100  Ag-OG46  Ag-GRA21
   Al  per  ME-ICP41  0.01  25  -  -
   As  ppm  ME-ICP41  2  10000  -  -
   B  ppm  ME-ICP41  10  10000  -  -
   Ba  ppm  ME-ICP41  10  10000  -  -
   Be  ppm  ME-ICP41  0.5  1000  -  -
   Bi  per  ME-ICP41  0.0002  1  -  -
   Ca  per  ME-ICP41  0.01  25  -  -
   Cd  ppm  ME-ICP41  0.5  1000  -  -
   Co  ppm  ME-ICP41  1  10000  -  -
   Cr  ppm  ME-ICP41  1  10000  -  -
   Cu  per  ME-ICP41  0.0001  1  Cu-OG46  -
   Fe  per  ME-ICP41  0.01  50  Fe-OG46  -
   Ga  ppm  ME-ICP41  10  10000  -  -
   Hg  ppm  ME-ICP41  1  10000  -  -
   K  per  ME-ICP41  0.01  10  -  -
   La  ppm  ME-ICP41  10  10000  -  -
   Mg  per  ME-ICP41  0.01  25  -  -
   Mn  per  ME-ICP41  0.0005  5  Mn-OG46  -
   Mo  ppm  ME-ICP41  1  10000  -  -
   Na  per  ME-ICP41  0.01  10  -  -
   Ni  ppm  ME-ICP41  1  10000  -  -
   P  ppm  ME-ICP41  10  10000  -  -
   Pb  per  ME-ICP41  0.0002  1  Pb-OG46  Pb-VOL70
   S  per  ME-ICP41  0.01  10  -  -
   Sb  ppm  ME-ICP41  2  10000  -  -
   Sc  ppm  ME-ICP41  1  10000  -  -
   Sr  ppm  ME-ICP41  1  10000  -  -
   Th  ppm  ME-ICP41  20  10000  -  -
   Ti  per  ME-ICP41  0.01  10  -  -
   Tl  ppm  ME-ICP41  10  10000  -  -
   U  ppm  ME-ICP41  10  10000  -  -
   V  ppm  ME-ICP41  1  10000  -  -
   W  ppm  ME-ICP41  10  10000  -  -
   Zn  per  ME-ICP41  0.0002  1  Zn-OG46  Zn-VOL70

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-4

 

Laboratory  Element  Unit  Method  Detection
Lower
Limit
  Detection
Upper
Limit
  1st  Upper Limit Default
Method
  2nd Upper
Limit Default
Method
Certimin  Au  ppm  G0108  0.005  10  G0014  -
   Ag  ppm  G0148  0.2  100  G0001  G0008
   Al  per  G0148  0.01  15  -  -
   As  ppm  G0148  3  10000  -  -
   Ba  ppm  G0148  1  10000  -  -
   Be  ppm  G0148  0.5  10000  -  -
   Bi  per  G0148  0.0005  1  -  -
   Ca  per  G0148  0.01  15  -  -
   Cd  ppm  G0148  1  10000  -  -
   Co  ppm  G0148  1  10000  -  -
   Cr  ppm  G0148  1  10000  -  -
   Cu  per  G0148  0.00005  1  G0038  -
   Fe  per  G0148  0.01  15  G0051  -
   Ga  ppm  G0148  10  10000  -  -
   Hg  ppm  G0148  1  10000  -  -
   K  per  G0148  0.01  15  -  -
   La  ppm  G0148  0.5  10000  -  -
   Mg  per  G0148  0.01  15  -  -
   Mn  per  G0148  0.0002  1  G0060  -
   Mo  ppm  G0148  1  10000  -  -
   Na  per  G0148  0.01  15  -  -
   Ni  ppm  G0148  1  10000  -  -
   P  per  G0148  0.01  15  -  -
   Pb  per  G0148  0.0002  1  G0076  G0339
   S  per  G0148  0.01  10  -  -
   Sb  ppm  G0148  5  10000  -  -
   Sc  ppm  G0148  0.5  10000  -  -
   Sr  ppm  G0148  0.5  5000  -  -
   Th  ppm  G0148  50  10000  -  -
   Ti  per  G0148  0.01  15  -  -
   Tl  ppm  G0148  2  10000  -  -
   U  ppm  G0148  50  10000  -  -
   V  ppm  G0148  2  10000  -  -
   W  ppm  G0148  10  10000  -  -
   Zn  per  G0148  0.00005  1  G0387  G0338

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-5

 

Figure 8-2: Schematic Flow Chart for Sample and Data Controls

8.3Quality Assurance and Quality Control

El Porvenir has historical data and information up to February 15, 2020, the cut-off date for the resource database, and has implemented a quality assurance/quality control (QA/QC) program. These processes comply with current industry best practices which involve appropriate procedures and routine insertion of certified reference materials (CRM), standards, blanks, and duplicates to monitor the sampling, sample preparation, and analytical processes. Analysis of QA/QC data is performed to assess the reliability of all sample assay data and the confidence in the data used for resource estimation.

Quality control samples have been inserted into the sample stream since 2014 and channel samples since 2012. El Porvenir routinely sends in-house CRMs, blanks, field, reject (preparation), and pulp (laboratory) duplicates to the laboratory. During 2018, Nexa incorporated systematic external checks into the QA/QC program. Check assay programs were also carried out prior to 2018. Pulps were sent to external laboratories for analysis. Currently, Inspectorate EP and ALS analyze samples from infill drilling and brownfield exploration drilling, respectively.

During the 2006 to 2009 drilling campaign, samples were sent to SGS for analysis. From 2010 to present, underground infill drilling samples are sent to Inspectorate EP. If Inspectorate EP is running out of capacity, samples are delivered to Certimin and/or ALS laboratories.

8.3.1QA/QC Protocols

Nexa has the following QA/QC protocols in place.

For infill and exploration drilling, one batch of samples is prepared for each drill hole. Control sample insertion rates are provided in Table 8-3, with field duplicates inserted directly following the original sample, coarse blank material samples inserted following a mineralized zone, and CRM samples inserted randomly.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-6

All QA/QC sample insertions maintain consecutive numerical order. Pulp reject duplicates, an additional split of material taken after the pulverizing stage, are saved, and then resubmitted to the secondary laboratory at a later date at a rate of approximately 2% of the total samples submitted.

Each batch of check samples (pulp rejects) submitted to the secondary laboratory includes CRM and blank samples.

QA/QC samples represent approximately 16% of the total samples. A QA/QC report is prepared monthly, by the onsite Database Administrator, and reviewed by the Resource Geologist and Nexa corporate QA/QC coordinator in San Paulo. Batches of samples identified by a QA/QC review as an anomalous result are repeated by the laboratory at the request of the Geology team. Table 8-3 shows the control sample insertion rate and the acceptance criteria followed during Nexa’s QA/QC program for El Porvenir.

Table 8-3: Control Sample Insertion Rate and Failure Criteria

Nexa Resources S.A. – El Porvenir Mine

Control Sample  Type  Insertion
Rate
  Failure
Criteria
  Expected/Allowed
% Failures
Blanks     1 in 50 (2%)  5 x DL  <5%
CRMs     1 in 20 (5%)  Outside 3 STD  <10%
Duplicates  Twin  1 in 100 (1%)  <±30% relative error  <10%
   Coarse  1 in 100 (1%)  <±20% relative error  <10%
   Pulp  1 in 20 (5%)  <±10% relative error  <10%
External checks  Pulp  1 in 50 (2%)  <5% bias  <10%

A QA/QC relational database is maintained in Fusion. A summary of QA/QC submittals from 2014 to 2020 is presented in Table 8-4.

The actual insertion rates vary slightly by year and sample type.

Table 8-4: QC Insertion Rates

Nexa Resources S.A. – El Porvenir Mine

         Drill Holes  Channel
Year  Control  Type  No.
Samples
  Insertion
Rate
(%)
  No.
Samples
  Insertion
Rate
(%)
2014 – Sep. 2017  Blanks  Pulp  901  2.97  393  3.85
      Coarse  899  2.96  392  3.84
   In-House CRMs  Low Grade  449  1.43  -  -
      Intermediate Grade  682  2.18  375  3.37
      High Grade  633  2.02  378  3.40
   Duplicates  Field  793  2.53  245  2.20
      Coarse  689  2.20  174  1.56
      Pulps  715  2.28  195  1.75
   All Control Samples     5,761  18.36  2152  19.97

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-7

 

         Drill Holes  Channel
Year  Control  Type  No.
Samples
  Insertion
Rate
(%)
  No.
Samples
  Insertion
Rate
(%)
Nov. 2017 - Aug. 2018  Blanks  Pulp  959  2.51  -  -
      Coarse  956  2.50  -  -
   In-House CRMs  Low Grade  694  1.82  -  -
      Intermediate Grade  624  1.63  -  -
      High Grade  586  1.53  -  -
   Duplicates  Field  956  2.50  -  -
      Coarse  952  2.49  -  -
      Pulps  951  2.49  -  -
      Check Assay  747  1.96  -  -
   All Control Samples     7,425  19.44  -  -
Aug. 2018 - May. 2019  Blanks  Pulp  1,641  2.48  -  -
      Coarse  1,638  2.48  -  -
   In-House CRMs  Low Grade  1,069  1.62  -  -
      Intermediate Grade  1,464  2.22  -  -
      High Grade  639  0.97  -  -
   Duplicates  Field  1,458  2.21  -  -
      Coarse  1,652  2.50  -  -
      Pulps  1,687  2.56  -  -
      Check Assay  641  0.97  -  -
   All Control Samples     11,890  18.01  -  -
Jun. 2019 - Feb. 2020  Blanks  Coarse  1,227  2.22  -  -
   In-House CRMs  Low Grade  1,155  2.09  -  -
      Intermediate Grade  1,159  2.10  -  -
      High Grade  409  0.74  -  -
   Duplicates  Field  830  1.50  -  -
      Coarse  1,036  1.88  -  -
      Pulps  2,047  3.71  -  -
      Check Assay  388  0.70  -  -
   All Control Samples     8,251  14.94  -  -
8.3.2Certified Reference Material

Results from the regular submission of CRMs, prepared in-house and certified by accredited laboratories, are analyzed to identify problems with specific sample batches and long term biases associated with the assay laboratories. CRMs were inserted into the sample stream by technicians trained in quality control procedures. CRMs values since 2014 are detailed in Table 8-5. Ten CRMs using in-house material were certified by Target Rocks Peru S.A.C. (MAT-05, MAT-06, MAT11, MAT12, PEPSSTD001, PEPSSTD002,

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-8

PEPSSTD003, PEPSSTD004, PEPSSTD005, PEPSSTD006), six standards (EMEI2240_2012 and “STD” pre-fixes) were certified by Actlabs Skyline Perú S.A.C., and three CRMs ( PEPSSTDAGA-05, PEPSSTDPLA-06, PEPSSTDPLM-04) were certified by Smee & Associates Consulting Ltd.

Table 8-5: CRMs Used at Porvenir Since 2014

Nexa Resources S.A. – El Porvenir Mine

         Au (g/t)  Ag (oz/t)  Ag (ppm)  Pb (%)  Zn (%)  Cu (%)
Laboratory  Method  Standard  Best Value  Std Dev  Best Value  Std Dev  Best Value  Std Dev  Best Value  Std Dev  Best Value  Std Dev  Best Value  Std Dev
Smee and Assoc. Consulting  Four acid  - AAS  PEPSSTDAGA-05  0.48  0.04  16.65  1.03        1.67  0.09  2.19  0.10  0.26  0.01
      PEPSSTDPLA-06  0.36  0.01  5.63  0.26        5.37  0.25  6.08  0.24  0.48  0.01
      PEPSSTDPLM-04  0.20  0.01  2.96  0.26        1.94  0.13  2.44  0.12  0.16  0.01
Target Rocks  Four acid Digestion – AAS  MAT-05        4.12  0.25        2.37  0.06  2.50  0.12  0.58  0.02
      MAT-06        15.08  0.42        7.75  0.20  7.98  0.23  2.53  0.12
      MAT11  0.93  0.09  1.76  0.11        1.37  0.04  2.19  0.13  0.17  0.01
      MAT12  8.98  0.48              6.83  0.21  6.95  0.24  0.18  0.00
   AR Digestion- AAS  PEPSSTD001  0.07  0.01  0.44  0.02  13.80  0.60  0.41  0.01  1.02  0.06  0.07  0.00
      PEPSSTD002  0.24  0.03  1.58  0.09  49.10  2.70  1.48  0.09  3.14  0.12  0.07  0.00
      PEPSSTD003  2.36  0.16  7.81  0.23  243.00  7.10  5.79  0.14  7.34  0.18  0.18  0.01
      PEPSSTD004  0.32  0.01        23.30  0.54  0.46  0.02  0.57  0.02  0.05  0.00
      PEPSSTD005  0.53  0.02        40.80  1.44  1.15  0.03  1.52  0.03  0.06  0.00
      PEPSSTD006  0.44  0.01        185.00  3.51  4.17  0.10  6.63  0.11  0.19  0.00
ACTLABS  Four acid Digestion – AAS  EMEI2240_2012        0.78  0.06        0.08  0.00  2.66  0.10  0.49  0.03
   Mult acid Digestion – AAS  STD2_ACTLABS2014        0.93  0.06        0.46  0.02  3.07  0.08  0.36  0.01
      STD3_ACTLABS2014        3.72  0.17        3.62  0.10  7.34  0.31  0.21  0.01
      STD1_ACTLABS2015        0.46  0.10        0.39  0.02  0.78  0.02  0.15  0.01
      STD2_ACTLABS2015        1.44  0.17        1.26  0.03  4.00  0.07  0.20  0.01
      STD3_ACTLABS2015        3.13  0.31        3.04  0.07  6.72  0.27  0.27  0.01
8.3.2.1Milpo, 2014 to 2017

This section has mostly been summarized from SRK (2017).

CRMs were used to assess the accuracy of the assay results from Inspectorate EP, they were placed into the sample stream by geologist to monitor accuracy of the analytical process. The database recorded 31,314 drill core samples with 1,764 standards (a submission rate of 1 in 18 samples) submitted in 2014 and 2017 and 11,129 channel samples with 753 standards (a submission rate of 1 in 15 samples) submitted between 2014 and 2016. Prior to 2014, El Porvenir did not have a QA/QC program implemented.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-9

Pass rates reported for standards submitted with drill core samples were 99 % for silver, 84% for lead, 97% for zinc, and 99% for copper. The accuracy levels for silver, zinc, and copper can be considered acceptable while lead is below acceptable levels. Pass rates reported for standards submitted with channel samples were 99% for silver, 77% for lead, 96% for zinc, and 99% for copper. The accuracy levels for silver, zinc, and copper can be considered acceptable, however, lead performance should be improved. In both cases, (channel and drill core) MAT-05, STD2_ACTLABS2015 and STD3_ACTLABS2015 show values below 80%. SRK identified minor biases in some of the standards, Table 8-6 presents the CRMs performance.

Table 8-6: 2014 to 2017 CRMs Performance

Nexa Resources S.A. – El Porvenir Mine

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-10

 

   Metal  Standard  No.
Submitted
  No.
Fails
  Pass
(%)
  Best
Value
  Mean  Bias
Drill Hole
Samples
  Ag (oz)  MAT-05  200  5  98  4.12  4.04  1.98%
      MAT-06  204  7  97  15.08  15.02  0.40%
      STD1_ACTLABS2015  449  0  100  0.46  0.46  0.00%
      STD2_ACTLABS2014  97  6  94  0.93  0.97  -4.12%
      STD2_ACTLABS2015  385  0  100  1.44  1.44  0.00%
      STD3_ACTLABS2014  117  0  100  3.72  3.74  -0.53%
      STD3_ACTLABS2015  312  0  100  3.13  3.14  -0.32%
      Total  1,764  18  99         
   Pb (%)  MAT-05  200  44  78  2.37  2.42  -2.07%
      MAT-06  204  4  98  7.75  7.8  -0.64%
      STD1_ACTLABS2015  449  0  100  0.39  0.4  -2.50%
      STD2_ACTLABS2014  97  0  100  0.46  0.48  -4.17%
      STD2_ACTLABS2015  385  142  63  1.26  1.3  -3.08%
      STD3_ACTLABS2014  117  1  99  3.62  3.64  -0.55%
      STD3_ACTLABS2015  312  117  62  3.04  3.12  -2.56%
      Total  1,764  308  84         
   Zn (%)  MAT-05  200  2  99  2.5  2.49  0.40%
      MAT-06  204  1  100  7.98  7.82  2.05%
      STD1_ACTLABS2015  449  42  91  0.78  0.76  2.63%
      STD2_ACTLABS2014  97  19  80  3.07  3.01  1.99%
      STD2_ACTLABS2015  385  32  92  4.00  3.97  0.76%
      STD3_ACTLABS2014  117  0  100  7.34  7.18  2.23%
      STD3_ACTLABS2015  312  0  100  6.72  6.75  -0.44%
      Total  1,764  96  95         
   Cu (%)  MAT-05  200  8  96  0.58  0.56  3.57%
      MAT-06  204  2  99  2.53  2.55  -0.78%
      STD1_ACTLABS2015  449  0  100  0.15  0.15  0.00%
      STD2_ACTLABS2014  97  2  98  0.36  0.36  0.00%
      STD2_ACTLABS2015  385  0  100  0.2  0.2  0.00%
      STD3_ACTLABS2014  117  1  99  0.21  0.21  0.00%
      STD3_ACTLABS2015  312  3  99  0.27  0.27  0.00%
      Total  1,764  16  99         
Channel
Sample
  Ag (oz)  MAT-05  9  0  100  4.12  3.98  3.52%
      MAT-06  10  3  70  15.08  14.67  2.79%
      STD2_ACTLABS2014  178  3  98  0.93  0.96  -3.12%
      STD2_ACTLABS2015  188  0  100  1.44  1.44  0.00%
      STD3_ACTLABS2014  217  1  100  3.72  3.74  -0.53%
      STD3_ACTLABS2015  151  0  100  3.13  3.13  0.00%
      Total  753  7  99         
   Pb (%)  MAT-05  9  7  22  2.37  2.5  -5.20%
      MAT-06  10  0  100  7.75  7.87  -1.52%
      STD2_ACTLABS2014  178  2  99  0.46  0.48  -4.17%
      STD2_ACTLABS2015  188  104  47  1.26  1.3  -3.08%
      STD3_ACTLABS2014  217  5  98  3.62  3.66  -1.09%
      STD3_ACTLABS2015  151  54  64  3.04  3.12  -2.56%
      Total  753  172  77         
   Zn (%)  MAT-05  9  0  100  2.5  2.5  0.00%
      MAT-06  10  0  100  7.98  7.84  1.79%
      STD2_ACTLABS2014  178  10  94  3.07  3.02  1.66%
      STD2_ACTLABS2015  188  18  90  4  3.97  0.76%
      STD3_ACTLABS2014  217  0  100  7.34  7.19  2.09%
      STD3_ACTLABS2015  151  0  100  6.72  6.77  -0.74%
      Total  753  28  96         
   Cu (%)  MAT-05  9  1  89  0.58  0.55  5.45%
      MAT-06  10  0  100  2.53  2.59  -2.32%
      STD2_ACTLABS2014  178  3  98  0.36  0.36  0.00%
      STD2_ACTLABS2015  188  0  100  0.2  0.2  0.00%
      STD3_ACTLABS2014  217  1  100  0.21  0.21  0.00%
      STD3_ACTLABS2015  151  2  99  0.27  0.27  0.00%
      Total  753  7  99         
8.3.2.2Nexa, November 2017 to 2020

Since November 2017, El Porvenir sent to Certimin, Inspectorate EP, and ALS a total of 139,319 drill core samples and 7,799 CRMs resulting in an insertion rate of 4.7%.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-11

Table 8-7 lists the certified values of the CRMs for Zn, Pb, Cu, and Ag, and the summary of the assay performance for the CRMs. Figure 8-3 and Figure 8-4 illustrate examples of the zinc and lead CRM results from the Mine for the 2018 to 2019 period.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-12

 

Table 8-7: 2017 to 2020 CRM Performance

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-13

 


Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-14

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-15

 

 

 

Figure 8-3: CRMs PEPSSTD001 and PEPSSTD002 Results for Zinc –Inspectorate EP (2018 to 2019)

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-16

 

 

Figure 8-4: CRMs PEPSSTD002 and PEPSSTD003 Results for Lead –Inspectorate EP (2018 to 2019)

SLR reviewed the results returned from the CRMs and notes that Nexa has implemented procedures reducing the CRM failure rates significantly. Results for the CRMs are generally within acceptable limits with a small percentage of failures.

In the SLR QP’s opinion, the CRMs cover a reasonable range of grades with respect to the overall resource grades and no significant bias was observed.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-17
8.3.3Blanks

The regular submission of blank material is used to assess contamination during sample preparation and to identify sample numbering errors. Field blank samples are composed of barren material that have grades that are less than the detection limits.

8.3.3.1Milpo, 2014 to 2017

A total of 1,800 blanks with 30,370 drill hole samples and a total of 785 blanks with 10,213 channel samples (a submission rate of 1 in 13 samples) were sent to Inspectorate.

The results in all the laboratories show a pass rate greater than 99% indicating negligible contamination.

8.3.3.2Nexa, November 2017 to 2020

Since 2018, a total of 3,821 coarse blanks (2.3%) and 2,600 fine blanks (1.6%) were inserted with core samples. These indicated no significant contamination occurred during the preparation and analysis of the samples. Table 8-8 and Table 8-9 present the results of the coarse and fine blanks, respectively. Results of the blanks are illustrated in Figure 8-5 with Nexa’s tolerance limit set at approximately five times the detection limits.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-18

Table 8-8: 2017 to 2020 Fine Blank Results

Nexa Resources S.A. – El Porvenir Mine

                  Failure Rate (%)
Period  Laboratory  QA/QC Samples  Type  No.
Samples
  Failure Limit
%
  Au ppm  Ag oz/t  Ag ppm  Cu %  Pb %  Zn %
Nov. 2017 – Aug. 2018  Certimin  Blanks  Fine  617  <5%  0.00%  0.20%  -  0.00%  0.20%  0.20%
   Inspectorate EP  Blanks  Fine  342  <5%  0.00%  0.00%  -  0.00%  0.30%  0.00%
Aug. 2018 – May. 2019  Certimin  Blanks  Fine  321  <5%  0.00%  0.00%  0.00%  1.00%  0.00%  0.00%
   Inspectorate EP  Blanks  Fine  361  <5%  0.00%  0.00%  -  0.00%  0.00%  0.00%
   ALS  Blanks  Fine  959  <5%  0.00%  0.00%  0.00%  0.00%  0.00%  0.00%

Table 8-9: 2017 to 2020 Coarse Blank Results

Nexa Resources S.A. – El Porvenir Mine

                  Failure Rate (%)
Period  Laboratory  QA/QC Samples  Type  No.
Samples
  Failure Limit %  Au ppm  Ag oz/t  Ag ppm  Cu %  Pb %  Zn %
Nov. 2017 – Aug. 2018  Certimin  Blanks  Coarse  614  <5%  0.00%  0.00%  -  0.00%  0.00%  0.00%
   Inspectorate EP  Blanks  Coarse  342  <5%  0.00%  0.30%  -  0.00%  0.00%  0.00%
Aug. 2018 – May. 2019  Certimin  Blanks  Coarse  323  <5%  0.00%  0.00%  0.00%  1.00%  0.00%  0.00%
   Inspectorate EP  Blanks  Coarse  359  <5%  -  0.00%  0.00%  0.00%  0.00%  0.00%
   ALS  Blanks  Coarse  956  <5%  0.00%  0.00%  0.00%  0.00%  0.00%  0.15%
Jun. 2019 – Feb. 2020  Inspectorate EP  Blanks  Coarse  181  <5%  -  -  0.00%  0.00%  0.00%  0.00%
   ALS  Blanks  Coarse  1046  <5%  0.00%  -  0.00%  0.00%  0.00%  0.15%

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-19

 

Figure 8-5: 2017 to 2020 Porvenir Blank Zn and Pb Assays – Inspectorate EP Laboratory

8.3.4Duplicates

Duplicates help assess the natural local-scale grade variance or nugget effect and are also useful for detecting sample numbering mix-ups. The field (core) duplicates help monitor the grade variability as a function of both sample homogeneity and laboratory error.

The precision of sampling and analytical results can be quantified by re-analyzing the same sample using the same methodology. The variance between the measured results will measure their precision.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-20

Precision is affected by mineralogical factors such as grain size, distribution, and inconsistencies in the sample preparation and analysis processes. There are several different duplicate sample types, which can be used to determine the precision of the entire sampling, sample preparation, and analytical process. Blind duplicate samples are submitted to the laboratory. A description of the different types of duplicates used by El Porvenir is provided in Table 8-10.

Table 8-10: Duplicate Types and Descriptions

Nexa Resources S.A. – El Porvenir Mine

Duplicate Description
Field The sample generated by another sampling operation at the same collection point includes a duplicate sample taken from a quarter of the drill core sample. Since mid-2016, a duplicate sample was taken from the second half of the drill core sample.
Reject The second sample obtained from splitting the coarse crushed rock during sample preparation and submitted blind to the same laboratory that assayed the original sample.
Pulp The second sample obtained from splitting the pulverized material during sample preparation and submitted blind at a later date to the same laboratory that assayed the original pulp.

Numerous plots and graphs are used monthly to monitor precision and bias levels. A brief description of the plots employed in the analysis of El Porvenir duplicate data is provided below:

·Scatter plot: assesses the scattering degree of the duplicate result plotted against the original value, which allows for bias characterization and regression calculations.
·Ranked half absolute relative difference (HARD) of samples plotted against their rank % value.

HARD:

·Acceptable HARD value for field duplicates is < 30%
·Acceptable HARD value for coarse duplicate is < 20%
·Acceptable HARD value for pulp is < 10 %

Duplicates were submitted with channel samples and drill core samples. If both the original and duplicate results returned a value less than two times the detection limit, the results were disregarded for the HARD analysis due to distortion in the precision levels at very low grades.

8.3.4.1Milpo, 2014 to 2017

This section has mostly been taken from SRK (2017).

SRK performed the HARD analysis for the elements Ag, Pb, Zn and Cu, which have the following detection limits: 0.13 oz Ag, 0.01% Pb, 0.01% Zn and 0.01% Cu. In this analysis, SRK filtered all the samples with grades below two times the detection limit. El Porvenir inserted field duplicates with drill core samples and channel samples as part of its QA/QC program.

Precision levels of core drill sample for field duplicate were found to be outside of the acceptable limits. Additionally, reject assay results were poor for both lead and zinc and the duplicate assay results for lead were outside of acceptable limits. The poor precision levels for the field duplicates have been attributed to the sampling procedures, specifically that Milpo did not mark the cut line on the core before the cutting phase or sending a quarter of the core for analysis as a field duplicate. Precision levels for field duplicates

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-21

in the channel samples were also outside the acceptable limit, and reject assay results were poor for both silver and lead. Duplicate assay results for copper were slightly out of acceptable limits.

8.3.4.2Nexa, November 2017 to 2020

Duplicate control charts were prepared for Zn, Au, Ag, Cu, and Pb in both laboratories. A total of 4,685 pulp duplicates (2.8%), 3,640 coarse duplicates (2.2%), and 3,244 field duplicates (2%) were inserted. Overall, the duplicate results indicate relatively good assay precision, with the exception of zinc field duplicates due to the variability that is inherent in the samples. Table 8-11 presents the results of the duplicate samples analyzed and Figure 8-6 to Figure 8-8 present the field, reject, and pulp duplicate scatter plots for lead and zinc, respectively.

SLR recommends continuing to select duplicates that are representative of the mineralization Zn, Pb, Cu, and Ag grade ranges, and completing ongoing studies to investigate the component of variability that is inherent in the sample, versus the component due to assay precision.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-22

Table 8-11: 2017 to 2020 Porvenir Duplicate Performance

Nexa Resources S.A. – El Porvenir Mine

                  Bias (%) / Failure Rate (%)
Period  Laboratory  QA/QC Samples  Type  No.
Samples
  Failure Limit %  Au ppm  Ag oz/t  Ag ppm  Cu %  Pb %  Zn %
Nov. 2017 – Aug. 2018  Certimin  Duplicates  Twin sample  616  <30%  4.90%  9.60%  -  5.50%  10.60%  14.00%
         Coarse  612  <20%  0.80%  0.80%  -  0.70%  10.60%  0.30%
         Pulps  612  <10%  1.30%  1.50%  -  0.00%  0.20%  0.00%
   Inspectorate EP  Duplicates  Twin sample  340  <30%  -  3.80%  -  2.90%  7.60%  11.50%
         Coarse  340  <20%  -  0.30%  -  0.00%  7.60%  0.90%
         Pulps  339  <10%  -  0.60%  -  0.90%  1.20%  1.50%
Aug. 2018 – May. 2019  Certimin  Duplicates  Twin sample  322  <30%  0.31%  1.49%  0.75%  2.17%  1.55%  3.11%
         Coarse  330  <20%  0.30%  0.00%  0.00%  0.00%  0.00%  0.00%
         Pulps  335  <10%  0.60%  0.00%  0.00%  0.00%  0.00%  0.00%
   Inspectorate EP  Duplicates  Twin sample  193  <30%  -  5.47%  4.55%  3.11%  11.92%  11.40%
         Coarse  357  <20%  -  0.00%  0.00%  0.00%  0.00%  0.00%
         Pulps  340  <10%     0.00%  0.40%  0.52%  0.52%  1.04%
   ALS  Duplicates  Twin sample  943  <30%  0.95%  2.86%  1.87%  2.33%  3.29%  6.79%
         Coarse  965  <20%  0.10%  0.00%  0.32%  0.10%  0.00%  0.21%
         Pulps  1012  <10%  0.99%  0.00%  0.31%  0.30%  0.10%  0.20%
Jun. 2019 – Feb. 2020  Inspectorate EP  Duplicates  Twin sample  23  <30%  -  -  0.00%  4.35%  21.74%  30.43%
         Coarse  182  <20%  -  -  0.00%  0.00%  0.00%  1.10%
         Pulps  282  <10%     -  0.71%  0%  0.35%  0.71%
   ALS  Duplicates  Twin sample  807  <30%  1.24%  -  2.97%  2.60%  4.83%  5.33%
         Coarse  854  <20%  0.12%  -  0.00%  0.12%  0.12%  0.00%
         Pulps  1765  <10%  0.62%  -  0.57%  0.28%  0.34%  0.45%

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-23

 

Figure 8-6: 2017 to 2020 Porvenir Field Duplicates for Zn and Pb Assays – Inspectorate EP Laboratory

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-24

 

Figure 8-7: 2017 to 2020 Porvenir Coarse Reject Duplicates for Zn and Pb Assays – Inspectorate EP Laboratory

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-25

 

Figure 8-8: 2017 to 2020 Porvenir Pulp Duplicates for Zn and Pb Assays – Inspectorate EP Laboratory

8.3.5External Check Samples

Submitting assays to a secondary laboratory helps to monitor bias at the principal laboratory. Reference materials and blanks were inserted in the check assay batches.

An example of zinc and lead assay performance for the check assays is provided in Figure 8-9.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-26

Nexa sent 1,776 pulp samples analyzed at Inspectorate EP to ALS and analyzed at ALS to Certimin for referee check assays. An approximate insertion rate of 2.0 % is used for external check samples. Statistics for the check assay results are presented in Table 8-12.

Table 8-12: 2017 to 2020 Porvenir External Check Performance

Nexa Resources S.A. – El Porvenir Mine

Period  Secondary
Laboratory
  Primary
Laboratory
  Element  No.
Samples
  Bias
(%)
Nov. 2017 - Aug. 2018  Certimin  ALS  Au ppm  432  -2.15
         Ag ppm  435  0.56
         Cu per  435  -1.66
         Pb per  435  -1.10
         Zn per  435  -0.55
   ALS  Certimin  Au ppm  202  -6.68
         Ag ppm  202  0.09
         Cu per  202  1.59
         Pb per  202  -0.35
         Zn per  202  2.37
      Inspectorate EP  Ag ppm  110  4.63
         Cu per  110  2.25
         Pb per  110  0.63
         Zn per  110  3.3
Aug. 2018 - May. 2019  Certimin  ALS  Au ppm  280  0.32
         Ag ppm  282  -1.42
         Cu per  282  -1.86
         Pb per  282  -1.03
         Zn per  282  -4.02
   ALS  Certimin  Au ppm  162  -0.26
         Ag ppm  162  -0.71
         Cu per  162  -1.75
         Pb per  162  -1.28
         Zn per  162  1.54
      Inspectorate EP  Ag ppm  197  4.04
         Cu per  197  2.63
         Pb per  197  1.53
         Zn per  197  2.45

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-27

 

Period  Secondary
Laboratory
  Primary
Laboratory
  Element  No.
Samples
  Bias
(%)
Jun. 2019 - Feb. 2020  Certimin  ALS  Au ppm  294  0.26
         Ag ppm  294  2.90
         Cu per  294  -1.80
         Pb per  294  1.76
         Zn per  294  -1.47
   ALS  Inspectorate EP  Ag ppm  94  2.23
         Cu per  94  3.44
         Pb per  94  1.52
         Zn per  94  4.06

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-28

 

Figure 8-9: 2017 to 2020 Porvenir External Checks for Zn and Pb Assays – Inspectorate EP Laboratory

The check assay results compared well, showing very high overall correlation coefficients. For silver, a potential positive of approximately 5% at Inspectorate EP in comparison to ALS was observed and should be investigated.

The SLR QP is of the opinion that the Inspectorate EP laboratory zinc, lead, copper, and silver assays are reliable and meet industry standards.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-29
8.4QA/QC Recommendations

SLR’s QA/QC recommendations are as follows:

Revaluate the 2014 to 2017 QA/QC failure rates after removing CRM numbering mix-ups and adjusting the failure limits for certain CRMs.

Investigate the potential 5% positive silver bias at Inspectorate EP.

In the SLR QP’s opinion, the QA/QC program as designed and implemented by El Porvenir is adequate, and the assay results within the database are suitable for use in a Mineral Resource estimate.

8.5Data Management

Database management is performed by a dedicated on-site geologist under the supervision of the Resource Geologist. Data is stored centrally on a Microsoft Cloud server in Fusion, a Datamine database product. Previous 2017, digital logging sheets prepared by the geologist were uploaded to the database management system Scoret (Balanza), which has now been superseded by Fusion. Original drill logs, structural logs, geotechnical logs, and details related to the holes are stored on-site in a folder, specific to each drill hole. Folders are clearly labelled and stored in a cabinet in the office.

Assay certificates are mailed to the Mine by ALS Peru S.A and Inspectorate and emailed to Nexa’s mine and corporate Database Administrators. Certificates are reviewed by the Mine Database Administrator prior to uploading information to Fusion.

Access to the El Porvenir database is by registered Fusion users from Nexa. Nexa maintains several user profiles with different access permissions and privileges defined by the Database Administrator. The data is updated automatically daily and weekly. Monthly back-ups are run following Nexa protocols.

8.6Sample Security

Core boxes were transported every day to the core shed by personnel from the drilling company. Samples were transported by a contractor supervised by the company personnel. Core boxes and samples were stored in safe, controlled areas.

Chain-of-custody procedures were followed whenever samples were moved between locations and to and from the laboratory, by the filling out of sample submittal forms.

In the SLR QP’s opinion, the sample preparation, analysis, and security procedures at El Porvenir are adequate for use in the estimation of Mineral Resources.

In the SLR QP’s opinion, the QA/QC program as designed and implemented by Nexa is adequate and the assay results within the database are suitable for use in a Mineral Resource estimate.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

8-30
9.0Data Verification
9.1Databases and Internal Verification

During the last quarter of 2017, Nexa transferred the database from SIOM database management system and Excel files to Fusion software and prepared an exhaustive number of checks to confirm the accuracy of the data migration. Nexa has implemented a series of routine verifications to ensure the collection of reliable data. Logging and sampling data are digitally entered into the database by downloading the information from the logging tablets.

Core logging, surveying, and sampling were monitored by exploration and mine geologists and verified routinely for consistency. The El Porvenir resource database is regularly maintained and validated by the database administrator using Fusion software validation routines and by regularly checking the drill hole data on-screen visually. Personnel from the Geology department conduct daily quality control checks on the data entry. A first check consists of identifying duplicate sample numbers or lack of information for certain intervals. Every month, all the assay data entered in the server are compared with a compilation of individual CSV files issued by the laboratory. Paper records are stored at a safe location at the Mine.

Assay data are captured from the Global LIMS server using custom routines, and this information is then entered into the Fusion database. The laboratory also issues CSV and pdf-format certificates, however, only the information that is digitally captured from the server is considered to be the true record.

Nexa prepared “The Informe de Validación de Base de Datos Atacocha” report containing additional detail regarding the data validation for El Porvenir (Nexa, 2019c). During this validation, Nexa found 76 channels and one drill hole creating inconsistencies with surrounding data. As a result, these channels and hole were removed from the Mineral Resource database.

The SLR QP is of the opinion that the data collection, import, and validation workflows are consistent with industry standards, and are of sufficient quality to support Mineral Reserve and Mineral Resource estimation.

9.2Previous Verification

In 2017, Amec Foster Wheeler (Amec) audited the Atacocha database (which also includes El Porvenir). Amec reviewed and validated the information from 2011 to 2017 compiled by Nexa. Amec used signed assay certificates to verify the assays in the database; some inconsistencies were observed in Zn and Cu assays. Other checks included collar locations, downhole survey measurements, and lithology codes. Some inconsistencies were observed. In addition, a comparison between drill hole assay and channel assay was performed. The test compared results of nearby holes by searching for channel samples near drill holes within a four-metre distance. Amec constructed QQ plots and found that both grade distributions were very similar, with no bias observed (Amec, 2017).

As part of SRK’s 2017 NI 43-101 Technical Report, SRK performed assay data verification by comparing assay certificates with values in the database. SRK found that a significant number of historical samples did not have assay certificates and downgraded some areas to Inferred as a result. Nexa has found more assay certificates since 2017 and completed a statistical and visual study that concluded that there were no significant issues with the historical data. SLR reviewed Nexa’s comparison work and concurred with the inclusion of historical data in the resource estimate with no classification downgrade.  

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

9-1
9.3SLR Verification

SLR visited El Porvenir from September 5 to 7, 2018. During the site visit, SLR reviewed plans and sections, visited the core shack, examined some drill cores and mineralization exposures at the underground mine, and held discussions with Nexa personnel.

As part of the data verification process, SLR inspected the drill holes in section and plan view to review geological interpretation related to drill hole and channel database and found good correlation. SLR queried the database for unique headers, unique samples, duplicate holes, overlapping intervals, blank and zero grade assays, and long interval sample, and reviewed QA/QC data collected by Nexa. SLR did not identify any significant discrepancies.

9.3.1Assay Certificate Verification

SLR performed checks on the El Porvenir Mineral Resource database by converting approximately 166,000 assay certificate results spanning August 2011 to March 2020 from original PDF and Excel formats to reformatted comma delimited text (CSV) files, compiled and imported them to a database, and then compared the compiled certificate assays to the assay table in the Mineral Resource drill and sample database. The work matched approximately 53,000 sample IDs to the assay database for Zn, Cu, Pb, Ag, and Fe. Results of the exercise are shown in Table 9-1. No significant errors were found. There were 629 samples for Ag where the values in the database ranged from 25 g/t Ag to 285 g/t Ag lower than the certificate assays. This is likely a result of choosing the lower value of multiple re-assays and shows a conservative approach since all mis-matched values were lower in the Mineral Resource database, and SLR did not include the results of a re-assay program in its certificate conversion and compilation exercise.

Table 9-1: SLR Assay Certificate Verification Results

Nexa Resources S.A. – El Porvenir Mine

Element  Assays
Count
  Count Certificate IDs  Certificates Start  Certificates End  % of Assays in DB  Sample
ID Matches
  Abs. Diff. Threshold  Num Outside Threshold  Notes
ZN (%)  763,041  165,681  2011-07-03  2019-10-30  22%  52,860  1  0   
CU (%)  736,580  165,622  2012-04-08  2019-10-30  22%  52,860  0.001  2  Both samples 1.5 vs DHDB 1.0
PB (%)  760,687  165,668  2011-07-03  2019-10-30  22%  52,860  1  0   
AG (PPM)  764,211  165,626  2011-07-03  2019-10-30  22%  52,860  25  629  all Certimin, all DHDB samples lower grade than certificates – likely due to resample program
FE (%)  229,134  165,262  2011-07-03  2019-10-30  72%  52,860  1  0   

SLR did not review the pre-2011 certificate data as it is mostly located in mined-out areas. The bulk of the Mineral Resources and Mineral Reserves are supported with data from 2011 to 2020. Figure 9-1 shows the distribution of pre-2011 (green) and 2011-2020 (red) assays for zinc in the Mineral Resource and Mineral Reserve area. Unsampled drill traces are grey. Note the Mineral Resource and Mineral Reserve solids are well-covered by the 2011-2020 sampling. Assay certificates pre-2011 were not available, with exception of 2009, however, Nexa and SLR reviewed this data in sections and plan views. Overall, the

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

9-2

data compared well with recent drilling. Based on SLR’s review, there is no reason to believe there is any significant issue related to this data, furthermore, Nexa is currently drilling in these areas to confirm assay values.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

9-3

 

Figure 9-1: Assay Sampling Coverage (Zn)

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

9-4

 

9.3.2Density Verification

SLR converted 3,553 density measurement certificates, spanning November 2015 to February 2020, from original Excel formats to reformatted CSV text files, compiled and imported them to a database, and compared them to the density table in the Mineral Resource drill and sample database.

Four files from 2011, 2012 and 2014 appear to contain grab samples, and only two of these had sample ID fields which concatenated the index and year in the table. Spot checks of the available sample IDs against the density table in the Mineral Resource database resulted in zero matches.

There were 565 certificate ID matches out of 1,131 in the El Porvenir Mineral Resource database, resulting in a comparison rate of 50%. SLR notes that there was only one density discrepancy greater than 0.2 g/cm3 between the matching certificate and the Mineral Resource sampleIDs. SLR considers this to be a very good result. Spatial coverage of the density samples relative to Mineral Resources (blue) and Mineral Reserves (orange) are shown in Figure 9-2.

The SLR QP found that the database is well maintained, and generally exceeds industry standards. The SLR QP is of the opinion that database and database verification procedures for El Porvenir comply with industry standards and are adequate for the purposes of Mineral Resource estimation.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

9-5

 

Figure 9-2: Density Sampling Coverage

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

9-6
10.0Mineral Processing and Metallurgical Testing
10.1Test Work

Nexa began developing a geometallurgical model for El Porvenir in 2017. The objectives of the work were to develop a geometallurgical model able to predict the recovery of lead, zinc, copper, arsenic, and manganese, concentrate grades, as well as abrasiveness (abrasion index (Ai)) and hardness (Bond ball mill work index (BWi)), and therefore throughput based on ore source within the deposit. The aim of the development work included:

·Maximization of operational value of the El Porvenir mining unit.
·Reduction of risks to production related to:
oPlant throughput.
oGrinding media consumption.
oRecovery of valuable minerals.
oConcentrate quality.
·Identification of flaws in the quality and interpretation of the available information.
·Identification of opportunities for improvement and to reduce risk.
·Definition and validation of geometallurgical domains from metallurgical test results.
·Evaluation of contaminants in the deposit.

The geometallurgical sample selection and test work were planned with the assistance of Transmin Metallurgical Consultants (Transmin). Preliminary results and interpretation were reported by Transmin in the report Estudio Geometalurgico Preliminar para Unidad Minera El Porvenir, June 15, 2018 (Transmin, 2018). The preliminary work was followed up by two additional phases of test work reported in Estudio Geometalúrgico Fase 2 para Unidad Minera El Porvenir, April 29, 2019 (Transmin, 2019) and Estudio Geometalúrgico Fase 3 para Unidad Minera El Porvenir, May 18, 2020 (Transmin, 2020).

In 2017, fifteen samples from El Porvenir were submitted for metallurgical testing. The samples were intended to be representative of 2018 concentrator feed. Test work included mineralogy, comminution testing (BWi and Ai), and flotation (variability tests, locked cycle tests (LCTs), and grind size evaluation).

Priority was given to samples from holes drilled in 2016 and 2017, so as to use the freshest possible material for metallurgical test work. Samples were selected to represent areas in the block model with Net Smelter Return (NSR) values greater than or equal to $40.94/t, as well as to include majority lithologies to be processed in 2018 (predominantly skarn and limestone). Grades of zinc, lead, copper, and silver were also considered in the selection of samples. Mineralogical characterization of the samples is represented in Figure 10-1 and Figure 10-2. The mineralogy is notable for the wide range of sulphide and sulphate content, the presence of sphalerite with manganese inclusions, as well as high levels of manganese sulphide in two samples, PAS-09 and PAS-23.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

10-1

Source: Transmin, 2018

Figure 10-1: Bulk Mineralogical Analysis

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

10-2

Source: Transmin, 2018

Figure 10-2: Sulphide Mineral Breakdown

Comminution test results ranged from 0.04 g to 0.33 g for Ai and 7.3 kWh/t to 20.6 kWh/t for Bwi.

Three composite samples were produced for use in grind size optimization flotation tests and for LCTs. Two composites of plant feed representing October 2017 and November 2017 were collected for repeatability testing and cleaner regrind testing. Bulk rougher flotation was completed at three grind sizes, 80% passing (P80) 100 µm, 150 µm, and 200 µm. The tests indicated that there was a tendency towards higher recoveries of copper and zinc to the bulk rougher concentrate at the finer grind sizes. This would result, however, in the need for more effort to reject the additional zinc from the bulk concentrate. Recovery of lead to the bulk concentrate was less affected but improved at finer grind sizes. Therefore, it was noted that optimization of primary grind size could help to maximize recoveries of valuable minerals and metals, but primary grind size should be considered in conjunction with throughput and energy consumption.

An evaluation of regrind size was conducted by completing cleaner tests on bulk and zinc rougher concentrates at P80 20 µm and 40 µm, as well as without regrinding. The tests indicated that recoveries were lower at finer grind sizes, but also that grades at the finer grind sizes were higher. It was noted that optimization of regrind size could help to reduce energy consumption for regrinding, while still achieving target concentrate grades.

A LCT was completed which produced a bulk concentrate of 53.8% Pb and zinc concentrate of 52.7% Zn. The limit for bismuth in the lead concentrate (1,000 ppm Bi) was exceeded at 5,597 ppm Bi, and the limit

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

10-3

for cadmium in the zinc concentrate (3,000 ppm Cd) was exceeded at 3,275 ppm Cd. Final recoveries for lead and zinc were 88.2% and 91.5%, respectively.

Variability tests were completed on the 15 variability samples. The tests consisted of bulk and zinc rougher flotation conditions that were adjusted according to the lead and zinc content of the samples, resulting in five different sets of flotation conditions.

Lead recovery to the bulk concentrate averaged 92% (excluding the low lead content samples), while zinc recovery to the zinc rougher concentrate averaged 79%.

Test work results from the samples were used to derive recovery versus head grade relationships for lead, zinc, copper, manganese, and arsenic. Transmin noted that the number of samples tested was less than the number required to represent the variability of the deposit, and that additional test work would be required to validate and update the geometallurgical model. In addition, it was recommended that arsenopyrite and manganese sulphides be included in the logging of drill core samples, and that the behaviours of bismuth and antimony should be evaluated in future test work.

In Phase 2 of the geometallurgical model development, 96 samples were selected for metallurgical test work, including samples from both El Porvenir and Atacocha. Samples were selected to represent the distribution of ore (from different zones within the mines) planned to be mined in 2019 (except for Atacocha where sample material for certain zones to be mined in 2019 was not available), and from blocks in the block model with NSR values greater than or equal to $40.94/t.

Samples that underwent comminution testing included 36 samples from El Porvenir and 10 samples from Atacocha. Ai values of the samples ranged from 0.0056 g to 0.47 g, with the majority of samples in the low abrasiveness range of < 0.3 g. BWi for the samples ranged from 5.6 kWh/t to 20.7 kWh/t with the majority of samples in the medium to hard range of 9 kWh/t to 20 kWh/t. Abrasiveness and hardness were found to be related to the SiO2 content of the samples.

Flotation test work was completed on 45 variability samples (rougher tests) and a composite produced from 40 individual samples from El Porvenir and 10 individual samples from a blend of 75% El Porvenir and 25% Atacocha material. Three composites (two El Porvenir and one Atacocha) were submitted for mineralogical analysis. The main gangue minerals in the composites were silicates and carbonates and the main sulphide minerals were pyrite, sphalerite, and galena. The flotation test work indicated that lead recovery was related to the lead head grade, and silver recovery was related to lead recovery; zinc, manganese, and arsenic recoveries were noted to be related to the source zone of the samples. LCTs conducted on the composites did not achieve stability and were therefore not included in the analysis of results.

In Phase 3 of the geometallurgical model development, 46 additional samples representing different zones and lithologies at El Porvenir underwent comminution testing. Ai results ranged from 0.0030 g to 0.68 g and BWi results ranged from 5.67 kWh/t to 23.1 kWh/t. Abrasiveness was found to be related to ore zone, lithology, SiO2 content, and loss on ignition (LOI). BWi was found to be related to ore zone, lithology, and SiO2 content.

A further 29 samples were used to produce two composites representing ore to be mined from 2020 to 2022, as well as three samples used to produce a composite representing the Don Ernesto zone for flotation test work. Mineralogical analysis of the composites indicated that the main sulphide minerals were pyrite, sphalerite, pyrrhotite, and galena. Compared to the 2020 to 2022 composites (PDFC-01 and PDFC-02), the Don Ernesto composite (PDFC-03) was higher in sulphides and also contained 2.5%

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

10-4

bournonite (PbCuSbS3), while PDFC-02 contained 2.1% alabandite (MnS). Gangue minerals were mainly silicates and carbonates.

LCTs were completed on PDFC-01 and PDFC-02 to produce bulk copper-lead concentrates and zinc concentrates. These tests produced the following results:

·PDFC-01
oThe bulk concentrate achieved a grade of 6.1% Cu, 41.7% Pb, and 2,623 g/t Ag at recoveries of 50.3% Cu, 91.7% Pb, and 73.6% Ag.
oThe zinc concentrate achieved a grade of 49.7% Zn at a recovery of 91%.
oThe bulk concentrate was consisted mainly of galena (47%), chalcopyrite (16%), and sphalerite (15%, mostly associated with galena).
oThe zinc concentrate consisted mainly of sphalerite (85%).
·PDFC-02
oThe bulk concentrate reached a grade of 1.0% Cu, 42.4% Pb, and 2.808 g/t Ag at recoveries of 34% Cu, 87% Pb, and 70% Ag. It also contained 8% Mn and 11% Zn.
oThe Zn concentrate reached a grade of 41.8% Zn at a recovery of 73%.
oThe bulk concentrate consisted of galena (44%), alabandite (13%), and sphalerite (21%). Sphalerite was associated equally with galena and pyrite.
oThe zinc concentrate consisted mainly of sphalerite (70%) and 5% alabandite.

Transmin recommended that manganese sulphides, lead oxides, and whole rock analysis, particularly for SiO2, be included in drill core analysis, that manganese be included in the geological model, and that consideration be given to mapping high SiO2 zones.

Based on the results of the test work, Transmin produced relationships for comminution parameters (Ai and BWi) and flotation predictions for recoveries and grades for copper, lead, and zinc concentrates using ore zones and grades that could be used in geometallurgical modelling. These relationships were updated through the various phases of test work.

10.2Operational Performance

Key operational performance figures for the El Porvenir concentrator since the beginning of 2016 are presented in Table 10-1. With zinc head grades of approximately 2.9% Zn and lead head grades of approximately 1.0% Pb, as well as high zinc recoveries (88%) and slightly lower lead recoveries (79%) to the respective concentrates, El Porvenir zinc concentrate production in 2019 was 110,000 t, while lead concentrate production was 33,000 t. Low copper head grades and low copper recovery to copper concentrate results in only minor copper concentrate production. Gold head grades are low at approximately 0.5 g/t Au and combined gold recovery to the lead and copper concentrates is approximately 30%, resulting in low (less than 1 oz/t Au) payable levels of gold in both concentrates. Silver recovery to the lead concentrate of 57% results in payable silver values in the lead concentrate (approximately 2,500 g/t Ag in 2020). Although silver recovery to the copper concentrate is low (5.1% in 2020), silver content in the copper concentrate is high enough (approximately 2,800 g/t Ag in 2020) that it likely contributes to the salability of the concentrate.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

10-5

Production in 2020 was significantly lower than in 2019 due to the effects of the COVID-19 pandemic and associated production interruptions. On March 15, 2020, the Peruvian Government declared a national emergency and imposed operating business restrictions including on the mining sector. The quarantine period was initially expected to last until the end of March 2020 but was subsequently extended up to May 10, 2020. In light of the government restrictions, Nexa suspended production at El Porvenir. During this period, mining activities were limited to critical operations with a minimum workforce to ensure appropriate maintenance, safety, and security. On May 6, 2020, the Peruvian Government announced the conditions for the resumption of operations for different sectors, including mining operations above 5,000 tpd. As a result, El Porvenir operations, which were suspended on March 18, 2020, restarted production on May 11, 2020, following the end of the quarantine period. After the resumption of operations, El Porvenir ramped up production to pre-pandemic levels by June 2020.

Table 10-1: Concentrator Operational Performance

Nexa Resources S.A. – El Porvenir Mine

   Units  Item  2016  2017  2018  2019  2020
Ore Processed  tonnes     2,154,151  1,834,511  2,149,927  2,120,765  1,502,618
Mill Head Grade  g/t  Ag  60.2  63.6  59.7  64.6  62.3
   %  Cu  0.14  0.13  0.15  0.15  0.17
   %  Pb  0.99  1.04  0.98  1.01  0.93
   %  Zn  3.22  2.86  3.04  2.93  2.65
Cu Concentrate  tonnes     2,949  2,460  2,701  2,185  1,711
   %  Cu Grade  22.2  20.0  21.0  21.3  19.5
   %  Cu Recovery  22.0  23.1  18.0  14.7  12.7
   oz/t  Ag Grade  102.6  85.4  55.4  81.3  89.9
   %  Ag Recovery (to Cu)  7.4  6.6  3.7  4.1  5.1
   oz/t  Au Grade  1.21  0.96  0.68  0.87   
   %  Au Recovery (to Cu)  10.7  9.2  5.8  5.0   
Pb Concentrate  tonnes     31,195  28,726  31,662  33,018  21,213
   %  Pb Grade  55.0  51.6  52.6  51.2  51.2
   %  Pb recovery  80.8  77.5  79.1  79.0  77.8
   oz/t  Ag Grade  77.3  74.8  75.3  78.4  80.7
   %  Ag Recovery (to Pb)  57.7  57.4  57.8  58.8  56.9
   oz/t  Au Grade  0.18  0.21  0.25  0.24   
   %  Au Recovery (to Pb)  16.3  21.4  24.7  25.5   
Zn Concentrate  tonnes     121,294  92,446  115,256  109,976  69,891
   %  Zn Recovery  90.2  87.9  88.7  88.2  87.7
   %  Zn Grade  51.6  49.9  50.2  49.7  49.9

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

10-6

Historical monthly recoveries at El Porvenir for 2015 to 2020 are presented in Figure 10-3, which shows zinc, lead, and copper recoveries to their respective concentrates, and total silver and gold recoveries to the lead and copper concentrates.

Figure 10-3: Historical Recovery to Concentrate

10.3Deleterious Elements

Bismuth levels in the copper concentrate will likely attract penalty charges, while arsenic may exceed penalizable levels from time to time. Zinc and lead contents in the copper concentrate are high (combined approximately 15% to 20%) and attract penalties, however, the high silver and gold content (2,529 g/t Ag and 27 g/t Au in 2019) likely help the saleability of the small volumes of copper concentrate produced. Currently the copper concentrate attracts penalties of approximately US$17/dmt.

The zinc and lead concentrates are clean and do not typically attract penalty charges, although the bismuth content of the lead concentrate could reach penalizable levels if there is a high content of bismuth in the ore.

In the SLR QP’s opinion, the metallurgical recovery data is adequate for the purposes of Mineral Resource and Mineral Reserve estimation in this Technical Report Summary.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

10-7
11.0Mineral Resource Estimates
11.1Summary

The Mineral Resource estimate for El Porvenir, dated December 31, 2020, using all data available as of February 15, 2020 was completed by El Porvenir staff (Nexa, 2020b) and reviewed by SLR.

The Mineral Resource estimate was completed using Datamine Studio RM and Leapfrog Geo software. Wireframes for geology and mineralization were constructed in Leapfrog Geo based on geology sections, assay results, lithological information, underground mapping, and structural data. Assays were capped to various levels based on exploratory data analysis and then composited to two metre lengths. Wireframes were filled with blocks and sub-celling at wireframe boundaries. Blocks were interpolated with grade using ordinary kriging (OK) and inverse distance cubed (ID3) interpolation algorithms. Block estimates were validated using industry standard validation techniques. Classification of blocks used distance-based and mineralization continuity criteria.

A summary of the El Porvenir Mineral Resources, exclusive of Mineral Reserves, is shown in Table 11-1. NSR cut-off values for the Mineral Resources were established using a zinc price of US$1.30 per pound, a lead price of US$1.02 per pound, a copper price of US$3.37 per pound, and a silver price of US$19.38 per ounce.

The Mineral Resources in El Porvenir are contained in four zones: Zona Alta (Upper Zone), Zona Intermedia (Intermediate Zone), Zona Baja (Lower Zone), and Profundizacion Zona (Mine Deepening Zone).

Mineral Resources at El Porvenir are reported using all the material within underground resource shapes generated in Deswik Stope Optimizer (DSO) software, satisfying minimum mining size, NSR cut-off values of US$60.06/t for the Upper Zone, US$61.09/t for the Intermediate Zone, US$59.75/t for the Lower Zone, and US$63.37/t for the Mine Deepening Zone for cut and fill (C&F) resource shapes, and continuity criteria.

SLR’s review of, and conclusions regarding, the resource model applies not just to the Mineral Resources listed in Table 11-1, but also to the Mineral Resources that were converted to Mineral Reserves.

The SLR QP reviewed the Mineral Resource assumptions, input parameters, geological interpretation, and block modelling and reporting procedures, and is of the opinion that the Mineral Resource estimate is appropriate for the style of mineralization at El Porvenir and that the block model is reasonable and acceptable to support the 2020 year end Mineral Resource estimate.

Mineral Resources have been classified in accordance with the definitions for Mineral Resources in S-K 1300, which are consistent with Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards for Mineral Resources and Mineral Reserves (CIM (2014) definitions).

Table 11-1: El Porvenir Mineral Resources - December 31, 2020

Nexa Resources S.A. – El Porvenir Mine

      Grade  Contained Metal
Category  Tonnage
(Mt)
  (% Zn)  (% Pb)  (% Cu)  (g/t Ag)  (000 t Zn)  (000 t Pb)  (000 t Cu)  (000 oz Ag)
Measured  0.18  2.59  0.99  0.23  63.46  4.8  1.8  0.4  378
Indicated  1.07  2.93  0.89  0.20  63.33  31.3  9.5  2.1  2,176

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-1

 

      Grade  Contained Metal
Category  Tonnage
(Mt)
  (% Zn)  (% Pb)  (% Cu)  (g/t Ag)  (000 t Zn)  (000 t Pb)  (000 t Cu)  (000 oz Ag)
M+I  1.25  2.87  0.91  0.20  63.35  36.1  11.4  2.6  2,554
Inferred  6.79  3.60  0.95  0.23  78.37  244.5  64.8  15.9  17,110

Notes:

1.The definitions for Mineral Resources in S-K 1300 were followed for Mineral Resources, which are consistent with CIM (2014) definitions.
2.Mineral Resources are reported on an 80.16% Nexa attributable ownership basis.
3.Mineral Resources are estimated at NSR cut-off values of US$60.06/t for the Upper Zone, US$61.09/t for the Intermediate Zone, US$59.75/t for the Lower Zone, and US$63.37/t for the Mine Deepening Zone for C&F resource shapes.
4.Mineral Resources are estimated using average long term metal prices of Zn: US$2,869.14/t (US$1.30/lb); Pb: US$2,249.40/t (US$1.02/lb); Cu: US$7,426.59/t (US$3.37/lb); and Ag: US$19.38/oz.
5.Metallurgical recoveries are accounted for in the NSR calculations based on historical processing data and are variable as a function of head grade. Recoveries at the LOM average head grades are 89.6% for Zn, 79.2% for Pb, 14.3% for Cu, and 77.5% for Ag.
6.A minimum mining width of 4.0 m was used for C&F resource shapes.
7.Bulk density varies depending on mineralization domain.
8.Mineral Resources are exclusive of Mineral Reserves.
9.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
10.Numbers may not add due to rounding.

The SLR QP reviewed the Mineral Resource assumptions, input parameters, geological interpretation, and block modelling and reporting procedures, and is of the opinion that the Mineral Resource estimate is appropriate for the style of mineralization and that the block model is reasonable and acceptable to support the December 31, 2020 Mineral Resource estimate.

The SLR QP is of the opinion that, with consideration of the recommendations summarized in Section 1 and Section 23, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.

11.2Resource Database

Nexa maintains the entire database in Studio RM-Fusion. The resource database contains drilling information and analytical results up to February 15, 2020. Information received after this date was not used in the Mineral Resource estimate. The database comprises 4,643 drill holes for a total of 757,590.140 m and 17,127 underground channels for a total of 97,104.81 m.

The Mineral Resource estimate is based on the WGS-84 coordinate system, and two B-Level National Grid points are used as a reference for all topographical measurements.

SLR received data from Nexa in Microsoft Excel format. A Datamine database was also provided and extracted in CSV format. Data were amalgamated, parsed as required, and imported by SLR into Maptek’s Vulcan Version 10.1.5 (Vulcan) software and Sequent Limited’s Leapfrog software version 5.0 (Leapfrog) for review.

The drill hole and channel database comprise coordinate, length, azimuth, dip, lithology, density, and assay data. For grade estimation, unsampled intervals within mineralization wireframes were replaced with half of the detection limit values. Detection limit text values (e.g., “<0.05”) were replaced with numerical values that were half of the analytical detection limit. The channel sample data was converted into drill hole data for use in interpretation and Mineral Resource estimation.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-2

For the purpose of the Mineral Resource estimate, the drill hole data were limited to those assays located inside the mineralization wireframes. This includes 4,290 drill holes containing 38,158 samples totalling 54,463 m, and 10,069 underground channels containing 28,356 samples totalling 46,785 m. A total of 21 drill holes were excluded from the Mineral Resource database (Table 7-2) as they either overlapped with new holes and have discrepancies with these holes, or were relocated to the Atacocha (mine adjacent and connected by an underground drift with El Porvenir) database. These 21 holes were also excluded from the geological modelling and estimation processes. Figure 11-1 illustrates the drill hole location in relation with the mineralization solids.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-3

 

Figure 11-1: 3D View of El Porvenir Mineralized Solids and Drill holes

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-4

 

The SLR QP conducted a number of checks on the Mineral Resource database as discussed in Section 9, Data Verification. The SLR QP is of the opinion that the database is of high quality and generally exceeds industry standards and is appropriate to support Mineral Resource estimation.

11.3Geological Interpretation

The El Porvenir underground Mineral Resource estimate is based on assay and geological interpretation for each individual mineralized domain. Geological models were built by El Porvenir geologists using the drilling and channel sampling assay results, as well as geological domains such as: rock type (sandstone, calcareous breccia, marble and skarn), mineralization structure type (vein, orebody, and mantos), structural and lithological controls observed in underground workings and drill core logging data. Figure 11-2 and Figure 11-3 present the El Porvenir geological domains.

During the interpretation process, three main styles of mineralization were identified at the Porvenir deposit:

·Skarn: mineralized zones of irregular to structurally controlled geometry, primarily contained within the Pucará Group, comprising garnet with associated metallic mineralization of galena, sphalerite, chalcopyrite, and silver-bearing sulphosalts (i.e., tetrahedrite).
·Structurally controlled zones (i.e., veins): mineralization comprising galena, sphalerite, and silver-bearing sulphosalts (i.e., tetrahedrite) with quartz, rhodochrosite, and pyrite that forms structurally controlled shoots with lengths of up to 150 m and vertical extents of up to 350 m.
·Replacement: lenses to irregular geometry contacts within the Pucará Group, comprising metallic mineralization of galena, sphalerite, chalcopyrite, and silver-bearing sulphosalts (i.e., tetrahedrite), and lenses or “mantos” in stratabound galena, sphalerite, and pyrite mineralization hosted in the Goyllarisquizga sandstone.

Skarn bodies are highly irregular in geometry and structurally controlled by variable trends (north-south to northwest-southeast) around the Milpo stock. For the vein mineralization, at least three groups were identified: (1) east-west striking; (2) replacement-style structures striking northwest-southeast dipping to the north; (3) and veins associated with intrusive dikes striking northeast-southwest; dipping to the south, and for the “mantos”, a northwest trending with shallow dipping to the south was recognized.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-5

 

Figure 11-2: El Porvenir Lithological and Control Type Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-6

 

Figure 11-3: El Porvenir Structure and Emplacement Type Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-7

 

11.4Geological Modelling

Nexa performed geological modelling of the Porvenir deposit using Leapfrog. All contact surfaces were modelled based on the drilling and channel sampling assay results, as well as the structural and lithological controls observed in underground workings and drill core logging data. A total of 41 interpreted cross sections and 40 levels with underground mapping were used to guide the modelling (Figure 11-4), and polylines were used to better control contacts where data was sparse and to mimic underground mapping to adjust for mineralization displacement. No minimum mining thickness was used for the mineralization wireframes because DSO shapes were used for resource reporting.

The vein and “mantos” were modelled as vein objects and grouped using the vein system tool, with no consideration for external lithologies. Orebody type mineralization style was modelled using the intrusion tool. Extra boundary control was imposed using polylines if necessary. The modelled mineralized zones were then exported to Datamine software to encode the block model. A total of 430 individual mineralization domains (Table 11-2) and a total of 24 mineralization group zones were interpreted and modelled (Table 11-3). Most of the mineralization group zones are in the operation area, with exception of Sara and Porvenir 2 Sur Oeste. Figure 11-5 and Figure 11-6 illustrate the mineralization group zone domain solids in plan view and cross sections, respectively.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-8

 

Figure 11-4: OB_Vcn3 showing drill holes and updated mapping

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-9

 

Table 11-2: Individual Mineralization Domains

Nexa Resources S.A. – El Porvenir Mine

 

 

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-10

 

Table 11-3: Mineralization Group Zone Domains

Nexa Resources S.A. – El Porvenir Mine

Mineralization Group
Zone
  Volume (m3)  Lithological
Control
  Rock
Type
  Structure
Type
  Emplacement
Type
Don Ernesto  394,265.02  Fault  Sandstone  Mineralized body  Structural
Don Lucho  766,128.63  Contact  Skarn  Mineralized body  Exoskarn
Éxito  2,763,581.47  Contact  Skarn  Mineralized body  Exoskarn
Integracion AT-EP  954,292.48  Fault/ Contact  Breccia-Skarn  Mineralized body  Breccia-Exoskarn
Porvenir 3  340,210.92  Fault  Sandstone  Mineralized body  Replacement Contact
Porvenir 9  7,067,926.99  Fault/ Contact  Sandstone-Skarn  Mineralized body  Exoskarn-Replacement
Porvenir 2 Sur Este  1,023,911.97  Fault  Sandstone  Mineralized body  Breccia-Structural-Replacement
Porvenir 2 Sur Oeste  1,893,829.62  Fault  Sandstone  Mineralized body  Replacement Contact
Sara  1,881,233.84  Fault  Sandstone  Mineralized body  Replacement Contact
Socorro 2 y 4  576,392.07  Fault  Marmol  Vein  Structural
Veta 1204  484,165.83  Fault  Marmol  Vein  Structural
Veta 1204 Inferior  1,189,380.33  Fault  Marmol  Vein  Structural
Veta 1204 Superior  1,228,289.40  Fault  Marmol  Vein  Structural
Veta 5  1,503,477.81  Fault/ Contact  Skarn  Mineralized body  Exoskarn
Veta AM  490,337.52  Contact  Skarn  Mineralized body  Exoskarn
Veta BX  4,679.90  Fault  Breccia  Mineralized body  Breccia
Veta Carmen Norte 1  604,381.53  Contact  Skarn  Mineralized body  Exoskarn
Veta Carmen Norte 3  3,710,274.16  Contact  Skarn  Mineralized body  Exoskarn
Veta Carmen Norte 4  461,265.07  Fault/ Contact  Marmol-Skarn  Vein  Structural-Exoskarn
Veta Carmen 1  850,357.73  Fault  Marmol  Vein  Structural
Veta Carmen 2  296,457.86  Fault  Marmol  Vein  Structural
Veta Carmen 3  404,796.21  Fault  Marmol  Vein  Structural
Veta Progreso  4,857,800.73  Contact  Skarn  Mineralized body  Exoskarn
Veta Vr  29,941.27  Fault  Marmol  Vein  Structural

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-11

 

Figure 11-5: El Porvenir Mineralization Group Zone Domains – Plan view

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-12

 

Figure 11-6: El Porvenir Mineralization Group Zone Domains – Cross Section

 

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-13

 

11.5Domain Modelling
11.5.1Grade Domains

Nexa prepared grade domain models for some of the individual mineralization domains by creating grade envelope wireframes based on assay grades. Grade threshold limits used to outline grade envelopes, and to define high and low grade domains, were determined by assessing probability plots, histograms, and contact plots to identify different populations, and by also considering spatial grade continuity.

A total of eight grade envelopes were built within the individual mineralization domains for Zn, Cu, Pb, and Ag. Silver and lead used the same grade domains as they were found statistically and spatially correlated.

The purpose of building high grade and low grade domains was to control the internal dilution and limit the smearing of high grade areas into low grade areas and vice versa, during the grade estimation. Table 11-4 lists the zinc, copper, silver, and lead grade domains and Figure 11-7 illustrates a 3D view of the grade domains in the VCN3 mineralization domain.

For the remaining individual mineralization domains, grade domains were not built.

Table 11-4: Zn, Cu, Ag, and Pb Grade Domains

Nexa Resources S.A. – El Porvenir Mine

Individual Mineralization Domains  COD_OB  Domain by Element  Grade Domain  C_Estim  Domain Type  Mean Grade of Domain  Grade Envelope
Por9  450  Zn  1  4501  Low Grade  3.30%  Outside 2%Zn envelope
Por9  450  Zn  2  4502  High grade  6.20%  Inside 2% Zn envelope
v5ne1  1750  Zn  1  17502  Low Grade  3.40%  Outside 10% Zn envelope
v5ne1  1750  Zn  2  17501  High grade  8.10%  Inside 10% Zn envelope
v12i1  259  Ag  1  2592  Low Grade  22.2 g/t  Outside 60 g/t Ag envelope
v12i1  259  Ag  2  2591  High grade  71.5 g/t  Inside 60 g/t Ag envelope
v12i1  259  Pb  1  2592  Low Grade  0.10%  Outside 0.1% Pb envelope
v12i1  259  Pb  2  2591  High grade  0.60%  Inside 0.1% Pb envelope
vcn3  1151  Cu  1  11511  Low Grade  0.10%  Outside 0.1% Cu envelope
vcn3  1151  Cu  2  11512  High grade  0.30%  Inside 0.1% Cu envelope

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-14

 

Figure 11-7: Plan and Cross Section Copper Grade Domains for VCN3

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-15

 

11.5.2Estimation Domains

Based on observations of the drill core and underground mineralization exposures, discussions with the geologists on-site, a review of the data in 3D, and statistical analysis, the mineralization at Porvenir is considered to be lithologically and structurally controlled. The bulk of the mineralization is located in the Porvenir 9, Don Ernesto, Exito, Veta Carmen Norte 3, Veta Progreso, and Sara, with some mineralization in the Veta 5, Veta 1204, Veta 1204 Inferior, Veta 1204 Superior, Veta Carmen 1 and Don Lucho, and lesser mineralization in the Veta VR, and Integracion AT-EP domains.

Nexa created zinc, lead-silver, and copper estimation domains using a number of geological parameters, which include geological domains (lithological control and mineralization type), grade domains (high grade and low grade domains), and the anisotropy and orientation of the estimation domains. A total of 91 zinc, 69 lead-silver, and 70 copper estimation domains were defined. Table 11-5, Table 11-6, and Table 11-7 summarize the estimation domains and Figure 11-8, Figure 11-9, and Figure 11-10 show the estimation domains in plan view.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-16

 

Table 11-5: Zinc Estimation Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-17

 

Table 11-6: Lead-Silver Estimation Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-18

 

Table 11-7: Copper Estimation Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-19

 

Figure 11-8: Zinc Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-20

 

Figure 11-9: Lead-Silver Domains

  

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-21

 

Figure 11-10: Copper Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-22

 

With respect to the geological and domain modelling used to support the Mineral Resource estimate, SLR offers the following conclusions and recommendations:

·Overall, the mineralization wireframes are adequate for the style of mineralization.
·The wireframes and estimation domains are suitable to support Mineral Resource and Mineral Reserve estimation.
·There is an opportunity to increase the volume of the mineralization solids. SLR observed some areas where mineralization intervals with high grades were close but excluded from the domain solids.
·Update the lithological model (it has not been updated since 2018) and build a litho-structural model with the main lithologies and faults that are controlling the mineralization, with all the data available, to help define the geometry and boundaries of the mineralization. An updated lithological model would also be beneficial to evaluate and define density values by rock and by domain.
oSome interpreted sections, plan views, and underground mapping were used to build the mineralization solids, however, there is no new 3D lithological model.
oThree faults (F1_Exito, F2_Exito, and F1_VCN3) based on underground mapping were used in the model to define Exito and Carmen Norte 3 limits and movements. These faults were built projecting a unique dip, however, they should be interpreted in 3D to improve the understanding and controlling of the mineralization solids.
·Nexa incorporated grade domains for zinc, lead-silver, and copper for some individual mineralization domains. SLR recommends reviewing the inclusion of more grade domains considering spatial and statistical correlations, to prevent smearing of high grades into low grade areas and vice versa.
·Review inclusion of very low grade in the contacts of the modelled solid and exclude if they are not used to achieve minimum thickness.
·Divide mineralization domains where groups of wireframes have been merged to avoid sharing of samples.
·The interaction between Don Ernesto and Sara should be considered and possibly modelled as a continuous mineralization solid, especially if both mineralization structures (Don Ernesto lower levels and Sara) have the same host rock and mineralization features.
·Include a logging code for each mineralization domain, structure type, and emplacement type to correlate with modelled domains.
·Improve the survey accuracy of the mineralized mined-out stopes and development to guide the mineralization solid geometries and trends.
11.6Resource Assays

Nexa performed exploratory data analysis (EDA) for each estimation domain, including univariate statistics, histograms, cumulative probability plots; box plots to compare geology domain statistics, and contact plots to investigate grade profiles between estimation domains and determine the extent of sample sharing across the geology contacts within the mineralization domains. Hard boundaries were determined for each of the estimation variables (zinc, copper, lead, and silver). The majority of the zinc is contained in eight estimation domains: vcn3, por9, porv9a, vprg, exito, por9p, por9q, and porv9w.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-23
11.7Treatment of High Grade Assays
11.7.1Capping Levels

Where the assay distribution is skewed positively or approaches log-normal, erratic high grade values can have a disproportionate effect on the average grade of a deposit. One method of treating these outliers in order to reduce their influence on the average grade is to cut or cap them at a specific grade level.

Nexa evaluated the raw assay grades using log-probability plots and histograms to assess the influence of higher grades for each element within the mineralization domains. Figure 11-11 is an example of a log-probability plot for the OB 1300 (vcn3ei1) domain. The criteria, applied by Nexa, for restricting outliers was to identify a pronounced break in the probability curve that occurs above the 95th to 99th percentile. Nexa applied a second capping level for the third interpolation pass in channel composites to restrict the high grade influence.

Table 11-8 lists the capping levels for drill hole (“CAPD”) and channel (“CAPC”) raw assays determined for each mineralization domain, and the second capping levels applied to the channel samples used for the third interpolation pass (“CAPC3”). A summary of raw assays and capped raw assays statistics is provided in Table 11-9, Table 11-10, Table 11-11, and Table 11-12.

Figure 11-11: Zn Capping Analysis for 1300 (VCN3EI1) Domain

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-24

 

Table 11-8: Capping Levels by Mineralization Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-25

 


Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-26


Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-27

Table 11-9: Estimation Domain Capped and Raw Assay Statistics for Zinc (Zn %)

Nexa Resources S.A. – El Porvenir Mine

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.
1  1  3196  0.00  50.86  10.48  8.99  0.86  0.00  50.86  10.48  8.99  0.86
1  2  2009  0.00  40.84  3.54  6.60  1.86  0.00  39.00  3.54  6.59  1.86
21  1  179  0.02  36.55  4.80  6.93  1.44  0.02  20.00  4.47  5.85  1.31
21  2  799  0.00  49.05  4.61  7.02  1.52  0.00  40.00  4.58  6.86  1.50
100  1  469  0.00  54.63  4.00  6.78  1.69  0.00  39.50  3.97  6.57  1.66
100  2  2227  0.00  49.81  4.65  7.63  1.64  0.00  49.50  4.65  7.63  1.64
154  1  1139  0.00  37.33  6.06  7.54  1.25  0.00  31.00  6.04  7.48  1.24
154  2  1776  0.00  46.56  6.15  7.76  1.26  0.00  38.00  6.13  7.70  1.26
157  1  77  0.04  31.30  10.78  8.06  0.75  0.04  23.00  10.60  7.72  0.73
201  2  24  0.00  14.98  2.00  3.77  1.89  0.00  14.98  2.00  3.77  1.89
250  1  205  0.06  42.96  8.12  8.02  0.99  0.06  32.00  8.01  7.62  0.95
250  2  39  0.00  30.65  8.70  7.59  0.87  0.00  21.00  8.35  6.76  0.81
256  1  9  0.11  13.91  7.28  4.94  0.68  0.11  13.91  7.28  4.94  0.68
256  2  273  0.00  25.64  2.51  4.17  1.66  0.00  21.00  2.48  4.03  1.63
259  1  2236  0.00  50.00  8.07  6.86  0.85  0.00  50.00  8.07  6.86  0.85
259  2  673  0.00  40.06  4.26  6.55  1.54  0.00  30.00  4.22  6.33  1.50
264  2  184  0.00  37.83  5.67  6.19  1.09  0.00  33.00  5.66  6.16  1.09
270  1  26  0.07  23.20  4.39  5.50  1.25  0.07  23.20  4.39  5.50  1.25
270  2  168  0.00  31.92  5.19  6.82  1.31  0.00  31.00  5.19  6.80  1.31
302  1  23  0.02  7.71  0.56  1.63  2.90  0.02  7.71  0.56  1.63  2.90
302  2  170  0.00  10.41  0.53  1.19  2.24  0.00  1.50  0.38  0.51  1.35
306  1  65  0.12  20.86  2.07  3.08  1.49  0.12  15.00  2.02  2.79  1.38
306  2  509  0.00  28.06  2.02  4.14  2.04  0.00  24.00  2.02  4.09  2.03
307  1  5574  0.00  53.65  6.95  6.79  0.98  0.00  37.00  6.95  6.77  0.97
307  2  4169  0.00  40.46  2.20  4.09  1.86  0.00  27.00  2.19  4.03  1.84
350  1  69  0.00  20.60  6.30  5.55  0.88  0.00  20.60  6.30  5.55  0.88
350  2  346  0.00  32.86  4.47  5.64  1.26  0.00  30.00  4.46  5.61  1.26
453  1  31  0.02  24.87  5.44  6.43  1.18  0.02  24.87  5.44  6.43  1.18
453  2  161  0.00  43.79  3.33  7.30  2.19  0.00  41.00  3.31  7.22  2.18
458  1  91  0.01  10.76  2.50  2.72  1.09  0.01  9.50  2.49  2.70  1.09
458  2  415  0.00  27.40  3.47  3.57  1.03  0.00  24.00  3.47  3.55  1.02
466  1  1086  0.00  38.18  4.77  6.10  1.28  0.00  36.00  4.77  6.09  1.28
466  2  2615  0.00  42.38  4.23  6.28  1.49  0.00  37.00  4.23  6.27  1.48
550  1  1  14.73  14.73  14.73  -  -  14.73  14.73  14.73  -  -
550  2  1063  0.00  41.45  3.05  5.98  1.96  0.00  37.00  3.05  5.94  1.95
600  1  2274  0.00  35.28  1.94  2.79  1.44  0.00  24.00  1.94  2.73  1.41
600  2  1859  0.00  45.40  2.45  4.40  1.80  0.00  34.00  2.44  4.33  1.77
652  1  9  0.02  0.93  0.43  0.30  0.69  0.02  0.93  0.43  0.30  0.69
652  2  494  0.00  14.77  0.27  0.70  2.64  0.00  2.00  0.23  0.43  1.89

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-28

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.
671  1  19  0.04  5.02  1.25  1.39  1.12  0.04  5.02  1.25  1.39  1.12
671  2  378  0.00  14.44  0.66  1.30  1.97  0.00  13.00  0.66  1.26  1.93
674  1  10  0.02  3.45  0.51  1.07  2.12  0.02  3.45  0.51  1.07  2.12
674  2  182  0.00  7.88  0.59  1.20  2.02  0.00  7.80  0.59  1.19  2.01
677  2  354  0.00  6.39  0.45  0.76  1.67  0.00  5.00  0.45  0.74  1.65
700  1  272  0.04  43.07  6.77  10.46  1.55  0.04  42.50  6.76  10.45  1.54
700  2  241  0.00  45.78  3.53  6.24  1.77  0.00  31.00  3.44  5.73  1.67
701  1  590  0.00  44.23  4.07  5.96  1.46  0.00  39.00  4.06  5.91  1.45
701  2  828  0.00  35.00  2.08  4.00  1.92  0.00  29.00  2.07  3.93  1.89
750  1  11  0.04  3.69  0.57  1.24  2.17  0.04  3.69  0.57  1.24  2.17
750  2  1266  0.00  24.10  1.57  2.47  1.57  0.00  21.00  1.57  2.42  1.55
751  1  8  0.01  1.33  0.50  0.39  0.77  0.01  1.33  0.50  0.39  0.77
751  2  135  0.00  7.26  1.40  1.34  0.96  0.00  7.00  1.39  1.33  0.95
756  2  225  0.00  20.02  1.15  2.03  1.76  0.00  15.50  1.14  1.97  1.72
800  1  46  0.02  3.88  0.50  0.76  1.51  0.02  3.88  0.50  0.76  1.51
800  2  60  0.00  18.37  1.62  3.44  2.12  0.00  8.00  1.34  2.29  1.71
850  2  97  0.00  32.36  4.98  7.09  1.42  0.00  30.00  4.96  6.98  1.41
860  1  12  0.26  13.83  3.15  3.82  1.21  0.26  13.83  3.15  3.82  1.21
860  2  146  0.00  32.73  2.25  3.60  1.60  0.00  18.00  2.20  3.28  1.49
865  2  103  0.00  33.02  5.55  6.90  1.24  0.00  27.00  5.51  6.77  1.23
872  2  111  0.00  16.54  2.03  3.01  1.49  0.00  14.50  2.02  2.98  1.48
883  1  11  1.92  21.91  5.53  3.55  0.64  1.92  21.91  5.53  3.55  0.64
883  2  38  0.12  19.97  5.70  5.23  0.92  0.12  18.50  5.68  5.18  0.91
901  1  134  0.01  13.66  2.51  2.63  1.05  0.01  12.50  2.50  2.59  1.04
901  2  550  0.00  34.36  3.78  4.75  1.26  0.00  26.50  3.77  4.70  1.25
908  2  245  0.00  30.81  2.31  3.69  1.60  0.00  21.00  2.28  3.47  1.52
950  1  22  0.30  17.70  5.86  5.33  0.91  0.30  17.00  5.81  5.24  0.90
950  2  283  0.00  34.92  3.88  6.28  1.62  0.00  33.00  3.87  6.23  1.61
1008  1  9  0.04  26.07  4.36  8.66  1.99  0.04  26.07  4.36  8.66  1.99
1008  2  237  0.00  23.92  1.55  3.55  2.29  0.00  23.00  1.54  3.51  2.28
1016  1  72  0.08  14.20  1.10  1.72  1.57  0.08  5.00  1.00  1.15  1.15
1016  2  199  0.00  29.96  3.55  5.61  1.58  0.00  25.00  3.50  5.41  1.55
1019  2  182  0.00  27.07  2.38  3.78  1.59  0.00  24.00  2.37  3.72  1.57
1026  1  195  0.03  12.24  1.32  1.73  1.31  0.03  10.00  1.31  1.66  1.27
1026  2  634  0.00  22.94  1.62  2.79  1.72  0.00  19.00  1.61  2.74  1.70
1028  1  188  0.02  19.46  2.24  2.89  1.29  0.02  15.50  2.23  2.84  1.27
1028  2  1876  0.00  25.51  2.04  2.60  1.27  0.00  23.50  2.04  2.60  1.27
1029  1  25  0.51  44.59  3.12  5.44  1.74  0.51  10.80  2.64  2.41  0.91
1029  2  300  0.00  33.23  2.96  3.86  1.31  0.00  25.00  2.93  3.66  1.25
1034  1  15  0.03  1.61  0.42  0.51  1.23  0.03  1.61  0.42  0.51  1.23
1034  2  302  0.00  34.83  1.83  3.72  2.03  0.00  25.50  1.82  3.65  2.00
1054  1  1  4.12  4.12  4.12  -  -  4.12  4.12  4.12  -  -

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-29

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.
1054  2  16  0.05  27.87  13.78  11.09  0.80  0.05  27.87  13.78  11.09  0.80
1151  1  1042  0.01  40.07  5.30  5.65  1.06  0.01  22.00  5.20  5.25  1.01
1151  2  3355  0.00  47.10  5.04  6.06  1.20  0.00  35.00  5.03  6.00  1.19
1208  2  118  0.00  47.80  6.63  9.09  1.37  0.00  41.50  6.56  8.78  1.34
1300  1  1333  0.00  41.28  7.79  6.84  0.88  0.00  36.50  7.78  6.81  0.88
1300  2  984  0.00  47.61  3.98  6.57  1.65  0.00  38.60  3.97  6.53  1.64
1350  1  49  1.55  30.30  13.34  6.01  0.45  1.55  24.50  13.22  5.71  0.43
1350  2  1508  0.00  28.24  4.82  4.79  0.99  0.00  27.50  4.82  4.79  0.99
1402  1  89  0.21  15.45  4.55  2.71  0.60  0.21  13.00  4.54  2.67  0.59
1402  2  2471  0.00  38.40  3.57  3.94  1.10  0.00  31.00  3.57  3.93  1.10
1408  2  460  0.00  22.55  3.32  3.69  1.11  0.00  19.00  3.31  3.61  1.09
1410  2  427  0.00  19.02  2.08  2.91  1.40  0.00  17.00  2.08  2.88  1.38
1450  1  129  0.02  11.72  1.57  2.28  1.45  0.02  8.00  1.50  2.01  1.34
1450  2  214  0.00  23.38  2.35  3.34  1.42  0.00  21.00  2.33  3.26  1.40
1452  1  81  0.00  20.72  1.94  4.07  2.10  0.00  13.00  1.73  3.27  1.89
1452  2  193  0.00  32.56  3.74  5.38  1.44  0.00  26.00  3.71  5.22  1.41
1458  1  334  0.00  34.48  3.98  6.20  1.56  0.00  30.00  3.95  6.08  1.54
1458  2  291  0.00  32.95  2.70  4.51  1.67  0.00  26.50  2.67  4.34  1.63
1504  1  113  0.01  21.48  1.71  3.14  1.84  0.01  15.50  1.65  2.83  1.71
1504  2  400  0.01  38.64  2.72  5.74  2.11  0.01  23.00  2.63  5.36  2.03
1555  1  907  0.01  38.44  2.94  4.84  1.64  0.01  37.00  2.94  4.83  1.64
1555  2  2121  0.00  55.23  3.12  5.26  1.69  0.00  38.50  3.11  5.21  1.67
1558  1  158  0.01  30.50  1.54  3.37  2.19  0.01  16.50  1.46  2.77  1.90
1558  2  905  0.00  37.41  1.71  3.81  2.23  0.00  34.50  1.71  3.79  2.22
1607  1  280  0.00  14.64  0.85  1.78  2.09  0.00  10.80  0.85  1.75  2.06
1607  2  785  0.00  34.25  1.56  3.46  2.21  0.00  32.00  1.56  3.43  2.20
1609  1  27  0.03  2.47  0.60  0.69  1.16  0.03  2.00  0.58  0.65  1.12
1609  2  306  0.00  21.61  0.94  2.27  2.41  0.00  17.00  0.93  2.17  2.33
1614  1  13  0.04  9.67  1.90  1.90  1.00  0.04  9.67  1.90  1.90  1.00
1614  2  118  0.00  34.11  3.31  5.80  1.75  0.00  23.00  3.18  5.22  1.64
1650  1  2089  0.00  41.38  7.36  6.45  0.88  0.00  36.00  7.35  6.43  0.87
1650  2  1281  0.00  37.30  3.28  5.15  1.57  0.00  29.00  3.27  5.07  1.55
1702  1  169  0.03  23.81  2.86  3.93  1.38  0.03  17.00  2.82  3.76  1.33
1702  2  264  0.00  48.23  3.14  5.23  1.67  0.00  36.00  3.12  5.11  1.64
1712  1  37  0.02  23.80  2.75  5.16  1.87  0.02  15.50  2.48  4.14  1.67
1712  2  186  0.00  26.97  2.53  4.90  1.94  0.00  23.50  2.52  4.83  1.92
1714  1  44  0.20  16.71  3.46  3.45  1.00  0.20  13.50  3.39  3.21  0.95
1714  2  222  0.00  35.84  5.49  7.40  1.35  0.00  33.00  5.49  7.37  1.34
1718  1  85  0.02  18.49  3.40  3.93  1.16  0.02  14.50  3.32  3.68  1.11
1718  2  73  0.00  18.25  1.46  3.38  2.32  0.00  13.00  1.41  3.18  2.26
1754  1  41  0.29  15.10  3.27  3.37  1.03  0.29  10.40  3.20  3.17  0.99
1754  2  860  0.00  43.26  2.57  3.90  1.52  0.00  29.00  2.56  3.85  1.50

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-30

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.  Min.(%)  Max.(%)  Mean(%)  Std. Dv  C.V.
1755  2  5  0.44  15.79  5.92  6.47  1.09  0.44  15.79  5.92  6.47  1.09
1850  1  312  0.01  22.49  2.29  3.80  1.66  0.01  17.00  2.27  3.70  1.63
1850  2  800  0.00  44.47  1.22  2.96  2.42  0.00  17.50  1.18  2.63  2.22
1855  1  329  0.00  31.40  10.32  7.77  0.75  0.00  30.00  10.31  7.75  0.75
1855  2  141  0.00  22.20  4.26  7.01  1.65  0.00  22.20  4.26  7.01  1.65
1900  1  1225  0.00  24.87  4.49  4.87  1.09  0.00  24.87  4.49  4.87  1.09
1900  2  705  0.00  19.67  2.49  3.14  1.26  0.00  17.50  2.48  3.12  1.26
1950  1  220  0.01  18.68  2.02  2.59  1.29  0.01  12.00  1.97  2.34  1.19
1950  2  227  0.00  13.97  1.35  2.11  1.56  0.00  10.50  1.34  2.01  1.51
1959  1  512  0.00  13.77  1.61  1.81  1.12  0.00  9.50  1.60  1.73  1.09
1959  2  317  0.00  24.28  1.49  2.47  1.65  0.00  20.00  1.48  2.38  1.61
1965  1  216  0.02  14.12  1.81  2.34  1.29  0.02  12.00  1.80  2.28  1.27
1965  2  288  0.00  23.85  1.06  2.21  2.09  0.00  12.50  1.02  1.91  1.87
2000  1  17  0.09  5.78  1.76  1.77  1.00  0.09  5.78  1.76  1.77  1.00
2000  2  290  0.00  14.74  1.42  1.64  1.15  0.00  11.00  1.41  1.53  1.08
2051  2  388  0.00  19.93  1.52  2.23  1.46  0.00  16.50  1.52  2.20  1.45
2060  2  488  0.00  31.67  1.84  3.38  1.83  0.00  28.00  1.84  3.31  1.80
2065  2  71  0.00  34.19  4.40  5.04  1.14  0.00  20.00  4.32  4.69  1.08
2067  2  22  0.01  25.31  2.98  5.53  1.85  0.01  14.00  2.44  3.50  1.43
2072  2  22  0.00  14.12  1.82  3.14  1.72  0.00  9.00  1.66  2.57  1.55
2073  2  12  0.16  4.59  2.06  1.42  0.69  0.16  4.50  2.06  1.42  0.69
2079  2  19  0.01  11.15  3.98  2.50  0.63  0.01  7.50  3.89  2.30  0.59
2100  1  75  0.04  21.24  2.04  3.45  1.69  0.04  16.50  2.00  3.25  1.63
2100  2  281  0.00  32.32  2.08  2.81  1.35  0.00  30.00  2.07  2.77  1.34
2104  2  226  0.02  28.60  2.60  4.13  1.59  0.02  26.00  2.60  4.10  1.58
2150  2  829  0.00  15.05  0.82  1.53  1.86  0.00  12.00  0.82  1.51  1.84
2156  1  1  0.72  0.72  0.72  -  -  0.72  0.72  0.72  -  -
2156  2  103  0.01  5.23  0.78  0.97  1.25  0.01  4.50  0.77  0.95  1.23
4501  1  180  0.01  21.75  2.92  3.72  1.27  0.01  9.00  2.62  2.79  1.06
4501  2  325  0.00  24.42  3.65  3.99  1.09  0.00  17.00  3.62  3.84  1.06
4502  1  693  0.01  52.17  6.49  6.15  0.95  0.01  27.00  6.38  5.62  0.88
4502  2  540  0.00  30.13  5.81  5.26  0.91  0.00  22.00  5.76  5.11  0.89
17501  1  191  0.01  30.30  8.51  7.87  0.93  0.01  20.00  8.18  7.25  0.89
17501  2  71  0.00  25.61  6.62  6.96  1.05  0.00  15.00  5.93  5.64  0.95
17502  1  288  0.02  23.75  3.08  4.45  1.45  0.02  15.00  2.97  4.05  1.36
17502  2  336  0.00  27.16  3.77  5.46  1.45  0.00  19.00  3.71  5.25  1.41

Note:

C_Hole: 1: Channels, 2: Drill holes

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-31

Table 11-10: Estimation Domain Capped and Raw Assay Statistics for Lead (Pb %)

Nexa Resources S.A. – El Porvenir Mine

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1  1  2363  0.00  39.80  6.57  7.12  1.08  0.00  30.00  6.54  7.01  1.07
1  2  2312  0.00  36.65  2.60  5.29  2.04  0.00  30.00  2.59  5.25  2.03
21  1  179  0.01  6.29  0.09  0.56  6.11  0.01  0.20  0.04  0.04  1.17
21  2  799  0.00  26.48  0.14  1.08  7.95  0.00  5.00  0.10  0.41  4.20
100  1  486  0.00  34.43  2.05  4.30  2.10  0.00  20.00  1.97  3.84  1.95
100  2  2181  0.00  39.31  2.71  5.04  1.86  0.00  30.00  2.70  5.00  1.85
154  1  1449  0.00  45.78  1.61  3.99  2.47  0.00  45.78  1.61  3.99  2.47
154  2  2547  0.00  25.93  0.45  2.03  4.50  0.00  6.50  0.33  1.12  3.42
157  1  77  0.01  23.26  1.91  3.82  1.99  0.01  15.50  1.78  3.14  1.76
185  1  34  0.04  37.26  2.74  7.21  2.63  0.04  15.80  1.89  3.28  1.73
185  2  537  0.00  36.24  2.02  3.26  1.62  0.00  18.00  1.98  3.03  1.53
201  2  24  0.00  34.99  4.09  8.26  2.02  0.00  30.00  3.99  7.90  1.98
256  1  9  0.01  1.02  0.20  0.27  1.34  0.01  1.02  0.20  0.27  1.34
256  2  273  0.00  22.71  0.90  2.44  2.72  0.00  13.50  0.86  2.17  2.54
264  2  184  0.00  0.10  0.01  0.01  0.82  0.00  0.10  0.01  0.01  0.82
307  1  5597  0.00  37.60  0.91  2.84  3.11  0.00  9.00  0.75  1.89  2.50
307  2  4339  0.00  20.31  0.17  1.02  6.12  0.00  2.00  0.09  0.31  3.41
308  1  71  0.02  18.16  0.43  1.42  3.32  0.02  10.00  0.41  1.23  3.03
308  2  177  0.00  18.10  0.30  1.54  5.04  0.00  0.90  0.09  0.21  2.33
309  1  57  0.07  19.68  1.51  3.18  2.10  0.07  13.00  1.39  2.56  1.84
309  2  155  0.00  33.77  2.54  4.82  1.90  0.00  20.00  2.44  4.34  1.78
310  1  118  0.00  32.60  5.94  7.80  1.31  0.00  22.00  5.74  7.30  1.27
310  2  105  0.00  32.52  3.07  5.88  1.92  0.00  27.50  3.04  5.74  1.89
350  1  59  0.00  25.50  2.13  4.44  2.09  0.00  10.00  1.76  2.81  1.60
350  2  197  0.00  7.80  0.36  1.15  3.24  0.00  2.00  0.21  0.51  2.47
450  1  873  0.01  17.17  0.15  0.99  6.46  0.01  1.50  0.07  0.25  3.36
450  2  865  0.00  17.91  0.15  1.07  6.98  0.00  2.50  0.08  0.33  4.04
451  1  10  0.01  0.17  0.03  0.05  1.51  0.01  0.17  0.03  0.05  1.51
451  2  149  0.00  2.36  0.06  0.22  3.82  0.00  0.25  0.03  0.06  1.91
456  1  45  0.00  1.30  0.11  0.26  2.32  0.00  1.30  0.11  0.26  2.32
456  2  195  0.00  27.65  1.11  3.83  3.44  0.00  5.50  0.60  1.47  2.46
458  1  77  0.01  1.07  0.03  0.12  3.89  0.01  0.10  0.02  0.02  1.06
458  2  381  0.00  12.46  0.05  0.43  9.36  0.00  0.30  0.02  0.04  1.63
466  1  1220  0.00  22.59  0.20  1.07  5.33  0.00  2.00  0.12  0.35  2.85
466  2  2793  0.00  32.33  0.17  1.14  6.84  0.00  1.30  0.08  0.22  2.84
600  1  2141  0.00  22.41  1.30  1.96  1.51  0.00  12.00  1.27  1.76  1.38
600  2  2744  0.00  29.00  0.65  2.30  3.51  0.00  6.00  0.48  1.18  2.45
671  1  30  0.02  8.56  1.37  1.96  1.43  0.02  8.56  1.37  1.96  1.43

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-32

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
671  2  767  0.00  30.33  1.17  2.08  1.78  0.00  9.50  1.12  1.71  1.53
700  1  272  0.02  38.66  3.53  5.68  1.61  0.02  20.00  3.47  5.48  1.58
700  2  241  0.00  25.91  2.75  5.22  1.90  0.00  25.91  2.75  5.22  1.90
701  1  590  0.02  35.88  5.15  5.72  1.11  0.02  28.00  5.11  5.54  1.08
701  2  1657  0.00  58.28  2.15  4.36  2.03  0.00  22.00  2.05  3.70  1.81
750  1  11  0.02  7.92  1.12  2.71  2.42  0.02  0.08  0.05  0.02  0.50
750  2  1266  0.00  29.59  0.92  1.90  2.07  0.00  9.00  0.87  1.53  1.76
751  1  54  0.01  43.41  3.64  8.00  2.20  0.01  37.00  3.51  7.38  2.10
751  2  195  0.00  31.43  1.31  1.92  1.47  0.00  20.00  1.29  1.77  1.37
756  2  225  0.00  17.76  0.90  1.72  1.90  0.00  15.50  0.90  1.68  1.86
850  1  12  0.14  5.12  1.57  1.27  0.81  0.14  5.12  1.57  1.27  0.81
850  2  243  0.00  23.32  1.82  3.65  2.01  0.00  19.00  1.79  3.50  1.96
865  2  141  0.00  16.03  1.14  2.53  2.23  0.00  9.00  1.04  2.10  2.02
878  2  73  0.00  5.37  0.38  0.87  2.32  0.00  3.50  0.35  0.74  2.11
883  1  11  1.77  17.22  4.20  2.86  0.68  1.77  17.22  4.20  2.86  0.68
883  2  38  0.00  19.58  3.42  4.66  1.36  0.00  19.58  3.42  4.66  1.36
901  1  134  0.08  16.73  1.66  2.33  1.40  0.08  8.00  1.55  1.80  1.16
901  2  550  0.00  29.01  2.34  3.47  1.48  0.00  16.00  2.27  3.12  1.37
908  2  245  0.00  25.28  2.19  3.31  1.51  0.00  20.00  2.17  3.14  1.45
1028  1  455  0.04  31.87  1.86  3.02  1.63  0.04  11.50  1.73  2.26  1.30
1028  2  2709  0.00  38.29  1.92  2.86  1.49  0.00  25.00  1.91  2.76  1.45
1034  1  30  0.05  20.00  1.47  2.81  1.91  0.05  10.00  1.37  2.25  1.64
1034  2  559  0.00  29.72  1.81  2.89  1.60  0.00  14.00  1.76  2.62  1.49
1151  1  1042  0.00  36.20  0.87  2.67  3.07  0.00  11.00  0.77  1.99  2.58
1151  2  3355  0.00  40.00  0.78  2.99  3.85  0.00  19.00  0.75  2.74  3.68
1300  1  1333  0.00  34.30  1.31  3.46  2.64  0.00  10.00  1.10  2.43  2.21
1300  2  984  0.00  22.54  0.51  1.99  3.87  0.00  7.00  0.41  1.29  3.15
1351  2  555  0.00  26.20  0.45  1.50  3.35  0.00  2.00  0.29  0.54  1.86
1402  1  138  0.03  12.80  1.76  2.19  1.24  0.03  8.00  1.71  1.98  1.16
1402  2  3483  0.00  31.16  0.91  2.08  2.30  0.00  12.00  0.88  1.87  2.13
1404  2  368  0.00  27.48  3.00  3.32  1.11  0.00  12.00  2.94  3.09  1.05
1408  1  4  0.06  15.40  5.19  6.22  1.20  0.06  15.40  5.19  6.22  1.20
1408  2  564  0.00  19.10  1.48  2.35  1.58  0.00  15.00  1.47  2.29  1.55
1450  1  153  0.00  24.97  1.98  2.65  1.34  0.00  9.50  1.91  2.34  1.23
1450  2  252  0.00  16.40  2.21  2.95  1.33  0.00  12.00  2.17  2.80  1.29
1458  1  281  0.00  23.37  1.75  2.80  1.60  0.00  12.00  1.69  2.43  1.44
1458  2  695  0.00  29.55  1.22  2.73  2.24  0.00  14.40  1.20  2.62  2.19
1504  1  139  0.00  8.60  0.15  0.87  5.96  0.00  0.20  0.03  0.04  1.49
1504  2  568  0.00  11.15  0.02  0.24  9.84  0.00  0.10  0.02  0.01  0.88
1555  1  1572  0.00  33.64  1.83  3.98  2.18  0.00  15.00  1.69  3.33  1.97
1555  2  2014  0.00  38.56  1.25  3.50  2.80  0.00  15.00  1.14  2.84  2.50

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-33

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1607  1  306  0.00  22.89  0.96  1.83  1.91  0.00  15.00  0.95  1.74  1.83
1607  2  1002  0.00  31.86  1.57  3.16  2.01  0.00  15.00  1.50  2.73  1.83
1611  1  1  0.61  0.61  0.61  -  -  0.61  0.61  0.61  -  -
1611  2  89  0.00  20.44  1.06  2.17  2.06  0.00  11.50  1.03  1.99  1.93
1614  1  13  0.03  9.28  1.66  2.55  1.54  0.03  9.28  1.66  2.55  1.54
1614  2  118  0.00  29.73  2.56  4.38  1.71  0.00  20.00  2.50  4.07  1.63
1650  1  2089  0.00  62.83  0.47  2.20  4.68  0.00  4.00  0.32  0.83  2.61
1650  2  1281  0.00  15.99  0.05  0.37  6.74  0.00  0.30  0.03  0.05  1.90
1712  1  81  0.02  8.67  0.68  1.31  1.93  0.02  8.67  0.68  1.31  1.93
1712  2  408  0.00  35.34  2.59  5.24  2.02  0.00  24.00  2.49  4.71  1.89
1716  1  374  0.01  29.12  1.95  3.90  2.00  0.01  18.00  1.89  3.56  1.89
1716  2  485  0.00  27.31  1.74  3.49  2.01  0.00  25.00  1.74  3.47  2.00
1718  1  85  0.02  7.27  1.40  1.98  1.42  0.02  7.27  1.40  1.98  1.42
1718  2  73  0.00  16.77  0.79  2.22  2.81  0.00  3.00  0.47  0.75  1.61
1750  1  479  0.00  22.91  1.84  2.92  1.59  0.00  12.00  1.78  2.66  1.49
1750  2  407  0.00  40.61  2.46  4.51  1.83  0.00  15.00  2.32  3.87  1.66
1850  1  312  0.01  27.23  1.76  3.32  1.89  0.01  10.00  1.58  2.51  1.59
1850  2  800  0.00  31.49  1.06  2.93  2.77  0.00  8.00  0.84  1.61  1.92
1855  1  377  0.00  45.00  3.91  6.37  1.63  0.00  22.00  3.78  5.92  1.57
1855  2  1032  0.00  30.47  2.46  4.02  1.64  0.00  22.00  2.43  3.88  1.60
1900  1  1437  0.00  21.76  1.87  2.41  1.29  0.00  14.00  1.86  2.33  1.26
1900  2  886  0.00  16.09  1.35  2.43  1.81  0.00  12.00  1.33  2.33  1.76
1960  1  520  0.00  17.52  0.62  1.26  2.03  0.00  5.30  0.58  0.92  1.59
1960  2  363  0.00  7.27  0.51  0.79  1.57  0.00  4.00  0.50  0.74  1.50
1965  1  216  0.01  12.81  1.62  2.10  1.29  0.01  7.00  1.56  1.85  1.19
1965  2  288  0.00  25.36  0.78  1.79  2.29  0.00  5.00  0.67  1.13  1.67
2000  1  25  0.01  1.56  0.42  0.37  0.90  0.01  1.56  0.42  0.37  0.90
2000  2  931  0.00  33.52  0.62  1.56  2.51  0.00  4.50  0.53  0.83  1.56
2051  2  388  0.00  16.27  0.90  1.70  1.89  0.00  8.40  0.86  1.43  1.66
2060  2  606  0.00  15.94  0.24  0.85  3.48  0.00  1.50  0.18  0.35  1.98
2067  2  22  0.00  0.15  0.02  0.04  1.66  0.00  0.15  0.02  0.04  1.66
2073  2  12  0.01  0.16  0.03  0.03  1.26  0.01  0.16  0.03  0.03  1.26
2079  2  19  0.00  0.78  0.14  0.20  1.43  0.00  0.78  0.14  0.20  1.43
2080  2  22  0.00  2.60  0.28  0.56  2.00  0.00  2.60  0.28  0.56  2.00
2083  2  71  0.00  0.41  0.01  0.04  3.02  0.00  0.05  0.01  0.01  1.17
2104  2  226  0.00  24.20  1.10  2.94  2.67  0.00  3.50  0.66  0.94  1.43
2156  1  1  0.48  0.48  0.48  -  -  0.48  0.48  0.48  -  -
2156  2  103  0.01  5.31  0.95  1.01  1.07  0.01  3.80  0.92  0.93  1.01
2591  1  1134  0.00  36.40  0.62  1.93  3.13  0.00  8.00  0.55  1.24  2.26
2591  2  43  0.00  2.35  0.12  0.38  3.14  0.00  2.00  0.11  0.34  3.00
2592  1  1102  0.00  10.80  0.16  0.81  5.14  0.00  2.8  0.11  0.38  3.40

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-34

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
2592  2  630  0.00  4.92  0.04  0.22  5.21  0.00  0.5  0.03  0.06  1.85

Note:

C_Hole: 1: Channels, 2: Drill holes

Table 11-11: Estimation Domain Capped and Raw Assay Statistics for Silver (Ag g/t)

Nexa Resources S.A. – El Porvenir Mine

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
1  1  2363  0.00  1427.65  232.24  237.63  1.02  0.00  1000.00  230.22  229.67  1.00
1  2  2312  0.00  3864.61  152.62  301.30  1.97  0.00  2000.00  150.91  287.90  1.91
21  1  179  2.02  232.34  13.22  24.97  1.89  2.02  60.00  11.17  13.08  1.17
21  2  799  0.00  1009.93  19.80  53.12  2.68  0.00  300.00  18.40  35.35  1.92
100  1  486  0.00  1467.77  128.77  225.57  1.75  0.00  1200.00  127.59  219.41  1.72
100  2  2181  0.00  9873.80  167.16  449.62  2.69  0.00  2000.00  153.97  242.53  1.58
154  1  1449  0.00  1445.07  73.87  119.45  1.62  0.00  490.00  70.64  100.59  1.42
154  2  2547  0.00  1287.99  36.48  89.38  2.45  0.00  420.00  33.70  68.46  2.03
157  1  77  1.24  377.91  98.93  73.16  0.74  1.24  220.00  94.90  61.70  0.65
185  1  34  2.02  880.85  105.99  179.96  1.70  2.02  250.00  75.82  66.56  0.88
185  2  537  0.00  2506.50  113.78  199.09  1.75  0.00  1000.00  108.14  153.43  1.42
201  2  24  0.00  2117.84  214.82  458.18  2.13  0.00  1600.00  205.02  421.44  2.06
256  1  9  5.29  208.08  78.89  76.75  0.97  5.29  208.08  78.89  76.75  0.97
256  2  273  0.00  775.10  55.56  99.34  1.79  0.00  500.00  53.23  84.66  1.59
264  2  184  0.00  143.39  18.38  15.87  0.86  0.00  60.00  17.61  11.45  0.65
307  1  5597  0.00  2901.95  58.28  97.66  1.68  0.00  1200.00  57.88  89.03  1.54
307  2  4339  0.00  926.88  19.36  37.22  1.92  0.00  400.00  19.20  34.69  1.81
308  1  71  2.02  479.93  40.52  65.14  1.61  2.02  179.00  36.46  43.32  1.19
308  2  177  1.40  805.00  30.41  72.62  2.39  1.40  435.00  28.93  59.50  2.06
309  1  57  2.02  692.36  62.07  107.90  1.74  2.02  400.00  58.74  91.65  1.56
309  2  155  0.00  1256.89  146.68  229.63  1.57  0.00  800.00  141.30  209.76  1.48
310  1  118  0.00  1679.59  291.47  399.35  1.37  0.00  1679.59  291.47  399.35  1.37
310  2  105  0.00  1819.86  159.61  275.33  1.72  0.00  1070.00  155.17  254.45  1.64
350  1  59  0.00  360.80  95.64  100.77  1.05  0.00  300.00  94.39  97.86  1.04
350  2  197  0.00  200.00  29.28  41.11  1.40  0.00  120.00  26.71  32.63  1.22
450  1  873  1.24  362.36  14.94  33.58  2.25  1.24  88.00  12.60  17.65  1.40
450  2  865  0.00  658.46  15.51  42.93  2.77  0.00  140.00  13.11  21.48  1.64
451  1  10  2.02  65.32  12.72  17.92  1.41  2.02  65.32  12.72  17.92  1.41
451  2  149  0.00  135.92  8.95  12.97  1.45  0.00  135.92  8.95  12.97  1.45
456  1  45  2.02  52.88  9.15  11.23  1.23  2.02  47.40  9.08  10.96  1.21
456  2  195  0.00  1182.24  55.69  143.69  2.58  0.00  450.00  47.84  100.42  2.10
458  1  77  2.02  142.76  7.78  18.60  2.39  2.02  61.50  6.68  11.76  1.76

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-35

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
458  2  381  0.00  530.31  7.32  18.97  2.59  0.00  57.00  6.78  8.51  1.25
466  1  1220  0.00  855.03  21.07  44.04  2.09  0.00  160.00  19.00  27.35  1.44
466  2  2793  0.00  1035.75  19.92  40.41  2.03  0.00  580.00  19.83  38.81  1.96
600  1  2141  0.00  1801.51  77.78  119.84  1.54  0.00  1100.00  77.26  114.32  1.48
600  2  2744  0.00  3278.62  48.99  116.26  2.37  0.00  900.00  47.87  100.53  2.10
671  1  30  4.04  534.98  84.69  118.63  1.40  4.04  534.98  84.69  118.63  1.40
671  2  767  0.00  9117.05  75.14  207.70  2.76  0.00  1300.00  71.45  126.80  1.77
700  1  272  2.02  2229.19  108.40  213.60  1.97  2.02  1200.00  105.17  190.78  1.81
700  2  241  0.00  4321.30  138.10  329.57  2.39  0.00  1790.00  129.47  249.74  1.93
701  1  590  0.93  3801.78  333.27  470.02  1.41  0.93  3000.00  331.54  458.86  1.38
701  2  1657  0.00  6760.00  153.15  307.22  2.01  0.00  2000.00  149.70  265.54  1.77
750  1  11  31.41  265.93  110.78  86.24  0.78  31.41  265.93  110.78  86.24  0.78
750  2  1266  0.00  1153.15  55.18  85.24  1.54  0.00  825.00  54.78  80.93  1.48
751  1  54  4.04  2071.18  192.89  395.80  2.05  4.04  1922.00  189.91  381.99  2.01
751  2  195  0.00  931.86  63.07  68.10  1.08  0.00  420.00  62.55  63.26  1.01
756  2  225  0.00  1630.76  92.76  125.16  1.35  0.00  400.00  87.85  90.52  1.03
850  1  12  6.53  186.00  62.59  45.76  0.73  6.53  186.00  62.59  45.76  0.73
850  2  243  0.00  1792.49  124.18  211.75  1.71  0.00  1400.00  123.84  209.39  1.69
865  2  141  0.00  1035.71  113.78  126.95  1.12  0.00  581.00  112.48  120.13  1.07
878  2  73  0.00  388.08  37.60  45.21  1.20  0.00  170.00  35.75  35.13  0.98
883  1  11  46.66  738.09  158.63  130.99  0.83  46.66  738.09  158.63  130.99  0.83
883  2  38  4.48  2002.75  167.37  272.51  1.63  4.48  700.00  148.27  171.18  1.15
901  1  134  2.02  584.12  90.95  81.17  0.89  2.02  250.00  86.78  64.74  0.75
901  2  550  0.00  1418.63  126.21  142.67  1.13  0.00  1000.00  125.70  139.22  1.11
908  2  245  0.00  2022.97  105.29  174.54  1.66  0.00  1400.00  104.31  165.71  1.59
1028  1  455  2.02  2055.94  105.74  168.75  1.60  2.02  1000.00  102.63  140.32  1.37
1028  2  2709  0.00  2933.68  95.03  153.25  1.61  0.00  2000.00  94.80  149.92  1.58
1034  1  30  2.02  746.48  63.52  100.39  1.58  2.02  244.00  56.77  69.92  1.23
1034  2  559  0.00  1187.53  81.03  121.80  1.50  0.00  700.00  80.03  115.33  1.44
1151  1  1042  0.31  836.68  49.60  100.75  2.03  0.31  510.00  47.90  90.63  1.89
1151  2  3355  0.00  2504.00  48.11  134.07  2.79  0.00  1000.00  46.88  121.99  2.60
1300  1  1333  0.00  1100.75  68.05  118.28  1.74  0.00  900.00  67.75  115.93  1.71
1300  2  984  0.00  728.75  31.49  66.63  2.12  0.00  400.00  30.79  61.82  2.01
1351  2  555  0.00  833.88  48.52  60.50  1.25  0.00  600.00  48.38  58.95  1.22
1402  1  138  3.11  503.88  123.54  91.26  0.74  3.11  400.00  122.05  85.86  0.70
1402  2  3483  0.00  1026.13  75.67  80.06  1.06  0.00  712.00  75.53  78.72  1.04
1404  2  368  0.00  1293.59  146.85  122.59  0.83  0.00  900.00  146.48  119.93  0.82
1408  1  4  4.35  1279.29  369.92  546.51  1.48  4.35  1279.29  369.92  546.51  1.48
1408  2  564  0.00  1469.02  89.84  120.88  1.35  0.00  1050.00  88.75  109.96  1.24
1450  1  153  0.00  714.76  63.21  86.76  1.37  0.00  500.00  62.69  83.76  1.34
1450  2  252  0.00  1206.21  99.77  133.49  1.34  0.00  890.00  98.90  127.14  1.29

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-36

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
1458  1  281  0.00  1100.13  96.68  151.63  1.57  0.00  850.00  95.21  143.09  1.50
1458  2  695  0.00  1567.49  98.75  215.11  2.18  0.00  1400.00  98.51  213.60  2.17
1504  1  139  0.93  320.68  15.55  35.40  2.28  0.93  70.00  12.21  12.77  1.05
1504  2  568  0.00  1148.03  16.70  33.50  2.01  0.00  210.00  15.97  16.04  1.00
1555  1  1572  0.00  2282.68  108.29  221.15  2.04  0.00  1800.00  107.69  216.02  2.01
1555  2  2014  0.00  5366.44  88.19  196.88  2.23  0.00  1600.00  87.49  185.20  2.12
1607  1  306  0.00  895.16  71.57  129.13  1.80  0.00  750.00  71.01  125.86  1.77
1607  2  1002  0.00  1669.01  139.00  239.04  1.72  0.00  1250.00  138.11  234.27  1.70
1611  1  1  284.29  284.29  284.29  -  -  284.29  284.29  284.29  -  -
1611  2  89  0.00  1482.39  248.75  293.32  1.18  0.00  1130.00  244.49  278.73  1.14
1614  1  13  4.04  470.60  87.16  124.75  1.43  4.04  470.60  87.16  124.75  1.43
1614  2  118  0.00  4381.24  219.35  345.19  1.57  0.00  1155.00  209.61  263.80  1.26
1650  1  2089  0.00  776.65  40.94  60.25  1.47  0.00  400.00  40.41  55.81  1.38
1650  2  1281  0.00  439.80  13.35  25.54  1.91  0.00  300.00  13.19  23.27  1.76
1712  1  81  2.02  654.42  78.38  120.30  1.53  2.02  600.00  78.04  118.73  1.52
1712  2  408  0.00  1363.92  113.58  172.20  1.52  0.00  900.00  110.35  152.73  1.38
1716  1  374  2.02  667.79  92.63  110.06  1.19  2.02  570.00  92.21  108.05  1.17
1716  2  485  0.00  1001.80  79.52  110.66  1.39  0.00  844.00  79.38  109.57  1.38
1718  1  85  0.31  265.62  65.68  55.96  0.85  0.31  214.00  64.71  52.93  0.82
1718  2  73  0.00  771.37  45.13  123.33  2.73  0.00  200.00  30.19  53.22  1.76
1750  1  479  2.02  1420.50  118.10  145.92  1.24  2.02  600.00  115.36  129.23  1.12
1750  2  407  0.00  2312.23  129.81  181.47  1.40  0.00  700.00  125.73  157.36  1.25
1850  1  312  2.02  1597.79  224.96  290.26  1.29  2.02  1500.00  224.38  287.59  1.28
1850  2  800  0.00  14727.19  184.32  488.68  2.65  0.00  2580.00  175.68  304.26  1.73
1855  1  377  0.00  1323.76  129.14  151.11  1.17  0.00  688.00  128.31  146.24  1.14
1855  2  1032  0.00  1806.99  120.63  181.64  1.51  0.00  1570.00  120.35  179.17  1.49
1900  1  1437  0.00  2237.58  119.12  141.16  1.19  0.00  1000.00  117.79  127.85  1.09
1900  2  886  0.00  6672.63  96.87  226.39  2.34  0.00  1500.00  92.62  131.54  1.42
1960  1  520  0.00  519.43  42.84  47.03  1.10  0.00  375.00  42.50  44.21  1.04
1960  2  363  0.00  1060.47  52.12  92.64  1.78  0.00  586.00  50.89  81.76  1.61
1965  1  216  1.24  777.90  103.59  114.68  1.11  1.24  438.00  100.43  100.60  1.00
1965  2  288  0.00  1098.57  50.49  104.30  2.07  0.00  400.00  46.19  72.26  1.56
2000  1  25  4.04  417.10  149.49  119.84  0.80  4.04  417.10  149.49  119.84  0.80
2000  2  931  0.00  1030.15  39.77  84.11  2.11  0.00  320.00  36.00  55.62  1.55
2051  2  388  0.00  3634.28  95.09  228.50  2.40  0.00  2000.00  91.57  182.56  1.99
2060  2  606  0.00  565.15  22.78  48.28  2.12  0.00  400.00  22.49  45.52  2.02
2067  2  22  0.90  123.26  13.60  27.58  2.03  0.90  50.00  10.23  16.07  1.57
2073  2  12  1.00  67.20  8.11  15.59  1.92  1.00  67.20  8.11  15.59  1.92
2079  2  19  2.36  81.96  16.89  18.91  1.12  2.36  81.96  16.89  18.91  1.12
2080  2  22  0.00  284.60  28.82  39.09  1.36  0.00  284.60  28.82  39.09  1.36
2083  2  71  0.00  55.60  4.74  6.57  1.39  0.00  29.00  4.51  5.12  1.14

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-37

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
2104  2  226  2.00  1100.44  84.00  119.63  1.42  2.00  920.00  83.43  115.11  1.38
2156  1  1  18.04  18.04  18.04  -  -  18.04  18.04  18.04  -  -
2156  2  103  1.30  368.00  71.06  71.97  1.01  1.30  200.00  66.35  58.53  0.88
2591  1  1134  0.00  1100.13  72.30  82.17  1.14  0.00  600.00  71.51  74.69  1.04
2591  2  43  0.00  139.34  34.69  37.58  1.08  0.00  139.34  34.69  37.58  1.08
2592  1  1102  0.00  560.17  24.84  42.62  1.72  0.00  200.00  23.35  31.08  1.33
2592  2  630  0.00  235.14  15.38  21.15  1.38  0.00  100.00  14.82  17.40  1.17

Note:

C_Hole: 1: Channels, 2: Drill holes

Table 11-12: Estimation Domain Capped and Raw Assay Statistics for Copper (Cu %)

Nexa Resources S.A. – El Porvenir Mine

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1  1  3365  0.00  11.58  0.28  0.48  1.69  0.00  2.70  0.27  0.33  1.23
1  2  3183  0.00  14.06  0.23  0.56  2.39  0.00  6.20  0.23  0.47  2.06
21  1  179  0.01  1.04  0.20  0.19  0.96  0.01  0.70  0.19  0.17  0.90
21  2  799  0.00  5.91  0.31  0.47  1.54  0.00  2.00  0.29  0.37  1.26
100  1  2262  0.00  30.69  0.23  1.13  4.96  0.00  1.30  0.12  0.28  2.23
100  2  4481  0.00  10.21  0.10  0.30  3.08  0.00  1.60  0.09  0.19  2.10
157  1  77  0.01  1.88  0.35  0.43  1.23  0.01  1.88  0.35  0.43  1.23
164  1  28  0.10  2.96  0.74  0.61  0.83  0.10  2.96  0.74  0.61  0.83
164  2  263  0.00  14.08  0.89  0.91  1.03  0.00  5.00  0.87  0.76  0.87
201  2  24  0.00  0.60  0.03  0.09  2.75  0.00  0.60  0.03  0.09  2.75
252  1  51  0.02  2.41  0.42  0.49  1.18  0.02  2.41  0.42  0.49  1.18
252  2  19  0.00  0.76  0.19  0.15  0.80  0.00  0.76  0.19  0.15  0.80
259  1  2236  0.00  10.07  0.23  0.41  1.79  0.00  1.60  0.21  0.23  1.06
259  2  673  0.00  12.29  0.46  0.83  1.79  0.00  6.00  0.45  0.71  1.57
264  2  184  0.00  14.41  0.90  1.07  1.19  0.00  7.90  0.87  0.85  0.97
307  1  5597  0.00  12.10  0.41  0.43  1.05  0.00  4.30  0.41  0.41  1.02
307  2  4339  0.00  17.23  0.43  0.64  1.50  0.00  4.00  0.42  0.54  1.29
350  1  69  0.00  1.10  0.33  0.23  0.69  0.00  1.10  0.33  0.23  0.69
350  2  346  0.00  5.90  0.42  0.69  1.64  0.00  3.50  0.41  0.60  1.47
450  1  873  0.01  3.32  0.36  0.39  1.08  0.01  3.32  0.36  0.39  1.08
450  2  865  0.00  6.14  0.37  0.47  1.25  0.00  6.14  0.37  0.47  1.25
456  1  14  0.07  1.33  0.51  0.41  0.80  0.07  1.33  0.51  0.41  0.80
456  2  158  0.00  8.14  0.68  1.11  1.63  0.00  8.14  0.68  1.11  1.63
458  1  108  0.01  2.93  0.22  0.32  1.47  0.01  2.93  0.22  0.32  1.47
458  2  418  0.00  35.00  0.39  2.02  5.22  0.00  5.00  0.29  0.43  1.50

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-38

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
466  1  3333  0.00  6.30  0.15  0.29  1.92  0.00  2.70  0.15  0.26  1.74
466  2  5274  0.00  16.55  0.26  0.47  1.79  0.00  4.40  0.26  0.42  1.64
671  1  55  0.01  0.41  0.07  0.09  1.31  0.01  0.25  0.06  0.08  1.20
671  2  1698  0.00  4.09  0.02  0.06  3.52  0.00  0.18  0.02  0.03  1.74
700  1  272  0.01  0.12  0.02  0.02  1.07  0.01  0.10  0.02  0.02  1.06
700  2  241  0.00  4.17  0.03  0.20  6.19  0.00  0.12  0.02  0.03  1.30
701  1  590  0.00  1.61  0.08  0.15  1.91  0.00  1.61  0.08  0.15  1.91
701  2  1657  0.00  3.44  0.04  0.11  2.76  0.00  0.45  0.04  0.07  1.83
750  1  11  0.02  1.03  0.32  0.26  0.80  0.02  1.03  0.32  0.26  0.80
750  2  1266  0.00  3.38  0.14  0.35  2.42  0.00  1.00  0.12  0.23  1.93
751  1  54  0.01  0.32  0.04  0.06  1.56  0.01  0.26  0.04  0.06  1.49
751  2  195  0.00  1.15  0.05  0.14  2.58  0.00  0.25  0.04  0.06  1.68
756  2  225  0.00  3.58  0.22  0.41  1.83  0.00  1.80  0.21  0.35  1.66
852  2  86  0.00  4.94  0.55  0.64  1.17  0.00  4.94  0.55  0.64  1.17
860  1  12  0.00  0.11  0.02  0.03  1.14  0.00  0.11  0.02  0.03  1.14
860  2  199  0.00  5.04  0.11  0.26  2.32  0.00  1.00  0.10  0.16  1.53
864  2  44  0.00  2.78  0.38  0.47  1.24  0.00  2.78  0.38  0.47  1.24
865  2  128  0.00  0.92  0.12  0.15  1.21  0.00  0.92  0.12  0.15  1.21
883  1  11  0.03  0.41  0.07  0.05  0.82  0.03  0.41  0.07  0.05  0.82
883  2  38  0.01  0.65  0.18  0.17  0.93  0.01  0.65  0.18  0.17  0.93
901  1  111  0.01  2.11  0.23  0.35  1.51  0.01  1.90  0.23  0.34  1.48
901  2  530  0.00  6.38  0.22  0.39  1.81  0.00  2.50  0.21  0.27  1.31
902  1  23  0.01  0.46  0.08  0.10  1.30  0.01  0.46  0.08  0.10  1.30
902  2  265  0.00  0.84  0.08  0.11  1.35  0.00  0.84  0.08  0.11  1.35
1004  1  6  0.02  0.99  0.18  0.28  1.54  0.02  0.99  0.18  0.28  1.54
1004  2  54  0.01  1.03  0.33  0.25  0.76  0.01  1.03  0.33  0.25  0.76
1008  1  34  0.00  0.13  0.02  0.03  1.39  0.00  0.13  0.02  0.03  1.39
1008  2  272  0.00  0.77  0.04  0.07  1.87  0.00  0.77  0.04  0.07  1.87
1010  1  48  0.00  0.94  0.10  0.19  1.97  0.00  0.94  0.10  0.19  1.97
1010  2  280  0.00  3.45  0.17  0.30  1.72  0.00  2.00  0.17  0.28  1.62
1023  1  177  0.01  0.30  0.03  0.04  1.32  0.01  0.30  0.03  0.04  1.32
1023  2  465  0.00  5.33  0.09  0.27  3.20  0.00  1.80  0.08  0.17  2.20
1028  1  272  0.01  0.79  0.05  0.08  1.53  0.01  0.79  0.05  0.08  1.53
1028  2  2190  0.00  4.64  0.09  0.14  1.51  0.00  0.82  0.09  0.11  1.25
1029  2  265  0.00  5.84  0.26  0.42  1.61  0.00  2.90  0.25  0.36  1.42
1034  1  45  0.00  0.50  0.05  0.07  1.55  0.00  0.50  0.05  0.07  1.55
1034  2  1103  0.00  1.38  0.07  0.11  1.51  0.00  0.63  0.07  0.10  1.39
1051  1  243  0.00  1.35  0.13  0.17  1.28  0.00  1.10  0.13  0.16  1.23
1051  2  1390  0.00  7.89  0.11  0.23  2.10  0.00  1.70  0.11  0.17  1.64
1300  1  1333  0.00  3.70  0.31  0.33  1.06  0.00  3.70  0.31  0.33  1.06

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-39

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1300  2  984  0.00  3.52  0.20  0.34  1.65  0.00  1.90  0.20  0.31  1.54
1402  1  138  0.00  2.20  0.29  0.28  0.95  0.00  2.20  0.29  0.28  0.95
1402  2  3827  0.00  20.65  0.33  0.57  1.73  0.00  8.20  0.33  0.46  1.41
1404  2  579  0.00  5.67  0.75  0.63  0.85  0.00  3.40  0.74  0.58  0.79
1408  1  75  0.01  0.88  0.14  0.18  1.26  0.01  0.88  0.14  0.18  1.26
1408  2  741  0.00  2.67  0.22  0.29  1.32  0.00  1.60  0.21  0.25  1.17
1450  1  162  0.01  0.47  0.04  0.06  1.57  0.01  0.47  0.04  0.06  1.57
1450  2  127  0.00  0.38  0.04  0.07  1.69  0.00  0.38  0.04  0.07  1.69
1455  1  168  0.00  10.88  0.14  0.93  6.75  0.00  0.30  0.06  0.08  1.32
1455  2  329  0.00  0.34  0.03  0.06  1.92  0.00  0.34  0.03  0.06  1.92
1458  1  231  0.00  2.80  0.18  0.33  1.87  0.00  1.50  0.16  0.25  1.54
1458  2  471  0.00  3.14  0.21  0.38  1.79  0.00  3.14  0.21  0.38  1.79
1502  1  26  0.01  0.86  0.21  0.15  0.73  0.01  0.86  0.21  0.15  0.73
1502  2  280  0.01  10.50  1.07  1.08  1.00  0.01  7.50  1.06  0.99  0.93
1504  1  113  0.00  5.41  0.63  0.77  1.21  0.00  5.41  0.63  0.77  1.21
1504  2  288  0.00  13.46  0.72  0.87  1.21  0.00  4.90  0.70  0.77  1.09
1607  1  307  0.00  0.41  0.03  0.04  1.44  0.00  0.41  0.03  0.04  1.44
1607  2  1091  0.00  1.25  0.04  0.08  1.94  0.00  1.25  0.04  0.08  1.94
1614  1  13  0.01  0.13  0.04  0.04  1.03  0.01  0.13  0.04  0.04  1.03
1614  2  118  0.00  0.39  0.07  0.08  1.16  0.00  0.39  0.07  0.08  1.16
1650  1  2089  0.00  11.60  0.40  0.46  1.14  0.00  2.50  0.39  0.35  0.91
1650  2  1281  0.00  13.38  0.37  0.68  1.87  0.00  5.00  0.35  0.45  1.27
1702  1  189  0.01  4.91  0.34  0.51  1.50  0.01  4.91  0.34  0.51  1.50
1702  2  386  0.00  1.63  0.20  0.24  1.19  0.00  1.40  0.20  0.23  1.15
1712  1  30  0.01  0.75  0.08  0.16  2.02  0.01  0.75  0.08  0.16  2.02
1712  2  389  0.00  1.60  0.07  0.14  2.13  0.00  0.40  0.06  0.09  1.47
1716  1  194  0.00  0.84  0.11  0.15  1.27  0.00  0.84  0.11  0.15  1.27
1716  2  372  0.00  1.30  0.09  0.16  1.74  0.00  1.30  0.09  0.16  1.74
1718  1  85  0.00  0.40  0.08  0.09  1.21  0.00  0.40  0.08  0.09  1.21
1718  2  73  0.00  0.70  0.04  0.11  2.92  0.00  0.13  0.02  0.04  1.70
1750  1  479  0.00  1.75  0.17  0.20  1.22  0.00  1.20  0.16  0.19  1.18
1750  2  407  0.00  1.98  0.20  0.35  1.77  0.00  1.98  0.20  0.35  1.77
1850  1  312  0.00  1.02  0.05  0.10  1.98  0.00  1.02  0.05  0.10  1.98
1850  2  800  0.00  1.28  0.03  0.07  2.17  0.00  1.28  0.03  0.07  2.17
1855  1  362  0.00  2.60  0.29  0.32  1.11  0.00  1.50  0.28  0.28  1.00
1855  2  488  0.00  5.93  0.16  0.29  1.78  0.00  2.30  0.16  0.24  1.48
1900  1  1652  0.00  5.70  0.08  0.19  2.42  0.00  0.90  0.07  0.12  1.55
1900  2  1081  0.00  1.26  0.05  0.11  2.03  0.00  0.86  0.05  0.10  1.87
1960  1  305  0.00  1.02  0.15  0.14  0.93  0.00  1.02  0.15  0.14  0.93
1960  2  168  0.00  0.69  0.08  0.09  1.22  0.00  0.69  0.08  0.09  1.22

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-40

 

         Raw Assay  Capped Raw Assay
C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1965  1  216  0.00  0.68  0.05  0.08  1.57  0.00  0.68  0.05  0.08  1.57
1965  2  288  0.00  2.41  0.03  0.11  3.31  0.00  0.15  0.03  0.03  1.39
2051  2  388  0.00  3.52  0.06  0.20  3.06  0.00  1.70  0.06  0.13  2.22
2060  2  580  0.00  3.56  0.13  0.23  1.75  0.00  3.56  0.13  0.23  1.75
2065  2  71  0.00  1.22  0.28  0.27  0.96  0.00  1.22  0.28  0.27  0.96
2067  2  22  0.02  2.97  0.29  0.40  1.38  0.02  2.97  0.29  0.40  1.38
2069  2  26  0.00  1.02  0.33  0.25  0.76  0.00  1.02  0.33  0.25  0.76
2072  2  22  0.00  0.18  0.04  0.05  1.29  0.00  0.18  0.04  0.05  1.29
2073  2  12  0.02  0.29  0.11  0.08  0.72  0.02  0.29  0.11  0.08  0.72
2079  2  19  0.10  1.06  0.42  0.25  0.58  0.10  1.06  0.42  0.25  0.58
2104  2  226  0.01  2.99  0.29  0.42  1.47  0.01  1.90  0.28  0.36  1.32
2156  1  1  0.01  0.01  0.01  -  -  0.01  0.01  0.01  -  -
2156  2  103  0.00  0.15  0.02  0.03  1.24  0.00  0.15  0.02  0.03  1.24
11511  1  323  0.01  1.16  0.14  0.11  0.79  0.01  0.40  0.14  0.09  0.67
11511  2  2137  0.00  3.06  0.14  0.16  1.14  0.00  0.90  0.14  0.14  1.02
11512  1  719  0.00  6.41  0.27  0.43  1.57  0.00  1.20  0.25  0.20  0.82
11512  2  1218  0.00  14.81  0.31  0.54  1.73  0.00  2.00  0.30  0.25  0.85

Note:

C_Hole: 1: Channels, 2: Drill holes

SLR performed an independent capping analysis on some elements for some domains, as well as a visual validation of the block model in section and plan view. Log probability plots were inspected for some of these domains and SLR applied a capping grade using a combination of histograms, probability plots, and decile analyses. SLR found that most of the coefficients of variation (CV) after applying capping are low, with exception of a few domains with CV values more than 1.5. SLR considers that the capping levels selected are appropriate.

SLR offers the following conclusions and recommendations:

·In general, the capping levels are reasonable, and suitable for the estimation of Mineral Resources.
·Silver and lead grades increased in comparison with previous estimates. SLR prepared independent silver capping analysis for some domains and these values were 3% to 5% less than Nexa silver capping values. Currently, there is not a well established reconciliation process to evaluate if the higher silver capping levels are reasonable. SLR recommends monitoring the silver and lead grades with grade control and head grade from the plant to compare with the model and to calibrate the silver capping values.
·Investigate if capping levels should be applied based on high grade and low grade domains for lead, copper, and silver.
·Report the metal loss as a result of capping high grades, and assess the amount of metal in the upper decile and percentiles of the distribution to gain a better understanding of the amount of risk associated with extreme values in each capping domain. For the major domain contributor to the Mineral Reserve and Mineral Resources (C_ESTAG 1151 Mineralization domain), there is still 58% of the total metal within the upper decile of the silver distribution.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-41

·Adjust capping values with production data when an accurate reconciliation process is established.
11.8Compositing

Nexa composited the capped assays to 2.0 m with a 1.0 m tolerance, beginning at the collars. Small intervals were merged with the previous interval. Sample lengths range from 0.1 m to 3.0 m. Composites were generated inside the mineralization domain wireframes, flagged by mineralization domain. The majority of samples (89%) had a length from 0.9 m to 2.0 m. Unsampled core intervals were assigned half of the detection limit value for each of the elements. The composite length corresponds to half of the parent block size height for the deposit. Figure 11-12 illustrates a comparison of the mean relative error between length-weighted composites at different composite lengths versus assay means by mineralization domain. Based on this analysis, the two metre composites result in the best correlation between assay data and composites. Nexa generated statistics of the composites is presented in Table 11-13, Table 11-14, Table 11-15, and Table 11-16.

Figure 11-12: Composite Length Comparison

Table 11-13: Estimation Domain Composite Statistics for Zinc (Zn %)

Nexa Resources S.A. – El Porvenir Mine

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1  1  2865  0.00  49.48  10.48  8.58  0.82
1  2  822  0.00  37.17  3.54  5.66  1.60
21  1  127  0.03  20.00  4.47  5.00  1.12

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-42

 

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
21  2  410  0.00  32.29  4.58  5.63  1.23
100  1  346  0.02  31.26  3.97  5.28  1.33
100  2  980  0.00  33.99  4.65  5.98  1.29
154  1  769  0.00  31.00  6.04  6.61  1.09
154  2  870  0.00  35.13  6.13  6.17  1.01
157  1  59  0.04  23.00  10.60  7.13  0.67
201  2  8  0.00  5.97  2.00  2.10  1.05
250  1  155  0.08  32.00  8.01  7.25  0.90
250  2  25  0.00  19.78  8.35  6.40  0.77
256  1  6  1.53  13.83  7.28  4.33  0.59
256  2  118  0.00  16.42  2.48  3.11  1.26
259  1  2064  0.00  41.20  8.07  6.71  0.83
259  2  405  0.00  29.80  4.22  5.22  1.24
264  2  102  0.03  24.25  5.66  4.78  0.84
270  1  26  0.07  23.20  4.39  5.50  1.25
270  2  95  0.00  26.58  5.19  5.56  1.07
302  1  16  0.03  5.01  0.56  1.23  2.19
302  2  105  0.00  1.50  0.38  0.48  1.25
306  1  44  0.12  5.92  2.02  1.81  0.90
306  2  219  0.00  12.29  2.02  2.81  1.39
307  1  5019  0.00  37.00  6.95  6.62  0.95
307  2  2117  0.00  27.00  2.19  3.50  1.60
350  1  54  0.00  19.64  6.30  5.45  0.86
350  2  196  0.00  29.04  4.46  4.89  1.10
453  1  24  0.02  24.87  5.44  6.43  1.18
453  2  77  0.00  32.42  3.31  6.03  1.82
458  1  88  0.01  9.50  2.49  2.66  1.07
458  2  219  0.00  11.97  3.47  2.64  0.76
466  1  864  0.00  36.00  4.77  5.62  1.18
466  2  1341  0.00  31.17  4.23  5.16  1.22
550  1  1  14.73  14.73  14.73  -  -
550  2  431  0.00  34.77  3.05  5.00  1.64
600  1  1940  0.00  24.00  1.94  2.62  1.35
600  2  931  0.00  27.95  2.44  3.63  1.49
652  1  6  0.07  0.72  0.43  0.25  0.57
652  2  330  0.00  2.00  0.23  0.39  1.70
671  1  17  0.04  5.02  1.25  1.35  1.09
671  2  250  0.00  7.61  0.66  0.93  1.42
674  1  10  0.02  3.45  0.51  1.06  2.10
674  2  107  0.00  5.61  0.59  0.92  1.56
677  2  251  0.00  4.54  0.45  0.66  1.47
700  1  202  0.04  42.44  6.76  9.07  1.34

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-43

 

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
700  2  119  0.00  28.12  3.44  5.09  1.48
701  1  460  0.01  38.24  4.06  5.52  1.36
701  2  405  0.00  24.65  2.07  3.31  1.59
750  1  7  0.04  3.69  0.57  1.24  2.17
750  2  755  0.00  16.13  1.57  2.03  1.30
751  1  8  0.01  1.33  0.50  0.39  0.77
751  2  76  0.00  4.27  1.39  1.09  0.78
756  2  115  0.00  7.70  1.14  1.66  1.46
800  1  37  0.02  3.33  0.50  0.67  1.33
800  2  30  0.00  8.00  1.34  2.26  1.68
850  2  61  0.00  27.64  4.96  5.29  1.07
860  1  12  0.26  13.83  3.15  3.82  1.21
860  2  86  0.00  12.74  2.20  2.34  1.06
865  2  62  0.00  24.55  5.51  5.80  1.05
872  2  67  0.00  14.50  2.02  2.34  1.16
883  1  8  3.09  7.89  5.53  1.72  0.31
883  2  21  0.33  15.70  5.68  3.82  0.67
901  1  109  0.01  12.50  2.50  2.38  0.95
901  2  312  0.00  26.50  3.77  3.69  0.98
908  2  110  0.00  17.42  2.28  2.40  1.06
950  1  20  0.30  17.00  5.81  4.97  0.85
950  2  153  0.00  23.04  3.87  4.93  1.27
1008  1  9  0.04  26.07  4.36  7.91  1.81
1008  2  104  0.00  17.97  1.54  2.60  1.69
1016  1  50  0.11  4.34  1.00  0.95  0.95
1016  2  98  0.00  24.50  3.50  4.44  1.27
1019  2  121  0.00  15.93  2.37  2.83  1.19
1026  1  161  0.03  10.00  1.31  1.47  1.12
1026  2  296  0.00  16.30  1.61  2.33  1.45
1028  1  137  0.03  12.72  2.23  2.46  1.10
1028  2  1160  0.00  17.82  2.04  1.99  0.97
1029  1  18  0.70  10.80  2.64  2.12  0.80
1029  2  189  0.00  17.09  2.93  2.64  0.90
1034  1  11  0.03  1.24  0.42  0.46  1.10
1034  2  156  0.00  24.78  1.82  2.83  1.56
1054  1  1  4.12  4.12  4.12  -  -
1054  2  8  0.34  26.52  13.78  8.21  0.60
1151  1  883  0.01  22.00  5.20  4.91  0.94
1151  2  1796  0.00  32.39  5.03  5.00  0.99
1208  2  63  0.00  37.46  6.56  6.73  1.03
1300  1  1211  0.00  36.50  7.78  6.51  0.84
1300  2  409  0.00  31.83  3.97  5.40  1.36

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-44

 

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1350  1  47  1.55  24.50  13.22  5.53  0.42
1350  2  980  0.00  24.27  4.82  4.18  0.87
1402  1  72  0.29  13.00  4.54  2.35  0.52
1402  2  1501  0.00  18.49  3.57  3.26  0.91
1408  2  267  0.00  16.00  3.31  2.90  0.88
1410  2  262  0.00  14.09  2.08  2.52  1.21
1450  1  79  0.10  7.74  1.50  1.73  1.16
1450  2  136  0.00  12.64  2.33  2.23  0.96
1452  1  68  0.02  11.26  1.73  2.81  1.62
1452  2  92  0.00  15.65  3.71  3.81  1.03
1458  1  257  0.00  30.00  3.95  5.44  1.38
1458  2  129  0.00  15.75  2.67  3.50  1.31
1504  1  81  0.02  15.50  1.65  2.44  1.47
1504  2  266  0.01  23.00  2.63  4.74  1.80
1555  1  707  0.01  24.80  2.94  4.04  1.37
1555  2  951  0.00  28.73  3.11  4.02  1.29
1558  1  112  0.01  15.02  1.46  2.33  1.60
1558  2  433  0.00  26.44  1.71  2.90  1.70
1607  1  225  0.00  10.36  0.85  1.45  1.71
1607  2  364  0.00  19.94  1.56  2.46  1.58
1609  1  23  0.03  1.73  0.58  0.55  0.96
1609  2  134  0.00  7.60  0.93  1.45  1.56
1614  1  11  0.04  5.25  1.90  1.69  0.89
1614  2  68  0.00  23.00  3.18  4.49  1.41
1650  1  1861  0.00  36.00  7.35  6.31  0.86
1650  2  762  0.00  28.14  3.27  4.31  1.32
1702  1  112  0.04  16.39  2.82  3.22  1.14
1702  2  128  0.00  29.32  3.12  4.20  1.35
1712  1  31  0.02  15.50  2.48  3.74  1.51
1712  2  101  0.00  18.32  2.52  3.74  1.49
1714  1  33  0.34  12.04  3.39  2.78  0.82
1714  2  120  0.00  24.60  5.49  5.49  1.00
1718  1  60  0.03  13.19  3.32  3.11  0.94
1718  2  28  0.00  13.00  1.41  3.09  2.20
1754  1  36  0.33  10.40  3.20  2.55  0.80
1754  2  486  0.00  25.88  2.56  2.87  1.12
1755  2  4  0.48  15.79  5.92  6.23  1.05
1850  1  266  0.01  17.00  2.27  3.47  1.53
1850  2  349  0.00  17.50  1.18  1.92  1.62
1855  1  322  0.00  30.00  10.31  7.65  0.74
1855  2  53  0.00  22.00  4.26  6.28  1.47
1900  1  1029  0.00  24.74  4.49  4.72  1.05

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-45

 

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1900  2  478  0.00  17.26  2.48  2.89  1.16
1950  1  192  0.01  12.00  1.97  2.25  1.14
1950  2  141  0.00  9.23  1.34  1.79  1.34
1959  1  399  0.00  9.50  1.60  1.65  1.03
1959  2  212  0.00  16.20  1.48  2.12  1.43
1965  1  185  0.02  12.00  1.80  2.21  1.23
1965  2  187  0.00  11.25  1.02  1.66  1.63
2000  1  17  0.09  5.78  1.76  1.77  1.00
2000  2  193  0.02  10.90  1.41  1.31  0.93
2051  2  254  0.04  16.50  1.52  1.80  1.19
2060  2  284  0.00  15.41  1.84  2.43  1.33
2065  2  41  0.00  20.00  4.32  4.02  0.93
2067  2  18  0.05  14.00  2.44  3.48  1.42
2072  2  13  0.00  6.36  1.66  1.97  1.19
2073  2  6  0.16  3.49  2.06  1.19  0.58
2079  2  12  0.05  7.08  3.89  1.84  0.47
2100  1  61  0.06  8.54  2.00  2.04  1.02
2100  2  171  0.00  12.62  2.07  2.13  1.03
2104  2  135  0.03  21.22  2.60  3.26  1.25
2150  2  448  0.00  7.79  0.82  1.18  1.43
2156  1  1  0.72  0.72  0.72  -  -
2156  2  68  0.01  3.15  0.77  0.85  1.10
4501  1  148  0.01  9.00  2.62  2.63  1.00
4501  2  188  0.00  15.22  3.62  3.17  0.88
4502  1  527  0.01  27.00  6.38  5.19  0.81
4502  2  300  0.02  21.80  5.76  4.01  0.70
17501  1  148  0.01  20.00  8.18  6.81  0.83
17501  2  34  0.00  15.00  5.93  4.60  0.78
17502  1  220  0.02  15.00  2.97  3.56  1.20
17502  2  146  0.00  17.33  3.71  4.07  1.10

Note:

C_Hole: 1: Channels, 2: Drill holes

Table 11-14: Estimation Domain Composite Statistics for Lead (Pb%)

Nexa Resources S.A. – El Porvenir Mine

C_ESTIM  Field  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1  1  2104  0.00  30.00  6.54  6.84  1.05
1  2  948  0.00  25.67  2.59  4.34  1.68
21  1  127  0.01  0.20  0.04  0.04  1.06
21  2  410  0.00  3.32  0.10  0.31  3.16

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-46

 

C_ESTIM  Field  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
100  1  360  0.02  20.00  1.97  3.27  1.66
100  2  959  0.00  29.77  2.70  3.71  1.37
154  1  1022  0.00  45.78  1.61  3.61  2.24
154  2  1183  0.00  6.50  0.33  0.97  2.97
157  1  59  0.03  15.50  1.78  3.11  1.75
185  1  27  0.04  15.80  1.89  2.77  1.46
185  2  293  0.00  14.30  1.98  2.34  1.18
201  2  8  0.00  11.20  3.99  3.85  0.96
256  1  6  0.01  0.64  0.20  0.21  1.05
256  2  118  0.00  9.66  0.86  1.60  1.87
264  2  102  0.00  0.05  0.01  0.01  0.60
307  1  5035  0.00  9.00  0.75  1.86  2.47
307  2  2222  0.00  2.00  0.09  0.27  2.93
308  1  58  0.02  5.03  0.41  0.76  1.88
308  2  119  0.00  0.90  0.09  0.19  2.12
309  1  47  0.07  11.17  1.39  2.21  1.58
309  2  72  0.00  13.16  2.44  3.17  1.30
310  1  91  0.05  22.00  5.74  6.21  1.08
310  2  46  0.00  20.54  3.04  4.60  1.51
350  1  44  0.00  10.00  1.76  2.71  1.54
350  2  117  0.00  2.00  0.21  0.46  2.21
450  1  675  0.01  1.50  0.07  0.23  3.11
450  2  488  0.00  2.50  0.08  0.28  3.39
451  1  10  0.01  0.17  0.03  0.05  1.51
451  2  79  0.00  0.24  0.03  0.05  1.63
456  1  38  0.01  1.12  0.11  0.26  2.29
456  2  97  0.00  5.50  0.60  1.30  2.17
458  1  74  0.01  0.10  0.02  0.02  1.06
458  2  199  0.00  0.28  0.02  0.03  1.33
466  1  949  0.00  2.00  0.12  0.33  2.69
466  2  1415  0.00  1.30  0.08  0.19  2.45
600  1  1856  0.00  12.00  1.27  1.70  1.34
600  2  1288  0.00  6.00  0.48  1.00  2.07
671  1  28  0.02  8.56  1.37  1.94  1.41
671  2  501  0.00  9.50  1.12  1.35  1.20
700  1  202  0.02  20.00  3.47  4.78  1.37
700  2  119  0.00  23.87  2.75  4.72  1.72

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-47

 

C_ESTIM  Field  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
701  1  460  0.02  28.00  5.11  5.02  0.98
701  2  853  0.00  22.00  2.05  3.19  1.56
750  1  7  0.02  0.08  0.05  0.02  0.43
750  2  755  0.00  8.90  0.87  1.34  1.53
751  1  45  0.01  29.86  3.51  6.11  1.74
751  2  106  0.00  9.24  1.29  1.40  1.08
756  2  115  0.00  7.34  0.90  1.40  1.55
850  1  12  0.14  5.12  1.57  1.27  0.81
850  2  147  0.00  19.00  1.79  2.71  1.52
865  2  85  0.00  8.60  1.04  1.81  1.74
878  2  44  0.00  3.22  0.35  0.64  1.84
883  1  8  1.89  5.57  4.20  1.12  0.27
883  2  21  0.01  11.98  3.42  3.62  1.06
901  1  109  0.08  8.00  1.55  1.71  1.10
901  2  312  0.00  15.92  2.27  2.61  1.15
908  2  110  0.00  11.95  2.17  2.20  1.01
1028  1  348  0.04  11.50  1.73  1.95  1.13
1028  2  1554  0.00  23.03  1.91  2.18  1.14
1034  1  24  0.05  10.00  1.37  1.96  1.43
1034  2  335  0.00  14.00  1.76  2.10  1.19
1151  1  883  0.00  11.00  0.77  1.85  2.40
1151  2  1796  0.00  19.00  0.75  2.29  3.07
1300  1  1211  0.00  10.00  1.10  2.39  2.17
1300  2  409  0.00  7.00  0.41  1.10  2.68
1351  2  368  0.00  2.00  0.29  0.51  1.74
1402  1  119  0.03  8.00  1.71  1.95  1.14
1402  2  2123  0.00  11.94  0.88  1.59  1.81
1404  2  252  0.00  12.00  2.94  2.63  0.89
1408  1  3  0.70  9.92  5.19  4.06  0.78
1408  2  319  0.00  10.17  1.47  1.91  1.30
1450  1  100  0.01  9.50  1.91  1.95  1.02
1450  2  156  0.00  12.00  2.17  2.26  1.04
1458  1  210  0.00  12.00  1.69  2.19  1.29
1458  2  302  0.00  9.94  1.20  1.96  1.63
1504  1  107  0.00  0.20  0.03  0.04  1.41
1504  2  361  0.00  0.08  0.02  0.01  0.72
1555  1  1314  0.00  15.00  1.69  2.96  1.75

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-48

 

C_ESTIM  Field  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1555  2  974  0.00  15.00  1.14  2.29  2.02
1607  1  247  0.00  10.86  0.95  1.40  1.47
1607  2  454  0.00  15.00  1.50  2.16  1.44
1611  1  1  0.61  0.61  0.61  -  -
1611  2  44  0.00  5.80  1.03  1.42  1.38
1614  1  11  0.03  9.28  1.66  2.46  1.48
1614  2  68  0.00  20.00  2.50  3.48  1.39
1650  1  1861  0.00  4.00  0.32  0.81  2.57
1650  2  762  0.00  0.30  0.03  0.05  1.66
1712  1  64  0.02  6.33  0.68  1.14  1.68
1712  2  221  0.00  24.00  2.49  3.87  1.55
1716  1  267  0.02  18.00  1.89  3.16  1.67
1716  2  274  0.00  21.41  1.74  2.81  1.62
1718  1  60  0.02  7.27  1.40  1.85  1.33
1718  2  28  0.00  3.00  0.47  0.70  1.48
1750  1  368  0.00  12.00  1.78  2.38  1.33
1750  2  180  0.00  13.96  2.32  3.13  1.35
1850  1  266  0.01  10.00  1.58  2.33  1.48
1850  2  349  0.00  8.00  0.84  1.25  1.49
1855  1  365  0.00  22.00  3.78  5.84  1.55
1855  2  517  0.00  22.00  2.43  2.93  1.21
1900  1  1167  0.00  14.00  1.86  2.21  1.19
1900  2  608  0.00  12.00  1.33  2.10  1.58
1960  1  453  0.00  5.30  0.58  0.87  1.50
1960  2  223  0.00  3.67  0.50  0.65  1.31
1965  1  185  0.01  7.00  1.56  1.78  1.14
1965  2  187  0.00  5.00  0.67  1.02  1.51
2000  1  22  0.03  1.56  0.42  0.36  0.87
2000  2  630  0.00  4.50  0.53  0.71  1.33
2051  2  254  0.03  8.40  0.86  1.15  1.34
2060  2  347  0.00  1.50  0.18  0.31  1.72
2067  2  18  0.00  0.13  0.02  0.04  1.48
2073  2  6  0.01  0.10  0.03  0.03  1.04
2079  2  12  0.01  0.55  0.14  0.17  1.18
2080  2  13  0.00  1.55  0.28  0.43  1.56
2083  2  41  0.00  0.05  0.01  0.01  1.08
2104  2  135  0.00  3.50  0.66  0.78  1.18

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-49

 

C_ESTIM  Field  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
2156  1  1  0.48  0.48  0.48  -  -
2156  2  68  0.01  3.80  0.92  0.81  0.88
2591  1  1039  0.00  8.00  0.55  1.21  2.22
2591  2  21  0.00  1.88  0.11  0.33  2.93
2592  1  1025  0.00  2.80  0.11  0.38  3.38
2592  2  384  0.00  0.48  0.03  0.05  1.66

Note. C_Hole: 1: Channels, 2: Drill holes

Table 11-15: Estimation Domain Composite Statistics for Silver (Ag g/t)

Nexa Resources S.A. – El Porvenir Mine

C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
1  1  2104  0.00  1000.00  230.22  223.70  0.97
1  2  948  0.00  2000.00  150.89  240.77  1.60
21  1  127  2.02  60.00  11.17  11.94  1.07
21  2  410  0.00  258.95  18.40  28.85  1.57
100  1  360  2.02  1200.00  127.59  190.70  1.49
100  2  959  0.00  2000.00  153.96  179.51  1.17
154  1  1022  0.00  490.00  70.64  89.57  1.27
154  2  1183  0.00  420.00  33.70  59.82  1.78
157  1  59  5.91  220.00  94.90  58.14  0.61
185  1  27  2.02  250.00  75.82  54.24  0.72
185  2  293  0.00  714.38  108.13  113.72  1.05
201  2  8  0.00  634.72  205.02  220.17  1.07
256  1  6  5.44  202.48  78.89  66.25  0.84
256  2  118  0.00  355.96  53.23  62.68  1.18
264  2  102  0.25  58.54  17.61  9.09  0.52
307  1  5035  0.00  1200.00  57.88  87.61  1.51
307  2  2222  0.00  400.00  19.20  29.14  1.52
308  1  58  2.02  150.23  36.46  32.24  0.88
308  2  119  1.64  411.28  28.93  50.58  1.75
309  1  47  2.02  300.82  58.74  74.20  1.26
309  2  72  0.00  800.00  141.22  156.26  1.11
310  1  91  1.87  1601.67  291.47  348.88  1.20
310  2  46  0.00  854.15  155.07  196.78  1.27
350  1  44  0.00  289.26  94.39  96.31  1.02
350  2  117  0.00  120.00  26.71  29.62  1.11
450  1  675  1.37  88.00  12.60  16.39  1.30
450  2  488  0.00  137.47  13.11  18.52  1.41
451  1  10  2.02  65.32  12.72  17.92  1.41
451  2  79  0.00  43.08  8.95  8.76  0.98

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-50

 

C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
456  1  38  2.02  47.40  9.08  10.67  1.18
456  2  97  0.00  415.63  47.82  85.98  1.80
458  1  74  2.02  61.50  6.68  11.76  1.76
458  2  199  0.00  34.24  6.78  6.81  1.00
466  1  949  0.00  160.00  19.00  25.88  1.36
466  2  1415  0.00  300.45  19.83  29.01  1.46
600  1  1856  0.00  1100.00  77.26  110.94  1.44
600  2  1288  0.00  900.00  47.88  83.86  1.75
671  1  28  4.04  534.98  84.69  118.40  1.40
671  2  501  0.00  969.50  71.45  94.62  1.32
700  1  202  2.02  1200.00  105.17  163.95  1.56
700  2  119  0.00  1120.04  129.47  208.17  1.61
701  1  460  2.02  3000.00  331.54  414.20  1.25
701  2  853  0.00  1925.58  149.70  221.07  1.48
750  1  7  32.75  265.93  110.78  75.09  0.68
750  2  755  0.00  755.46  54.78  71.13  1.30
751  1  45  4.04  1559.25  189.91  321.41  1.69
751  2  106  0.00  323.01  62.54  53.41  0.85
756  2  115  0.00  329.67  87.81  78.05  0.89
850  1  12  6.53  186.00  62.59  45.76  0.73
850  2  147  0.00  1400.00  123.84  171.88  1.39
865  2  85  0.00  500.78  112.48  105.11  0.93
878  2  44  0.00  126.06  35.75  26.48  0.74
883  1  8  96.73  230.48  158.63  49.25  0.31
883  2  21  5.18  383.18  148.27  126.56  0.85
901  1  109  2.02  250.00  86.78  61.53  0.71
901  2  312  0.00  859.83  125.71  113.23  0.90
908  2  110  0.00  662.63  104.31  108.88  1.04
1028  1  348  2.02  850.68  102.63  117.26  1.14
1028  2  1554  0.00  1404.94  94.79  116.40  1.23
1034  1  24  2.02  244.00  56.77  60.41  1.06
1034  2  335  0.00  700.00  80.03  91.30  1.14
1151  1  883  0.31  510.00  47.90  84.26  1.76
1151  2  1796  0.00  1000.00  46.88  103.40  2.21
1300  1  1211  0.00  900.00  67.75  113.27  1.67
1300  2  409  0.00  400.00  30.78  53.34  1.73
1351  2  368  0.00  534.52  48.38  50.85  1.05
1402  1  119  3.11  400.00  122.05  83.23  0.68
1402  2  2123  0.00  668.72  75.53  67.65  0.90
1404  2  252  0.00  900.00  146.48  98.50  0.67
1408  1  3  17.42  823.95  369.92  380.80  1.03
1408  2  319  0.00  498.27  88.75  82.38  0.93

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-51

 

C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
1450  1  100  1.98  500.00  62.69  71.44  1.14
1450  2  156  0.00  569.89  98.90  91.62  0.93
1458  1  210  0.00  817.98  95.21  128.33  1.35
1458  2  302  0.00  1229.95  98.50  152.15  1.54
1504  1  107  0.93  70.00  12.21  11.99  0.98
1504  2  361  0.00  114.31  15.97  12.43  0.78
1555  1  1314  0.00  1800.00  107.69  185.06  1.72
1555  2  974  0.00  1528.42  87.48  152.08  1.74
1607  1  247  0.00  750.00  71.01  111.94  1.58
1607  2  454  0.00  1192.70  138.10  191.96  1.39
1611  1  1  284.29  284.29  284.29  -  -
1611  2  44  0.00  1130.00  244.49  236.74  0.97
1614  1  11  4.04  470.60  87.16  121.19  1.39
1614  2  68  0.00  1155.00  209.61  232.32  1.11
1650  1  1861  0.00  400.00  40.41  54.94  1.36
1650  2  762  0.00  300.00  13.19  19.28  1.46
1712  1  64  2.02  599.68  78.04  108.51  1.39
1712  2  221  0.00  900.00  110.35  125.61  1.14
1716  1  267  2.07  492.91  92.21  94.40  1.02
1716  2  274  0.00  579.06  79.38  82.96  1.05
1718  1  60  0.31  209.95  64.71  46.65  0.72
1718  2  28  0.00  200.00  30.19  50.67  1.68
1750  1  368  2.02  600.00  115.36  117.93  1.02
1750  2  180  0.00  698.47  125.70  129.61  1.03
1850  1  266  2.02  1500.00  224.38  267.55  1.19
1850  2  349  0.00  1529.36  175.69  237.47  1.35
1855  1  365  0.00  681.17  128.31  143.14  1.12
1855  2  517  0.00  1285.36  120.33  133.11  1.11
1900  1  1167  0.00  1000.00  117.79  119.30  1.01
1900  2  608  0.00  788.24  92.62  108.72  1.17
1960  1  453  0.00  375.00  42.50  40.42  0.95
1960  2  223  0.00  586.00  50.89  74.28  1.46
1965  1  185  1.24  438.00  100.43  95.57  0.95
1965  2  187  0.00  307.61  46.19  59.22  1.28
2000  1  22  7.46  417.10  149.49  116.78  0.78
2000  2  630  0.00  320.00  36.00  48.47  1.35
2051  2  254  1.00  1344.90  91.57  144.04  1.57
2060  2  347  0.00  368.74  22.49  40.35  1.79
2067  2  18  0.90  50.00  10.23  14.94  1.46
2073  2  6  1.00  44.05  8.11  13.61  1.68
2079  2  12  2.86  49.16  16.89  14.55  0.86
2080  2  13  0.00  90.46  28.82  24.76  0.86

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-52

 

C_ESTIM  C_Hole  # Samples  Min.
(g/t)
  Max.
(g/t)
  Mean
(g/t)
  Std. Dv
(g/t)
  C.V.
2083  2  41  0.00  29.00  4.51  4.53  1.01
2104  2  135  2.90  557.75  83.43  85.51  1.02
2156  1  1  18.04  18.04  18.04  -  -
2156  2  68  4.98  200.00  66.35  55.20  0.83
2591  1  1039  0.00  600.00  71.51  73.63  1.03
2591  2  21  0.00  88.09  34.67  30.41  0.88
2592  1  1025  0.00  200.00  23.35  30.69  1.31
2592  2  384  0.00  99.63  14.82  14.81  1.00

Note. C_Hole: 1: Channels, 2: Drill holes

Table 11-16: Estimation Domain Composite Statistics for Copper (Cu %)

Nexa Resources S.A. – El Porvenir Mine

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1  1  3024  0.00  2.70  0.27  0.32  1.18
1  2  1426  0.00  6.20  0.23  0.39  1.69
21  1  127  0.01  0.60  0.19  0.16  0.81
21  2  410  0.00  2.00  0.29  0.33  1.14
100  1  1574  0.00  1.30  0.12  0.24  1.93
100  2  2010  0.00  1.41  0.09  0.15  1.71
157  1  59  0.01  1.84  0.35  0.41  1.19
164  1  21  0.16  2.52  0.74  0.55  0.75
164  2  156  0.00  4.36  0.87  0.64  0.73
201  2  8  0.00  0.11  0.03  0.04  1.15
252  1  38  0.05  1.61  0.42  0.42  1.00
252  2  11  0.00  0.40  0.19  0.10  0.51
259  1  2064  0.00  1.60  0.21  0.22  1.04
259  2  405  0.00  4.80  0.45  0.58  1.29
264  2  102  0.01  6.77  0.87  0.75  0.86
307  1  5035  0.00  4.30  0.41  0.40  0.98
307  2  2222  0.00  3.30  0.42  0.48  1.14
350  1  54  0.00  1.10  0.33  0.22  0.68
350  2  196  0.00  2.75  0.41  0.49  1.22
450  1  675  0.01  3.19  0.36  0.35  0.97
450  2  488  0.00  6.14  0.37  0.40  1.06
456  1  14  0.07  1.33  0.51  0.41  0.80
456  2  76  0.00  5.82  0.68  0.89  1.30
458  1  98  0.01  2.93  0.22  0.32  1.46
458  2  220  0.00  3.13  0.29  0.33  1.14
466  1  2784  0.00  2.70  0.15  0.24  1.64
466  2  2547  0.00  4.39  0.26  0.36  1.38

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-53

 

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
671  1  50  0.01  0.25  0.06  0.07  1.15
671  2  1131  0.00  0.18  0.02  0.02  1.48
700  1  202  0.01  0.09  0.02  0.02  0.91
700  2  119  0.00  0.11  0.02  0.02  1.09
701  1  460  0.00  1.61  0.08  0.14  1.73
701  2  853  0.00  0.39  0.04  0.05  1.45
750  1  7  0.02  0.63  0.32  0.19  0.59
750  2  755  0.00  1.00  0.12  0.22  1.83
751  1  45  0.01  0.22  0.04  0.05  1.26
751  2  106  0.00  0.25  0.04  0.06  1.57
756  2  115  0.00  1.60  0.21  0.30  1.40
852  2  51  0.00  2.18  0.55  0.53  0.96
860  1  12  0.00  0.11  0.02  0.03  1.14
860  2  117  0.00  0.85  0.10  0.12  1.20
864  2  30  0.00  2.78  0.38  0.44  1.17
865  2  78  0.00  0.92  0.12  0.13  1.09
883  1  8  0.04  0.12  0.07  0.02  0.37
883  2  21  0.01  0.49  0.18  0.13  0.69
901  1  88  0.01  1.90  0.23  0.33  1.46
901  2  283  0.00  1.71  0.21  0.22  1.07
902  1  21  0.01  0.46  0.08  0.10  1.28
902  2  139  0.00  0.63  0.08  0.08  0.98
1004  1  5  0.02  0.51  0.18  0.17  0.95
1004  2  30  0.05  0.73  0.33  0.20  0.61
1008  1  27  0.01  0.13  0.02  0.03  1.17
1008  2  121  0.00  0.32  0.04  0.06  1.44
1010  1  41  0.00  0.87  0.10  0.17  1.78
1010  2  158  0.00  2.00  0.17  0.24  1.41
1023  1  142  0.01  0.24  0.03  0.04  1.20
1023  2  221  0.00  1.11  0.08  0.13  1.69
1028  1  201  0.01  0.79  0.05  0.07  1.38
1028  2  1303  0.00  0.82  0.09  0.10  1.08
1029  2  172  0.00  2.35  0.25  0.31  1.24
1034  1  36  0.00  0.50  0.05  0.07  1.41
1034  2  593  0.00  0.63  0.07  0.08  1.10
1051  1  202  0.00  1.07  0.13  0.15  1.17
1051  2  628  0.00  1.70  0.11  0.14  1.36
1300  1  1211  0.00  3.70  0.31  0.32  1.02
1300  2  409  0.00  1.88  0.20  0.25  1.25
1402  1  119  0.00  2.20  0.29  0.27  0.92
1402  2  2331  0.00  7.05  0.33  0.40  1.22

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-54

 

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
1404  2  412  0.00  3.24  0.74  0.53  0.72
1408  1  61  0.01  0.65  0.14  0.16  1.17
1408  2  438  0.00  1.60  0.21  0.22  1.02
1450  1  106  0.01  0.35  0.04  0.05  1.30
1450  2  70  0.00  0.23  0.04  0.05  1.29
1455  1  127  0.00  0.30  0.06  0.07  1.15
1455  2  136  0.00  0.21  0.03  0.04  1.34
1458  1  174  0.00  1.47  0.16  0.23  1.41
1458  2  212  0.00  2.35  0.21  0.33  1.53
1502  1  16  0.03  0.59  0.21  0.12  0.61
1502  2  173  0.01  6.96  1.06  0.77  0.72
1504  1  91  0.01  5.12  0.63  0.70  1.11
1504  2  188  0.00  4.36  0.70  0.66  0.94
1607  1  248  0.00  0.37  0.03  0.04  1.33
1607  2  498  0.00  0.67  0.04  0.07  1.51
1614  1  11  0.01  0.13  0.04  0.04  1.02
1614  2  68  0.00  0.39  0.07  0.07  0.97
1650  1  1861  0.00  2.50  0.39  0.35  0.89
1650  2  762  0.00  3.11  0.35  0.36  1.03
1702  1  137  0.01  4.91  0.34  0.48  1.40
1702  2  190  0.00  1.29  0.20  0.20  1.00
1712  1  26  0.01  0.75  0.08  0.15  1.97
1712  2  210  0.00  0.40  0.06  0.07  1.17
1716  1  136  0.00  0.84  0.11  0.14  1.18
1716  2  202  0.00  1.09  0.09  0.14  1.54
1718  1  60  0.00  0.39  0.08  0.08  1.11
1718  2  28  0.00  0.13  0.02  0.04  1.67
1750  1  368  0.00  1.04  0.16  0.18  1.07
1750  2  180  0.00  1.79  0.20  0.33  1.67
1850  1  266  0.00  0.59  0.05  0.08  1.68
1850  2  349  0.00  0.29  0.03  0.04  1.39
1855  1  353  0.00  1.50  0.28  0.27  0.99
1855  2  259  0.00  1.49  0.16  0.18  1.14
1900  1  1354  0.00  0.90  0.07  0.11  1.46
1900  2  724  0.00  0.86  0.05  0.09  1.64
1960  1  266  0.00  0.81  0.15  0.13  0.87
1960  2  107  0.00  0.69  0.08  0.09  1.12
1965  1  185  0.00  0.68  0.05  0.07  1.50
1965  2  187  0.00  0.14  0.03  0.03  1.19
2051  2  254  0.00  0.94  0.06  0.10  1.61
2060  2  330  0.00  1.32  0.13  0.17  1.29

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-55

 

C_ESTIM  C_Hole  #
Samples
  Min.
(%)
  Max.
(%)
  Mean
(%)
  Std. Dv
(%)
  C.V.
2065  2  41  0.00  0.93  0.28  0.25  0.89
2067  2  18  0.02  1.28  0.29  0.32  1.10
2069  2  17  0.00  1.02  0.33  0.23  0.70
2072  2  13  0.00  0.17  0.04  0.05  1.20
2073  2  6  0.02  0.21  0.11  0.06  0.55
2079  2  12  0.17  0.93  0.42  0.19  0.45
2104  2  135  0.02  1.90  0.28  0.34  1.25
2156  1  1  0.01  0.01  0.01  -  -
2156  2  68  0.00  0.10  0.02  0.02  1.06
11511  1  267  0.01  0.40  0.14  0.09  0.63
11511  2  1100  0.00  0.86  0.14  0.12  0.88
11512  1  616  0.00  1.20  0.25  0.19  0.77
11512  2  696  0.00  1.86  0.30  0.22  0.75

Note. C_Hole: 1: Channels, 2: Drill holes

11.9Trend Analysis
11.9.1Variography

Nexa generated downhole and directional variograms using the two metre composite values generated for each domain and each element. The variograms were used to support the characterization and quantification of the variance of mineralization within the spatial continuity of the mineralization domains being analyzed. Variograms were standardized and modelled using two spherical structures in three directions. The variograms were used for OK interpolation and as a guide for selecting search ellipse ranges.

Figure 11-13 illustrates an example of the zinc variograms for the 307 Progreso Domain. The results for all modelled variograms for zinc are listed in Table 11-17.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-56

Figure 11-13: Zinc Normal Score Experimental and Modelled Variograms for Domain Progreso 307

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-57

Table 11-17: Zinc Variogram Parameters

Nexa Resources S.A. – El Porvenir Mine

      Datamine Rotation
V-ANGLE
  Rotation System
V-AXIS
  Search Ellipse Structure 1  Search Ellipse Structure 2
C_ESTIM  Nugget  1  2  3  1  2  3  Var. Model Type  Sill  Major  Minor  Vertical  Var. Model Type  Sill  Major  Minor  Vertical
1  0.3  69.00  0.00  65.00  3  2  1  1  0.38  9  6  16  1  0.32  23  31  27
100  0.22  92.13  40.24  57.80  3  2  1  1  0.4  50  10  10  1  0.38  98  27  12
154  0.34  -139.74  66.80  -58.14  3  2  1  1  0.28  10  5  2  1  0.38  32  16  8
157  0.25  -66.51  -4.33  59.91  3  2  1  1  0.51  17  19  1  1  0.24  25  20  15
256  0.2  6.55  -9.39  69.72  3  2  1  1  0.09  17  19  1  1  0.71  65  20  15
264  0.15  80.00  44.92  85.76  3  2  1  1  0.31  38  16  3  1  0.54  56  36  14
270  0.13  146.34  14.94  84.83  3  2  1  1  0.31  23  35  5  1  0.56  99  36  30
302  0.16  105.94  9.95  -83.91  3  2  1  1  0.16  46  19  5  1  0.68  63  52  14
350  0.07  92.57  38.94  -86.14  3  2  1  1  0.32  19  13  6  1  0.61  45  29  18
453  0.2  -74.26  58.53  70.58  3  2  1  1  0.01  23  21  1  1  0.79  60  58  15
466  0.15  138.39  73.26  16.91  3  2  1  1  0.41  28  4  11  1  0.44  43  14  13
550  0.06  -114.69  48.97  -74.66  3  2  1  1  0.1  91  3  1  1  0.84  94  38  15
600  0.23  97.95  72.04  55.73  3  2  1  1  0.01  22  7  8  1  0.76  59  30  17
652  0.08  -69.00  18.75  23.86  3  2  1  1  0.08  63  19  1  1  0.84  335  20  15
671  0.447  -58.80  18.89  16.69  3  2  1  1  0.05  52  19  1  1  0.503  66  20  15
674  0.447  8.80  28.02  -11.17  3  2  1  1  0.01  3  19  1  1  0.543  91  39  15
677  0.13  26.69  20.25  -14.97  3  2  1  1  0.33  38  19  1  1  0.54  74  20  15
700  0.21  64.36  54.47  126.05  3  2  1  1  0.08  58  19  1  1  0.71  59  20  15
750  0.39  -97.53  35.63  -58.67  3  2  1  1  0.19  6  5  1  1  0.42  34  17  20
751  0.39  -175.98  74.21  -108.68  3  2  1  1  0.01  47  47  1  1  0.6  106  50  20
860  0.39  68.49  39.93  -86.09  3  2  1  1  0.19  6  5  1  1  0.42  20  20  20
865  0.39  -124.18  39.82  -83.49  3  2  1  1  0.01  20  5  1  1  0.6  20  20  20

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-58

 

      Datamine Rotation
V-ANGLE
  Rotation System
V-AXIS
  Search Ellipse Structure 1  Search Ellipse Structure 2
C_ESTIM  Nugget  1  2  3  1  2  3  Var. Model Type  Sill  Major  Minor  Vertical  Var. Model Type  Sill  Major  Minor  Vertical
872  0.17  -119.13  -4.92  -79.96  3  2  1  1  0.07  19  5  1  1  0.76  20  20  20
901  0.19  -179.12  -9.96  95.08  3  2  1  1  0.11  22  8  2  1  0.7  167  88  28
908  0.13  78.26  78.83  26.30  3  2  1  1  0.06  10  7  5  1  0.81  40  22  13
950  0.08  -54.42  49.34  -77.67  3  2  1  1  0.57  86  61  1  1  0.35  92  66  20
1008  0.39  -144.18  39.82  -83.49  3  2  1  1  0.19  6  5  1  1  0.42  20  20  20
1016  0.39  -77.34  -14.77  -79.66  3  2  1  1  0.19  6  5  1  1  0.42  20  20  20
1019  0.26  -171.00  50.00  90.00  3  2  1  1  0.32  6  5  1  1  0.42  20  20  20
1026  0.39  91.26  19.74  80.43  3  2  1  1  0.19  15  12  1  1  0.42  43  24  9
1028  0.39  104.93  34.39  77.85  3  2  1  1  0.01  64  16  1  1  0.6  93  30  20
1029  0.21  -129.68  19.47  -76.20  3  2  1  1  0.37  6  5  1  1  0.42  20  20  20
1034  0.11  -5.41  54.01  -105.44  3  2  1  1  0.11  7  22  4  1  0.78  46  125  12
1208  0.39  125.19  14.67  77.59  3  2  1  1  0.07  79  28  1  1  0.54  134  33  20
1300  0.26  115.03  59.88  38.86  3  2  1  1  0.55  13  12  1  1  0.19  34  17  20
1350  0.14  -78.46  59.94  94.00  3  2  1  1  0.18  36  5  6  1  0.68  40  24  22
1402  0.39  -84.87  14.89  97.24  3  2  1  1  0.11  34  5  4  1  0.5  60  41  14
1408  0.22  130.47  69.41  75.65  3  2  1  1  0.25  42  37  1  1  0.53  71  41  20
1410  0.21  -105.41  42.82  -67.93  3  2  1  1  0.02  33  5  1  1  0.77  48  28  20
1450  0.39  -109.25  34.51  -79.06  3  2  1  1  0.01  6  44  1  1  0.6  55  53  20
1452  0.39  -108.63  24.60  -78.99  3  2  1  1  0.12  45  5  1  1  0.49  76  75  20
1458  0.09  -20.00  60.00  90.00  3  2  1  1  0.25  28  20  3  1  0.66  34  21  13
1504  0.06  152.23  9.93  -97.11  3  2  1  1  0.37  9  7  3  1  0.57  40  26  12
1555  0.39  -79.05  -72.04  -55.73  3  2  1  1  0.1  25  12  2  1  0.51  34  31  7
1558  0.11  81.90  38.96  74.49  3  2  1  1  0.01  9  5  14  1  0.88  34  24  21
1607  0.24  -115.26  19.74  -80.43  3  2  1  1  0.01  23  24  1  1  0.75  72  28  20
1614  0.39  65.00  70.00  -90.00  3  2  1  1  0.01  20  5  1  1  0.6  20  20  20

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-59

 

      Datamine Rotation
V-ANGLE
  Rotation System
V-AXIS
  Search Ellipse Structure 1  Search Ellipse Structure 2
C_ESTIM  Nugget  1  2  3  1  2  3  Var. Model Type  Sill  Major  Minor  Vertical  Var. Model Type  Sill  Major  Minor  Vertical
1650  0.16  91.00  83.00  0.00  3  2  1  1  0.35  10  4  4  1  0.49  26  29  18
1702  0.28  52.42  65.19  51.92  3  2  1  1  0.02  19  16  1  1  0.7  89  17  20
1712  0.39  -124.00  10.00  -90.00  3  2  1  1  0.01  25  5  1  1  0.6  33  20  20
1714  0.39  114.03  59.88  38.86  3  2  1  1  0.19  6  5  1  1  0.42  20  20  20
1718  0.09  -99.00  70.00  90.00  3  2  1  1  0.01  47  5  1  1  0.9  56  20  20
1754  0.39  -46.00  40.00  -90.00  3  2  1  1  0.11  21  38  1  1  0.5  92  45  20
1850  0.19  -71.00  70.00  -90.00  3  2  1  1  0.62  10  5  1  1  0.19  34  17  20
1855  0.25  -45.40  64.83  97.07  3  2  1  1  0.28  54  5  6  1  0.47  55  17  20
1900  0.05  -77.05  72.04  -124.27  3  2  1  1  0.14  5  6  2  1  0.81  48  11  11
1950  0.39  66.09  -19.97  -86.81  3  2  1  1  0.27  19  13  1  1  0.34  34  23  8
1959  0.16  -110.00  -15.00  -90.00  3  2  1  1  0.01  4  12  15  1  0.83  38  29  26
1965  0.11  -114.38  49.96  93.11  3  2  1  1  0.09  27  17  4  1  0.8  46  30  14
2000  0.35  29.81  18.30  162.67  3  2  1  1  0.21  21  5  1  1  0.44  41  23  11
2051  0.36  -136.12  9.96  -95.08  3  2  1  1  0.01  29  5  1  1  0.63  51  39  20
2060  0.39  95.93  59.62  171.42  3  2  1  1  0.32  33  17  1  1  0.29  46  29  20
2100  0.15  146.00  40.00  -90.00  3  2  1  1  0.23  7  5  4  1  0.62  37  20  20
2150  0.39  16.33  35.63  160.48  3  2  1  1  0.01  53  5  1  1  0.6  63  17  20
2156  0.39  -49.32  -27.03  142.55  3  2  1  1  0.19  6  5  1  1  0.42  20  11  5
201  0.5  70.00  75.00  90.00  3  2  1  1  0.02  3  19  1  1  0.48  20  20  20
250  0.3  -141.19  14.67  -77.59  3  2  1  1  0.22  10  13  6  1  0.48  74  29  9
306  0.25  -90.00  90.00  175.00  3  2  1  1  0.36  5  3  1  1  0.39  49  18  15
307  0.17  129.12  -9.96  84.92  3  2  1  1  0.17  4  8  3  1  0.65  47  23  11
458  0.31  85.00  30.00  -90.00  3  2  1  1  0.48  75  31  8  1  0.21  82  55  24
701  0.16  -70.34  15.76  37.25  3  2  1  1  0.38  8  7  8  1  0.46  44  10  12
756  0.23  85.98  74.21  -71.32  3  2  1  1  0.59  30  5  1  1  0.17  34  17  20

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-60

 

      Datamine Rotation
V-ANGLE
  Rotation System
V-AXIS
  Search Ellipse Structure 1  Search Ellipse Structure 2
C_ESTIM  Nugget  1  2  3  1  2  3  Var. Model Type  Sill  Major  Minor  Vertical  Var. Model Type  Sill  Major  Minor  Vertical
800  0.08  -177.27  19.99  87.87  3  2  1  1  0.44  37  19  1  1  0.47  40  26  14
850  0.44  -125.25  38.38  -70.72  3  2  1  1  0.2  6  5  1  1  0.36  20  20  20
883  0.41  111.48  35.63  -58.67  3  2  1  1  0.19  6  5  1  1  0.4  20  20  20
1054  0.43  -112.28  37.43  -65.80  3  2  1  1  0.19  6  5  1  1  0.39  20  20  20
1609  0.34  -125.85  69.62  -78.45  3  2  1  1  0.13  46  26  1  1  0.52  80  51  20
1755  0.5  -31.85  34.94  -56.37  3  2  1  1  0.18  6  5  1  1  0.32  20  20  20
2065  0.42  108.02  74.21  71.32  3  2  1  1  0.19  6  5  1  1  0.38  30  20  20
2067  0.48  -86.18  39.82  -83.49  3  2  1  1  0.19  6  5  1  1  0.32  20  20  20
2072  0.46  -9.18  39.82  -83.49  3  2  1  1  0.19  6  5  1  1  0.35  20  20  20
2073  0.44  -95.82  39.82  -96.52  3  2  1  1  0.19  6  5  1  1  0.38  20  20  20
2079  0.44  -134.89  -3.21  3.83  3  2  1  1  0.18  6  5  1  1  0.38  20  20  20
2104  0.22  92.00  70.00  0.00  3  2  1  1  0.27  82  5  1  1  0.51  94  66  20
4501  0.06  -105.79  24.85  -83.39  3  2  1  1  0.6  6  4  5  1  0.35  18  21  16
4502  0.06  -105.79  24.85  -83.39  3  2  1  1  0.6  6  4  5  1  0.35  18  27  16
259  0.08  99.06  31.03  59.23  3  2  1  1  0.51  6  6  6  1  0.41  57  34  30
17501  0.06  -25.81  -34.78  -82.69  3  2  1  1  0.69  14  17  5  1  0.25  40  51  8
17502  0.06  -25.81  -34.78  -82.69  3  2  1  1  0.45  16  59  5  1  0.49  31  131  8
1151  0.06  116.26  58.39  49.26  3  2  1  1  0.38  8  31  4  1  0.56  42  114  58
21  0.22  92.133  40.239  57.803  3  2  1  1  0.4  50  10  10  1  0.38  98  27  12

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-61
11.10Search Strategy and Grade Interpolation Parameters

Grades were interpolated into blocks on a parent cell basis using OK for a small number of domains with sufficient data and reasonable modelled variograms. For the other domains, ID³ interpolation method was used. All the variables, Zn, Cu, Pb, and Ag, were interpolated, and estimates were not density weighted. All directions were based on Datamine’s dynamic anisotropy, which varies search ellipsoid orientations according to the trend of the mineralization domain.

The grade estimation was completed in three passes. Pass 1 uses a search radius equal to the variogram range; Pass 2 uses a search radius equal to 1.5 to 2.5 times the range of Pass 1; and Pass 3 uses a search radius of 10 times the range of Pass 1.

The search criteria for the largest contributor domains for the Mineral Resource and the Mineral Reserve are listed in Table 11-18 for zinc estimates and in Table 11-19 for silver estimates.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-62

 

Table 11-18: Zinc Estimation Parameters

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-63

 

Table 11-19: Silver Estimation Parameters

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-64

 

11.11Bulk Density

A total of 1,131 density measurements were taken within 191 mineralization domains. Nexa grouped individual mineralization domains by rock and mineralization style and defined density domains (Figure 11-14). Table 11-20 shows the statistics of all of the density data for each density domain and the density sample location is shown in Figure 11-15. Nexa assigned the mean density values to their respective density domains. In areas without or little density data, Nexa assigned either the average density for the deposit (3.42 g/cm3) or a density value from a nearby density domain with similar mineralization and rock type.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-65

 

Table 11-20: Density Data Statistics

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-66

 

Figure 11-14: 3D View of Density Domains

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-67

 

Figure 11-15: 3D View of Density Values

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-68

 

The SLR QP generated statistics based on mineralized zones and density domains to review the assigned density values and is of the opinion that the density values are reasonable and acceptable. The SLR QP recommends taking more density measurements in areas that currently have insufficient density tests available, particularly in areas within the Mineral Resource and Mineral Reserve shapes.

11.12Block Models

Mineralization wireframes were filled with blocks in Datamine Studio RM. The block model was sub-celled at wireframes boundaries with parent cells measuring 4 m by 4 m by 4 m and minimum sub-cell sizes of 0.5 m by 0.5 m by 0.5 m. The block model setup is shown in Table 11-21.

Table 11-21: Block Model Setup

Nexa Resources S.A. – El Porvenir Mine

Parameter  East (m)  North (m)  Elevation (m)
Minimum Coordinate  366,300  8,826,200  2,398
Maximum Coordinate  368,700  8,831,156  4,702
Block size  4  4  4
Min. Sub Block size  0.5  0.5  0.5

The SLR QP is of the opinion that the block size is appropriate, based on the drill spacing and proposed mining method, and is suitable to support the estimation of Mineral Resources and Mineral Reserves.

11.13Net Smelter Return and Cut-Off Value

An NSR value was determined using the Mineral Resource metal prices, metallurgical recoveries, transport, treatment, and refining costs. Metal prices used for Mineral Resources are based on consensus, long term forecasts from banks, financial institutions, and other sources. The NSR value is expressed as US$/t and is calculated for Mineral Resources to make an adequate comparison with production costs in order to determine whether the mineralized material can be economically mined.

The Mine currently produces zinc concentrate with contained silver, lead concentrate with contained silver and gold, and copper concentrate with contained silver and gold as sellable products. The payable metals in concentrates include the applicable concentrate treatment, transportation, refining charges, deductions and penalty elements, according to sales agreements signed between mines and smelters or traders.

The smelter terms and metal prices used to determine NSR factors are provided in Table 11-22. The prices are based on 10 year average of the London Metal Exchange (LME) projected prices. The smelter terms are effective as of October 2020.

Table 11-22: NSR Data

Nexa Resources S.A. – El Porvenir Mine

Item  Units  Value
Net Metallurgical Recovery *
Zn  %  89.60
Pb  %  79.21

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-69

 

Item  Units  Value
Cu  %  14.29
Ag  %  77.50
Cu Concentrate Payable %      
Cu  %  96.7
Ag  %  90
Pb Concentrate Payable %      
Pb  %  95
Ag  %  95
Zn Concentrate Payable %      
Zn  %  94.6
Ag  %  70
Metal Prices      
Zn  US$/lb  1.30
Pb  US$/lb  1.02
Cu  US$/lb  3.37
Ag  US$/oz  19.38
Logistics and TC      
Zn Concentrate  US$/t conc  $295
Pb Concentrate  US$/t conc  $266
Cu Concentrate **  US$/t conc  $279
Integrated Zn      
Conversion Cost  US$/t Zn prod  $452
Premium  US$/t Zn Prod  $173
Refining Cost      
Au in Pb conc  US$/oz  $10.00
Ag in Pb conc  US$/oz  $1.00
Ag in Cu conc  US$/oz  $0.50
       
* Based on LOM average metal grades
** Included a 16.68 USD/t penalty

Nexa reviewed supply and demand projections for zinc, lead, and copper, as well as consensus long term (ten year) metal price forecasts. SLR verified that Nexa’s selected metal prices for estimating Mineral Reserves are in line with independent forecasts from banks and other lenders. Prices selected for Mineral Resource estimation are 15% higher, which is in line with typical industry practice.

The average NSR factors are calculated using the LOM revenue contribution from each metal net of off-site costs and factors, divided by the reserve grade for that metal, and are indicative of the relative contribution of each metal unit to the economics of the mine. For most metals, a variable recovery (as a function of head grade) was used, and therefore the average NSR factors should not be applied to head grades without considering the head grade versus recovery relationship.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-70

Metallurgical recoveries used for Mineral Resources are based on historical data which have been consolidated by Nexa as head grade vs. recovery curves shown in Figure 11-16, Figure 11-17, and Figure 11-18. These curves are developed by regression on data set of historical performance.

Figure 11-16: Zinc Recovery Curve

Figure 11-17: Lead Recovery Curve

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-71

 

Figure 11-18: Copper Recovery Curve

Several cut-off NSR values (or cut-off grades) have been calculated for El Porvenir dependent on the mining zone and mining method. Each zone has a different material movement cost depending on whether truck haulage, shaft, or a combination of the two is used. Break-even cut-off grade includes direct and indirect mining costs, processing costs, and general and administrative (G&A) as shown in Table 11-23.

Table 11-23: Cut-Off Grade Calculation by Mining Zone and Method

Nexa Resources S.A. – El Porvenir Mine

Item  Units  C&F
Upper Zone      
Mine Cost  US$/t  42.26
Development  US$/t  13.82
Plant Costs  US$/t  10.50
G&A  US$/t  7.30
Cut-Off Grade  US$/t  60.06
       
Intermediate Zone      
Mine Cost  US$/t  43.29
Development  US$/t  13.82
Plant Costs  US$/t  10.50
G&A  US$/t  7.30

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-72

 

Item  Units  C&F
Cut-Off Grade  US$/t  61.09
       
Lower Zone      
Mine Cost  US$/t  41.95
Development  US$/t  13.82
Plant Costs  US$/t  10.50
G&A  US$/t  7.30
Cut-Off Grade  US$/t  59.75
       
Mine Deepening Zone      
Mine Cost  US$/t  45.57
Development  US$/t  13.82
Plant Costs  US$/t  10.50
G&A  US$/t  7.30
Cut-Off Grade  US$/t  63.37

Mining costs have been reviewed, and SLR considers that the operating costs are reasonable for this type of operation and mining methods.

11.14Classification

Definitions for resource categories used in this report are those defined by SEC in S-K 1300. Mineral Resources are classified into Measured, Indicated, and Inferred categories.

Blocks were classified as Measured, Indicated, and Inferred based on drill hole spacing requirements determined from global variograms for the mineralization domains with a combination of the number of holes. Three classification groups were defined based on geology, grade continuity, and volume. Separate classification interpolation passes were run to flag the resource categories for each group. Flagging of the blocks by drill hole spacing was done by using a search pass with dimensions as described in Table 11-25.

The first pass involved a numerical block classification based on the number of drill holes and search radii in Table 11-25 followed by a post processing of the classification to remove isolated blocks to avoid the "spotted dog" effect and to demonstrate continuity between samples.

The classification of the Mineral Resource estimate was applied as follows:

·Measured Mineral Resources: Measured blocks were defined, using criteria as defined in Table 11-25, and supported with data of a low level of uncertainty as follows:
oDrilling, sampling, and sample preparation and assay procedures: follow industry standards and best practices.
oReliability of sampling data: Good database integrity and representativity based on SLR's independent data verification and validation, as well as no significant bias observed in QA/QC analysis results.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-73
oConfidence in interpretation and modelling of geological and estimation domains: The drill hole spacing is sufficient to confirm the location and continuity of the geological and estimation domain wireframes and has been confirmed by underground mapping in places at Veta Carmen Norte 3, Exito, Socorro 2 and 4, and Carmen Norte 1, and Veta Carmen Norte 1.
oGeology and grade continuity: Based on drilling and underground mapping, trend analysis and variography show reasonable geology and grade continuity.
oConfidence in estimation of block grades for the main metals: Block grades correlate well with composite data, statistically and spatially, locally and globally.
oAcceptable bulk density representativity: Sufficient density measurements have been taken for the main domains.
oWell supported drilling spacing criteria: Block grade interpolations are based on a minimum of three drill holes using search radii that are based on reasonable variograms ranges.
·Indicated Mineral Resources: Indicated blocks were defined, using criteria as defined in Table 11-25, and supported with data of a low and/or medium level of uncertainty as follows:
oDrilling, sampling, and sample preparation and assay procedures: follow industry standards and best practices.
oReliability of sampling data: Acceptable database integrity and representativity based on SLR's independent data verification and validation, as well as no significant bias observed in QA/QC analysis results.
oConfidence in interpretation and modelling of geological and estimation domains: The drill spacing is sufficient to assume the locations and continuity of grade. Most of the main domains (Veta Carmen Norte 3, Porvenir 9, Progreso, and Sara) show good agreement with the drill holes or/and underground mapping and some minor domains show relatively acceptable agreement with the drill holes and underground mapping where the density of drill holes is less, particularly at the mineralization edges.
oGeology and Grade Continuity: Based on drilling and underground mapping, trend analysis and variography, main domains show reasonable geology and grade continuity.
oConfidence in estimation of block grades for the main metals: Block grades correlate well with composite data, statistically and spatially, locally and globally.
oAcceptable bulk density representativity: Sufficient density measurements were taken for most of the main domains, and reasonable density measurements for some of the domains with limited density measurements available at some of the mineralization edges.
oWell supported drilling spacing criteria: Block grade interpolations are based on a minimum of three drill holes using search radii that are based on reasonable variograms ranges.
·Inferred Mineral Resources: Inferred blocks were defined, using criteria as defined in Table 11-24 and supported with data of a low and/or medium and/or high level of uncertainty as follows:
oDrilling, sampling, and sample preparation and assay procedures: follow industry standards and best practices.
oReliability of sampling data: Acceptable database integrity and representativity based on SLR's independent data verification and validation, as well as no significant bias observed in QA/QC analysis results. There are some areas with drill holes pre-2006 with limited data support, however, most of these zones are surrounding with drill holes with good data support.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-74

oConfidence in interpretation and modelling of geological and estimation domains: Mineralization domain solids show relatively acceptable agreement with the drill holes and underground mapping where the density of drill holes is less, particularly at the mineralization edges and areas supported by wider drill hole spacing is implied.
oGeology and grade continuity: Based on drilling and underground mapping, trend analysis and variography, some domains show good geology and grade continuity, some other domains geometries are less well defined, and geological and grade continuity for these domains is less continuous and more variable.
oConfidence in estimation of block grades for the main metals: Block grades correlate reasonably well with composite data, statistically and spatially, locally and globally.
oBulk density representativity: Reasonable for most of the domains. Density measurements for some domains are required.

Infill drilling: More drilling is required to determine continuity of mineralization in areas of wide drill spacing in order to upgrade Inferred Resources to Indicated.

Table 11-24: Nexa Search Ellipse Ranges for Classification Criteria

Nexa Resources S.A. – El Porvenir Mine

Classification Groups  Measured  Indicated  Inferred
Major Continuity Zones  25 m x 25 m x 12.5 m  50 m x 50 m x 25 m  100 m x 100 m x 50 m
Medium Continuity Zones  20 m x 20 m x 10 m  50 m x 50 m x 25 m  100 m x 100 m x 50 m
Minor Continuity Zones  15 m x 15 m x 10 m  40 m x 40 m x 20 m  60 m x 60 m x 30 m
Minimum DDH in ellipse1  3  3  2

Note:

1.Minimum DDH in ellipse refers to the isotropic search ellipsoid used to flag the distances in the blocks

Figure 11-19 show histogram validations of the classification based on the distance of each block to its closest sample for the major, medium, and minimum continuity domains, respectively. Figure 11-20 and Figure 11-21 show a plan view and a longitudinal section of the final model classification.

The SLR QP reviewed the classification results and is of the opinion that the resource classification criteria developed by El Porvenir are reasonable and acceptable, however, SLR noticed that there are a small number of areas where the largest continuity was assigned to small mineralization solids due to merging small wireframes for estimation purposes. This observation is not significant as there were few areas observed, however, SLR recommends re-evaluating the Measured and Indicated classification in these smaller solids. SLR also recommends monitoring the production data to confirm the drill spacing is appropriate for detailed planning.

The SLR QP is of the opinion that the definitions for Mineral Resources used in this report have been classified in accordance with the definitions for Mineral Resources in S-K 1300, which are consistent with CIM (2014) definitions.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-75

 

Major Continuity Zones

 

 

Figure 11-19: Histogram of Distance (M) by Category and Continuity Zone

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-76

 

Figure 11-20: Final Classification Designation – Plan View

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-77

 

Figure 11-21: Final Classification Designation – Longitudinal Section

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-78

 

11.15Block Model Validation

Nexa and SLR carried out a number of block model validation procedures including:

·Visual inspection of composite versus block grades (Figure 11-22, Figure 11-23, Figure 11-24, and Figure 11-25).
·Comparison between OK, ID3, NN, and composite mean grades (Table 11-25).
·Swath plots (Figure 11-26).
·Histogram comparison of grade block distribution versus composite grade distribution (Figure 11-27).
11.15.1Visual Validation

A visual comparison on vertical sections and plan views found good overall correlations between the block and composite grades. Figure 11-22, Figure 11-23, Figure 11-24, and Figure 11-25 illustrate the visual correlation between the block and composite grades in the vcn3 and vcn32 mineralization domains on cross sections looking north for Zn, Pb, Cu, and Ag, respectively. There is a better correlation in the blocks closest to the composites as opposed to the blocks located further away, which show a reasonable degree of smoothing.

Nexa and SLR visually compared the composite and block grades on plans and sections and found that they correlated well spatially.

11.15.2Global Statistical Comparison

The OK or ID3 block means for each mineralization domain were compared with the NN estimations. These comparisons produced percentage differences between the estimates which were within ±10% in most of the domains, with the exception of domains dl11, por9o, and por9q that appear to be underestimated and exiti1, porv9e, and por9cf1 that appear to be overestimated. Overall, the comparisons show that the methods used to estimate grades were appropriate. Table 11-25 shows an example of this comparison for the largest contributor domains for the Mineral Resource and the Mineral Reserve. SLR recommends reviewing the grade interpolation of these domains to control high grade smearing in low grade areas and vice versa. A grade domain will also help to prevent smearing.

Table 11-25: Comparison of ID3, OK, and NN Zinc Grades – Measured and Indicated Blocks

Nexa Resources S.A. – El Porvenir Mine

            ZN_NN  ZN_OK     ZN_IDW3   
Domain  Class  Inter.
Method
  #
Blocks
  Mean (%)  CV  Mean (%)  CV  Rel. diff in Means  Mean (%)  CV  Rel. diff in Means
de2  1  IDW3  35,886  2.53  1.53  2.69  1.02  -6%  2.77  1.05  -9%
de2  2  IDW3  42,173  2.41  1.11  2.32  0.64  4%  2.44  0.77  -1%
dl01  2  IDW3  30,088  2.43  0.85  2.30  0.41  6%  2.29  0.53  6%
dl05  2  IDW3  22,252  2.73  1.40  2.75  0.87  -1%  2.66  0.97  3%
dl11  2  IDW3  5,885  2.63  0.70  2.17  0.25  19%  2.18  0.40  19%
exiti1  2  IDW3  3,908  2.27  1.45  4.45  0.57  -65%  3.24  0.81  -35%

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-79

 

            ZN_NN  ZN_OK     ZN_IDW3   
Domain  Class  Inter.
Method
  #
Blocks
  Mean (%)  CV  Mean (%)  CV  Rel. diff in Means  Mean (%)  CV  Rel. diff in Means
exito  1  IDW3  55,586  3.55  0.86  3.68  0.46  -3%  3.66  0.56  -3%
exito  2  IDW3  101,243  3.35  0.95  3.50  0.53  -4%  3.40  0.66  -1%
exitoa  1  IDW3  3,341  5.58  0.75  5.41  0.36  3%  5.43  0.43  3%
exitoa  2  IDW3  7,912  4.90  0.84  4.61  0.40  6%  5.39  0.43  -10%
exitob  1  IDW3  2,579  5.73  0.63  5.80  0.33  -1%  5.88  0.39  -3%
exitob  2  IDW3  13,377  5.06  0.75  5.34  0.37  -5%  5.38  0.43  -6%
porv9a  1  OK  13,820  6.61  0.92  6.56  0.54  1%  6.83  0.57  -3%
porv9a  2  OK  79,718  3.98  1.15  4.63  0.59  -15%  4.43  0.71  -11%
porv9e  1  IDW3  10,301  5.57  0.93  5.83  0.45  -5%  5.79  0.45  -4%
porv9e  2  IDW3  28,628  3.09  1.27  3.60  0.70  -15%  3.69  0.74  -18%
porv9w  1  IDW3  16,978  3.10  1.21  3.31  0.60  -7%  3.36  0.68  -8%
porv9w  2  IDW3  128,987  2.76  1.82  2.89  1.02  -5%  2.80  1.26  -2%
por9cf1  1  IDW3  1,790  5.70  1.16  5.70  0.61  0%  5.87  0.80  -3%
por9cf1  2  IDW3  10,145  4.35  1.23  5.11  0.60  -16%  5.08  0.77  -16%
por9o  1  IDW3  33,522  2.37  2.03  2.20  1.23  8%  2.10  1.32  12%
por9o  2  IDW3  94,951  2.82  1.35  3.08  0.94  -9%  3.11  1.03  -10%
por9p  1  IDW3  56,296  4.11  1.23  4.14  0.73  -1%  4.15  0.77  -1%
por9p  2  IDW3  88,538  4.25  1.16  4.30  0.67  -1%  4.32  0.81  -2%
por9q  1  IDW3  4,003  2.77  1.72  2.54  0.93  9%  2.34  1.12  17%
por9q  2  IDW3  113,741  4.97  1.13  5.00  0.58  -1%  5.05  0.78  -2%
por9r  1  IDW3  42,930  2.81  1.18  2.58  0.58  9%  2.51  0.62  11%
por9r  2  IDW3  34,198  3.87  0.89  2.54  0.51  42%  2.65  0.57  37%
por9s  2  IDW3  52,578  3.38  1.08  3.02  0.95  11%  3.26  1.00  4%
por9u  2  IDW3  15,549  2.08  1.09  2.10  0.49  -1%  2.23  0.59  -7%
sara1  2  IDW3  35,771  1.11  1.26  1.16  0.60  -5%  1.12  0.80  -1%
sara2  2  IDW3  39,877  1.51  1.27  1.37  0.86  9%  1.41  0.99  7%
sara3  2  IDW3  33,713  0.63  0.99  0.60  0.54  4%  0.60  0.69  6%
vcarmn  1  IDW3  6,721  6.99  1.06  6.97  0.75  0%  7.12  0.76  -2%
vcarmn  2  IDW3  68,807  8.05  1.06  7.75  0.71  4%  7.62  0.82  5%
vcn3w6  2  IDW3  14,019  3.74  0.72  3.16  0.40  17%  3.38  0.53  10%
vcn3w8  2  IDW3  21,119  4.24  1.38  4.38  0.63  -3%  4.39  0.85  -4%
vcn32  1  IDW3  2,479  4.77  0.90  4.71  0.57  1%  4.89  0.64  -2%

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-80

 

            ZN_NN  ZN_OK     ZN_IDW3   
Domain  Class  Inter.
Method
  #
Blocks
  Mean (%)  CV  Mean (%)  CV  Rel. diff in Means  Mean (%)  CV  Rel. diff in Means
vcn32  2  IDW3  77,285  6.74  0.79  6.75  0.40  0%  6.86  0.53  -2%
vc1b  1  IDW3  5,583  6.46  0.96  7.11  0.39  -10%  7.03  0.47  -9%
vc1b  2  IDW3  14,406  4.47  1.22  4.99  0.54  -11%  4.59  0.70  -3%
vc31  1  IDW3  103,152  4.63  1.12  4.56  0.71  1%  4.52  0.78  2%
vc31  2  IDW3  73,470  5.37  1.20  5.15  0.74  4%  5.41  0.89  -1%
vprg  1  IDW3  392,908  5.93  1.05  6.04  0.70  -2%  6.06  0.74  -2%
vprg  2  IDW3  476,484  3.25  1.44  3.44  1.01  -6%  3.39  1.09  -4%
v12ne  1  IDW3  44,661  4.20  1.20  4.09  0.56  3%  4.12  0.77  2%
v12ne  2  IDW3  31,050  4.78  1.23  4.28  0.59  11%  4.41  0.77  8%
v12s33  1  IDW3  20,983  2.62  1.10  2.62  0.66  0%  2.53  0.72  4%
v12s33  2  IDW3  11,721  5.18  0.84  4.99  0.60  4%  5.39  0.69  -4%
v5i  1  OK  75,980  7.48  0.85  7.45  0.42  0%  7.46  0.47  0%
v5i  2  OK  71,267  3.28  1.36  3.61  0.76  -10%  3.46  0.88  -5%
v5ne5  2  IDW3  11,036  2.74  0.81  2.88  0.49  -5%  2.86  0.58  -4%

In the SLR QP’s opinion, the statistical tables that compare the declustered composite mean (NN) and block zinc grades show that the two populations have similar distributions with not much grade smoothing evident.

11.15.3Local Validation

Swath plots were generated to assess for local bias and to compare the differences between the OK and ID3 block grade estimates and the NN estimated grades for each domain and element. The plots in Figure 11-26 show the combined Measured, Indicated, and Inferred blocks in the east, north, and vertical directions. SLR considers that the results show acceptable agreement of composite (NN) and block grades.

Histograms comparing the composite grades versus the block grades suggest that the grade distribution of these two data are similar. An example is shown in Figure 11-27.

On the basis of its review and validation procedures, the SLR QP is of the opinion that the grade estimates for zinc, copper, lead, and silver are reasonable, and that the block model is suitable to support Mineral Resource and Mineral Reserve estimation.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-81

 

Figure 11-22: Vertical Section Showing Zn Blocks Versus Composite Grades

  

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-82

 

Figure 11-23: Vertical Section Showing Pb Blocks Versus Composite Grades

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-83

 

Figure 11-24: Vertical Section Showing Ag Blocks Versus Composite Grades

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-84

 

Figure 11-25: Vertical Section Showing Cu Blocks Versus Composite Grades

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-85

 

Figure 11-26: Swath Plot: Zn Grade Variation Along X, Y, and Z

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-86

 

Figure 11-27: Zn OK, ID3, Nn Blocks Versus Zn Composite Histograms

11.16Mineral Resource Reporting

The Mineral Resources for the El Porvenir underground operation as of December 31, 2020, are summarized in Table 11-1. The Mineral Resource estimate was reported using all the material within resource shapes generated in Deswik software, satisfying minimum mining size, continuity criteria, and using NSR cut-off values of US$60.06/t for the Upper Zone, US$61.09/t for the Intermediate Zone, US$59.75/t for the Lower Zone, and US$63.37/t for the Mine Deepening Zone for C&F resource shapes (Figure 11-28 and Figure 11-29). NSR cut-off values for the Mineral Resources were established using a zinc price of US$2,869.14/t Zn, a lead price of US$2,249.40/t Pb, a copper price of US$7,427.59/t Cu, and a silver price of US$19.38/oz Ag. El Porvenir Mineral Resources are in compliance with the S-K 1300 resource definition requirement of “reasonable prospects for economic extraction”.

Wireframe models for the underground excavations as of September 30, 2020 were prepared to remove the portions of the mineralized zones that had been mined-out before the resource and reserve stopes were generated. Mineral Resource and Mineral Reserves estimates were depleted for forecast production from October 1, 2020 to December 31, 2020. After year end, SLR verified the estimate by reviewing actual mining results for this short period of projected mining. Deviations from plan were approximately 1% less of total Mineral Reserves tonnage. The SLR QP is of the opinion that this has had an insignificant impact on the year end resource and reserve estimates. The sub-blocking functions of the Deswik software package were employed to maximize the accuracy of the mined-out contacts. For the underground excavations, solid models of the stopes, mine development, and drifts were constructed digitally from data collected using a total station surveying unit.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-87

Nexa also generated solids for non-recoverable areas (“constraint” solids) due to poor ground conditions and inaccessibility, to remove these zones from the Mineral Resources and Mineral Reserves. SLR considers generating operational and safety constraints to identify, quantify, and remove the tonnes and grades from Mineral Resources and Mineral Reserves to be a good practice. SLR recommends documenting all the data support to define non-recoverable solids and document any changes to these solids.

The SLR QP reviewed the resource shapes and is of the opinion that overall they are reasonable, however, there are few areas where shapes do not follow the mineralization trend wireframe and, as a result, unnecessary internal dilution was incorporated and some resources were excluded locally. SLR recommends adjusting these resource shapes to follow mineralization trend.

SLR also noticed that there is a significant amount of tonnes within blocks above the NSR cut-off value that were not included in the Mineral Resources or Mineral Reserves, and are not part of the “constraint” solids. Nexa and SLR reviewed these areas and note that they are mostly skin remnants, however, SLR recommends re-evaluating these zones on an ongoing basis to potentially include part of these tonnes with continuous blocks that have the potential to be recoverable, to generate resource shapes and possibly reserve stopes.

SLR also observed a minor overlapping of the resource shapes with areas that were within the “constraint solids”, and few reserve stopes that were overlapping with mined-out solids. The overlapping volume is not material as it is less than 1%. Nevertheless, the SLR QP recommends improving and cleaning up the mined-out solids to deplete appropriately the block model and resource and reserve shapes, and incorporating a validation step of reviewing for overlapping of solids.

In the SLR QP’s opinion, the assumptions, parameters, and methodology used for the El Porvenir underground Mineral Resource estimates are appropriate for the style of mineralization and mining methods.

The SLR QP is of the opinion that with consideration of the recommendations summarized in Section 1 and Section 23, any issues relating to all relevant technical and economic factors likely to influence the prospect of economic extraction can be resolved with further work.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-88

 

Figure 11-28: Plan View of Mineral Resources Inclusive and Exclusive of Mineral Reserves

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-89

 

Figure 11-29: Longitudinal Section of Mineral Resources Inclusive and Exclusive of Mineral Reserves

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-90

 

11.17Comparison to Previous Mineral Resource Estimates

A comparison of the current Nexa Mineral Resource estimate, exclusive of Mineral Reserves, to the previous 2019 Mineral Resource estimate is presented in Table 11-26. Mineral Resources are reported on an 80.16% Nexa attributable ownership basis. Overall, the resources have slightly decreased. The differences are primarily due to the following changes:

·Higher NSR cut-off values.
·Decrease in tonnes in Porvenir 9, Progreso, Veta 1204 due to changes in interpretation, and in Carmen Norte 3, Carmen Norte 4, Veta 1204 inferior, and Socorro due to new drilling and reinterpretation. Some of the decrease in tonnes was offset by delineating new resources in Sara, and incorporating more resources in Don Lucho, AM, Integration ATA EP, Carmen 1, and Exito.
·Depletion of material through mining.
·Incorporation of “constraint ” solids or non-recoverable areas that are excluded from the Mineral Reserves and Mineral Resources, due to poor ground conditions and inaccessibility.
·Increase in silver values due to higher capping values.
·Slightly lower density values due to the addition of 219 density determinations from the 2019-2020 drilling campaign located mostly at Sara, Don Lucho, Integration ATA EP, Veta Carmen Norte 3, and Veta AM.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-91

Table 11-26: EL Porvenir Underground Comparison of 2020 versus 2019 Mineral Resources

Nexa Resources S.A. – El Porvenir Mine

   El Porvenir Mineral Resources - December 31, 2020  El Porvenir Mineral Resources - December 31, 2019
      Grade  Contained Metal     Grade  Contained Metal
Category  Tonnage
(Mt)
  (% Zn)  (% Pb)  (% Cu)  (g/t Ag)  (000 t Zn)  (000 t Pb)  (000 t Cu)  (000 oz Ag)  Tonnage
(Mt)
  (% Zn)  (% Pb)  (% Cu)  (g/t Ag)  (000 t Zn)  (000 t Pb)  (000 t Cu)  (000 oz Ag)
Measured  0.18  2.59  0.99  0.23  63.46  4.8  1.8  0.4  378  0.83  3.1  1.08  0.21  70.2  25.8  9.0  1.8  1,881
Indicated  1.07  2.93  0.89  0.2  63.33  31.3  9.5  2.1  2,176  1.00  3.2  1.01  0.21  57.8  32.5  10.1  2.1  1,861
M+I  1.25  2.87  0.91  0.2  63.35  36.1  11.4  2.6  2,554  1.84  3.2  1.04  0.21  63.4  58.3  19.1  3.8  3,741
Inferred  6.79  3.6  0.95  0.23  78.37  244.5  64.8  15.9  17,110  7.46  3.6  0.85  0.22  58  270.1  63.4  16.4  13,917

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

11-92
12.0Mineral Reserve Estimates
12.1Summary

El Porvenir is an underground mine that, at full output, produces approximately 5,600 tpd of ore. The Mine has been in operation since 1949. The current Mineral Resource and Mineral Reserve model consists of 430 deposits of various sizes and dips.

The Mineral Reserves are grouped into four mining zones, which are differentiated by elevation (Table 12-1).

Table 12-1: El Porvenir Mining Zones

Nexa Resources S.A. – El Porvenir Mine

Original Name Term Used in Report Definition
Zona Alta Upper Zone Above 3,700 m
Zona Intermedia Intermediate Zone Between 3,100 m and 3,700 m
Zona Baja Lower Zone Between 2,900 m and 3,100 m
Profundizacion Mine Deepening Zone Below 2,900 m

The Upper Zone is the oldest mining area, where most of the mineralized areas have been mined, with currently available stopes mainly corresponding to the recovery of remnant material and new mineralized zones. The vertical spacing of levels in the Upper Zone ranges between 60 m and 100 m.

The Intermediate and Lower zones are the major current mining areas with levels spacing of approximately 200 m.

The Mine Deepening Zone is the future mining area at depth and has a level spacing of 100 m.

El Porvenir uses two mining methods, C&F and SLS. C&F uses the overhand method to extract the ore using attack ramps and is employed in areas of poor ground conditions that do not allow for the SLS method to be used. The SLS method is used in areas that have favourable ground conditions and are steeply dipping.

Measured and Indicated Mineral Resources were used as inputs for conversion into Proven and Probable Mineral Reserves, respectively, and for the mine design process.

Mineral Reserves were estimated by flagging mined-out stope surveys through September 2020 and planned mining to December 31, 2020, as zero-values in the block model. After year end, SLR verified the estimate by reviewing actual mining results for the short period of projected mining. Deviations from the plan, amounting to approximately 1% of total Mineral Reserves tonnage, were caused by 2020 infill drilling and mining of some areas classified as Inferred at the time of the estimate. SLR considers these deviations to be typical of ongoing mining operations, and not significant or material to the estimate of Mineral Reserves.

The Mineral Reserves for El Porvenir as of December 31, 2020 are summarized in Table 12-2.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-1

Table 12-2: Mineral Reserves – December 31, 2020

Nexa Resources S.A. – El Porvenir Mine

      Grade  Contained Metal
Category  Tonnage
(000 t)
  (% Zn)  (% Pb)  (% Cu)  (g/t Ag)  (000 t Zn)  (000 t Pb)  (000 t Cu)  (000 oz Ag)
Proven  3,017  3.76  0.98  0.25  62.9  113.3  29.6  7.6  6,094
Probable  8,085  3.74  0.85  0.22  62.8  302.7  68.5  18.0  16,324
Total  11,102  3.75  0.88  0.23  62.8  416.0  98.1  25.6  22,418

Notes:

1.The definitions for Mineral Reserves in S-K 1300 were followed for Mineral Reserves which are consistent with CIM (2014) definitions.
2.Mineral Reserves are reported on an 80.16% Nexa attributable ownership basis.
3.Mineral Reserves are estimated at cut-off grades depending on the zone and mining method.
4.Mineral Reserves are estimated using average long term prices of Zn: US$2,494.90/t (US$1.13/lb); Pb: US$1,956.00/t (US$0.89/lb); Cu: US$6,457.90/t (US$2.93/lb); Ag: US$16.85/oz.
5.Metallurgical recoveries are accounted for in the NSR calculations based on historical processing data and are variable as a function of head grade. Recoveries at the LOM average head grades are 89.6% for Zn, 79.2% for Pb, 14.3% for Cu, and 77.5% for Ag.
6.A minimum mining width of 5 m was used.
7.Density is 3.12 t/m3.
8.Numbers may not add due to rounding.

The SLR QP is not aware of any risk factors associated with, or changes to, any aspect of the modifying factors such as mining, metallurgical, infrastructure, permitting, or other relevant factors that could materially affect the Mineral Reserve estimate.

12.2Dilution

The following formula is used to determine the amount of dilution in a stope:

 

The dilution used in the Mineral Reserve estimation is implemented through two means:

·Dilution by design (internal dilution)
·Dilution by overbreak (planned/operational dilution)

Dilution by design refers to the waste incorporated during the stope design process, in which portions of waste wall rock (non categorized) and Inferred blocks are incorporated inside the shape of the stopes. This is commonly referred to as internal dilution and is shown inside the blue stope design in Figure 12-1.

Dilution by overbreak is determined from several factors such as:

·Geometry of the mineralized zone
·Mining method
·Operational conditions
·Geomechanics
·Rock mechanics implemented

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-2
·Presence of water

These factors determine the amount of planned overbreak in a stope.

The dilution factor for C&F is 0.5 m of dilution applied to the hanging wall and footwall of the design. The dilution was applied using DSO.

The dilution factor for SLS stopes is 10% and is applied post design as a factor. Nexa is in the process of determining the dilution factor for each mining method and is using the above factors as an acceptable base point. The SLS stopes are in good ground and have an average dip of 80°. In the SLR QP’s opinion, the factor used is reasonable.

Figure 12-1: Schematic Section View of Stope Illustrating Dilution and Extraction Values in a Stope

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-3

 

12.3Net Smelter Return

A NSR value calculation was performed on potential mining blocks, considering the following attributes:

·Grades: Zn, Pb, Cu, Ag
·Metal prices
·Metallurgical recovery
·Commercial terms and conditions

The NSR value is expressed as US$/t and is calculated for Mineral Reserves to make an adequate comparison with production costs in order to determine whether mined material is ore (economically minable) or waste.

The sellable products from the Mine are:

·Zinc concentrate
·Lead concentrate with silver content
·Copper concentrate with silver content

The payable metals in concentrates include the applicable concentrate treatment, transportation, refining charges, deductions, and penalty elements, according to sales agreements signed between mines and smelters or traders.

Costs and other parameters used to calculate the NSR cut-off value are shown in Table 12-3. The metal prices are based on 10 year average of the LME projected prices.

The average NSR factors are calculated using the LOM revenue contribution from each metal net of off-site costs and factors, divided by the reserve grade for that metal, and are indicative of the relative contribution of each metal unit to the economics of the mine. For most metals, a variable recovery (as a function of head grade) was used, and therefore the average NSR factors should not be applied to head grades without considering the head grade versus recovery relationship.  Therefore, the NSR factors are variable by head grade.  The grade-recovery relationship for each metal based on recent operating performance are presented in Figure 12-2, Figure 12-3, and Figure 12-4.

Table 12-3: NSR Data

Nexa Resources S.A. – El Porvenir Mine

Item  Units   
Net Metallurgical Recovery *
Zn  %  89.60
Pb  %  79.21
Cu  %  14.29
Ag  %  77.50
Cu Concentrate Payable %      
Cu  %  96.7
Ag  %  90
Pb Concentrate Payable %      
Pb  %  95
Ag  %  95

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-4

 

Item  Units   
Zn Concentrate Payable %      
Zn  %  94.6
Ag  %  70
Metal Prices      
Zn  US$/lb  1.13
Pb  US$/lb  0.89
Cu  US$/lb  2.93
Ag  US$/oz  16.85
Logistics and TC      
Zn Concentrate  US$/t conc  $295
Pb Concentrate  US$/t conc  $266
Cu Concentrate **  US$/t conc  $279
Integrated Zn      
Conversion Cost  US$/t Zn prod  $452
Premium  US$/t Zn prod  $173
Refining Cost      
Ag in Pb conc  US$/oz  $1.00
Ag in Cu conc  US$/oz  $0.50

* Based on LOM average metal grades

** Included a US$16.68/t penalty

Nexa reviewed supply and demand projections for zinc, lead, and copper, as well as consensus long term (ten year) metal price forecasts. SLR verified that Nexa’s selected metal prices for estimating Mineral Reserves are in line with independent forecasts from banks and other lenders.

Metallurgical recoveries used for Mineral Reserves are based on historical data which has been consolidated by Nexa in Ore Head Grade vs. Recovery Curves presented in Figure 12-2, Figure 12-3, and Figure 12-4. These curves are developed by regression of historical performance data sets.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-5

 

Figure 12-2: Zinc Recovery Curve

Figure 12-3: Lead Recovery Curve

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-6

 

Figure 12-4: Copper Recovery Curve

12.4Cut-Off Grade

Metal prices used for Mineral Reserves are based on consensus, long term forecasts from banks, financial institutions, and other sources. For Mineral Resources, metal prices used are slightly higher than those for Mineral Reserves.

Several cut-off NSR values (or cut-off grades) have been calculated for El Porvenir dependent on the mining zone and mining method. Each zone is based on an elevation range as listed in Table 12-1. Each zone has a different material movement cost depending on whether truck haulage, shaft, or a combination of the two is used. The Lower Zone, for instance, has a lower cut-off grade than the other zones due to heavy skipping influence as shown in Table 12-4, below. Economic cut-off grade included direct and indirect costs as follows:

·Mining costs (including cost of mine development costs)
·Processing costs
·G&A costs

Measured or Indicated blocks that have an average NSR value above the economic cut-off grade, are scheduled to be mined, and are not isolated (i.e., a single stope far from other stopes) are classified as economically mineable and included in the Mineral Reserve estimate.

Marginal mining blocks are defined as blocks below the economic cut-off grade, which, however, benefit from certain conditions such as location and thus can be evaluated using a marginal cut-off grade. The stopes generally have development complete due to development accessing adjacent stopes and therefore, the development costs are removed for such marginal blocks resulting in the marginal cut-off grade.

Capital costs have been averaged in cut-off grade calculation.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-7

Mining blocks with an NSR value below the marginal cut-off grade are classified as waste.

Table 12-4: Cut-Off Grade Calculation by Mining Zone and Method

Nexa Resources S.A. – El Porvenir Mine

Item  Units  SLS Costs  C&F Cost
Upper Zone         
Mine Cost  US$/t  38.95  42.26
Development  US$/t  13.82  13.82
Plant Costs  US$/t  10.50  10.50
G&A  US$/t  7.30  7.30
Cut-Off Grade  US$/t  56.75  60.06
Marginal Cut-Off Grade  US$/t  42.93  46.24
          
Development Cost  US$/m  1,395.73  1,395.73
          
Intermediate Zone         
Mine Cost  US$/t  39.98  43.29
Development  US$/t  13.82  13.82
Plant Costs  US$/t  10.50  10.50
G&A  US$/t  7.30  7.30
Cut-Off Grade  US$/t  57.78  61.09
Marginal Cut-Off Grade  US$/t  43.96  47.27
          
Development Cost  US$/m  1,395.73  1,395.73
          
Lower Zone         
Mine Cost  US$/t  38.64  41.95
Development  US$/t  13.82  13.82
Plant Costs  US$/t  10.50  10.50
G&A  US$/t  7.30  7.30
Cut-Off Grade  US$/t  56.44  59.75
Marginal Cut-Off Grade  US$/t  42.62  45.93
          
Development Cost  US$/m  1,395.73  1,395.73
          
Mine Deepening Zone         
Mine Cost  US$/t  42.26  45.57
Development  US$/t  13.82  13.82
Plant Costs  US$/t  10.50  10.50
G&A  US$/t  7.30  7.30

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-8

 

Item  Units  SLS Costs  C&F Cost
Cut-Off Grade  US$/t  60.06  63.37
Marginal Cut-Off Grade  US$/t  46.24  49.55
          
Development Cost  US$/m  1,395.73  1,395.73

SLR considers that the operating costs are reasonable for this type of operation and mining methods.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

12-9
13.0Mining Methods
13.1Introduction

El Porvenir is one of the deepest underground mines in South America, extending more than 1,800 m below the main access level. El Porvenir produces approximately 2.1 Mtpa of zinc-lead-copper ore using two mining methods, with the predominant method being mechanized overhand C&F. C&F has been used at El Porvenir for many decades and accounts for over 80% of its production. The remainder of the output comes from SLS, which was introduced at the operation in 2018. El Porvenir uses a version of this method called Avoca, also referred to as longitudinal longhole retreat mining.

Mine production is presently underway in the Upper Zone, the Intermediate Zone, the Lower North Zone, and the Lower West (El Porvenir 9) Zone (Figure 13-1). Table 13-1 indicates the mining methods used in the active mineral deposits within these zones.

Table 13-1: Mining Methods in Active Mining Zones

Nexa Resources S.A. - El Porvenir Mine

   C&F  SLS
Upper Mine Zone      
DE2     
V1204     
CN4     
AM     
Don Lucho     
       
Intermediate Mine Zone      
CN3     
Exito    
Carmen   
       
Lower North Mine Zone      
CN3     
       
Lower West Mine Zone      
Porvenir-9     

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-1

 

Figure 13-1: Active Mining Zones

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-2

 

13.2Mine Design and Mining Methods

Table 13-2 through Table 13-5 present the design parameters used for modelling Mineral Reserves. Respectively, these tables provide the parameters for stope design, development excavations, production rates, dilution, and recovery.

Table 13-2: Long Term Stope Design Parameters

Nexa Resources S.A. - El Porvenir Mine

Item  Method  Parameters
(m)
Height  C&F  5.00
   SLS  20.00
Minimum Width  C&F  5.00
   SLS  5.00
Maximum Width  C&F  10.00
   SLS  8.00
Length  C&F  5.00
   SLS  10.00
Minimum Pillar - Veins  C&F  5.00
   SLS  5.00
Rib Pillar  C&F  -
   SLS  10.00
Sill Pillar - Panels  Above Level -440  10.00
   Below Level -440  15.00
Pillar - Surface  Upper Zone  30.00

Table 13-3: Development Design Parameters

Nexa Resources S.A. - El Porvenir Mine

Item  Width
(m)
  Height
(m)
  Grade
(%)
  Radius
(m)
Ramps for Truck Haulage  4.50  4.00  13%  18.00
Ramps for Load-Haul- Dump Units (LHDs)  4.50  4.00  13%  18.00
Main Crosscut  4.50  4.00  + 1%  8.00
Crosscut between Veins  4.50  4.00  + 1%  8.00
Bypass  4.50  4.00  Per design  8.00
Access to Orebody  4.50  4.00  15%  8.00

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-3

 

Item  Width
(m)
  Height
(m)
  Grade
(%)
  Radius
(m)
Attack Ramps  Per design  Per design  Per design  8.00
Drift  4.50  4.00  + 1%  8.00
Ventilation Drift  4.00  4.00  + 1%  8.00
Electrical Substation  4.00  4.00  + 1%  6.00
Sump  4.50  4.00  -15%  6.00
Diamond Drill Station  6.00  6.00  + 1%  6.00
Raise Bore (diameter)  2.1/3.1  2.1/3.1  -  -
Raise (diameter)  2.1/3.1  2.1/3.1  -  -

Table 13-4: Long Term Production Rate Parameters

Nexa Resources S.A. - El Porvenir Mine

Item  Units  Parameters
C&F Crew Contribution - ZA  t/month  35,000
C&F Crew Contribution - ZI/ZB  t/month  38,000
SLS Contribution  t/month  17,500
Hydraulic Backfill  t/month  10,500
Advance per Crew  blasts/month  55
Output through Hoisting  t/month  133,000
Output through Truck Haulage  t/month  46,000
Ore Density  t/month  3.54
Waste Density  t/month  2.98

Table 13-5: Long Term Parameters For Dilution And Recovery

Nexa Resources S.A. - El Porvenir Mine

Item  Method  Units  Parameters
Operational Dilution  C&F  (m)  1.00
   SLS  (%)  10.00
Planned Dilution  C&F  (m)  Varies
   SLS  (%)  Varies
Recovery  C&F  (%)  98.00
   SLS  (%)  85.00

Table 13-6 and Table 13-7 provide monthly results for mine production and development advance during recent years. El Porvenir mined 2.11 Mt of ore in 2019 and 1.52 Mt in 2020, and advanced development

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-4

headings by 12.2 km in 2019 and by 10.8 km in 2020. Dilution accounted for 37.5% of the ore tonnage produced in 2020.

Table 13-6: Mine Production -- Years 2018 to 2020

Nexa Resources S.A. - El Porvenir Mine

   Units  Jan  Feb  Mar  Apr  May  June  July  Aug  Sept  Oct  Nov  Dec  Total
2018                                          
Ore Mined  000 t  172.8  175.7  171.4  174.6  184.8  179.2  181.3  179.2  176.1  186.1  177.7  186.0  2,145.0
Stockpile  000 t  7.4  22.4  9.9  9.2  14.0  11.5  9.5  12.8  3.1  18.1  11.3  10.8  11.7
Dilution  %  23.1  16.3  16.2  22.8  20.9  21.5  22.1  24.6  22.0  22.0  22.0  36.8  22.6
                                           
2019                                          
Ore Mined  000 t  179.8  170.2  187.9  172.9  191.4  165.4  193.5  169.8  179.3  148.8  186.4  165.4  2,110.7
Stockpile  000 t  16.6  20.0  17.7  14.9  13.1  6.8  9.1  5.7  2.3  2.7  2.0  0.4  9.3
Dilution  %  34.0  25.3  33.4  41.9  35.9  39.6  35.5  38.8  31.8  34.1  29.0  27.4  33.9
                                           
2020                                          
Ore Mined  000 t  163.7  150.5  102.6  -  80.2  151.7  116.6  145.6  165.0  139.1  139.6  170.2  1,524.7
Stockpile  000 t  11.7  0.62  -  -  8.76  6.3  1.2  0.41  0.54  0.90  1.6  0.13  3.2
Dilution  %  36.5  36.5  31.6  -  29.1  38.4  35.4  44.2  45.0  35.3  37.0  36.0  37.5

Table 13-7: Development Advance - Years 2017 to 2020

Nexa Resources S.A. - El Porvenir Mine

Year  Units  Jan  Feb  Mar  Apr  May  June  July  Aug  Sept  Oct  Nov  Dec  Total
2017  m  1,427  1,111  847  1,039  1,085  1,128  1,095  963  974  1,065  1,156  873  12,762
2018  m  1,545  986  1,153  1,363  1,180  1,215  1,175  1,213  1,245  1,249  1,214  916  14,453
2019  m  1,135  1,235  1,138  955  763  977  1,120  1,021  983  976  999  939  12,242
2020  m  1,139  967  690  -  264  1,020  612  892  1,254  1,333  1,403  1,239  10.811

C&F and SLS have similar development requirements as they both involve dividing a mining zone into horizons between sublevels and excavating the ore in an ascending fashion. Sublevels are typically spaced at 20 m vertical intervals and accessed via spiral ramps. The development on each sublevel includes an access drift, a footwall drive, and crosscuts or attack ramps, which provide access to the orebody. For SLS, the footwall drive can be as close as 15 m from the footwall contact, whereas for C&F, they have to be offset from it by 60 m to provide sufficient distance for fanning the attack ramps. Figure 13-2 illustrates a zone mined with C&F, while Figure 13-3 shows a zone with SLS.

Figure 13-4 illustrates C&F’s mining cycle, consisting of drilling, blasting, mucking, and ground support. Backfilling is carried out after completing a cut and before initiating the next higher-up one. Table 13-8 provides information about the method as applied at the Mine. With C&F, ore in an ore block is mined

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-5

from bottom to top in five metre thick horizontal slices or cuts. The first cut of the stope is mined as a drift through the orebody, which is slashed out between the footwall and hanging wall contacts. The subsequent cuts are mined by breasting, which involves slashing the ore by drilling horizontal holes with the jumbo and blasting the ore downwards to the previous cut’s free face. Following each breast, the broken ore is mucked and transported out of the stope with an LHD.

Table 13-8: Cut and Fill Mining Method at El Porvenir

Nexa Resources S.A. - El Porvenir Mine

Parameter  Description
Version  Mechanized overhand C&F
Sublevel interval  Typically, 20 m
Cut height  5 m
Cuts accessed per attack ramp  4 cuts
Attack-ramp grade  15%
Excavation method  Breasting - horizontal drilling with jumbo
Explosive  Ammonium nitrate/fuel oil (ANFO)
Backfill  • Up to 70% uncemented rockfill and
• remainder hydraulic tailings backfill   

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-6

 

Figure 13-2: Cut and Fill Stoping – Longitudinal View

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-7

 

Figure 13-3: Sublevel Stoping – Longitudinal View

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-8

 

Figure 13-4: Cut and Fill Mining Cycle

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-9

 

Attack ramps driven from the sublevels provide access to a C&F stope. Figure 13-5 illustrates the procedure for accessing the progressively higher cuts. An attack ramp is initially driven with a -15% inclination to access a cut below the sublevel’s elevation. The attack ramp is then back-slashed in a fan-like fashion with some muck left on the floor to access each subsequent cut. The ramp to the highest cut will have a continuous positive grade over its entire 60 m length. The next cut must be accessed with a new attack ramp, driven at -15% from the next higher-up sublevel. An attack ramp at El Porvenir permits accessing four cuts from a sublevel.

After mining the complete cut or horizontal slice of a C&F stope, the open space must be backfilled from floor to back. Besides supporting the stope walls, the backfill provides the floor for mining the next higher-up cut. Hydraulic backfill is the principal backfill used for C&F at the Mine and consists of classified mill tailings sent underground via a pipeline as slurry. Up to 70% of the stope is filled with rockfill, which is waste from development headings. This material is dumped on the stope floor, after which hydraulic backfill is placed to tight-fill the remaining opening. The stope then sits inactive for several days until the water drains out of the hydraulic backfill, leaving it with a consistency similar to fine sand.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-10

 

Figure 13-5: Access to Cut and Fill Stopes

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-11

 

While C&F is the predominant mining method at El Porvenir, SLS accounts for a small but growing proportion of the production. The Mine uses a version of SLS called Avoca, which is used instead of C&F when the configuration of the orebody and the ground conditions are suitable for the method and when development waste is available for backfilling. Table 13-9 analyzes the advantages and disadvantages of the SLS Avoca method as compared with C&F.

Table 13-9: Advantages and Disadvantages of Avoca Compared with Cut and Fill

Nexa Resources S.A. - El Porvenir Mine

Advantages Disadvantages

·        Is an excellent method for disposing of development waste, which is not the case with C&F.

·        Has a higher productivity and lower mining costs than C&F.

·        Backfilling can be carried out in parallel with longhole drilling.

·        Sublevel development may be less. The footwall drive can be located closer to the contact which reduces the length of crosscuts and there is no back-slashing of attack ramps.

·        Less ground support is required as the stoping procedure does not involve breasting cuts or back-slashing attack ramps.

·        Is not a selective method like C&F, so wall dilution will be higher and recovery lower.

·        Additional dilution will occur when backfill from the waste pile is mucked with the ore.

·        The method only works with rockfill. It is not compatible with hydraulic backfill.

·        Is only suitable if the footwall dips at a sufficiently steep angle such that the broken ore can be drawn down by gravity without it hanging up on the footwall.

·        Is less suitable for mining zones with poor ground conditions than C&F. For instance, cable bolts may be required to stabilize a weak hanging wall.

As previously stated, the SLS Avoca method is similar to C&F in terms of its bottom-up mining sequence and development requirements. The main difference between the methods is how they excavate the ore horizons between sublevels. C&F mines the ore in horizontal slices by breasting, while Avoca mines vertical slices by benching.

Avoca benches the ore in a retreating fashion. The benches retreat towards the middle of the vein, starting from the opposite ends of the vein. The ore between two sublevels is completely mined-out once the final bench is blasted at the middle of the vein. Backfilling is an integral part of the mining cycle. The stope is progressively backfilled as the ore is extracted. The rockfill pile advances behind the bench. Figure 13-6 illustrates the Avoca version of SLS, and Figure 13-7 shows the method’s mining cycle. Table 13-10 provides information about how Avoca is applied at El Porvenir.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-12

 

Source: Nexa

Figure 13-6: Avoca Mining Method

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-13

 

Figure 13-7: Sublevel Stoping Mining Cycle

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-14

 

Table 13-10: Sublevel Stoping Method at El Porvenir

Nexa Resources S.A. - El Porvenir Mine

Parameter Description
SLS at El Porvenir  
  • Contribution 15% to 20% of mine production
  • Version of SLS Avoca (longitudinal longhole retreat mining)
     
Orebody Characteristics Required for SLS
  • Vein Configuration Continuity, tabular form, regular profile
  • Dip Dip > 65°
  • Width Width > 3 m
  • Ground Conditions RMR > 40 (favourable ground)
     
Longhole Drilling  
  • Drilling Direction Downholes
  • Hole Diameter 63 mm
  • Burden 1.5 m
  • Spacing 1.5 m
  • Drilling Layout Parallel or fanned depending on vein geometry
  • Bench-Face Inclination 90° - holes in each row are drilled in vertical plane
  • Bench Height 15 m to 18 m, depending on sublevel interval
     
Production Blasting  
  • Typical Blast Three rows of longholes per blast
  • Explosive ANFO
  • Primer One stick of emulsion per hole
  • Controlled Blasting Sometimes emulsion in footwall and hanging wall
  • Slot to Initiate Bench Vertical crater retreat (VCR) drop raise between upper and lower ore drives
     
Backfilling  
  • Backfill Loose rockfill from development waste
  • Backfilling Procedure LHD enters from extreme ends of stope
  • Minimum Span 20 m to 25 m rockfill pile to ore bench before blast
  • Maximum Span 30 m to 40 m rockfill pile to ore bench after blast
  • Backfill Pile Slope Angle of repose = 30° to 40°
     
Ground Support  
  • Cable Bolting In hanging wall with shallow dip or poor ground.
  • Cable Bolts Up to 15 m long, depends on stope design.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-15

 

Parameter Description
  • Shotcrete 50 mm, on sublevels per geotechnical recommendation
  Crosscut Spacing 80 m to 120 m

Benching at each end of the vein is initiated by drilling and blasting longholes into a slot raise consisting of a drop raise between the upper and lower ore drives. The benches are drilled with rows of longholes, which are drilled as downholes from the upper ore drive. Typically, three rows of longholes are blasted at a time. Figure 13-8 is an example of a drilling layout for a row of longholes in an Avoca stope.

Following each bench blast, an LHD mucks the broken ore from the lower sublevel ore drive. As the LHD operates beyond the bench’s brow, some of the ore must be mucked using radio remote control. The LHD transports each bucket of ore out of the stope, and either dumps it into an orepass on the sublevel or loads it onto a truck.

With Avoca, backfilling is an integral part of the mining cycle, generally proceeding in parallel with production drilling. Once the blasted ore is mucked out, the stope is backfilled by advancing the pile of rockfill toward the bench, filling the void created by mining it.

An LHD delivers each bucket of rockfill to the stope entering via one of the upper sublevel crosscuts. It travels over the rockfill already deposited and dumps its load over the edge of the advancing pile. The filling operation stops when the gap between the top edge of the waste pile and the bench edge measures 20 m to 30 m. This gap provides a free face for the next production blast. When blasted, the broken ore impacts against the sloping waste pile, rather than scattering about an open stope. When mucking the ore, the LHD operator must avoid mixing it with the waste backfill.

In veins with strike lengths of less than approximately 100 m, El Porvenir may use a version of the mining method called Modified Avoca. With this version, the LHD delivers rockfill to the stope via the central crosscut rather than the ones at the ends of the vein. The LHD travels through the upper sublevel ore drive and dumps the rockfill starting from the bench edge.

The advantage of Modified Avoca is that a footwall drive is not required. Its disadvantages are:

·Production drilling cannot be carried out in parallel with backfilling on the same side of the stope.
·Ventilation uses vent ducting.
·Extra rockfill handling is required.

This additional handling occurs as some of the rockfill must be mucked out from the lower ore drive to open up a free face for blasting the next bench. The time and cost saved by eliminating the footwall drive often outweigh the disadvantages. Modified Avoca is not a suitable method when the vein’s strike length exceeds 100 m as the LHD’s in-stope travel time becomes excessive.

El Porvenir has successfully applied C&F mining for decades, and C&F will continue to be the predominant mining method in future years. The Avoca version of SLS is an advantageous method for zones that have suitable conditions for its application. Compared with C&F, it is a higher productivity and lower cost mining method. Furthermore, it is an excellent method for disposing of development waste. Using development waste as backfill saves on the cost of hauling it out of the Mine, reduces ramp congestion, and saves on ventilation for truck haulage.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-16

 

Figure 13-8: Typical Layout for Longhole Drilling

13.3Geomechanics and Ground Support

The geotechnical conditions at El Porvenir result from the rock mass’s characteristics and the Mine’s depth. The host rock and the mineralized zones are generally classified as fair to good, with rock mass ratings (RMR) ranging from 40 to 60. El Porvenir is one of South America's deepest mines, extending more than 1,800 m below the main access level. Its depth contributes to the occurrence of seismic events, including rockbursts.

Table 13-11 summarizes information regarding the rock mass characteristics at El Porvenir. The host rock consists mainly of slightly altered limestones and marble. The mineralized zone is moderately altered and consists primarily of skarn, breccia, calcareous breccias, heterolithic breccias, and siliceous breccias. The rock mass has three joint sets of discontinuities and a system of random joints spaced from 50 mm to 600 mm. The discontinuities are generally calcite filled or clean and wet. The rock strengths range from medium to high (60 MPa to 120 MPa). The in-situ stresses are approximately 45 MPa in the middle zone

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-17

of the Mine and high in the lower zones, exceeding 60 MPa. Table 13-12 presents representative values for major stresses both in magnitude and azimuth that were measured in 2001.

Table 13-11: Rock Mass Characteristics

Nexa Resources S.A. - El Porvenir Mine

Deposit Geology Description
Host Rock Slightly altered limestones and marble.
Mineralized Zones Moderately altered, includes skarn, breccia, calcareous breccias, heterolithic breccias, and siliceous breccias
Deposit Type Contact metasomatic replacement type polymetallic ore deposit
Alteration Zone Alteration zone of metamorphism, skarn, and marble in the intrusive-limestone rock contacts.
Strike Southern bodies and veins strike north-south, northeast, and northwest, and northern structures strike northwest.
Discontinuities Three joint sets of discontinuities plus random joints system with spacings ranging from 50 mm to 600 mm.  Discontinuities are generally calcite filled or clean and wet.
Intact Rock Properties Density
(t/m3)
UCS
(MPa)
Intrusive Rock 2.65 to 2.96 50 to 80
Pyritic Intrusive 3 to 4.2  
Marble 2.7 to 3.1 50 to 250
Limestone 2.7 50 to 100
Mineralization 3.2 to 4.1 50 to 100
Geomechanics Classification
Permanent Workings Type II rock (RMR: 60–80) to type III rock (RMR: 40–60)
Producing ore zones Type III rock (RMR: 40–60) and type IV rock (RMR: 20–40)
In-Situ Stresses
Middle Zone ~ 45 MPa
Lower Zones > 60 MPa
Water Conditions Minimal water infiltrations, the rock mass is generally dry.

Sources: SRK, 2017 & Nexa, 2020

Table 13-12: Magnitude and Azimuth of the In-Situ Stresses

Nexa Resources S.A. - El Porvenir Mine

Sigma 1  Azimuth  Dip  Sigma 2  Azimuth  Dip  Sigma 2  Azimuth  Dip
42.4 MPa  90°  16.5°  36 MPa  356°  13°  30 MPa  231°  70°

Source: SRK, 2017

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-18

Seismic events, including rockbursts, occur due to the high ground pressures associated with the Mine’s depth. Table 13-13 presents information about seismicity and seismic events at El Porvenir. Sudden, violent rock failure (rockbursts) is one of the most critical risks for the operation. Most seismic events originate sufficiently far away from the mine workings that they are not severe enough to impact underground operations.

Table 13-13: Seismic Events

Nexa Resources S.A. - El Porvenir Mine

Seismic Events at El Porvenir
Largest recorded Mw 1.6 in September 2018. Historically, since 2006, events up to 2.2 have occurred.
Typical events Mw -0.5 to 1.5
Distances in the rock mass Typically, 300 m to 500 m from the excavations
Seismic Risk 1.13 The classic formulation of the Gutenberg-Richter model (Model GR, Gutenberg and Richter 1958) is the one most used in the seismic characterization of a source for hazard studies combined with area-type sources.  The recurrence model involves considering a logarithmic relationship between the rate of large and small earthquakes that can occur in a source zone or a fault (or a linear relationship between the logarithm of the rate of large and small earthquakes).
Procedures According to Intensity of Seismic Event
Small ML < 0  
Medium ML 0 to 0.8 Temporarily stop work and inspect the area.
Large ML 0.8 to 1.5 Leave the stopes and shut down operations for one shift.
Very Large ML > 1.5 Withdraw to a safe zone and shut down operations in the stope and nearby ones for at least two shifts.
Seismic Magnitude Measurements Used
ML = Linear Magnitude Scale
Mw = Moment Magnitude Scale, measures the size of events in terms of the amount of energy released. Specifically, moment magnitude refers to the amount of rock movement (i.e., the distance of movement along a fault or fracture) and the area of the fault or fracture surface, defined by Hanks & Kanamori (1979).

Source: Nexa, 2020

El Porvenir has implemented measures to minimize the risks associated with seismic events. The Mine’s geomechanical team has a microseismic monitoring system installed in the Mine to monitor seismicity.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-19

presents the procedures to be followed when a seismic event occurs. The Mine planning team incorporates the following measures in its mine designs:

·The timing and sequencing of excavations are planned such that yielded ground does not store excessive strain energy.

·       Stope-blast designs minimize the number of mining steps. Blasts are controlled to maintain stability around excavations.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-20

 

Figure 13-9: Procedures for Seismic Events

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-21

 

Table 13-14 presents El Porvenir’s ground support standards. An excavation’s ground support requirement depends on whether it is permanent or temporary and the quality of its rock in terms of RMR. Split sets are used in temporary mine workings, and resin-rebar bolts are required in permanent ones. Shotcrete containing synthetic fibre is applied when ground conditions are less than favourable.

Table 13-14: Ground Support Procedures

Nexa Resources S.A. - El Porvenir Mine

Excavation
Type
  RMR
Range
  Bolt
Type
  Bolt
Length
  Bolt
Spacing
(m)
  Mesh
Type
  Shotcrete1
Thickness (mm)
  Steel
Sets
Temporary (< 1 year)
Maximum Span 8 m
  < 30  Split Set  2.1 m  1.00 x 1.00m  Welded  75  -
   30 - 40  Split Set  2.1 m  1.20 x 1.20m  -  50  -
   40 - 50  Split Set  2.1 m  1.10 x 1.10m  Welded  -  -
   50 - 60  Split Set  2.1 m  1.30 x 1.30m  Welded  -  -
   > 60  Split Set  2.1 m  1.50 x 1.50m  -  -  -
                      
Permanent (> 1 year)
Maximum Span 6 m
  < 20  Avoid Excavating               
   20 - 30  Split Set     -  -  50  1.0 m
   30 - 40  Split Set  2.1 m  1.10 x 1.10m  Welded  75  -
   40 - 50  Resin Rebar  2.1 m  1.20 x 1.20m  -  50  -
   50 - 60  Resin Rebar  2.1 m  1.30 x 1.30m  Welded  -  -
   > 60  Resin Rebar  2.1 m  1.50 x 1.50m  Welded  -  -

Note:

9.Contains synthetic fibre
13.3.1Recent Geotechnical Studies

A number of geotechnical studies have recently been carried out by Nexa (Nexa, 2019c; Nexa 2020h; Nexa, 2021):

·Geomechanical study for implementing ground support standards;
·Stability analysis for applying the sublevel stoping method in the CN-03 Vein, Level -890/-910;
·Stability analysis for applying the sublevel stoping method in the Carmen Cola Vein, Level 3470/3450;
·Determining the rib pillar for the Éxito Vein, 3550 Level;
·Determining the maximum longitudinal span for mining the Éxito Vein (3370 Level) with sublevel open stoping;
·Determining the crown pillar for mining the Porvenir 3 Stope – Upper Zone;
·Geomechanical study of the Don Ernesto Orebody at El Porvenir Mine; and
·Evaluation of the seismic hazard at the El Porvenir Mine (Calixto, 2020)

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-22
13.4Hydrogeology

El Porvenir experiences moderate groundwater inflows and consequently has not developed hydrological models. The average flow of water discharged is 125 L/s. This rate is from all sources, including drilling. Amphos 21 Consulting Perú S.A.C. (Amphos 21) has carried out the following hydrogeological studies related to an environmental impact, shaft deepening, and the tailings dam:

·Modification of the Environmental Impact Study of the Atacocha Mine - Hydrological and Hydrogeological Study (July 2018)
·Preliminary Hydrogeological Study for deepening the Picasso shaft (December 2016)
·Hydrogeological Analysis for Flow Estimation during the Construction of the Winze (October 2014)
·Hydrogeological Study and Water Balance Support for Raising the El Porvenir Tailings Dam to 4,100 MASL (August 2019)

Amphos 21 identified the following hydrogeological systems at El Porvenir:

·Sub-surface system: It occurs in quaternary sediments and weathered and highly fractured rock. It is associated with shallow and surface water and the principal water bodies and catchments where the mine's infrastructure, including the tailings dam facilities, is located.
·Depth system: It is hydraulically disconnected from the sub-surface system and occurs adjacent to the underground workings. Water infiltrations towards the mine are minimal. However, some water infiltration occurs in the fractures and drill holes in the mine's western area, close to Milpo-Atacocha fault.
13.5Infrastructure and Mine Services
13.5.1Introduction

Table 13-15 summarizes the Mine’s infrastructure and fixed equipment.

Table 13-15: Mine Infrastructure

Nexa Resources S.A. - El Porvenir Mine

Infrastructure Location Description
Compressor House 0 Level San Carlos mine entrance 1 x Ingersoll Rand, 298 kW, 85 psig, 1050 cfm
1 x Ingersoll Rand, 223 kW, 85 psig, 1000 cfm
2 x Gardener Denver, 130 kW, 85 psig, 700 cfm
La Quinua Tunnel Level 3620 (-450) Drainage tunnel
Pump station Level 3470 (-600) 3 x Stationary pumps Vogel, 450 hp, one of which on standby.
Pump station Level 3240 (-830) 3 x Stationary pumps Vogel, 600 hp, one of which on standby.
Pump station Level 3100 (-970) 3 x Stationary pumps Vogel, 250 hp, one of which on standby.
Pump station Level 2840 (-1230) 3 x Stationary pumps Vogel, 450 hp, one of which on standby.
Auxiliary pump Level -1370 Submersible pump, 15 hp
Auxiliary pump Level 1570 Submersible pump, 15 hp

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-23

 

Infrastructure Location Description
Dewatering Pipe   Steel, 10" Ø
Refuge Station Level 3650 (-420), Cx 969 20-person capacity, 72 hours
Refuge Station Level 2460, Spiral 55 20-person capacity, 72 hours
Powder Magazine Level -440  
Powder Magazine Level -970  
Maintenance Shop Level 3470 For rubber-tired mobile equipment
Picasso Shaft Collar Level (0) 4101.78 MASL 1 Cage + 2 skips, 1,732 m depth
Hoist Room:    
Production Hoist Level 4070 MASL 2 x 3,000 hp / 2 drum 192" x 72"
Service Hoist Level 4070 MASL 1,200 hp / 1 drum 120"x72"

The following subsections describe El Porvenir’s infrastructure and mine services.

13.5.2Ventilation

El Porvenir’s ventilation system provides airflow of approximately 32,000 m3/min to the underground workings. Figure 13-10 illustrates the Mine’s ventilation system.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-24

 

Figure 13-10: Ventilation System

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-25

 

Table 13-16 and Table 13-17 present the balance between intake and return airflows measured at each of the monitoring stations listed. The fresh air enters the Mine via 11 intake points, and the return air is expelled to surface via 11 routes.

Table 13-16: Ventilation Balance - Intake Airflow

Nexa Resources S.A. - El Porvenir Mine

Code  Intake Airflow  Flow
(m3/min)
EP-I-1  Mine Entrance San Carlos 4070 level  2,593.4
EP-I-2  Phase 1 Adit 4070 level  269.7
EP-I-3  Main Drift 4170 level  4,383.0
EP-I-4  Main drift 4120 level  1,299.6
EP-I-5  Mine Entrance 4020 level  356.2
EP-I-6  Porvenir II Ramp 3990 level  1,008.8
EP-I-7  Main Drift 4150 level  6,960.1
EP-I-8  La Quiñua Tunnel 3620 level  4,849.4
EP-I-9  Connecting Drift to Atacocha 4070m level  2,420.5
EP-I-10  Connecting Drift to Atacocha 3370m level  5,535.3
EP-I-11  Don Ernesto Raise 4050 level  2,428.1
   Total  32,104.1

Table 13-17: Ventilation Balance - Return Airflow

Nexa Resources S.A. - El Porvenir Mine

Code  Return Airflow  Flow
(m3/min)
EP-S-1  Pocket Raise 4120 level  1,205.4
EP-S-2  Conventional raise 4120 level  2,277.4
EP-S-3  Exito raise 4170 level  1,571.0
EP-S-1  Porvenir II raise 3970 level  4,383.0
EP-S-1  CN 4 raise 4150 level  7,616.0
EP-S-1  Drift #1 South - 1 3100 level  999.3
EP-S-1  Drift #1 South - 2 2900 level  1,508.7
EP-S-1  Drift #2 South 3630 level  2,901.3
EP-S-1  Drift #4 South 3630 level  1,862.9
EP-S-1  Drift #5 South 3630 level  1,579.8
EP-S-1  Alimak 2 4150 level  8,084.1
   Total  33,988.9

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-26

The Mine’s total estimated ventilation demand is based on the factors indicated in Table 13-18. As El Porvenir is a mechanized operation, approximately 80% of the requirement is attributable to diesel equipment. Six main ventilation fans with capacities ranging from 90,000 cfm to 210,000 cfm extract the return air from the Mine (Table 13-19). Figure 13-11 presents a 200,000 cfm main ventilation fan both before installation and while in operation.

Table 13-18: Ventilation Requirement

Nexa Resources S.A. - El Porvenir Mine

Item  Flow
(m3/min)
Personnel  2,011.0
Wood  0.0
Temperature  0.0
Diesel Equipment  24,828.9
Leaks  4,026.0
Total  30,865.9
    
Actual Fresh Air Intake  32,104.1
Coverage (%)  104%

Table 13-19: Main Ventilation Fans

Nexa Resources S.A. - El Porvenir Mine

Code  Make  Power
(hp)
  Capacity
(cfm)
  Level
EP-VE-103  Howden  200  90,000  Level 3300 (-770)
EP-VE-107  Zitron  400  200,000  Level 4150 (+80)
EP-VE-110  Zitron  400  200,000  Level 4150 (+80)
EP-VE-116  Airtec  200  100,000  Level 3630 (-440)
EP-VE-43  Joy  400  210,000  Level 4170 (+100)
EP-VE-44  Joy  400  180,000  Level 3620 (-450)

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-27

 

Source: Nexa, 2020d

Figure 13-11: Main Ventilation Fan

Secondary fans direct the airflow through the Mine’s secondary ventilation circuits. Table 13-20 presents the system’s main branches. Smaller auxiliary fans and vent ducting ventilate the development headings. Auxiliary fans range from 20,000 cfm to 50,000 cfm in capacity and have electric motors ranging from 40 hp to 100 hp. The fabric type ventilation ducting ranges from 24 in. to 36 in. in diameter. Figure 13-12 presents examples of work headings ventilated with ducting.

Table 13-20: Main Ventilation Branches

Nexa Resources S.A. - El Porvenir Mine

Ventilation Branch  Nominal Capacity
(cfm)
  Intake/Return
Raise CH-3  200,000  Intake
Raise CH-Central  180,000  Intake
Raise Socorro Norte  100,000  Intake
Raise CH-2A  200,000  Return
Raise CH-1  100,000  Return
Raise CH-2  100,000  Return
Raise CN-4  200,000  Return
Raise CH-4&5  200,000  Return

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-28

 

Source: Nexa, 2020d

Figure 13-12: Ventilation Ducting Used to Ventilate Work Headings

13.5.3Mine Dewatering

El Porvenir's dewatering system discharges water via the La Quinua tunnel. Mine water occurring above the tunnel's elevation drains to it by gravity via drain holes. Water occurring in the levels below the tunnel is pumped to it by the Mine's pumping system. Figure 13-13 illustrates El Porvenir's dewatering system.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-29

Figure 13-13: Mine Dewatering System

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-30

 

The water occurring in the stopes, sublevels, and work headings flows by gravity or is pumped to the auxiliary sumps present on each sublevel. The water is then conducted via drain holes and ditches to one of the main sumps and pumping stations. As shown in Figure 13-14, water is pumped sequentially from station to station until it is finally discharged to the La Quinua tunnel. Pump stations are located on levels 2840 (-1230), 3100 (-970), 3240 (-830), and 3470 (-600).

Figure 13-14: Dewatering Sequence

Each station has two sumps with capacities ranging from 400 m3 to 700 m3. The first sump receives the dirty water and allows the sediments to settle out of it. The clean overflow is transferred to the second sump. The water is then pumped to the station on the next higher level or from the 3240 level station to

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-31

the La Quinua tunnel. The sumps are periodically cleaned by pumping the mud and sediment to old stopes.

Each pump station is equipped with three stationary, multi-stage pumps, each with a capacity of 70 m3/h to 90 m3/h. Two of these pumps operate in parallel, while the third one is a standby unit, available to replace either of the others. An automatic system controls the starting and stopping of these pumps. Two independent lines consisting of 10 in. diameter steel pipe extend between the pumping stations and from the uppermost station to the La Quinua tunnel. One of the dewatering lines is in use while the other is on standby.

The La Quinua tunnel is the drainage outlet for the Mine’s dewatering system. The water flows via a ditch in the tunnel, exiting through the portal at the town of La Quinua. The water passes through the water treatment plant and then discharges into the Huallaga River. The discharge from the Mine averages 136 m/s. Table 13-21 presents details about the Mine’s dewatering system.

Table 13-21: Dewatering System

Nexa Resources S.A. - El Porvenir Mine

Pump Station Pump Type Power
(hp)
Capacity
(L/s)
  Elevation
(MASL)
Pumping Height
(m)
La Quinua Water-Treatment Plant            
             
Level 3620 (-450) Quinua Drainage Tunnel         3,620  
             
Level 3470 (-600) Pump Station Vogel 450 83 } In parallel    
Vogel 450 83 3,513.72 158
Vogel 450 83 Standby    
             
Level 3240 (-830) Pump Station Vogel 600 90 } In parallel    
Vogel 600 90 3,281.81 247.4
Vogel 600 90 Standby    
             
Level 3100 (-970) Pump Station Vogel 250 73 } In parallel    
Vogel 250 73 3,120.89 158
Vogel 250 73 Standby    
             
Level 2840 (-1230) Pump Station Vogel 450 83 } In parallel    
Vogel 450 83 2,874.98 200
Vogel 450 83 Standby    
             
Level -1370 Auxiliary Pump Auxiliary pump 15     2,879.82 60
             
Level -1570 Auxiliary Pump Auxiliary pump 15        

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-32

 

While part of the mine water originates from groundwater inflows, drilling, and other mine operations, most of it comes from backfilling. When hydraulic backfill is placed in a C&F stope, it requires a sufficient water content to flow as a slurry through the backfill pipeline. Once the backfill is placed in the stope, the water drains out of it over several days. The water percolates through the backfill material and drains out through the barricades that seal the attack ramps. The barricades are lined with textile, and the water filters through it. The tailings component of the backfill remaining in the stope has a consistency similar to fine sand. The water drained from the barricades flows or is pumped to the auxiliary sumps on the sublevel. Figure 13-15 illustrates the process of draining backfill from a stope.

Figure 13-15: Drainage from Backfilling Stopes

13.5.4Compressed Air

The Mine’s compressed air is supplied by four compressors (Table 13-15, Mine Infrastructure) installed in a compressor house situated at the San Carlos entrance (0 level). These units have a combined nominal capacity of 3,450 cfm. Compressed air is supplied to the underground working areas via a system of pipes.

13.5.5Water Supply

Seven tanks and pipes with 2 in., 3 in., and 4 in. diameters supply the Mine’s industrial water. Table 13-22 lists the locations and capacities of the water tanks.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-33

Table 13-22: Water Tanks

Nexa Resources S.A. - Mina El Porvenir

Location  Capacity
(m3)
Level +170  180
Level +80  165
Level -280  400
Level -360  300
Level -600  180
Level -700  188
Level -970  200
13.5.6Backfill

Backfill plays a critical role in a stope’s ground support by filling the opening left from excavating the ore. Backfill also serves as a floor for mining the next higher up cut in the case of C&F and the next higher up intersublevel horizon in SLS. El Porvenir’s mining operations use two types of backfill:

·Unconsolidated hydraulic backfill
·Loose rockfill

Rockfill consists of waste blasted in development headings. C&F stopes can be backfilled with up to 70% rockfill, while hydraulic backfill must fill the remaining opening. SLS (Avoca) stopes are backfilled with rockfill only. Any waste that cannot be used as backfill must be hauled via truck to surface where it may be used for civil work on the tailings dam.

Figure 13-16 illustrates the hydraulic-backfill system, and Table 13-23 provides information about the backfill’s preparation and distribution. Table 13-24 presents the design criteria for hydraulic backfill, which is a slurry consisting of mill tailings from the processing plant that have been classified to remove the fine particles. A bank of hydrocyclones achieves this classification process. The coarser component, which is suitable for backfill, is separated as the underflow. The fine tailings in the overflow are disposed of in the TSF.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-34

Figure 13-16: Hydraulic Backfill System

Table 13-23: Hydraulic Backfill Preparation and Distribution

Nexa Resources S.A. - El Porvenir Mine

Item   Description
Warman Pump, 10x8, EM 8032, 175 hp   Pumps tailings from processing plant thickener to backfill plant
Nest of 8 hydrocyclones, CAVEX D10   Overflow (fines) goes to the tailings pond
    Underflow used for backfill
Warman 8x6, 50 hp Pumps   Pump overflow to either of two tailings ponds
Denver 5x4, 30 hp   Two pumps pump backfill mixture to storage tanks
Storage Tank #1, 400 m3,   Stores backfill mixture (1,200 t capacity)
Storage Tank #2, 400 m3   Holds water used to flush backfill lines
Agitators   Two 11 m3 agitators keep pulp at 1,750 g/L to 1,950 g/L for Low Area and 1,650 g/L to 1,800 g/L for the High Area
Mars H180 S Pump, 250 hp   Pumps hydraulic backfill via 4 in. dia. pipeline to the higher-elevation zones

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-35

 

Item   Description
Lines #1 and #2   Hydraulic backfill flows to lower levels by gravity via boreholes
Distribution Piping Network    
• From plant to -100 (3070) level   Polyethylene pipe with 5 in. external diameter, 500 m in length
• From -100 (3970) level to the raise   Polyethylene pipe with 4 in. external diameter
• From the raise to the stopes   Polyethylene pipe with 3i n. external diameter

Table 13-24: Design Criteria of Hydraulic Backfill

Nexa Resources S.A. - Mina El Porvenir Mine

Parameter  Units  Value
Pulp density low area  g/L  1,750 to 1,950
Pulp density high area  g/L  1,650 to 1,800
% solids low area  %  63.77
Quantity pulp low area  m3/hr  54
Percolation time  cm/hr  2.44
D60/D10     5.23
Aggressiveness     Low

Until the Mine is ready to receive it, the backfill is stored at the hydraulic backfill plant in two tanks, which keep the tailings suspended as a slurry (Figure 13-17). The backfill supplied to El Porvenir’s Upper Zone is pumped with a Mars Pump. This part of the system has a capacity of 30,000 t/month. The backfill supplied to the Intermediate Zone flows by gravity through the Mine’s reticulation system. This part of the system has a capacity of 60,000 t/month.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-36

Figure 13-17: Hydraulic Backfill Plant

13.5.7Emergency Egress and Mine Rescue

Figure 13-18 illustrates the Mine’s emergency egress routes and shows the locations of two refuge stations. The refuge stations are set up for Mine rescue purposes and can accommodate 20 individuals for up to 72 hours (Table 13-15, Mine Infrastructure). Table 13-25 lists the routes available for exiting the Mine.

Table 13-25: Exits to Surface

Nexa Resources S.A. - El Porvenir Mine

Exit Description
1 Level 0, where the Picasso Shaft is located
2 Via the Principal Spiral Ramp, which communicates to surface at level -50
3 Level +80 by Ramp
4 Level -450, connecting to surface via the La Quinua tunnel.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-37

 

Figure 13-18: Emergency Egress Routes and Refuge Stations

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-38

 

13.5.8Electric Power

El Porvenir has the following three sources of electric power:

·Paragsha II Substation
·La Candelaria Hydroelectric Plant
·Standby power from generators

Table 13-26 describes electrical power supply for the El Porvenir operation. Figure 13-19 illustrates the electrical system for the Mine in a one-line diagram.

Table 13-26: Supply of Electric Power

Nexa Resources S.A. - El Porvenir Mine

Electric Power Source #1: Paragsha II Substation

·The Paragsha II Substation is located in the nearby city of Cerro de Pasco and is part of the national electric power grid (Sistema Interconectado Nacional).
·The Paragsha II Substation supplies electric power at 138 kV to the Milpo Substation via a 12.57 km long transmission line.
·The Milpo Substation has two 25 MVA transformers operating in parallel that step down the voltage from 138 kV to 50 kV.
·The Milpo Substation supplies electric power at 50 kV to #3 Substation via a 0.88 km long transmission line.
·Substation #3 has two transformers operating in parallel that step down the voltage from 50 kV to 13.2 kV.
·The Milpo Substation also supplies electricity at 50 kV to the Nueva Chicrin Substation, which provides power for the Atacocha Mine.

Electric Power Source #2: La Candelaria Hydroelectric Plant

·The La Candelaria Hydroelectric Plant is located in La Quinua and has a capacity of 5.5 MVA.
·The hydroelectric plant supplies electric power at 50 kV to the secondary side of the Milpo Substation via a 2.94 km-long transmission line.
·The Milpo Substation supplies electric power to #3 Substation, which steps down the voltage from 50 kV to 13.2 kV.

Electric Power Source #3: Standby Generators at Substation #2

·Substation #2 has four Sulzer generator sets that provide standby power.
·These generators produce electricity at 460 V, have a combined capacity of 2.3 MVA, and are rated at 100 kW, 250 kW, 450 kW, and 750 kW, respectively.
·In case of an interruption of supply from the national electric power grid, the generators and hydroelectric plant can provide electricity for operating critical services such as ventilation fans and pumps.
·The voltage of the electricity produced by the generators is stepped up from 460 V to 13.2 KV.
·Substation #2 can provide power at 13.2 kV to the secondary side of Substation #3 and to the main Substations #10 and #11, which supply the Picasso Shaft.
·These substations subsequently reduce the voltage to 2.4 kV.
·Substation #2 also has transformers that step down the voltage from 13.2 kV to 2.4 kV and can connect to secondary substations located underground, including Substations #121 and #123.
·These secondary substations step down the voltage from 2.4 kV to 440 V and supply power for pumps and other equipment.

Distribution of Electric Power to the Underground Mine: Substation #3

·Substation #3 distributes electric power to the main underground substations, which reduce to the voltage from 13.2 kV to 2.4 kV

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-39
·These main substations supply power to secondary substations throughout the mine.
·The secondary substations reduce the voltage from 2.4 kV to 440 V for operating ventilation fans, pumps, and other equipment.

Source: Nexa, 2020d

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-40

 

Figure 13-19: One-Line Diagram of the El Porvenir Electrical System

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-41

 

The Paragsha II Substation is located in the nearby city of Cerro de Pasco and is part of the national electric power grid (Sistema Interconectado Nacional), and supplies electric power at 138 kV to the Milpo Substation via a 12.57 km long transmission line. The Milpo Substation has two 25 MVA transformers operating in parallel that step down the voltage from 138 kV to 50 kV. The Milpo Substation supplies electric power at 50 kV to #3 Substation via a 0.88 km long transmission line and also supplies electricity at 50 kV to the Nueva Chicrin Substation, which provides power for the Atacocha Mine.

The La Candelaria Hydroelectric Plant is located in the town of La Quinua and has a capacity of 5.5 MVA. It supplies electric power at 50 kV to the secondary side of the Milpo Substation via a 2.94 km long transmission line. The Milpo Substation provides electric power to #3 Substation, which steps down the voltage from 50 kV to 13.2 kV.

El Porvenir has four Sulzer generators at Substation #2. These are standby units and are available to provide power in case of an interruption of supply from the national electric power grid. The generators working together with the La Candelaria Hydroelectric Plant can provide power for operating critical services such as ventilation fans and pumps. The four units are rated at 100 kW, 250 kW, 450 kW, and 750 kW, respectively, and have a combined capacity of 2.3 MVA. They produce electricity at 460 V, which is stepped up to 13.2 kV.

Substation #2 can provide power at 13.2 kV to the secondary side of Substation #3 and to the main Substations #10 and #11, which supply the Picasso Shaft. These latter substations reduce the voltage to 2.4 kV. Substation #2 also has transformers that step down the voltage from 13.2 kV to 2.4 kV and connect to secondary substations located underground, including Substations #121 and #123. These secondary substations step down the voltage from 2.4 kV to 440 V and supply power for pumps and other equipment.

Substation #3 serves as a central hub for distributing El Porvenir's power and consists of two transformers operating in parallel that step down the voltage from 50 kV to 13.2 kV. It distributes electric power to the main underground substations, which reduce the voltage to 2.4 kV. The main substations supply electricity to the secondary substations throughout the mine. These, in turn, reduce the voltage from 2.4 kV to 440 V for operating ventilation fans, pumps, and other equipment. Figure 13-20 and Figure 13-21 illustrate the standard layout of a substation and electrical equipment, respectively.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-42

 

Figure 13-20: Standard Layout for an Underground Electrical Substation – Plan View

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-43

 

Figure 13-21: Electrical Equipment in a Typical Substation

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-44

 

13.5.9Communications

El Porvenir has a leaky-feeder system for communications and data transmission underground. The system consists of the installation of a special coaxial cable that acts as an antenna along its length for two-way radio communication. It is called “leaky” because the cable has slots cut into its outer shield enabling it to emit and receive radio signals as a radiating cable. The system requires line-of-site positioning between the cable and the handset or other device. Consequently, the coaxial cable must be extended along a drift or other heading advances to maintain full communications capability.

Should El Porvenir plan on upgrading its underground data communications capabilities, it should consider replacing the leaky-feeder system with a high speed digital network based on Wi-Fi or LTE technology. Leaky feeder’s low frequency limits its data transferring capacity and hence its compatibility with mining’s increasingly data driven technologies.

As the Mine has extensive existing workings, a private 4G-LTE network could be an attractive option. A private 4G-LTE network can provide substantial level coverage with a lower installation requirement than alternative systems as it sends a reliable signal over long distances without coaxial cables, amplifiers, or access points. Furthermore, it is not limited to line-of-site transmission.

A high speed digital network will permit El Porvenir to implement centralized control and monitoring of underground operations from a control room on surface. These centralized functions can include real time tracking of personnel and equipment, telemetry, ventilation on demand (VOD), seismic monitoring, and closed circuit television, among other applications.

With a high speed digital network, El Porvenir could implement automated and/or tele-remote technology to operate equipment from control stations on surface. The technology can be used for mucking development headings, crushing, and operating rockbreakers, etc. A significant benefit is that it allows many mining operations to continue during otherwise non-productive periods, including lunch breaks, shift changes, blasting times, and ventilating smoke. SLR does not, however, consider automated/tele-remote technology a practical option for mucking stopes or production drilling, as automation technology is not compatible with El Porvenir’s mining methods and orebody configuration.

With an upgraded communications system, El Porvenir could implement tele-remote mucking of development headings. After blasting the round and during shift change, the operator could run the LHD from a control station on surface. With this procedure, the heading could be mucked out and ready for ground support as soon as the oncoming crew arrives at the workplace underground.

13.5.10Transport and Material Handling

The underground transportation and materials handling system at El Porvenir has the following components:

·Ramps
·Orepasses
·Track haulage level
·Picasso Shaft
·Conveyor

El Porvenir has several ramp systems that provide access to the levels and sublevels. Most of the ramps have a spiral configuration and coil from sublevel to sublevel over a vertical interval of typically 20 m.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-45

While the Mine uses most of the development waste as rockfill to backfill the stopes, approximately 10% to 30% of it must be hauled to surface via the ramps.

The ore produced in the C&F and SLS stopes is transported to and dumped in orepasses by LHDs. These orepasses extend to the 2,900 track haulage level (-1170), where the ore is pulled from chutes and loaded onto mine cars. The mine cars dump at an orepass grizzly, and the ore is transferred to the Picasso Shaft's loading pocket on the 2,500 level. From there, the ore is loaded onto skips and hoisted via the shaft to the ore dump. After being discharged at the dump, the ore is transferred to the underground crushing plant. Crushed ore is transported to the surface and the processing plant via a conveyor in an inclined drift.

With a shaft depth of 1,732 m, the El Porvenir shaft is the deepest in South America (southamericatotheworld.com). Information about the Picasso Shaft is presented Table 13-27. The Picasso Shaft consists of a cage for transporting personnel and two counterbalanced skips for hoisting ore. It is not set up for hoisting waste. Nexa plans to upgrade the Picasso Shaft by replacing the wood sets in its upper portion with steel ones. This upgrade will permit higher hoisting speeds increasing its ore hoisting capacity.

Table 13-27: Picasso Shaft

Nexa Resources S.A. - El Porvenir Mine

Item   Description
Production hoist   2 x 3,000 hp, two drum 192" x 72"
Service hoist   1,200 hp, single drum 120" x 72"
Hoisting rope - production hoist   2 1/4" diameter
Hoisting rope - service hoist   1 1/4" diameter
Hoistroom - production hoist   Level 4070 MASL
Hoistroom - service hoist   Level 4070 MASL
Shaft collar level   San Carlos level, Level (0) 4101.78 MASL
Shaft bottom   2370 MASL
Shaft depth   1,732 m
Skips   2 skips counterbalanced
Skips, hoisting speed   3,000 feet per metre (fpm) nominal, 2,000 fpm in operation
Skip payload   16 t/skip nominal capacity, 13 t/skip in operation depending on ore grade.
Cage   9 Persons per deck, 2 decks
Cage, maximum hoisting speed   1,254 fpm
Loading pocket   Level (-1570) 2500 MASL
Ore dump   Level 4070 MASL
Tramming level   Level 2900 (-1170)
Underground crushing plant   Level 4060 MASL, Hewitt Robins 30" x 42", 150 hp, 300 t/h, 4.5" opening

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-46
13.6Mine Equipment

El Porvenir is a highly mechanized mining operation and consequently has a considerable quantity of equipment. Table 13-28 and Table 13-29 present information about the Mine’s trackless mobile equipment and track equipment, respectively. Table 13-15 (Mine Infrastructure) and Table 13-27 (Picasso Shaft) provide information about fixed pieces of equipment, including the Picasso Shaft’s hoisting plant. To achieve its production and development targets, El Porvenir strives to achieve the mechanical availabilities indicated in Table 13-30 for strategic equipment.

Table 13-28: Trackless Mobile Equipment

Nexa Resources S.A. - El Porvenir Mine

            Contractors
Type  Make  Model  Nexa  Seprocal1  Iesa2  Incimmet3  Unicon4
Underground Loader 3.5 yd3  Caterpillar  R1300G  1  -  -  -  -
Underground Loader 6.0 yd3  Caterpillar  R1600G  6  -  -  -  -
Underground Loader 6.0 yd3  Caterpillar  R1600H  2  3  6  -  -
Underground Loader 6.0 yd3  Atlas Copco  ST 1030  -  1  -  -  -
Jumbo  Tamrock  DD410  1  -  -  -  -
Jumbo  Sandvik  DD411-60  1  -  -  -  -
Jumbo  Sandvik  DT821  2  -  -  -  -
Jumbo  EPIROC  Boomer S1D  -  3  6  -  -
Scaler  BTI  H519BX10  2  -  -  -  -
Scaler  BTI  HS18  1  -  -  -  -
Scaler  BTI  VPS25  1  -  -  -  -
Scaler  Paus  853-S8  -  3  3  -  -
Bolter  MacLean  MEM-928 & 946  6  -  -  -  -
Bolter  Resemin  Bolter 88  -  3  -  -  -
Bolter  EPIROC  BOLTEC S  -  -  4  -  -
Scissor Lift  BTI  SL6-812  1  -  -  -  -
ANFO Loader  Normet  Charmec 6605B  1  -  -  -  -
ANFO Loader  MacLean  AC3  3  -  -  -  -
ANFO Loader  Mercedes Benz  ATEGO 1726 / 42  -  -  3  -  -
Forklift  Caterpillar  DP70NM  1  -  -  -  -
Production Drill Rig  Resemin  Raptor 552 R  -  -  -  1  -
Cable Bolter  Tamrock  Cabolt 7-5  -  -  -  1  -
Dump Trucks  VOLVO  FM500 6X4R  -  -  10  -  -
Dump Trucks  SANDVIK  EJC-417  -  -  1  -  -
Dump Trucks  EPIROC  MT2010  -  -  1  -  -
Dump Trucks  EPIROC  MT2200  -  -  1  -  -
Dump Trucks  Sandvik  TH-320  -  1  -  -  -

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-47

 

            Contractors
Type  Make  Model  Nexa  Seprocal1  Iesa2  Incimmet3  Unicon4
Dump Trucks  Atlas Copco  MT-2010  -  4  -  -  -
Shotcrete Sprayer  Putzmeister  Wetcret SPM 4210  -  -  -  -  5
Shotcrete Sprayer  Putzmeister  Mixkret4  -  -  -  -  11

Notes:

10.Operaciones Seprocal S.A.C. (Seprocal)
11.Iesa S.A. (Iesa)
12.Ingenieros Civiles Mineros y Metallurgistas S.A. (Incimmet)
13.Unión de Concreteras S.A. (Unicon)

Table 13-29: Track Equipment

Nexa Resources S.A. - El Porvenir Mine

Type  Make  Model  Quantity
Trolley Locomotive  Goodman  15 ton 36 in. gauge  2
Trolley Locomotive  IMIM  LT-15  1
Mine Cars  Kiruna  04 m3  22

Table 13-30: Required Mechanical Availability for Strategic Equipment

Nexa Resources S.A. - El Porvenir Mine

Equipment  Mechanical
Availability
  Quantity
6 yd3 LHD  93%  9
Jumbo  85%  5
Scissor Lift  85%  5
ANFO Loader  80%  2
Scaler  85%  4
Locomotive  90%  3
Hoisting System  90%  1
13.7Personnel

The workforce of El Porvenir’s mining operations consists of Nexa personnel and employees of the following contractors:

·Seprocal
·Iesa
·Incimmet
·Unicon

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-48

Production at El Porvenir is carried out by Nexa mine personnel, while contractors carry out development. Table 13-31 lists the Nexa personnel involved with underground operations at El Porvenir. The Mine operates on two 12 hour shifts providing 24/7 coverage. Mine personnel work a 14 x 7 shift cycle consisting of seven days of dayshift, seven days of nightshift, and seven days off.

Table 13-31: Nexa Personnel - Underground Mine

Nexa Resources S.A. - El Porvenir Mine

Area  Qty  Comments
Personnel on Shift Work  89  < 12 hour shift
Personnel on Time Off  44  < Shift cycle 14 days working on-site x 7 days off
Personnel with Restrictions  48  < Personnel with risk (>65, medical restriction) + Permanent union leave
Mine Supervision  18  < Including personnel on time off
Technical Services Staff  6  < Including personnel on time off
Total Nexa  205   

Source: Nexa

13.8Life of Mine Plan

At El Porvenir, mine design and planning are conducted using Deswik software. The life of mine (LOM) plan is based on operations continuing until 2028. Table 13-32 presents the mine production schedule broken down by metal grades on a annual basis until 2028. Mine output remains stable at present levels until 2024 but then progressively declines over the remaining years of operations. Table 13-33 breaks down the production by mining method. The share of the output originating from SLS increases steadily from 19% in 2021 to 84% in 2025 and then drops over the final three years of operations. Table 13-34 breaks down the production by mining zone. The share of output originating from the Mine Deepening Zone increases progressively from almost nil in 2021 to 66% in 2027. Table 13-35 presents El Porvenir’s LOM development schedule, broken down by heading and expenditure type.

Table 13-32: Mine Production Schedule

Nexa Resources S.A. - El Porvenir Mine

   Units  Total  2021  2022  2023  2024  2025  2026  2027  2028
Ore Total  000 t  13,850  2,161  2,222  2,220  2,036  1,658  1,380  1,371  802
Stopes  000 t  12,743  2,001  2,008  2,029  1,879  1,524  1,270  1,309  724
Develop  000 t  1,107  160  214  191  157  134  110  62  79
Zn  %  3.75  3.28  3.69  3.57  3.82  4.11  4.25  4.01  3.39
Pb  %  0.88  1.12  0.92  1.02  0.96  0.71  0.67  0.66  0.70
Cu  %  0.23  0.17  0.21  0.24  0.25  0.24  0.27  0.28  0.21
Ag  g/t  62.8  72.5  61.6  66.6  61.9  52.3  56.6  59.1  70.0
NSR  US$/t  98.54  95.91  97.27  98.20  100.48  99.56  103.22  99.99  92.61

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-49

Table 13-33: Mine Production by Mining Method

Nexa Resources S.A.- El Porvenir Mine

   Units  Total  2021  2022  2023  2024  2025  2026  2027  2028
Cut and Fill                              
Ore Mined  000 t  9,319  1,823  1,480  1,493  1,148  902  976  983  514
ZnEq Grade  %  4.93  4.83  4.75  4.88  4.83  5.15  5.15  5.22  4.73
Grade Zn  %  3.48  3.20  3.41  3.29  3.56  4.20  3.81  3.76  2.59
Grade Pb  %  0.97  1.17  0.94  1.11  0.91  0.69  0.79  0.86  1.07
Grade Cu  %  0.18  0.15  0.16  0.18  0.20  0.22  0.21  0.23  0.15
Grade Ag  g/t  69.0  73.4  64.4  69.0  61.0  54.7  68.1  74.0  99.8
Development  m  70,117  20,519  12,216  11,573  10,061  7,926  4,560  2,209  1,052
                               
Sublevel Stoping                              
Ore Mined  000 t  4,531  338  742  727  888  756  404  388  289
ZnEq Grade  %  5.17  5.02  5.33  5.30  5.44  4.88  5.55  4.71  4.68
Grade Zn  %  4.30  3.72  4.24  4.14  4.16  4.01  5.31  4.64  4.81
Grade Pb  %  0.71  0.83  0.87  0.82  1.03  0.74  0.37  0.17  0.06
Grade Cu  %  0.33  0.31  0.30  0.38  0.31  0.25  0.40  0.42  0.32
Grade Ag  g/t  50.4  67.5  56.3  61.6  63.5  49.8  28.6  21.5  16.8
Development  m  58,868  3,593  10,284  10,842  12,414  8,741  6,032  3,584  3,377
                               
From All Sources                              
Ore Mined  000 t  13,850  2,161  2,222  2,220  2,036  1,658  1,380  1,371  802
ZnEq Grade  %  5.01  4.86  4.94  5.01  5.10  5.03  5.26  5.08  4.71
Grade Zn  %  3.75  3.28  3.69  3.57  3.82  4.11  4.25  4.01  3.39
Grade Pb  %  0.88  1.12  0.92  1.02  0.96  0.71  0.67  0.66  0.70
Grade Cu  %  0.23  0.17  0.21  0.24  0.25  0.24  0.27  0.28  0.21
Grade Ag  g/t  62.8  72.5  61.6  66.6  61.9  52.3  56.6  59.1  70.0
Total ZnEq  000 t  693  105  110  111  104  83  73  70  38
Development  m  128,985  24,113  22,500  22,416  22,475  16,667  10,592  5,793  4,429

Table 13-34: Production by Mining Zone

Nexa Resources S.A. - El Porvenir Mine

Mining Zones  Units  Total  2021  2022  2023  2024  2025  2026  2027  2028
Upper Mine Zone  000 t  4,069  758  722  795  542  248  361  362  281
Intermediate Zone  000 t  4,470  957  815  831  843  572  100  100  251
Lower Mine Zone  000 t  1,380  443  425  207  118  143  45  0  0
Mine Deepening Zone  000 t  3,932  4  259  387  533  695  874  909  270
Total  000 t  13,850  2,161  2,222  2,220  2,036  1,658  1,380  1,371  802

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-50

Table 13-35: Development Schedule

Nexa Resources S.A. - El Porvenir Mine

   Unit  Total  2021  2022  2023  2024  2025  2026  2027  2028
Horizontal Development                              
Capital Development  m  63,867  11,817  11,058  11,785  13,114  9,071  4,378  1,319  1,325
Operating Development  m  65,118  12,296  11,442  10,630  9,361  7,596  6,214  4,474  3,104
Total  m  128,985  24,113  22,500  22,416  22,475  16,667  10,592  5,793  4,429
                               
Vertical Development  m  2,582  485  458  352  465  333  294  67  129
                               
Heading Type                              
Access  m  14,495  5,332  2,942  2,081  1,639  1,632  686  45  138
Haulage  m  19,732  3,342  4,586  3,808  3,184  2,848  1,775  190  0
Ore Access  m  18,856  2,491  2,939  3,432  3,540  2,632  1,642  1,513  668
Ore Drive  m  31,757  4,423  5,603  5,118  4,182  3,332  3,886  2,916  2,298
Orepass Drive  m  545  90  153  71  154  78  0  0  0
Electrical Substation  m  529  95  93  116  117  109  0  0  0
Ramp  m  27,407  6,908  3,847  4,775  5,281  2,985  1,833  830  947
Sump  m  583  46  34  25  330  147  0  0  0
Vent Drive  m  5,842  552  727  769  1,584  1,812  239  70  90
Crosscut  m  9,237  835  1,576  2,222  2,466  1,091  531  229  288
Total  m  128,985  24,113  22,500  22,416  22,475  16,667  10,592  5,793  4,429

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

13-51
14.0Processing and Recovery Methods

El Porvenir concentrator has an ore processing capacity of approximately 2.2 Mtpa and consists of conventional crushing, grinding, and flotation to produce copper, lead, and zinc concentrates. El Porvenir copper and lead concentrates are sold to traders and delivered by road and rail to Callao which is approximately 270 km by road for shipping overseas, while zinc concentrate is transported by road and rail to Nexa’s Cajamarquilla zinc refinery near Lima. El Porvenir is approximately 315 km from Lima by road.

14.1Process Description

A simplified flow sheet for El Porvenir concentrator is provided in Figure 14-1. The concentrator processes on average approximately 5,800 tpd to 5,900 tpd.

Primary crushing takes place underground at El Porvenir using a 30 in. x 42 in. jaw crusher. The product of the primary crusher with a top size of approximately 4.0 in. to 4.5 in. (100 mm to 125 mm) is transported by conveyor to the 30,000 t coarse ore stockpile at surface. Ore is reclaimed from the coarse ore stockpile by two feeders and transferred to a conveyor feeding a primary screen. Oversize from the screen reports to the secondary cone crusher while the screen undersize (top size of 10 mm) reports to the grinding circuit feed bins. Secondary crusher product with a top size of 30 mm reports to a three-way splitter that splits the material between three secondary screens. Oversize from these screens is fed to two tertiary crushers while screen undersize (top size of 10 mm) reports to the grinding circuit feed bins. Tertiary crusher product is returned to the secondary screens.

The grinding circuit consists of two primary ball mills and five secondary ball mills. Crushed ore is fed from the two grinding circuit feed bins to the two primary ball mills. Discharge from the primary ball mills reports to two flash flotation cells which produce lead concentrate that reports to the final lead concentrate storage tank and tails that undergo high frequency vibrational screening. Coarse material from the classifiers reports to the secondary ball mills while fine material or overflow from the classifiers is combined in a mixing box, a portion of which is directed to an additional flash flotation step also producing lead concentrate while the remainder (as well as the tails from this flotation step) report to bulk flotation conditioning.

The bulk flotation circuit consisting of bulk rougher, scavenger, and cleaner cells produces a copper and lead concentrate. Bulk scavenger concentrate is reground before being returned to the roughers. Bulk flotation is followed by copper-lead separation consisting of copper roughers, scavengers, and cleaners, during which copper minerals are floated while lead minerals are depressed to produce separate copper and lead concentrates. Tails from the bulk flotation circuit go on to feed the zinc flotation circuit.

Tails from the bulk flotation circuit undergo three stages of conditioning prior to zinc flotation. The zinc flotation circuit consists of zinc roughers, scavengers, and three stages of cleaning to produce zinc concentrate and final tails.

Concentrates are dewatered in thickeners (lead and zinc) and a dewatering cone (copper) followed by a filter press for zinc concentrate and disc filters for lead and copper concentrates. The filtered concentrates are stored in covered stockpiles prior to being loaded into trucks using a front-end loader. Water from concentrate dewatering is recycled for use in the process. Lead and zinc concentrate moisture content is approximately 8% to 9%, and copper concentrate moisture content is approximately 11%.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

14-1

Tailings at approximately 22% solids are classified in cyclones, with coarse material in the underflow at approximately 62% solids sent to the hydraulic backfill plant for use in the Mine as backfill. Mine backfill constitutes approximately 50% of tailings produced. Water from tailings dewatering is returned to the process. Overflow from the cyclones containing the fine tailings is deposited in the conventional TSF adjacent to the Mine and processing plant. Tailings can be discharged at various points in the TSF by means of valved discharge points on the tailings line. Clarified water discharged from the TSF joins natural water flows used to generate electricity in Nexa’s La Candelaria Hydroelectric Plant.

14.2Energy, Water, and Process Materials Requirements

Power requirements for the processing facilities are not anticipated to change significantly in the foreseeable future from the current power requirements.

Make-up water is supplied from various creeks around the TSF, as well as the Carmen Chico River, approximately 3.2 km south of the processing facility. Water consumption is not expected to change significantly from the recent historical water usage and no supply concerns have been noted.

Key reagents used in the process include lime, sodium cyanide, sodium isopropyl xanthate (SIPX), methyl isobutyl carbinol (MIBC), copper sulphate, zinc sulphate, and collectors for copper, lead, and zinc.

14.3Manpower

The processing plant personnel number 63. Maintenance (124), technical services (28), and projects personnel (nine) service the Mine and other departments in addition to the processing plant. These numbers are not anticipated to change significantly in the foreseeable future.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

14-2

 

Figure 14-1: Process Flow Sheet

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

14-3
15.0Infrastructure

A combination of transportation methods, including road access, aircraft via Huánuco, and rail to Cerro de Pasco are used to supply the Mine. Off-site infrastructure includes facilities for the transfer of concentrate from truck to rail at Cerro de Pasco to transport concentrate for export by train to the port of Callao. Mine access is via a 13 km dirt road northeast from Cerro de Pasco, and paved road from Lima to Cerro de Pasco (approximately 315 km).

The main road from Lima to Cerro de Pasco is used for personnel transportation, supply of food, reagents, spare parts, mining supplies, and diesel fuel. Huánuco airport can be used for personnel transportation and emergency situations.

The site comprises an underground mine, TSF, waste rock stockpiles, an ore processing facility with associated laboratory and maintenance facilities, and maintenance buildings for underground and surface equipment. Additional facilities and structures include an office building, change house facilities, main shaft, ventilation shaft, backfill plant, explosives storage area, hydroelectric power generating plant, power lines and substation, fuel storage tanks, a warehouse and laydown area, and an accommodation camp.

15.1Power Plant and Distribution

The power supply for the Mine comes from two sources:

·The national power grid via a 50/13.8 kV main substation located near the Mine,
·The La Candelaria Hydroelectric Plant, which consists of three turbines (0.5 MVA, 1.2 MVA and 3.5 MVA), is connected to the Mine through the main substation by a 4.6 km long 50 kV transmission line.

Power is generated at 4,660 kV at the La Candelaria Hydroelectric Plant. All other project loads are fed at 13.8 kV from the main substation through overhead power lines. These power lines are used to deliver power to various locations to support activities during operation of the Mine.

15.2On-Site Roads

Mine site roads include main roads suitable for mining trucks that transport concentrates to Cerro de Pasco and Lima and service roads for smaller vehicles. The site roads are used by authorized mine personnel and equipment, with access controlled by Nexa.

A network of approximately 15 km to 20 km of service roads has been built providing access to the underground mine, processing plant, TSF, waste rock stockpiles, mine offices, workshops, mine camps, and other surface infrastructure. The roads are approximately six metres wide designed for two-way 15 m3 truck traffic and road maintenance equipment.

15.3Utilities and Services

Raw water is sourced from a small creek, Tingovado, as well as from other creeks around the TSF.

Fresh water supply is obtained from the Carmen Chico River, approximately 3.2 km south of the processing facility. This water is primarily for use in the mine camps and make-up requirements for the processing facility and industrial area.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-1
15.4Sewage Collection and Disposal

A sewage treatment facility has been constructed south of the industrial and mine camp sites at a lower elevation. Buried sewer pipes collect sewage from the site and transfer it to the treatment facility. The treatment facility consists of two independent containerized treatment lagoon systems providing redundancy if one unit must be shut down for maintenance. The system is capable of treating all of the wastewater generated in the camp, industrial, and office areas. Treated effluent is released to the TSF via a small stream.

15.5Site Security

The principal site entry point on the access road from Cerro de Pasco consists of a lighted security gate and vehicle access barrier. A gatehouse provides sanitary facilities, communications equipment, and search facilities including metal detection. A weighbridge is located close to the gatehouse to enable load monitoring of incoming and outgoing vehicles.

15.6Communication and IT Systems

Point-to-point satellite communication is the main communication system between the Mine and the outside world. The system includes voice/data/video/fax, internet, and VPN services, including bidirectional links between the Mine site and Lima.

Satellite television for entertainment, cellular communication, and FM radio is provided by local service providers.

15.7Vehicle Fueling Facility and Mine Equipment Ready Line

The vehicle fueling facility and ready line is located adjacent to the processing plant. The fueling facility stores diesel and gasoline. Smaller tanks hold a variety of oils and lubricants.

15.8Site Buildings and Facilities

A plan of the site buildings and facilities is provided in Figure 15-1.

15.8.1Operations and Maintenance Building

The Operations and Maintenance building is a masonry building that provides offices for Mine management, administration, and technical staff, including environmental, administrative management, training, accounting, safety, and security. It includes staff support facilities such as a conference room, printing room, and lunchroom.

The underground mine operations building, electrical room, trackless equipment workshop, tire shop, air compressor shop, maintenance shop, lamp house, lockers, and washrooms are constructed adjacent to the main entrance to the underground mine at a 50 m distance, as approved by Peruvian safety regulations.

To the south of the main entrance to the Mine are the main mine supplies storage, processing plant building, electrical workshop, backfill plant, and laboratory facilities.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-2
15.8.2Accommodation Facilities

The permanent accommodation complex has been constructed on an approximately 60 ha site north of the Mine infrastructure complex. The accommodation complex incorporates the following camp sites:

·Type A: staff houses, and staff hotel where dormitories are private, single occupancy rooms.
·Type B: three story building blocks are semi-private and have single occupancy rooms with two rooms sharing one shower and a washroom.
·Type C: three story blocks of dormitories are double occupancy rooms with a central shower and washroom facility shared by ten rooms.

The accommodation complex also includes the following facilities:

·Kitchen, bakery, dining hall.
·Recreation, exercise, and entertainment facility including a cinema that can also be used for meetings and training.
·Three soccer fields.
·Workers union building.
·Hospital equipped with trauma treatment facilities as well as life support equipment. The hospital is comprised of a waiting and reception area, doctor's office, operating theatre, two bed wards, washroom facilities, storage room, and ambulance parking.
15.8.3Explosives Magazine

The explosives magazine has been constructed and operated in accordance with Peruvian Law.

15.8.4Solid Waste Disposal and Recycling Facility

Non-recyclable, non-toxic solid waste is disposed of in an on-site lined landfill. Used tires are shredded and placed in the landfill.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-3

 

Figure 15-1: Site Layout

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-4

 

15.9Tailings Storage

The El Porvenir TSF receives tailings generated by both El Porvenir and Atacocha concentrator plants. A portion of tailings is used for hydraulic backfill at El Porvenir. The El Porvenir TSF was originally constructed in the 1970s, and the current elevation of the dam crest is 4,060 MASL. The downstream toe is inferred to be less than 3,920 m from available plans, resulting in a dam height of 140 m.

Nexa is planning to improve the water management system through construction of a perimeter channel (i.e., upstream water diversion) to intercept clean (non-contact water) surface runoff water preventing its entrance to the TSF. Diverted water will be discharged downstream of the TSF in the Lloclla River gorge.

Contact water is recycled via a decant pumping system to the concentrator for use in the processing facility. The diversion on the western side of the TSF will be raised for the ultimate dam (Ausenco, 2016b). A lined seepage collection monitoring pond is located at the downstream toe of the main embankment to control water quality prior to water release to the environment. The monitoring pond is equipped with an overflow spillway and outlet channel for discharge into a local tributary creek of the Lloclla River.

A decant overflow system located on the left side of the main embankment conveys surplus flows from the tailings pond to the monitoring pond through the Lloclla Tunnel. Operation of a sluice gate at the pond location allows for the diversion of decanted water into the monitoring pond or bypass it, discharging directly into a local tributary creek of the Lloclla River. The water intake of the decant overflow system is a hydraulic structure consisting of two concrete towers with a series of inlets stacked vertically (referred to as “windows” in the Ausenco design reports). Inlets must be progressively blocked and rendered inactive as the deposited tailings reach certain elevation.

A channeling structure, consisting of two breakwaters, direct flows towards the emergency spillway. The spillway is an overflow tunnel located in the right abutment. It is reportedly designed to convey flows from probable maximum precipitation (SRK, 2017). The tunnel discharges via a tunnel daylighting at elevation 4,035 MASL. A lined seepage collection monitoring pond is located at the downstream toe of the main embankment.

The layout of the TSF with its crest elevation of 4,064 MASL is presented in Figure 15-2. The intention is to raise the main embankment in 10 m increments with intermediate raises of four metres. It is noted that the expansion of the TSF to contain the LOM tailings requires a rockfill embankment dam and seepage collection pond at the northeast corner of the TSF to prevent tailings from impacting the concentrator plant area, as well as the northwest where the Tingovado Creek is diverted. The embankment located at the process pond is raised progressively in a downstream direction and its upstream slope is lined with a two millimetre thick high density polyethylene (HDPE) geomembrane. The detailed design of the El Porvenir TSF to its final elevation of 4,100 MASL has been completed (Ausenco, 2016b). Planning is also currently underway to re-activate the Atacocha TSF and construction is underway to raise its embankment to an elevation 4,126 MASL (Ausenco, 2020). Upgrades to the pumping and piping systems at El Porvenir will allow disposal of the El Porvenir tailings, not used for hydraulic backfill, at the Atacocha TSF.

Figure 15-3 shows the main TSF dam with a crest elevation of 4,060 MASL in plan view. The average crest width is approximately 15 m, with an overall downstream fill slope of 2.5H:1V and 1.5H:1V upstream; with an average interbank slope of 2H:1V.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-5

 

Figure 15-2: Tailings Storage Facility Layout with Dam at Elevation 4,064 MASL

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-6

 

Figure 15-3: Tailings Storage Facility Main Dam Layout at Elevation 4,064 MASL

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-7

 

Surface preparation for dam raises includes the removal of topsoil and unsuitable soils and compaction to provide a suitable foundation. For cases where there are cavities, a product of karst processes, the sealing of the openings with mortar or cyclopean concrete is required. To SLR’s knowledge the measures to address seepage through karst rocks have been implemented through recent TSF construction including a sandy gravel platform around the perimeter of the TSF (SRK, 2017), and bedrock foundation grouting of the dam abutments in 2015. On-going operations will require continuous tailings deposition planning and pond management to maintain the design beach widths to limit seepage through the permeable dam.

A cross section of the main dam at its ultimate crest elevation is shown on Figure 15-4. The initial TSF dam raises were performed using mainly compacted coarse tailings (cyclone underflow) with the centreline construction method. Due to a shortfall of the coarse fraction of the tailings to be used in the dam raises from 4,043 MASL, further raises used compacted rockfill and structural fill.

The crest of the dam is a horizontal platform of 15 m width and is composed of structural fill, which is mainly made up of sandy gravel. At the final elevation of the dam crest of 4,100 MASL, the height of the dam will be 187 m above the natural ground level of the gorge in which the dam is constructed.

In the design of the TSF, expansion plans considered that the processing rate would increase to 9,000 tpd in 2019 (3.24 Mtpa). Tailings produced would amount to 95.38% of ore processed. The design also considered the integration of El Porvenir with the Atacocha Mine and the disposal of Atacocha tailings in the El Porvenir TSF from 2016 onward. The Atacocha ore processing rate considered was 4,500 tpd (1.62 Mtpa) with plans for this to be increased to 5,000 tpd (1.8 Mtpa). Tailings produced would amount to 95% of ore processed.

Monthly and annual dam safety inspections are currently being conducted by Geoconsultoria Ltda, an external consultant, for both the Atacocha and El Porvenir dams. SLR relies on the conclusions of Geoconsultoria [latest annual report titled Evaluación Annual de Seguridad – 2018 dated March 20, 2019] and provides no conclusions or opinions regarding the stability of the listed dams and impoundments.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-8

 

Figure 15-4: Tailings Storage Facility Main Dam Section to Elevation 4,100 MASL

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-9

 

15.10Waste Rock Storage Facilities

Historically, the volume of waste rock deposited on surface has been minor given that the El Porvenir operation is an underground mine. In the past, waste rock has been deposited in two areas within the TSF, and La Quinua waste rock dump (WRD) located outside the TSF. The La Quinua WRD is currently inactive.

Currently, waste rock is only brought to surface for storage if backfilling is not possible. If waste rock is brought to surface in the future, it will be deposited in a designated area near the secondary TSF embankment (southwest of the concentrator plant area), approved in Directorial Resolution R.D. 693-2012 MEM-AAM/LCD/RPP/MPC.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

15-10
16.0Market Studies
16.1Markets

The principal commodities produced at El Porvenir, zinc, lead, copper, and silver, are freely traded, at prices and terms that are widely known, so that prospects for sale of any Nexa production are virtually assured. Zinc and copper represent 72% of El Porvenir’s gross revenue, while lead and silver contribute 28% of the revenue. El Porvenir is an operating mine with concentrate sales contracts in place for copper and lead concentrates, while zinc concentrate is consumed by Nexa’s Cajamarquilla smelter according to their internal planning. SLR has reviewed the concentrate terms provided by Nexa and found them to be consistent with current industry norms.

Market information in this section is based on the industry scenario analysis prepared by Nexa’s Market Intelligence team in July 2020 based on information sourced from different banks and independent financial institutions, economy and politics research groups, and metals consultants.

Nexa’s Market Intelligence team notes that the industry has progressed from volatile markets in 2019 due to US/China trade wars, Brexit, and developing economies slowing down, to more uncertainty in 2020 due to the COVID-19 pandemic, a plunging global economy, the oil crisis, and the US elections. All these factors have affected the market fundamentals.

The SLR QP has reviewed the market studies and analyses and is of the opinion that the results support the assumptions in the Technical Report Summary.

16.1.1Zinc
16.1.1.1Demand

The major market drivers for zinc demand are construction and infrastructure, transportation and vehicles production, industrial machinery production, batteries, and renewable energy. All these industries have been affected by the COVID-19 pandemic which has caused the global economy to slow down. As a result, zinc metal demand has also decreased in 2020, by approximately 10% year over year.

Nexa’s Market Intelligence team examined several scenarios for demand recovery and future growth and settled on a base case that forecasts pre-COVID-19 levels of demand in the second half of 2022, with a demand compound annual growth rate (CAGR) of approximately 1.3% from 2023 to 2025. In 2019, they had forecasted a CAGR of approximately 1.7% between 2019 and 2024.

16.1.1.2Supply

Nexa’s Market Intelligence team’s supply forecast analysis was based on the following industry information: zinc mine start-up and closure, mine production guidance, disruption allowance evaluation, project pipeline, and cost evaluation for 2020 onwards. Nexa’s forecast analysis results are summarized as follows:

·Mine disruption factor: Based on independent data, Nexa has forecast a mine disruption factor of 4% for China and 4% until 2023 and 2% to 3% for 2024 and 2025 for the rest of the world (ROW).
·Project Pipeline: The analysis considered greenfield projects forecast to begin production between 2020 and 2025.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-1
·Zinc concentrate production evolution - Global: Recent market conditions due to the COVID-19 pandemic have affected mines worldwide, reducing investments and causing mine closures. As a result, zinc supply might be limited in the long term.
·China concentrate evolution: China concentrate supply is expected to increase by 3% through the 2020 to 2025 cycle, but significantly depends on the ability of China’s small mines to survive amid lower price levels and volatile market conditions.
·Zinc Global Market Balance: Based on the above considerations, Nexa’s forecast is for a significant zinc supply surplus in 2020 and 2021, with an increase in demand starting in the second half of 2022. From 2024 onwards, the global demand will exceed zinc supply.
16.1.1.3Zinc Price Outlook

Zinc prices depend on variations in supply, demand, and the perceived supply/demand balance. The most commonly referenced currency for zinc transactions is US dollars. Based on Nexa’s Market Intelligence team’s analysis of zinc supply, demand, global balance, and zinc consensus prices, Nexa forecasts stressed zinc prices in 2021 and 2022 as between $2,000/t and $2,300/t, with a potential price increase to greater than $2,700/t starting in 2024 to 2025, and a long term price of $2,449/t. Figure 16-1 shows the results of Nexa’s analysis.

Source: Nexa, 2020f

Figure 16-1: Zinc Price Outlook (2020-2025)

16.1.2Copper
16.1.2.1Demand

The major market drivers for copper demand are power generation and transmission, construction, factory equipment, and the electronics industry. The COVID-19 pandemic affected copper demand in 2020 and, in the opinion of Nexa’s Market Intelligence team, will also impact it in the years ahead (2021 and 2022). In the long term, the Nexa predicts a lower demand growth, mainly reflecting China’s

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-2

economic transition, despite the positive contribution of global trends such as electric vehicles, renewable energy, and urbanization.

Nexa analyzed multiple demand scenarios, with a Base Case forecasting a reduction in copper demand by 9.0% between 2019 and 2020, and starting in the second half of 2020, a slower paced recovery with a demand CAGR of 3.2% between 2020 and 2025. Copper demand is predicted to grow from 26.9 Mt in 2020 to 31.5 Mt by 2025.

16.1.2.2Supply

Nexa’s Market Intelligence team’s supply forecast analysis was based on the following industry information: copper mine start-up and closure, mine production guidance, project pipeline, and cost evaluation for 2020 onwards. Nexa’s forecast analysis results are summarized as follows:

·Project Pipeline: The pipeline is short, mainly because there are fewer opportunities in mining friendly jurisdictions.
·Copper concentrate (sulphide) production evolution: Nexa considers that the majority of the production will come from sulphide mines. Nexa forecasts a concentrate production CAGR increase of 4.2% between 2020 and 2025. The increase in supply results from the ramp-up of brownfield projects.
·Copper solvent extraction and electrowinning (SXEW) (oxide) production evolution: Nexa forecasts a downward trend for SXEW production. Based on Nexa’s analysis, a concentrate production CAGR will decrease by 2.7% between 2020 and 2025, as a result of mine closures and reductions in production.
·Refined Copper Market Balance: the copper market has been in deficit for the last three years, leading to lower stocks, despite lower prices since mid-2018 mainly due to the trade war between the USA and China, and the COVID-19 pandemic outbreak in 2020. Based on the above production assumptions, Nexa provided a forecast for Copper Market Balance between 2020 and 2025, showing a significant copper supply surplus in 2020 and a slightly positive surplus in 2021 and 2022. From 2023 onwards, the global copper demand will create a deficit in copper supply (Figure 16-2).

Source: Nexa, 2020f

Figure 16-2: Refined Copper Market Balance (2020-2025)

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-3
16.1.2.3Copper Price Outlook

Copper prices depend on variations in supply, demand, and the perceived supply/demand balance. Based on Nexa’s Market Intelligence team’s analysis of copper supply, demand, global balance, and copper consensus prices, Nexa forecasts stressed copper prices between 2021 and 2024 as between $6,040/t and $6,351/t, with a potential price increase to higher than $6,500/t after 2024, and a long term price of $6,627/t. Figure 16-3 shows the results of Nexa’s analysis.

Source: Nexa, 2020f

Figure 16-3: Copper Price Outlook (2020-2025)

16.1.3Lead and Silver

Lead and silver in conjunction represent 28% of El Porvenir’s gross revenue. Given their impact in the El Porvenir revenue mix, Nexa has based its lead and silver price forecast solely on consensus prices and correlation analysis published by metal market analysts and financial institutions.

16.1.3.1Lead Price Outlook

Lead represents 11% of El Porvenir’s gross revenue. Nexa’s lead prices were chosen considering a spread applied on the zinc prices curve. These spreads are commonly used and monitored by the market, based on a strong correlation between the two metals. For the cycle 2021 to 2025 a growing spread between US$ 350/t Pb to US$ 700/t Pb was considered. Nexa forecasts increasing lead prices between 2021 and 2025 (between US$ 1,869/t Pb and US$ 2,247/t Pb), and a lower long term price of US$ 1,910/t Pb. Figure 16-4 presents the results of Nexa’s lead analysis.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-4

Figure 16-4: Lead Price Outlook (2020-2025)

16.1.3.2Silver Price Outlook

Silver represents 17% of El Porvenir’s gross revenue. Nexa’s silver prices were chosen based on the median of consensus quotes/prices published by banks and institutions on a monthly basis. The silver forecast curve in Figure 16-5 presents the median silver price considering 23 different institutional sources. Nexa forecasts declining silver prices between 2021 and 2025 (between US$ 17.30/oz Ag and US$ 16.40/oz Ag), with a potential long term price increase to US$ 16.87/oz Ag.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-5

 

Figure 16-5: Silver Price Outlook (2020-2025)

16.2Contracts
16.2.1Streaming Agreement

There are no streaming agreements associated with El Porvenir.

16.2.2Other Contracts

Various operational support services are provided by contractors, including underground mining, surface tailings haulage and placement, concentrate haulage, catering, security, and the Mine site laboratory.

There are currently 1,794 contractor personnel providing the services as listed in Table 16-1.

Table 16-1: Third Party Contractors

Nexa Resources S.A. - El Porvenir Mine

Contractor  Area  Personnel
A&G Ced S.A.C.  Human Resources   15 
Ancro S.R.L.  Environment   6 
Antares Mantenimiento Industrial S.A.C.  Plant   17 
Ausenco  Projects   2 
Biddle Inc S.A.C.  Plant   9 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-6

 

Contractor  Area  Personnel
Confipetrol Andina S.A.  Mine   61 
Plant      145 
Constructora Pawer S.R.L.  Health & Safety   3 
Corporacion Zafiro Sdj E.I.R.L.  Mine   4 
Distribuidora De Mangueras Hidraulicas Sac  Mine   5 
Explomin Del Peru S.A. Exploración  Mine   65 
Explomin Del Peru S.A. Infill  Mine   62 
Exsa S.A.  Mine   56 
Ferreyros S.A.  Mine   15 
Grupo Alvarado  Information Technology   1 
Iesa S.A.  Mine   548 
Incimmet S.A.  Mine   24 
Inspectorate Services Peru S.A.C.  Plant   19 
Operaciones Seprocal S.A.C  Mine   155 
Mine      67 
Prosegur  Human Resources   50 
Resiter Peru S.A.C.  Mine   6 
Salus Laboris S.A.C.  Health & Safety   26 
Sandvik Del Peru S.A.  Mine   55 
Esermul  Human Resources   101 
Human Resources      13 
Sodexo  Human Resources   111 
Steo  Health & Safety   8 
Transportes Brandito  Environment   5 
Transportes Expreso Milpo S R Ltda  Human Resources   12 
Tumi Contratistas Mineros S.A.C.  Mine   14 
Union De Concreteras S.A.  Mine   114 
Total      1,794 

SLR has reviewed the mine operating costs related to contracts and found these to be reasonable, as long as the production targets are realized.

16.2.3Quality of Zinc Concentrate

Table 16-2 presents the average quality of the zinc concentrate El Porvenir shipped to the Cajamarquilla smelter in 2019. El Porvenir’s concentrate made up to approximately 5% of the smelter’s feed in 2019.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-7

Table 16-2: Quality of El Porvenir Zinc Concentrate

Nexa Resources S.A. – El Porvenir Mine

Zn
(%)
  Cu
(%)
  Fe
(%)
  Pb
(%)
  S
(%)
  CaO
(%)
  MgO
(%)
  Hg
(ppm)
  Moisture
(%)
 49.9    1.0    8.1    1.3    32.1    1.2    0.5    7.0    8.0 

Source: Nexa 2020d

16.2.4Concentrate Sales Contracts

El Porvenir has contracts for the sale of its copper and lead concentrates with refineries and global traders. Nexa considers these contracts to be in line with industry norms. El Porvenir ships its zinc concentrate to smelters owned by Nexa.

16.2.5Penalties

Table 16-3 and Table 16-4 present the schedules of the contaminant element penalties for El Porvenir's lead and copper concentrates, respectively. While no penalties are currently applied to the zinc or lead concentrates, the copper concentrate incurs a penalty of approximately US$17/dmt.

Table 16-3: Contaminant Element Penalties - Lead Concentrate

Nexa Resources S.A. – El Porvenir Mine

As: between $1 and $2 for each 0.1%, when grade is be higher than 0.5%.
Sb: between $1 and $2 for each 0.1%, when grade is be higher than 0.5%.
Bi: between $1 and $1.5 for each 0.01%, when grade is be higher than 0.6% or 1.1% (typically 1.1%)
Mn: There may be penalty scales above 10%, values between $1-$2 for each 0.1%
Pb: when grade is below specification (normally <45%).

Table 16-4: Contaminant Element Penalties - Copper Concentrate

Nexa Resources S.A. – El Porvenir Mine

As: $1.5 for each 0.1% above 0.3%
Sb: $5-$6 for each 0.1% above 0.3%
Bi: $1.5 for each 0.01% above 0.06%
Pb+Zn: $1.5 for each 1% above 9% (this penalty can be separate Pb and Zn, as well)
16.2.6Concentrate Specifications

The lead concentrate contains, on average, 50% Pb and 2,500 g/t Ag. The copper concentrate contains, on average, 20% Cu and 2,500 g/t Ag.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-8
17.0Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups

The information presented in this section is based on documentation provided by Nexa for review. No site visit was conducted in support of the preparation of Section 17 of this Technical Report Summary.

17.1Environmental Aspects
17.1.1Mine Operation Overview

El Porvenir is located in the district of San Francisco de Asís de Yarusyacán, in the province of Pasco, Peru, approximately 13 km northeast of the town of Cerro de Pasco. The property is in the central Andes mountains region of Peru, between elevations 3,900 MASL and 4,350 MASL. The El Porvenir LOM currently extends until 2027.

The El Porvenir facilities are located within the micro-basin of the Milpo Creek, which discharges to the Chinchao Creek and this in turn to the Lloclla River. The Lloclla River is formed by the confluence of the Pucayacu and Jabonera creeks, and flows into the Panamarca River, which becomes the Huallaga River further downstream. Consequently, the El Porvenir area belongs to the water system of the upper basin of the Huallaga River (i.e. the Alto Huallaga Inter-basin). Highest flows in the Lloclla River typically occur in March, with lowest flows in July.

The El Porvenir operation is comprised of the following main facilities:

·Underground mine
·Concentrator plant
·TSF
·WRDs (currently inactive)
·Water management facilities and infrastructure
·Ancillary buildings and infrastructure (administration, storage, vehicle maintenance, domestic waste landfill, waste management, etc.)

With the integration of the Atacocha and El Porvenir operations, tailings from Atacocha are deposited in El Porvenir TSF, located approximately four kilometres south of Atacocha. This is the current tailings disposal practice.

El Porvenir operates a conventional concentration processing plant with a nominal capacity of 6,500 tpd of ore. The concentrator plant processes on average approximately 5,800 tpd to 5,900 tpd. The processing flowsheet includes a multistage crushing plant, a conventional ball mill grinding stage, and sequential differential flotation to produce three final mineral concentrates: a zinc concentrate, a lead concentrate, and a copper concentrate (SRK, 2017). Power supply is obtained from the national grid through a 138 KV power line.

Environmentally, El Porvenir is not located within a protected natural area nor its buffer zones (SRK, 2017).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-9
17.1.2Environmental Baseline

Environmental baseline studies have been completed as part of the EIA. The detailed baseline characterization is included in the EIA reports. A summary of the existing conditions in the El Porvenir area based on information included in Ecotec (2018) and KCB (2020) is presented below.

17.1.2.1Climate

The climate is cold and dry throughout the year, which is typical of the Central Andes Mountain Region. Approximately 80% of the annual rainfall takes place between October and March. From June to August there are generally minimal rainfalls. Based on data from the Cerro de Pasco regional meteorological station operated by the government (data record from 1975 to 2017), the average temperature ranges from 4°C in July to 6°C in November. The average annual precipitation is 943 mm, with maximum monthly precipitation of 135 mm in March and minimum monthly precipitation of 15 mm in July.

17.1.2.2Air Quality

Air quality has been characterized using records from eight monitoring stations for the period 2016 to 2018. The monitoring results are compared against national environmental quality standards for air quality (D.S. No. 003-2017-MINAM). Measured concentrations for particulate matter less than 10 μm (PM10), particulate matter less than 2.5 μm (PM2.5), gases (sulphur dioxide, nitrogen dioxide, carbon monoxide, ozone, hydrogen sulphide) and benzene were below the limit set in the standard.

17.1.2.3Surface Water Quality

Characterization of existing conditions presented in Ecotec (2018) and KCB (2020) is based on surface water quality monitoring conducted at five sampling locations in three natural waterbodies (Lloclla River, Tingovado Creek, and Huallaga River). Four of these stations are located upstream of the mining activities and one is located downstream. Surface water quality is compared with the national environmental quality standards for water: D.S. No. 002-2008-MINAM for monitoring records from 2013 and 2014, D.S. No. 015-2015-MINAM for monitoring records from 2015 and 2016, and D.S. No. 004-2017-MINAM for monitoring records from 2017 and 2018. The reference values selected from the standards correspond to class 3-D1 for irrigation of high and low stem crops, and class 4-E2 for the Huallaga River.

Results from monitoring of water quality in the Lloclla and Huallaga rivers indicate a reduction of exceedances over time. Monitoring data from 2016 to 2018 (Ecotec, 2018)indicate some exceedances associated with zinc and lead in the Huallaga River, and some exceedances for pH, lead and manganese in the Lloclla River.

The water quality analysis included in Ecotec (2018) presented an individual discussion for each parameter explaining how the exceedances are associated with geological and morphological conditions inherent to the El Porvenir location. From the data presented in the Ecotec report exceedances are observed for short periods of time and are not simultaneously occurring for all the monitored parameters.

17.1.2.4Effluent Water Quality

Effluent water quality is monitored at two discharge locations: water discharge from the underground mine to the Huallaga River, and water discharge from the TSF to the Lloclla River. The water quality at the effluent discharge locations complies with the maximum permissible limits established by the current Peruvian Legislation (D.S. No. 010-2010-MINAM and D.S. 003-2010-MINAM).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-10
17.1.2.5Groundwater Quality

No groundwater quality monitoring has been carried out prior to 2020 with the exception of monitoring at two locations where discharge of groundwater to surface from the aquifer takes place (i.e. springs). According to Ecotec (2018), one of the springs (station 13MM) has the potential to influence concentrations of arsenic, manganese, and lead in the waters of the Lloclla and Huallaga rivers. The second spring (station 14MM) has the potential to influence concentrations of arsenic in the water of the Lloclla and Huallaga rivers. Comparison against national standards is not applicable because no standards for groundwater quality have been developed for Peru.

17.1.2.6Soils and Land Use

There are two types of soils in the El Porvenir area, mineral and organic, derived from residual and transported soils. Actual land use corresponds to five categories: urban development (populated centers) and private facilities (mining activity), cultivated land, natural pastures, arboreal vegetation, and unproductive land (rock outcrops).

Soils at El Porvenir have concentrations of arsenic, cadmium, and lead that exceed the national environmental quality standards (D.S. No. 011-2017-MINAM for industrial use), at some sampling points. According to the baseline characterization, high values of arsenic and lead could be attributed to the local lithology and mineralization. High values of cadmium could be of natural origin since cadmium is associated with zinc and lead impurities.

17.1.2.7Noise and Vibrations

Ambient noise has been characterized using records from eight monitoring stations for the period 2016 to 2018. Exceedances were registered in three stations during the day and four stations at night when comparing the monitoring results against the national environmental noise quality standards (D.S. No. 085-2003-PCM) for an Industrial Zone. Exceedances were attributed to human activities and vehicular traffic (Ecotec, 2018). The ambient vibrations monitored at three locations meet international standards used as a reference (BS7385 Part 2-1993).

17.1.2.8Aquatic Biology

Aquatic communities account for plankton, periphyton, macroinvertebrates (benthos), and fish. According to KCB (2020), during the wet season in 2015 the phytoplankton was represented by 56 species, the zooplankton by 16 species, the periphyton by 45 species, the benthos by 30 species, and the fish by one specie (Oncorhynchus mykiss [rainbow trout]). During the wet season in 2016 the phytoplankton was represented by 27 species, zooplankton by nine species, periphyton by 11 species, and benthos by 14 species. None of the species identified in the El Porvenir area of influence are included in the list of protected species within the Peruvian legislation.

17.1.2.9Flora

There are five species included in the national protection list approved under Supreme Decree D.S. No. 043-2006-AG that are found in the El Porvenir area: Ephedra rupestris (CR), Senecio nivalis (VU), Chuquiraga spinosa (NT), Baccharis genistelloides (NT), and Buddleja coriácea (CR). One specie was identified as endemic: Plantago serícea (Plantaginaceae), and two species are used for medicinal purposes by local communities: Minthostachys mollis and Ephedra rupestris.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-11
17.1.2.10Fauna

Fauna in the El Porvenir area is represented by six species of mammals, 34 species of birds, one specie of amphibian, and one specie of reptiles. Four species of mammals, eight species of birds, one specie of amphibian, and one specie of reptiles are included in the national protection list approved under Supreme Decree D.S. No. 004-2014-MINAGRI. The endemic species include two species of mammals, two species of birds, one specie of amphibian, and one specie of reptiles.

17.1.2.11Fragile Ecosystems

The high elevation wetlands (bofedales in Spanish) are present within the area of indirect influence of El Porvenir (i.e. they are located outside the direct area of influence). Ecosystems considered as fragile in Perú are recognized by Law No. 28611 – Environment General Law.

17.1.2.12Social

The El Porvenir area of influence encompasses the following rural communities and populated centers (list provided by Nexa through email communication):

·        Comunidad de San Francisco de Asís de Yarusyacán (20 Anexos),

·        Comunidad de Titaclayán,

·        Comunidad de Cajamarquilla,

·        Comunidad de Malauchaca,

·        Comunidad Santa Rosa de Pitic,

·        Comunidad San Miguel,

·        Comunidad La Candelaria,

·        Centro Poblado La Quinua,

·        Comunidad 30 de Agosto,

·        Comunidad San Juan de Yanacachi,

·        Comunidad San Juan de Jarapampa, and

·Cooperativa Pucayacu.
17.1.3Environmental Studies and Key Environmental Issues

SLR has been provided with the following documents and reports to conduct its review:

·Modification of the Environmental Impact Assessment for Capacity Expansion of the Concentrator Plant to 5,500 tpd (Compañía Minera Milpo, 2011)
·Modification of the Environmental Impact Assessment for Capacity Expansion to 7,500 tpd (Cesel Ingenieros, 2011)
·Fifth Supporting Technical Report (Quinto Informe Técnico Sustentatorio) for Modification of Auxiliary Components of El Porvenir Mine (Ecotec, 2018)
·Sixth Supporting Technical Report (Sexto Informe Técnico Sustentatorio) for Introduction of Technical Improvements to the Concentrator Plant (Escegis S.R.L, 2020)
·List of approved permits for El Porvenir (updated list provided on November 17, 2020)

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-12
·Annual Report on Compliance with the Environmental Management Strategy in 2018 (Nexa, 2019)
·Annual Report on Compliance with the Environmental Management Strategy in 2019 (Nexa, 2020e)
·Quarterly monitoring reports on surface water quality, effluent discharge quality, air quality, non-ionizing radiation, noise and domestic wastewater treatment prepared by SGS del Perú for Nexa in 2019 and 2020
·Bi-annual monitoring reports on terrestrial and aquatic biology (fauna and flora) campaigns carried out in 2019 prepared by RYG Consultora Ambiental for Nexa
·Reports from SGS Perú for 2020 on groundwater quality analysis for samples taken near the TSF dam
·Emergency response plan for El Porvenir (document No. MU-EP-SSM-SSO-003-ES Rev. 1 from 2020)
·Independent Technical Report pursuant to National Instrument 43-101 of the Canadian Securities Administrators for El Porvenir Mine, Perú. Report prepared by SRK Consulting issued on August 15, 2017

El Porvenir is managed according to the environmental and closure considerations presented in four type of documents, which must be approved by directorial resolutions (RD for its acronym in Spanish) from the Peruvian government (see Project Permitting):

·Environmental Adjustment and Management Plan
·EIA and subsequent modifications
·Supporting Technical Reports (ITS for its acronym in Spanish)
·Mine Closure Plan

Various EIA modifications and ITSs have been submitted and approved between 2001 and 2020. The most recent EIA approved in 2012 corresponds to the expansion of the concentrator plant production rate to 7,500 tpd.

The key project effects and associated management strategies are presented in Table 17-1, as described in the EIA and ITS documents reviewed by SLR. Prevention and mitigation measures identified for soils, air quality, water quality, biology, socio-economic aspects, landscape, and archeological remains are presented in the Environmental Management Plans included in the EIA and ITS documents. Mitigation measures against vibrations are not considered in the environmental studies provided to SLR. The monitoring program includes meteorology, air quality, non-ionizing radiation, noise, surface water quality, spring water quality, effluent discharges, flora and fauna, and TSF physical stability. In the SLR QP’s opinion, the Environmental Management Plan is adequate to address potential issues related to environmental compliance.

Air quality and ambient noise monitoring are currently conducted at six locations, while monitoring of non-ionizing radiation is conducted at two locations. Water quality monitoring is currently occurring at a total of 14 locations (see Table 17-2). The results of the monitoring program for these environmental aspects are reported to the Peruvian authorities quarterly.

No environmental issues that could materially impact the ability to extract the Mineral Resources and Mineral Reserves were identified by SLR from the documentation available for review.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-13

Table 17-1: Summary of Key Environmental Effects and Management Strategies

Nexa Resources S.A. – El Porvenir Mine

Environmental
Component
Potential Impact Mitigation Measures / Management Strategies
Topography and landscape Relief alteration changes in
landscape’s visual quality.
No specific measures or strategies are proposed.
Soils Changes to soil uses.
Changes to soil quality.
Mitigation measures imbedded in the infrastructure design to minimize spill accidents.
Appropriate management of industrial and domestic waste.
Appropriate management of oils and fuels.
Appropriate management of hazardous waste.
Development and implementation of spills management plan.
Removal of soils exposed to spills and storage in sealed containers for appropriate disposal in agreement with applicable legislation.
Activities for vehicle maintenance are restricted to designated areas.
Surface water Changes to surface water flows.
Changes to surface water quality.
Appropriate management of chemical substances.
Development and implementation of spills management plan.
Domestic wastewater treatment.
Mine water sedimentation ponds.
Diversion of non-contact water around the TSF.
Inspection and maintenance of the TSF diversion channel.
Collection of surface runoff in the concentrator plant area.
Sediment and erosion control measures.
Tailings sub-drainage is captured in a monitoring pond and recirculated or discharged according to its quality, considering sediment control.
Monthly water quality monitoring for receiving water bodies and effluent discharges.  Currently Nexa reports monitoring results from 11 stations (five of them are effluent discharges).
Quarterly reporting of monitoring results.
Groundwater Changes to phreatic level.
Changes to groundwater quality.
No specific measures or strategies are proposed.
Monthly water quality monitoring in two springs and one piezometer (see Table 17-2).
Quarterly reporting of monitoring results.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-14

 

Air quality Changes from particulate and gas emissions. Regular irrigation of access roads with tanker trucks during the dry season.
Wet grinding.
Traffic speed control.
Regular preventive maintenance of vehicles and equipment.
Use of personal protective equipment by mine staff and training.
Monitoring of particulate matter (PM10 and PM2.5), metals (lead, arsenic and zinc) and gases during the construction and operation phases.
Monthly air quality monitoring at six stations located leeward and windward of the Concentrator Plant and the TSF.
Quarterly reporting of monitoring results.
Noise Disturbances resulting from changes
to ambient noise levels.
Use of hearing protection devices in the concentrator plant area.
Controlled time of exposition of workers to noise sources.
Appropriate planning and scheduling of operation of noise sources.
Regular preventive maintenance of vehicles and equipment.
Use of vehicle horns limited to emergency situations.
Quarterly monitoring at six stations.
Quarterly reporting of monitoring results.
Flora and fauna Changes to vegetation cover.
Alterations to habitat.
Disturbance of wild fauna.
Prohibition to disturb fauna.
Land clearing limited to authorized areas.
Prohibition to collect flora.
Prohibition to extract species of flora and fauna.
Noise control measures.
Sediment control measures to protect natural streams.
Traffic speed limits.
Prohibition to use vehicle horns except in case of emergency.
Monitoring of phytoplankton, zooplankton, benthic organisms, perifiton and macrofitas at four stations.
Monitoring of metals content in sediment samples.
Monitoring of flora at four stations.
Monitoring of fauna at four stations.
Bi-annual monitoring (dry and wet season).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-15
17.1.4Environmental Management System

Nexa uses an ISO 14001 compliant environmental management system at El Porvenir to support environmental management, monitoring and compliance with applicable regulatory requirements during operation.

Nexa utilizes an Integrated Dam Management System (referred to as SIGBar) for the TSF, which provides guidelines for document management, monitoring, evaluation, risk analysis, compliance with standards and legislation, training of personnel, operation of structures and other provisions.

The environmental monitoring program established at El Porvenir and the environmental audits performed annually (aiming to identify critical environmental risks in the operations) are the main tools of the El Porvenir’s Environmental Management System to track the implementation of high environmental standards and the continuous compliance with the environmental commitments. The environmental audit matrix includes the evaluation of:

·Audit results to comply with legal requirement for environmental audit.
·Environmental monitoring activities.
·Environmental incidents.

Nexa does not have an Environmental Policy for El Porvenir. According to Nexa’s website and the Nexa Annual Report on 2019 performance, the company identifies and manages the main risks from both an operational and strategic point of view, reducing and mitigating impacts to maintain business sustainability. Nexa has an integrated management system that establishes the guidelines that govern the conduct of the businesses, with a focus on quality management of environmental, health and workplace safety, and social responsibility issues. In addition, Nexa follows applicable environmental laws and regulations pertaining to its business in each country where it operates (Nexa, 2019).

Nexa has stated the following environmental goals in its Annual Report on 2019 performance:

·75% recirculation and lower specific use of water.
·Reduce the specific emission of greenhouse gases by 5%.
·Decrease the disposal of tailings in dams and a 50% reduction in the specific generation of mining and smelting waste.
·Ensure that 100% of the units have pre-prepared future use alternative studies and updated decommissioning plans, in line with the sector’s benchmark standards.
17.2Mine Waste and Water Management
17.2.1Environmental Geochemistry

Geochemical testing of the cyclone tailings underflow by Ausenco (2013) determined that the tailings have a high potential for generating acid drainage in the long term. While the leaching tests do not indicate potential for metal solubilization in the short term, kinetic tests, that demonstrate the evolution of the quality of the leachates over time, have not been completed. Geochemical testing by the Universidad Nacional de Ingenieria (Ausenco 2018) of the waste rock used for dam construction concluded that the rock was non-acid generating.

According to information included in the initial Mine Closure Plan (KCB, 2007), the waste rock deposited on surface (mostly in the La Quinua WRD) is non-acid generating. No geochemistry analysis of the rock

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-16

walls of the El Porvenir underground mine has been conducted. If the rock is similar to the material disposed in the La Quinua WRD, then it is either non-acid generating or has an uncertain potential for acid generation. Due to high neutralization potential of the rock identified from early testing, no acid rock drainage (ARD) is anticipated to occur in the short or mid term. The Mine Closure Plan recommends carrying out additional geochemical studies to confirm the rock acid generation potential before closure in order to define and appropriate closure strategy and management measures to achieve geochemical stability.

17.2.2Tailings Management

The safety of operating a centerline raised tailings dam depends on the ability to maintain wide tailings beaches and a low phreatic level in the dam shell for stability. SLR notes that no water balance information was available for review regarding the interaction between the Atacocha and El Porvenir operations, which is significant since the El Porvenir milling operations draws reclaim water from the TSF. The SLR QP is of the opinion that impact of a temporary suspension of El Porvenir milling operations on the El Porvenir TSF water balance should be considered.

Crest settlements at the left side of the dam were reportedly noted in a 2008 report by Golder Associates that was not available for review (SRK, 2017). No issues with regard to crest settlements were noted in recent dam safety monitoring reports. SLR notes however that bedrock foundation grouting of the left and right abutments carried out in 2015 observed very significant grout takes in numerous grouthole stages indicating the filling of voids. A series of seepage collection sub-drainage pipes were also installed on the downstream shell of the dam prior to raising the rockfill to the crest elevation of 4,056 MASL (Ausenco, 2016a).

Tailings disposal at El Porvenir is performed in subaerial conditions which allows a beach with a gentle slope towards the water or supernatant pond (settling pond). Tailings deposition planning considers deposition from three main locations. These discharge locations allow for the settling pond to be centrally located within the TSF and a tailings beach to form in front of the main embankment. The minimum beach width is 150 m. A capacity assessment of the TSF by Nexa (2020) recommends topographic and bathymetric surveys every six months to assess the available capacity.

Dam monitoring at El Porvenir consists of instrument measurements and field inspections. Field inspections (regular routine inspections) are carried out by Nexa personnel responsible for its operation, and monthly by an external consultant (Geoconsultoria). Piezometers and water level indicators are measured every two weeks, surface landmarks monthly, pluviometry, the graduated level of the water level within the TSF, is read daily. The data is reviewed by an external consultant (Geoconsultoria) on a monthly basis. An annual audit report is also completed by Geoconsultoria. Nexa utilizes an Integrated Dam Management System (referred to as SIGBar) which provides guidelines for document management, monitoring, evaluation, risk analysis, compliance with standards and legislation, training of personnel, operation of structures and other provisions.

The latest monthly inspection report by Geoconsultoria, reviewed by SLR was dated 28 April 2020. Geoconsultora (2020) stated that the freeboard and upstream beach width were acceptable, however the emergency spillway channel was covered during the construction of the non-contact diversion ditch, and some damage to a survey monument required repair (the survey monument has been repaired). The last annual audit report by Geoconsultoria reviewed by SLR was dated March 2019. The report concluded that the safety condition of the tailings dam is satisfactory.

The following recommendations are proposed for the El Porvenir TSF:

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-17
·Classification of the TSF in terms of the Global Tailings Standard or the Canadian Dam Association. The classification may require more conservative design criteria in terms of flood management and seismic loading.
·A dam breach analysis to inform the TSF classification and emergency preparedness plan.
·A trigger alert response plan (TARP) for the piezometers for inclusion in the monitoring plan.
·Capacity assessments of the TSF completed on a bi-annual basis with topographic and bathymetric surveys.
·Complete long term geochemical kinetic testing of the tailings.
·Implement a groundwater monitoring program at the TSF to determine levels of metals and sulphates.
·Monitor the water quality from the TSF subsurface drains.
17.2.3Water Management

Freshwater is withdrawn at the Yanamachay pumping station from the Carmen Chico River and the Huarmipuquio Spring for distribution to the potable water tank and three water supply ponds that feed the concentrator plant for industrial processes. These water supply ponds also receive water from the Milpo Creek via the Socorro Pond. Water from the potable water tank is supplied to the mine camp and neighbouring communities (Vista Alegre, San Carlos, San Juan).

Water for underground mine operations activities is taken from the water supply ponds of the concentrator plant. Underground mine water is pumped to the La Quinua Sedimentation Pond to promote settling of solid particles before being discharged to the Huallaga River.

Tailings discharged to the TSF come from the El Porvenir and Atacocha concentrator plants. Tailings water and surface runoff resulting from direct rainfall over the TSF footprint are collected in the tailings pond. Water from the tailings pond is recirculated to the El Porvenir concentrator plant as make-up water for ore processing via the three water supply ponds of the concentrator plant area. Seepage water intercepted by the TSF underdrain system is captured in a lined monitoring pond and recirculated to the tailings pond or discharged into a local tributary of the Lloclla River if the water quality meets the applicable standards for direct discharge to the environment. Surplus water collected in the TSF pond is discharged through a decant overflow system that conveys flows to the monitoring pond. Operation of a sluice gate at that location allows for discharge control of decanted water into the monitoring pond or directly into a local tributary of the Lloclla River. As a contingency measure, the water management system allows conveyance of water collected in the monitoring pond to the sediment ponds located near the La Quinua WRD.

Nexa is planning to improve the TSF water management system through construction of a perimeter channel to intercept non-contact water (freshwater) from the sub-watershed that contributes natural surface runoff towards the TSF footprint. The Chinchao and Tingovado creeks will be intercepted by this diversion channel that will redirect water from the creeks towards the Lloclla River.

Sanitary wastewater generated at El Porvenir is collected and treated in a wastewater treatment plant. Treated water is conveyed to the tailings pond of the TSF for re-use in mine operation activities.

SLR did not find evidence of an integrated site-wide water balance for the El Porvenir and Atacocha operations within the documentation provided for review. Furthermore, it is unclear if the water balance for El Porvenir is continuously tracked during operation to support decision making associated with water

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-18

management and dam safety. A water balance for ongoing operations to be updated regularly by mine operations personnel (or a designated consultant) is an important tool to ensure that sufficient water is available for ore processing and that pond water levels are adequate for safe operation of the TSF. The water balance makes it possible to track trends and conduct short term predictions through the simulation of variable operating and/or climatic scenarios to support decision making associated with tailings pond operation (e.g., maintaining adequate dam freeboard at all times).

SLR recommends Nexa develop an integrated water balance that reflects the interaction between the El Porvenir and Atacocha operations in regard to water balance, to identify and predict possible scenarios of interruption of mine operations due to water management issues and/or dam safety concerns (e.g., not maintaining adequate dam freeboard).

According to the Nexa 2020 Annual Report on Compliance with the Environmental Management Strategy in 2019, water quality monitoring currently takes place at the 14 locations listed in Table 17-2. Based on the documentation available for review, SLR is not aware of any non-compliance issues raised by the authorities associated with the El Porvenir water quality monitoring program.

Based on the Environmental Management Plans presented in the EIA and ITS documents, only one groundwater quality monitoring location is included in the environmental monitoring program. Monitoring results at this location are not included in the quarterly monitoring reports on water quality. SLR was provided with 11 reports from SGS, a laboratory accredited by the Peruvian authorities, with results of water quality analysis of samples taken between January 2020 and November 2020 at location PH-1 identified as “TSF dam”. Each report covers a period of data of approximately one week. No interpretation of analysis results is included in these reports.

Typical practice for environmental monitoring of groundwater involves the installation of wells upstream and downstream of the mine site to compare water quality results and identify potential impacts of the mine operation to groundwater. It is unclear how El Porvenir currently verifies that no changes to groundwater due to mining activities are taking place within the area of influence of the operation. SLR recommends expanding the groundwater quality monitoring program to include additional stations for collection of groundwater quality samples (and subsequent analysis). As a minimum, consideration should be given to the installation of one station upstream of El Porvenir.

Table 17-2: Water Quality Monitoring Locations

Nexa Resources S.A. – El Porvenir Mine

Station ID  Type of Water  Location
5MM  Surface water effluent  Underground mine discharge at La Quinua tunnel outlet.
5AMM  Surface water effluent  Discharge from sedimentation pond to the Huallaga River.
6MM  Surface water effluent  Discharge from the TSF to the Lloclla River.
6CH-F4  Surface water effluent  La Candelaria Hydroelectric Plant - Station 4.
16MM  Surface water effluent  Inflow to the Sanitary Wastewater Treatment Plant from the mine camp.
7MM  Receiving water body  Lloclla River upstream of the TSF.
8MM  Receiving water body  Lloclla River downstream of the TSF.
9MM  Receiving water body  Huallaga River upstream of the La Quinua tunnel outlet.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-19

 

Station ID  Type of Water  Location
10MM  Receiving water body  Huallaga River downstream of the La Quinua tunnel outlet.
11MM1  Diverted water  TSF diversion channel before the discharge to the Lloclla River.
12MM  Surface water body  Tingovado Creek upstream of the diversion channel.
13MM  Groundwater  Spring.
14MM  Groundwater  Spring.
15MM*  Groundwater  Piezometer.

Note:

1.As of December 2019, this station had not been implemented (Nexa, 2020).
17.3Project Permitting

El Porvenir complies with applicable Peruvian permitting requirements. The permits are RDs issued by the Peruvian authorities upon approval of mining environmental management instruments filed by the mining companies such as EIAs, ITSs, and Mine Closure Plans. The approved permits address the authority’s requirements for operation of the El Porvenir underground mine, TSF, concentrator plant, water usage, and effluents discharge.

Nexa maintains an up to date record of the legal permits obtained to date, documenting the approving authority, validity period and expiry dates, status (current, canceled or superseded), and indicating if renewal is required or not. The list of approved legal permits for El Porvenir provided to SLR by Nexa addresses the following aspects:

·EIA certifications
·Water use licences
·Effluent discharge
·Mine closure planning
·Beneficiation concessions
·Tailings management
·Power generation
·Licences for use of explosives
·Absence of archaeological remains

The El Porvenir RDs on environmental certifications, effluent discharge, water use, mine closure and tailings management are listed in Table 17-3. According to the record of the legal permits provided by Nexa in November 2020, the approved environmental certifications (i.e. EIA and ITS) do not have expiry dates and therefore renewal dates are not applicable. The third amendment to the Mine Closure Plan is currently under review process by the Peruvian Authorities in order to renew the mine closure obligations that expired in September 2019.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-20

Table 17-3: Environmental, Mine Closure, and Tailings Disposal Licences

Nexa Resources S.A. – El Porvenir Mine

Authority  Obligation/Licence   Date of Issue(DD/MM/YYYY)   Expiration Date(DD/MM/YYYY)   Status 
Environmental Certifications
MINEM-DGM  PAMA (Programa de Adecuación y Manejo Ambiental) Approval   17/01/1997   None   Active 
   RD 023-1997-EM/DGM             
MINEM-DGE  PAMA Approval - Electric System (CH Candelaria + CT Milpo)   23/01/1997   None   Active 
   RD 028-1997-EM/DGE             
MINEM-DGAAM  EIA for Production Expansion of the Plant to 3,100 tpd   26/11/2001   None   Active 
   RD 379-2001-EM/DGAA             
MINEM-DGM  PAMA Approval of Execution   07/11/2002   None   Active 
   RD 288-2002-MEM/DGM             
MINEM-DGAAM  Modification of the EIA for Production Expansion of the Concentrator Plant to 5,500 tpd   02/09/2011   None   Active 
   RD 271-2011-MEM/AAM             
MINEM-DGAAM  EIA for Capacity Expansion of the Concentrator Plant to 7,500 tpd and Expansion of Cyclone Tailings   25/06/2012   None   Active 
   RD 203-2012-MEM/AAM             
MINEM-DGAAM  1st ITS El Porvenir – Transmission Line 220 kV Substation Paragsha II – Substation El Porvenir and Transmission Line 50 kV   02/04/2014   None   Active 
   RD 159-2014-MEM/DGAAM             
MINEM-DGAAM  2nd ITS El Porvenir – Integration Tailings Storage/Tailings Line Atacocha-El Porvenir (El Porvenir Zone) RD 526-2014-MEM/DGAAM   20/10/2014   None   Active 
MINEM-DGAAM  IGA Ownership Change   02/03/2015   None   Active 
   Record 647-2015-MEM/DGAAM             
MINEM-DGAAM  3rd ITS El Porvenir – Approval “Variant to Ends of Transmission Line 220 kV-S.E. Paragsha II-SE El Porvenir and SE Milpo (El Porvenir), and tension reduction of Transmission Line from 220 kV to 138 kV"   09/07/2015   None   Active 
   RD 271-2015-MEM-DGAAM             
SENACE  4th ITS El Porvenir – Capacity Expansion of the Concentrator Plant to 9,0 tpdRD 319-2017-SENACE-DCA dated October 24, 2017   24/10/2017   None   Active 

 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-21

 

Authority  Obligation/Licence   Date of Issue(DD/MM/YYYY)   Expiration Date(DD/MM/YYYY)  Status
SENACE  5th ITS El Porvenir – Auxiliary Components   13/12/2018   None  Active
   RD 058-2018-SENACE-PE/DEAR           
SENACE  6th ITS El Porvenir – Introduction of Technical Improvements to the Concentrator Plant     10/03/2020   None  Active
   RD N° 51-2020-SENACE-PE/DEAR           
Effluent Discharge and Reuse Authorizations
ANA-DGCRH  Authorization for Discharge of Treated Industrial Residual Water from the Concentrator Plant   10/08/2010   10/08/2012  Inactive Modified
   RD 014-2010-ANA-DGCRH           
ANA-DGCRH  Authorization for Domestic Residual Water Reuse for Irrigation   07/01/2013   07/01/2015  Inactive Renewed
   RD 005-2013-ANA-DGCRH           
ANA  Renewal of Authorization for Discharge from LQ and Porvenir Underground Mine Portals   15/06/2015   15/06/2019  Expired Not Renewed
   RD 172-2015-ANA-DGCRH           
AAA-HUALLAGA  Authorization for Water Reuse   07/07/2015   07/05/2019  Expired Not Renewed
   RD 165-2015-ANA/AAA-HUALLAGA           
ANA  Renewal of Authorization for Discharge from LQ and Porvenir Underground Mine Portals   16/06/2019   16/06/2022  Active
   RD 192-2019-ANA-DCERH           
ANA  Renewal of Authorization for Domestic Residual Water Reuse for Mining Purposes (Irrigation)   06/07/2019   07/06/2025  Active
   RD 600-2019-ANA/AAA-HUALLAGA           
Water Use Licences              
ANA  Mine Water Licence   08/04/1974   None  Inactive
   RS 0392-1974-AG           
ANA  Mine and Camp Water Licence   04/03/1976   None  Inactive
   RS 0057-76-AG/DGA           
ANA  Mine and Population Water Licence   14/12/1976   None  Inactive
   RS 307-76-AG/DGA           
ANA  Power Generation Water Licence   30/06/1992   None  Active
   RD 0020-92-AG-DGAS           
ANA  Power Generation Water Licence   17/07/1992   None  Active
   RD 0029-92-AG-DGAS           
ANA  Population Industrial Water Licence   13/12/1992   None  Inactive
   RA 0014-92-SRP-DGA/RN Y DR SAS           
ANA  Power Generation Water Licence   15/02/1993   None  Active
   RA 001-93-DGA-SRPRN           

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-22

 

Authority  Obligation/Licence   Date of Issue(DD/MM/YYYY)   Expiration Date(DD/MM/YYYY)  Status
ANA  Population Camp Water Licence   09/07/1998   None  Inactive
   RA 011-98-AG-DSRAP/INRENA-ATDRP           
MINAGRI-ANA  Power Water Use Licence (Modification Ar1)   22/12/2006   None  Inactive Modified
   RD 127-2006-AG-DRA-P-A-TPDR           
MINAGRI-ANA  Water for Population Use Licence (Modification Ar1)   22/12/2006   None  Inactive Modified
   RD 125-2006-AG-DRA-P/ATPDR           
MINAGRI-ANA  Water for Mining Use Licence (Modification Ar1)   22/12/2006   None  Inactive Modified
   RD 126-2006-AG-DRA-P/ATPDR           
ANA  Approval of Ownership Change to MAP - Water for Population Use Licence   06/04/2015   None  Inactive
   RD 264-2015-ANA-AAA-X-MANTARO           
ANA/AAA-HUALLAGA  Approval of Ownership Change to MAP – Power Use   11/02/2016   None  Not Applicable
   RD 086-2016-ANA/AAA-HUALLAGA           
ANA  Approval of Ownership Change to MAP - Water for Mining Use Licence   13/06/2016   None  Inactive
   RD N° 399-2016-ANA/AAA-HUALLAGA           
ANA  Approval of Ownership Change to Nexa El Porvenir– Surface Water for Mining Use   03/10/2019   None  Active
   RA 322-2019-ANA-AAA-HUALLAGA-ALA ALTO HUALLAGA           
Mine Closure Plans              
MINEM-DGAAM  El Porvenir Mine Closure Plan Approval   17/06/2009   9/15/2019  Active Renewable
   RD 166-2009-MEM/AAM           
MINEM-DGAAM  El Porvenir Mine Closure Plan First Amendment   15/09/2011   9/15/2019  Active Renewable
   RD 286-2011-MEM/AAM           
MINEM-DGAAM  El Porvenir Mine Closure Plan Update   30/01/2013   9/15/2019  Active Renewable
   RD 034-2013-MEM/AAM           
MINEM-DGAAM  El Porvenir Mine Closure Plan Second Amendment   15/09/2016   9/15/2019  Active Under Renewal
   RD 277-2016-MEM/DGAAM           
Tailings Management              
MINEM-DGM  Beneficiation Concession for the Tailings Storage Facility   12/08/1997   None  Active
   RD 280-97-EM/DGM           
MINEM-DGM  Beneficiation Concession for the Tailings Storage Facility   12/09/1997   None  Active
   RD 281-97-EM/DGM           

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-23

 

 

Authority   Obligation/Licence   Date of Issue(DD/MM/YYYY)   Expiration Date(DD/MM/YYYY)   Status 
 MINEM-DGM   Construction Authorization for Expansion of Tailings Storage Facility to Dam Elevation 4,043   07/04/2010   None   Active 
     RD 178-2010-MEM             
 MINEM-DGM   Authorization for Operation of Tailings Storage Facility to Dam Elevation 4,043   18/09/2010   None   Active 
     RD 356-2010-MEM-DGM/V             
 MINEM-DGM   Modification of Schedule for Expansion of the Tailings Storage Facility   09/07/2014   None   Active 
     RD 252-2014-MEM-DGM/V             
 MINEM-DGM   Construction Authorization for New Components of Tailings Line from Profile Alignment Station 1+524m to El Porvenir Tailings Storage Facility   29/12/2014   None   Active 
     RD 0584-2014-MEM-DGM/V             
 MINEM-DGM   Authorization for Operation of El Porvenir Tailings Storage Facility to Dam Elevation 4,047 and Expansion of the Beneficiation Concession "Aquiles 1 Accumulation" to 183.28 ha   12/06/2015   None   Active 
     RD 612-2015-MEM/DGM             
 MINEM-DGM   Authorization for Operation of Tailings Pipeline El Porvenir   19/06/2015   None   Active 
     RD 194-2015-MEM-DGM-DTM/PB             
 MINEM-DGM   Authorization for Operation of New Components of Tailings Line from Profile Alignment Station 1+524m to El Porvenir Tailings Storage Facility   19/06/2015   None   Active 
     RD 0251-2015-MEM-DGM/V             
 MINEM-DGM   Authorization for Operation of Tailings Storage Facility Expansion to Dam Elevation 4,048.5   18/08/2016   None   Active 
     RD 0499-2016-MEM-DGM/V             
 MINEM-DGM   Construction of Tailings Storage Facility Expansion to Dam Elevation 4,100 and Secondary Embankment at the Process Plant Side   09/01/2017   None   Active 
     RD 006-2017-MEM-DGM/V             
 MINEM-DGM   Authorization for Operation of Tailings Storage Facility Expansion to Dam Elevation 4,056 and Extension of Diversion Channel   25/09/2017   None   Active 
     RD 828-2017-MEM-DGM/V             
 MINEM-DGM   Authorization for Operation of Tailings Storage Facility to Dam Elevation 4,060   07/10/2019   None   Active 
     RD 0498-2019-MEM-DGM/V             

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-24

 

17.4Social or Community Requirements
17.4.1General Context

Nexa’s Cerro Pasco mine complex includes both El Porvenir and the nearby Atacocha. The communities located within the area of direct influence are:

·Comunidad de San Francisco de Asís de Yarusyacán
·Anexo de Machcan
·Anexo San Ramón de Yanapampa
·Comunidad de Titaclayán
·Centro Poblado San Isidro de Yanapampa
·Comunidad de Cajamarquilla
·Comunidad San Antonio de Malauchaca

This subsection presents the results of the social review based on a review of Nexa’s policies, programs, social risk management systems, and/or social performance against relevant International Finance Corporation (IFC) Performance Standards (PS). The IFC PSs have been used as a framework but this social review does not represent a detailed audit of Nexa’s compliance with IFC PSs or specific guidelines. Nexa’s social performance is benchmarked against the following IFC 2012 PSs:

·PS1: Social and Environmental Assessment and Management Systems requires that companies identify, assess, and mitigate the social and environmental impacts and risks they generate throughout the lifecycle of their projects and operations. From a social perspective, the requirement includes: a comprehensive social assessment; identification of critical social impacts and risks; community consultation and engagement; information disclosure; mitigation plans to address impacts and risks; and development of an organizational structure with qualified staff and budgets to manage the overall social management system.
·PS2: Labour and Working Conditions incorporates the ILO conventions that seek to protect basic worker rights and promote effective worker/management relations.
·PS4: Community Health and Safety declares the project’s duty to avoid or minimize risks and impacts to community health and safety and addresses priorities and measures to avoid and mitigate project related impacts and risks that might generate community exposure to risks of accidents and diseases.
·PS5: Land Acquisition and Involuntary Resettlement considers the need for land acquisition or involuntary resettlement of any individual, family or group; including the potential for economic displacement.
·PS7: Indigenous Peoples considers the presence of Indigenous groups, communities, or lands in the area that may be directly or indirectly affected by projects or operations.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-25
·PS8: Cultural Heritage. This standard is based on the Convention on the Protection of the World Cultural and Natural Heritage. The objectives are to preserve and protect irreplaceable cultural heritage during a project's operations, whether or not it is legally protected or previously disturbed and promote the equitable sharing of benefits from the use of cultural heritage in business activities.

SLR notes that PS3 Resource Efficiency and Pollution Prevention and PS6 Biodiversity Conservation correspond to environmental performance standards, which have been discussed at the beginning of Section 17 of this Technical Report Summary.

17.4.2Social and Environmental Assessment and Management Systems

At a corporate level, Nexa has adopted the guidelines of the International Integrated Reporting Council (IIRC) and the standards for the Global Reporting Index (GRI). The IIRC guidelines promote a cohesive and integrated approach to reporting on organizational activities. The GRI standards provide best practices for public reporting on economic, environmental, and social impacts in order to aid Nexa and its shareholders and stakeholders understand their corporate contribution to sustainable development. These standards were reported on in the most recent Nexa Annual Report (Nexa, 2020e). With respect to social issues, the 2019 Annual Report provided details of corporate activities aligning with the following GRI Standards:

·Employment
·Occupational health and safety (OHS)
·Non-discrimination
·Training and education
·Diversity and equal opportunities
·Freedom of association and collective bargaining
·Child labour
·Forced or compulsory labour
·Human rights assessment
·Local communities
·Social assessment of suppliers
·Socio-economic compliance

Nexa’s 2019 Annual Report also includes reporting on corporate progress towards several sustainable development goals. With respect to social environment issues, these include:

·Gender equality
·Decent work and economic growth
·Good health and well-being
·Peace, justice, and strong institutions
·Quality education
·Reduced inequalities
·Sustainable cities and communities
·Responsible consumption and production

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-26
·Life below water

Nexa has a corporate compliance policy (PC-RCC-CCI-005-EN) meant to guide Nexa representatives and third parties. The compliance policy includes the following policies and procedures:

·Code of Conduct
·Anti-Corruption Policy
·Money Laundering and Financing Terrorism Prevention Policy
·Antitrust/Competition Policy
·Insider Trading Policy
·Disclosure Policy
·Compliance Program Manual
·Money Laundering and Financing Terrorism Prevention Manual
·Gifts and Hospitality Procedure
·Relationships with Government Representatives Procedure
·Travel and Entertainment Procedure
·Integrity Due Diligence Procedure
·Conflict of Interests Procedure

Nexa has developed policies, protocols and operational procedures and practices that aim to address various aspects of the company’s social responsibility with regard to its mining operations. These policies, protocols and procedures have been designed to meet host country requirements and comply with IFC standard PS1 (“Environmental and Social Assessment and Management System (ESMS)”) requirements. These policies and procedures are updated periodically in response to changing local conditions throughout the mine life.

As required by IFC PS1, Nexa’s management system is based on an overarching Corporate policy defining the environmental and social objectives and principles that will guide the project to achieve sound environmental and social performance. Nexa’s policy aims to achieve the following:

·Prevent, mitigate, minimize and control environmental impacts, occupational health and safety risks; training, motivating and listening to the opinion of its workers, to foster in them a culture regarding the environment, safety and health of the worker, as well as to its visitors and interested parties.
·Ensure that all workers receive fair compensation according to the work they develop, as well as dignified working conditions, a conducive work environment and oriented to their working skills and personal development.
·Develop activities in favor of the welfare of the populations that live near Nexa’s operations, respecting their culture and traditions.
·Promote the continuous improvement of the effectiveness of the Management System, through compliance with environmental standards, quality, occupational safety and health, contained in legal requirements and other accepted by the organization.
·Provide a product that satisfies the quality required by its customers, in a timely manner, optimizing production costs, innovating and being internationally competitive.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-27

Also consistent with IFC PS1, Nexa’s Community Relationships Policy (SGI-GRS-P-15) aims to achieve the following:

·Respect for communities’ culture, resources, and traditions.
·Treating local communities as strategic allies, seeking to develop activities that are of mutual benefit.
·Promoting local employment and job opportunities with preferential local suppliers.
·Developing local capacities to achieve competitiveness.
·Promoting the social role of the company as an active actor that contributes to the local development under the leadership of the state authority, be it local, regional or national.
·Orienting all social development initiatives in a manner that promotes self-management and sustainability, promoting the contribution of the beneficiaries themselves and co- financing to achieve shared development.
·Establishing the understanding among staff that social responsibility traverses the whole company.
·Encouraging communication about the company’s activities in the locality of its operations.
·Generating social and environmental assets from the mining activity.

A social baseline description, assessment of socio-economic impacts, and identification of mitigation actions have been carried out to mitigate negative impacts and maximize positive benefits of the El Porvenir Mine. These components are generally consistent with social impact assessment practices. A Community Relations Plan has been developed (included in the modification of the EIA from 2011) outlining objectives, strategies and specific indicators for the following programs: information and communication; support to social projects and productive investment projects; health services; education; technical training; training for social and environmental participatory monitoring; promotion of environmental awareness; compensation for land use; and improvement of houses in surrounding communities.

Nexa has a permanent information office dedicated to receiving, managing, and addressing complaints, claims, questions and information requests from the communities. To be proactive, Nexa has also developed a communications program that involves the following activities:

·Distribution of informative material (Quarterly).
·Social concern monitoring (Quarterly).
·A complaint management process aimed at preventing and managing possible social conflicts in the area.
·Meetings with local authorities (Quarterly).
·Guided tours (Quarterly).

In 2019 a conflict was registered with Nexa and the community of San Juan de Yanacachi in the Pasco region of Peru, related to land use.

In the SLR QP’s opinion the grievance mechanism in place and the Community Relations Plan, in combination with Nexa’s Social Management Policy and Management Procedures on negotiation for land access, monitoring of social commitments, management of social crisis, promotion of local hiring, and communication with stakeholders, are adequate to address potential issues related to local communities.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-28
17.4.3Labour and Working Conditions

Corporately, Nexa has affirmed its commitment to safe and positive labour and working conditions. The relevant Sustainable Development Targets identified by Nexa include, but are not limited to:

·Achieving full and productive employment and decent work for all women and men, including young people and persons with disabilities, and equal pay for work of equal value by 2030.
·Protecting labour rights and promote safe and secure working environments for all workers, including migrant workers, in particular migrant women, and persons in precarious employment.

Nexa has adopted OHS policies to ensure the protection and promotion of the safety, human health, and welfare of employees. Corporately, Nexa reports on its health and safety performance and highlights safety as its greatest asset. Several corporate initiatives are aimed at promoting safety, ensuring workers and contractors are trained, and that processes are in place to address any incidents that arise. Nexa has a management standard that outlines the process to communicate classify, analyze, and record potential accidents (near misses) and accidents in order to improve health and safety measures. Nexa also reports on the health and safety performance at all of their sites.

As approximately 75% of Nexa’s Peruvian operations are comprised of outsourced employees, special programs have been developed to ensure health and safety objectives are being met.

In 2017, Nexa created the Peru Safety Plan, which is a program having the objective of eliminating all fatalities, reducing the number and severity of accidents and enhancing the safety culture in the units across Peru. Over two and a half years, 244 initiatives were developed in 30 projects. At the end of 2019, Nexa had completed mapping and a critical analysis of its of activities. The safety of operations in Peru was recognized by the Peruvian Mining Safety Institute (Instituto de Seguridad Minera (Isem)), which recognized the Atacocha unit for the lowest accident rate and absence of fatal accidents in the underground mining category in the last 12 months of operations.

In 2019, Nexa also launched the 100% safe campaign to raise the awareness of employees of partner companies about safe behavior, encouraging reflection on the actions of each person in routine tasks. Despite these efforts, one fatality in its Peruvian operations was reported in Nexa’s 2019 Annual Report.

Corporately, Nexa has stated its commitment to internationally recognized human rights and prohibits any violation of human rights in its operations and suppliers. Suppliers are asked to provide information regarding both social responsibility and human rights preservation. Nexa reported that in 2019, there were no complaints of non-compliance with any requirements related to human rights impacts, across all of its operations. Furthermore, Nexa is also seeking to review all outside suppliers for their conformity with human rights ethics. As of 2019, approximately half of its suppliers had been reviewed, with no known records of any human rights violations.

There are procedures in place for employees and contractors to report grievances and ethical violations, including directly to management, via telephone and online. At the time of this writing, there were no specific reports on the number of grievances or ethical violations relevant to the Cerro Pasco mine complex.

Commitments previously established between Milpo and the San Juan de Milpo Community include the prioritization of permanent employment opportunities regardless of gender for the duration of the ongoing mine operations; in the event that a sub-contractor ceases its involvement with the mine operation, Nexa will re-assign personnel from the community to other activities.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-29

As part of the Marco Agreement previously established between Nexa and the San Francisco de Asis de Yarusyacan Community, Nexa is committed to employ 60% of workers from specialized service companies from the community, dependent on employment opportunities required by the mine operations (both El Porvenir and Atacocha) for qualified and non-qualified workforce.

Employees have access to a number of benefits including paid vacations and holidays, financial bonuses, health, education, overtime, living allowance, and other employment bonuses.

17.4.4Community Health and Safety

Corporately, Nexa has made several commitments to improve community health and safety, as well as the overall well-being of community members.

Nexa supports social health and community well being through a number of community based initiatives in Nexa’s areas of influence. The 2018 EIA set out the components of Nexa’s social responsibility program, including:

·Communications with local communities and stakeholders.
·Mitigation of social impacts and provision of job opportunities.
·Managing social circumstances that could result in social conflict.
·Promoting local employment, particularly among youth.
·Acquisition of local products, goods and services.
·Enhancing livestock operations.
·Implementing medical campaigns to improve health conditions.
·Provision of school supplies to children.
·Water management.
·Support of local festivities.
·Support for local infrastructure / community projects.
·Strengthening of local capabilities.

For instance, in 2019, to strengthen local development processes Nexa supported the development of spaces for dialogue and interaction with public, private, and community institutions. From this, local governments, service providers and users began to manage drinking water services more sustainably, improving their performance in the management of public services and their role in local development.

In 2019, Nexa implemented a safe school program to improve health conditions of students at five schools located in El Porvenir and Atacocha.

In 2019, Nexa verified its emergency response conditions at all operating units in Peru and an Emergency Response Plan (PAE for its acronym in Spanish) was delivered with management training and simulated exercises. A Global Emergency Response Plan is in development, to align the actions of the individual unit plans with the corporate Crisis and Business Continuity Management Plan.

In 2020, Nexa reported that the authorities of the countries which they operate have adopted policies referring to the COVID-19 pandemic declared by the World Health Organization (WHO), such as the state of emergency declared by the Peruvian government. Nexa has also been in discussions with local stakeholders to develop protocols and programs to monitor and manage the risk of COVID-19 including on-site and with the movement of workers on and off-site.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-30
17.4.5Land Acquisition and Involuntary Resettlement

At the time of writing, there does not appear to be any land acquisition or involuntary resettlement associated with the Cerro Pasco complex operations. Therefore, the SLR QP is of the opinion that PS5 is not applicable.

17.4.6Indigenous Peoples

There are no Indigenous Peoples in the vicinity of the Cerro Pasco complex. Therefore, the SLR QP is of th opinion that PS7 does not appear to be applicable.

17.4.7Cultural Heritage

Projects of archaeological evaluation have been undertaken in the El Porvenir area. A number of certificates of absence of archaeological remains (CIRA for its acronym in Spanish) have been issued to Milpo by the National Ministry of Culture approving the supporting documentation submitted in writing by the mining company to the ministry for review and approval. At the time of writing, no information was available on Chance Find Procedures, which might be applicable as the proposed expansion undergoes construction and expanded operations commence.

17.4.8Conclusions and Recommendations

SLRs review of social aspects indicates that, at present, Nexa’s Cerro Pasco complex, is a positive contribution to sustainability and community well being. Nexa has established and continues to implement its various corporate policies, procedures, and practices in a manner consistent with relevant IFC PSs. Nexa has, and continues to make, a positive contribution to the communities most affected by the site operations and has done a thorough job in documenting potential effects on stakeholders and protecting the rights, health and safety of its employees.

At this time, there are no specific recommendations to improve Nexa’s social performance at the Cerro Pasco complex. Outreach, dialogue, and clear documentation should continue, particularly through the COVID-19 pandemic.

17.5Mine Closure Requirements
17.5.1Mine Closure Plan and Regulatory Requirements

The Mine Closure Plan is periodically updated over the LOM. A conceptual Mine Closure Plan was prepared in 2006 for the Mine components within the context of the Peruvian legislation (KCB, 2006) and has subsequently been amended or updated four times. The Mine Closure Plan addresses temporary, progressive, and final closure actions, and post-closure inspection and monitoring. Under Article 20 of the Peruvian mine closure regulations, the first update of the Mine Closure Plan must be submitted to the Peruvian Ministry of Energy and Mines (the Ministry) three years after approval of the initial Mine Closure Plan, and every five years thereafter. Two years before final closure, a detailed version of the Mine Closure Plan will have to be prepared and submitted to the Ministry for review and approval. The following is a summary of the El Porvenir Mine Closure Plan updates and modifications to date:

·Initial Closure Plan approved in 2007 by R.D. No. 318-2007-MEM/AAM and prepared according to the modification of Supreme Decree D.S. No. 033-2005-EM (Mine Closure Law).
·Feasibility level Mine Closure Plan approved in 2009 by R.D. No. 166-2009-MEM-AAM.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-31
·First amendment to the Mine Closure Plan approved in 2011 by R.D. No. 286-2011-MEM-AAM.
·Update of the Mine Closure Plan approved in 2013 by R.D. No. 034-2013-MEM-AAM.
·Second amendment to the Mine Closure Plan approved in 2016 by R.D. No. 277-2016-MEM-AAM.
·Third amendment to the Mine Closure Plan prepared in January 2020 and submitted to the Peruvian Ministry of Energy and Mines for approval.

The Conceptual Mine Closure Plan approved in 2007 (KCB, 2006), the R.D. from 2009, the update to the Mine Closure Plan approved in 2013 (Schlumberger Water Services, 2012), and the third amendment to the Mine Closure Plan (KCB, 2020) were available for review.

The approved period for implementation of closure and post-closure in the latest Mine Closure Plan includes seven years of progressive closure (2021 to 2027), two years of final closure (2028 to 2029), and five years of post-closure (2030 to 2034). Post-closure monitoring, assumed to extend for five years after closure, will include monitoring of physical, geochemical, hydrological, and biological stability.

The specific objectives of the El Porvenir Mine Closure Plan are as follows:

·Health and safety – Assure public health and safety during execution of closure and post-closure activities, recovering the original environmental quality of the surroundings and developing feasible rehabilitation works from a biological, technical and financial perspective. Protect the human health and the environment by maintaining physical and chemical stability of Mine components.
·Physical stability – Geotechnical stability of earth structures implementing designs that minimize short term and long term risks of failure following the applicable Peruvian legislation and best international practices.
·Geochemical stability – Feasibility design of encapsulating covers for hazardous materials and materials with potential to cause contamination of the environment. The covers should be designed to employ local materials with physical and geochemical characteristics resistant to degradation and erosion through time. The covers should be compatible with the landscape, favourable to the growth of local vegetation species.
·Hydrological stability – Adequate management of surface runoff. Design flows with adequate return period according to the applicable Peruvian legislation should be evaluated. The need for closure water management structures should be identified.
·Land use – Recovery of original levels for ground surface to the extent feasible in order to make it compatible with predevelopment land uses in the project area.
·Waterbodies use – Maintain equilibrium in the micro-basins located in the mine area, preserving water quantity and quality, and implementing adequate water management.
·Social objectives – Minimize socio-economic impacts creating conditions that promote sustainability for the social stakeholders through execution of social programs.

The Mine Closure Plan promotes to the extent feasible a passive condition that minimizes the efforts required for care and maintenance of the closed Mine components during post-closure.

The closure criteria for each component of El Porvenir are defined according to the following aspects:

·Dismantling
·Demolition, salvage and disposal
·Physical stabilization

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-32
·Geochemical stabilization
·Hydrological stability (water management)
·Re-establishing the landscape contour
·Re-vegetation
·Rehabilitation of aquatic habitats
·Social programs
·Post-closure maintenance and monitoring

The Mine Closure Plan concentrates on the decommissioning and closure of primary facilities and elements of infrastructure at El Porvenir, which include:

·Underground mine and associated portal, ventilation shafts, support facilities, and underground infrastructure.
·Processing facilities (concentrator plant and associated infrastructure).
·WRDs.
·TSF.
·Water management facilities and infrastructure.
·Borrow areas and quarries.
·Mine camps (San Juan de Milpo and Carmen Chico) and administrative buildings.
·Access roads.
·Ancillary buildings.
·Ancillary infrastructure including among others:
·Electrical and ventilation systems.
·Transportation systems.
·Communication systems.
·Domestic waste landfill.
·Waste management facilities.
·Organic waste management facilities.
·La Candelaria Hydroelectric Plant.
·Power transmission lines and electrical sub-stations.
·Topsoil deposits.

A summary of the main proposed closure activities is presented in Table 17-4. Of note the that water supply to the San Juan de Milpo community from the Carmen Chico spring will be retained during post-closure.

Table 17-4: Summary of Main Closure Activities

Nexa Resources S.A. – El Porvenir Mine

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-33

 

Mine Component  Closure Activities
Mine  Underground mine  Redirection of underground mine water discharge towards the TSF.
Flooding of underground works (recovery of phreatic level).
Plugging or filling of mine openings.
Disconnection, dismantling and removal of equipment and water management infrastructure.
Soil sampling to evaluate contamination.
Excavation/removal of contaminated material (including concrete) for appropriate disposal.
Waste disposal facilities  La Quinua WRD  Slope contouring for physical stability.
Cover installation and revegetation.
Construction of an erosion prevention structure on the slope adjacent of the Huallaga River.
TSF     Dam reconfiguration, if required for physical stability.
Leveling and recontouring of the disposed tailings surface.
Cover installation to prevent oxidation of the deposited tailings.
Re-vegetation.
Replacement of the overflow tunnel with a closure overflow spillway that discharges surface runoff to the Milpo Creek.
Improvements to the drainage system near the confluence of the Milpo Creek and the Lloclla River to prevent flooding the area of the San Miguel community.
Other infrastructure  Concentrator plant
Shops
Water management infrastructure
Power transmission lines
Hazardous waste storage areas
Access roads
La Candelaria Hydroelectric Plant
  Dismantling, demolition, salvaging and disposal of structures.
(Donation of facilities to the local community will be considered on grounds of safety).
Disposal of concrete in the underground mine.
Removal of equipment for recycling, salvaging or disposal.
Removal of contaminated soils.
Transportation to authorized disposal areas.
Cleaning and purification of tanks and deposits.
Removal of Socorro pond.
Recontouring of terrain and re-vegetation.
Sale of the hydroelectric power plant to a third party that could continue the power supply to local communities.
Staff facilities  Mine camp
Administrative buildings
Potable water and septic systems
  Mobilization of equipment, machinery, and personnel.
De-energization.
Dismantling and removal of structures and equipment to authorized disposal areas.
Dismantling and demolition of concrete structures for disposal in the underground mine.
Recontouring of terrain and re-vegetation.

 

It is noted that the design criteria for the El Porvenir TSF closure planning are to Peruvian Standards, which are less stringent than Canadian dam safety guidelines. For example, the El Porvenir tailings dam has been designed to meet stability requirements for a 2,500 year return earthquake with estimated peak ground acceleration of 0.4 times the acceleration due to gravity, which is significant. Post-seismic stability analyses for El Porvenir dam were carried out by Ausenco (2016) to demonstrate dam stability but no information was provided related to the risk of failure of the emergency spillway inlet control structure

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-34

and the potential for liquefied tailings release through the spillway tunnel. The ultimate tailings level is some 50 m above the spillway tunnel invert.

The El Porvenir TSF emergency spillway has been designed to pass the Probable Maximum Flood resulting from 146 mm of precipitation in 6 hours, which is appropriate given the size of the dam. It is not clear that the post-closure flood routing assumed the perimeter watershed diversion channels would still be in service in the long term. The risk of diversion channel blockage and potentially higher inflows to the TSF should be evaluated with additional freeboard added to the dam crest, if required, to ensure the dam is not overtopped.

A comprehensive dam safety review is recommended in order to finalize the detailed closure plan prior to moving into the closure stage.

Physical, chemical, hydrological, and biological stability conditions following closure will be verified through implementation of the post-closure maintenance and monitoring program. Monitoring will also support the evaluation and verification of compliance with closure activities, and the identification of deviations leading to the adoption of corrective measures. The monitoring activities will be carried out considering the Peruvian Environmental Quality Standards and Maximum Permissible Limits, as well as criteria set in the Mine Closure Plan for physical, chemical, hydrological, and biological stability.

No specific details of the post-closure monitoring programs for physical stability, water quality, biology and social were found in the Mine Closure Plan reports provided to SLR. Hence, SLR recommends to either confirm if these programs have been sufficiently advanced at a concept level or if details should be incorporated to the next update of the Mine Closure Plan for El Porvenir. As a minimum, it is recommended that post-closure monitoring programs include the following:

·Specific activities and frequency to monitor physical and hydrological stability (mainly focused on inspections).
·Locations and frequency for water quality sampling (surface water and groundwater).
·Biology campaigns and frequency.
·Indicators to track progress with social initiatives and programs implemented during the operations phase towards achieving social objectives at closure and post-closure.
·Proposed documentation and reporting.
17.5.2Closure Cost Estimate and Financial Assurance for Closure

A closure cost estimate was developed and included in the Mine Closure Plans. The total value estimated in 2020 for the remaining LOM presented in the third amendment to the Mine Closure Plan is as follows (excluding local taxes):

·Progressive Closure (2021 to 2027) US$10,990,121
·Final Closure (2028 to 2029) US$12,583,266
·Post-Closure (2030 to 2034) US$ 1,622,646
·Total US$25,196,033

According to Supreme Decree D.S. N° 262-2012-MEM/DM, the financial assurance is calculated based on inflation and discount rates in order to estimate the net present value (NPV) for the mine closure cost. The total financial assurance (progressive closure, final closure, and post-closure) calculated in 2020 considering an inflation rate of 2.37% and a discount rate of 2.14%, is US$20,635,472 (including local

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-35

taxes). A detailed breakdown of the cost estimate is provided in the third amendment to the El Porvenir Mine Closure Plan (KCB, 2020).

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-36
18.0Capital and Operating Costs

For the purpose of this Technical Report Summary, SLR reviewed the capital and operating costs required for the mining and processing of Mineral Reserves at El Porvenir provided by Nexa. The capital and operating cost estimates were prepared based on recent operating performance and the current operating budget for 2020. The cost estimates are accurate to within +/-10%. SLR considers these cost estimates to be reasonable, as long as the production targets are realized. All costs in this section are expressed in Q4 2020 US dollars.

18.1Capital Costs

Table 18-1 presents the LOM budget for capital expenditures at El Porvenir. The Mine is a current producer, therefore there are no pre-production capital costs. Capital expenditures are considered sustaining capital as they replace existing production assets, maintain current capacity, or are related to safety, health, and the environment. Underground mine development capital is based on a cost per development metre of US$1,396/m. The LOM sustaining capital costs for El Porvenir are estimated to be US$221 million.

Table 18-1: Life of Mine Capital Budget

Nexa Resources S.A. – El Porvenir Mine

Cost
(US$000)
  Total  2021  2022  2023  2024  2025  2026  2027  2028
Tailing Dam & Waste Deposit                                             
Raising   53,858    10,808    18,149    24,900    —      —      —      —      —   
New Dam   13,246    2,700    1,000    —      5,000    4,546    —      —      —   
Tailing Treatment   3,782    3,782    —      —      —      —      —      —      —   
Heavy Mobile Equipment                                             
Replacement   23,284    1,838    50    3,567    4,781    5,593    3,641    3,815    —   
Addition   3,335    850    1,600    —      —      —      —      —      —   
Asset Integrity                                             
Asset Integrity – Plant   11,365    6,605    2,805    475    575    705    100    100    —   
Asset Integrity – Mine   150    —      —      —      —      150    —      —      —   
Other Sustaining                                             
Others   1,340    110    550    250    290    100    0    40    —   
Civil Construction   200    200    —      —      —      —      —      —      —   
Mining Facilities                                             
Communication system   2,450    550    700    600    300    300    —      —      —   
Pumping   2,500    700    300    300    300    300    300    300    —   
Electrical Substation   1,650    1,000    200    450    —      —      —      —      —   

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-37

 

Cost
(US$000)
  Total  2021  2022  2023  2024  2025  2026  2027  2028
Ventilation / Cooling   950    100    150    100    150    150    150    150    —   
Operation Unit Projects                                             
Improvements   4,631    1,821    1,110    1,700    —      —      —      —      —   
Audit & Inspection   2,380    390    890    1,100    —      —      —      —      —   
Other Expenditures                                             
Expansion Projects   —      —      —      —      —      —      —      —      —   
Information Technology   1,020    480    150    130    130    130    —      —      —   
Automation Project   2,190    874    1,166    150    —      —      —      —      —   
Mine Development Capital Cost                                             
Underground Mine Development   92,745    17,170    16,073    16,941    18,954    13,124    6,521    1,934    2,030 
Total   221,075    49,977    44,894    50,663    30,479    25,982    10,712    6,338    2,030 

The Mine Closure Plan was prepared to meet the Peruvian national requirements with the closure and reclamation cost assessed at US$25.2 million. The closure cost should be reviewed and updated regularly to address updates in the national requirements.

18.2Operating Costs

The El Porvenir operating costs are based on a LOM period of eight years between 2021 and 2028. The operating cost inputs including labour, consumables, and supplies were based on data provided by Nexa and reflect the existing operating status of the Mine. Table 18-2 presents the LOM forecast for operating costs at El Porvenir and Table 18-3 lists Nexa personnel working at the Mine as of December 31, 2020.

Table 18-2: Operating Budget

Nexa Resources S.A. – El Porvenir Mine

All-In Cost
(US$000)
  Total  2021  2022  2023  2024  2025  2026  2027  2028
Mine Underground   454,350    63,077    64,320    64,742    61,913    55,796    51,610    51,569    41,323 
High Zone C&F   127,409    22,074    19,242    20,828    15,955    8,275    13,293    13,374    14,369 
High Zone SLS   4,947    301    1,818    2,354    473    —      —      —      —   
Intermediate C&F   49,425    19,329    11,914    12,146    4,161    1,874    —      —      —   
Intermediate SLS   90,866    8,801    11,734    11,978    21,170    17,064    3,651    3,673    12,795 
Low Zone C&F   30,666    11,827    11,445    4,944    13    861    1,577    —      —   
Low Zone SLS   8,855    636    366    797    3,358    3,698    —      —      —   
Deepening C&F   98,132    —      5    5,621    15,239    19,778    21,641    23,630    12,218 
Deepening SLS   44,050    109    7,795    6,074    1,546    4,246    11,448    10,892    1,941 
Processing   176,174    23,274    23,452    23,446    22,910    21,808    20,998    20,972    19,314 
G&A   101,109    15,774    16,219    16,206    14,861    12,103    10,076    10,011    5,858 
Development Operating Cost   90,887    17,162    15,971    14,837    13,065    10,602    8,673    6,244    4,332 
Total   822,519    119,288    119,961    119,231    112,750    100,309    91,356    88,797    70,827 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-38

Table 18-3: Nexa Personnel at El Porvenir Mine – December 31, 2020

Nexa Resources S.A. – El Porvenir Mine

Department  Personnel
Business Intelligence   12 
Human Resources   18 
Geology - Mine   26 
Management   4 
Logistics   8 
Maintenance   124 
Mine   210 
Open Pit Mine   1 
Plant   63 
Community Relations   5 
Safety   13 
Technical Services   28 
Environment   4 
Projects   9 
Total   525 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-39
19.0Economic Analysis

The economic analysis contained in this Technical Report Summary is based on El Porvenir’s Mineral Reserves reported on a 100% ownership basis (Nexa owns 80.16%), economic assumptions provided by Nexa for El Porvenir, and the capital and operating costs as presented in Section 18 of this Technical Report Summary.

19.1Economic Criteria
19.1.1Physicals
·Mine life: 8 years (between 2021 and 2028):
·Underground ore tonnes mined: 13.85 Mt
oCu grade: 0.23% Cu
oZn grade: 3.75% Zn
oPb grade: 0.88% Pb
oAg grade: 62.8 g/t Ag
·Processed:
oTotal Ore Feed: 13.85 Mt
§Cu grade: 0.23% Cu
§Zn grade: 3.75% Zn
§Pb grade: 0.88% Pb

§  Ag grade: 62.8 g/t Ag

oContained Metal:
§  Cu:31,500 t Cu
§  Zn:518,900 t Zn
§  Pb:122,400 t Pb
§  Ag:27.966 million ounces (Moz) Ag
oMetallurgical Recoveries at LOM average grades (recoveries vary as a function of head grade):
§Cu recovery 14.3%
§Zn recovery 89.6%
§Pb recovery 79.2%
§Ag in Cu recovery 3.8%
§Ag in Zn recovery 14.6%
§Ag in Pb recovery 59.1%
oRecovered Metals:

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-40
§  Cu:4,500 t Cu
§  Zn:464,700 t Zn
§  Pb:96,800 t Pb
§  Ag:21.676 Moz Ag
oPayable Metals:
§  Cu:4,300 t Cu
§  Zn:390,700 t Zn
§  Pb:91,200 t Pb
§  Ag:16.664 Moz Ag
19.1.2Revenue
·Revenue is estimated based on the following LOM weighted average metal prices:
oCu price: US$6,388/t Cu
oZn price: US$2,511/t Zn
oPb price: US$1,977/t Pb
oAg price: US$17.20/oz Ag
·Net Revenue includes the benefit of additional US$128.7/t Zn selling price and zinc smelting at cost (rather than at commercial third-party terms), due to integration with Nexa’s Cajamarquilla refinery.
·Logistics, Treatment (TC), and Refining (RC) charges:
oLOM average Transportation/Logistics charges:
§Cu concentrate: US$127.05/t concentrate for export
§Zn concentrate: US$38.03/t concentrate to Cajamarquilla refinery
§Pb concentrate: US$123.84/t concentrate for export
oTreatment Charges:
§TC+RC Cu concentrate: US$111.68/t concentrate
§TC Zn concentrate for export: US$238.72/t concentrate
§TC Pb concentrate: US$201.68/t concentrate
§Refined Zn conversion costs at Cajamarquilla: US$509.73/t
oRefining Charges:
§Ag in Cu concentrate: US$0.50/oz
§Ag in Pb concentrate: US$1.00/oz
·NSR Revenue after logistics, treatment, and refining charges is US$1,306 million.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-41
19.1.3Capital Costs
·LOM sustaining capital costs of US$221.1 million.
·Closure costs of US$25.2 million were included at the end of the Mineral Reserves based LOM in year 2029.
19.1.4Operating Costs
·LOM unit operating cost average of:
oMine Development: US$6.56/t mined
oUnderground Mining: US$32.81/t mined
oProcessing: US$12.72/t milled
oG&A: US$7.30/t milled
·Total unit operating costs of US$59.39/t milled.
·LOM operating costs of US$822.5 million.
19.1.5Taxation and Royalties
·Corporate income tax rate in Peru is 29.50%.
·Special Mining Tax (IEM/GEM) LOM average rate: 4.3%.
·Mining royalties LOM average rate: 4.3%.
·Employees participation: 8%.
·SLR has relied on a Nexa taxation model for calculation of income taxes applicable to the cash flow.
19.2Cash Flow

SLR developed a LOM after-tax cash flow model for El Porvenir to confirm the economics of the Nexa LOM plan. The model is based on Nexa’s TR EP 2020 v6 Final model. The model does not take into account the following components:

·Financing costs
·Insurance
·Overhead cost for a corporate office

A cash flow summary is presented in Table 19-1. Production is reported on a 100% ownership basis (Nexa owns 80.16%). All costs are in Q4 2020 US dollars with no allowance for inflation.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-42

 

Table 19-1: After-Tax Cash Flow Summary

INTENTIONALLY LEFT BLANK

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-43

 

INTENTIONALLY LEFT BLANK

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-44

 

 

INTENTIONALLY LEFT BLANK

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-45

 

 

INTENTIONALLY LEFT BLANK

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-46

 

19.2.1Cash Flow Analysis

Mine economics have been evaluated using the discounted cash flow method, using mid-year discounting convention, and taking into account annual processed tonnages and copper, zinc, lead, and silver grades. The associated process recovery, copper, zinc, and lead concentrate grades, metal prices, operating costs, refining and transportation charges, royalties, and capital expenditures were also considered.

The economic analysis confirmed that the El Porvenir Mineral Reserves are economically viable. The pre-tax net present value (NPV) at an 9% base discount rate is US$155 million and the after-tax NPV at an 9% base discount is US$130 million, on a 100% Mine basis (Nexa own 80.16%).

The summary of the results of the cash flow analysis is presented in Table 19-2.

Table 19-2: Cash Flow Analysis

Nexa Resources S.A. – El Porvenir Mine

Item  Discount Rate  Units  Value
Pre-tax NPV at 7% discount   7%  US$ million   165 
Pre-tax NPV at 8% discount   8%  US$ million   160 
Pre-tax NPV at 9% discount   9%  US$ million   155 
              
After-Tax NPV at 7% discount   7%  US$ million   139 
After-Tax NPV at 8% discount   8%  US$ million   134 
After-tax NPV at 9% discount   9%  US$ million   130 

The undiscounted pre-tax cash flow is US$207 million, and the undiscounted after-tax cash flow is US$177 million. For this cash flow analysis, the internal rate of return (IRR) and payback are not applicable as there is no negative initial cash flow (no initial investment to be recovered).

19.3Sensitivity Analysis

Project risks can be identified in both economic and non-economic terms. Key economic risks were examined by running cash flow sensitivities on after-tax NPV at an 9% discount rate. The following items were examined:

·Metal prices
·Head grade
·Metallurgical recovery
·Operating costs
·Capital costs

After-tax sensitivity over the base case has been calculated for -20% to +20% (for head grade), -10% to +5% (for recoveries), -20% to +20% (for metal prices), and -5% to +15% (operating costs and capital costs) variations to determine the most sensitive parameter of this project. The sensitivities are shown in Table 19-3 and Figure 19-1.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-47

Table 19-3: After-Tax Sensitivity Analysis

Nexa Resources S.A. – El Porvenir Mine

   Head Grade  NPV at 9%
(US$ million)
 80%    Cu:0.18% Zn:3.00% Pb:0.71% Ag:50.24 g/t    -33 
 90%    Cu:0.20% Zn:3.37% Pb:0.80% Ag:56.52 g/t    57 
 100%    Cu:0.23% Zn:3.75% Pb:0.88% Ag:62.8 g/t    130 
 110%    Cu:0.25% Zn:4.12% Pb:0.97% Ag:69.8 g/t    202 
 120%    Cu:0.27% Zn:4.50% Pb:1.06% Ag:75.4 g/t    270 
      Net Average Recovery (all metals)    NPV at 9%
(US$ million)
 
 90%    81%    57 
 98%    85%    94 
 100%    90%    130 
 103%    92%    148 
 105%    94%    166 
      Metal Prices    NPV at 9%
(US$ million)
 
 80%    Cu:$2.32/lb Zn:$0.91/lb Pb:$0.72/lb Ag:$13.76/oz    -77 
 90%    Cu:$2.61/lb Zn:$1.03/lb Pb:$0.81/lb Ag:$15.48/oz    40 
 100%    Cu:$2.90/lb Zn:$1.14/lb Pb:$0.90/lb Ag:$17.20/oz    130 
 110%    Cu:$3.19/lb Zn:$1.25/lb Pb:$0.99/lb Ag:$18.92/oz    215 
 120%    Cu:$3.48/lb Zn:$1.37/lb Pb:$1.08/lb Ag:$20.64/oz    294 
      Operating Costs (US$ million)    NPV at 9%
(US$ million)
 
 95.0%    781    152 
 97.5%    802    141 
 100.0%    823    130 
 107.5%    884    97 
 115.0%    946    64 
      Total Capital Costs (US$ million)    NPV at 9%
(US$ million)
 
 95.0%    234    140 
 97.5%    240    135 
 100.0%    246    130 
 107.5%    264    116 
 115.0%    283    101 

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-48

Figure 19-1: After-Tax NPV Sensitivity Graph

The after-tax NPV is most sensitive to metal prices, then to head grade, followed by metallurgical recoveries, operating costs, and capital costs.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-49
20.0Adjacent Properties

El Porvenir is situated adjacent to the Atacocha mining operation. The Atacocha property consists of 147 concessions covering approximately 2,872.5 ha and a processing plant (RPA, 2019). The mining site consists of 1,343.0 ha, and other surface property includes the TSF, accommodations, and other ancillary infrastructure. Atacocha is a polymetallic mining operation that consists of the Atacocha underground mine, the San Gerardo open pit, and the Chicrin 2 processing plant, which has a 4,500 tpd capacity. Atacocha is wholly owned by Nexa Resources Atacocha S.A.A. (formerly Compañía Minera Atacocha), in which Nexa Peru has a 66.62% equity interest. Nexa directly and indirectly owns 80.24% of the latter company. Table 20-1 presents Atacocha’s production from 2018 to 2020.

Table 20-1: Production - Atacocha Mine

Nexa Resources S.A. – El Porvenir Mine

   YE 2020  YE 2019  YE 2018
Treatment ore (in tonnes)   1,065,363    1,505,428    1,551,472 
Average ore grade               
Zinc (%)   1.20    1.43    1.43 
Copper (%)   0.05    0.08    0.10 
Lead (%)   1.15    1.30    1.18 
Silver (ounces per tonne)   1.39    1.52    1.42 
Gold (ounces per tonne)   0.01    0.01    0.02 
Metal contained in concentrate production               
Zinc (in tonnes)   9,614    16,668    17,323 
Copper (in tonnes)   0    40    125 
Lead (in tonnes)   10,210    16,464    15,595 
Silver (in oz)   1,184,750    1,882,138    1,678,920 
Gold (in oz)   6,260    9,306    15,431 
Cash cost, net of by-product credits (in US$/t)   17.8    1,052.0    1,115.5 
Cash cost, net of by-product credits (in US$/lb)   0.8    0.48    0.51 
Capital expenditures (in millions of US$)   15.3    11.8    16.9 

Source: Nexa, 2020g

Together, El Porvenir and Atacocha form the Cerro Pasco Mining Complex. In 2013, Nexa initiated a project to integrate the two mines to streamline their operations, which has included the following areas:

·Administrative functions
·TSF
·Electric power supply

As indicated in Figure 20-1, El Porvenir is surrounded by other mineral properties. The following companies that hold properties in the vicinity are subsidiaries of the Volcan Group:

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-50
·Compañía Minera Vichaycocha
·Empresa Exploradora de Vinchos
·Empresa Minera Paragsha
·Minera San Sabastián AMC S.C.R.L.

The Volcan Group operates the Cerro de Pasco Mine in the nearby city of Cerro de Pasco. Nexa maintains a group of mining concessions located within the boundaries of some of the Volcan Group’s properties.

Other local property holders include:

·Sociedad Minera El Brocal
·David Prospero Rudas y otros
·Corporación Minera Centauro S.A.C. (Centauro)

Centauro is a Peruvian capital corporation that focuses on exploration, mining, and processing of polymetallic minerals, such as gold, silver, and copper.

SLR has not independently verified this information and this information is not necessarily indicative of the mineralization at El Porvenir.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-51

 

Figure 20-1: Mining Concessions in the Vicinity of El Porvenir

Source: Nexa, 2020

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-52
21.0Other Relevant Data and Information

No additional information or explanation is necessary to make this Technical Report Summary understandable and not misleading.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-53
22.0Interpretation and Conclusions

SLR has the following conclusions by area.

22.1Geology and Mineral Resources
·As of December 31, 2020, exclusive of Mineral Reserves, Measured Mineral Resources are estimated to total 0.18 Mt at 2.59% Zn, 0.99% Pb, 0.23% Cu, and 63.46 g/t Ag and Indicated Mineral Resources are estimated to total 1.07 Mt at 2.93% Zn, 0.89% Pb, 0.20% Cu, and 63.33 g/t Ag. In addition, Inferred Mineral Resources are estimated to total 6.79 Mt at 3.60% Zn, 0.95% Pb, 0.23% Cu, and 78.37 g/t Ag. Mineral Resources are reported on an 80.16% Nexa attributable ownership basis.
·El Porvenir has features of skarn, hydrothermal vein/breccia-style, and stratabound deposits.
·The control of mineralization is lithological, mineralogical, and structural.
·Protocols for drilling, sampling, analysis, verification, and security meet industry standard practices. The drill hole database was verified by SLR and is suitable for Mineral Resource estimation.
·The geological models are reasonably constructed using available geological information and are appropriate for Mineral Resource estimation.
·The assumptions, parameters, and methodology used for the El Porvenir Mineral Resource estimate are appropriate for the style of mineralization and proposed mining methods.
·Nexa’s exploration strategy, practices, and procedures are in line with industry standards.
·A number of polymetallic prospects located near the deposits have been outlined and warrant additional exploration.
22.2Mining and Mineral Reserves
·As of December 31, 2020, Proven and Probable Mineral Reserves are estimated to total 11.10 Mt at 3.75% Zn, 0.88% Pb, 0.23% Cu, and 63 g/t Ag. Mineral Reserves are reported on an 80.16% Nexa attributable ownership basis.
·The assumptions, parameters, and methodology used for the El Porvenir Mineral Reserve estimate meet industry standard practices and are appropriate for the style of mineralization and proposed mining methods.
·Most of El Porvenir’s ore production comes from mechanized C&F, which has proven to be an effective method for mining its deposits for decades. An increasing share of the Mine’s production comes from SLS in those areas that are suitable for the method. SLS is a lower-cost method than C&F, and provides an efficient means for disposing of development waste. According to the LOM plan, SLS’s share of El Porvenir’s output will increase from approximately 16% in 2021 to 46% in 2025.
22.3Mineral Processing
·Test work has been conducted in order to produce a geometallurgical model to predict metallurgical response during future processing at El Porvenir and relationships based on the ore

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-54

source at El Porvenir having been derived to predict throughput, grinding media consumption, recovery, and concentrate quality.

·Review of historical production indicates that recoveries of copper, lead, and zinc are related to their head grades, while the majority of silver is recovered to the lead concentrate.
·Average LOM planned head grades of zinc and copper are forecast to be similar to or higher than average head grades for the past three years, while the average planned lead head grade is forecast to decrease slightly compared to recent head grades. Forecast recoveries are in line with those achieved in recent years.
·No fundamental changes to the concentrator feed are anticipated, and in the SLR QP’s opinion, based on recent processing plant performance, the forecast recoveries and concentrate qualities for the near future are reasonable.
22.4Environmental, Permitting and Social Considerations
·No environmental issues were identified from the documentation available for review that could materially impact the ability to extract the Mineral Resources and Mineral Reserves. The El Porvenir operation complies with applicable Peruvian permitting requirements. The approved permits address the authority’s requirements for operation of the underground mine, TSFs, WRD, concentrator plant, water usage, and effluents discharge.
·The monitoring program at El Porvenir includes meteorology, air quality, non-ionized radiation, noise, surface water quality, groundwater quality (only one location), spring water quality, effluent discharges, fauna and flora, and TSF physical stability. El Porvenir reports the results of its monitoring program to the authorities according to the frequency stated in the approved resolutions. SLR is not aware of any non-compliance issues raised by the authorities.
·In the SLR QP’s opinion, the Environmental Management Plan for El Porvenir is adequate to address potential issues related to environmental compliance. A recommendation has been provided regarding the groundwater quality monitoring program (see Section 1.1.2.4).
·Nexa utilizes an Integrated Dam Management System (referred to as SIGBar) for the El Porvenir TSF, which provides guidelines for document management, monitoring, evaluation, risk analysis, compliance with standards and legislation, training of personnel, operation of structures and other provisions.
·The safety of operating a centerline raised tailings dam depends on the ability to maintain wide tailings beaches and a low phreatic level in the dam shell for stability. No issues with regard to crest settlements were noted in recent dam safety monitoring reports. SLR notes, however, that bedrock foundation grouting of the left and right abutments carried out in 2015 observed very significant grout takes in numerous grouthole stages indicating the filling of voids. A series of seepage collection sub-drainage pipes were also installed on the downstream shell of the dam prior to raising the rockfill to crest elevation 4,056 MASL. The dam monitoring consists of instrument measurements and field inspections.
·A Mine Closure Plan has been developed for all the Mine components within the context of Peruvian legislation and is periodically updated. The most recent modification to the Mine Closure Plan and update to the closure cost estimate are from January 2020.
·SLR’s social review indicates that, at present, Nexa’s operations at El Porvenir are a positive contribution to sustainability and community well-being. Nexa has established and continues to implement its various corporate policies, procedures, and practices in a manner consistent with

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-55

relevant IFC Performance Standards. Nexa has, and continues to make, a positive contribution to the communities most affected by the site operations and has done a thorough job in documenting potential effects on stakeholders and protecting the rights, health, and safety of its employees.

·In the SLR QP’s opinion the grievance mechanism in place and the Community Relations Plan, in combination with Nexa’s Social Management Policy and Nexa’s Management Procedures on negotiation for land access, monitoring of social commitments, management of social crisis, promotion of local hiring, and communication with stakeholders, are adequate to address potential issues related to local communities.
·Nexa established commitments with the communities San Juan de Milpo and San Francisco de Asis de Yarusyacan to employ direct and indirect local workforce, dependent on employment opportunities required by the mine operations for qualified and non-qualified workforce.
22.5Costs and Economic Analysis
·The LOM operating cost forecast reflects the existing operating status of the Mine. The SLR QP has reviewed recent operating costs and is of the opinion that the forecast is appropriate for the El Porvenir operation. Nexa also continue to assess operating efficiencies and approaches in efforts to improve operating costs in the different cost centres.
·The economics of the El Porvenir operation are positive over the LOM, confirming that the Mineral Reserves are economically viable. The economic analysis shows an after-tax NPV, at an 9% base discount rate, of $130 million, on a 100% Mine basis (Nexa owns 80.16%).

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-56
23.0Recommendations

SLR has the following recommendations by area.

23.1Geology and Mineral Resources
1.Improve the reconciliation processes by implementing a formal procedure and forming a multi-disciplinary team to organize and analyze reconciliation results so that production data can be used to calibrate future resource and reserve models.
2.Divide mineralization domains where groups of wireframes have been merged to avoid sharing of samples.
3.Review the inclusion of additional grade domains considering spatial and statistical correlations, to prevent smearing of high grades into low grade areas and vice versa.
4.Update the 2018 lithological model and build a litho-structural model with the main lithologies and faults that are controlling the mineralization to help define the geometry and boundaries of the mineralization. An updated lithological model would also be beneficial to evaluate and define density values by rock and by domain.
5.Until there is a well-established reconciliation process, monitor the silver and lead grades in the model with grade control and head grade to calibrate capping values and confirm if the higher silver and lead capping values are appropriate.
6.Investigate if capping levels should be applied based on high grade and low grade domains for zinc, lead, copper, and silver.
7.Increase the number of density samples in areas that currently have insufficient density tests available.
8.Use the production data to monitor the chosen drill spacing for the minor continuity zones to determine if sufficient confidence is provided to support detailed mine planning, as these domains show less grade and geological continuity.
9.Review and adjust resource and reserve shapes to follow the mineralization trend. Currently, there are a small number of shapes that do not follow the mineralization trend.
10.Re-evaluate some of the zones that were not included in the Mineral Resources and Mineral Reserves, on an ongoing basis, to potentially include part of these tonnes with continuous blocks that have the potential to be recoverable, to generate resource shapes and possibly reserve stopes.
11.Document all the supporting data used to define non-recoverable solids and document any changes.
12.Improve the survey accuracy of the mineralized mined-out stopes and development to guide the mineralization solid geometries and trends, and clean up the mined-out solids, particularly, overlapping areas.
13.Complete the 2021 exploration program, consisting of a 18,000 m drill program to define new Inferred Resources. The 2021 exploration program budget is approximately US$3.1 million.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-57
23.2Mining and Mineral Reserves
1.Consider upgrading the Mine’s underground communication system by replacing the present leaky-feeder system with a high speed digital network based on Wi-Fi or LTE technology. The upgrade would permit implementing the following:
oCentralized control and monitoring of underground operations from a control room on surface, including real-time tracking of personnel and equipment, telemetry, VOD, seismic monitoring, and closed-circuit television, among other applications.
oAutomated and tele-remote technology to operate equipment from control stations on surface for mucking development headings during shift changes, crushing, and operating rockbreakers, among other applications.
2.As the Mine has extensive existing workings, a private 4G-LTE network could be an attractive option. A private 4G-LTE network can provide substantial level coverage with a lower installation requirement than alternative systems as it sends a reliable signal over long distances without coaxial cables, amplifiers, or access points. Furthermore, it is not limited to line-of-site transmission.
23.3Mineral Processing
1.Evaluate the potential benefits that may be derived from a geometallurgical model to determine whether additional test work and further development of a geometallurgical model will provide more valuable information than what is already available from test work results.
23.4Environmental, Permitting and Social Considerations
1.Due to uncertainty regarding the potential for acid generation of the waste rock, geochemical evaluation (including static and kinetic geochemical testing on waste rock samples) should be carried out prior to closure to inform closure planning and water quality predictions for post-closure. Water quality monitoring should continue during operations to verify compliance with the national environmental standards and the appropriateness of the waste rock disposal and water management procedures that are in place.
2.Expand the groundwater quality monitoring program to include additional stations for collection of groundwater quality samples (and subsequent analysis). At a minimum, consideration should be given to the installation of one station upstream of the El Porvenir site.
3.Implement a water balance for ongoing operations to be updated by Mine personnel using meteorological and water monitored data on a regular basis (at least monthly). The water balance is an important tool to track trends and conduct short term predictions through simulation of variable operating and/or climatic scenarios to support decision making associated with tailings pond operation (e.g., maintaining adequate freeboard at all times).
4.Develop an integrated water balance that reflects the interaction between the El Porvenir and Atacocha operations from a water balance perspective to identify and predict possible scenarios of interruption of mine operations due to water management issues and/or dam safety concerns (e.g., not maintaining adequate dam freeboard).
5.Investigate opportunities for optimization of construction, tailings deposition, and water management between the Atacocha and El Porvenir operations in order to prevent situations

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-58

where potential problems with one of the tailings dams could impact continuity of the sister operation.

6.The following recommendations are proposed for the TSF:
oClassification of the TSF in terms of the Global Tailings Standard or the Canadian Dam Association. The classification may require more conservative design criteria in terms of flood management and seismic loading.
oA dam breach analysis to inform the TSF classification and emergency preparedness plan.
oA TARP for the piezometers for inclusion in the monitoring plan.
oCapacity assessments of the TSF completed on a bi-annual basis with topographic and bathymetric surveys.
oComplete long term geochemical kinetic testing of the tailings.
oImplement a groundwater monitoring program at the TSF to determine levels of metals and sulphates.
oMonitor the water quality from the TSF subsurface drains.
23.5Costs and Economic Analysis
1.Continuously monitor costs and lock in costs as soon as possible to eliminate economic uncertainty.
2.Continue efforts towards improving efficiencies and approaches to mining and development operations as opportunities arise in these areas.

 

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-59
24.0References

Amphos 21 Consulting Perú S.A.C., 2013-2019:

·El Porvenir: Estudio Hidrogeológico Preliminar para - Profundización del Pique Picasso, prepared for Compañía Minera Milpo S.A., December 2016.
·UM El Porvenir: Análisis Hidrogeológico para Estimación de Caudales durante la Construcción del Pique Winze, prepared for Compañía Minera Milpo S.A., October 2014.
·UM El Porvenir: Análisis Hidrogeológico para Estimación de Caudales durante la Construcción del Pique Winze, prepared for Compañía Minera Milpo S.A., October 2014.
·Modificación del Estudio de Impacto Ambiental de la UM Atacocha - Estudio Hidrológico e Hidrogeológico, prepared for Compañía Minera Milpo S.A., July 2018.
·Estudio Hidrogeológico y Soporte a Balance Hídrico para el Recrecimiento Presa de Relaves El Porvenir hasta la Cota 4,100 msnm, El Porvenir Mine, prepared for Compañía Minera Milpo S.A., August 2019.

Ausenco Vector, 2013, Ingeniería de Detalle para el Crecimiento de la Presa de Relaves El Porvenir, Anexo F – Caracterización Geoquí0ica del Relave Cicloneado, Report No. J09.82.12.03 Rev. 0 prepared for Compañía Minería Milpo S.A.A., February 2013.

Ausenco, 2016a: Milpo Andina Perú S.A.C. Ingeniería de Detalle Recrecimiento del Dique El Porvenir – Cota 4056. Report No. 101521-01-RPT-005 Rev. B, prepared for Compañía Minería Milpo S.A.A., August 2016.

Ausenco, 2016b: Milpo Andina Perú S.A.C. Ingeniería de Detalle del Recrecimiento de la Presa de Relaves El Porvenir – Cota 4100. Report No. 101521-01-RPT-002 Rev. 0, prepared for Compañía Minería Milpo S.A.A., August 2016.

Ausenco, 2018: Milpo Andina Perú S.A.C. Ingeniería de Detalle Recrecimiento del Dique El Porvenir – Cota 4064. Report No. 102378-01-RPT-004 Rev. 1, prepared for Compañía Minería Milpo S.A.A., September 7, 2018.

Ausenco, 2020: Compañía Minera Atacocha S.A.A. Ingeniería de Detalle del Recrecimiento de la Relavera Atacocha desde la Cota 4110 a la Cota 4128. Report No. 102377-01-RPT-006 Rev. 0, prepared for Compañía Minera Atacocha S.A.A., March 17, 2020.

Bardales, M., 2020, Legal Opinion on Section 4 of Technical Report (Memo), Nexa Resources, August 16, 2020.

Baumgartner, R., Fontboté, L., and Vennemann, T., 2008, Mineral Zoning and Geochemistry of Epithermal Polymetallic Zn-Pb-Ag-Cu-Bi Mineralization at Cerro de Pasco. Economic Geology, Vol. 103, pp 493-537.

Benavides-Caceres, V.,1999, Orogenic Evolution of the Peruvian Andes. in Geology and Ore Deposits of the Central Andes, Soc. Econ. Geo. Special Pub. No. 7, Skinner, B.J. (Ed), pp. 61-107.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-60

Calixto, F., 2020, Evaluación del Peligro Sísmico en U. M. El Porvenir, Institute of Mine Seismology, December 24, 2020.

Canadian Institute of Mining, Metallurgy and Petroleum (CIM), 2014, CIM Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014.

Clark, A.H., Farrar, E., Kontak, D.J., Langridge, R.J., Arena, F., Francem L.J., McBride, S.L., Woodman, P.L., Wasteneys, H.A., Sandeman, H.A. and Archibald, D.A., 1990, Geologic and Geochronological Constraints on the Metallogenic Evolution of the Andes of Southern Peru. Econ. Geo., Vol. 85, pp. 1520-1583.

Cesel Ingenieros, 2011, Modificación del EIA para la Ampliación de la Capacidad Instalas a 7,500 TMD Unidad Minera El Porvenir, prepared for Compañía Minería Milpo S.A.A., December 2011.

Climaco, R., 2020, Market Assumptions (Memo), Nexa Resources, October 2020

Cobeñas, B.G.R., 2008, Cinturonas metalogénicos cenozoicos en Pasy y Huánuco: tipos de yacimientos y naturaleza geoquímica de los magmas asociados: Universidad Nacional Mayor do San Marcos, Facultad de Ingeniera Geologica, Minera, Metalurgica y Geografica, Tesis, 75 p.

De Pinha Taranto, 2020, D., Smelter Terms (Memo), Nexa Resources, October 2020.

Ecotec, 2018, Quinto Informe Técnico Sustentatorio (ITS) para la Modificación de Componentes Auxiliares de la Unidad Minera El Porvenir, Report No. 290463-200-103-INF-001 Rev. 1 prepared for Nexa Resources El Porvenir S.A.C., December 4, 2018.

Ellison, R.A., Klink, B.A., and Hawkins, 1989, Deformation events in the Andean cycle in the Altiplano and Western Cordillera, southern Peru. Journal of South American Earth Sciences, Vol. 3 pp. 263-276.

Engler, A., 2009, The Geology of South America. GEOLOGY Vol. IV, pp. 374-405.

Escegis, 2020, Sexto Informe Técnico Sustentatorio de la Unidad Minera El Porvenir, prepared for Nexa Resources El Porvenir S.A.C., January 2020.

Form 20-F for fiscal year ended December 31, 2019 for Nexa Resources S.A., United States Securities and Exchange Commission, filed March 20, 2020.

Form 20-F for fiscal year ended December 31, 2018 for Nexa Resources S.A., United States Securities and Exchange Commission, filed April 3, 2019.

Geoconsultoria, 2020, Formulario De Registro De Inspección (FRI), April 28, 2020.

Geoconsultoria, 2018, Nexa, El Porvenir, Presa de relaves - Evaluación Anual de Seguridad - 2017 MP05RT09 Rev. 0, January 2018.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-61

Gilbert, J.M., and Lowell, J.D., 1974, Variations in zoning patterns pattern in porphyry ore deposits: Can. Inst. Mining Metall., v. 67, no. 742, pp. 99-104.

Global Mining Guidelines Group (GMG), 2018, Underground Mine Communications Infrastructure Guidelines, Part III: General Guidelines, version date September 21, 2018.

Hammarstrom, J.M., Kotlyar, B.B., Theodore, T.G., Elliott, J.E., John, D.A., Doebrich, J.L., Nash, J.T., Carlson, R.R., Lee, G.K., Livo, K.E., and Klein, D.P., 1991, Cu-Au and Zn-Pb Skarn Deposits: U.S. Geological Survey Open File Report 95-0831, Ch. 12, pp. 90-111.

Klohn Crippen Berger (KCB), 2006, Plan de Cierre Conceptual de la U.E.A. Milpo No. 1, prepared for Compañía Minería Milpo S.A.A., August 16, 2006.

KCB, 2020, Tercera Modificación de Plan de Cierre El Porvenir, Report No. ZC1365A01 prepared for Nexa Resources El Porvenir S.A.C., January 2020.

Mégard, F., 1968, Geologia de Cuadrángulo de Huandayo: Boletin del Servicio de Geologia y Mineria 18, 123p.

Nexa Resources S.A., 2019a, Corporate Policies.

Nexa Resources S.A., 2019b, Informe de Validación de Base de Datos Atacocha.

Nexa Resources, 2019c, Estudio Geomecánico de Implementación de la Cartilla Geomecánica de Sostenimiento, Prepared by the Departamento De Geomecánica, El Porvenir Mine, August 2019.

Nexa Resources S.A., 2020a, An Internal legal opinion by Magaly Bardales, Legal Corporate Manager and Institutional Affairs, Nexa, a letter to RPA expressing an opinion on Section 4 content of Technical Report (August 16, 2020).

Nexa Resources S.A., 2020b, Reporte de Recursos Minerales U.M. El Porvenir, Pasco, Peru, Reporte Interno (July 22, 2020).

Nexa Resources S.A., 2020c, Estudio de la Vida Útil da estrutura: Barragem de Relaves de la Unidad El Porvenir.

Nexa Resources S.A., 2020d, Plan de minado 2020 El Porvenir, including:

·Ventilación El Porvenir (Memo),
·Sistema de drenaje y bombeo (Memo)
·Relleno hidráulico (Memo)
·Sistema de suministro de energía eléctrica (Memo)
·Marketing and Metal Price Assumptions (Memo)
·Smelter Terms and Concentrate Marketing (Memo)

Nexa Resources S.A., 2020e, Informe Anual – Aseguramiento y Control de Calidad 2020.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-62

Nexa Resources S.A., 2020f: Market Intelligence team, Industry Scenario 2020 – Supply and Costs presentation (July 2020).

Nexa Resources S.A., 2020g: Form 20-F for fiscal year end December 31, 2019 filed with United States Securities and Exchange Commission

Nexa Resources S.A., 2020h, Geotechnical Studies, including:

·Analisis de Estabilidad para la Aplicación del Metodo de Minado Sub Level Stoping en la Veta CN-03 Nv. -890/-910, El Porvenir Mine, April 15, 2020.
·Analisis de Estabilidad para la Aplicación del Metodo de Minado Sub Level Stoping en la Veta Carmen Cola Nv. 3470/3450., El Porvenir Mine, December 14, 2020.
·Determinación del Pilar Veta Éxito NV. 3550 (Rib Pillar), El Porvenir Mine September 2020.
·Determinación de la Longitud Maxima Abierta para El Minado SLS de la Veta Éxito NV. 3370, El Porvenir Mine, May 2020.
·Determinación del Pilar Corona para el Minado del Stope Porvenir 3 – Zona Alta, El Porvenir Mine, March 2020.

Nexa Resources S.A., 2021, Estudio Geomecánico Cuerpo Don Ernesto, El Porvenir Mine, January 2021.

Peterson, U., 1999, Magmatic and metallogenic evolution of the Central Andes. In Geology and ore deposits of the Central Andes (Skinner, B.; editor). Society of Economic Geology, Special Publication, No. 7, pp. 109-153.

Roscoe Postle Associates Inc. (RPA), 2019: Technical Report on the Atacocha Mine, Pasco Province, Central Peru, a NI 43-101 Technical Report prepared for Nexa Resources S.A., March 22, 2019.

Saez, F. et al, 2017, Independent Technical Report pursuant to NI 43-101 of Canadian Sec. Admin. For El Porvenir Mine, Peru, SRK Consulting (Peru) S.A., effective date June 30, 2017.

Schlumberger Water Services, 2012, Actualización de Plan de Cierre de Minas Unidad Minera El Porvenir (U.E.A. Milpo No. 1), Report No. 51739 prepared for Compañía Minería Milpo S.A.A., June 2012.

Soler and Bonhomme, 1988: Oligocene magmatic activity and associated mineralization in the polymetallic belt of central Peru. Economic Geology, 83(3), 657-663.

SRK Consulting (Peru) S.A., 2017, Independent Technical Report pursuant to National Instrument 43-101 of the Canadian Securities Administrators for El Porvenir Mine, Perú, prepared for VM Holding S.A., filed on SEDAR/ available at www.sedar.com (August 15, 2017).

Stuart, L., 2020, Getting the message across, CIM Magazine.

Transmin Metallurgical Consultants, 2018, Estudio Geometalúrgico Preliminar para Unidad Minera El Porvenir, prepared for Nexa Resources S.A. (June 15, 2018).

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-63

Transmin Metallurgical Consultants, 2019, Estudio Geometalúrgico Fase 2 para Unidad Minera El Porvenir, prepared for Nexa Resources Peru S.A. (April 29, 2019).

Transmin Metallurgical Consultants, 2020, Estudio Geometalúrgico Fase 3 para Unidad Minera El Porvenir, prepared for Nexa Resources Peru S.A. (May 18, 2020).

US Securities and Exchanges Commission, 2018: Regulation S-K, Subpart 229.1300, Item 1300 Disclosure by Registrants Engaged in Mining Operations.

US Securities and Exchange Commission, Form 20-F Nexa Resources S.A., for fiscal year end December 31, 2019.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-64
25.0Reliance on Information Provided by the Registrant

This report has been prepared by SLR for Nexa. The information, conclusions, opinions, and estimates contained herein are based on:

·Information available to SLR at the time of preparation of this report,
·Assumptions, conditions, and qualifications as set forth in this report, and
·Data, reports, and other information supplied by Nexa and other third party sources.

For the purposes of the Summary and Section 3 of this Technical Report Summary, SLR has relied on ownership information provided in an internal legal opinion by Magaly Bardales, Legal Corporate Manager and Institutional Affairs dated August 16, 2020 (Nexa, 2020a). SLR has not researched property title or mineral rights for the El Porvenir Mine as we consider it reasonable to rely on Nexa’s legal counsel who is responsible for maintaining this information.

SLR has relied on Nexa for guidance on applicable taxes, royalties, and other government levies or interests, applicable to revenue or income from the Mine in the Summary and Section 19. As the Mine has been in operation for over ten years, Nexa has considerable experience in this area.

The Qualified Persons have taken all appropriate steps, in their professional opinion, to ensure that the above information from Nexa is sound.

Except for the purposes legislated under provincial securities laws, any use of this report by any third party is at that party’s sole risk.

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-65
26.0Date and Signature Page

This report titled “Technical Report Summary on the El Porvenir Mine, Department of Pasco, Peru” with an effective date of December 31, 2020 was prepared and signed by:

 

SLR Consulting (Canada) Ltd. (Signed) SLR Consulting (Canada) Ltd.

 

Dated at Toronto, ON
January 15, 2021

Nexa Resources S.A. | El Porvenir Mine, SLR Project No: 233.03259.R0000

Technical Report Summary - January 15, 2021

16-66