New Fortress Energy Announces First Quarter 2023 Results

May 4, 2023

NEW YORK -- New Fortress Energy Inc. (Nasdaq: NFE) (“NFE” or the “Company”) today reported its financial results for the first quarter of 2023.

Summary Highlights

Pleased to report record quarterly Adjusted EBITDA(1) of $440 million for Q1 2023
NFE's net income for Q1 2023 was $152 million
Adjusted EPS for Q1 2023 was $0.90 per share on a fully diluted basis and $0.71 when including losses on disposal of certain assets
On track to achieve our Illustrative Adjusted EBITDA Goal(2) of ~$2.0 billion for 2023
Today we are announcing a 2023 Illustrative Adjusted Net Income Goal(2) of ~$1.2 billion
Our 2023 Illustrative Adjusted Net Income Goal(2), if achieved, would result in a 6x increase in net income relative to 2022
Puerto Rico
Genera PR LLC, an independently managed subsidiary of NFE, was awarded a 10-year contract(3) to manage PREPA's thermal power generation system of approximately 3,600 MW
Contract consists of a $22.5 million annual payment and up to $100 million of annual incentives
Intended to enhance grid reliability and reduce power costs for Puerto Rican consumers and businesses
Awarded 350 MW of emergency power contracts(4) via U.S. Army Corps' Puerto Rico Power System Stabilization Task Force
Currently mobilizing power generation assets to Palo Seco and San Juan to start providing capacity in the second quarter of 2023(5)
Fast LNG
Construction of our first Fast LNG unit is 90%+ Complete(7) and Deployment(7) to Altamira is expected in June 2023(5)
We expect to complete Commissioning(7) of our first Fast LNG unit in the shipyard and on-location at the Altamira site and continue to anticipate First Gas and COD(7) in July 2023 and August 2023, respectively(5)
FLNG 2 and FLNG 3 are already under construction, and all long-lead items have been procured
Deployment(7) and Ready for Installation(7) expected in the second half of 2024(5)
We recently signed a non-binding Letter of Intent with CFE to explore installing FLNG 2 and FLNG 3 at an underutilized existing onshore terminal in Altamira
Terminals
We have Completed(7) the Barcarena terminal and expect First Gas(9) to Norsk Hydro in late 2023(5); we remain on schedule and, also in 2023(5), expect to commence Operations(7) at our Santa Catarina terminal
Separately, Construction(10) of our 630 MW power plant at Barcarena is underway pursuant to a fixed-price, date-certain EPC contract with Mitsubishi and Toyo Setal; Operations(7) expected to commence in July 2025(5) pursuant to 25-year PPAs with Brazilian distribution companies
Commercial
We are finalizing our agreement(8) to sell our 135 MW La Paz power plant to CFE for approximately $180 million, and the transaction is expected to close in the third quarter of 2023(5)



Awarded 353 MW of capacity contract(6) with a 10-year duration from the Single Electricity Market Operator (SEMO), the operator of Ireland's electric grid
Expecting to finalize permitting and construction contract for a 600 MW combined-cycle natural gas power plant beginning operations in 2026, to be supplied by our Shannon LNG terminal in Ballylongford
Hydrogen
Construction(10) on our first hydrogen plant is progressing on schedule in Beaumont (120 MW, ~50,000 kg/d), an industrial hub in Texas
We have several other green hydrogen projects in various stages of Development(10) with a focus on sites with strategic logistics, low-cost power, and strong regional hydrogen demand
Other Developments
We sold our ownership stake(11) in the Hilli in exchange for the return of 4.1 million NFE shares, $100 million in cash, and the extinguishment of $323 million in Hilli-related debt
We have historically funded our growth through a combination of asset sales and operating cash flow, and we believe we have sufficient liquidity to complete our capital projects without the need for external financing

On May 3, 2023, NFE’s Board of Directors approved a dividend of $0.10 per share, with a record date of June 15, 2023 and a payment date of June 28, 2023

Financial Highlights
 Three Months Ended
(in millions)March 31, 2022December 31, 2022March 31, 2023
Revenues$505.1 $546.4 $579.1 
Net income$241.2 $65.8 $151.6 
Diluted EPS$1.13 $0.30 $0.71 
Adjusted net income$161.8 $182.7 $187.6 
Adjusted EPS$0.77 $0.87 $0.90 
Terminals and Infrastructure Segment Operating Margin(12)
$211.1 $196.0 $402.1 
Ships Segment Operating Margin(12)
$89.0 $87.5 $78.7 
Total Segment Operating Margin(12)
$300.1 $283.4 $480.8 
Adjusted EBITDA(1)
$257.7 $239.3 $439.7 

Please refer to our Q1 2023 Investor Presentation (the “Presentation”) for further information about the following terms:
1)“Adjusted EBITDA,” see definition and reconciliation of this non-GAAP measure in the exhibits to this press release.
2)“Illustrative Adjusted EBITDA Goal” is based on the "Illustrative Total Segment Operating Margin Goal" less illustrative Core SGA assumed to be at $180 million for all periods 2023 onward including the pro rata share of Core SG&A from unconsolidated entities. “Illustrative Adjusted Net Income Goal” is based on the "Illustrative Total Segment Operating Margin Goal" less interest expense, tax expense, SG&A not included in core SG&A, including business opportunity screening costs and stock compensation, equity investment income, interest income, and depreciation and amortization. “Illustrative Total Segment Operating Margin Goal,” or “Illustrative Future Goal” means our goal for Total Segment Operating Margin under certain illustrative conditions. These illustrative financial metrics are based on management’s expectations and are not based on generally accepted accounting principles and should not be relied upon for any reason. There is no guarantee that we will reach our goals and actual results may differ from our expectations. Please refer to this explanation for all uses of this term. “Illustrative Adjusted EBITDA Goal” reflects the volumes of LNG that it is our goal to sell under binding contracts multiplied by the average price per unit at which we expect to price LNG deliveries, including both fuel sales and capacity charges or other fixed fees, less the cost per unit at which we expect to purchase or produce and deliver such LNG or natural gas, including the cost to (i) purchase natural gas, liquefy it, and transport it to one of our terminals or purchase LNG in strip cargos or on the spot market, (ii) transfer the LNG into an appropriate ship and transport it to our terminals or facilities, (iii) deliver the LNG, regasify it to natural gas and deliver it to our customers or our power plants and (iv) maintain and operate our terminals, facilities and power plants. For vessels chartered to third parties, this illustration reflects the revenue from ships chartered to third parties, capacity and tolling arrangements, and other fixed fees, less the cost to operate and maintain each ship, in each case based on contracted amounts for ship charters, capacity and tolling fees, and industry standard costs for operation and maintenance. There can be no assurance that the costs of purchasing or producing LNG, transporting the LNG and maintaining and operating our terminals and facilities will result in the Illustrative Total Segment Operating



Margin Goal reflected. “Illustrative Adjusted Net Income Goal” reflects our Illustrative Total Segment Operating Margin, less interest expenses from our debt facilities assuming a weighted average interest rate of 8% on $6.6 billion pro forma outstanding debt offset by capitalized income of $150 million per year from 2023 onward, taxes at an effective tax rate of approximately 15%, non-core illustrative SGA, approximately $13 million per year illustrative income from equity investments in joint ventures, interest on outstanding cash balances equal to approximately 8% on unrestricted cash accounts, and depreciation and amortization in an aggregate amount of $40 million per quarter on our operating assets, including FLNG depreciated over a 20-year life starting on its expected date of start of operations. For the purpose of this presentation, we assumed no other income and expenses to be incurred under generally accepted accounting principals. For the purpose of this presentation, we have assumed an average Total Segment Operating Margin between $12.94 and $18.35 per MMBtu for all downstream terminal economics, because we assume that (i) we purchase delivered gas at a weighted average of $6.12 in 2023, (ii) our volumes increase over time, and (iii) we will have costs related to shipping, logistics and regasification similar to our current operations because the liquefaction facility and related infrastructure and supply chain to deliver LNG from Pennsylvania or Fast LNG (“FLNG”) does not exist, and those costs will be distributed over the larger volumes. For Hygo + Suape assets we assume an average delivered cost of gas of $16.00 in 2023 based on industry averages in the region. We assume all Brazil terminals and power plants are Operational and earning revenue through fuel sales and capacity charges or other fixed fees. For Vessels chartered to third parties, this illustration reflects the revenue from ships chartered to third parties, capacity and tolling arrangements, and other fixed fees, less the cost to operate and maintain each ship, in each case based on contracted amounts for ship charters, capacity and tolling fees, and industry standard costs for operation and maintenance. We assume an average Total Segment Operating Margin of up to $182k per day per vessel and our effective share of revenue and operating expense related to the existing tolling agreement for the Hilli FLNG going forward. For Fast LNG, this illustration reflects the difference between the delivered cost of open LNG and the delivered cost of open market LNG less Fast LNG production cost. Management is currently in multiple discussions with counterparties to supply feedstock gas at pricing of approximately $4.31 per MMBtu, multiplied by the volumes for Fast LNG installation of 1.4 MTPA each per year. These costs do not include expenses and income that are required by GAAP to be recorded on our financial statements, including the return of or return on capital expenditures for the relevant project, and selling, general and administrative costs. Our current cost of natural gas per MMBtu are higher than the costs we would need to achieve Illustrative Total Segment Operating Margin Goal, and the primary drivers for reducing these costs are the reduced costs of purchasing gas and the increased sales volumes, which result in lower fixed costs being spread over a larger number of MMBtus sold. References to volumes, percentages of such volumes and the Illustrative Total Segment Operating Margin Goal related to such volumes (i) are not based on the Company’s historical operating results, which are limited, and (ii) do not purport to be an actual representation of our future economics. We cannot assure you if or when we will enter into contracts for sales of additional LNG, the price at which we will be able to sell such LNG, or our costs to produce and sell such LNG. Actual results could differ materially from the illustration and there can be no assurance we will achieve our goal.
3) Refers to the award of a 10-Year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico awarded to our subsidiary, Genera PR LLC ("Genera"), in the first quarter of 2023. Pursuant to the award, we expect to receive an annual management fee and be eligible for performance-based incentive fees, beginning after the service period under the contract commences.
4) Refers to the selection by the U.S. Army Corps of Engineers of Weston Solutions, Inc. (“Weston”) to support Puerto Rico’s grid stabilization project with additional power capacity to enable maintenance and repair work on the island’s power system and grid. We have entered into agreements with Weston for the installation and operation of 150MW of additional power to be generated at the Palo Seco Power Plant in Puerto Rico as well as the supply of natural gas. We have also entered into agreements with Weston for the installation and operation of 200MW of additional power to be generated at the San Juan Power Plant in Puerto Rico as well as the supply of natural gas. We have also entered into agreements with Weston for the installation and operation of 200MW of additional power to be generated at the San Juan Power Plant in Puerto Rico as well as the supply of natural gas.
5) Lead times and expected development times used in this press release indicate our internal evaluations of a project’s expected timeline. They refer to us completing certain stages of projects within a timeframe and within a spectrum of budget parameters that, when taken as a whole, are substantially consistent with our business model. These timeframes include assumptions regarding items that are outside our control, including permitting, weather, and other potential sources of delay. To the extent that projects have not yet started or are currently under development, we can make no assurance that such projects are on track within the timeline parameters we establish. Additionally, the construction of facilities is inherently subject to the risks of cost overruns and delays. If we are unable to construct, commission and operate all of our facilities as expected, or, when and if constructed, they do not accomplish our goals, or if we experience delays or cost overruns in construction, estimates regarding timelines, budget and savings could be materially and adversely affected.
6) Refers to the award of a 10-year contract by the Single Electricity Market Operator (SEMO) to Shannon LNG Limited, a subsidiary of NFE, for the delivery of 400 MW of electricity generation capacity at the site in Kerry, Ireland by October



1, 2026. The contract was awarded following a competitive auction process, operated by SEMO, and regulated by the Commission For Regulation of Utilities (CRU) and the Northern Ireland Authority for Utility Regulation (NIAUR).
7) “Online”, “Operational”, "Operating", "Completion", "Completed", “COD” or “commercial operations date”, “Commissioning,” “COD” or “commercial operations date”, “Commissioning,” “Deployment” or similar statuses (either capitalized or lower case) with respect to a particular project means we expect gas to be made available within sixty (60) days, gas has been made available to the relevant project, or that the relevant project is in full commercial operations. Where gas is going to be made available or has been made available but full commercial operations have not yet begun, full commercial operations will occur later than, and may occur substantially later than, our reported Operational, Completion or Deployment date, and we may not generate any revenue until full commercial operations has begun. We cannot assure you if or when such projects will reach full commercial operations. Actual results could differ materially from the illustrations reflected in this press release and there can be no assurance we will achieve our goals. Our ability to export liquefied natural gas depends on our ability to obtain export and other permits from the United States, Mexican and other governmental and regulatory agencies, which we have not yet obtained. No assurance can be given that we will receive required permits, approvals and authorizations from governmental and regulatory agencies in connection with the exportation of liquefied natural gas on a timely basis or at all.
8) Refers to the binding short-form agreements with Comisión Federal de Electricidad (“CFE”) related to the (i) expansion and extension of NFE’s supply of natural gas to multiple CFE power generation facilities in Baja California Sur, and (ii) sale of NFE’s 135 MW La Paz power plant to CFE. These transactions are subject to customary terms and conditions and execution of final long-form binding definitive agreements. We cannot assure you if or when we will enter into long-form definitive agreements related to such projects or the terms of any such agreements. Furthermore, upon execution of long-form definitive agreements, we cannot assure you if or when conditions to such agreements will be satisfied, or if we will obtain the required approvals for the transactions set forth in such agreement.
9) Refers to the date on which (or, for future dates, management's current estimate of the date on which) natural gas is first made available in our projects, including our facilities in development. Full commercial operations of such projects will occur later than, and may occur substantially later than, the date of first gas. We cannot assure you if or when such projects will reach the date of delivery of first gas, or full commercial operations. Actual results could differ materially from the illustration and there can be no assurance we will achieve our goal.
10) “Under Construction”, “In Construction”, “Under Construction”, “Development,” “In Development” or similar statuses means that we have taken steps and invested money to develop a facility, including execution of agreements for the development of the project (subject, in certain cases, to satisfaction of conditions precedent), procuring land rights and entitlements, negotiating or signing construction contracts, and undertaking active engineering, procurement and construction work. Our development projects are in various phases of progress, and there can be no assurance that we will continue progress on each development as we expect or that each development will be Completed or enter full commercial operations. There can be no assurance that we will be able to enter into the contracts required for the development of these facilities on commercially favorable terms or at all. If we are unable to enter into favorable contracts or to obtain the necessary regulatory and land use approvals on favorable terms, we may not be able to construct and operate these assets as expected, or at all. Additionally, the construction of facilities is inherently subject to the risks of cost overruns and delays, and these risks of delay are exacerbated by the COVID-19 pandemic. If we are unable to construct, commission and operate all of our facilities as expected, or, when and if constructed, they do not accomplish our goals, or if we experience delays or cost overruns in construction, our business, operating results, cash flows and liquidity could be materially and adversely affected.
11) Refers to the agreement between the Company and Golar LNG Limited (“GLNG”) for the sale of NFE’s ownership stake in the 2.4 MTPA floating liquefaction facility Hilli in exchange for the return of 4.1 million NFE shares and $100 million in cash. As part of the agreement, NFE also extinguished $323 million in debt obligations associated with its interest in the Hilli.
12) “Total Segment Operating Margin” is the total of our Terminals and Infrastructure Segment Operating Margin and Ships Segment Operating Margin. "Terminals and Infrastructure Segment Operating Margin" includes our effective share of revenue, expenses and operating margin attributable to our 50% ownership of Centrais Elétricas de Sergipe Participações S.A. (“CELSEPAR”), prior to the disposition of this investment in the fourth quarter of 2022. "Ships Segment Operating Margin" includes our effective share of revenue, expenses and operating margin attributable to our ownership of 50% of the common units of Hilli LLC prior to the disposition of this investment in the first quarter of 2023. Hilli LLC owns Golar Hilli Corporation (“Hilli Corp”), the disponent owner of the Hilli.

Additional Information
For additional information that management believes to be useful for investors, please refer to the presentation posted on the Investors section of New Fortress Energy’s website, www.newfortressenergy.com, and the Company’s most recent Annual Report on Form 10-K, which is available on the Company’s website. Nothing on our website is included or incorporated by reference herein.

Earnings Conference Call



Management will host a conference call on Thursday, May 4, 2023 at 8:00 A.M. Eastern Time. The conference call may be accessed by dialing (888) 224-1121 (toll free from within the U.S.) or +1-323-794-2575 (from outside of the U.S.) fifteen minutes prior to the scheduled start of the call; please reference “NFE First Quarter 2023 Earnings Call” or conference code 9863837.

A simultaneous webcast of the conference call will be available to the public on a listen-only basis at www.newfortressenergy.com within the "Investors" tab under “Events & Presentations.” Please allow extra time prior to the call to visit the website and download any necessary software required to listen to the internet broadcast. A replay of the conference call will be available at the same website location shortly after the conclusion of the live call.

About New Fortress Energy Inc.
New Fortress Energy Inc. (Nasdaq: NFE) is a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable, and clean energy. The company owns and operates natural gas and liquefied natural gas (LNG) infrastructure and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets. Collectively, the company’s assets and operations reinforce global energy security, enable economic growth, enhance environmental stewardship and transform local industries and communities around the world.

Cautionary Statement Concerning Forward-Looking Statements
This press release contains certain statements and information that may constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995. All statements contained in this press release other than historical information are forward-looking statements that involve known and unknown risks and relate to future events, our future financial performance or our projected business results. You can identify these forward-looking statements by the use of forward-looking words such as “expects,” “may,” “will,” “approximately,” “predicts,” “intends,” “plans,” “estimates,” “anticipates,” or the negative version of those words or other comparable words. Forward looking statements include: illustrative financial metrics and other similar metrics, including goals, expected financial growth and margins, among others; benefits to be derived from our projects in Puerto Rico, including enhancement of grid reliability and reduction of power costs, among others; ability to maintain our expected development timelines; expectations regarding our ability to construct, complete and commission our projects on time and within budget; the execution of definitive documents and their related terms and conditions, including without limitation the sales price of the La Paz power plant to CFE; and all the information in the exhibits to this press release. These forward-looking statements are necessarily estimates based upon current information and involve a number of risks, uncertainties and other factors, many of which are outside of the Company’s control. Actual results or events may differ materially from the results anticipated in these forward-looking statements. Specific factors that could cause actual results to differ from those in the forward-looking statements include, but are not limited to: risks related to the development, construction, completion or commissioning schedule for the facilities; risks related to the operation and maintenance of our facilities and assets; failure of our third-party contractors, equipment manufacturers, suppliers and operators to perform their obligations for the development, construction and operation of our projects, vessels and assets; our ability to implement our business strategy; the risk that proposed transactions may not be completed in a timely manner or at all; the receipt of permits, approvals and authorizations from governmental and regulatory agencies on a timely basis or at all; new or changes to existing governmental policies, laws, rules or regulations, or the administration thereof; failure to maintain sufficient working capital and to generate revenues, which could adversely affect our ability to fund our projects; adverse regional, national, or international economic conditions, adverse capital market conditions and adverse political developments; and the impact of public health crises, such as pandemics (including coronavirus (COVID-19)) and epidemics and any related company or government policies and actions to protect the health and safety of individuals or government policies or actions to maintain the functioning of national or global economies and markets. These factors are not necessarily all of the important factors that could cause actual results to differ materially from those expressed in any of NFE’s forward-looking statements. Other known or unpredictable factors could also have material adverse effects on future results. Any forward-looking statement speaks only as of the date on which it is made, and we undertake no duty to update or revise these forward-looking statements, even though our situation may change in the future. New factors emerge from time to time, and it is not possible for NFE to predict all such factors. When considering these forward-looking statements, you should keep in mind the risk factors and other cautionary statements included in New Fortress Energy Inc.’s annual and quarterly reports filed with the Securities and Exchange Commission, which could cause its actual results to differ materially from those contained in any forward-looking statement.

IR:
Patrick Hughes
ir@newfortressenergy.com

Media:
Jake Suski
press@newfortressenergy.com



(516) 268-7403
Source: New Fortress Energy Inc.



Exhibits – Financial Statements
Condensed Consolidated Statements of Operations
For the three months ended December 31, 2022 and March 31, 2023
(Unaudited, in thousands of U.S. dollars, except share and per share amounts)

 
For the Three Months Ended
 December 31, 2022March 31, 2023
Revenues 
Operating revenue$448,646 $501,688 
Vessel charter revenue96,744 76,524 
Other revenue979 919 
Total revenues546,369 579,131 
 
Operating expenses
Cost of sales (exclusive of depreciation and amortization shown separately below)135,899 184,938 
Vessel operating expenses12,786 13,291 
Operations and maintenance28,931 26,671 
Selling, general and administrative70,099 52,138 
Transaction and integration costs9,409 494 
Depreciation and amortization36,201 34,375 
Asset impairment expense2,550 — 
Total operating expenses295,875 311,907 
Operating income250,494 267,224 
Interest expense80,517 71,673 
Other (income) expense, net(16,431)25,005 
Income before income from equity method investments and income taxes186,408 170,546 
(Loss) income from equity method investments(117,793)9,980 
Tax provision2,810 28,960 
Net income65,805 151,566 
Net income attributable to non-controlling interest(1,678)(1,360)
Net income attributable to stockholders$64,127 $150,206 
 
Net income per share – basic$0.31 $0.72 
Net income per share – diluted$0.30 $0.71 
Weighted average number of shares outstanding – basic208,768,552 208,707,385 
Weighted average number of shares outstanding – diluted209,745,660209,325,619




Adjusted EBITDA
For the three months ended March 31, 2023
(Unaudited, in thousands of U.S. dollars)
Adjusted EBITDA is not a measurement of financial performance under GAAP and should not be considered in isolation or as an alternative to income from operations, net income, cash flow from operating activities or any other measure of performance or liquidity derived in accordance with GAAP. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental view of the overall operation of our business in evaluating the effectiveness of our ongoing operating performance in a manner that is consistent with metrics used for management’s evaluation of the Company’s overall performance and to compensate employees. We believe that Adjusted EBITDA is widely used by investors to measure a company’s operating performance without regard to items such as interest expense, taxes, depreciation, and amortization which vary substantially from company to company depending on capital structure, the method by which assets were acquired and depreciation policies. Further, we exclude certain items from our SG&A not otherwise indicative of ongoing operating performance.
We calculate Adjusted EBITDA as net income, plus transaction and integration costs, contract termination charges and loss on mitigations sales, depreciation and amortization, asset impairment expense, interest expense, net, other (income) expense, net, loss on extinguishment of debt, changes in fair value of non-hedge derivative instruments and contingent consideration, tax expense, and adjusting for certain items from our SG&A not otherwise indicative of ongoing operating performance, including non-cash share-based compensation and severance expense, non-capitalizable development expenses, cost to pursue new business opportunities and expenses associated with changes to our corporate structure, plus our pro rata share of Adjusted EBITDA from unconsolidated entities, less the impact of equity in earnings (losses) of unconsolidated entities.
Adjusted EBITDA is mathematically equivalent to our Total Segment Operating Margin, as reported in the segment disclosures within our financial statements, minus Core SG&A, including our pro rata share of such expenses of unconsolidated entities. Core SG&A is defined as total SG&A adjusted for non-cash share-based compensation and severance expense, non-capitalizable development expenses, cost of exploring new business opportunities and expenses associated with changes to our corporate structure. Core SG&A excludes certain items from our SG&A not otherwise indicative of ongoing operating performance.
The principal limitation of this non-GAAP measure is that it excludes significant expenses and income that are required by GAAP to be recorded in our financial statements. Investors are encouraged to review the related GAAP financial measures and the reconciliation of the non-GAAP financial measure to our GAAP net income, and not to rely on any single financial measure to evaluate our business. Adjusted EBITDA does not have a standardized meaning, and different companies may use different Adjusted EBITDA definitions. Therefore, Adjusted EBITDA may not be necessarily comparable to similarly titled measures reported by other companies. Moreover, our definition of Adjusted EBITDA may not necessarily be the same as those we use for purposes of establishing covenant compliance under our financing agreements or for other purposes. Adjusted EBITDA should not be construed as alternatives to net income and diluted earnings per share attributable to New Fortress Energy, which are determined in accordance with GAAP.



The following table sets forth a reconciliation of net income to Adjusted EBITDA for the three months ended March 31, 2022, December 31, 2022 and March 31, 2023:
 (in thousands)Three Months
 Ended
March 31, 2022
Three Months
 Ended
December 31, 2022
Three Months
 Ended
March 31, 2023
Total Segment Operating Margin$300,083 $283,432 $480,817 
Less: Core SG&A (see definition above)40,960 44,120 41,067 
Less: Pro rata share Core SG&A from unconsolidated entities1,390 (23)14 
Adjusted EBITDA (Non-GAAP)$257,733 $239,335 $439,736 
 
 
Net income$241,181 $65,805 $151,566 
Add: Interest expense, net44,916 80,517 71,673 
Add: Tax (benefit) provision(49,681)2,810 28,960 
Add: Depreciation and amortization34,290 36,201 34,375 
Add: Asset impairment expense— 2,550 — 
Add: SG&A items excluded from Core SG&A (see definition above)7,081 25,978 11,071 
Add: Transaction and integration costs1,901 9,409 494 
Add: Other (income) expense, net(19,725)(16,431)25,005 
Add: Changes in fair value of non-hedge derivative instruments and contingent consideration(2,492)(96,377)111,140 
Add: Pro rata share of Adjusted EBITDA from unconsolidated entities(1)
50,497 11,080 15,432 
Less: (Income) loss from equity method investments(50,235)117,793 (9,980)
Adjusted EBITDA (Non-GAAP)$257,733 $239,335 $439,736 

(1)Includes the Company’s effective share of Adjusted EBITDA of CELSEPAR of $30,207 for the three months ended March 31, 2022, and the Company’s effective share of the Adjusted EBITDA of Hilli LLC of $20,291, $11,080 and $15,432 for the three months ended March 31, 2022, December 31, 2022, and March 31, 2023, respectively. We no longer include the results of CELSEPAR and Hilli LLC in our results of operations after the sale of these investments in the fourth quarter of 2022 and the first quarter of 2023, respectively.



Segment Operating Margin
(Unaudited, in thousands of U.S. dollars)

Performance of our two segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We define Consolidated Segment Operating Margin as GAAP net income, adjusted for selling, general and administrative expense, transaction and integration costs, contract termination charges and loss on mitigation sales, depreciation and amortization, asset impairment expense, interest expense, other (income) expense, loss on extinguishment of debt, net, (income) loss from equity method investments and tax (benefit) expense. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales minus Operations and maintenance minus Vessel operating expenses, each as reported in our financial statements.

Three Months Ended March 31, 2023
(in thousands of $)Terminals and Infrastructure
Ships 1
Total Segment
Consolidation and
 Other 2
Consolidated
Segment Operating Margin$402,139 $78,678 $480,817 $(126,586)$354,231 
Less:     
Selling, general and administrative    52,138 
Transaction and integration costs    494 
Depreciation and amortization    34,375 
Interest expense    71,673 
Other expense, net    25,005 
(Income) from equity method investments    (9,980)
Tax provision    28,960 
Net income    $151,566 

(1)Ships includes our effective share of revenues, expenses and operating margin attributable to our 50% ownership of Hilli LLC, prior to the disposition of this investment. The earnings attributable to the investment of $5,986 for the three months ended March 31, 2023 are reported in income from equity method investments in the condensed consolidated statements of operations and comprehensive income.
(2)Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to 50% ownership of Hilli LLC in our segment measure and exclusion of the unrealized mark-to-market gain or loss on derivative instruments.






Three Months Ended December 31, 2022
(in thousands of $)Terminals and Infrastructure
Ships ⁽1
Total Segment
Consolidation and
Other ⁽2
Consolidated
Segment Operating Margin$195,957 $87,475 $283,432 $85,321 $368,753 
Less:
Selling, general and administrative70,099 
Transaction and integration costs9,409 
Depreciation and amortization36,201 
Asset impairment expense2,550 
Interest expense80,517 
Other (income), net(16,431)
Loss from equity method investments117,793 
Tax provision2,810 
Net income$65,805 

(1)Ships includes our effective share of revenues, expenses and operating margin attributable to our 50% ownership of Hilli LLC. The loss attributable to the investment of $120,580 for the three months ended December 31, 2022 is reported in (Loss) income from equity method investments in the consolidated statements of operations and comprehensive income (loss).
(2)Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to our 50% ownership of Hilli LLC in our segment measure and exclusion of the unrealized mark-to-market gain or loss on derivative instruments.

























Three Months Ended March 31, 2022
(in thousands of $)Terminals and Infrastructure ⁽¹⁾Ships ⁽²⁾Total SegmentConsolidation and
Other ⁽³⁾
Consolidated
Segment Operating Margin$211,083 $89,000 $300,083 $(49,395)$250,688 
Less:
Selling, general and administrative48,041 
Transaction and integration costs1,901 
Depreciation and amortization34,290 
Interest expense44,916 
Other (income), net(19,725)
(Income) from equity method investments(50,235)
Tax (benefit)(49,681)
Net income$241,181 

(1)Terminals and Infrastructure includes our effective share of revenues, expenses and operating margin attributable to our 50% ownership of CELSEPAR. The earnings attributable to the investment of $36,680 for the three months ended March 31, 2022 are reported in (loss) income from equity method investments in the consolidated statements of operations and comprehensive income (loss). Terminals and Infrastructure does not include the unrealized mark-to-market gain on derivative instruments of $2,492 for the three months ended March 31, 2022 reported in Cost of sales.
(2)Ships includes our effective share of revenues, expenses and operating margin attributable to our 50% ownership of Hilli LLC. The earnings attributable to the investment of $13,555 for the three months ended March 31, 2022 are reported in (loss) income from equity method investments in the condensed consolidated statements of operations and comprehensive income (loss).
(3)Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to 50% ownership of CELSEPAR and Hilli LLC in our segment measure and exclusion of the unrealized mark-to-market gain or loss on derivative instruments.











































Adjusted Net Income and Adjusted Earnings per Share
(Unaudited, in thousands of U.S. dollars)

The following table sets forth a reconciliation between net income attributable to stockholders and earnings per share adjusted for non-cash impairment charges and losses on disposals of assets.


Three months ended March 31, 2022Three months ended December 31, 2022Three months ended March 31, 2023
Net income attributable to stockholders$238,269 $64,127 $150,206 
Non-cash impairment charges, net of tax(76,460)118,558 — 
Loss on disposal of investment in Hilli LLC— — 37,401 
Adjusted net income$161,809 $182,685 $187,607 
Weighted-average shares outstanding - diluted210,082,295 209,745,660 209,325,619 
Adjusted earnings per share$0.77 $0.87 $0.90 




Condensed Consolidated Balance Sheets
As of March 31, 2023 and December 31, 2022
(Unaudited, in thousands of U.S. dollars, except share amounts)

 March 31, 2023December 31, 2022
Assets  
Current assets  
Cash and cash equivalents$296,860 $675,492 
Restricted cash325,298165,396
Receivables, net of allowances of $748 and $884, respectively353,192280,313
Inventory76,53639,070
Prepaid expenses and other current assets, net102,251226,883
Total current assets1,154,137 1,387,154
 
Construction in progress3,357,4342,418,608
Property, plant and equipment, net2,094,4172,116,727
Equity method investments136,300392,306
Right-of-use assets477,757377,877
Intangible assets, net80,31285,897
Goodwill776,760776,760
Deferred tax assets, net8,0748,074
Other non-current assets, net138,555141,679
Total assets$8,223,746 $7,705,082 
 
Liabilities
Current liabilities
Current portion of long-term debt$277,035 $64,820 
Accounts payable310,27280,387
Accrued liabilities602,9281,162,412
Current lease liabilities106,66648,741
Other current liabilities99,27552,878
Total current liabilities1,396,1761,409,238
Long-term debt4,951,5454,476,865
Non-current lease liabilities349,621302,121
Deferred tax liabilities, net26,45525,989
Other long-term liabilities50,62349,010
Total liabilities6,774,4206,263,223
 
Commitments and contingencies
Stockholders’ equity
Class A common stock, $0.01 par value, 750 million shares authorized, 204.7 million issued and outstanding as of March 31, 2023; 208.8 million issued and outstanding as of December 31, 20222,0472,088
Additional paid-in capital1,047,5411,170,254
Retained earnings191,81962,080
Accumulated other comprehensive income 57,34455,398
Total stockholders’ equity attributable to NFE1,298,7511,289,820
Non-controlling interest150,575152,039
Total stockholders’ equity1,449,3261,441,859
Total liabilities and stockholders’ equity$8,223,746 $7,705,082 




Condensed Consolidated Statements of Operations
For the three months ended March 31, 2023 and 2022
(Unaudited, in thousands of U.S. dollars, except share and per share amounts)

 
Three Months Ended March 31,
 20232022
Revenues  
Operating revenue$501,688 $400,075 
Vessel charter revenue76,524 92,420 
Other revenue919 12,623 
Total revenues579,131 505,118 
 
Operating expenses 
Cost of sales (exclusive of depreciation and amortization shown separately below)184,938 208,298 
Vessel operating expenses13,291 22,964 
Operations and maintenance26,671 23,168 
Selling, general and administrative52,138 48,041 
Transaction and integration costs494 1,901 
Depreciation and amortization34,375 34,290 
Total operating expenses311,907 338,662 
Operating income267,224 166,456 
Interest expense71,673 44,916 
Other expense (income), net25,005 (19,725)
Income before income from equity method investments and income taxes170,546 141,265 
Income from equity method investments9,980 50,235 
Tax provision (benefit)28,960 (49,681)
Net income151,566 241,181 
Net income attributable to non-controlling interest(1,360)(2,912)
Net income attributable to stockholders$150,206 $238,269 
 
Net income per share – basic$0.72 $1.14 
Net income per share – diluted$0.71 $1.13 
 
Weighted average number of shares outstanding – basic208,707,385 209,928,070 
Weighted average number of shares outstanding – diluted209,325,619 210,082,295 
 




Condensed Consolidated Statements of Cash Flows
For the three months ended March 31, 2023 and 2022
(Unaudited, in thousands of U.S. dollars)
 
Three Months Ended March 31,
 20232022
Cash flows from operating activities  
Net income$151,566 $241,181 
Adjustments for:
Depreciation and amortization34,608 34,852 
(Earnings) of equity method investees(9,980)(50,235)
Dividends received from equity method investees5,830 7,609 
Change in market value of derivatives3,330 (24,855)
Deferred taxes— (58,769)
(Earnings) recognized from vessels chartered to third parties transferred to Energos(31,954)— 
Loss on the disposal of equity method investment37,401 — 
Other(2,090)2,847 
Changes in operating assets and liabilities: 
Decrease (increase) in receivables28,136 (58,462)
(Increase) in inventories(2,271)(18,617)
(Increase) in other assets(27,966)(15,440)
Decrease in right-of-use assets13,336 17,016 
(Decrease) increase in accounts payable/accrued liabilities(43,400)68,520 
(Decrease) increase in amounts due to affiliates(2,519)2,035 
(Decrease) in lease liabilities(9,709)(11,773)
Increase (decrease) in other liabilities55,822 (21,527)
Net cash provided by operating activities200,140 114,382 
   
Cash flows from investing activities  
Capital expenditures(563,268)(189,221)
Sale of equity method investment100,000 — 
Net cash used in investing activities(463,268)(189,221)
   
Cash flows from financing activities  
Proceeds from borrowings of debt700,000 200,836 
Payment of deferred financing costs(5,903)(3,504)
Repayment of debt(1,080)(123,669)
Payments related to tax withholdings for share-based compensation— (13,054)
Payment of dividends(649,796)(23,773)
Net cash provided by financing activities43,221 36,836 
Impact of changes in foreign exchange rates on cash and cash equivalents948 12,979 
Net (decrease) in cash, cash equivalents and restricted cash(218,959)(25,024)
Cash, cash equivalents and restricted cash – beginning of period855,083 264,030 
Cash, cash equivalents and restricted cash – end of period1$636,124 $239,006 
   
1 Cash and cash equivalents includes $13,966, which has been classified as assets held for sale and included in the Other non-current assets on the condensed consolidated balance sheets.