Quarterly Report March 2022

Published: 2022-04-26 06:28:00 ET
<<<  go to JSE:S32 company page
South32 Limited (JSE:S32) News - Quarterly Report March 2022

QUARTERLY REPORT
MARCH 2022
South32 Limited
(Incorporated in Australia under the Corporations Act 2001 (Cth))
(ACN 093 732 597)
ASX / LSE / JSE Share Code: S32; ADR: SOUHY
ISIN: AU000000S320

     •     Our FY22 production guidance remains unchanged with our operations continuing to deliver to plan, capitalising on strong
           prices
     •     Our FY22 Operating unit cost guidance has been updated to reflect stronger producer currencies, higher raw material costs
           and the increase in commodity prices, that in many cases result in higher price-linked royalties at our operations
     •     We finished the period with net cash [1] of US$52M after completing the acquisition of a 45% interest in the Sierra Gorda
           copper mine [2] for US$1.4B during the quarter
     •     Worsley Alumina remains on-track to creep production beyond nameplate capacity in FY22, with the refinery benefitting
           from historical investment and ongoing improvement initiatives
     •     Brazil Aluminium [3] delivered first metal from the restart of the renewable-powered Alumar smelter following the end of
           the period
     •     Hillside Aluminium and Mozal Aluminium continued to test their maximum technical capacity, taking advantage of record
           aluminium prices
     •     Sierra Gorda recorded 9.7kt of copper equivalent production [4] for the period following the completion of our acquisition
           on 22 February 2022
     •     Cannington delivered a 6% increase in year to date zinc equivalent production [5], benefitting from higher planned silver
           grades and a drawdown in run of mine inventory
     •     Cerro Matoso achieved a 33% increase in year to date nickel production, due to higher grades from the Q&P pit and the
           prior period’s successful furnace refurbishment
     •     Illawarra Metallurgical Coal realised a 42% increase in quarterly production, despite the ongoing impact of wet weather and
           disruptions to labour availability caused by COVID-19
     •     Manganese production declined by 4% in the quarter with a 1% improvement at Australia Manganese, more than offset by
           the impact of planned maintenance at both of our South African mines
     •     We completed a pre-feasibility study for the zinc-lead-silver Taylor Deposit at the Hermosa project during the quarter,
           underlining its potential to be a globally significant and sustainable producer of base and precious metals in the industry’s
           first cost quartile [6]

     “We achieved a number of significant milestones in the quarter, making further progress to reshape our portfolio for a low
     carbon future.
     “We reported copper production for the first time, having completed our acquisition of a 45 per cent interest in the Sierra Gorda
     copper mine.”
     “We moved a step closer to doubling our share of green aluminium production, delivering first metal from our Brazil Aluminium
     smelter following the end of the period.
     “We also reported the pre-feasibility results for our Taylor Deposit, underlining its potential to add further growth in the metals
     critical to a low carbon future.
     “We achieved another excellent operating result, delivering to plan, capitalising on historically strong end markets for many of
     our commodities.
     “Our strong financial position allowed us to close the acquisition of Sierra Gorda and return our balance sheet to a net cash
     position by the end of the March quarter.
     “In April we paid our fully franked, interim dividend, returning a record US$404 million to shareholders off the back of a
     significantly improved financial performance in the December 2021 half.”
     Graham Kerr, South32 CEO

 Production summary

 South32 share                                     9M YTD21         9M YTD22    YoY      3Q21          2Q22          3Q22       QoQ

    Alumina production (kt)                           3,934           3,927    (0%)     1,218        1,332        1,317        (1%)
    Aluminium production (kt)                           736             737     0%        240          246          243        (1%)
    Payable copper production (kt)                        –             8.4    N/A          –           –           8.4        N/A
    Payable silver production (koz)                    9,477         10,363     9%      3,484        3,217        3,653         14%
    Payable lead production (kt)                        90.6           94.8     5%       33.0         28.3         34.6         22%
    Payable zinc production (kt)                        48.2           49.1     2%       17.8         17.3         16.4         (5%)
    Payable nickel production (kt)                      23.2           30.9    33%        7.1         10.7         10.6         (1%)
    Metallurgical coal production (kt)                 4,830          4,332   (10%)     1,568        1,192        1,565         31%
    Manganese ore production (kwmt)                    4,179          3,963    (5%)     1,357        1,252        1,206        (4%)
    
    Unless otherwise noted: percentage variance relates to performance during the nine months ended March 2022 compared with the nine months ended March 2021 (YoY), or the March 2022 quarter
    compared with the December 2021 quarter (QoQ); production and sales volumes are reported on an attributable basis.


CORPORATE UPDATE
•        In response to the situation in Ukraine, we made the values based decision to cease commodity sales to Russian entities, and continue
         to work through the commercial implications. Our broader commodities sales exposure to Russia has historically been limited and,
         until the current circumstances change, we will not enter into any new transactions or business relationships with Russian entities.

•        The COVID-19 pandemic continues to impact our operations and supply chains across our global portfolio, with FY22 production
         guidance remaining subject to further potential impacts from COVID-19.

•        Working capital remains elevated across the business, due to higher prices and the ongoing impact of logistics congestion on our
         supply chains, slowing the movement of inventory at a number of operations. In our aluminium value chain, where this is most acute,
         we have responded by establishing alternative shipping solutions and points of dispatch to move inventory closer to our customers.
         While we expect the build in working capital to partially unwind once port congestion and freight market tightness alleviates, and we
         realise the full benefit of initiatives implemented across our business, we continue to observe volatility in supply chains.

•        We finished the quarter with a net cash [1] balance of US$52M following completion of the acquisition of a 45% interest in the Sierra
         Gorda copper mine on 22 February 2022 [2]. The US$1.4B upfront cash payment for Sierra Gorda was funded by a combination of cash
         on hand (US$600M) and a short-term acquisition bridge facility (US$800M). Further payments to finalise the tax liabilities associated
         with the acquisition are expected to be made over the next 15 months in accordance with their statutory due dates [7].

•        Following the end of the period, we repaid the short-term acquisition bridge facility with cash on hand and the proceeds of our
         inaugural US dollar bond issuance. We issued US$700M in Senior Unsecured Notes (Notes) due 2032 that will pay interest at a rate of
         4.35% per annum [8]. Reflecting our strong financial position and commitment to disciplined capital allocation, Standard and Poor’s
         and Moody’s assigned BBB+ and Baa1 credit ratings respectively, to the Notes.

•        We received net distributions [9] of US$36M (South32 share) during the quarter from our Manganese equity accounted investments
         (EAI) (US$138M in the nine months ended March 2022). This follows a temporary build in finished goods inventory at Australia
         Manganese which is expected to unwind in the June 2022 quarter.

•        We spent US$16M during the quarter purchasing a further 5M shares at an average price of A$4.64 per share via our on-market share
         buy-back. To 31 March 2022 our capital management program was 86% complete with US$285M remaining to be returned to
         shareholders ahead of its extension or expiry on 2 September 2022 [10], bringing total returns under our capital management
         program to US$1.8B since inception.

•        Following the end of the period, we paid a fully franked interim dividend of US$404M in respect of the December 2021 half year.

•        We expect our agreed acquisition of an additional shareholding and related rights in Mozal Aluminium to complete in mid CY22 [11],
         subject to the remaining conditions, including approval from the Mozambique Competition Regulatory Authority, being satisfied.

•        Following the end of the period, we submitted an Environmental Impact Statement for the Dendrobium Next Domain (DND) life
         extension project. This follows DND being declared State Significant Infrastructure in the December 2021 quarter. The New South
         Wales Minister for Planning, Industry and Environment is responsible for the state approval outcome for the project, which is
         expected to be determined following a public review period.

•        Demonstrating our commitment to using innovative technologies to reduce emissions, in line with our goal to halve operational
         carbon emissions by 2035 as part of our pathway to achieve net zero operational carbon emissions by 2050, we were awarded a
         A$15M grant from the New South Wales Government in April 2022 to construct a commercial pilot Ventilation Air Methane
         abatement facility at Illawarra Metallurgical Coal. The new facility, featuring cutting-edge technology to tackle fugitive methane
         emissions will be established with the support of CSIRO and our own co-funding of A$4.5M.

•        On 7 March 2022, we announced that the sale of the Metalloys manganese alloy smelter would not proceed following a failure to
         satisfy certain commercial conditions to the agreement [12]. Metalloys remains on care and maintenance as we assess future options
         for the smelter.

•        Following the end of the period, we received clearance from the Brazilian Competition Authority for our acquisition of an additional
         18.2% interest in the Mineração Rio do Norte (MRN) bauxite mine. The additional interest in MRN will increase our ownership to 33%
         and further aligns our bauxite supply requirements within our aluminium value chain in Brazil. Completion of the acquisition is
         expected in the June 2022 quarter.

 
                                                                                                                                               Page 2 of 12
DEVELOPMENT AND EXPLORATION UPDATE

•      We completed the pre-feasibility study (PFS) for the zinc-lead-silver Taylor Deposit at our Hermosa project in January 2022. The PFS
       results highlight Taylor’s potential to be the first development of a multi-decade operation, establishing Hermosa as a globally
       significant producer of metals critical to a low carbon future in the industry’s first cost quartile. Taylor has now moved into feasibility
       stage, while we continue to advance the PFS for the Clark Deposit, which has the potential to produce battery-grade manganese as
       well as zinc and silver.

•      We commenced the construction of water infrastructure to support critical path orebody dewatering for the Taylor Deposit during the
       quarter. Subsequent to the end of the period, our Board approved US$278M of pre-commitment capital expenditure to advance the
       orebody dewatering program and early works at Taylor ahead of a final investment decision in mid CY23. This pre-commitment is
       included in the previously announced ~US$1.7B upfront capital estimate for Taylor [6]. Our FY22 Growth capital expenditure guidance
       has been revised down by US$25M to US$90M, predominantly reflecting the impact of slower than expected contractor mobilisation.

•      We directed US$13M to our exploration programs at Hermosa in the nine months ended March 2022. As part of our work to assess
       targets across a highly prospective corridor we commenced further exploration drilling at the Peake prospect [13] during the period.

•      The United States Department of Interior (DOI) filed a motion to suspend the right-of-way permits issued to the Alaska Industrial
       Development and Export Authority for the Ambler Access Road in February 2022. This suspension would allow for additional work to
       be undertaken by the DOI on the Final Environmental Impact Statement for the Ambler Access Road, which if developed would unlock
       the Ambler region. Together with our Ambler Metals Joint Venture partner, we are assessing the impact of the motion on the
       development timeline for the Arctic Deposit’s PFS, and our continuing preparations for the CY22 summer exploration season.

•      We invested US$20M in the nine months ended March 2022 in our early stage greenfield exploration opportunities with multiple
       programs targeting base metals currently underway in Australia, USA, Canada, Argentina, Peru and Ireland.

•      We directed US$32M towards exploration programs at our existing operations and development options in the nine months ended
       March 2022 (US$24M capitalised), including US$2M for our Manganese EAI (US$1M capitalised), US$13M at the Hermosa project
       (noted above, all capitalised) and US$8M at Ambler Metals (all capitalised).




PRODUCTION SUMMARY

    Production guidance
                                                                    FY21      9M YTD22          FY22e [a]    Guidance comments
    (South32 share)
    Worsley Alumina
    Alumina production (kt)                                        3,963           2,961            3,965
    Brazil Alumina
    Alumina production (kt)                                        1,398             966            1,300
    Brazil Aluminium
                                                                                                             Nameplate capacity (179ktpa, our
    Aluminium production (kt)                                           –               –               5    40% share) expected to be reached
                                                                                                             in the March 2023 quarter [3]
    Hillside Aluminium [14]
    Aluminium production (kt)                                        717             535              720
    Mozal Aluminium [14]
    Aluminium production (kt)                                        265             202              273
    Sierra Gorda
    Payable copper equivalent production [4] (kt)                       –             9.7              31
    Payable copper production (kt)                                      –             8.4              27
                                                                                                             Reflects our 45% ownership since
    Payable molybdenum production (kt)                                  –             0.2              0.4   22 February 2022
                                                                                                             
    Payable gold production (koz)                                       –             2.3              10
    Payable silver production (koz)                                     –              85             225
    Cannington
    Payable zinc equivalent production [5] (kt)                    319.0           234.8           292.2
    Payable silver production (koz)                               13,655          10,278          12,283
    Payable lead production (kt)                                   131.8             94.8           117.9
    Payable zinc production (kt)                                    67.7             49.1            66.7
    Cerro Matoso
    Payable nickel production (kt)                                   34.1            30.9            43.8
    Illawarra Metallurgical Coal
    Total coal production (kt)                                     7,645           4,926            6,800
    Metallurgical coal production (kt)                             6,170           4,332            5,900

                                                                                                   Page 3 of 12
     Production guidance
                                                                                    FY21         9M YTD22             FY22e [a]          Guidance comments
     (South32 share)
     Energy coal production (kt)                                                   1,475                 594                 900
     Australia Manganese
     Manganese ore production (kwmt)                                               3,529               2,519               3,200
     South Africa Manganese
     Manganese ore production [15] (kwmt)                                          2,060               1,444               2,000

a.      The denotation (e) refers to an estimate or forecast year. All guidance is subject to further potential impacts from COVID-19.



CAPITAL EXPENDITURE AND OPERATING UNIT COST GUIDANCE

•       Our FY22 total capital expenditure guidance has been revised down by US$36M to US$702M (including Manganese and Sierra Gorda
        EAI). The change primarily reflects our deferral of spend at Worsley Alumina into FY23 (reducing our FY22 Improvement and life
        extension capital expenditure estimate by US$11M to US$91M) and slower than expected contractor mobilisation at our Hermosa
        project (reducing our FY22 Growth capital expenditure estimate by US$25M to US$90M). Our FY22 Safe and reliable capital
        expenditure guidance remains unchanged at US$521M (including Manganese and Sierra Gorda EAI) and is subject to potential labour
        availability and supply chain constraints that may impact our ability to execute scheduled work.

•       We have revised our FY22 Operating unit cost guidance at the majority of our operations to reflect the impact of stronger producer
        currencies, higher prices for raw material inputs and an increase in price-linked royalties as we continue to benefit from strong prices
        across our portfolio.

     Operating unit cost [a]
                                                     FY22 prior guidance                     FY22 new
                                                                                                       FY22 new guidance vs. FY22 prior guidance
                                                                  [16(b)]                guidance [17]

     Worsley Alumina
                                                                                                             Stronger Australian dollar (AUD:USD 0.73) and higher
     (US$/t)                                                               257                        265
                                                                                                             prices for caustic soda and freight
     Brazil Alumina (non-operated)
                                                    We continue to expect H2 FY22 to be ~5% higher than H1 FY22 (US$262/t) due to higher caustic
     (US$/t)
                                                    soda and energy prices
     Hillside Aluminium
                                                    We continue to expect H2 FY22 to be ~10-15% higher than H1 FY22 (US$1,935/t) due to the
     (US$/t)
                                                    stronger South African rand (USD:ZAR 15.06) and higher raw material input prices
     Mozal Aluminium
                                                    We continue to expect H2 FY22 to be ~10-15% higher than H1 FY22 (US$2,008/t) due to the
     (US$/t)
                                                    stronger South African rand (USD:ZAR 15.06) and higher raw material input prices
     Sierra Gorda
     (US$/lb CuEq) [c]                                                    1.63                       1.63 No change to guidance
     Cannington
                                                                                                             Stronger Australian dollar (AUD:USD 0.73), inventory
     (US$/t) [d]                                                           120                        131
                                                                                                             movements and higher price-linked royalties
     Cerro Matoso
     (US$/t) [e]                                                           145                       142 Stronger Colombian peso (USD:COP 3,843) and higher
     (US$/lb)                                                             4.17                       4.49 price-linked royalties
     Illawarra Metallurgical Coal
                                                                                                             Stronger Australian dollar (AUD:USD 0.73) and higher
     (US$/t)                                                               115                        126
                                                                                                             price-linked royalties
     Australia Manganese (FOB)
                                                                                                             Stronger Australian dollar (AUD:USD 0.73) and higher
     (US$/dmtu)                                                           1.81                       1.88
                                                                                                             fuel prices
     South Africa Manganese (FOB)
                                                                                                             Stronger South African rand (USD:ZAR 15.06), higher
     (US$/dmtu)                                                           2.51                       2.79
                                                                                                             price-linked royalties and transport costs
a.      Operating unit cost is Revenue less Underlying EBITDA, excluding third party sales, divided by sales volumes. Operating cost is Revenue less Underlying EBITDA excluding
        third party sales.
b.      FY22 prior guidance as at H1 FY22 was based on commodity price and foreign exchange rate forward curves or our internal expectations for the remainder of FY22, as at
        January 2022. Refer to footnote 16.

                                                                                                                                   Page 4 of 12
c.   US dollar per pound of copper equivalent production. FY21 index prices for copper (US$4.23/lb), molybdenum (US$15.7/lb), gold (US$1,796/oz) and
     silver (US$25.2/oz) have been used for FY22e Operating unit costs.
d.   US dollar per tonne of ore processed. Periodic movements in finished product inventory may impact Operating unit costs.
e.   US dollar per tonne of ore to kiln. Periodic movements in finished product inventory expected to lower FY22e Operating unit cost.



WORSLEY ALUMINA (86% SHARE)
                                                                                                                                                       3Q22          3Q22
                                                                      9M           9M
 South32 share                                                                                   YoY             3Q21         2Q22        3Q22           vs            vs
                                                                    YTD21        YTD22
                                                                                                                                                       3Q21          2Q22


 Alumina production (kt)                                             2,885        2,961           3%               875          973          982        12%             1%


 Alumina sales (kt)                                                  2,918        2,856          (2%)              840        1,022          910          8%         (11%)


Worsley Alumina saleable production increased by 3% (or 76kt) to 2,961kt in the nine months ended March 2022 as the refinery benefited
from historical and ongoing improvement initiatives. Volumes in the March 2022 quarter increased by 1% as two scheduled hydrate
shipments, more than offset the impact of planned calciner maintenance.

Sales decreased by 11% in the March 2022 quarter as a vessel’s late arrival led to a shipment slipping into April 2022. We realised a circa
10% premium to the Platts Alumina Index [18] on a volume weighted M-1 basis for alumina sales in the nine months ended March 2022,
with our realised prices capturing the impact of elevated global freight rates which are also reflected in our Operating unit costs.
FY22 production guidance remains unchanged at 3,965kt with our ongoing focus on improvement initiatives at the refinery expected to
creep production above nameplate capacity of 4.6Mt (100% basis).




BRAZIL ALUMINA (36% SHARE)

                                                                                                                                                       3Q22         3Q22
                                                                     9M           9M
 South32 share                                                                                  YoY             3Q21         2Q22        3Q22            vs           vs
                                                                   YTD21        YTD22
                                                                                                                                                       3Q21         2Q22


 Alumina production (kt)                                            1,049          966         (8%)               343          359          335         (2%)         (7%)


 Alumina sales (kt)                                                 1,058          932        (12%)               384          379          306        (20%)        (19%)


Brazil Alumina saleable production decreased by 8% (or 83kt) to 966kt in the nine months ended March 2022 following an incident in July
2021 that damaged one of the two bauxite ship unloaders at the refinery. Although the refinery returned to nameplate capacity in October
2021, production declined by 7% in the March 2022 quarter with wet weather causing temporary outages to third party power supply.

The 19% decline in sales for the March 2022 quarter reflects the scheduling of additional shipments in the prior period. We realised a circa
5% premium to the Platts Alumina Index [18] on a volume weighted M-1 basis for alumina sales in the nine months ended March 2022,
with our realised prices capturing the impact of elevated global freight rates which are also reflected in our Operating unit costs.
FY22 production guidance remains unchanged at 1,300kt.




BRAZIL ALUMINIUM (40% SHARE)

                                                                                                                                                       3Q22          3Q22
                                                                      9M           9M
 South32 share                                                                                   YoY             3Q21         2Q22        3Q22           vs            vs
                                                                    YTD21        YTD22
                                                                                                                                                       3Q21          2Q22


 Aluminium production (kt)                                                 –            –        N/A                  –            –            –        N/A           N/A


 Aluminium sales (kt)                                                      –            –        N/A                  –            –            –        N/A           N/A




                                                                                                                           Page 5 of 12
During the quarter we announced our participation in the restart of the Alumar aluminium smelter, together with our joint venture partner
Alcoa Corporation. We have secured cost efficient renewable power for our share of production from the smelter, while our alumina
supply will be sourced from the co-located Brazil Alumina refinery.

First production was achieved following the end of the period. While the smelter has achieved a slower than expected ramp-up, our FY22
production guidance remains unchanged at 5kt. We still expect to achieve nameplate capacity of 179ktpa (our 40% share) in the March
2023 quarter [3].




HILLSIDE ALUMINIUM (100%)

                                                                                                                         3Q22       3Q22
                                                         9M        9M
South32 share                                                                 YoY         3Q21      2Q22      3Q22         vs         vs
                                                       YTD21     YTD22
                                                                                                                         3Q21       2Q22


Aluminium production (kt)                                537        535      (0%)           176       178       177        1%        (1%)


Aluminium sales (kt)                                     538        515      (4%)           191       176       179       (6%)         2%


Hillside Aluminium saleable production was largely unchanged at 535kt in the nine months ended March 2022 as the smelter continued to
test its maximum technical capacity, despite the impact of increased load-shedding. FY22 production guidance, which does not assume any
load-shedding impact, remains unchanged at 720kt.

We commenced execution of the AP3XLE energy efficiency project during the period with the first pots expected to be relined in the June
2022 quarter. The project is expected to bring both volume and efficiency benefits, while reducing the smelter’s carbon intensity.




MOZAL ALUMINIUM (47.1% SHARE)

                                                                                                                         3Q22       3Q22
                                                         9M        9M
South32 share                                                                 YoY         3Q21      2Q22      3Q22         vs         vs
                                                       YTD21     YTD22
                                                                                                                         3Q21       2Q22


Aluminium production (kt)                                199        202        2%            64        68        66        3%        (3%)


Aluminium sales (kt)                                     194        188      (3%)            64        67        66        3%        (1%)


Mozal Aluminium saleable production increased by 2% (or 3kt) to 202kt in the nine months ended March 2022 as the volume benefit of our
investment in the AP3XLE energy efficiency project more than offset the impact of increased load-shedding.
FY22 production guidance, which does not assume any load-shedding impact, remains unchanged at 273kt.




SIERRA GORDA (45% SHARE)
                                                                                                                         3Q22        3Q22
                                                         9M        9M
 South32 share                                                                YoY          3Q21      2Q22      3Q22        vs          vs
                                                       YTD21     YTD22
                                                                                                                         3Q21        2Q22

 Payable copper equivalent production [4] (kt)              –        9.7      N/A              –         –       9.7       N/A         N/A

 Payable copper production (kt)                             –        8.4      N/A              –         –       8.4       N/A         N/A

 Payable copper sales (kt)                                  –      11.1       N/A              –         –      11.1       N/A         N/A


Following the completion of our acquisition of a 45% interest in the joint venture on 22 February 2022, our share of payable copper
equivalent production [4] was 9.7kt to the end of the March 2022 quarter. Our FY22 copper equivalent production guidance of 31kt [2]
remains unchanged (copper 27kt, molybdenum 0.4kt, gold 10koz and silver 225koz).

                                                                                           Page 6 of 12
Our transition to ownership has progressed to plan and we are working with our joint venture partner and the experienced in-country
team to ensure continuation of the operation’s strong recent performance. The capital efficient de-bottlenecking project, which is
targeted to lift plant throughput by a further 6% to approximately 50Mtpa [19] remains on-track. The project is expected to achieve the
targeted incremental throughput on a sustainable basis in the December 2022 quarter.




CANNINGTON (100% SHARE)
                                                                                                                             3Q22       3Q22
                                                           9M          9M
 South32 share                                                                   YoY         3Q21       2Q22      3Q22         vs         vs
                                                         YTD21       YTD22
                                                                                                                             3Q21       2Q22

 Payable zinc equivalent production [5] (kt)              221.9       234.8      6%           81.4       74.3      82.3        1%        11%

 Payable silver production (koz)                          9,477     10,278       8%          3,484      3,217     3,568        2%        11%

 Payable silver sales (koz)                               9,276       9,536      3%          2,950      4,000     2,818       (4%)      (30%)

 Payable lead production (kt)                              90.6        94.8      5%           33.0       28.3      34.6        5%        22%

 Payable lead sales (kt)                                   89.8        91.2      2%           28.4       38.0      27.9       (2%)      (27%)

 Payable zinc production (kt)                              48.2        49.1      2%           17.8       17.3      16.4       (8%)       (5%)

 Payable zinc sales (kt)                                   47.7        50.1      5%           15.9       18.5      17.3        9%        (6%)


Cannington payable zinc equivalent production [5] increased by 6% (or 12.9kt) to 234.8kt in the nine months ended March 2022 as the
operation benefitted from a planned increase in average silver grades and drew down run of mine stocks. Ore mined decreased by 12%
during the March 2022 quarter with underground performance impacted by COVID-19 workforce restrictions.

Payable silver and lead sales decreased by 30% and 27% respectively during the March 2022 quarter following additional shipments in the
prior period as the operation recovered from adverse weather in the September 2021 quarter.

The operation’s transition to 100% truck haulage from the June 2022 quarter remains on-track, with FY22 production guidance remaining
unchanged (silver 12,283koz, lead 117.9kt and zinc 66.7kt). The change in configuration is a low cost capital option that has the potential to
bring forward higher-grade material from FY23 at current operating costs and throughput rates.




CERRO MATOSO (99.9% SHARE)
                                                                                                                             3Q22       3Q22
                                                           9M        9M
 South32 share                                                                  YoY          3Q21       2Q22      3Q22         vs         vs
                                                         YTD21     YTD22
                                                                                                                             3Q21       2Q22

 Payable nickel production (kt)                            23.2      30.9       33%             7.1      10.7      10.6       49%        (1%)

 Payable nickel sales (kt)                                 23.2      29.9       29%             6.7       9.7        9.8      46%          1%


Cerro Matoso payable nickel production increased by 33% (or 7.7kt) to 30.9kt in the nine months ended March 2022, despite unplanned
maintenance in the quarter. Production at the operation continues to benefit from the completion of a major furnace refurbishment in
FY21 and a ~9% improvement in average nickel grade (9M YTD22: 1.73%; 9M YTD21: 1.58%) due to the addition of ore from the higher
grade Q&P pit.

Our ferronickel product typically attracts a discount to the LME Nickel index price on a M or M+1 basis. Payable nickel sales remained
largely unchanged in the March 2022 quarter with the temporary disruption of the traded nickel market in March slowing the drawdown of
finished goods. Looking forward, the current discount to the LME nickel price is expected to widen over historical levels due to market
dynamics between ferronickel and Nickel Pig-Iron pricing.

FY22 production guidance remains unchanged at 43.8kt.




                                                                                              Page 7 of 12
ILLAWARRA METALLURGICAL COAL (100%)
                                                                                                                            3Q22       3Q22
                                                          9M         9M
 South32 share                                                                  YoY         3Q21       2Q22      3Q22         vs         vs
                                                        YTD21      YTD22
                                                                                                                            3Q21       2Q22

 Total coal production (kt)                              5,920     4,926      (17%)         1,824      1,257     1,781      (2%)       42%

 Total coal sales [20] (kt)                              5,850     4,720      (19%)         1,823      1,547     1,465     (20%)       (5%)

 Metallurgical coal production (kt)                      4,830     4,332      (10%)         1,568      1,192     1,565      (0%)       31%

 Metallurgical coal sales (kt)                           4,707     4,235      (10%)         1,542      1,387     1,358     (12%)       (2%)

 Energy coal production (kt)                             1,090       594      (46%)           256         65       216     (16%)       232%

 Energy coal sales (kt)                                  1,143       485      (58%)           281       160        107     (62%)       (33%)


Illawarra Metallurgical Coal saleable production decreased by 17% (or 994kt) to 4,926kt in the nine months ended March 2022 as we
completed an extended longwall move at the Dendrobium mine in the December 2021 quarter and COVID-19 workforce restrictions
impacted labour availability. Lower production included a 496kt (or 46%) decline in energy coal volumes as we made the decision to stop
sales of low-margin coal wash material, with elevated freight rates making them uneconomic.

Despite the impact of adverse weather, saleable production improved by 42% in the March 2022 quarter as the operation returned to
normalised rates following the completion of an extended longwall move in the prior quarter and improved labour availability. The
operation’s next longwall move is planned for the Appin mine in the June 2022 quarter.

Poor weather contributed to a 5% reduction in coal sales during the March 2022 quarter with multiple shipments slipping into April 2022
due to the prioritisation of the health and wellbeing of seafarers slowing loading conditions. Notwithstanding the ongoing risk of further
adverse weather, FY22 production guidance is currently unchanged at 6.8Mt.




AUSTRALIA MANGANESE                               (60% SHARE)
                                                                                                                            3Q22       3Q22
                                                          9M         9M
 South32 share                                                                  YoY         3Q21       2Q22      3Q22         vs         vs
                                                        YTD21      YTD22
                                                                                                                            3Q21       2Q22

 Manganese ore production (kwmt)                         2,663     2,519       (5%)           829       807        815       (2%)         1%

 Manganese ore sales (kwmt)                              2,730     2,512       (8%)           865       831        775      (10%)        (7%)


Australia Manganese saleable production decreased by 5% (or 144kwmt) to 2,519kwmt in the nine months ended March 2022 as ore
handling characteristics resulted in lower yield at the primary concentrator. The PC02 circuit continued to operate above its design
capacity, as we took advantage of favourable market conditions and realised the benefit of establishing market depth for our low-cost
PC02 fines product. The product contributed 12% of total production (9M YTD21: 10%), further benefiting margins at the operation.

Notwithstanding the improved production performance in the March 2022 quarter, FY22 production guidance is currently unchanged at
3,200kwmt while we continue to monitor the potential for further impacts from the wet season.




SOUTH AFRICA MANGANESE (ORE 54.6% [15] SHARE)
                                                                                                                            3Q22       3Q22
                                                          9M         9M
 South32 share                                                                  YoY         3Q21       2Q22      3Q22         vs         vs
                                                        YTD21      YTD22
                                                                                                                            3Q21       2Q22

 Manganese ore production [15] (kwmt)                    1,516     1,444       (5%)           528       445        391     (26%)       (12%)



                                                                                             Page 8 of 12
 
Manganese ore sales [15] (kwmt)                      1,456    1,589        9%          452       579       495      10%       (15%)


South Africa Manganese saleable production decreased by 5% (or 72kwmt) to 1,444kwmt in the nine months ended March 2022, as
scheduled maintenance was completed in the quarter at both the Wessels and Mamatwan mines.

Although ore sales reduced by 15% in the March quarter due to the lower production volumes and third party port performance, we
maintained the significant drawdown in stocks that we have prioritised in FY22, returning finished goods to their optimal operating
window. Notwithstanding fewer sales in the quarter, we achieved a premium of circa 15% to the medium grade 37% manganese lump ore
index [21] on a volume weighted M-1 basis as we continue to optimise our product mix.

FY22 production guidance remains unchanged at 2,000kwmt as we continue to monitor market conditions and optimise our use of higher
cost trucking that incurs additional costs, but maximises cash flow at the operation.



                                                                                     Page 9 of 12

NOTES
1.    Net cash number is unaudited and should not be considered as an indication of or alternative to an IFRS measure of profitability, financial performance or liquidity.
2.    Refer to market release “South32 completes acquisition of 45% interest in Sierra Gorda copper mine” dated 22 February 2022.
3.    Refer to market release “Restart of Brazil Aluminium using renewable power” dated 6 January 2022.
4.    Payable copper equivalent production (kt) was calculated by aggregating revenues from copper, molybdenum, gold and silver, and dividing the total Revenue by the price of
      copper. Average metallurgical recoveries are 83% for copper, 57% for molybdenum and 53% for gold. FY21 index prices for copper (US$4.23/lb), molybdenum (US$15.7/lb),
      gold (US$1,796/oz) and silver (US$25.2/oz) have been used for 9M YTD22 and FY22e.
5.    Payable zinc equivalent production (kt) was calculated by aggregating revenues from payable silver, lead and zinc, and dividing the total Revenue by the price of zinc. FY21
      realised prices for zinc (US$2,357/t), lead (US$1,862/t) and silver (US$25.4/oz) have been used for FY21, 9M YTD22 and FY22e.
6.    Refer to market release “Hermosa project update” dated 17 January 2022.
7.    June 2022, December 2022 and June 2023.
8.    Refer to market release “South32 closes US$700M of Senior Notes offering” dated 14 April 2022.
9.    Net distributions from our Manganese equity accounted investments includes net debt movements and dividends, which are unaudited and should not be considered as an
      indication of or alternative to an IFRS measure of profitability, financial performance or liquidity.
10.   Since inception, US$1.4B has been allocated to the on-market share buy-back (679M shares at an average price of A$2.90 per share) and US$386M returned in the form of
      special dividends.
11.   Refer to market release “Update on acquisition of additional shareholding in Mozal Aluminium” dated 30 March 2022.
12.   Refer to market release “Sale of Metalloys manganese alloy smelter will not proceed” dated 7 March 2022.
13.   Peake Prospect Exploration Target: The information in this announcement that relates to the Exploration Target for Peake Prospect is extracted from “Hermosa Project
      Update” published on 17 January 2022 and is available to view on www.south32.net. The information was prepared by a Competent Person in accordance with the
      requirements of the JORC Code. South32 confirms that it is not aware of any new information or data that materially affects the information included in the original market
      announcement. South32 confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original
      market announcement.
14.   Production guidance for Hillside Aluminium and Mozal Aluminium does not assume any load-shedding impact on production.
15.   South Africa Manganese ore has been reported as a 54.6% interest (previously 60%) to reflect our 60% interest in the Metalloys manganese alloy smelter which is currently
      on care and maintenance and aligning with our interest in Hotazel Manganese Mines (HMM). South32 has a 44.4% ownership interest in HMM. 26% of HMM is owned by a
      B-BBEE consortium comprising Ntsimbintle Mining (9%), NCAB Resources (7%), Iziko Mining (5%) and HMM Education Trust (5%). The interests owned by NCAB Resources,
      Iziko Mining and HMM Education Trust were acquired using vendor finance with the loans repayable via distributions attributable to these parties, pro rata to their share in
      HMM. Until these loans are repaid, South32’s interest in HMM is accounted at 54.6%.
16.   FY22 prior Operating unit cost guidance includes royalties (where appropriate) and the influence of exchange rates, and includes various assumptions for FY22, including: an
      alumina price of US$378/t; an average blended coal price of US$244/t for Illawarra Metallurgical Coal; a manganese ore price of US$5.42/dmtu for 44% manganese product;
      a nickel price of US$8.83/lb; a silver price of US$24.57/troy oz; a lead price of US$2,329/t (gross of treatment and refining charges); a zinc price of US$3,179/t (gross of
      treatment and refining charges); an AUD:USD exchange rate of 0.72; a USD:ZAR exchange rate of 15.47; a USD:COP exchange rate of 3,930; and a reference price for caustic
      soda; all of which reflected forward markets as at January 2022 or our internal expectations.
17.   FY22 new Operating unit cost guidance includes royalties (where appropriate) and the influence of exchange rates, and includes various assumptions for FY22, including: an
      alumina price of US$399/t; an average blended coal price of US$382/t for Illawarra Metallurgical Coal; a manganese ore price of US$6.07/dmtu for 44% manganese product;
      a nickel price of US$10.60/lb; a silver price of US$24.22/troy oz; a lead price of US$2,308/t (gross of treatment and refining charges); a zinc price of US$3,461/t (gross of
      treatment and refining charges); an AUD:USD exchange rate of 0.73; a USD:ZAR exchange rate of 15.06; a USD:COP exchange rate of 3,843; and a reference price for caustic
      soda; all of which reflected forward markets as at March 2022 or our internal expectations.
18.   The sales volume weighted average of the Platts Alumina Index (FOB Australia) on the basis of a one month lag to published pricing (Month minus one or “M-1”) for Worsley
      Alumina was US$363/t and Brazil Alumina was US$370/t in the nine months ended March 2022.
19.   The information in this document that refers to Production Target for the medium term (CY22 to CY26) is based on the original announcement
      "SOUTH32 TO ACQUIRE A 45% INTEREST IN THE SIERRA GORDA COPPER MINE“ released on 14 October 2021 and is available to view at www.south32.net. The production
      target is based on based 100% on proven and probable mineral reserve of the foreign estimate. All Material assumptions for the production target and forecast financial
      information for the medium term (CY22 to CY26) are included in the original announcement. The mineral reserve estimates are "qualifying foreign estimates" under the ASX
      Listing Rules and stated by KGHM as being classified in accordance with National Instrument 43-101 and CIM Standard for Disclosure (43-101). Competent persons have not
      done sufficient work to classify the foreign estimates as Mineral Resources and Ore Reserves in accordance with the JORC Code. It is uncertain that following evaluation and
      further exploration that the foreign estimates will be able to be reported as Mineral Resources or Ore Reserves in accordance with the JORC Code. Reference should be
      made to the clarifying statement on mineral resources and mineral reserves in the original market announcement, in accordance with ASX Listing Rule 5.12. South32 is not
      in possession of any new information or data relating to the foreign estimate that materially impacts on the reliability of the estimates. South32 confirms that the
      information contained in the clarifying statement in the Market Announcement continues to apply and has not materially changed.
20.   Illawarra Metallurgical Coal sales are adjusted for moisture and will not reconcile directly to Illawarra Metallurgical Coal production.
21.   The sales volume weighted average of the Metal Bulletin 37% manganese lump ore index (FOB Port Elizabeth, South Africa) on the basis of M-1 was US$3.18/dmtu in the
      nine months ended March 2022.

The following abbreviations have been used throughout this report: US$ million (US$M); US$ billion (US$B); grams per tonne (g/t); tonnes (t); thousand tonnes (kt); thousand
tonnes per annum (ktpa); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); thousand ounces (koz); million ounces (Moz); thousand wet metric tonnes (kwmt);
million wet metric tonnes (Mwmt); million wet metric tonnes per annum (Mwmt pa); dry metric tonne unit (dmtu); thousand dry metric tonnes (kdmt).

Figures in Italics indicate that an adjustment has been made since the figures were previously reported. The denotation (e) refers to an estimate or forecast year.




OPERATING PERFORMANCE

                                                9M       9M
 South32 share                                                  3Q21    4Q21    1Q22    2Q22     3Q22
                                             YTD21    YTD22

 Worsley Alumina (86% share)

 Alumina hydrate production (kt)             2,989   2,966      977     992     997     997          972

 Alumina production (kt)                     2,885    2,961     875   1,078    1,006    973          982


                                                                                                                                   Page 10 of 12
                                               9M      9M
South32 share                                                 3Q21    4Q21    1Q22    2Q22          3Q22
                                             YTD21   YTD22

Alumina sales (kt)                           2,918    2,856    840    1,086    924    1,022           910

Brazil Alumina (36% share)

Alumina production (kt)                      1,049     966     343     349     272     359            335

Alumina sales (kt)                           1,058     932     384     333     247     379            306

Brazil Aluminium (40% share)

Aluminium production (kt)                        –       –       –       –       –       –               –

Aluminium sales (kt)                             –       –       –       –       –       –               –

Hillside Aluminium (100%)

Aluminium production (kt)                      537     535     176     180     180     178            177

Aluminium sales (kt)                           538     515     191     169     160     176            179

Mozal Aluminium (47.1% share)

Aluminium production (kt)                      199     202      64      66      68      68             66

Aluminium sales (kt)                           194     188      64      68      55      67             66

Sierra Gorda (45% share)

Ore processed (Mt)                               –      2.3      –       –       –       –             2.3

Copper ore grade processed (%, Cu)               –     0.45      –       –       –       –           0.45

Payable copper equivalent production4 (kt)       –      9.7      –       –       –       –             9.7

Payable copper production (kt)                   –      8.4      –       –       –       –             8.4

Payable copper sales (kt)                        –     11.1      –       –       –       –           11.1

Payable molybdenum production (kt)               –      0.2      –       –       –       –             0.2

Payable molybdenum sales (kt)                    –      0.1      –       –       –       –             0.1

Payable gold production (koz)                    –      2.3      –       –       –       –             2.3

Payable gold sales (koz)                         –      3.0      –       –       –       –             3.0

Payable silver production (koz)                  –      85       –       –       –       –             85

Payable silver sales (koz)                       –     111       –       –       –       –            111

Cannington (100%)

Ore mined (kwmt)                             2,123    2,112    714     696     750     725            637

Ore processed (kdmt)                         2,026    2,066    724     720     687     698            681

Silver ore grade processed (g/t, Ag)           175     180     177     213     185     169            188

Lead ore grade processed (%, Pb)               5.4      5.4     5.8     6.6     5.5     4.9            5.9

Zinc ore grade processed (%, Zn)               3.4      3.4     3.5     3.9     3.2     3.6            3.4

Payable zinc equivalent production5 (kt)     221.9    234.8    81.4    97.1    78.2    74.3           82.3

Payable silver production (koz)              9,477   10,278   3,484   4,178   3,493   3,217          3,568

Payable silver sales (koz)                   9,276    9,536   2,950   4,460   2,718   4,000          2,818

Payable lead production (kt)                  90.6     94.8    33.0    41.2    31.9    28.3           34.6

Payable lead sales (kt)                       89.8     91.2    28.4    41.9    25.3    38.0           27.9

Payable zinc production (kt)                  48.2     49.1    17.8    19.5    15.4    17.3           16.4

Payable zinc sales (kt)                       47.7     50.1    15.9    21.3    14.3    18.5           17.3

                                                          Page 11 of 12
                                                

South32 share                                   9M       9M    3Q21    4Q21     1Q22    2Q22          3Q22
                                               YTD21   YTD22   

Cerro Matoso (99.9% share)

Ore mined (kwmt)                               2,064   3,726    594   1,174     1,058   1,358         1,310

Ore processed (kdmt)                           1,683   2,025    528     702       620      715           690

Ore grade processed (%, Ni)                     1.58    1.73   1.60     1.76     1.76     1.71          1.73

Payable nickel production (kt)                  23.2    30.9    7.1     10.9      9.6     10.7          10.6

Payable nickel sales (kt)                       23.2    29.9    6.7     10.3     10.4      9.7           9.8

Illawarra Metallurgical Coal (100%)

Total coal production (kt)                      5,920   4,926   1,824   1,725   1,888     1,257         1,781

Total coal sales20 (kt)                         5,850   4,720   1,823   1,766   1,708     1,547         1,465

Metallurgical coal production (kt)              4,830   4,332   1,568   1,340   1,575     1,192         1,565

Metallurgical coal sales (kt)                   4,707   4,235   1,542   1,367   1,490      1,387         1,358

Energy coal production (kt)                     1,090     594     256     385     313         65           216

Energy coal sales (kt)                           1,143    485     281      399     218       160           107

Australia Manganese (60% share)

Manganese ore production (kwmt)                  2,663   2,519    829      866      897       807          815

Manganese ore sales (kwmt)                       2,730   2,512    865      891      906       831          775

Ore grade sold (%, Mn)                           44.4     44.2    44.4     44.5     44.2      44.2         44.1

South Africa Manganese (54.6% share)

Manganese ore production15 (kwmt)                1,516   1,444    528      544      608       445            391

Manganese ore sales15 (kwmt)                     1,456   1,589    452      579      515       579            495

Ore grade sold (%, Mn)                            40.1    39.8    40.6     39.5     40.3      38.7           40.5

Forward-looking statements
This release contains forward-looking statements, including statements about trends in commodity prices and currency exchange rates; demand for commodities; production
forecasts; plans, strategies and objectives of management; capital costs and scheduling; operating costs; anticipated productive lives of projects, mines and facilities; and
provisions and contingent liabilities. These forward-looking statements reflect expectations at the date of this release, however they are not guarantees or predictions of future
performance. They involve known and unknown risks, uncertainties and other factors, many of which are beyond our control, and which may cause actual results to differ
materially from those expressed in the statements contained in this release. Readers are cautioned not to put undue reliance on forward-looking statements. Except as required
by applicable laws or regulations, the South32 Group does not undertake to publicly update or review any forward-looking statements, whether as a result of new information or
future events. Past performance cannot be relied on as a guide to future performance. South32 cautions against reliance on any forward looking statements or guidance,
particularly in light of the current economic climate and the significant volatility, uncertainty and disruption arising in connection with COVID-19.


FURTHER INFORMATION
 INVESTOR RELATIONS                                           MEDIA RELATIONS
 Tom Gallop                                                   Jamie Macdonald                                              Miles Godfrey
 M +61 439 353 948                                            M +61 408 925 140                                            M +61 415 325 906
 E Tom.Gallop@south32.net                                     E Jamie.Macdonald@south32.net                                E Miles.Godrey@south32.net


Approved for release to the market by Graham Kerr, Chief Executive Officer
JSE Sponsor: The Standard Bank of South Africa Limited
26 April 2022


                                                                                                                            Page 12 of 12

Date: 26-04-2022 08:28:00
Produced by the JSE SENS Department. The SENS service is an information dissemination service administered by the JSE Limited ('JSE'). 
The JSE does not, whether expressly, tacitly or implicitly, represent, warrant or in any way guarantee the truth, accuracy or completeness of
 the information published on SENS. The JSE, their officers, employees and agents accept no liability for (or in respect of) any direct, 
indirect, incidental or consequential loss or damage of any kind or nature, howsoever arising, from the use of SENS or the use of, or reliance on,
 information disseminated through SENS.