PRODUCTION REPORT FOR THE FIRST QUARTER FY2023 ENDED 31 DECEMBER 2022
Tharisa, the platinum group metals (PGMs) and chrome co-producer dual-listed on the Johannesburg and
London stock exchanges, today announces its production and cash balance results for Q1 FY20231
Quarter highlights
‒ Lost Time Injury Frequency Rate (‘LTIFR’) of 0.3 per 200 000-man hours worked
‒ Mining volumes impacted by unprecedented rainfall not seen in the history of the Tharisa Mine
‒ Processing efficiencies impacted by increased processing of oxidised ore and variable ROM stockpiles
‒ PGM output marginally lower versus prior quarter at 42.7 koz (Q4 FY2022: 45.3 koz)
‒ Chrome output fell as a direct result of feed and ore mix variability at 383.1 kt (Q4 FY2022:
416.2 kt) with grades remaining consistent at 17%
‒ Vulcan Plant optimisation continuing with increased output on track for H2 FY2023
‒ Production guidance maintained at between 175 koz and 185 koz PGMs (6E basis) and 1.75 Mt to 1.85
Mt of chrome concentrates
‒ Elevated PGM prices driven by PGM demand for the automotive industry and lower production from
major suppliers; Chrome prices remain buoyant currently at US$260/t due to eroding Chinese stockpiles
‒ Successful ground breaking at Karo Platinum Mine in Zimbabwe; project construction ongoing
‒ Raised US$31.8m from bond issue for Karo Mining Holdings on the Victoria Falls Stock Exchange
‒ Cash on hand US$213.9 million, with a net cash position of US$101.1 million
‒ Growth strategy firmly on track for FY2023
Key Operating Numbers
Quarter Quarter Quarter on Quarter Year
ended ended quarter ended ended
31 Dec 30 Sep movement 31 Dec 30 Sep
2022 2022 % 2021 2022
Reef mined kt 1 081.5 1 314.7 (17.7) 1 413.9 5 505.4
6E PGMs produced koz 42.7 45.3 (5.7) 47.7 179.2
Chrome concentrates produced kt 383.1 416.2 (8.0) 401.8 1 582.7
(excluding third party)
Average PGM contained metal basket US$/oz 2 360 2 400 (1.7) 2 394 2 564
price
Metallurgical grade chrome concentrate US$/t 223 226 (1.3) 161 209
contract price CIF
China
1
Tharisa’s financial year begins 01 October each year and finishes on 30 September.
Phoevos Pouroulis, CEO of Tharisa, commented:
“Despite operational headwinds at the Tharisa Mine, the Company delivered a solid quarter of PGM and chrome
production, underpinning our commitment in delivering guidance of between 175 koz and 185 koz PGM and 1.75
Mt and 1.85 Mt chrome concentrates. The quarter also saw significant progress in the development of Karo
Platinum, which will be our second Tier 1 PGM asset, with ground breaking and the commencement of the
development of the necessary infrastructure and mine construction, supported by the first bond issue on the
Victoria Falls Exchange in Zimbabwe.
The fatality in October 2022 overshadowed the quarter where output was hampered by unprecedented rainfall,
which registered an annualised increase in rainfall of 27%. While the changes we have made to the pit layout
provided significantly better drainage, access to the pit was nevertheless hampered due to the high-water level,
directly resulting in pit flexibility being compromised. Our stockpile management strategy implemented over the
past 24 months resulted in minimising the impact to our normal output.
Our growth strategy remains intact, underpinned by further free cash flow generation in the quarter, as well as
progressing with our ambitions to become a multi-asset and multi-jurisdiction group with the rapid progress of
the Karo Platinum Project.”
Health & Safety
‒ The health and safety of our stakeholders remains a core value to the Group and Tharisa continues to
strive for zero harm at its operations
‒ LTIFR of 0.3 per 200 000-man hours worked
Market Update
‒ Chrome prices remain strong, with spot at around US$260/t at the time of writing. Stockpiles in China
remain at the lower end of seasonal levels despite lower ferrochrome production in the latter part of
the quarter. Demand for chrome remains resilient and shipments are being executed as rapidly as
possible given transport logistics constraints in South Africa. Tharisa has benefited from its ability to
access three ports to ensure we deliver our products to our clients. Chinese New Year will slow demand
towards the end of January 2023 but with the economy in China opening post COVID-19 restrictions,
we continue to foresee strong demand for the product heading into the Northern Hemisphere spring.
‒ PGM prices remained elevated over the quarter and are set to continue at these levels on the back of
PGM demand from the automotive industry and lower production from the major suppliers. As
forecast, while palladium prices have rerated, ever growing reduction of platinum surplus supplies will
lead to a deficit over the next 12 to 18 months, according to consensus industry forecasts. The growing
reduction in platinum surplus supplies has resulted in platinum price increases with rhodium and other
minor PGM basket constituents remaining strong. This is a direct result of the forecasted lower output
due to the operational issues addressed above
Operational Update
‒ Total reef mined of 1 081.5 kt (Q4 FY2022: 1 314.7 kt) as weather impacted access to all benches, which
affected mining and drilling volumes
‒ Stripping ratio of 10.6 m3: m3 (Q4 FY2022: 13.3 m3: m3) in line with new life of mine requirements but
also affected by adverse weather conditions
‒ Total reef tonnes milled for the quarter at 1 427.4 kt (Q4 FY2022: 1 446.8 kt), utilising stockpiles to
maintain plant throughput
‒ Quarterly PGM production at 42.7 koz (Q4 FY2022: 45.3 koz)
‒ Rougher feed grade of 1.66 g/t (Q4 FY2022: 1.67 g/t)
‒ Recovery of 71.7% (Q4 FY2022: 76.2%) as oxidised ore from the stockpile was fed into the
circuits
‒ Quarterly chrome production at 383.1 kt (Q4 FY2022: 416.2 kt)
‒ Grade of 17.0% Cr2O3 (Q4 FY2022: 17.3%)
‒ Recovery at 65.7% (Q4 FY2022: 69.6%) impacted by high variability of ore mix and feed grade,
as well as work on spiral adjustment and replacement, impacting mainly specialty output with
metallurgical chrome output up on a quarter-by-quarter basis
‒ Vulcan Plant optimisation continuing with increased output on track for H2 FY2023
Karo Platinum Update
‒ Construction commencement ceremony was held on 7 December 2022, with land clearing continuing
‒ Successful capital raise and listing on VFEX Exchange on 16 December 2022
Cash Balance and Debt Position
‒ Tharisa had a cash balance of US$213.9 million (30 September 2022 US$143.4 million) at the end of
the quarter, and debt of US$112.8 million (30 September 2022 US$64.8 million). The increased cash
has resulted in an improved net cash position of US$101.1 million (30 September 2022 US$78.6
million). The cash and debt numbers include the fully consolidated recent capital raise on the VFEX
Guidance
Production guidance maintained at between 175 koz and 185 koz PGMs (6E basis) and 1.75 Mt to 1.85 Mt of
chrome concentrates.
Production Numbers
Quarter Quarter Quarter on Quarter Year
ended ended quarter ended ended
31 Dec 30 Sep movement 31 Dec 30 Sep
2022 2022 % 2021 2022
Reef mined kt 1 081.5 1 314.7 (17.7) 1 413.9 5 505.4
Stripping ratio m3: m3 10.6 13.3 (20.3) 11.2 12.8
Reef milled kt 1 427.4 1 446.8 (1.3) 1 432.1 5 608.2
PGM flotation feed kt 1 115.3 1 108.1 0.6 1 069.3 4 274.5
PGM rougher feed grade g/t 1.66 1.67 (0.6) 1.75 1.70
PGM recovery % 71.7 76.2 (5.9) 79.3 76.6
6E PGMs produced koz 42.7 45.3 (5.7) 47.7 179.2
Platinum produced koz 23.2 25.0 (7.2) 26.5 99.0
Palladium produced koz 7.5 7.9 (5.1) 7.5 30.0
Rhodium produced koz 4.2 4.4 (4.5) 4.6 17.2
Average PGM contained metal basket US$/oz 2 360 2 400 (1.7) 2 394 2 564
price
Platinum price US$/oz 967 887 9.0 997 968
Palladium price US$/oz 1 952 2 077 (6.0) 1 941 2 107
Rhodium price US$/oz 12 951 13 746 (5.8) 13 522 14 962
Quarter Quarter Quarter on Quarter Year
ended ended quarter ended ended
31 Dec 30 Sep movement 31 Dec 30 Sep
2022 2022 % 2021 2022
Average PGM contained metal basket ZAR/oz 41 682 40 850 2.0 36 897 40 437
price
Cr2O3 ROM grade % 17.0 17.3 (1.7) 18.1 17.4
Chrome recovery % 65.7 69.6 (5.6) 65.6 68.3
Chrome yield % 26.8 28.8 (6.9) 28.1 28.2
Chrome concentrates produced kt 383.1 416.2 (8.0) 401.8 1 582.7
(excluding third party)
Metallurgical grade kt 347.2 325.9 6.5 305.3 1 233.2
Specialty grades kt 35.9 90.3 (60.2) 96.5 349.5
Third party chrome production kt 40.9 38.2 7.1 49.2 188.2
Metallurgical grade chrome concentrate US$/t 223 226 (1.3) 161 209
contract price CIF
China
Metallurgical grade chrome concentrate ZAR/t 3 932 3 867 1.7 2 471 3 345
contract price CIF
China
Average exchange rate ZAR:US$ 17.6 17.0 3.5 15.4 15.8
Paphos, Cyprus
11 January 2023
JSE Sponsor
Investec Bank Limited
Connect with us on LinkedIn and Twitter to get further news and updates about our business.
Investor Relations Contacts:
Ilja Graulich (Head of Investor Relations and Communications)
+27 11 996 3500
+27 83 604 0820
igraulich@tharisa.com
Financial PR Contacts:
Bobby Morse / Oonagh Reidy
+44 207 466 5000
tharisa@buchanan.uk.com
Broker Contacts:
Peel Hunt LLP (UK Joint Broker)
Ross Allister / Georgia Langoulant
+44 207 7418 8900
BMO Capital Markets Limited (UK Joint Broker)
Thomas Rider / Nick Macann
+44 207 236 1010
Berenberg (UK Joint Broker)
Matthew Armitt / Jennifer Lee / Detlir Elezi
+44 203 207 7800
Nedbank Limited (acting through its Corporate and Investment Banking division) (RSA Broker)
Carlyle Whittaker
+27 11 294 0061
About Tharisa
Tharisa is an integrated resource group critical to the energy transition and decarbonisation of economies. It
incorporates exploration, mining, processing and the beneficiation, marketing, sales, and logistics of PGMs and
chrome concentrates, using innovation and technology as enablers. Its principal operating asset is the Tharisa
Mine, located in the south-western limb of the Bushveld Complex, South Africa. The mechanised mine has an
18 year pit life and can extend operations underground by at least 40 years. Tharisa also owns Karo Mining
Holdings a development stage, low-cost, open-pit PGM asset located on the Great Dyke in Zimbabwe. The
Company is committed to reducing its carbon emissions by 30% by 2030 and the development of a roadmap is
continuing to be net carbon neutral by 2050. Tharisa plc is listed on the Johannesburg Stock Exchange (JSE:
THA) and the Main Board of the London Stock Exchange (LSE: THS).